Environmental studies, environmental planning, project & monitoring

Customer: ANAS International - Roma Title: Environmental protection assistance for the East - West motorway construction (Lot East 400 km) – Algeria. Year: 2009

Customer: ADR - Roma Title: Landscaping of green areas in Fiumicino Airport - . Year: 2009

Customer: ANAS International - Roma Title: Environmental Impact Study for the realisation of Al Faw port - Iraq. Year: 2009

Customer: Privato

Title: Environmental Impact Study for a photovoltaic plant in the town of Cantalupo in Sabina (Ri). Year: 2009

Customer: Consorzio di Bonifica dell’Oristanese - Oristano

Title: Re-naturalisation of River Tirso downstream Cantoniera Dam – Oristano. Year: 2009

Customer: Seacon - Roma

Title: Environmental Impact Study for the realisation of an Highway Service Area at Ponte Stura – Alessandria. Year: 2008

Customer: Ing. Lucio Abbadessa - Roma

Title: Environmental Impact Study for the realisation of an Highway Service Area at Bevano (Bologna – Milano motorway) – Bologna. Year: 2008

Customer: Martino Associati - Grosseto

Title: Environmental Impact Study for an Urban Solid Waste treatment facility at Colleferro – Roma. Year: 2007 Customer: GP Ingegneria - Roma

Title: Environmental Impact Study for Subiaco ring road – Roma. Year: 2007

Customer: Martino Associati - Grosseto

Title: Environmental Impact Study for Roma Sud waste water treatment plant upgrade – Roma. Year: 2007

Customer: GP Ingegneria - Roma

Title: Environmental Impact Study for Rieti – A1 motorway – Rieti. Year: 2006

Customer: Seacon - Roma

Title: Environmental Impact Study for a navy yard at Porto Ercole – Grosseto. Year: 2006

Customer: Sogesid SpA - Roma

Title: Environmental Impact Study for Regional Water Supply Programme in . Year: 2006

Customer: Seacon - Roma

Title: Environmental Impact Study for the realisation of a wet-dock in the Gaeta harbour. Year: 2006

Customer: Mele Engineering - Pigreco - Roma

Title: Environmental Impact Study for Valmontone – Latina motorway. Year: 2005

Customer: Presidenza del Consiglio dei Ministri - Roma

Title: Feasibility study of the urban solid waste treatment system for the small islands in Sicily. Year: 2005

Customer: Bonifica Spa - Roma

Title: Environmental Impact Study for Lucca – Modena motorway: landscape components. Year: 2005

Customer: Ing. Amedeo Figliolini - Avezzano Title: Environmental Impact Study for Pescasseroli – A24 motorway. Year: 2005

Customer: Sled - Napoli

Title: Environmental Impact Study for a waste water treatment plant at Punta Gradelle – Napoli. Year: 2005

Customer: Sogesid SpA - Roma

Title: Strategic Environmental Assessment for Sardinian Water Supply Programme. Year: 2004

Customer: Ing. Lucio Abbadessa - Roma

Title: Environmental Impact Study for a Motorway Service Area at Zola Predosa – Bologna. Year: 2004

Customer: Seacon - Roma

Title: Environmental Impact Study for Foce Sisto estuary environmental rehabilitation – Latina. Year: 2004

Customer: Seacon - Roma

Title: Environmental Impact Study for a wet-dock along seafront at S. Marinella – Roma. Year: 2004

Customer: Carlo Lotti S.p.A. - Roma

Title: Environmental Impact Study for the realisation of a lot along SS 42 motorway in the vicinity of Edolo – Brescia. Year: 2004

Customer: Seacon - Roma

Title: Environmental Impact Study for a wet-dock along seafront at S. Salvo – Pescara. Year: 2004

Customer: Carlo Lotti S.p.A. - Roma

Title: Environmental Impact Study for the Po - Ferrara waterway – Ferrara. Year: 2004

Customer: Studio Ing F. Martino - Grosseto

Title: Environmental Impact Study for treatment of solid waste (selection, composting, rdf,) at Rieti and Valmontone. Year: 2004

Customer: Acqualatina SpA - Latina

Title: Initial Environmental Analysis of Integrated Water System of ATO 4 water programme– (preparatory activity for registration EMAS for businesses) – Latina. Year: 2004

Customer: Umweltkontor SpA - Cagliari

Title: Environmental Impact Study for Aritzo & Montiferru windparks (Sardinia). Year: 2004

Customer: AIC Progetti - Roma

Title: Environmental Impact Study for Trapani – Mazara del Vallo motorway (air and noise pollution). Year: 2004

Customer: Regione Lazio - Roma

Title: Environmental Impact Study for S.S.2 Cassia motorway from Monterosi to Viterbo. Year: 2004

Customer: Arch. Terzoli - Roma

Title: Environmental Impact Study for Nettuno harbour – Roma. Year: 2004

Customer: ANAS SpA - Roma

Title: Environmental feasibility study of the Iraqi Transportation Master Plan (air pollution, noise, energy consumption). Year: 2004

Customer: 3TI Progetti - Roma

Title: Design of mitigation measures for S.S. 106 Jonica motorway – lotto Catanzaro Marina di Gioiosa Jonica. Year: 2004

Customer: Studio Martino & Associati - Grosseto

Title: Environmental Impact Study for a solid waste plant at Maccarese – Roma. Year: 2003

Customer: Bonifica SpA - Roma

Title: Environmental Impact Study for Agrigento airport. Year: 2003 Customer: Lombardi S.A. - Lugano

Title: Environmental Impact Study for Abba Lughente Dam – Sardinia. Year: 2003

Customer: Enel Hydro Spa - Bergamo

Title: Environmental Impact Study for Cerni Ossam Dam - Bulgarian Republic. Year: 2003

Customer: Studio Martino & Associati - Grosseto

Title: Environmental Impact Study for the realisation of a plasma torch in solid waste treatment plant at Malagrotta – Roma. Year: 2002

Customer: Studio Lucianetti - Roma

Title: Environmental Impact Study for the Urban Plan Le Vignole – Roma. Year: 2002

Customer: TEMI SrL - Roma

Title: Environmental Impact Study (air and soil pollution) for the ex Ferrovie Stato area at Bologna Central Railway Station - Bologna Year: 2002

Customer: Consorzio Impregilo - Todini - Astaldi - Roma

Title: Environmental Impact Study for Kramis Dam – Algeria. Year: 2002

Customer: Sogesid - Roma

Title: Preliminary environmental studies for Regional Water Programme, Sardinia Year: 2002

Customer: Enel Hydro - Roma

Title: Environmental Impact Study for Siciliacque water programme (water supply and wastewater treatment) – Sicily. Year: 2002

Customer: Carlo Lotti S.p.A. - Roma

Title: Environmental Impact Study for Perrero Hydropower station – Cuneo. Year: 2002

Customer: Carlo Lotti S.p.A. - Roma

Title: Environmental consultancy for River Oglio environmental planning. Year: 2002

Customer: Rete Ferroviaria Italiana - Roma

Title: Railway acoustic barriers design, Via Sabatucci – Via Marchionni – Bologna. Year: 2002

Customer: Di Vietri Antonio - Spinazzola

Title: Environmental Impact Study for Spinazzola renewable energy plant (wind and PV) – Bari. Year: 2002

Customer: Arch. Passamonti - Roma

Title: Environmental Impact Study for a commercial area in Frosinone. Year: 2002

Customer: Hydrocontrol - Cagliari

Title: Environmental Impact Study for Enichem landfill at Assemini – Cagliari. Year: 2001

Customer: Consorzio di Bonifica dell’Oristanese

Title: Environmental Impact Study of Cantoniera Dam – Silì water supply system – Oristano. Year: 2001

Customer: Enel Hydro - Roma

Title: Environmental studies for the ATO 5 water supply programme – Frosinone. Year: 2001

Customer: Geasar S.p.A. - Olbia

Title: Landscaping studies for the green areas at Olbia airport. Year: 2001

Customer: V.D.A. - Fidenza

Title: Environmental Impact Study for V.D.A. solvent recycling plant – Parma. Year: 2001-2002

Customer: Enel Hydro S.p.A. - Seriate

Title: Environmental Impact Study for Terminillo windpark – Rieti. Year: 2001-2002 Customer: Maltauro Costruzioni S.p.A. - Padova

Title: Environmental Impact Study for the realisation of an integrated complex of works in the thermal-baths at Fordongianus – Oristano. Year: 2001

Customer: Carlo Lotti S.p.A. - Roma

Title: Environmental Impact Study for a flood protection system for river Tagliamento – Pordenone. Year: 2001

Customer: Carlo Lotti S.p.A. - Roma

Title: Environmental Impact Study for Beijing No. 10 – Water Plant “A” Project. Year: 2001

Customer: So.Ges.Id. S.p.A. - Roma

Title: Environmental studies for QCS 94-99 water programme - Roma Year: 2001

Customer: Carlo Lotti S.p.A. - Roma

Title: Environmental Impact Study for “Pescara d’Arquata” water supply system – Ascoli Piceno. Year: 2001

Customer: Carlo Lotti S.p.A. - Roma

Title: Environmental Impact Study for the Isser rural development programme – Algeria. Year: 2001

Customer: S.G.I. - Milano

Title: Monitoring programme (air and noise pollution) for the High Speed Train facilities in Firenze. Year: 2001

Customer: Enel Hydro- Roma

Title: Environmental Impact Studies for five polishing lagoons in Regione Campania. Year: 2001

Customer: Commissione Europea – Direzione Generale dell’Ambiente - Bruxelles

Title: Study concerning transposition by Italy of EC Directive 79/409/EEC on the conservation of wild birds. Year: 2000-2001

Customer: Carlo Lotti S.p.A. - Roma Title: Environmental Impact Study for Caserta-Foggia Railway (Orsaro-Cervara) – Foggia. Year: 2000-01

Customer: Studio Valle - Roma

Title: Environmental feasibility study of Calalzo-Cortina-Dobbiaco railway. Year: 2000-01

Customer: Enel Hydro – Bergamo

Title: Environmental studies for ATO 4 water supply programme – Latina. Year: 2000

Customer: Enel Hydro – Bergamo

Title: Environmental studies for the ATO ASTI water supply programme - Asti Year: 2000

Customer: A.Q.P. – Acquedotto Pugliese Mediterraneo S.p.A. - Bari

Title: Environmental feasibility study for a desalination plant in Aqaba – Jordan. Year: 2000

Customer: Carlo Lotti S.p.A. - Roma Title: Environmental Impact Study for the solid waste collection and treatment system (incineration) at Gioia Tauro. Year: 2000

Customer: International Uinistero Affari Esteri – Dir. Gen. Cooperazione

Title: Environmental feasibility study of Dessié-Lago Tana road – Ethiopia. Year: 2000

Customer: E.A.S – Ente Acquedotti Siciliani - Palermo

Title: Environmental Impact Study of Blufi Dam – Palermo. Year: 2000

Customer: Studio Lucianetti - Roma

Title: Environmental Impact Study of artificial snow plants in Regione Abruzzo. Year: 2000

Customer: Fernord - Roma

Title: Environmental Impact Study for an a hangar for railway equipment in Rome. Year: 2000 Customer: TECA s.r.l. - Roma

Title: Environmental studies for “Parco Naturale di Santadi” planning – Cagliari. Year: 2000

Customer: Commissione Europea – DG XI - Bruxelles

Title: Study concerning administrative & judicial implementation of certain water Directives in Italy. Year: 1999

Customer: Commissione Europea – DG XI - Bruxelles

Title: Study concerning the transposition of EEC Directive 92/43 (HABITAT) by Italy. Year: 1999

Customer: Cesen S.p.A: - Genova – World Bank _ Washington

Title: Environmental Impact Study of water supply and sanitation projects in Cuenca – Ecuador. Year: 1999

Customer: Tor Vergata S. c.a r.l. - Roma

Title: Environmental Impact Study for a landfill reclamation at Università di Tor Vergata – Roma. Year: 1999

Customer: AICA srl - Roma

Title: Environmental Impact Study for Trasversale delle Serre motorway – Lot 1 - Vibo Valentia. Year: 1999

Customer: Studio Lucianetti - Roma

Title: Environmental Impact Study for Valle 12 sewage system in Montecompatri – Roma. Year: 1999

Customer: Waterways - Roma

Title: Landscaping for the realisation of a new garage in the town of Urbino. Year: 1999

Customer: PROG.IN. - Roma

Title: Environmental Impact Study for various sewage works for the town of Fiumicino – Roma. Year: 1999 Customer: I.T.F. - Napoli

Title: Environmental Impact Studies for realisation of six plants for production of combustibles deriving from waste-matter and a plant for Thermo-valorisation for the Province of Naples. Year: 1999

Customer: Carlo Lotti S.p.A. - Roma

Title: Environmental Impact Study for “S. Giovanni” tube station and “Colosseo” tube station on Line C of the Rome Underground. Year: 1999

Customer: Sogesid S.p.A. - Roma

Title: Impact mitigating measures design for a waste water treatment plant in Reggio Calabria. Year: 1999

Customer: Carlo Lotti S.p.A. - Roma

Title: Environmental Impact Study of three railway lines at Palermo. Year: 1998

Customer: Ing. Fabrizio Lanza - Roma

Title: Waste water treatment plant in Potenza. Year: 1998

Customer: Environmental & Water Engineering Ltd - Londra

Title: Environmental impact assessment of a plant for used oils treatment at Bilbao – Spain. Year: 1998

Customer: Studio Lucianetti - Roma

Title: Environmental Impact Study or seven drainage pumping stations in Rome – Ostia. Year: 1998

Customer: Seacon - Roma

Title: Environmental Impact Study for Sora - Frosinone motorway - V Lot. Year: 1998

Customer: Setec S.p.A. - Roma

Title: Cost/benefits analysis of a Meat Market Centre at . Year: 1998 Customer: Carlo Lotti S.p.A. - Roma

Title: Environmental Impact Study for Alaco Dam – Foggia. Year: 1998

Customer: Carlo Lotti S.p.A. - Roma

Title: Environmental Impact Study for a waste water treatment plant in Nocera Inferiore – Salerno. Year: 1998

Customer: Carlo Lotti S.p.A. - Roma

Title: Environmental Impact Study for Su Ponti Paris road junction – Cagliari. Year: 1998

Customer: Progein - Roma; Ing. Massimo Malaspina

Title: Environmental Impact Study for S.P. Settecamini – Guidonia road – Roma. Year: 1997

Customer: Setec S.p.A. - Roma

Title: Environmental Impact Study for Ferrara ring road. Year: 1997

Customer: Carlo Lotti S.p.A. - Roma

Title: Environmental studies for the General Hydraulic Plan of River Po Authority - Lombardia, Val d’. Year: 1997

Customer: T.EC.A. - Roma

Title: Environmental Impact Studies for three dams in Nurra region – Sardinia. Year: 1997

Customer: Carlo Lotti S.p.A. - Roma

Title: Environmental Impact Study for the water supply, sewage and wastewater treatment systems in Elbasan – . Year: 1997

Customer: Toto Costruzioni S.p.A. - Chieti

Title: Environmental Impact Study for Francavilla ringroad – Pescara. Year: 1997

Customer: T.EC.A – Roma Title: Environmental Impact Study for Ruinas dam – Sardinia. Year: 1997

Customer: CO.GE.PRO – Roma

Title: Environmental Impact Study for a waste water treatment plant in Cuma – Napoli. Year: 1996

Customer: Sardegna Ingegneria S.r.l. – Cagliari

Title: Environmental Impact Study for Rio Mogoro dam – Cagliari. Year: 1996

Customer: Carlo Lotti S.p.A. – Roma

Title: Impact mitigating measures design for Piano dei Limiti dam and reservoir – Foggia. Year: 1996

Customer: Carlo Lotti S.p.A. – Roma

Title: Environmental Impact Study for Monte Exi dam and reservoir – Cagliari. Year: 1996

Customer: Carlo Lotti S.p.A. - Roma

Title: Preliminary studies for River Po Basin Plan- Subproject SP1 "Floods and naturalness of river beds" - Co-ordination of environmental surveys – Parma. Year: 1996

Customer: FERNORD S.c.r.l. - Roma

Title: Acoustic barrier design in the vicinity of the railway station at Prima Porta - Ferrovia Roma Nord - Roma. Year: 1995

Customer: TOTO Costruzioni Generali S.P.A. - Chieti

Title: Environmental Impact Study for Sangritana railway – Chieti. Year: 1995

Customer: TECA S.r.l. - Roma

Title: Environmental Impact Study for Cantoniera Beccia dam – Nuoro. Year: 1995

Customer: Carlo Lotti S.p.A. - Roma

Title: Environmental Impact Study for River Liri hydraulic rehabilitation works – L’Aquila. Year: 1994 Customer: TECA S.r.l. - Roma

Title: Environmental Impact Study for of S. Allusia dam – Nuoro. Year: 1994

Customer: Aquaital S.R.L. - Roma

Title: Environmental Impact Study for an underwater gas-duct on Isola d'Elba – Grosseto. Anno: 1994

Customer: Aquaital S.R.L. - Roma

Title: Environmental Impact Study for a wastewater treatment plant in Boville Ernica – Frosinone. Year: 1994

Customer: S.W.S. Padova

Title: Environmental Impact Study for a 400 Kv. c.c. power line between Galatina and Porto Badisco – Lecce. Year: 1993

Customer: S.I.I. - Servizi Integrati di Ingegneria - Roma

Title: Environmental Impact Study of the new port of Trani – Bari. Year: 1992

Customer: ENEL - Ente Nazionale per l'Energia Elettrica - Distretto Abruzzo

Title: Environmental Impact Study for a 150 Kv power line between Scoppito and Corvaro – Rieti. Year: 1993

Customer: V.T.A. – Visalli Technoart snc - Roma

Title: Environmental Impact Study of an head-office building for A1 motorway – Bologna. Year: 1993

Customer: TECA S.R.L. - Roma

Title: Environmental Impact Study for Terra Mala dam – Sardinia. Year: 1992

Customer: S.W.S. - Padova

Title: Field surveys and data retrieval for the Environmental Impact Study of the power line 380 kV between Avezzano and Villanova – L’Aquila – Pescara. Year: 1992 Customer: PR.O.B.I. - Progettazione Opere Bonifica e Impianti Idraulici - Roma

Title: Environmental Impact Study for the water supply system at "La Nova" – Viterbo. Year: 1992

Customer: Impresa Federici - Roma

Title: Environmental Impact Study for a water supply pumping station in Ottavia – Roma. Year: 1992

Customer: C.M. Consulting and Management - Roma

Title: Environmental Impact Study for the underground railway line Grano - S. Giovanni in Rome. Year: 1992

Customer: Fernord S.C.R.L. - Roma

Title: Environmental Impact Study for the upgrade of Flaminio Railway Station – Roma. Year: 1992

Customer: Studio Lucianetti - Roma

Title: Environmental Impact Study for submerged hydraulic works at Ponte Cestio – Roma. Year: 1992

Customer: Asian Development Bank - M. Manila (Filippine) - Carlo Lotti S.p.A. - Roma. - Roma

Title: Environmental Impact Study for Marikina dam at Metro Manila – Philippines. Year: 1992

Customer: Carlo Lotti S.p.A. - Roma

Title: Environmental study for water resources reclamantion of the mine at Monteponi – Cagliari. Year: 1991

Customer: Carlo Lotti S.p.A. - Roma

Title: Environmental Impact Study of Rupe Cavolo and Brindisi di Montagna dams – Potenza. Year: 1991

Customer: Asian Development Bank - M. Manila (Filippine) - Carlo Lotti S.p.A.

Title: Environmental Impact Study of Trans-basin Umiray-Angat project. Project includes the construction of dams, hydraulics tunnels and serving roads in a natural national park – Metro Manila – Philippines. Year: 1991

Customer: ENEL - Ente Nazionale per l'Energia Elettrica - Direzione Costruzioni

Title: Environmental Impact Study (landscape) for a 380 kV power line at Ceprano – Frosinone. Year: 1991

Customer: Carlo Lotti S.p.A. - Roma- Del Favero S.p.A. -Trento

Title: Environmental Impact Study for the water supply system of Acerenza Dam – Potenza. Year: 1991

Customer: Studio Lucianetti - Roma

Title: Environmental Impact Study for S.R. n.8 motorway Lecce – Otranto. Year: 1991

Customer: CON.TE.CA. S.r.l. - Roma - Astaldi S.p.A. - Roma

Title: Environmental Impact Study for S.R. n. 6 motorway Canosa di Puglia – Spinazzola. Year: 1991

Customer: Carlo Lotti S.p.A. - Roma

Title: Environmental Impact Study of Transport Master Plan for Regione Sicilia. Anno: 1990

Customer: Pessina S.p.A. - Milano

Title: Environmental Impact Study for Potenza ringroad. Year: 1990

Customer: Carlo Lotti S.p.A. - Roma

Title: Environmental Impact Study for a wastewater treatment plant in Maratea – Potenza. Year: 1990

Customer: Degremont Italia S.p.A. - Milano

Title: Environmental Impact Study for Roma Sud wastewater treatment plant upgrade – Roma. Year: 1990

Customer: Impresa Cervellati - Ferrara

Title: Environmental Impact Study for Avezzano-Sora motorway (V Tronco) – Frosinone. Year: 1990