Application for Environmental Clearance
Total Page:16
File Type:pdf, Size:1020Kb
Environmental Clearance for Proposed “Engracia” at Pimple Gurav, Pune APPLICATION FOR ENVIRONMENTAL CLEARANCE For “ENGRACIA” At S.No.24 (P), Plot no. 2, CTS no. 625(P), Pimple Gurav, Dist.: Pune, Maharashtra Project Proponent M/s Jagtap Patil Promoters & Builders Submitted by- SGM Corporate Consultants Pvt. Ltd. QCI –NABET Accredited 1 Environmental Clearance for Proposed “Engracia” at Pimple Gurav, Pune APPENDIX – I FORM – 1 (I) Basic Information: Sr. No. Item Details 1. Name of the Project/s “Engracia” 2. S. No. in the Schedule 8 (a) 3. Proposed capacity/area/length/tonnage to Plot Area : 6300.99 m2 be handles/command area/lease FSI Area – 10075.99 m2 area/number of wells to be drilled Non FSI Area – 14601.41 m2 Total construction area: 24677.40 m2 4. New/Expansion/Modernization New 5. Existing Capacity/Area etc. NA 6. Category of Project i.e. ‘A’or ‘B’ Category ‘B’ 7. Does it attract the general condition? If Not Applicable yes, please specify 8. Does it attract the specific condition? If Not Applicable yes, please specify 9. Location Plot/Survey/Khasra No. S.No. 24(P), Plot no. 2, CTS no. 625 (P) Village Pimple Gurav Tehsil Haveli District Pune State Maharashtra 10. Nearest railway station/airport with Nearest Railway station: Pune – Dapodi distance in kms. railway station- 3.3 km Nearest Airport: Pune Airport- 14.3 km 11. Nearest Town, city, District Headquarters City : Pune –11.0 km along with distance in kms. District: Pune 12. Village Panchayat, Zilla Parishad, Pimpri Chinchwad Municipal Corporation Municipal Corporation, Local body (PCMC) (complete postal addresses with telephone nos. to be given) 13. Name of the applicant Mr.Shankar Pandurang Jagtap 14. Registered Address S.no. 24(P), Plot no. 2, CTS no. 625 (P), Pimple Gurav, Tal. Haveli, Dist. Pune. 15. Address for Correspondence S.no. 24(P), Plot no. 2, CTS no. 625 (P), Pimple Gurav, Tal. Haveli, Dist. Pune. Name Mr.Shankar Pandurang Jagtap Designation (Owner/Partner/CEO) Owner Address S.no. 24(P), Plot no. 2, CTS no. 625 (P), Pimple Gurav, Tal. Haveli, Dist. Pune. Pin Code 411061 Telephone no. -- Fax No. -- 16. Details of Alternative sites examined if any Not Applicable location of these sites should be shown on a toposheet 2 Environmental Clearance for Proposed “Engracia” at Pimple Gurav, Pune Sr. No. Item Details 17. Interlinked Projects Not Applicable 18. Whether separate application of interlinked Not Applicable project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. Not Applicable a. The Forest (Conservation) Act, 1980? b. The Wildlife (Protection) Act, 1972? c. The C.R.Z Notification, 1991? 22. Whether there is any Government Not Applicable order/Policy relevant/relating to the site? 23. Forest land involved (hectares) Not Applicable 24. Whether there is any litigation pending Not Applicable against the project and /or land in which the project is propose to be set up? Name of the court Case No. Orders/directions of the court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No confirmation rates, wherever possible) with source of information data 1.1 Permanent or temporary change Yes The developer has proposed construction is in in land use, land cover or conformity with the DC rule. topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing Yes Land: The plot is a having gentle slope. Land, vegetation and building? Vegetation: No Existing Trees. 1.3 Creation of new land uses? Yes Proposed construction is in conformity with the development permission from PCMC. 1.4 Pre-construction investigation Yes The pre-construction investigation is done. e.g. borehole, soil testing? 1.5 Construction works Yes The proposed construction project is consisting of construction of 3 no. of Residential Building. However developer has constructed (FSI + Non FSI) : 16634.1 m2 1.6 Demolition work Yes There is no any demolition of work. 3 Environmental Clearance for Proposed “Engracia” at Pimple Gurav, Pune Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No confirmation rates, wherever possible) with source of information data 1.7 Temporary sites used for Yes There will be temporary housing facility for the construction works or housing of construction workers and temporary sheds will be construction workers? used for storage of the construction goods or materials. 1.8 Above ground buildings, Yes The proposed construction project is consisting of structures or earthworks construction of 3 nos. of residential buildings. including linear structures, cut Sr.No. Building name No. of floors and fill or excavations 1 Bldg A 2P+11 2 Bldg B 2P+11 3 Bldg C 2P+11 4 Club house G+1 Earthwork will include excavation for creation of foundation. The approximate quantity of earthwork will be approx. 2140.5 cum 1.9 Underground works including No Not Applicable mining or tunneling? 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and manufacturing No Not Applicable processes? 1.14 Facilities for storage of goods or Yes Temporary sheds will be constructed for storage materials? of construction materials 1.15 Facilities for treatment or Yes Construction Phase: disposal of solid waste or liquid Temporary sanitation facility will be provided for effluents? construction workers by regular toilets with septic tank. Operation Phase: The site will have sewage treatment plant (STP) for treatment & treated water will be reuse. The organic waste to be treated by mechanical- composting on site and inorganic waste will be disposed to municipal solid waste management system. Please refer Annexure – II for Solid Waste Management Wastewater will be treated in Sewage Treatment Plant with MBBR technology Treated water will reused for flushing & gardening. Please refer Annexure III for Water Supply and Wastewater Management . 1.16 Facilities for long term housing of No Not Applicable operational workers? 4 Environmental Clearance for Proposed “Engracia” at Pimple Gurav, Pune Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No confirmation rates, wherever possible) with source of information data 1.17 New road, rail or sea traffic Yes Construction Phase during construction or There will be temporary increase in traffic due to operation? transport of construction material. Operation Phase There will be minor increase due to residents /visitors commuting to the commercial areas from outside. 1.18 New road, rail, air waterborne or Yes Internal roads will be constructed as a part of the other transport infrastructure project plan. including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not Applicable transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No Not Applicable lines or pipelines? 1.21 Impoundment, damming, No Not Applicable culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossing? No Not Applicable 1.23 Abstraction or transfers of water No Not Applicable from ground or surface waters? 1.24 Changes in water bodies or the No Not Applicable land surface affecting drainage or run-off? 1.25 Transport of personnel or Yes Construction Phase: materials for construction, Construction materials will be transported to the operation or decommissioning? site. Transport of workers employed for construction. Operation Phase: The persons in residential and commercial areas during operation phase will use public transportation facilities & their own vehicles. 1.26 Long-term dismantling or No Not Applicable decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes Construction phase: either temporarily or Temporary and minor influx of construction permanently? labour due to employment opportunities generated during construction phase. 5 Environmental Clearance for Proposed “Engracia” at Pimple Gurav, Pune Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No confirmation rates, wherever possible) with source of information data Operation Phase: This is a proposed construction project. There will be a permanent influx of the people. 1.29 Introduction of alien species? No Not Applicable 1.30 Loss of native species or genetic No Not Applicable diversity? 1.31 Any other actions? No Not Applicable 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non- renewable or in short supply): Sr. Information/checklist Yes/ Details thereof (with approximate quantities/ rates, No. confirmation No wherever possible) with source of information data 2.1 Land especially undeveloped Yes The developer has obtained NA permission. or agricultural land (ha) 2.2 Water (expected source & Yes Construction phase: competing users) unit: KLD Source: Tanker water Requirement: Total = 50 m 3/day Operation phase: Source: Tanker water for drinking and domestic use and recycled water from STP for flushing, gardening purpose. Total Water Requirement = 144 m3/day (Fresh Water: 95 m3/day and Recycled Water: 49 m3/day) Please refer Annexure III for Water Supply and Wastewater Management . 2.3 Minerals (MT) Yes The proposal pertains to the construction activity only. Raw materials like cement, sand segregate, gypsum will be used during construction. 2.4 Construction material – Yes Raw material requirement for construction: stone, aggregates, sand / soil Raw Material Requirement (expected source – MT) Material Unit Quantity Cement Ton 18936.00 Steel Ton 3369.00 Metal Cu.