Views of the North Shore Mountains from Cambie Street Bridge

Total Page:16

File Type:pdf, Size:1020Kb

Views of the North Shore Mountains from Cambie Street Bridge View Point: Cambie Bridge 1/3 point View Point: Cambie Street at 12th (just north of merge point at the 6th View Cone E1 Ave View Cone 9.2.2 Ave on-ramp) .47m .98m 43 17 .48m .02m .68m .98m .08m .52m 1933.9m (Distance to Nearest Point) 64 78 700m (Distance to Ref Point) 85 106 110 126 895.3m (Distance to Nearest Point) 2042.55m (Distance to Furthest Point) 1006.13m (Distance to Furthest Point) 2553.91m (Distance to Ref Point) Context View Cone Analysis E1 View Cone 9.2.2 From Cambie Bridge to Crown / Grouse From Cambie Street to North Shore Mountains Applicable Viewcones 720 Beatty Street View Point: View platform at foot View Point: Cambie Street b/w 10th and 11th of Alder Crossing north of Lamey's View Cone A Ave View Cone 9.1 Mill Road .9m .63m 12 34 .85m .32m .88m .06m .68m View Point: Cambie Bridge 1/3 point View Point: Cambie Street at 12th .78m 1770.88m (Distance to Ref Point) 2382.98m (Distance to Ref Point) (just north of merge point at the 6th View Cone E1 Ave 102 111 116 107 126 107 View Cone 9.2.2 Ave on-ramp) 1836.92m (Distance to Nearest Point) 1766.03m (Distance to Nearest Point) 1940.81m (Distance to Furthest Point) 1874.86m (Distance to Furthest Point) .47m .98m 43 17 .48m .02m .68m .98m .08m .52m 1933.9m (Distance to Nearest Point) 64 78 700m (Distance to Ref Point) 85 106 110 126 895.3m (Distance to Nearest Point) View Cone A 2042.55m (Distance to Furthest Point) View Cone 9.1 1006.13m (Distance to Furthest Point) From Alder Terrace to2553 Mount.91m (Distance Seymour to Ref Point) From Cambie Street to North Shore Mountains View Cone E1 View Cone 9.2.2 From Cambie Bridge to Crown / Grouse View ConeFrom A Cambie Street to North Shore Mountains View Cone A From Alder Terrace to Mount Seymour From Alder Terrace to Mount Seymour 720 Beatty Street View Point: View platform at foot View Point: Cambie Street b/w 10th and 11th of Alder Crossing north of Lamey's View Cone A Ave View Cone 9.1 Mill Road .9m .63m 12 34 .85m .32m .88m .06m .68m 1770.88m (Distance to Ref Point) .78m 2382.98m (Distance to Ref Point) 102 111 116 107 126 107 1836.92m (Distance to Nearest Point) 1766.03m (Distance to Nearest Point) 1940.81m (Distance to Furthest Point) 1874.86m (Distance to Furthest Point) View Cone A View Cone 9.1 From Alder Terrace to Mount Seymour From Cambie Street to North Shore Mountains View Cone 9.1 View Cone 9.1 From Cambie Street to North Shore Mountains From Cambie Street to North Shore Mountains 720 Beatty Street View Point: Cambie Bridge 1/3 point View Point: Cambie Street at 12th (just north of merge point at the 6th View Cone E1 Ave View Cone 9.2.2 Ave on-ramp) .47m .98m 43 17 .48m .02m .68m .98m .08m .52m 1933.9m (Distance to Nearest Point) 64 78 700m (Distance to Ref Point) 85 106 110 126 895.3m (Distance to Nearest Point) 2042.55m (Distance to Furthest Point) 1006.13m (Distance to Furthest Point) 2553.91m (Distance to Ref Point) View Cone E1 View Cone 9.2.2 From Cambie Bridge to Crown / Grouse From Cambie Street to North Shore Mountains View Cone 9.2.2 View Cone 9.2.2 From Cambie Street to North Shore Mountains From Cambie Street to North Shore Mountains 720 Beatty Street View Point: View platform at foot View Point: Cambie Street b/w 10th and 11th of Alder Crossing north of Lamey's View Cone A Ave View Cone 9.1 Mill Road .9m .63m 12 34 View Point: Cambie Bridge 1/3 point View Point: Cambie Street at 12th .85m .32m .88m .06m .68m .78m View Cone E1 1770.88m (Distance to Ref Point) (just north of merge point at the 23826th .98m (Distance to Ref Point) View coneAve E1 View Cone 9.2.2 102 111 Ave on-ramp) 116 107 126 107 1836.92m (Distance to Nearest Point) 1766.03m (Distance to Nearest Point) 1940.81m (Distance to Furthest Point) 1874.86m (Distance to Furthest Point) .47m .98m 43 17 .48m .02m .68m .08m .98m .52m 1933.9m (Distance to Nearest Point) 78 64 700m (Distance to Ref Point) 85 106 110 126 View Cone A View895.3m Cone (Distance to 9.1Nearest Point) 2042.55m (Distance to Furthest Point) 1006.13m (Distance to Furthest Point) 2553.91m (Distance to Ref Point) From Alder Terrace to Mount Seymour From Cambie Street to North Shore Mountains View Cone E1 View Cone 9.2.2 From Cambie Bridge to Crown / Grouse From Cambie Street to North Shore Mountains View Cone E1 View Cone E1 From Cambie Bridge to Crown / Grouse From Cambie Bridge to Crown / Grouse 28 Beatty Street / Expo Boulevard View Point: View platform at foot View Point: Cambie Street b/w 10th and 11th of Alder Crossing north of Lamey's View Cone A Ave View Cone 9.1 Mill Road .9m .63m 12 34 .85m .32m .88m .06m .68m 1770.88m (Distance to Ref Point) .78m 2382.98m (Distance to Ref Point) 102 111 116 107 126 107 1836.92m (Distance to Nearest Point) 1766.03m (Distance to Nearest Point) 1940.81m (Distance to Furthest Point) 1874.86m (Distance to Furthest Point) View Cone A View Cone 9.1 From Alder Terrace to Mount Seymour From Cambie Street to North Shore Mountains 720 Beatty Street Four View Cones intersect the site at 720 Beatty Street, View Cone 9.1, 9.2, A and E1. The most restrictive of the four is View Cone E1, which is a view of the North Shore mountains from the Cambie Street Bridge. View cone A View cone E1 720 Beatty Street View cone 9.1 250M View cone 9.2 0 1,000 FT Beatty Street / Expo Boulevard 29 Context Analysis Viewcone E1 Allowable height under View Cone E1 (Cambie Bridge to Crown/Grouse) 83.39 m / 273.60 ft Geodetic Site Distance to Elevation Elevation at Allowable Allowable +18.11 Point C Point on View Point View Cone Public Plaza Building Building 73.20 m / 240.16 ft Site (m) E1 (m) (m) Height (m) Height (ft) +15.56 SITE 88.36 m / 289.91 ft Point A 895.30 90.32 15.65 74.67 244.99 Point B 74.67 m / 244.99 ft 87.39 m / 286.71 ft Point B 922.79 88.76 15.56 73.20 240.16 +16.32 Point D Point C 1006.13 101.5 18.11 83.39 273.60 Point A +15.65 Point E +15.65 Point D 965.11 104.68 16.32 88.36 289.91 Point E 948.44 103.04 15.65 87.39 286.71 View Point Elevation: 17.98 m Reference Point Elevation: 64.98m Distance from Reference Point to View Point: 700m Project Elevation to View Cone E1 Reference Point Elevation: 64.89m at Nearest Point: 101.5m (View Cone) Project Elevation to View Cone E1 at Nearest Point: 90.32m View Cone - E1 700m - Distance to Reference Point 898.14m - Distance to Nearest Point 1009m - Distance to Furthest Point 7 00m Distance 895 to Reference .3m Distance Point 1006 to .13m Nearest Distance Point to Furthest Point View Cone E1 View Point: Cambie Bridge 1/3 point (just north of the merge point at the 6th Ave on-ramp) View Point Elevation: 17.98m Reference Point: BC Place Facade Reference Point Elevation: 64.98m Distance from View Point to Reference Point: 700.00m Project Site Distance from View Point & Elevation at Property Line: • Point A: Nearest Corner: Distance= 895.3m, Geo Elevation= 90.32m, Site Elevation= 15.65m, Building Height= 74.67m • Point C: Furthest Corner: Distance= 1,006.13m, Geo Elevation= 101.5m, Site Elevation= 18.11m, Building Height= 83.39m 30 Beatty Street / Expo Boulevard W Georgia Street " ] 7 m 369' - [112. 211 -5 338' 603 " [103. m ] SubArea A 5" Robson Street 68'- 136'-2" m] -2" [20.843 [41.509 m 87' m] ] Beatty Street 571 150' [26. [45. - 805 3 " " -4 ] m m 146' ] 602 [44. Point B Point C Point A Point D Point E Beatty Street / Expo Boulevard View cone E1 is on the site is defined by a series of points 31 Concept Skyline Shangri-La Scotia Tower Harbour Centre BC Place Woodward’s Rogers Arena Smithe St Georgia St Dunsmuir St South-North Skyline Aerial view looking West to CBD 42 Beatty Street / Expo Boulevard Scotia Tower Vancouver BC Place Public Library Cambie St Hamilton St Homer St Richards St Seymour St Beatty St Pacific Blvd Pacific Expo Blvd East-West Skyline Aerial view looking East to NEFC Beatty Street / Expo Boulevard 43 Concept Skyline 44 Beatty Street / Expo Boulevard Beatty Street / Expo Boulevard 45 Concept Viewcone Analysis 720 Beatty Street intersects with View Cone E1 which protects the views of the North Shore mountains from Cambie Street Bridge. This view cone is already interrupted by the spires of BC Place and Vancouver Lookout, creating a rather unique situation. The spires of BC place create a view shadow that extends across the project site. The view shadow varies as a result of the distance from the view point of View Cone E1 to the individual spires of BC Place. The furthest spire from the view point creates a line that defines the lowest point of the view shadow.
Recommended publications
  • Craig Henschel
    Escarpment Viaducts Georgia Street Viaduct Dunsmuir Street Viaduct Skytrain Underpass Viaduct Ramps Disregarded & Disrespected: Highways to Nowhere: Horizontal & Vertical Separation: Cement Pond and Astroturf: What's It All About? Without anyone to speak up for it, this Ususally, highways link one city to Downtown sits on an escarpment 13 metres above the What happened to nature? Are we really going Psychological barrier? Yes. underutilized land has been treated horribly. another. These raised highways link False Creek level. The two viaducts extend this vertical surround the remaining edges of False Creek with Physical barrier? Yes. From sub-surface toxins to highways which man-made hills to the escarpment they separation one kilometre each. One way streets and a concrete paths, riprap and plastic grass? Does False Waste of land? Yes. seem uncomfortable being there, North East go up a kilometre away. How wierd is highway morphology further separate NEFC from the Creek need the makings of an open sewer or a Waste of airspace? Yes. False Creek needs a life-saving intervention. that? rest of the city. healthy and supportive ecosystem? Just ugly? Yes. Question: OMG, if they take the viaducts away, how will I get downtown? Answer: Drive, take transit, cycle or walk. But just like everywhere else, the roads will be on the ground. Pavement or Paradise? Untying the Gordian Knot of the Highway that Wasn't One of the great foundational stories of Vancouver was the public rejection of the highway which would have cut through the entire city. Separation Anxiety: But even after this rejection, the Georgia and Dunsmuir Street viaducts were built anyway.
    [Show full text]
  • 1035 Seymour Street Vancouver, BC
    FOR LEASE 1035 Seymour Street Vancouver, BC Prime Retail Premises SHERMAN SCOTT BLAKE DAVIes COLLIERS INTERNATIONAL 604 662 2663 604 694 7239 200 Granville Street, 19th Floor [email protected] [email protected] Vancouver, BC V6C 2R6 604 681 4111 www.collierscanada.com 1A S t a n l e y P a r k S D t r a n le S y t a Beaver P n a l Lake r e k y D P r a P r i k p C e l a i u n s e e Stanley w R a d Park y Avison W ay 1A 99 ark Dr y P nle r ta n D S S goo ta La nl ey N P ar k Dr Lost Lagoon Devonian Coal Harbour Harbour Park W. Georgia St Alberni St Lagoon Dr Park Ln Haro St Beach Ave Chilco St Harbour Pendrell St Green Park W. Commissioner St Gilford St Comox St Bidwell St Pender St Denman St Pendrell St W. Georgia St Canada Pl Alberni St Canada Place Nicola St Melville St Bidwell St For Lease > 1035 Seymour Street, Vancouver,Cardero St BC English Bay Broughton St 99 Waterfront Beach Ave Beach Jervis St Hastings St E. Commissioner Cordova St Nelson St Barclay St Bute St Burrard Pender St 1A Bidwell St Haro St Dunsmuir St Pendrell St Thurlow St Water St Cardero St Comox St W. Georgia St Powell St Columbia St Nicola St St Abbott LOCATION Burrard St Seymour St Granville St Carrall Robson St Davie St Broughton St Located on Seymour Street between Smithe and Nelson, the subject propertyBurnaby St is just blocks from Vancouver’s Entertainment District, Central Business District City Centre Homer St Howe St Pender St Harwood St and historic Yaletown.
    [Show full text]
  • Fall 2011 Baseline Truck Traffic in Metro Vancouver
    Fall 2011 Baseline Truck Traffic in Metro Vancouver Watercrossings, Border Crossings and Top 10 Truck Volume Locations (Weekday, 6AM-10PM) Transportation Committee Map of the Month March 12, 2014 Legend Screenline Volumes Total Vehicles Counted (fall weekday in 2011) Light and Heavy Commercial Trucks Lions Gate Bridge Passenger Vehicles, Motorcycles, 61,000 Vehicles Second Narrows Bridge Transit Vehicles, Bicycles 1% Trucks 120,000 Vehicles Daily Average from Auto Counts (no truck data) 5% Trucks Regional Land Use Designations Burrard Bridge Industrial and Mixed Employment 53,000 Vehicles Cambie Bridge General Urban 2% Trucks 46,000 Vehicles Agricultural, Conservation & Recreation, Rural 2% Trucks Highway 1 - West of Granville Bridge North Road Brunette Ave. - Pitt River Bridge 51,000 Vehicles 103,000 Vehicles South of Highway 1 70,000 Vehicles 1% Trucks 8% Trucks 53,000 Vehicles 6% Trucks 13% Trucks Port Mann Bridge Arthur Laing Bridge 96,000 Vehicles Knight St Bridge 72,000 Vehicles, 2% Trucks 7% Trucks 89,000 Vehicles Golden Ears Bridge Airport Connector Bridge- 19,000 Vehicles, 5% Trucks 8% Trucks Pattullo Bridge 27,000 Vehicles 8% Trucks Moray Bridge- 17,000 Vehicles, 5% Trucks 63,000 Vehicles Oak St Bridge 7% Trucks Dinsmore Bridge- 21,000 Vehicles, 2% Trucks 78,000 Vehicles Queensborough Bridge 3% Trucks 79,000 Vehicles No. 2 Road Bridge- 30,000 Vehicles, 1% Trucks Highway 1 - West of Highway 91 - West of 9% Trucks 176th Street No. 8 Road Alex Fraser Bridge 70,000 Vehicles 82,000 Vehicles 102,000 Vehicles 12% Trucks 10% Trucks 8% Trucks George Massey Tunnel 77,000 Vehicles 7% Trucks Highway 1 - East of 264th Street 59,000 Vehicles 12% Trucks Point Roberts Border Crossing Highway 13 Border Crossing 5,500 Daily Average Highway 99 Border Crossing Highway 15 Border Crossing 4,400 Daily Average No truck data 13,000 Vehicles 13,000 Vehicles No truck data 1% Trucks 14% Trucks A Note About the Border Crossings Highway 99 Border Crossing prohibits all commercial vehicles, but a small number of commercial trucks were observed on the survey day.
    [Show full text]
  • Importantadvisory
    IMPORTANT ADVISORY Sun Run road closures in effect SUNDAY, APRIL 19 The Vancouver Sun Run takes place on Sunday, April 19 at 9:00 a.m. The 10K course starts at Georgia and Burrard and will be lined with water stations and live musical performers. For the safety of the 50,000 participants, various road closures will be in effect between 5:00 a.m. and 1:30 p.m. These closures may restrict parking and access to and from your building. We apologize for any inconvenience and invite you to join us for a fun-filled morning. On behalf of Sun Run participants and volunteers, thank you for your cooperation and support. The following streets will be closed during the specified times on Sunday, April 19. DOWNTOWN AREA – GEORGIA ST · Seymour to Bute (start area): 5 a.m. – 11 a.m. mi. · Bute to the Causeway (including all streets crossing Georgia): k 8 a.m. – 11 a.m. · Lions Gate Bridge (access from Pender St only): SUN RUN 8 a.m. – 11 a.m. START LINE START · Howe to Burrard from Dunsmuir to Robson: STAGING AREA 5 a.m. – 11 a.m. · Denman St – Georgia to Robson: 8 a.m. – 11 a.m. WALKER’S · Robson St – west of Denman St to Stanley Park: PIT STOP 8 a.m. – 11 a.m. STANLEY PARK FINISH LINE · Beach Avenue (Stanley Park to Hornby St): 8:30 a.m. – 11:30 a.m. · Stanley Park Dr at North Lagoon Dr: 6 a.m. – 11 a.m. · Ryan Rd at Park Lane/South Lagoon Dr: 6 a.m.
    [Show full text]
  • Land for LEASE
    Partnership. Performance. Image Source: Google River Road 1611 Patrick Street 0.912 acres (39,727 SF) Patrick Street Savage Road 1600 Savage Road 1.305 acres (56,846 SF) LAND FOR LEASE Opportunity 1600 SAVAGE ROAD & To lease two properties totalling 1611 PatrICK STREET approximately 2.22 acres of fenced RICHMonD, BC yard area in North Richmond Ryan Kerr*, Principal Angus Thiele, Associate 604.647.5094 604.646.8386 [email protected] [email protected] *Ryan Kerr Personal Real Estate Corporation 1600 SAVAGE ROAD & 1611 PatrICK StrEET RICHMonD, BC Location Property Details The subject properties provide the opportunity to lease up to 2.22 acres of fenced and secured yard space conveniently located off of River Road between Available Land Area Savage Road and Patrick Street, east of No. 6 Road, in north Richmond, BC. This site boasts a central location, with convenient access to Vancouver and the rest 1600 Savage Road 1.305 acres (56,846 SF) of the Lower Mainland via major arterials such as Knight Street, SW Marine Drive, 1611 Patrick Street 0.912 acres (39,727 SF) Highway 91, and Highway 99. Total 2.22 acres (96,573 SF)* Zoning *Approximately I-L (Light Impact Industrial Zone) is intended to accommodate and regulate Lease Rate the development of light impact industry, transportation industry, warehouses, $2.25 PSF Net distribution centres and limited office and service uses. Access Each property has one (1) point of access & Property Features egress • 1600 Savage Road is fenced and paved Available Immediately • 1611 Patrick Street is fenced and compacted gravel • Rare opportunity to lease yard of this size in Richmond Ryan Kerr*, Principal 604.647.5094 DriveD riveTime MapTimes Map [email protected] To Snug Cove To Langdale *Ryan Kerr Personal Real Estate Corporation Cypress Provincial Park ture Bay) par Horseshoe o (De Bay aim Nan To Whytecli HORSESHOE BAY Park Ferry Terminal Whytecli Lynn Headwaters MARINE DR.
    [Show full text]
  • Granville Bridge Connector and Drake Street Improvements
    Granville Bridge Connector and Drake Street Improvements Council Presentation | September 16, 2020 Burrard Bridge Cambie Granville Bridge Bridge Improving the False Creek Bridges Identified as a Council priority after significant public engagement: False Creek Pedestrian & Cycling Crossing Study (2001) Transportation 2040 Plan (2012) Granville Bridge improvements included in the 2019-2022 Capital Plan Burrard Bridge Cambie Granville Bridge Bridge Climate Emergency Response Advances Transportation 2040 mode share target by ten years: Two-thirds of trips in the city by active transportation & transit by 2040 2030 Granville Bridge Connector is key to achieving this target. Many people live and work DRAKE STREET near Granville Bridge UPGRADES Within a 5-minute walk: about 18,000 residents & 17,000 jobs Within a 5-minute bike ride: about 90,000 residents & 125,000 jobs Many people live and work DRAKE STREET near Granville Bridge UPGRADES Approximately 12,000 vehicle trips across the bridge each day are less than 5km long Fewer people walking & biking on Granville DRAKE Bridge reflect significant comfort & STREET accessibility challenges UPGRADES Daily Walking Volumes Daily Cycling Volumes (July, mid-week) (July, mid-week) 5,000 8,000 4,000 6,000 3,000 4,000 2,000 2,000 1,000 0 0 Burrard Cambie Granville Burrard Cambie Granville Bridge Bridge Bridge Bridge Bridge Bridge Fewer than 50% walk across Granville Fewer than 5% cycle across Granville Bridge, compared to Cambie Bridge Bridge, compared to Burrard Bridge Source: 2018 City of Vancouver
    [Show full text]
  • 236 West Broadway CARRA 222 -236 West Broadwaygore DUNLEVY BUR DA L HORNB GI COLUMBIA VIE ROBSON a CORDOVA
    W. GE ON DR. ALBERNIOR LAGO GIA ANE ARK L CO HAR P Burrard Inlet CHIL O L WEL W. COMMISSION GILFORD ER BID O COMO P DENMAN ENDER X CARDER A W. CANAD A GE A PL E ON CANADAC NICOL ALBERNIOR AC PL GIA E MEL VIL BROUGHT VIS LE HAS English Bay English HAR JER E. COMMISSIONER BEA TING CORDO L BARC O P FOR SALE > INVESTMENT/DEVELOPMENT OPPORTUNITY CH FORBUTE SALE > INVESTMENT/DEVELENDER S OPMENT OPPORTUNITY WEL VA ST LA AY BID O NELSON Y OW DUNSMUIR RAILW COMO ALEXANDER CARDER A THURL WATER P MAIN ENDREL X W. Y GE POWELL NICOL ON RARD OR ABBO 222 - 236 West Broadway CARRA 222 -236 West BroadwayGORE DUNLEVY BUR DA L HORNB GI COLUMBIA VIE ROBSON A CORDOVA BROUGHTBURNAB TT AV LE LL HARW SEYMOUR HASTINGS vancOUVER, BC Y vancOUVER, WEBC E JAC AV HEA OO SMITHEHO HOMER K Sunset Beach GRANVIL E D ST S PENDER SON . H TLEY OWPA BUTE UL’S NELSON KEEFER AV QUEBE RICHARD DUNSMUIR VIAD AV N E THURL CAMBIE HELMCKEN TO E RARD EXPO BL C Nearby Amenities BEA Y HAMIL BUR VD CH Y GM . UNION PA DA TT CIFIC HORNB VIE VD Place BL LE BEA GEORGIA VIADUCT Downtown Vancouver DRAKE N PRIOR ST TO ST 1. Granville Island GRANVIL A S AND EXPO BC Place Stadium TION SEYMOUR HAMIL MALKIN Vanier VD 2. False Creek SeawallAVE Park RARD BRIDGE MAINL RICHARD BUR CIFIC BL NATIONAL HOMER PA 3. Canadian Tire Science NATIONAL VD World 4. Save-On-Foods CAMBIE BRIDGE PACIFIC BL QUEBE TERMINAL LE BRIDGE 5.
    [Show full text]
  • Vancouver, B. C
    Vancouver, Canda Lively and Diverse by Nathan Brightbill, Elizabeth Powers Nature Vancouver’s Downtown Central Area (left) includes extensive waterfront greenways and parks at False Creek North and South as well as Coal Harbor and Stan- ley Park in background. Stanley Park is the fi rst park created in Vancouver. Its close downtown proximity and multitude of activi- ties make it a beloved place to visit. (photo: www.seevancou- verbc.com) Dr. Sun Yat Sen Garden (below) is an urban oasis in Vancouver’s Chinatown. It is a classical Chi- nese garden run by the Dr. Sun Yat Sen Garden Society of Van- couver. (Photo: Nathan Brightbill). Vancouver is a city of an estimated 560,000 with a robust parks system particularly noted for its large urban open spaces, like Stanley Park, and its attention to greenways and other pedestrian amenities. The total land area is 106.7 square kilometers, exclud- ing Stanley Park which covers 3.9 square kilometers. Other parks, golf courses and open space total 11.9 square kilometers. The city’s Parks Board is unique in Canada because it is an autonomous and separately elected committee, rather than appointed by council. The board was formed during the creation of Stanley Park in 1886 (see Stanley Park: Vancouver’s First Park). Vancouver contains over 200 parks. The Parks Board mission is to “Provide, preserve and advocate for parks and recreation services to benefi t people, communities and the environment.” Parks principals are based on integrity, responsiveness, learning, leadership , inclusiveness, and accountability. Some say Vancouver is a “setting in search of a city.” The parks strategy plays a signifi cant role in maintaining integration between the city and its environment.
    [Show full text]
  • 260-3480 GILMORE WAY Burnaby, BC
    FOR SUBLEASE www.avisonyoung.com #260-3480 GILMORE WAY Burnaby, BC Opportunity to sublease well improved office space in a building with excellent amenities. Nicolas Bilodeau, Senior Vice President 604.647.1336 [email protected] #260-3480 Gilmore Way 1 2 Burnaby, BC PROPERTY DETAILS Building Class A Location Available Area Located in the heart of Burnaby, 3480 Gilmore Way features a 6,117 sf high-quality work environment with excellent amenities for staff including bicycle storage, showers and jogging trails. Expiry 3 4 March 31, 2021 Suite Highlights Available ; Nicely improved with ; Boardroom On Notice recent renovations ; Reception Area Lease Rate ; Mix of open plan and closed offices ; 7 Meeting rooms / Offices Contact listing brokers ; Kitchen & Staff Lounge ; Furniture can be made available Op Costs/Taxes $17.40 (2020) Building Features/Amenities 5 6 Zoning • Large, ground floor common meeting room (1,600 sf) available CD M8a DPK allows for business or to tenants (in landlord’s neighbouring building) professional offices as well as technological • Barrier-free access throughout the building research and manufacturing • Secure bike storage, shower and changing facilities Parking • Adjacent to the Gilmore Way Urban Trail with 2.5 /1,000 sf at $80 per month streams, walking and biking trails Floor Plan 6 5 2 6 3 1 4 To Snug Cove To Langdale Cypress Provincial Park Horseshoe Bay To Nanaimo (Departure Bay) Whytecli HORSESHOE BAY Park Ferry Terminal Whytecli Lynn Headwaters MARINE DR. Regional Park Grouse Woods Whyte Y C.N. RAIL (Tunnel) WEST A Islet B R O Glenmore L E H T C B A VANCOUVER Nelson Canyon DISTRICT OF Gleneagles Park Eagle Y A Harbour B N Cypress E NORTH VANCOUVER S Park CYPRESS BOWL ROAD R NANCY GREENEWAY L A Estates Upper MARINE DRIVE Lynn Cypress Capilano MONTROYAL BLVD.
    [Show full text]
  • Bridgehead Guidelines
    $1 City of Vancouver Land Use and Development Policies and Guidelines Community Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 873.7344 fax 873.7060 [email protected] BRIDGEHEAD GUIDELINES [FORMALLY ADOPTED AS “GUIDELINES FOR SITING AND MASSING BUILDINGS ADJACENT TO DOWNTOWN VANCOUVER BRIDGEHEADS”] Adopted by City Council December 9, 1997 CONTENTS Page 1 Application and Intent ........................................................ 1 4 Guidelines Pertaining to the Regulations of the Zoning and Development By-law, the False Creek Official and Area Development Plans, the False Creek North Official Development Plan and Applicable CD-1 By-laws .................................................. 1 4.1 North Burrard Bridgehead — West Side ............................................ 1 4.2 North Burrard Bridgehead — East Side ............................................ 2 4.3 South Burrard Bridgehead — East and West Sides .................................... 2 4.4 North Granville Bridgehead — West Side ........................................... 3 4.5 North Granville Bridgehead — East Side ........................................... 3 4.6 South Cambie Bridgehead — East Side ............................................ 4 4.7 Georgia Viaducts East ......................................................... 7 1 Application and Intent These guidelines are to be used in conjunction with the RT-2, RM-5A, C-3A, FC-1, HA-1A, M-1, M-2 and I-2 District Schedules and the False Creek Official and Area Development Plans, the False Creek North
    [Show full text]
  • Bridging the Infrastructure Gap
    Bridging the Infrastructure Gap A Comparison of Bridge Infrastructure Crossing the Fraser River to Bridge Infrastructure in Four Major Western Canadian Cities By Get Moving BC September 2008 Table of Contents Table of Contents page 2 Executive Summary Page 3 Introduction page 7 Bridges in Western Canadian Cities: An Overview page 9 New Bridge Infrastructure is Being Added page 12 Bridge Traffic Volumes page 15 Traffic Congestion: An Overview page 19 The Cost of Traffic Congestion page 24 Conclusion and Recommendations page 26 Appendix A: Notes on the population and bridges of Edmonton page 30 Appendix B: Notes on the population and bridges of Calgary page 32 Appendix C: Notes on the population and bridges of Winnipeg page 35 Appendix D: Notes on the population and bridges of Saskatoon page 38 Appendix E: Notes on the population and bridges of Portland page 40 Appendix F: Notes on the population and bridges of the Lower Mainland page 44 2 – Bridging the Infrastructure Gap Executive Summary – Bridging the Infrastructure Gap By Get Moving BC – September 2008 Last October, Get Moving BC released a revealing study comparing bridges in the Portland area to bridges in the Lower Mainland. Despite having a significantly smaller metropolitan population than the Vancouver area, the Portland area was found to have significantly more bridges (60% more) and significantly more bridge lanes (75% more) crossing the Willamette River than the Vancouver area has crossing the Fraser River. Now, with our current study, “Bridging the Infrastructure Gap,” we have examined bridge infrastructure in four major western Canadian cities (Calgary, Edmonton, Winnipeg and Saskatoon) to see how well served these cities are compared to the Vancouver area.
    [Show full text]
  • Overview Context
    December 6, 2017 City of Vancouver Transportation Engineering and Planning By email: [email protected] Re: Proposed Cambie Bridge Improvements Dear Sir/Madam; HUB Cycling is a charitable organization that works to make cycling better through education, events and collaboration. We are Metro Vancouver’s leader in making cycling an attractive choice for everyone. We are writing with comments on the proposed Cambie Bridge Improvements. Overview HUB Cycling representatives attended the Open House event that City staff held on November 30, 2017 regarding the Cambie Bridge Improvements project, and reviewed the display boards.1 We regularly hear from HUB members and the general public about the congested conditions on the Cambie Bridge multiuse path (MUP) and fully support the creation of a dedicated and protected southbound bike lane to relieve pressure on the MUP. We do have suggestions as this project moves forward. Context HUB Cycling has created a Gap Priority List for routes within the City of Vancouver, and throughout Metro Vancouver. We itemize gaps in the existing cycling network, and evaluate them in terms of how much improvements to these routes would impact our goal of getting more people riding, more often. The Cambie Bridge is currently ranked high on our gap list due to the directness of the connection it offers to downtown, and because of its relatively low elevation change compared to other bridges. The Cambie Bridge also has the potential to provide a significant connection to the south shore of False Creek from the West End, with improvements to the Nelson and Smithe bike routes to extend them further west.
    [Show full text]