Bakhrija Stone Mine Is Situated Near Village Bakhrija, Tehsil Narnaul, District Mahendragarh,,Haryana in an Area of 40.62 Hectare

Bakhrija Stone Mine Is Situated Near Village Bakhrija, Tehsil Narnaul, District Mahendragarh,,Haryana in an Area of 40.62 Hectare

PROJECT SUMMARY INTRODUCTION Bakhrija Stone Mine is situated near Village Bakhrija, Tehsil Narnaul, District Mahendragarh,,Haryana in an area of 40.62 hectare. The proposed rate of production is 77.56 lakh MT/ annum Stone along with associated minerals. The expected life of mine is 12 years. The Letter of Intent (LoI) was granted by the Government of Haryana accepted the highest bid offered by the applicant M/s Everrise Advisory Services Pvt. Ltd., in the auction held on 11.08.2015 & 12.08.2015 and accordingly Department of Mines & Geology, Govt. of Haryana, vide Memo No DMG/HY/ML/Bakhrija-3/2015/7849 dated 02.09.2015, for the period of 12 years over an area of 40.62 Ha. Salient Features of the Project Environmental setting Mining of Stone along with Associated Minor Project Name Minerals at Bakhrija Plot – 3 by M/s Everrise Advisory Services Pvt Ltd Village- Bakhrija, Plot No.-3, Tehsil-Narnaul, Location of mine District- Mahendergarh, State-Haryana Latitude 27°55'01.32''to 27°54'59.37''North Longitude 76°03'28.34''to 76°03'27.56''East Toposheet number 54 A/01 Land use 40.62 ha Minerals of mine Stone along with associated minerals Total geological reserves 99008799 MT Total mineable reserves 90666004 MT Life of mine 12 years Proposed production of mine 77.56 lakh MT/ annum Method of mining Other than fully mechanized (OTFM) No of working days 300 days Water demand 40 KLD Sources of water Nearby villages Man power 130 Nizampur on Rewari- Phulera station 6.5 km NW Nearest Railway Station Nearest State Highway/National NH-8 is 21 km away in SE direction (Aerial dist) Highway Nearest Airport Jaipur airport is 110 km away in South direction (Aerial dist) Seismic Zone Zone II Proposed Planning Mining method - Other than fully mechanized (OTFM) Production - Stone along with associated minerals, 77.56 lakh MT / annum Conclusion The Stone along with associated minor minerals as mined will be used as masonry stone, whereas the mineral rejects of about 1 to 2 % will be used for making haul road, hence there will be no need of its separate stacking. .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us