A303/A30/A358 Corridor Feasibility Study Stage 1 Report

Total Page:16

File Type:pdf, Size:1020Kb

A303/A30/A358 Corridor Feasibility Study Stage 1 Report A303/A30/A358 Corridor Feasibility Study Stage 1 Report Stage 1 Report A303/A30/A358 Corridor Feasibility Study Prepared for The Highways Agency Date: February 2015 Elms House 43 Brook Green London W6 7EF A303/A30/A358 Corridor Feasibility Study Stage 1 Report Table of contents List of tables .....................................................................................................................2 Acronyms and abbreviations ...........................................................................................4 Executive summary ...........................................................................................................i 1 Introduction and purpose ..........................................................................................1 1.1 Introduction ..............................................................................................................1 1.2 Study scope .............................................................................................................1 1.3 Study aims and objectives ........................................................................................3 1.4 Report structure .......................................................................................................4 2 Background and historical work................................................................................5 2.1 Background ..............................................................................................................5 2.2 Previous work and decisions .....................................................................................5 2.3 A303 Working Group ................................................................................................6 2.4 Sources ................................................................................................................. 11 2.5 Availability of existing transport modelling ................................................................ 11 2.6 Potential for modal transfer and travel demand reduction ......................................... 12 3 Understanding the current situation........................................................................ 14 3.1 Introduction ............................................................................................................ 14 3.2 National, Regional and Local Policy ........................................................................ 14 3.3 Route description, characteristics and standards ..................................................... 18 3.4 Traffic .................................................................................................................... 24 3.5 Current Route Performance Indicators .................................................................... 30 3.6 Environmental Constraints ...................................................................................... 45 3.7 Other Issues and Constraints .................................................................................. 56 3.8 Economic baseline ................................................................................................. 57 3.9 Summary ............................................................................................................... 59 4 Understanding the future situation.......................................................................... 63 4.1 General .................................................................................................................. 63 4.2 Future policies and priorities ................................................................................... 63 4.3 Future growth ......................................................................................................... 63 4.4 Future changes to the transport system ................................................................... 66 4.5 Future travel demands ............................................................................................ 68 4.6 Future performance ................................................................................................ 68 4.7 Summary ............................................................................................................... 75 A303/A30/A358 Corridor Feasibility Study Stage 1 Report 5 Establish the need for intervention ......................................................................... 78 5.1 Current transport-related problems .......................................................................... 78 5.2 Future transport-related problems ........................................................................... 80 6 Identifying objectives for the study ......................................................................... 82 7 Geographic area of interest ..................................................................................... 83 8 Conclusions and recommendations ........................................................................ 85 8.1 Conclusions ........................................................................................................... 85 8.2 Recommendations ................................................................................................. 86 List of tables Table 2-1: Initial Improvement Options ................................................................................7 Table 2-2: Current PCF Stage of Improvement Schemes/Sections .......................................9 Table 2-3 : Comparison of journey times between the south west and London .................... 12 Table 3-1: Corridor Sections and Lengths .......................................................................... 18 Table 3-2: Corridor Cross-Section Lengths ........................................................................ 20 Table 3-3 A303/A30/A358 2013 Traffic Flows .................................................................... 24 Table 3-4: August Uplifts Relative October - 2013 .............................................................. 25 Table 3-5: AADT Traffic Growth on the A30 & A303 Since 2008 ......................................... 29 Table 3-6: AADT Traffic Growth Since 2004 (DfT Sources) ................................................ 30 Table 3-7: Corridor CRFs & Stresses – 2013 Neutral Month ............................................... 33 Table 3-8: Corridor CRFs & Stresses – 2013 Summer Month ............................................. 33 Table 3-9: Weekday Travel Times & Speeds ..................................................................... 37 Table 3-10: Saturday Travel Times & Speeds .................................................................... 37 Table 3-11: Sunday Travel Times & Speeds ...................................................................... 38 Table 3-12: OTRM 2013 Summary .................................................................................... 40 Table 3-13: Personal Injury Accident Severity by Year for Study Corridor ............................ 42 Table 3-14: PIA Data for Single Carriageway Sections of the Corridor ............................... 43 Table 3-15 : Casualty Data for Single Carriageway Sections of the Corridor ....................... 44 Table 3-16: Locations of Flood Risk on the A30 and A303 .................................................. 46 Table 3-17: Water Environment Designations .................................................................... 47 Table 3-18: Heritage & Historic Resources ........................................................................ 48 Table 3-19: Ecological Sites .............................................................................................. 49 Table 3-20: Landscape Features ....................................................................................... 50 Table 3-21: First Priority Location Summary....................................................................... 51 Table 3-22: Locations of Water Pollution Risk on the A30 and A303 ................................... 52 A303/A30/A358 Corridor Feasibility Study Stage 1 Report Table 3-23: Landfill Designation ........................................................................................ 52 Table 4-1: Committed Local Transport Network Enhancement Schemes with Relevance to the Corridor ...................................................................................................................... 67 Table 4-2: TEMPRO 6.2 2021, 2031 and 2041 Household & Jobs Forecasts ...................... 69 Table 4-3: Corridor CRFs & Stresses – Neutral Month ....................................................... 70 Table 4-4: Corridor CRFs & Stresses – Summer Month...................................................... 70 Table 4-5: Lengths (km) of Corridor at Different Stresses - Neutral Month ........................... 72 Table 4-6: Lengths (%) of Corridor at Different Stresses - Neutral Month ............................ 73 Table 4-7: Mvkm at Different Stresses - Neutral Month ....................................................... 73 Table 4-8: Lengths (km) of Corridor at Different Stresses - Summer Month ......................... 74 Table 4-9: Lengths (%) of Corridor at Different Stresses - Summer Month........................... 74 Table 4-10: Mkm at Different Stresses - Summer Month ..................................................... 75 Table 5-1: PIA Summary (2008 to 2012 for A30 and A303, 2009 to 2013 for A358) ............. 79 Table 5-2: Million Vehicle Kilometres at Different
Recommended publications
  • From: Melksham Rail User Group To: “Melksham Bypass Consultation” Date: 16Th January 2021
    From: Melksham Rail User Group To: “Melksham Bypass Consultation” Date: 16th January 2021 Dear Sirs, Input to current "A350 Melksham Bypass" consultation from the Melksham Rail User Group Thank you for the early opportunity to provide input into the "A350 Melksham Bypass" consultation process. This input is written on behalf of the Melksham Rail User Group and was unanimously adopted at the group meeting on Wednesday 13th January 2021. 1. Please consider the Melksham Rail User Group and the TransWilts Community Rail Partnerships as stakeholders and consultees throughout this process 2. We commend options 4 and 5 (rail and bus) public transport and option 6 (cycle and walking) improvements, and note that they score very highly on deliverability, affordability and acceptability. Whilst they are unlikely to meet your objectives on their own, they should provide a valuable and significant element implemented as thoroughly as practical in any solution 3. Please look at alternative of long distance traffic routing via the already Highways England / Trunk A46/A36 route rather than by increasing capacity on the regional A350 (you have confirmed you can add other options at this stage). 4. Please take a look at the alternative of rail use for longer distance freight and medium and longer passenger traffic via the TransWilts railway line which parallels the A350 road. 5. Please ensure that any railway crossings (options 9a, 9b, 9c, 8a and 8b) allow for the line to be restored to a double track such that trains can path both ways under or over the bridge at the same time. Please rule out level crossings at each point that rail and road cross.
    [Show full text]
  • WILTSHIRE Extracted from the Database of the Milestone Society
    Entries in red - require a photograph WILTSHIRE Extracted from the database of the Milestone Society National ID Grid Reference Road No. Parish Location Position WI_AMAV00 SU 15217 41389 UC road AMESBURY Church Street; opp. No. 41 built into & flush with churchyard wall Stonehenge Road; 15m W offield entrance 70m E jcn WI_AMAV01 SU 13865 41907 UC road AMESBURY A303 by the road WI_AMHE02 SU 12300 42270 A344 AMESBURY Stonehenge Down, due N of monument on the Verge Winterbourne Stoke Down; 60m W of edge Fargo WI_AMHE03 SU 10749 42754 A344 WINTERBOURNE STOKE Plantation on the Verge WI_AMHE05 SU 07967 43180 A344 SHREWTON Rollestone top of hill on narrow Verge WI_AMHE06 SU 06807 43883 A360 SHREWTON Maddington Street, Shrewton by Blind House against wall on Verge WI_AMHE09 SU 02119 43409 B390 CHITTERNE Chitterne Down opp. tank crossing next to tree on Verge WI_AMHE12 ST 97754 43369 B390 CODFORD Codford Down; 100m W of farm track on the Verge WI_AMHE13 ST 96143 43128 B390 UPTON LOVELL Ansty Hill top of hill,100m E of line of trees on Verge WI_AMHE14 ST 94519 42782 B390 KNOOK Knook Camp; 350m E of entrance W Farm Barns on bend on embankment WI_AMWH02 SU 12272 41969 A303 AMESBURY Stonehenge Down, due S of monument on the Verge WI_AMWH03 SU 10685 41600 A303 WILSFORD CUM LAKE Wilsford Down; 750m E of roundabout 40m W of lay-by on the Verge in front of ditch WI_AMWH05 SU 07482 41028 A303 WINTERBOURNE STOKE Winterbourne Stoke; 70m W jcn B3083 on deep verge WI_AMWH11 ST 990 364 A303 STOCKTON roadside by the road WI_AMWH12 ST 975 356 A303 STOCKTON 400m E of parish boundary with Chilmark by the road WI_AMWH18 ST 8759 3382 A303 EAST KNOYLE 500m E of Willoughby Hedge by the road WI_BADZ08 ST 84885 64890 UC road ATWORTH Cock Road Plantation, Atworth; 225m W farm buildings on the Verge WI_BADZ09 ST 86354 64587 UC road ATWORTH New House Farm; 25m W farmhouse on the Verge Registered Charity No 1105688 1 Entries in red - require a photograph WILTSHIRE Extracted from the database of the Milestone Society National ID Grid Reference Road No.
    [Show full text]
  • West Ashton Neighbourhood Development Plan 2018-2026
    WEST ASHTON NEIGHBOURHOOD DEVELOPMENT PLAN 2018-2026 Referendum Version Contents 1. Introduction ............................................................................... 3 2. Portrait of West Ashton ............................................................ 7 3. Vision and Objectives ............................................................. 14 4. NDP Policies ........................................................................... 17 5. Informal Aspirations ................................................................ 33 6. Monitoring and Review ........................................................... 34 Appendix 1: Evidence Base Appendix 2: The Neighbourhood Area and Parish of West Ashton Appendix 3: West Ashton and Ashton Park Appendix 4: West Ashton: Landscape and Biodiversity Appendix 5: West Ashton and Heritage Appendix 6: West Ashton and Flood Risk Appendix 7: West Ashton and Sustainable Transport Appendix 8: West Ashton Researchers 2 1. Introduction The West Ashton Neighbourhood Development Plan (NDP) covers the whole of the Parish of West Ashton which is a rural community located adjacent to the county town of Trowbridge. 1.1. West Ashton Parish Council resolved to prepare a Neighbourhood Development Plan (NDP) on 21st July 2015. Neighbourhood planning was introduced by the Localism Act 2011 and gives communities the power to develop a shared vision for their area. Neighbourhood plans can shape, direct and help to deliver sustainable development, by influencing local planning decisions by Wiltshire Council
    [Show full text]
  • A303 PI Inspector's Report
    Report to the First Secretary of The Planning State and the Secretary of State for Inspectorate 4/09 Kite Wing Transport Temple Quay House 2 The Square Temple Quay By Michael Ellison MA (Oxon) Bristol BS1 6PN 0117 372 6372 An Inspector appointed by the First Secretary Date: 31 January of State and the Secretary of State for 2005 Transport Assisted by Clive Cochrane Dip Arch, Reg Arch, MSc, MRTPI HIGHWAYS ACT 1980 ACQUISITION OF LAND ACT 1981 ROAD TRAFFIC REGULATION ACT 1984 THE A303 TRUNK ROAD (STONEHENGE IMPROVEMENT) ORDER 200 THE A303 TRUNK ROAD (STONEHENGE IMPROVEMENT) SLIP ROADS ORDER 200 THE A303 TRUNK ROAD (STONEHENGE IMPROVEMENT) (DETRUNKING) ORDER 200 THE A303 TRUNK ROAD (STONEHENGE IMPROVEMENT) SIDE ROADS ORDER 200 THE A303 TRUNK ROAD (STONEHENGE IMPROVEMENT) COMPULSORY PURCHASE ORDER (NO. ) 200 THE A303 TRUNK ROAD STONEHENGE IMPROVEMENT (COUNTESS ROUNDABOUT TO LONGBARROW CROSSROADS) (PROHIBITION OF CERTAIN CLASSES OF TRAFFIC AND PEDESTRIANS) ORDER 200 AND THE A303 TRUNK ROAD STONEHENGE IMPROVEMENT (STONEHENGE BYWAY) (PROHIBITION OF MOTOR VEHICLES) ORDER 200 Dates of Inquiry: 17 February 2004 to 11 May 2004 Ref: HA61/4/3 REPORT TO THE FIRST SECRETARY OF STATE AND THE SECRETARY OF STATE FOR TRANSPORT FILE REF: HA61/4/3 CONTENTS Section Subject Page Number Case Details 1 1 Introduction 3 2 Description of the site and its surroundings 7 3 Procedural Submission 12 4 The case of the Highways Agency 14 Background and history of the scheme 14 The need for the scheme 17 Traffic forecasts 20 The scheme proposals 21 Design standards 26
    [Show full text]
  • THE UFO REPORT App Endix Some Major UFO Organizations 223 the Crop Circles 224 Some UFO Journals 225 Bibliography 226 Services 228 Index 231 Editor's Foreword
    Subject: Unexplained Lights Later in the night a red sun/ike light was seen through the trees. It moved about and pulsed. At one point it appeared to throw offglowing particles and then broke into five separate white objects and then disappeared. Immediately thereafter, three starlike objects were noticed in the sky, two objects to the north and one to the south, all of which were about 1 oo offthe horizon. The objects moved rapidly in sharp angular movements and displayed red, green and blue lights. The objects to the north appeared to be elliptical through an 8-12 power lens. Then they turned to full circles. The objects to the north remained in the sky for an hour or more. The object to the south was visible for two or three hours and beamed down a stream of light from time to time. Numerous individuals, including the undersigned, witnessed the activities. -from an oHicial memorandum wriHen by Charles I. Halt, Lt. Col., USAF to the British Ministry of Defense January 13, 1981 Other UFO Reports from Avon Books COMMUNION by Wh itley Strieber THE GULF BREEZE SIGHTINGS: THE MosT AsTOUNDING MuLTIPLE UFO SIGHTINGs IN U.S. HISTORY by Ed Wa lters and Frances Wa lters PHENOMENON: FORTY YEARS OF FLYING SAUCERS edited by John Sp encer and Hilary Evans REPORT ON COMMUNION by Ed Conroy TRANSFORMATION by Wh itley Strieber UFO CRASH AT ROSWELL by Ke vin D. Randle and Donald R. Schmitt Avon Books are available at special quantity discounts for bulk purchases for sales promotions, premiums, fund raising or edu­ cational use.
    [Show full text]
  • Salisbury Plain SAC Conservation Objectives Supplementary Advice
    European Site Conservation Objectives: Supplementary Advice on Conserving and Restoring Site Features Salisbury Plain Special Area of Conservation (SAC) Site code: UK0012683 Date of Publication: 20 February 2017 Page 1 of 30 About this document This document provides Natural England’s supplementary advice about the European Site Conservation Objectives relating to Salisbury Plain SAC. This advice should therefore be read together with the SAC Conservation Objectives which are available here. You should use the Conservation Objectives, this Supplementary Advice and any case-specific advice given by Natural England, when developing, proposing or assessing an activity, plan or project that may affect this site. This Supplementary Advice to the Conservation Objectives presents attributes which are ecological characteristics of the designated species and habitats within a site. The listed attributes are considered to be those that best describe the site’s ecological integrity and which, if safeguarded, will enable achievement of the Conservation Objectives. Each attribute has a target which is either quantified or qualitative depending on the available evidence. The target identifies as far as possible the desired state to be achieved for the attribute. The tables provided below bring together the findings of the best available scientific evidence relating to the site’s qualifying features, which may be updated or supplemented in further publications from Natural England and other sources. The local evidence used in preparing this supplementary advice has been cited. The references to the national evidence used are available on request. Where evidence and references have not been indicated, Natural England has applied ecological knowledge and expert judgement.
    [Show full text]
  • Report on the Joint World Heritage Centre / ICOMOS Advisory Mission to Stonehenge, Avebury and Associated Sites
    World Heritage 41 COM Patrimoine mondial Paris, 27 June / 27 juin 2017 Original: English UNITED NATIONS EDUCATIONAL, SCIENTIFIC AND CULTURAL ORGANIZATION ORGANISATION DES NATIONS UNIES POUR L'EDUCATION, LA SCIENCE ET LA CULTURE CONVENTION CONCERNING THE PROTECTION OF THE WORLD CULTURAL AND NATURAL HERITAGE CONVENTION CONCERNANT LA PROTECTION DU PATRIMOINE MONDIAL, CULTUREL ET NATUREL WORLD HERITAGE COMMITTEE / COMITE DU PATRIMOINE MONDIAL Forty-first session / Quarante-et-unième session Krakow, Poland / Cracovie, Pologne 2-12 July 2017 / 2-12 juillet 2017 Item 7 of the Provisional Agenda: State of conservation of properties inscribed on the World Heritage List and/or on the List of World Heritage in Danger Point 7 de l’Ordre du jour provisoire: Etat de conservation de biens inscrits sur la Liste du patrimoine mondial et/ou sur la Liste du patrimoine mondial en péril MISSION REPORT / RAPPORT DE MISSION Stonehenge, Avebury and Associated Sites (United Kingdom of Great Britain and Northern Ireland) (373bis) Stonehenge, Avebury et sites associés (Royaume-Uni de Grande-Bretagne et d'Irlande du Nord) (373bis) 31 January – 3 February 2017 Report on the joint World Heritage Centre / ICOMOS Advisory Mission to Stonehenge, Avebury and Associated sites 31 January – 3 February 2017 Table of contents Executive Summary 1. Introductory Statements 1.1 Acknowledgments 1.2. Aims and mandate of the February 2017 Mission 2. Context and background 2.1 Statement of Outstanding Universal Value (OUV) 2.2 Summary 1st Mission recommendations (October 2015 – report April 2016). 2.3 Reactions by the civil society 2.4 Governance and consensus building among heritage bodies 3. Responses by the SP to the recommendations of the first Mission - April 2016 3.1 Willingness to respond 3.2 Issues of archaeological organisation and quality control 3.3 Issue of visitor numbers and behaviour 4.
    [Show full text]
  • Stonehenge A303 Improvement: Outline Assessment of the Impacts
    Stonehenge A303 improvement: outline assessment of the impacts on the Outstanding Universal Value of the World Heritage property of potential route options presented by Highways England for January 2017 Nicola Snashall BA MA PhD MCIfA National Trust Christopher Young BA MA DPhil FSA Christopher Young Heritage Consultancy January 2017 ©Historic England and the National Trust Stonehenge A303 improvements: outline assessment of the impacts on the Outstanding Universal Value of the World Heritage property of potential route options presented by Highways England for January 2017 Executive Summary Introduction In 2014, English Heritage (now Historic England) and the National Trust commissioned an assessment (Snashall, Young 2014) on the potential impact of new road options, including a tunnel, for the A303 within the Stonehenge component of the Stonehenge, Avebury and Associated Sites World Heritage property. Since at that time, there were no detailed proposals, that report considered four possible alternatives and concluded that, of these, an off-line route with a tunnel of 2.9kms length would be the most deliverable solution. The government remains committed to improving the A303 and to funding sufficient for a tunnel of at least 2.9kms length within the World Heritage property. Highways England are consulting in early 2017 on route options developed since 2014 for this road scheme through the World Heritage property and bypassing Winterbourne Stoke village to the west. This report is an outline assessment of these initial options on the Outstanding Universal Value (OUV) of the World Heritage property. It has been commissioned to assess the impact of the latest road options in the light of updated archaeological information.
    [Show full text]
  • Project Name Construction Start Actual Construction End
    Construction Construction Construction Project Name Start Actual End Planned End Actual M5 J11a-12 MP 86/9 Geotech 10/01/2013 19/04/2013 21/03/2013 M5 J20-21 VRS MP 155/5 - 159/0 10/01/2013 17/01/2014 17/01/2014 M5 J31 Exminster Drainage 02/09/2011 30/10/2011 30/10/2011 A38 Lee Mill to Voss Farm FS C 01/10/2009 01/04/2011 01/04/2011 A30 SCORRIER-AVERS W/B & E/B C 02/02/2012 01/07/2012 01/03/2012 A30 PLUSHA KENNARDS HSE E/B C 18/09/2012 24/09/2012 25/09/2012 A38 WHISTLEY HILL DRAINAGE C 07/11/2011 24/12/2011 23/12/2011 A47 Guyhirn Bank C NP 19/09/2012 28/09/2012 29/09/2012 A120 Coggeshall Bypass East C 13/11/2012 16/11/2012 16/11/2012 A14 Orwell to Levington C 04/11/2013 11/11/2013 11/11/2013 A14SpittalsI/CResurfacingC NP 02/07/2012 07/08/2013 26/07/2012 A38 Clinnick R/W & White C 11/03/2012 06/07/2012 06/07/2012 A30 Whiddon Down to Woodleigh 01/12/2011 14/02/2012 14/02/2012 A49 KIMBOLTON RETAINING-CapRd 11/02/2013 10/04/2013 30/04/2013 NO3:A404 A308toA4130 SB Appl C 16/07/2012 18/07/2012 21/07/2012 NO3 M4 J6-7 EB Cippenham C 24/09/2012 11/08/2012 16/11/2012 A36 Southington Farm Geotech C 05/09/2011 24/06/2011 21/10/2011 A303 BOSCOMBE DOWN RS C 01/01/2011 30/06/2011 30/06/2011 M5 J18 Avonmouth slip lighti C 01/02/2012 31/03/2012 31/03/2012 A303 South Pethrton St Light C 01/05/2011 30/09/2011 30/09/2011 A303Cartgate RAB St Lighting C 01/01/2012 29/02/2012 29/02/2012 A4 Portway Signals C 01/02/2011 30/09/2011 30/09/2011 M4/M5 Alm.
    [Show full text]
  • A303 Amesbury to Berwick Down
    A303 Amesbury to Berwick Down 8 e m TR010025 u l o V Deadline 4 8.30.6 - Written summaries of oral submissions put at Traffic and Transport hearing on 13th June 2019 APFP Regulation 5(2)(q) Planning Act 2008 The Infrastructure Planning (Examination Procedure) Rules 2010 June 2019 A303 Amesbury to Berwick Down Infrastructure Planning Planning Act 2008 The Infrastructure Planning (Examination Procedure) Rules 2010 A303 Amesbury to Berwick Down Development Consent Order 20[**] Written summaries of oral submissions put at Traffic and Transport hearing on 13th June 2019 Regulation Number: Regulation 5(2)(q) Planning Inspectorate Scheme TR010025 Reference Application Document Reference 8.30.6 Author: A303 Amesbury to Berwick Down Project Team, Highways England Version Date Status of Version Rev 0 21 June 2019 Deadline 4 Issue A303 Amesbury to Berwick Down Table of Contents Introduction ................................................................................................................ 2 3 METHODOLOGY AND MODELLING............................................................... 3 4 PUBLIC RIGHTS OF WAY ............................................................................... 8 5 CONSTRUCTION TRAFFIC .......................................................................... 22 6 OPERATIONAL TRAFFIC .............................................................................. 23 7 ASSESSMENT OF OTHER SUGGESTED ROUTES .................................... 27 8 ECONOMIC AND BENEFIT COST RATIO ASSESSMENT ..........................
    [Show full text]
  • Whitchurch to Andover Walk
    Saturday Walkers Club www.walkingclub.org.uk Whitchurch to Andover walk Longparish, thatched cottages and the River Test Longparish, thatched cottages & River Test Length 19.0km (11.8 miles), 5 hours. For the whole outing, including trains, sights and meals, allow at least 9 hours. Toughness 3 out of 10. OS Maps Explorers 131 & 144 or Landranger 185. Whitchurch, map reference SU 464 489, is in Hampshire, 16km north of Winchester. Features This is a lovely, longish walk that is neither steep nor particularly liable to mud. At lunchtime the walk comes to so many thatched cottages that a visitor to this country might suppose thatch to be the most popular roofing material for English country villages. The morning leg of this walk is glorious and takes you through some delightful, peaceful Hampshire countryside. The route initially follows the line of a dismantled railway, then passes the Church of All Hallows in Whitchurch to go beside the crystal clear and gently flowing River Test – ‘England’s most famous trout stream’. On then to the village of Tufton, with its interesting church. A new path returns you to the route of the dismantled railway as you by-pass Paper Mill Farm. Then on to Longparish where you stop for lunch at one of its two pubs (but note: the second pub is being refurbished as a Community pub, June 2021. It should re-open later in 2021). https://www.walkingclub.org.uk/walk/whitchurch-to-andover/ 1/14 The church at Longparish, with punishment stocks beside it, is your first stop after lunch.
    [Show full text]
  • Preliminary Outline Assessment of the Impact of A303 Improvements On
    Preliminary Outline Assessment of the impact of A303 improvements on the Outstanding Universal Value of the Stonehenge Avebury and Associated Sites World Heritage property Nicola Snashall BA MA PhD MCIfA National Trust Christopher Young BA MA DPhil FSA Christopher Young Heritage Consultancy December 2014 ©English Heritage and the National Trust Preliminary Outline Impact Assessment of A303 improvements on the Outstanding Universal Value of the Stonehenge and Avebury World Heritage property December 2014 REVISIONS December 2014 version including minor corrections and clarifications following copy reading and internal proofing. Executive Summary The Government have asked the Highways Agency to prepare feasibility studies for the improvement of six strategic highways in the UK. One of these is the A303 including the single carriageway passing Stonehenge. This study has been commissioned by English Heritage and the National Trust to make an outline preliminary assessment of the potential impact of such road improvements on the Outstanding Universal Value of the World Heritage property. A full impact assessment, compliant with the ICOMOS guidance and with EU and UK regulations for Environmental Impact Assessment (EIA) would be a much larger task than this preliminary assessment. It would be prepared by the promoter of a road scheme and would require more supporting material and more detailed analysis of impacts. The present study is an outline preliminary assessment intended to inform the advice provided by the National Trust and English Heritage to the Highways Agency and the Department for Transport. It deals only with impact on Outstanding Universal Value and does not examine impacts on other nationally or locally significant heritage.
    [Show full text]