IIS Windows Server

Total Page:16

File Type:pdf, Size:1020Kb

IIS Windows Server WARWICKSHIRE COUNTY COUNCIL A46 LINK ROAD (PHASE 1 STONELEIGH) FINHAM BROOK / WESTLEY BRIDGE GROUND INVESTIGATION REPORT Contract: 21662 Date: March 2017 Ian Farmer Associates (1998) Limited 1 Fairfield Court Seven Stars Industrial Estate Wheler Road, Coventry CV3 4LJ Tel: 024 7630 3422 A46 Link Road (Phase 1 Stoneleigh), Finham Brook / Westley Bridge GROUND INVESTIGATION REPORT Carried out at A46 LINK ROAD (PHASE 1 STONELEIGH) FINHAM BROOK / WESTLEY BRIDGE Prepared for WARWICKSHIRE COUNTY COUNCIL Shire Hall Market Place Warwick CV34 4RL Contract No: 21662 Date: March 2017 Issue Date Description / Revision Details Prepared Approved Distribution 01 31/03/17 First Issue PC PB PDF to WWC Ian Farmer Associates (1998) Limited 1 Fairfield Court, Seven Stars Industrial Estate Wheler Road, Coventry, CV3 4LJ Tel: 024 7630 3422 www.ianfarmer.co.uk A46 Link Road (Phase 1 Stoneleigh), Finham Brook / Westley Bridge EXECUTIVE SUMMARY On the instructions of Warwickshire County Council, an investigation was undertaken to determine ground conditions to enable foundation and road/hard standing design to be carried out, together with a geoenvironmental risk assessment. It is understood that the proposed development comprises the construction of a new retaining wall and abutments for the new bridge over the Finham Brook. The site is situated beside the Finham Brook where the Stoneleigh Road crosses it over the existing Westley Bridge, approximately 3.5km to the north-east of Kenilworth town centre and may be located by Landranger Grid Map Reference SP318737. Published geology indicates the site to be covered by superficial deposits of Alluvium, with First River Terrace Deposits also marked as present, underlain by the Kenilworth Sandstone Formation. Site work comprised the sinking of four cable percussive boreholes, one of which was extended by rotary coring, and one window sample borehole. Standpipes were installed in four of the boreholes and monitored for groundwater levels on return visits. Selected sampled were subjected to geotechnical laboratory analysis. Allowable bearing pressures have been assessed for shallow spread foundations, with 75kPa available in the Alluvium and 175kPa available in the River Terrace Deposits. The ground level drops by 2.0m between the northern and southern banks of the brook which is evident by the absence of alluvial deposits in BH3 and BH4 and therefore any shallow bridge foundation can be installed below the Made Ground and within the River Terrace Deposits at a minimum depth of 1.4mbgl, where an allowable bearing pressure of 50kPa can be assumed. Foundations greater than 2.0mbgl can be designed to a greater allowable bearing pressure of 165kPa. Deeper foundations would require a piled foundation which would gain support in end bearing from the sandstone with side adhesion from both the River Terrace Deposits and the underlying residual sands of the weathered Kenilworth Sandstone Formation. A Design Sulphate Class for the soils / rock may be taken as DS-1, with site conditions suggesting an ACEC class for the site of AC-1 would be appropriate None of the samples analysed exhibited contaminant concentrations which would be considered to represent any significant risk to human health or controlled waters and there was no significant evidence of contamination within the soils observed. The material represented by the samples tested would be classified as non-hazardous waste, should disposal of material to landfill be required. However, the material is fit for purpose for reuse on the site and this should be considered where possible prior to any offsite disposal. Contract No. 21662 A46 Link Road (Phase 1 Stoneleigh), Finham Brook / Westley Bridge CONTENTS EXECUTIVE SUMMARY 1.0 INTRODUCTION 3 2.0 SITE SETTING 4 2.1 Site Location 4 2.2 Site Description 4 2.3 Geological Setting 4 3.0 SITE WORK 6 4.0 LABORATORY TESTS 7 4.1 Geotechnical Testing 7 4.2 Chemical Testing 7 5.0 GROUND CONDITIONS ENCOUNTERED 8 5.1 Sequence 8 5.2 Made Ground 8 5.3 Alluvial Deposits 8 5.4 River Terrace Deposits 8 5.5 Kenilworth Formation 9 5.6 Groundwater 9 6.0 GEOTECHNICAL ASSESSMENT 10 6.1 Introduction 10 6.2 Assessment of Soil Condition 10 6.3 Made Ground 10 6.4 Alluvial Deposits 11 6.5 River Terrace Deposits 11 6.6 Kenilworth Sandstone Formation – Residual Deposits 12 6.7 Kenilworth Sandstone Formation – Rock 13 6.8 Proposed Scheme 14 6.9 Foundation Recommendations 14 6.10 Excavations 16 6.11 Chemical Attack on Buried Concrete 16 7.0 GEOENVIRONMENTAL RISK ASSESSMENT 18 7.1 Contaminated Land 18 7.2 Site History 18 7.3 Risk Assessment – Human Health 18 7.4 Risk Assessment - Controlled Waters 18 7.5 Risk Evaluation 19 7.6 Waste 19 8.0 MANAGEMENT OF CONTAMINATION 20 8.1 Remediation and Verification 20 8.2 Management of Unidentified Sources of Contamination 20 Contract No. 21662 Page 1 of 25 A46 Link Road (Phase 1 Stoneleigh), Finham Brook / Westley Bridge 8.3 Risk Management During Site Works 20 9.0 REFERENCES 22 APPENDIX 1 - DRAWINGS Figure A1.1 - Site Location Plan Figure A1.2 - Exploratory Hole Location Plan APPENDIX 2 - SITE WORK General Notes on Site Work ii/i-ii/iv - SPT Calibration Certificate - Cable Percussive & Rotary Borehole Records - Window Sample Borehole Records - Groundwater Monitoring APPENDIX 3 - GEOTECHNICAL TESTS General Notes on Geotechnical Tests iii/i-iii/i Test Report 21662/1 - Results of Geotechnical Tests – Soils Test Report 21662A/1 - Results of Geotechnical Tests – Rock Test Report 17-38977 - Results of Chemical Geotechnical Tests – Soils Test Report 17-41315 - Results of Chemical Geotechnical Tests – Rock APPENDIX 4 - GEOENVIRONMENTAL TESTS General Notes on Geoenvironmental Tests iv/i-iv/i Test Report 17-38938 - Results of Contamination Tests – Soils Waste Report 21662 - HazWasteOnlinetm Records APPENDIX 5 - DESIGN CONSIDERATIONS Geotechnical Design Considerations v/i-v/iii APPENDIX 6 - GEOENVIRONMENTAL ASSESSMENT General Notes on Chemical Contamination vi/i-vi/vi Contract No. 21662 Page 2 of 25 A46 Link Road (Phase 1 Stoneleigh), Finham Brook / Westley Bridge 1.0 INTRODUCTION 1.1 On the instructions of Warwickshire County Council, an investigation was undertaken to determine ground conditions to enable foundation and road/hard standing design to be carried out, together with a geoenvironmental risk assessment. 1.2 It is understood that the proposed development comprises the construction of a new retaining wall and abutments for the new bridge over the Finham Brook. 1.3 A preliminary investigation report (PIR) has not been commissioned as part of the scope of works, therefore the comments within this report are based solely on this intrusive phase of investigation. 1.4 It is recommended that a copy of this report be submitted to the relevant authorities to enable them to carry out their own site assessments and provide any comments. 1.5 This report has been prepared for the sole use of the Client for the purpose described and no extended duty of care to any third party is implied or offered. Third parties using any information contained within this report do so at their own risk. 1.6 The comments given in this report and the opinions expressed herein are based on the information received, the conditions encountered during site works, and on the results of tests made in the field and laboratory. However, there may be conditions prevailing at the site which have not been disclosed by the investigation and which have not been taken into account in the report. 1.7 The comments on groundwater conditions are based on observations made at the time the site work was carried out. It should be noted that groundwater levels vary owing to seasonal or other effects. Contract No. 21662 Page 3 of 25 A46 Link Road (Phase 1 Stoneleigh), Finham Brook / Westley Bridge 2.0 SITE SETTING 2.1 Site Location 2.1.1 The site is situated beside the Finham Brook where the Stoneleigh Road crosses it over the existing Westley Bridge, approximately 3.5km to the north-east of Kenilworth town centre and may be located by Landranger Grid Map Reference SP318737. 2.1.2 A site location plan is included in Appendix 1, Figure A1.1. 2.2 Site Description 2.2.1 The site is split over both sides of the Stoneleigh Road. 2.2.2 The area to the north-east of the Stoneleigh Road comprises land immediately adjacent to an approximately 75m long stretch of the NE-SW flowing Finham Brook. 2.2.3 The brook is immediately bounded by sparse woodland, with an arable field to the south-east and pasture to the north-west. 2.2.4 The site area sloped very gently south-west and also relatively sharply by a couple of metres to the brook, with the fields lying at an approximate elevation of 65m to 63mAOD. 2.2.5 The area to the south-west of the Stoneleigh Road comprises a single exploratory hole point lying within an enclosed paddock / yard. 2.2.6 The paddock / yard consists of an area of gravelled hardstanding along its northern edge, with a number of beehives towards the rear (W) of the site. The southern part of the site is a little higher in elevation and comprises a grassed paddock. A number of mature trees separate the two. 2.2.7 This site area was relatively flat and lay at an approximate elevation of 65mAOD. 2.2.8 An exploratory hole location plan is given in Appendix 1, Figure A1.2. 2.3 Geological Setting 2.3.1 Details of the geology underlying the site have been obtained from BGS Sheet 184, ref. 9.2. 2.3.2 The geological map indicates the site area adjacent to Finham Brook to be covered by superficial deposits of Alluvium, comprising ‘clay, silt and gravel’, with First River Terrace Deposits also marked as present, described as ‘sand and gravel’.
Recommended publications
  • Canley Brook Area
    Canley Brook Area Design summary www.hs2.org.uk Introduction HS2 High Speed Two (HS2) is the new high speed railway for Britain. In 2017, Parliament approved plans for the part of the railway that will run between the West Midlands and London. The design of HS2 is an ongoing process. A preliminary design was approved by Parliament, which our main works contractors are refining, within certain agreed limits. This work includes taking any opportunities to deliver HS2 as effectively as possible while minimising our impact on communities and the environment. As we undertake the next stage of design work on the railway, we would like to make the community aware of any work that affects them. This includes the design of HS2 in the Canley Brook area (Kenilworth Cutting, the A429, Canley Brook Viaduct and Crackley Road Cutting). This design summary explains how the scheme design has been changed in this area. For the latest information about this work please visit www.hs2inwarwickshire.co.uk Balfour Beatty Vinci Joint Venture Balfour Beatty Vinci (BBV) are the main works contractor for this area of the route. Their job is to prepare the final design of the HS2 route and build the railway in preparation for the track and signalling installation. Your Community Engagement Manager from BBV is Gurcharan Singh. * Note on images within this document Please note, all images are an artist’s impression based on the latest HS2 route design. Every effort has been made to ensure that images are as accurate as possible. This includes the location, size, materials and finishes of structures, and the species mix and placement of planting.
    [Show full text]
  • West Midlands Schools
    List of West Midlands Schools This document outlines the academic and social criteria you need to meet depending on your current secondary school in order to be eligible to apply. For APP City/Employer Insights: If your school has ‘FSM’ in the Social Criteria column, then you must have been eligible for Free School Meals at any point during your secondary schooling. If your school has ‘FSM or FG’ in the Social Criteria column, then you must have been eligible for Free School Meals at any point during your secondary schooling or be among the first generation in your family to attend university. For APP Reach: Applicants need to have achieved at least 5 9-5 (A*-C) GCSES and be eligible for free school meals OR first generation to university (regardless of school attended) Exceptions for the academic and social criteria can be made on a case-by-case basis for children in care or those with extenuating circumstances. Please refer to socialmobility.org.uk/criteria-programmes for more details. If your school is not on the list below, or you believe it has been wrongly categorised, or you have any other questions please contact the Social Mobility Foundation via telephone on 0207 183 1189 between 9am – 5:30pm Monday to Friday. School or College Name Local Authority Academic Criteria Social Criteria Abbot Beyne School Staffordshire 5 7s or As at GCSE FSM or FG Alcester Academy Warwickshire 5 7s or As at GCSE FSM Alcester Grammar School Warwickshire 5 7s or As at GCSE FSM Aldersley High School Wolverhampton 5 7s or As at GCSE FSM or FG Aldridge
    [Show full text]
  • Finham Sewage Treatment Works Thermal Hydrolysis Process Plant and Biogas Upgrade Plant Variation Applications
    Finham Sewage Treatment Works Thermal Hydrolysis Process Plant and Biogas Upgrade Plant Variation Applications | 0.2 July 2020 Severn Trent Water EPR/YP3995CD/V006 Thermal Hy drolysis Process Pla nt a nd Biogas Up gra de Plan t Va ria tion Ap plica tions Sever n Tr ent Wa ter Thermal Hydrolysis Process Plant and Biogas Upgrade Plant Variation Applications Finham Sewage Treatment Works Project No: Project Number Document Title: Thermal Hydrolysis Process Plant and Biogas Upgrade Plant Variation Applications Document No.: Revision: 0.2 Document Status: <DocSuitability> Date: July 2020 Client Name: Severn Trent Water Client No: EPR/YP3995CD/V006 Project Manager: Mark McAree Author: James Killick File Name: Document2 Jacobs U.K. Limited Jacobs House Shrewsbury Business Park Shrewsbury Shropshire SY2 6LG United Kingdom T +44 (0)1743 284 800 F +44 (0)1743 245 558 www.jacobs.com © Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This document has been prepared on behalf of, and for the exclusive use of Jacobs’ client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this document by any third party. Document history and status Revision Date Description Author Checked Reviewed Approved i Thermal Hydrolysis Process Plant and Biogas Upgrade Plant Variation Applications Contents Non-Technical Summary..................................................................................................................................................
    [Show full text]
  • Finham Parish Council – New Parish Council Created – the Story of How a New Parish Council Was Created in a Previously Un-Parished Area of Coventry
    Finham Parish Council – New Parish Council Created – The Story Of How A New Parish Council Was Created In A Previously Un-Parished Area Of Coventry Headlines Finham is a suburb, south from the city of Coventry, in the West Midlands. This case study tells the story of how the Finham Residents Association triggered a Community Governance Review and established a parish council. The case study provides an example of good practice for campaigns aspiring to set up a parish council, outlining key elements of success as well as some of the challenges faced by the Finham campaign and how these were overcome. Currently Finham is due to have its first elections in May 2016 and over the past months the main focus of campaign organisers has been to encourage residents to stand for election. Why A Council Is Wanted The development of a new housing estate raised concern among the residents of Finham, due to the increased volume of traffic, with roads being unable to accommodate the additional amount of vehicles, as well as the additional strain on schools and underdeveloped public transport. Although Finham Residents’ Association opposed the developments, it was felt that residents would have more say in the development plans of the area through the creation of a parish council. Furthermore, the parish council could also undertake projects and schemes, working in partnership with other bodies and scrutinising the principal authority with the scope of improving service delivery and ensuring that the needs of residents are being met, improving their representation at local government level. Contextual issues related to the theme Finham is a suburb, south from the city of Coventry, in the West Midlands.
    [Show full text]
  • Inham Park School (A Company Limited by Guarantee)
    Finham Park School (A Company Limited by Guarantee) Report and Financial Statements Year Ended 31 August 2013 Company Number 7700317 I BDO Fin ham Park School Report and financial statements for the year ended 31 August 2013 Contents Page: 1 Reference and administrative details 3 Trustees' report 12 Governance statement 16 Statement on regularity, propriety and compliance 16 Statement of trustees' responsibilities 17 Independent auditor's report 19 Independent reporting auditor's assurance report on regularity 21 Statement of financial activities 22 Balance sheet 23 Cash flow statement 24 Notes forming part of the financial statements Finham Park School Reference and administrative details for the year ended 31 August 2013 Trustees Peter Burns" (Chair) Mercer Mottram" (Vice Chair) Perihan Yavash Alethea Fuller John Blundell"' Mark Bailie * (Headteacher and accounting officer) Dhiran Vagdia* Laura Dodd Chloe Agg (resigned 16/3/13) Jayne Armitage Mark Hughes Kerry Blakeman Rachel Goves Kalwinder Sandhu" Catherine Colby-Johnson Aaron Tighe Paul Bates Phil Kerry Fanny Anderson (appointed 15/5/13) " Member of the finance committee Senior Leadership Team Mark Bailie Headteacher Mandy Gilmore Business Manager Russell Plester Deputy Headteacher Vivien Maginnis Deputy Headteacher Jo Brake Assistant Headteacher Matt Gaynon Assistant Headteacher Foorkan Kiddy Assistant Headteacher Sarah Megeney Assistant Headteacher Warwick Webster Assistant Headteacher Ryan Downie Head of Sixth Form Company Secretary Mandy Gilmore Finham Park School Reference and administrative details for the year ended 31 August 2013 (continued) Principal and registered office Finham Park School, Green Lane, Coventry, CV3 6EA. Independent auditor BDO LLP, 125 Colmore Row, Birmingham, B3 3SD. Bankers Lloyds TSB, 2nd Floor, 30 High Street, Coventry, CV1 5RA.
    [Show full text]
  • 580 Bus Time Schedule & Line Route
    580 bus time schedule & line map 580 Bourton on Dunsmore View In Website Mode The 580 bus line (Bourton on Dunsmore) has 3 routes. For regular weekdays, their operation hours are: (1) Bourton on Dunsmore: 5:50 PM (2) Coventry: 7:00 AM - 5:45 PM (3) Rugby: 7:05 AM - 4:20 PM Use the Moovit App to ƒnd the closest 580 bus station near you and ƒnd out when is the next 580 bus arriving. Direction: Bourton on Dunsmore 580 bus Time Schedule 35 stops Bourton on Dunsmore Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 5:50 PM Pool Meadow Bus Station, Coventry Tuesday 5:50 PM Gosford Street, Coventry (Cu3) Service Road, Coventry Wednesday 5:50 PM Earl St, Coventry (Mp1) Thursday 5:50 PM Jordan Well, Coventry Friday 5:50 PM Little Park St, Coventry (Sj1) Saturday 5:50 PM Little Park Street, Coventry Quadrant, Coventry (By4) 159 New Union Street, Coventry 580 bus Info Rail Station Bridge, Coventry (Wr1) Direction: Bourton on Dunsmore Warwick Road, Coventry Stops: 35 Trip Duration: 58 min Leamington Rd, Earlsdon Line Summary: Pool Meadow Bus Station, Coventry, 157 Warwick Road, Coventry Gosford Street, Coventry (Cu3), Earl St, Coventry (Mp1), Little Park St, Coventry (Sj1), Quadrant, War Memorial Park, Stivichall Coventry (By4), Rail Station Bridge, Coventry (Wr1), 13 Leamington Road, Coventry Leamington Rd, Earlsdon, War Memorial Park, Stivichall, Armorial Rd, Stivichall, Stivichall Croft, Armorial Rd, Stivichall Stivichall, Baginton Rd, Stivichall, Dewsbury Ave, Leamington Road, Coventry Stivichall, Stonebridge Highway, Finham,
    [Show full text]
  • Davenport High Quality Estate Agents
    Elizabeth Davenport High Quality Estate Agents 12 ANCHORWAY ROAD FINHAM, COVENTRY, CV3 6JJ zzzzzzzzzzzzz Elizabeth D avenport The Property FREEHOLD Guide Price £260,000 Finham Park Catchment ~ Spacious Open Plan Through Lounge Dining Room ~ Three Bedrooms ~ Ideal Family Home An attractive family home nestled in the heart of Finham, just behind Green Lane, within easy walking distance of both Finham primary and Finham Park secondary school. The house has been well maintained and improved over the years by the present owners and now offers ideal accommodation for anyone looking for a home ready to move into. The flexible family accommodation briefly offers entrance hall, Spacious open plan through lounge dining room extended kitchen with a range of appliances. To the first floor there are three bedrooms, two of which are good size double room with the third being a single room. From the landing there is a family bathroom with white suite. Externally there are gardens to both front and rear, the property benefits from rear vehicular access via a gated service road with additional street parking available at the front. There is potential to add a driveway to the front like many of the neighbouring properties properties subject to obtaining the necessary permissions. If you are interested in receiving further information or to book a viewing appointment please do not hesitate to call Elizabeth Davenport on 02476 01 01 05 and one of our friendly team will be happy to make all of the viewing arrangements. zzzzzzzzzzzzz Elizabeth The Location Davenport Green Lane is one of Coventry’s most popular locations for families.
    [Show full text]
  • Study of the Effects of Secondary School Admissions Policies on House Prices in One Local Area
    J. R. Statist. Soc. A (2003) 166, Part 1, pp. 135–154 Is comprehensive education really free?: a case- study of the effects of secondary school admissions policies on house prices in one local area Dennis Leech and Erick Campos University of Warwick, Coventry, UK [Received December 2001. Revised June 2002] Summary. The paper reports on a study that tests the anecdotal hypothesis that parents are willing to pay a premium to secure places for their children in popular and oversubscribed com- prehensive schools. Since many local education authorities use admissions policies that are based on catchment areas and places in popular schools are very difficult to obtain from out- side these areas—but very easy from within them—parents have an incentive to move house for the sake of their children’s education.This would be expected to be reflected in house prices. The study uses a cross-sectional sample based on two popular schools in one local education authority area, Coventry. Differences in quality of housing are dealt with by using the technique of hedonic regression and differences in location by sample selection within a block sample design. The sample was chosen from a limited number of locations spanning different catch- ment areas to reduce both observable and unobservable variability in nuisance effects while maximizing the variation in catchment areas. The results suggest that there are strong school catchment area effects. For one of the two popular schools we find a 20% premium and for the other a 16% premium on house prices ceteris paribus. Keywords: Coventry; Hedonic price functions; House prices; Sample design; Schools 1.
    [Show full text]
  • Selective Licensing in Coventry
    2018 Selective Licensing in Coventry FEASIBILITY REPORT CHOWNS, ADRIAN PLANNING AND REGULATORY SERVICES Contents EXECUTIVE SUMMARY .................................................................................................................... 4 1. Introduction ................................................................................................................................. 5 1.1 Selective Licensing .................................................................................................................. 5 1.2 Why is the Selective Licensing Scheme being proposed? ..................................................... 6 2. Methodology ................................................................................................................................ 8 3. Supporting Information ............................................................................................................ 9 3.1 National Picture ...................................................................................................................... 9 3.2 Local Context ........................................................................................................................ 10 3.3 Strategic Context .................................................................................................................. 12 3.4 Housing in Coventry ............................................................................................................. 14 3.5 The Private Rented Sector (PRS) .........................................................................................
    [Show full text]
  • Proposed Erection of a Single-Storey Two Bedroom House on the E
    New Planning Applications Application No: W/17/1278 Description: Proposed erection of a single-storey two bedroom house on the existing plot, with a freestanding single garage, with the erection of a balcony to the eastern elevation and the laying of a permeable gravel circulation and parking spaces and access route into the building. Address: The Orchard, Coventry Road, Stoneleigh, CV8 3BZ Closing date: 9th August Application No:W/17/0961 LB Description: Erection of single storey extension and change of use of existing annexe accommodation to a detached dwelling. Address: Abbey Farm, Ashow Road, Ashow, Kenilworth, CV8 2LE Closing date: Extended to 27th July Application No: W/17/0960 Description: Erection of a single storey extension to an existing annex to form a new dwellinghouse (Use Class C3). Address: Abbey Farm, Ashow Road, Ashow, Kenilworth, CV8 2LE Closing date: Extended to 27th July Application No: W/17/1052 Description: Removal of single garage doors and brick peer to create double garage door. Address: 5 The Cunnery, Stoneleigh Park, Kenilworth, CV8 2PZ Applicant: Mrs Williams Parish Council supports – comments submitted on 30th June due to deadline W/17/1168 HS2 Description: Construction of an additional pond at Finham Brook(SK085-02-01) Address: Finham Brook Valley, Land On The North of Dalehouse Lane,Kenilworth Applicant: HS2 Ltd Closing date 20th July -requested 27th July Proposal: Installation of two glass reinforced polymer kiosks Address: Finham Sewage Treatment Works, St Martins Road, Stoneleigh, CV3 6SD No observations (Closing date 7th June – PC was written to but letter was returned.) Application has been granted Progress of Planning Applications Application Number: W/16/0239 Address: Land to the north and south of the A45 (between Festival and Tollbar junctions) and land at the A45/Festival Roundabout, the A46/Tollbar Roundabout and at the junctions of the A444 with the A4114/Whitley Roundabout.
    [Show full text]
  • The History of Kenilworth Castle 12Th Century
    THE HISTORY OF KENILWORTH CASTLE 12TH CENTURY - When and why people first created the site Kenilworth Castle was founded in the early 1120s by Geoffrey de Clinton, Lord Chamberlain and treasurer to Henry I Clinton was a local rival to Roger de Beaumont, the Earl of Warwick and owner of the neighbouring Warwick Castle, and the king made Clinton the sheriff in Warwickshire to act as a counterbalance to Beaumont's power. Henry I’s son had died and so he needed to show that he was powerful even though he did not have an heir The castle's original form is uncertain. It has been suggested that it consisted of a motte, an earthen mound surmounted by wooden buildings; however, the stone great tower may have been part of the original design. Henry II (Henry I’s grandson)succeeded to the throne at the end of a Civil war that lasted from 1135 to 1154 but during the revolt of 1173–74 he faced a significant uprising led by his son, Henry, backed by the French crown. The conflict spread across England and Kenilworth was garrisoned by Henry II's forces; By this point Kenilworth Castle consisted of the great keep, the inner bailey wall, a basic causeway across the smaller lake that preceded the creation of the Great Mere, and the local chase for hunting. De Clinton’s Keep. Windows were added much later, these would have been arrow slits and fishtail arrow slits in the original keep. THE HISTORY OF KENILWORTH CASTLE 13TH CENTURY – King John - Henry's successor, Richard I, paid relatively little attention to Kenilworth, but under King John significant building resumed at the castle.
    [Show full text]
  • ADMISSIONS POLICY September 2021
    ADMISSIONS POLICY September 2021 1 Finham Park School is an Academy and the Academy Trust of the School is the admission authority. The admission arrangements comply with the Fair Access protocol as detailed in the Admissions Code. For September 2021 Finham Park School’s Published Admission Number (PAN) for Year 7 is 270. If there are more requests for the school than there are places available within the school’s admission number, places will be allocated in accordance with the following criteria and in the order shown below: 1. Children who, at the time of admission, are in care of a local authority or are provided with accommodation by the authority (looked after children). Also children who were previously looked after but ceased to be so because they were adopted, or became subject to child arrangements order or a special guardianship order. A looked-after child is defined in Section 22 of the Children Act 1989. 2. Children who live inside or outside the catchment area served by the school, who have a brother or sister attending the school, provided that the sibling is in year 7-10 and will continue to attend Finham Park School the following year. 3. The Children of all staff who have been continuously employed by the school for a period of at least two years for the purpose of working in the school as follows: All full-time teaching staff All full-time support staff – defined as those on 37 week and above contract All part time teaching staff with a 45% and above timetable All part time support staff who work at least 15 hours per week for 37 weeks or more The two-year qualification period may be waived if a post is hard to fill.
    [Show full text]