Employment Land Needs Assessment

Total Page:16

File Type:pdf, Size:1020Kb

Employment Land Needs Assessment Ipswich and Waveney Economic Areas Employment Land Needs Assessment Final Report February 2016 Ipswich and Waveney Economic Areas ELNA Employment Land Needs Assessment Final Report Ipswich Borough Council, Babergh District Council, Mid Suffolk District Council, Suffolk Coastal District Council and Waveney District Council February 2016 14400/MS/CGJ/LE Nathaniel Lichfield & Partners 14 Regent's Wharf All Saints Street London N1 9RL nlpplanning.com This document is formatted for double sided printing. © Nathaniel Lichfield & Partners Ltd 2016. Trading as Nathaniel Lichfield & Partners. All Rights Reserved. Registered Office: 14 Regent's Wharf All Saints Street London N1 9RL All plans within this document produced by NLP are based upon Ordnance Survey mapping with the permission of Her Majesty’s Stationery Office. © Crown Copyright reserved. Licence number AL50684A Ipswich and Waveney Economic Areas ELNA : Final Report Executive Summary This Employment Land Needs Assessment has been prepared by Nathaniel Lichfield & Partners on behalf of Ipswich Borough Council, Babergh, Mid Suffolk, Suffolk Coastal and Waveney District Councils. It provides an update to the economic needs evidence base for the respective local authority areas to 2031 by assessing economic development needs for the Ipswich Economic Area (covering Ipswich, Suffolk Coastal, Mid Suffolk and Babergh) and the Waveney Economic Area objectively in line with the National Planning Policy Framework (NPPF) and Planning Practice Guidance (PPG). The study considers future quantitative land and floorspace requirements alongside related qualitative factors for individual sectors and employment uses. The key findings of the study are as follows: 1 The Ipswich Economic Area has a sizeable population which has recorded strong growth in recent years, particularly within Ipswich Borough. Growth in workforce jobs has been uneven across the area, with Ipswich Borough maintaining the largest workforce in the Economic Area. Key sectors in employment terms comprise public admin, health and education; retail and wholesale; professional and business services. 2 Business growth has lagged behind regional and national averages in recent years and the majority of businesses are small firms employing between 0 and 4 workers. Employment space in the Economic Area is dominated by industrial (B1c/B2/B8) uses with the largest concentration in Ipswich Borough. The stock of employment space has steadily been increasing over the period 2000 to 2012, and industrial uses have accounted for the majority of new development that has occurred in recent years. Availability of employment land stands at over 200ha, comprising undeveloped allocations and outstanding planning permissions, much of which is located within Mid Suffolk and Babergh. 3 The A14 represents the key commercial property market driver in the Ipswich Economic Area, with occupier movement and requirements generally flowing in an East-West direction along this corridor. The area’s other key route, the A12, is not characterised by the same level of activity, with limited synergy between Ipswich and Waveney in commercial property market terms. Smaller commercial centres such as Hadleigh and Sudbury are characterised by relatively self-contained property markets and localised demand. 4 The Ipswich Economic Area is generally perceived as a good industrial location, with the Port of Felixstowe having a very significant economic influence from an industrial perspective. Demand is largely localised with very few examples of inward investment in the area in recent years. Industrial supply has continued to tighten over recent months with local property agents pointing to a particular gap in the market for industrial 10289021v11 Ipswich and Waveney Economic Areas ELNA : Final Report units up to15,000sq.ft. The office market is significantly weaker than industrial, with very few established, recognised office centres outside of Ipswich itself. 5 The Waveney Economic Area has become increasingly recognised for its growing potential to support the offshore energy sector. Employment has declined over the last four years indicating that Waveney’s economy has particularly suffered from the effects of the recession. Key sectors in employment terms include public administration, health and education, finance and business services, retail and manufacturing. Recent economic performance across a range of business, productivity and labour market indicators has been relatively poor. 6 Employment floorspace is also dominated by industrial uses, and this stock of space has gradually increased over the last 12 years. B class floorspace is concentrated in Lowestoft, historically around the port area of Lake Lothing and more recently in industrial estates around the edge of the town. Moderate amounts of new employment development have occurred over the last few years, mainly relating to industrial (B2/B8) uses and driven by a small number of large developments. Just under 98 hectares of employment land is currently available for development, including 40 hectares within Enterprise Zones. 7 In functional economic terms, Waveney is closely connected with neighbouring Great Yarmouth, with both towns playing an important role in servicing the renewable energy sector, and to a lesser extent the oil and gas industry. It has significantly weaker economic linkages with other Suffolk authorities, due in part to the relative distance between these locations and relatively poor highway network. Waveney’s industrial market is buoyant, with recent development driven by the designation of an Enterprise Zone. However, employment land supply in the town is nearly exhausted and in absence of new development land being identified, requirements are likely to be displaced to Great Yarmouth which benefits from greater availability of land. In contrast, Waveney is not an established office location and lacks the critical mass of office occupiers to compete for office based activity and firms. 8 Two different scenarios of future employment space requirements have been considered, based on a range of lower and higher growth conditions that could arise in the future. The extent to which these scenarios reflect an assumption of higher or lower future economic growth than the sub-region has achieved in the recent past varies considerably across the individual local authorities that together comprise the two Economic Areas. 9 The overall net floorspace requirements related to a baseline EEFM growth scenario is equivalent to 439,115sqm across the Ipswich Economic Area and 64,290sq.m for the Waveney Economic Area over the 20 year period to 2031, implying in broad terms a need for 88.5ha and 13.0ha of employment land in net terms respectively. The majority of this spatial requirement relates to office (B1a/b) uses. 10289021v11 Ipswich and Waveney Economic Areas ELNA : Final Report 10 A higher growth scenario has also been considered which examines the employment benefits that could arise from the construction and ongoing maintenance of a number of new offshore wind developments that are planned to take place off the coast of East Anglia over the study period to 2031. The additional employment growth effects extend to the Waveney Economic Area only, and results in a net floorspace requirement of 79,424sq.m or 15.6ha over the 20 year period to 2031. Office uses still comprise the majority of this overall floorspace requirement, although industrial uses represent a greater proportion of the overall requirement when compared with the baseline EEFM scenario. It is important to emphasise the uncertainty associated with this higher growth scenario particularly in terms of assumptions regarding overall employment, regional retention and port distribution. 11 Sizewell C represents another significant economic development that is expected to take place within the study area over the plan period. It is likely to generate additional demand for B class space and land in Suffolk Coastal and surrounding authority areas over the period to 2031 over and above the scale of demand estimated through the baseline EEFM scenario. 12 Whilst growth needs have been identified on an Economic Area and individual local authority basis, there will be some degree of footloose needs that potentially operate and can be accommodated across individual local authority boundaries. Functional Economic Market Area analysis presented as part of the ELNA identifies a number of distinct economic geographies and commercial property market sub-areas operating across the sub-region which broadly correspond with a two tier Economic Area approach in functional geographic terms. 13 To ensure a flexible and responsive policy framework that proactively plans to accommodate economic needs over the plan period to 2031, it will be necessary not just to focus on meeting forecast quantitative requirements (which will fluctuate over time), but to consider the opportunities and risks that flow from particular policies for supporting economic growth. It will therefore be important that subsequent supply- side studies and assessments undertaken as part of the next stage of the Local Plan evidence base provide a comprehensive assessment of the quality and fitness-for-purpose of employment land supply across the two Economic Areas alongside a more detailed analysis of the qualitative supply-side issues identified as part of this study within the context of identified economic needs. 10289021v11 Ipswich and Waveney Economic Areas ELNA : Final Report Contents
Recommended publications
  • Friends of Halesworth County Library Minutes of Meeting of the Trustees
    Friends of Halesworth County Library Minutes of meeting of the Trustees held on 29th October 2019 Present: Alison Britton (Chair), David Borer, Natalie Evans, Sheila Freeman, Nigel Frostick, Julie Gulliver, Evelyn Lindqvist, Irene Thomas Actions 1. Welcome & Apologies: Yvonne Sandison. Apologies 2. Minutes • Minutes of meeting held 17th September were read and approved. 3. Matters arising • Transportation – A response from Emma Healey is still awaited. Alison AB and not elsewhere attended the Halesworth Volunteer Centre AGM on 17th October but did not on agenda have a chance to speak with Emma. But co-operation with the Library was mentioned in the HVC future plans! • Alison will ask David Hopkins to investigate a new screen and projector as he AB has knowledge of the previous one. • Christmas Raffle Prizes – it was agreed that Trustees would contribute to the AB purchase of two “One4all” gift cards – one for £100 and one for £50. 4. Updates David Borer reported: Treasurer’s report • Receipts: Donations £439.79 inc. a £100 from the Woolnoughs which Alison has acknowledged. £422.05 Antique Street Market; Income from donated items £144.10; £15.26 interest on savings account. Total receipts: £1,333.01 • Outgoing Payments: £1,828.64 shelving; EPS Banner £75; ReadySpex re-stock £139.92; petty cash £71.99. Total £2,115.95 • Balances: Petty cash £164.84 Current account £9,080.80 Savings account £30,275.31 Current Total: £39,520.95 5. Sorting Friends Bank account signatories for the • It was decided that the treasurer is to be the HSBC main account holder. bank accounts Alison Britton to remain a signatory and two new signatories to be added: Julie Gulliver and Evelyn Lindqvist.
    [Show full text]
  • Lender Panel List December 2019
    Threemo - Available Lender Panels (16/12/2019) Accord (YBS) Amber Homeloans (Skipton) Atom Bank of Ireland (Bristol & West) Bank of Scotland (Lloyds) Barclays Barnsley Building Society (YBS) Bath Building Society Beverley Building Society Birmingham Midshires (Lloyds Banking Group) Bristol & West (Bank of Ireland) Britannia (Co-op) Buckinghamshire Building Society Capital Home Loans Catholic Building Society (Chelsea) (YBS) Chelsea Building Society (YBS) Cheltenham and Gloucester Building Society (Lloyds) Chesham Building Society (Skipton) Cheshire Building Society (Nationwide) Clydesdale Bank part of Yorkshire Bank Co-operative Bank Derbyshire BS (Nationwide) Dunfermline Building Society (Nationwide) Earl Shilton Building Society Ecology Building Society First Direct (HSBC) First Trust Bank (Allied Irish Banks) Furness Building Society Giraffe (Bristol & West then Bank of Ireland UK ) Halifax (Lloyds) Handelsbanken Hanley Building Society Harpenden Building Society Holmesdale Building Society (Skipton) HSBC ING Direct (Barclays) Intelligent Finance (Lloyds) Ipswich Building Society Lambeth Building Society (Portman then Nationwide) Lloyds Bank Loughborough BS Manchester Building Society Mansfield Building Society Mars Capital Masthaven Bank Monmouthshire Building Society Mortgage Works (Nationwide BS) Nationwide Building Society NatWest Newbury Building Society Newcastle Building Society Norwich and Peterborough Building Society (YBS) Optimum Credit Ltd Penrith Building Society Platform (Co-op) Post Office (Bank of Ireland UK Ltd) Principality
    [Show full text]
  • Retail Monitoring Survey 2015
    Retail Monitoring Survey 2015 1 Retail Monitoring Survey 2015 Retail Monitoring Survey 2015 As part of the Council’s ongoing monitoring work, a Retail Monitoring Survey is undertaken. The survey covers retailing within town centres (AP56) and district centres (AP59) identified as such within the 2001 Local Plan policy1. Town Centre reports – May 2015 Aldeburgh Felixstowe Framlingham Leiston Saxmundham Woodbridge District Centre reports – May 2015 Cavendish Park, Felixstowe 1 Grange Farm, Kesgrave The Square, Martlesham Heath Walton High Street Wickham Market This information helps monitor the viability and vitality of existing retail centres and has helped inform changes to town and district centre boundaries. Additional data concerning retailing in the district can be found in the annually updated Authority Monitoring Report (AMR). 1 Sycamore Drive, Rendlesham not monitored. Retail Monitoring Survey 2015 TOWN CENTRES FELIXSTOWE TOWN CENTRE SHOPPING USES - May 2015 ADDRESS NO. NAME AREA (sq USE FORMER USE IF CHANGED WITHIN YEAR or IS VACANT m) CLASS HAMILTON Rd,East 2 Vacant 95 A1 Coes Menswear 4 Taxi office no sign on door or anything 18 SG Coastal Taxis 6 The Card Centre 67 A1 8 San Moi Oriental – Noodle Bar & Restaurant 104 A3 China Garden – chinese restaurant 10 Tony`s Star Nails – nail bar 88 A1 Vacant 12 The Thrifty Thistle 44 A1 Vacant 14 Hair Artistry 84 A1 Vogue Hair Company 16 Café on the Corner 126 A3 Vacant 18-20 Barclays bank 480 A2 2 22 Trinity Methodist Church 555 D1 24 Vacant 72 A2 Ashton K C J - solicitors 26 Madison
    [Show full text]
  • IBS Annual Review 2018.Pdf
    Established 1849 Includes summary financial statement for year ended 30 November 2018 growing closer One of the most significant events of the year was the introduction of the General Data Protection Regulation, a complex project which we worked efficiently and diligently to comply with. Membership and branches Chairman’s summary 4 As a mutual we place great importance on the 170 Years of “The Old Freehold” 5 satisfaction and support of our members and work All In 6 to meet their needs. Community matters 8 The demand for our face-to-face services saw us Savings & Mortgages 10 open new premises at a time when other financial Introducing our Board 12 service providers have closed branches. We are Summary Financial Statement 14 facing increasing demand for complementary Directors’ Remuneration Report 18 online services and are making good progress with this project which will remain a focus in the coming year. Supporting home ownership Looking back By employing an expert, manual approach to underwriting we understand the personal at 2018 circumstances behind each mortgage A welcome from Richard Norrington, application enabling us to be innovative with Chief Executive our mortgage lending. We introduced new products specifically designed With a backdrop of continuing economic for borrowers aged 50 plus, offering no maximum uncertainty, we began our financial year positively age restriction at the end of the mortgage deal. with a commitment to our face-to-face services, Borrowing in later life brings with it a set of unique opening two new premises in the existing branch needs as well as changing sources of income towns of Ipswich and Woodbridge.
    [Show full text]
  • Suffolk County Council
    Suffolk County Council Western Suffolk Employment Land Review Final Report May 2009 GVA Grimley Ltd 10 Stratton Street London W1J 8JR 0870 900 8990 www.gvagrimley.co.uk This report is designed to be printed double sided. Suffolk County Council Western Suffolk Employment Land Review Final Report May 2009 Reference: P:\PLANNING\621\Instruction\Clients\Suffolk County Council\Western Suffolk ELR\10.0 Reports\Final Report\Final\WesternSuffolkELRFinalReport090506.doc Contact: Michael Dall Tel: 020 7911 2127 Email: [email protected] www.gvagrimley.co.uk Suffolk County Council Western Suffolk Employment Land Review CONTENTS 1. INTRODUCTION........................................................................................................... 1 2. POLICY CONTEXT....................................................................................................... 5 3. COMMERCIAL PROPERTY MARKET ANALYSIS.................................................... 24 4. EMPLOYMENT LAND SUPPLY ANALYSIS.............................................................. 78 5. EMPLOYMENT FLOORSPACE PROJECTIONS..................................................... 107 6. BALANCING DEMAND AND SUPPLY .................................................................... 147 7. CONCLUSIONS AND RECOMMENDATIONS......................................................... 151 Suffolk County Council Western Suffolk Employment Land Review LIST OF FIGURES Figure 1 The Western Suffolk Study Area 5 Figure 2 Claydon Business Park, Claydon 26 Figure 3 Industrial Use in
    [Show full text]
  • Welcome to This A14 Cambridge to Huntingdon Improvement Scheme Public Exhibition. This Exhibition Is About the Work We Are Doing
    A14 Cambridge to Huntingdon improvement scheme A1 Welcome Alconbury D3 Woolley A141 S2 Huntingdon St Ives A14 Town centre improvements including removal of A14 viaduct Ellington D3 The Hemingfords Brampton D2 Existing A14 Godmanchester Fenstanton Fen Drayton Proposed A14 Swavesey Buckden D3 D3 D2 The Offords A1 Northstowe Hilton Conington New development S2 A1198 D3 Boxworth Lolworth Histon Bar Hill D4 Milton Girton A14 D3 M11 Routes for construction traffic East Coast Mainline railway Cambridge River Great Ouse A428 Huntingdon Southern Bypass S2 Single 2 lane carriageway A1 widening D2 Dual 2 lane carriageway A14 on-line improvements D3 Dual 3 lane carriageway Cambridge Northern Bypass D4 Dual 4 lane carriageway Local access roads © Crown copyright and database rights 2016 Ordnance Survey 100030649 Highways England, creative S160069 Welcome to this A14 Cambridge to Huntingdon improvement scheme public exhibition. This exhibition is about the work we are doing in Huntingdon as part of the A14 Cambridge to Huntingdon improvement scheme. Members of the project team are here to answer any questions you might have. Thank you Highways England – Creative BED19_0157 A14 Cambridge to Huntingdon improvement scheme Why is the scheme necessary? The A14 provides an east- west route linking the Midlands with East Anglia. It begins at Catthorpe near Rugby, where it connects with the M1 and M6 motorway, and continues east for approximately 130 miles to the port town of Felixstowe. It forms one of the UK’s strategic routes and is part of the Trans-European Transport Network. The A14 between Cambridge and Huntingdon serves an additional purpose, connecting the A1(M) motorway to the North The scheme will: of England with the M11 motorway � combat congestion, making the to London and the South East.
    [Show full text]
  • ANNUAL REPORT Year Ended 30 November 2020 Year Ended 30 November 2020
    ANNUAL REPORT Year ended 30 November 2020 Year ended 30 November 2020 2 www.ibs.co.uk Contents 4 Chairman’s Report 6 Chief Executive’s Report 9 Directors’ Report 16 Corporate Governance Report 24 Directors’ Remuneration Report 26 Statement of Directors’ Responsibilities 27 Independent Auditor’s Report 32 Statement of Comprehensive Income 33 Statement of Financial Position 34 Statement of Changes in Members’ Interests 35 Statement of Cash Flows 36 Notes to the Accounts 68 Annual Business Statement 69 Information Relating to Directors 2020 3 Year ended 30 November 2020 Chairman’s Report Despite the impact of COVID-19 on all UK businesses Ipswich Against this backdrop the overall results of the business Building Society has remained firmly open for business. We also demonstrate our strengthened resilience. Highlights of the have seen continued growth in mortgages and improved our year were: capital position, whilst continuing to deliver exceptional service to • Strong targeted mortgage completions of £123m (2019: members thanks to outstanding levels of colleague engagement £115m). Our targeted approach delivered a strong net interest and maintaining our ongoing support to our communities. margin of 1.8% (2019: 1.8%) on a total book of £568m at year The year has clearly been dominated by the COVID-19 pandemic end (2019: £523m). which has brought concerns about health and wellbeing for many • Savings balances increased by £21m taking overall deposits to of our members as well as having a significant economic impact. a pleasing £624m (2019: £603m). The efforts to control the pandemic have been considerable and I would like to thank all key workers in the UK for everything they • Despite the pressures of the pandemic we recorded continued have done for us during this time; their spirit and hard work has supportive feedback from members, with the Society’s overall Net been inspirational.
    [Show full text]
  • Evolution of Ubiquitous Computing with Sensor Networks in Urban Environments
    Evolution of Ubiquitous Computing with Sensor Networks in Urban Environments Eiko Yoneki University of Cambridge Computer Laboratory Cambridge CB3 0FD, United Kingdom [email protected] ABSTRACT of smart WSNs with a bigger network such as the Internet A significant increase in real world event monitoring capability increases the coverage area and application domain of the with wireless sensor networks will lead to a further evolution of ad hoc network. Based on such a technological vision, new ubiquitous computing. This paper describes this evolution, lead- types of applications will rely on ad hoc connections between ing to humans being connected to the real world via comput- nearby nodes to establish multi-hop dynamic routes in order ers without awareness. We address an ad hoc communication to propagate data and messages between out-of-range nodes. paradigm, a data-centric approach, and a middleware’s task, to Sensors could be attached to any object, which may move understand the ultimate goal of this new world. We also briefly around, or be placed stationally. Furthermore sensors could explain our upcoming new traffic monitoring project in the city be attached to the human body creating Personal Area Net- of Cambridge. work (PAN). The communication among objects, humans, and computers happens at home, at an office, on a street, at EMERGENCE OF WIRELESS SENSOR NET- the train station, in a car, in a restaurant, or in other places at any time. Fig.1 shows application spaces for ubiquitous WORKS computing with WSNs. Ubiquitous Computing opens com- The evolution of cyber space started from mainframe com- munications over tiny sensor networks through Internet scale puters and moved to PCs.
    [Show full text]
  • A14 Cambridge to Huntingdon Improvement Scheme
    A14 CAMBRIDGE TO HUNTINGDON IMPROVEMENT SCHEME DEVELOPMENT CONSENT ORDER - EXAMINATION Representation on Local Traffic Impacts By Cambridgeshire County Council Shire Hall, Castle Hill, Cambridge, CB3 0AP 2 September 2015 A14 Cambridge to Huntingdon Development Consent Order Written Representation on Local Traffic for Deadline 8 CONTENTS CONTENTS 2 1. INTRODUCTION 3 2. CHARM TRAFFIC MODEL 4 3. LOCAL TRAFFIC IMPACTS 6 3.2 Local Impact Report 7 4. SPECIFIC ISSUES 8 4.2 B1514 Brampton Road 8 4.3 Hinchingbrooke 8 4.4 Spittals 9 4.5 Galley Hill 9 5. ADDITIONAL WORK 10 6. MONITORING 12 7. INTERACTION WITH OTHER DEVELOPMENTS 13 7.1 Northstowe 13 7.2 A428 13 APPENDIX A - EXISTING NORTHSTOWE MONITORING 16 APPENDIX B – ADDITIONAL MONITORING LOCATIONS 18 APPENDIX C – ROAD CLOSURE GUIDELINES 19 APPENDIX D – SYSTRA REPORT 25 Page 2 A14 Cambridge to Huntingdon Development Consent Order Written Representation on Local Traffic for Deadline 8 1. INTRODUCTION 1.1.1 This Written Representation is in respect of Local Traffic Impacts and supersedes Chapter 10 of the County Council’s previous written representation (REP3-006) 1.1.2 This Written Representation, in respect of the A14 Cambridge to Huntingdon Improvement Scheme (the Scheme) Development Consent Order (the Order or DCO), is made in accordance with the Infrastructure Planning (Examination Procedure) Rules 2010, Rule 10. It must be read in conjunction with the Local Impact Report submitted for Deadline 8. 1.1.3 The Local Impact Report presents local traffic impacts and recommendations for mitigation. Information in the Local Impact Report is generally not repeated in this document.
    [Show full text]
  • SUFFOLK LOCAL PLAN MODELLING Forecasting Report - Forecasts with Demand Adjustments
    Suffolk County Council SUFFOLK LOCAL PLAN MODELLING Forecasting Report - Forecasts with demand adjustments SCC LP 9.2 OCTOBER 2020 PUBLIC Suffolk County Council SUFFOLK LOCAL PLAN MODELLING Forecasting Report - Forecasts with demand adjustments TYPE OF DOCUMENT (VERSION) PUBLIC PROJECT NO. 70044944 OUR REF. NO. SCC LP 9.2 DATE: OCTOBER 2020 WSP WSP House 70 Chancery Lane London WC2A 1AF Phone: +44 20 7314 5000 Fax: +44 20 7314 5111 WSP.com PUBLIC QUALITY CONTROL Issue/revision First issue Revision 1 Revision 2 Revision 3 Remarks Draft Draft Final Date July 2020 September 2020 October 2020 Prepared by Louise Murray- Leonardo Mendes Leonardo Mendes Bruce Signature Checked by Leonardo Mendes Charlotte Herridge Charlotte Herridge Signature Authorised by Michael Johns Michael Johns Michael Johns Signature Project number 70044944 70044944 70044944 Report number SCC_LP 9.0 SCC_LP 9.1 SCC_LP 9.2 File reference SUFFOLK LOCAL PLAN MODELLING PUBLIC | WSP Project No.: 70044944 | Our Ref No.: SCC LP 9.2 October 2020 Suffolk County Council CONTENTS EXECUTIVE SUMMARY 1 GLOSSARY 1 2 INTRODUCTION 4 2.1 BACKGROUND 4 2.2 TRANSPORT MODEL 4 2.3 STUDY AREA 6 2.4 FUTURE HIGHWAY SCHEMES 11 2.5 FORECAST DEVELOPMENT ASSUMPTIONS 14 3 RESULTS 16 3.1 SUFFOLK HIGHWAY FOCUS 16 3.2 VOLUME TO CAPACITY RATIO 16 3.3 MODEL RUNS COMPARED 16 3.4 PASSENGER CAR UNIT HOUR DELAY REDUCTION BY LPA – DEMAND ADJUSTMENT IMPACT 17 3.5 OVERALL JUNCTION V/C SUMMARY BY LPA – DEMAND ADJUSTMENT IMPACT 22 3.6 OVERALL LINK V/C SUMMARY BY LPA – DEMAND ADJUSTMENT IMPACT 25 3.7 RESULTS SUMMARIES
    [Show full text]
  • Morelock Signs Working With
    working with The A14 Cambridge to Huntingdon improvement scheme covers a long and congested section of the A14 dual carriageway and is currently going through major works as part of Highways England's proposals to relieve trafc congestion, connect communities and enhance national economic growth. With the route at capacity, almost 85,000 vehicles use this stretch of the A14 every day with up to 21,000 being heavy goods vehicles. Since the start of the project and the installation of narrow lanes a temporary posted speed limit of 40mph was imposed. It became apparent that not all drivers were adhering to the speed limit especially during the evenings. Unfortunately, drivers felt they could exceed the 40mph limit through the enforcement cameras which evidently caused a rise in the amount of speeding offences issued and safety of road workers was being compromised. Working together with the Trafc Management team supported by Highways England, Morelock delivered a new solution with radar speed sign technology implemented in trafc management for the rst time. The introduction of the new LED speed indicating devices in construction work zones will protect the lives of road workers and encourage drivers travelling through to slow down. Radar speed sign technology is a successful technique being used for trafc calming efforts. These signs are proven to help reduce drivers' speeds in both the short and long term. Morelock's radar speed signs equipped with software that capture driver speed and relevant trafc data have been deployed in a host of applications from small communities to larger industrial sites and in partnership with the police force to tackle speeding by educating and changing driver behaviour.
    [Show full text]
  • Save Honey Hill Group Comments on Cambridge Waste-Water
    Save Honey Hill Group Comments on Cambridge Waste-Water Treatment Plant Relocation Phase Two Consultation Members of Save Honey Hill Group welcome the opportunity to comment on the proposals in the statutory Phase Two Consultation as set out in the CWWTPR Document Library. While we are keen to engage with AW for mitigation, we do this without prejudice to our stated aim to stop the relocation to Honey Hill as there is no operational need to do so1, the housing proposed for the vacated brownfield site can be met elsewhere more quickly than the planned availability of the site in 2028, and there is not a proper planning basis for this proposal. While the comments here are representative of the views of the group, individual members may also make their own responses. We welcome the fact that residents of a wider geographical area in North Cambridge have been consulted in this Phase. Comments to us from some of these residents are also included here. We recognise that not all surveys have been completed and that technical reports which would better inform our responses to the proposals are not yet available. We therefore recognise that proposals may change considerably before the Phase Three Consultation and reserve the right to comment more fully at that time. The questionnaire asks which environmental issues relating to the project are important to us. As all are of equal importance our comments are set out under specific issues but not necessarily in the order in which they appear in the questionnaire. 1. Design and Visual Impact Designs for recent Waste Water Treatment Plants (WWTPs) elsewhere have aimed at achieving solutions which can neither be seen nor smelled, such as Southern Water’s Peacehaven plant2, Thames Water’s Deepham’s WWTW3 and Southern Water’s Eastbourne plant4.
    [Show full text]