Leslie Barns & Connection Track LESLIE BARNS & CONNECTION TRACK Leslieville BIA Meeting May 2, 2014 1 OVERVIEW • Communications • Queen/Leslie Intersection Closure Overview • Next Steps - Coordination of TTC Track Upgrades (Queen streetcar stops between Brooklyn Ave to east of Parliament) - Queen/Broadview Intersection Construction 2 COMMUNICATIONS 3 COMMUNICATIONS Newsletters • Distributed to 35 000 properties, from Broadview to the Beach, north to Gerrard, south to the Lake Spring, 2014 - Leslie Barns Newsletter 4 COMMUNICATIONS “Open During Construction” Postcards and Posters • Inform community about transit and access during closure, promote BIA • Postcards mailed via Canada Post to over 35 000 homes and businesses • Posters provided to Businesses • Posters for transit stops on Queen East 5 WORKING WITH THE LESLIEVILLE BIA “Doors Open Event” at Russell Carhouse featuring the New Streetcar • Saturday, May 24, 11am-5pm 6 COMMUNICATIONS TTC Explainer Video for the Leslie, Victoria, Broadview, and overall Queen Street work • Explain transit plans, including Victoria street • http://www.youtube.com/watch?v=asI-YBCkC8k • Promote local businesses 7 COMMUNICATIONS Newspaper ads in The Metro, Beach Mirror, Beach Metro • Highlight local access during Queen/Leslie work, encourage local shopping 8 TRANSIT ROUTING Replacement bus service during intersection closure travels to University Avenue • Routing requested at community meetings and by BIA in 2013 • Increase frequency for 72 Pape, 83 Jones and 31 Greenwood buses at community request 9 BROADVIEW/QUEEN Broadview intersection construction moved to begin June 30, 2014 after World Pride Staggering Leslie and Broadview provides better service on Queen St East 10 QUEEN/LESLIE INTERSECTION CONSTRUCTION 11 QUEEN/LESLIE INTERSECTION – UTILITY UPGRADES 12 SEWER WORK EXAMPLE– LESLIE STREET New storm culverts placed under Leslie Street to improve storm sewer operation 13 QUEEN/LESLIE CLOSURE – SCOPE OF WORK • Replace 80+ year old watermain and water infrastructure • Install high capacity storm sewer • Install upgraded Bell chamber (avoids impacts to tracks during utility works in future) • Install new TTC cables and chamber (access for maintenance) • Install new TTC tracks • Install new overhead catenary poles 14 QUEEN/LESLIE CLOSURE – WATERMAIN UPGRADE • Replacing and upgrading the Watermain has impacts • For water work affecting businesses (not residents), preference to perform work when businesses are closed overnight, pending Toronto Water approval • Minimum 2 temporary water shutoffs during closure – to disconnect service from old main and make new connection (details, locations TBC following valve testing) • Some watermain valves are over 100 years old and need replacement • Only Toronto Water is permitted to turn off water and must approve timing • Inform residents and businesses immediately once schedule is set with Toronto Water • Work is subject to weather (heavy rains) 15 QUEEN/LESLIE INTERSECTION • Close smallest possible area that allows contractor to complete intersection work efficiently • Maintain pedestrian access to businesses and residences, small interruptions for pole installation • New access to Avondale Parking Lot via Leslie Street (remove and then replace fence) • Waterman south of Queen St on Leslie St advanced to start May 8th Lane closures 16 EARLY JUNE – PREPARING FOR TRACK INSTALLATION AT QUEEN AND LESLIE INTERSECTION • Fastest way to install tracks is pre -assembly • Pre-assembled rail system for Leslie/Queen requires six 80 foot flatbed trucks • Significantly reduces duration of track installation (and duration of road closure) • Requires Police escort, then track system installed like jigsaw puzzle • Six flatbeds park for approximately 1 week (Carlaw to Greenwood, staggered to maintain side street access) • Removed ASAP after track system installed Flatbed trucks with pre-assembled rail system (King and Sumach example) 17 CONSTRUCTION PHASING – LESLIE ST CONTEXT May 11 to June 21, 2014 Sewer replacement and utility upgrades Staggered closure from north of Eastern Avenue - access maintained to Marigold Condo parking garage Utility work – access to The Duke parking maintained from Lane Queen and Leslie closure for utilities and track work – 6 weeks (May 11 – June 21) Traffic configuration shifts back to south side 18 TRANSIT SERVICE – MAY 11 TO JUNE 21 Replacement bus service during intersection closure travels beyond Parliament Street to University Avenue Increased frequency on Pape, Jones and Greenwood Buses 19 QUEEN/LESLIE CLOSURE – WORK HOURS - Work is required overnight in order to return regular access as fast as possible - Per major intersection closures across Toronto, work is planned 24/7 - Police and/or flagpersons will be on site to assist pedestrians 20 DUST MITIGATION • Wet cutting of concrete • Truck wheel washing • Window washing for businesses and residences directly fronting construction 21 COORDINATING TTC TRACK UPGRADES AT SELECT STOPS ON QUEEN STREET EAST 22 COORDINATING TRACK UPGRADES ON QUEEN EAST • Important track upgrades at some streetcar stops on Queen St (unrelated to Leslie Street ) are being coordinated during the Leslie/Queen and Broadview/Queen intersection closures • TTC Operations met with Leslieville and Riverside BIAs and Councillors to develop plans • Coordinate works this year to avoid future streetcar disruption Leslieville BIA Meeting, May 2, 2014 23 COORDINATING TRACK REPLACEMENT - QUEEN STREET • Tracks are worn at some streetcar stops and need replacement • Work during intersection closures (when no streetcars are running on Queen St East) • Track upgrades at stops do not require street closures, do occupy centre track lanes • 4 days per stop Queen Streetcar Stop Rail Replacement Locations • Not continuous across Streets Direction Timeline* Queen Street East Booth Avenue West May 12 - 15 Logan Avenue East May 20 - 23 Logan Avenue West May 26 - 29 Brooklyn Avenue East May 30 - Jun 2 Brooklyn Avenue West Jun 3 - 6 • Diego Sinagoga Carlaw Avenue East Jun 19 - 22 Community Liaison Carroll Street West Jul 1 - 4 416-393-2197 River Street East Jul 10 - 13 River Street West Jul 14 -17 [email protected] Tracy Street East Jul 21 - 24 Three additional stops will be considered if time permits Bright Street East TBD Pape Avenue East TBD Sackville Street West TBD Note: There is no track work planned in this area from June 22 to June 30. 24 STREETCAR STOP – TRACK REPLACEMENT May to July 2014 (Brooklyn Avenue to Tracy Street) QUEEN/BROADVIEW INTERSECTION 26 BROADVIEW/QUEEN INTERSECTION JUNE 30-JULY 25 Bus diverts via Carlaw, Dundas, River Street Scheduled after World Pride 27 TRAFFIC MANAGEMENT 28 TRAFFIC MANAGEMENT Key changes made to assist traffic flow in Leslieville BIA and vicinity: • Additional east-west green time added to 17 intersections along Queen St & along Eastern Avenue • 10 Electronic Changeable Message Signs with Traffic Info • Signal timing changes to improve east-west flow on Dundas and Gerrard during Queen/Leslie closure • Ongoing traffic volume monitoring and cameras at key intersections to make signal adjustments Improvements on Carlaw passed at City Council • Rush hour parking now prohibited on east side of Carlaw from 4pm-6pm to improve flow into Leslieville • New right turn green arrow added at Lake Shore and Carlaw 29 THANK YOU 30 .
Recommended publications
  • Service Summary 2012 07 29.Pdf
    SERVICE SUMMARY – Introduction Abbreviations Avg spd ..... Average speed (km/h) NB ............ Northbound This is a summary of all transit service operated by the Toronto Transit Commission for the period Dep ........... Departure SB ............. Southbound indicated. All rapid transit, streetcar, bus, and community bus routes and services are listed. The RT ............. Round trip EB ............. Eastbound summary identifies the routes, gives the names and destinations, the garage or carhouse from Term ......... Terminal time WB ............ Westbound which the service is operated, the characteristics of the service, and the times of the first and last Veh type ... Vehicle type 8 ............. Accessible service trips on each route. The headway operated on each route is shown, together with the combined or average headway on the route, if more than one branch is operated. The number and type of Division abbreviations vehicles operated on the route are listed, as well as the round-trip driving time, the total terminal Arw ........... Arrow Road Mal ........... Malvern Rus ............ Russell time, and the average speed of the route (driving time only, not including terminal time). Bir ............. Birchmount MtD .......... Mount Dennis Wil ............ Wilson Bus DanSub ..... Danforth Subway Qsy ........... Queensway WilSub ...... Wilson Subway The first and last trip times shown are the departure times for the first or last trip which covers Egl ............ Eglinton Ron ........... Roncesvalles W-T ........... Wheel-Trans the entire branch. In some cases, earlier or later trips are operated which cover only part of the routing, and the times for these trips are not shown. Vehicle abbreviations Additional notes are shown for routes which interline with other routes, which are temporarily 6carHT .....
    [Show full text]
  • Inclusion on the City of Toronto's Heritage Register -1627 Danforth Avenue
    ~TORONTO REPORT FOR ACTION Inclusion on the City of Toronto's Heritage Register - 1627 Danforth Avenue Date: April 4, 2019 To: Toronto Preservation Board Toronto and East York Community Council From: Senior Manager, Heritage Preservation Services, Urban Design, City Planning Wards: Ward 19 – Beaches-East York SUMMARY This report recommends that City Council include the property at 1627 Danforth Avenue on the City of Toronto's Heritage Register. The site contains a complex known historically as the Danforth Carhouse, which is currently owned by the Toronto Transit Commission (TTC). It was developed beginning in 1914 by the Toronto Civic Railways (TCR), expanded by the Toronto Transportation Commission (forerunner to today's TTC) and the TTC and currently used as offices and staff facilities for TTC personnel. In 2015, City Council requested that the property at 1627 Danforth Avenue be researched and evaluated for inclusion on the City of Toronto's Heritage Register. It has been identified for its potential cultural heritage value in the Danforth Avenue Planning Study (2018). It is the selected site for a police station consolidating 54 and 55 Divisions. The property at 1627 Danforth Avenue is part of a Master Plan study being undertaken by CreateTO to guide the redevelopment of the site as a multi-use civic hub for the Toronto Transit Commission, the Toronto Police Service and the Toronto Public Library as the key anchor tenants, which will incorporate and adaptively reuse the Danforth Carhouse. RECOMMENDATIONS The Senior Manager, Heritage Preservation Services, Urban Design City Planning recommends that: 1. City Council include the property at 1627 Danforth Avenue on the City of Toronto's Heritage Register in accordance with the Statement of Significance (Reasons for Inclusion), attached as Attachment 3 to the report (April 4, 2019) from the Senior Manager, Heritage Preservation Services, Urban Design, City Planning.
    [Show full text]
  • 125 Years of Toronto Streetcars
    125 YEARS OF TORONTO STREETCARS UPPER CANADA RAILWAY SOCIETY BOX 122 STATION "A" TORONTO, ONTARIO One of the Belgian streetcars which recently began running on a new line at the Grand Cypress Resort near Orlando, Florida. See article 'The End of an Era' in this issue. , --John Fleck Gulf Pulp & Paper Co. 0-6-0 38, on display at Mount Forest, Ont., after being bought by Christian Bell Porcelain. Further details in Feb. 1986 NEWSLETTER. Photo taken April 26, 1986. McCarten lP NFTA LRV 125 has been turned into the world's newest and fanciest 'streetcar diner' outside Hoak's Armor Inn, Hamburg, N.Y. The car was dropped and damaged irreparably while being deliverd to the NFTA shops in Buffalo; a replacement 125 was subsequently built and delivered and the '1st 125', which never turned a wheel in revenue service, was sold to this restaurant, probably for use as a cocktail lounge. July 28, 1986. McCarten SEPTEMBER 1986 3 Years of Urban Rail Transit in Tnronto On Sept. 11, 1986 we think back to the equivalent date in 1861, when Canada's first urban rail passenger service commenced operation: a horsecar service provided by the Toronto Street Railway Company. Mr. Alexander Easton of Philadelphia, a public transit entrepreneur of the day, obtained a 30-year franchise to operate animal powered streetcar service from the City of Toronto on March 26, 1861. The TSR was organized in May of that year with A. Easton as President and Alexander Bleekly and Daniel Smith as Directors. The franchise provided for service on at least a 30-minute headway, with the daily operating period to be 16 hours a day in summer and 14 hours a day in winter (the spring and fall seasons do not appear to have been recognized).
    [Show full text]
  • Service Summary September 1, 2019 to October 12, 2019
    Service Summary September 1, 2019 to October 12, 2019 Data compiled by the Strategy and Service Planning Department SERVICE SUMMARY – Introduction Abbreviations Avg spd..... Average speed (km/h) NB ............. Northbound This is a summary of all transit service operated by the Toronto Transit Commission for the period Dep ........... Departure SB ............. Southbound indicated. All rapid transit, streetcar, bus, and community bus routes and services are listed. The RT ............. Round trip EB ............. Eastbound summary identifies the routes, gives the names and destinations, the garage or carhouse from which Term ......... Terminal time WB ............ Westbound Veh type ... Vehicle type the service is operated, the characteristics of the service, and the times of the first and last trips on each route. The headway operated on each route is shown, together with the combined or average Division abbreviations headway on the route, if more than one branch is operated. The number and type of vehicles Arw ........... Arrow Road Mal ............ Malvern Rus ............ Russell/Leslie operated on the route are listed, as well as the round-trip driving time, the total terminal time, and the Bir ............. Birchmount MtD ........... Mount Dennis Wil ............. Wilson Bus average speed of the route (driving time only, not including terminal time). DanSub..... Danforth Subway Qsy ........... Queensway WilSub ....... Wilson Subway The first and last trip times shown are the departure times for the first or last trip which covers the Egl ............ Eglinton Ron ........... Roncesvalles W-T ........... Wheel-Trans entire branch. In some cases, earlier or later trips are operated which cover only part of the routing, and the times for these trips are not shown.
    [Show full text]
  • Cartometro Toronto Edition
    COCHRANE, VANCOUVER RICHMOND HILL, STOUFFVILLE AB C DEBARRIE FG HI J Maintenance and Storage Facility Water Tower City of Markham Morningside Brenyon Murison Version 1.0 h h tt Neilson p t : t //c fr p a e. :/ rto fre fr /c .metro. e. June 2016 art fre o . Burrows Hall TORONTO .metro Washburn Progress Markham Vaughan Metropolitan Centre Rapid Transit and Streetcar Network 1 Massie Shorting VMC Crossover Old Cummer Plan of tracks, platforms, yards, and extensions White Haven City of Vaughan McCowan 5 Brownspring Military Trail Brimley Legend Midland Ellesmere University of Toronto 1 Agincourt Scarborough Campus 1 Highway 407 Kennedy 1 Track / track number Allanford Finch Storage Track Birchmount Station platform 1 Finch Bay Mills Warden Pioneer Village Finch Crossover Platform oriented to single track Palmdale York University Pharmacy West Hill To be closed (2017) On-street stop without platform Pioneer Village 2 3 Crossover 4 Don Mills (2024) Scarborough McCowan Centre 1 2 York University 3 4 5 Closed / unused / never opened platform Don Mills Victoria Park 6 7 8 Crossover Consumers McCowan Crossover McCowan Yard 1984 Platform under construction 24/03/1985 Kingston / Morningside Midland Future station with funding allocated Leslie Bessarion North York Centre Lawrence Open air section 18/06/1987 Finch West Storage Track Bayview DD/MM/YYYY Bayview Ellesmere Crossover Oriole Opening date of section (2023) (DD/MM/YYYY) Extension under construction (opening date) Finch West 6 24/11/2002 Finch West Crossover Galloway Removed track 4 Sheppard-Yonge
    [Show full text]
  • AECOM Report 4.Dot
    Ashbridges Bay Light Rail Vehicle (LRV) Maintenance and Storage Facility – Transit Project Assessment – Environmental Project Report 1. Introduction 1.3 Study Overview and Purpose On June 29, 2009 the City of Toronto Council approved the TTC capital budget allowing the TTC to complete the The Toronto Transit Commission (TTC) and the City of Toronto are undertaking an Environmental Assessment (EA) purchase of 204 Light Rail Vehicles to replace its aging streetcar fleet. The Toronto Transit Commission and the City of for the new Ashbridges Bay Maintenance and Storage Facility (MSF) for Light Rail Vehicles (LRVs). This facility will Toronto have identified the site of a maintenance and storage facility to accommodate the replacement fleet of new low service and store new LRVs schedule to arrive in 2013. In addition, new non-revenue service tracks are required to floor LRVs. The selected site for the facility, previously identified in consultation with area residents and stakeholders, provide a connection from the proposed facility to the existing streetcar tracks along Queen Street East. The project is will be located at the southeast corner of Lake Shore Boulevard East and Leslie Street in the City of Toronto. being conducted under Ontario Regulation 231/08 following the Transit Project Assessment (TPA) Process. The new LRVs will replace the streetcars that TTC currently operates throughout Toronto. The existing streetcars are between 30 and 40 years old and are nearing the end of their functional use. As opposed to the existing streetcars,
    [Show full text]
  • Report Cover.Cdr
    AvailableOnline See introduction on next page for details. Service Summary May 10, 2009 to June 20, 2009 SERVICE SUMMARY – Introduction Abbreviations Avg spd..... Average speed (km/h) NB ............ Northbound This is a summary of all transit service operated by the Toronto Transit Commission for the period Dep........... Departure SB ............. Southbound indicated. All rapid transit, streetcar, bus, and community bus routes and services are listed. The RT ............. Round trip EB ............. Eastbound summary identifies the routes, gives the names and destinations, the garage or carhouse from Term ......... Terminal time WB............ Westbound which the service is operated, the characteristics of the service, and the times of the first and last Veh type ... Vehicle type 8 ............. Accessible service trips on each route. The headway operated on each route is shown, together with the combined or average headway on the route, if more than one branch is operated. The number and type of Division abbreviations vehicles operated on the route are listed, as well as the round-trip running time, the total terminal Arw........... Arrow Road Mal........... Malvern Rus............Russell time, and the average speed of the route. Bir ............. Birchmount MtD .......... Mount Dennis Wil ............Wilson Bus DanSub..... Danforth Subway Qsy ........... Queensway WilSub ......Wilson Subway The first and last trip times shown are the departure times for the first or last trip which covers Egl ............ Eglinton Ron........... Roncesvalles W-T...........Wheel-Trans the entire branch. In some cases, earlier or later trips are operated which cover only part of the routing, and the times for these trips are not shown. Vehicle abbreviations Additional notes are shown for routes which interline with other routes, which are temporarily 6carHT .....
    [Show full text]
  • SERVICE SUMMARY – Introduction Abbreviations Avg Spd
    SERVICE SUMMARY – Introduction Abbreviations Avg spd ..... Average speed (km/h) NB ............ Northbound This is a summary of all transit service operated by the Toronto Transit Commission for the period Dep ........... Departure SB ............. Southbound indicated. All rapid transit, streetcar, bus, and community bus routes and services are listed. The RT ............. Round trip EB ............. Eastbound summary identifies the routes, gives the names and destinations, the garage or carhouse from Term ......... Terminal time WB ............ Westbound which the service is operated, the characteristics of the service, and the times of the first and last Veh type ... Vehicle type trips on each route. The headway operated on each route is shown, together with the combined or average headway on the route, if more than one branch is operated. The number and type of Division abbreviations vehicles operated on the route are listed, as well as the round-trip driving time, the total terminal Arw ........... Arrow Road Mal ........... Malvern Rus ............ Russell time, and the average speed of the route (driving time only, not including terminal time). Bir ............. Birchmount MtD .......... Mount Dennis Wil ............ Wilson Bus DanSub ..... Danforth Subway Qsy ........... Queensway WilSub ...... Wilson Subway The first and last trip times shown are the departure times for the first or last trip which covers Egl ............ Eglinton Ron ........... Roncesvalles W-T ........... Wheel-Trans the entire branch. In some cases, earlier or later trips are operated which cover only part of the routing, and the times for these trips are not shown. Vehicle abbreviations Additional notes are shown for routes which interline with other routes, which are temporarily 6carT ......... Six-car train of T- or TR-series 23-metre subway cars (Lines 1 and 2) operating over different routings, or which are temporarily operating with buses instead of 4carT ........
    [Show full text]
  • TTC's New Streetcar Procurement Process and Lessons Learned
    TTC’S NEW STREETCAR PROCUREMENT PROCESS AND LESSONS LEARNED TRANSPORTATION RESEARCH BOARD January 12, 2016 Stephen Lam, P.Eng. Head of Streetcar Department TORONTO TRANSIT COMMISSION CONTENTS . Introduction . TTC System Facts . Project Objectives and Procurement Process . Contract Award . Public & Stakeholder Consultation . Safety & Accessibility Features . Noise & Ground Borne Vibration . Infrastructure Upgrades . Testing, Commissioning and Revenue Service Launch 2 STREETCAR FLEET PLAN CLRV (30 years for 196 cars) CLRV Overhaul ALRV (52 cars) ALRV Life Extension LF Streetcar Procurement Enter Service - new cars 2025 1978 1989 2007 2009 2014 2019 AODA Notes: 1. Accessibility for Ontarians with Disability Act – full accessibility by January 1, 2025 2. CLRV overhaul was scaled down on anticipation of LFLRV deliveries 3 CONTENTS . Introduction . TTC System Facts . Project Objectives and Procurement Process . Contract Award . Public & Stakeholder Consultation . Safety & Accessibility Features . Noise & Ground Borne Vibration . Infrastructure Upgrades . Testing, Commissioning and Revenue Service Launch 4 TTC STREETCAR HISTORY The new streetcar would be the fourth generation of streetcar built for the TTC in the last 93 years, following the Peter Witt, the PCC, the CLRV and the ALRV 5 STREETCAR FACTS – CURRENT SYSTEM Vehicles: • 196 Canadian Light Rail Vehicles (1st CLRV – 1977) • 52 Articulated Light Rail Vehicles (1st ALRV – 1987) Tracks: • 85 double track km • 89 special trackwork Service Routes: • 11 Routes total >300 route-km or 186 route-miles • 3 Semi-Right-of-Way 6 STREETCAR FACTS – CURRENT SYSTEM • Annual Streetcar Passenger-trips ~ 87 million • Busies 3 streetcar routes in TTC system: o 504 King = 57,000/day o 510 Spadina/Harbourfront = 55,000/day o 501 Queen = 52,000/day TTC Annual Ridership ~ 545 million in 2015 Highest Single-day Ridership ~ 1.875 million 7 UNIQUE TTC OPERATING ENVIRONMENT (1) Unique TTC Environment vs.
    [Show full text]
  • Russell Carhouse – LFLRV Sand Silo and Delivery System
    For Action Russell Carhouse – LFLRV Sand Silo and Delivery System Date: July 10, 2019 To: TTC Board From: Chief Capital Officer Summary The purpose of this report is to obtain authorization for the award of Contract D6-23, Russell Carhouse – Low Floor Light Rail Vehicle (LFLRV) Sand Silo and Delivery System to Duron Ontario Ltd. (Duron) in the amount of $5,825,150, inclusive of all taxes, on the basis of the lowest total bid price. The work of this Contract includes the installation of a sand silo and a pneumatic sand dispensing system complete with compressors, air dryers, and all sand delivery piping. Recommendations It is recommended that the Board authorize the: 1. Award of Contract D6-23, Russell Carhouse – LFLRV Sand Silo and Delivery System to Duron Ontario Ltd. in the amount of $5,825,150, inclusive of all taxes, on the basis of the lowest total bid price. Financial Summary Once approved, Contract D6-23, Russell Carhouse – LFLRV Sand Silo and Delivery System will require funding of $5,825,150, which will be expended predominantly from 2019 to 2021. Funds for this expenditure are included in the TTC’s 2019-2028 Capital Budget under Project No. 6097– Light Rail Vehicle (LRV) Carhouse Facility Renewal Program, which was approved by City Council on March 7, 2019. The LRV Carhouse Facility Renewal Program total project approval is $81M of which $67M has been committed to date. The Chief Financial Officer has reviewed this report and agrees with the financial impact information. Russell Carhouse – LFLRV Sand Silo and Delivery System 1 of 4 Equity/Accessibility Matters TTC is working toward making Toronto’s transit system barrier-free by implementing changes that will make its services and facilities accessible to everyone by 2025.
    [Show full text]
  • January 2020 Update
    For Information Chief Executive Officer’s Report – January 2020 Update Date: January 27, 2019 To: TTC Board From: Chief Executive Officer Summary The Chief Executive Officer’s Report is submitted each month to the TTC Board, for information. Copies of the report are also forwarded to each City of Toronto Councillor, the Deputy City Manager, and the City Chief Financial Officer, for information. The report is also available on the TTC’s website. Financial Summary The monthly Chief Executive Officer’s Report focuses primarily on performance and service standards. There are no financial impacts associated with the Board’s receipt of this report. Equity/Accessibility Matters The TTC strives to deliver a reliable, safe, clean, and welcoming transit experience for all of its customers, and is committed to making its transit system barrier-free and accessible to all. This is at the forefront of TTC’s new Corporate Plan 2018-2022. The TTC strongly believes all customers should enjoy the freedom, independence, and flexibility to travel anywhere on its transit system. The TTC measures, for greater accountability, its progress towards achieving its desired outcomes for a more inclusive and accessible transit system that meets the needs of all its customers. This progress includes the TTC’s Easier Access Program, which is on track to making all subway stations accessible by 2025. It also includes the launch of the Family of Services pilot and improved customer service through better on-time service delivery with improved shared rides, and same day bookings to accommodate Family of Service Trips. These initiatives will help TTC achieve its vision of a seamless, barrier free transit system that makes Toronto proud.
    [Show full text]
  • For Action TTC 15-Year Capital Investment Plan & 2020
    For Action TTC 15-Year Capital Investment Plan & 2020 – 2029 Capital Budget & Plan Date: December 16, 2019 To: TTC Board From: Interim Chief Financial Officer Summary The purpose of this report is to: 1. Provide the Board with an update on the Toronto Transit Commission’s Capital Investment Plan as it relates to the recommended 10-year Capital Budget and Plan (2020-2029) and 15-year Outlook (2020-2034); and 2. Seek approval for the staff-recommended 2020-2029 TTC Capital Budget and Plan to provide funding for the acquisition, renewal and improvements of TTC’s assets that supports Toronto’s transit service delivery. Last year, the TTC introduced a 15-year Capital Investment Plan (CIP), entitled “Making Headway - Capital Investments to Keep Transit Moving 2019-2033”. This report provided a comprehensive review of all state-of good repair needs and capital requirements to support the Commission’s asset lifecycle replacement and ridership growth. The outcome of this review resulted in a base capital investment requirement totalling $33.5 billion over a 15-year period (2019 to 2033 inclusively) of which $23.7 billion was unfunded due to limited sources of funding. The report acknowledged that further work is to be undertaken to refine estimates, schedule and assess critical needs within the framework of the Capital Investment Model. As directed by the Board and City Council, the CIP has been updated and further refined and now totals $36.1 billion (between 2020 and 2034), of which, approximately $27 billion is required between 2020-2029. For the 2020 Budget process, additional work has been undertaken to provide new information regarding the asset age, condition and potential implications of deferred funding.
    [Show full text]