KRISHNA WATER DISPUTES Trlbunal
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
1 Issues Pertaining to Peninsular Rivers Wing Interstate Matters: (A) Mullaperiyar Dam Issue 1. on 29-10-1886, a Lease In
Issues pertaining to Peninsular Rivers wing i. Interstate matters: (a) Mullaperiyar Dam Issue 1. On 29‐10‐1886, a lease indenture for 999 years was made between Maharaja of Travancore and Secretary of State for India for Periyar irrigation works. By another agreement in 1970, Tamil Nadu was permitted to generate power also. The Mullaperiyar Dam was constructed during 1887‐1895. Its full reservoir level is 152 ft and it provides water through a tunnel to Vaigai basin in Tamil Nadu for irrigation benefits in 68558 ha area. 2. In 1979, reports appeared in Kerala Press about damage to Periyar Dam. On 25th November, 1979 Chairman, CWC held meeting with the officers of Irrigation and Electricity, Deptt. of Kerala and PWD of Tamil Nadu and some emergency medium term measures and long‐term measures for strengthening of Periyar Dam were decided. A second meeting under the Chairmanship of Chairman, CWC was held on 29th April 1980 and it was opined that after the completion of emergency and medium term measures, the water level in the reservoir can be raised up to 145 ft. 3. The matter became sub‐judice with several petitions. On the directions of the Supreme Court in its order dated 28.4.2000, Minister (WR) convened the Inter‐State meeting on 19.5.2000 and as decided in the meeting, an Expert Committee under Member (D&R), CWC with representatives from both States was constituted in June 2000 to study the safety of the dam. The Committee in its report of March, 2001 opined that with the strengthening measures implemented, the water level can be raised from 136 ft. -
District Survey Report - 2018
District Survey Report - 2018 4 DEPARTMENT OF MINES AND GEOLOGY Government of Andhra Pradesh DISTRICT SURVEY REPORT - KRISHNA DISTRICT Prepared by ANDHRA PRADESH SPACE APPLICATIONS CENTRE (APSAC) ITE & C Department, Govt. of Andhra Pradesh 2018 i District Survey Report - 2018 ACKNOWLEDGEMENTS APSAC wishes to place on record its sincere thanks to Sri. B.Sreedhar IAS, Secretary to Government (Mines) and the Director, Department of Mines and Geology, Govt. of Andhra Pradesh for entrusting the work for preparation of District Survey Reports of Andhra Pradesh. The team gratefully acknowledge the help of the Commissioner, Horticulture Department, Govt. of Andhra Pradesh and the Director, Directorate of Economics and Statistics, Planning Department, Govt. of Andhra Pradesh for providing valuable statistical data and literature. The project team is also thankful to all the Joint Directors, Deputy Directors, Assistant Directors and the staff of Mines and Geology Department for their overall support and guidance during the execution of this work. Also sincere thanks are due to the scientific staff of APSAC who has generated all the thematic maps. VICE CHAIRMAN APSAC ii District Survey Report - 2018 Contents Page Acknowledgements List of Figures List of Tables 1 Salient Features of Krishna District 1 1.1 Administrative Setup 1 1.2 Drainage 2 1.2a Kolleru Lake- A eco-sensitive zone 4 1.3 Climate and Rainfall 4 1.4 Transport and Communications 9 1.5 Population and Literacy 10 1.6 Important Places 11 1.6a Places of Tourist Interest 11 1.6b Places of -
Water Resources Department Performance Budget
GOVERNMENT OF KARNATAKA WATER RESOURCES DEPARTMENT (MAJOR, MEDIUM IRRIGATION AND CADA) PERFORMANCE BUDGET 2017-18 JUNE 2017 1 PREFACE The Administrative Reforms Commission set up by the Government of India, inter alia, recommended that Department/Organizations of both the Centre and the States, which are in charge of development programmes, should introduce performance budgeting. In accordance with this suggestion, the Water Resources Department has been publishing performance budget from the year 1977-78. The performance budget seeks to present the purpose and the objective for which funds are requested, the cost of the various programmes and activities and quantitative data, measuring the work performed or services rendered under each programme and activity. In other words, performance budget represents a work plan conceived in terms of functions, programmes, activities and projects with the financial and physical aspects closely interwoven in one document. It may be mentioned here that, in the performance budget compiled now, an attempt has been made to relate the traditional budget to the programmes and activities. Suggestions for improvements are welcome and these would be gratefully received and considered while publishing the performance budget in the coming years. Bangalore Principal Secretary to Government June 2017 Water Resources Department 2 INTRODUCTION Performance budgeting helps in focusing attention on programmes, activities and their costs as also the performance in both physical and financial terms. Having regard to the merits of the technique, the Government of Karnataka has decided to adopt the system. As is inherent in the technique of performance budgeting, programme has been presented giving brief particulars of the programme, irrigation potential activity, classification and source of finance. -
WATER RESOURCE MANAGEMENT Evaluating the Benefits and Costs of Developmental Interventions in the Water Sector in Andhra Pradesh
WATER RESOURCE MANAGEMENT Evaluating the Benefits and Costs of Developmental Interventions in the Water Sector in Andhra Pradesh Cost-Benefit Analysis Dr. Dinesh AUTHORS: Kumar Executive Director Institute for Resource Analysis and Policy (IRAP), Hyderabad © 2018 Copenhagen Consensus Center [email protected] www.copenhagenconsensus.com This work has been produced as a part of the Andhra Pradesh Priorities project under the larger, India Consensus project. This project is undertaken in partnership with Tata Trusts. Some rights reserved This work is available under the Creative Commons Attribution 4.0 International license (CC BY 4.0). Under the Creative Commons Attribution license, you are free to copy, distribute, transmit, and adapt this work, including for commercial purposes, under the following conditions: Attribution Please cite the work as follows: #AUTHOR NAME#, #PAPER TITLE#, Andhra Pradesh Priorities, Copenhagen Consensus Center, 2017. License: Creative Commons Attribution CC BY 4.0. Third-party-content Copenhagen Consensus Center does not necessarily own each component of the content contained within the work. If you wish to re-use a component of the work, it is your responsibility to determine whether permission is needed for that re-use and to obtain permission from the copyright owner. Examples of components can include, but are not limited to, tables, figures, or images. Evaluating the Benefits and Costs of Developmental Interventions in the Water Sector Andhra Pradesh Priorities An India Consensus Prioritization -
Need to Ensure Adequate Availability of Water in Palar River in Tamil Nadu and Also Expedite Pennayar - Palar Link Canal Project
an> Title: Need to ensure adequate availability of water in Palar River in Tamil Nadu and also expedite Pennayar - Palar Link Canal Project. SHRI B. SENGUTTUVAN (VELLORE): River Palar, an inter-State river, originating in Karnataka, runs to a distance of 53 kms in Karnataka, 30 kms in Andhra Pradesh and 222 kms in Tamil Nadu. The river is covered under Schedule-A of the Madras-Mysore Agreement. As per Clause II of Agreement upstream State cannot construct any dam or reservoir without consent of the downstream State. During the monsoons, where adequate rainfall is received, the waters of the river replenish more than one thousand tanks, ponds and lakes on either side of its banks, which are the sources of water of drinking and irrigation in Vellore and Kancheepuram Districts. The Palar ayacut supports cultivation of roughly 4.2 lakh acres of lands. However, due to the construction of Check-dams across the river by neighbouring States of Karnataka and Andhra Pradesh, the water flow in the river has completely ceased leaving the land patched, dry and drought-stricken. To compound the problems, the Andhra Pradesh Government is raising the height of check dam in Perumpallam village on the very border of Tamil Nadu State to a height of 12 feet and more with a view to converting it into a reservoir. This would seriously impede water flow in the Palar and deprive Tamil Nadu of the much needed Palar water. In order to protect the ayacutdars, the inter-state Palar River has to be nationalised removing all dams and barriers constructed across it and the 52 km long Pennayar-Palar Link Canal Project has to be implemented expeditiously. -
Water Demand Management in Areas of Groundwater Over-Exploitation
ENGINEERING KNOWLEDGE AND RESEARCH PROGRAMME (KaR 8332) Water demand management in areas of groundwater over-exploitation WATER DEMAND MANAGEMENT STRATEGY FORMULATION FINAL REPORT FEBRUARY 2006 in association with VRV Consultants (P) Ltd, Chennai, India Jouzy & Partners, Amman, Jordan DFID R8332 Water demand management in areas of groundwater over-exploitation WATER DEMAND MANAGEMENT - STRATEGY FORMULATION FINAL REPORT - February 2006 __________________________________________________________________________ Contents MAIN REPORT Page No. PREFACE 1 S. SUMMARY 3 1. INTRODUCTION 7 1.1 Purpose of the Report 7 1.2 International perspective 9 1.3 Water sector strategies 11 2. WATER DEMAND MANAGEMENT 15 2.1 Definition 15 2.2 Potential measures 15 2.2.1 Previous studies 15 2.2.2 Broad categories of water demand management measures 17 2.3 Potential impacts 19 3. THE POOR AND VULNERABLE 21 3.1 Water, poverty and vulnerability 21 3.1.1 The sustainable livelihoods approach 21 3.1.2 Water-Poverty links 23 3.1.3 Vulnerability assessment 24 4. STRATEGY FORMULATION 27 4.1 General 27 4.1.1 Policy review 27 4.1.2 Strategy formulation 28 4.2 Institutional and community aspects 31 4.3 Poor and vulnerable identified 34 4.4 Data requirements 35 4.5 Water demand management options defined 37 4.6 Enabling and supporting measures 40 4.7 Water savings and unit cost of water saved 41 4.7.1 General 41 4.7.2 Financial and economic aspects 42 4.8 Impact of demand management measures 43 01 June 2006 i DFID R8332 Water demand management in areas of groundwater over-exploitation WATER DEMAND MANAGEMENT - STRATEGY FORMULATION FINAL REPORT - February 2006 __________________________________________________________________________ 4.9 Comparison of measures and their likelihood of success 45 4.9.1 Impact of measures 45 4.9.2 Pre-conditions and likelihood of success 46 5. -
Techofworld.In Techofworld.In
Techofworld.In Techofworld.In Indira Sagar Dam of Madhya Pradesh has been constructed on which river? 1.Penna river 2.Krishna river 3.Narmada river 4.Palar river 5.None of these Answer Answer –3.Narmada river Rihand Dam has been constructed on Rihand river in which Indian state? 1.Tamil Nadu 2.Karnataka 3.Andhra Pradesh 4.Uttar Pradesh 5.None of these Answer Answer – 4.Uttar Pradesh In which stated the Sardar Sarovar Dam has been constructed on Narmada river? 1.Tamil Nadu 2.Madhya Pradesh 3.Andhra Pradesh 4.Uttar Pradesh 5.None of these Answer Answer – 5.None of these – Gujarat Ukai Dam located in Gujarat has been constructed on which river? 1.Tapi river 2.Penna river 3.Narmada river 4.Karjan river 5.None of these Answer Answer – 1.Tapi river Techofworld.In Techofworld.In Nagarjuna Sagar Dam in Andhra Pradesh is built on which river? 1.Periyar river 2.Penna river 3.Narmada river 4.Krishna river 5.None of these Answer Answer – 4.Krishna river Pong Dam of Himachal Pradesh has been constructed on which river? 1.Beas river 2.Tapi river 3.Gola river 4.Subansiri river 5.None of these Answer Answer – 1.Beas river Srisailam dam on Krishna river is located in which state? 1.Tamil Nadu 2.Karnataka 3.Madhya Pradesh 4.Gujarat 5.None of these Answer Answer – 5.None of these – Andhra Pradesh Supa Dam on Kali Nadi river is located in_________. 1.Himachal Pradesh 2.Arunachal Pradesh 3.Punjab 4.Karnataka 5.None of these Answer Answer – 4.Karnataka Techofworld.In Techofworld.In Tehri Dam of Uttarakhand is built on which river? 1.Bhagirathi river 2.Tapi -
MGL-INT-1-2016-UNPAID SHAREHOLDERS LIST AS 30-06-2021.Xlsx
FOLIO-DEMAT ID DWNO NETDIV NAME ADDRESS 1 ADDRESS 2 ADDRESS 3 City PIN 1203280000222453 16110214 23.00 BENOY CHERIAN . P O BOX 10315 DANWAY QATAR DOHA 0 IN30167010076943 16111106 45.00 SHARANJIT KAUR E - 205 AMAR COLONY LAJPAT NAGAR - IV NEW DELHI 110024 IN30226913012127 16112294 7.00 ABHISHEK ATTRI FLAT NO 78 POCKET 4 BLOCK D SECTOR 15 ROHINI DELHI DELHI INDIA 110085 1204470006200258 16112337 9.00 SATYAPAL SINGH D-1/6A PHASE-1 BLOCK D-1 BUDDH VIHAR DELHI 110086 IN30177416845663 16114732 45.00 POOJA SINGHAL H NO 349 STRT MAMOORA GANV VILL MAMOORA POLICE STN SEC 58 GAUTAM BUDH NAGAR NOIDA 201307 IN30105510700089 16114941 118.00 DAYA SHANKER SHUKLA 10/175 KHALASI LINE KANPUR 208002 1202060000069367 16110595 45.00 INDERA DEVI 7232 ROOP NAGAR NEW DELHI 110007 1204470005506787 16111071 9.00 PANKAJ SETHI A-I-136 LAJPAT NAGAR I DELHI 110024 1204470001327271 16111440 11.00 ANUPAMA GUPTA 145/5 FRIENDS ENCLAVE S P ROAD NANGLOI DELHI 110041 IN30131320232745 16111627 39.00 PAWAN KUMAR JAIN 172 WEST AZAD NAGAR OPP EVERGREEN PUBLIC SCHOOL KRISHNA NAGAR DELHI 110051 1204470002696978 16111937 5.00 BALJIT SINGH 25 - B HARI NAGAR DELHI DELHI 110064 IN30223610816408 16112288 900.00 MANORANJAN SOOD 81 NAVYUG APARTMENTS SECTOR 9 ROHINI DELHI 110085 IN30223610157507 16110526 45.00 RAJEEV SETHI 14 A/3 W E A KAROL BAGH NEW DELHI 110005 1204470002710628 16110557 11.00 SHEHZAD AHMAD 3592 MAIN ROAD BARA HINDU RAO DELHI 110006 1203320007146634 16110882 270.00 MOHINDER KAUR B-162 I FLOOR FATEH NAGAR DELHI 110018 IN30311610826815 16111208 40.00 VIDHI NARANG J -101 -
Are You Suprised ?
Chapter 2 Physical features 2.1 Geographical Disposition The Pennar (Somasila) – Palar - Cauvery (Grand Anicut) link canal off takes from the existing Somasila reservoir located across the Pennar River near Somasila village in Nellore district of Andhra Pradesh state. The link canal is proposed to pass through the Kaluvaya, Rapur, Dakkili, Venkatagiri mandals of Nellore district; Srikalahasti, Thottambedu, Pitchattur and Nagari mandals of Chittoor district of Andhra Pradesh state, Tiruttani taluk of Tiruvallur district; Arakonam taluk of Vellore district; Cheyyar and Vandavasi taluks of Tiruvannamalai district; Kancheepuram, Uthiramerur taluks of Kancheepuram district; Tindivanam, Gingee, Villupuram, Tirukoilur taluks of Villupuram district; Ulundurpettai, Vridhachalam, Tittagudi taluks of Cuddalore district; Udaiyarpalayam, Ariyalur taluk of Perambalur district; and Lalgudi taluk of Tiruchchirappalli district of Tamil Nadu state.The link canal alignment passes through Pennar basin, Streams between Pennar and Palar basins, Palar basin and streams between Palar and Cauvery basins. The link canal takes off from the right flank of Somasila dam with a full supply level of 95.420 m. and runs parallel on right side of the Kandaleru flood flow canal, upto RD 10 km. The canal generally runs in south direction till it out-falls into Grand Anicut across Cauvery River at RD 529.190 km. The major rivers that would be crossed by the canal are Swarnamukhi, Arani Ar, Nagari, Palar, Cheyyar, Ponnaiyar, and Vellar. The districts that would be benefited by the link canal through enroute irrigation are Nellore, Chittoor of Andhra Pradesh state and Tiruvallur, Kancheepuram, Vellore, Tiruvannamalai, Villupuram, Cuddalore districts of Tamil Nadu state and Pondicherry (U.T). -
Department of Mines and Geology
Government of Andhra Pradesh DEPARTMENT OF MINES AND GEOLOGY DISTRICT SURVEY REPORT KRISHNA DISTRICT Prepared by ANDHRA PRADESH SPACE APPLICATIONS CENTRE (APSAC) Planning Department, Govt. of Andhra Pradesh July 2018 ACKNOWLEDGEMENTS We are grateful to the Secretary to Government (Mines) and the Director, Department of Mines and Geology, Govt. of Andhra Pradesh for entrusting the work for preparation of District Survey Reports of Andhra Pradesh. We gratefully acknowledge the help of the Director, Directorate of Economics and Statistics, Planning Department, Govt. of A.P. for providing valuable literature. We owe a great deal to Sri. G.Sreenivas Choudhary, Deputy Director, (Mines) for his overall support and guidance during the execution of this work. We are also thankful to the Assistant Directors of Mines and Geology of Vijayawada and Nandigama offices for their support in providing information. Our sincere thanks are due to the scientific staff of APSAC who has generated all the thematic maps. VICE CHAIRMAN APSAC CONTENTS 1 Salient Features of Krishna District Page Number 1.1 Administrative Setup 1 1.2 Drainage 2 1.3 Climate and Rainfall 5 1.4 Agriculture and Soils 6 1.5 Transport and Communications 7 1.6 Population and Literacy 8 1.7 Aquaculture in Krishna District 9 1.8 Important Places 12 1.8a. Places of Tourist Interest 12 1.8b. Places of Religious and Cultural Importance 13 1.8c. Places of Economic and Commercial Importance 15 2 Geology and Mineral Resources of the District 17 2.1 Geology of Krishna District 17 2.2 Mineral Resources of Krishna District 22 2.3 Geomorphology of Krishna District 36 2.3a. -
Assessment of Fluoride Concentration in Palar River in Kanchipuram District, Tamil Nadu, India R
Research Article Assessment of fluoride concentration in Palar River in Kanchipuram district, Tamil Nadu, India R. Pradeep Kumar1*, R. Priya1, Lakshmi Thangavelu2 ABSTRACT Back ground: River Palar is one of the most contaminated rivers of India due to various industries. Aim:To study the fluoride concentration in the Pallar river. Four river water samples were collected during the pre-monsoon season spanning over June 2015. Methodology: Fluoride levels were analyzed by standardized analytical method by the Chief Water Analyst, State Level Water Testing Laboratory, Tamil Nadu Water Supply and Drainage Board, Government of Tamil Nadu, Chennai (ISO 9001–2000 - Certified). Result: In the present study, fluoride contents in all samples ranged between 0.18 and 0.22 mg/l, which are less than the optimum range of 1.5 mg/l, as recommended by the WHO. KEY WORDS: Fluoride, Palar River, Water quality INTRODUCTION of the global tanning factories are located in this state. Out of this, 449 units are located in the Vellore River water resources are highly essential for various district, particularly in the Palar basin (Upper Palar). domestic, agricultural, and industrial purposes. Hence, The impact of tannery wastewater disposal leads to the consumption rate is increasing day by day in the environmental as well as social disharmony of the areas where surface water sources are not enough to society and also acts as a major industrial pollution meet the demands. In recent decades, water pollution source that the country faces today. Even though has been considered as an important agenda for this problem persists for a long time, it has attracted various research activities due to its significant role in serious attention only in recent time. -
NWMP Data 2017
A.P. POLLUTION CONTROL BOARD NWMP DATA FOR THE MONTH OF DECEMBER- 2017 C) 0 pH S.No. Odour (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) Colour uS/cm) Human sources Weather activities Total Alk. %Sodium Phen-Alk. Hardness DO (mg/L) Frequency Potassium Phosphate TFS (mg/L) TSS (mg/L) TDS (mg/L) TKN (mg/L) SAR (mg/L) Magnesium BOD (mg/L) COD (mg/L) Ammonia-N Programme District / RO downstream Station code Conductivity (MPN/100ml) (MPN/100ml) Station name Depth (mtrs.) Boron (mg/L) Flow (m3/Sec) Sampling time Total Coliform Fecal Coliform Sodium (mg/L) Diversity index Major polluting Use of water in Floating matter Calcium (mg/L) Fluoride (mg/L) Nitrite-N (mg/L) Turbidity (NTU) Chloride (mg/L) Monitoring date Saprobity index Water Temp( Nitrate-N (mg/L) Sulphate (mg/L) Bathing, Upstream of river Krishna at Krishna / Irrigation 1 25 NWMP Monthly 05.12.2017 12.00 PM Clear >1 mtr. Cloth None None None - 25 7.5 7.55 748 1.6 0.9 BDL <2 800 -- -- 1.29 NIL 120 120 10 BDL BDL 160 40 14 45 70 435 428 5 BDL 0.26 3 0.76 48 2.4 Domestic Prakasam barrage Vijayawada purpose washing Upstream of Pennar river at Nellore / Odourl Irrigation 2 1257 NWMP Monthly 04.12.2017 1.45 PM Clear App 2-ft ---- ---- Colorless - 27 7.1 7.43 1455 1.6 2.2 BDL ,2 800 -- -- 2.85 NIL 330 220 10 BDL BDL 360 80 38 95 180 890 878 5 BDL 0.28 3 0.67 51.7 4.1 Domestic Somasila Nellore ess purpose Cattle Puligadda aqueduct near Krishna / Irrigation 3 1782 NWMP Monthly 05.12.2017 11.30 AM Clear >1 mtr.