PROJECT SUMMARY

INTRODUCTION

Bakhrija Stone Mine is situated near Village Bakhrija, Tehsil , District ,, in an area of 40.62 hectare. The proposed rate of production is 77.56 lakh MT/ annum Stone along with associated minerals. The expected life of mine is 12 years.

The Letter of Intent (LoI) was granted by the accepted the highest bid offered by the applicant M/s Everrise Advisory Services Pvt. Ltd., in the auction held on 11.08.2015 & 12.08.2015 and accordingly Department of Mines & Geology, Govt. of Haryana, vide Memo No DMG/HY/ML/Bakhrija-3/2015/7849 dated 02.09.2015, for the period of 12 years over an area of 40.62 Ha.

Salient Features of the Project

Environmental setting Mining of Stone along with Associated Minor Project Name Minerals at Bakhrija Plot – 3 by M/s Everrise Advisory Services Pvt Ltd Village- Bakhrija, Plot No.-3, Tehsil-Narnaul, Location of mine District- Mahendergarh, State-Haryana Latitude 27°55'01.32''to 27°54'59.37''North

Longitude 76°03'28.34''to 76°03'27.56''East Toposheet number 54 A/01 Land use 40.62 ha Minerals of mine Stone along with associated minerals Total geological reserves 99008799 MT Total mineable reserves 90666004 MT Life of mine 12 years Proposed production of mine 77.56 lakh MT/ annum Method of mining Other than fully mechanized (OTFM) No of working days 300 days Water demand 40 KLD Sources of water Nearby villages Man power 130 Nizampur on - Phulera station 6.5 km NW Nearest Railway Station

Nearest State Highway/National NH-8 is 21 km away in SE direction (Aerial dist) Highway Nearest Airport Jaipur airport is 110 km away in South direction (Aerial dist) Seismic Zone Zone II

Proposed Planning

Mining method - Other than fully mechanized (OTFM) Production - Stone along with associated minerals, 77.56 lakh MT / annum

Conclusion

The Stone along with associated minor minerals as mined will be used as masonry stone, whereas the mineral rejects of about 1 to 2 % will be used for making haul road, hence there will be no need of its separate stacking.