Rugby, Warwickshire, CV21 1RA, CV21 1PD Freehold Interest for Sale

Total Page:16

File Type:pdf, Size:1020Kb

Rugby, Warwickshire, CV21 1RA, CV21 1PD Freehold Interest for Sale Rugby, Warwickshire, CV21 1RA, CV21 1PD Freehold interest for sale 1 Investment Highlights Stabilised freehold portfolio comprising part of Phase 2 & Phase 4 of St. Modwen’s Edison Place masterplan, which extends to 82 acres: An estate comprising 87 apartments and 88 car parking spaces arranged across two phases: 61 apartments let on ASTs arranged over 4 unbroken blocks. Two of the flats are currently held vacant pending refurbishment 26 flats sold on 250 year leases arranged over 4 blocks 88 associated surface car parking spaces (61 car parking spaces remain in full ownership, 1 car parking space for Phase 4 visitors and 26 are in the control of the long leaseholders) Currently generating a total £502,030 per annum, comprising: AST income of £498,180 per annum Ground rent income of £3,850 per annum Residential Net Saleable Area (“NSA”) of the AST units equates to 3,484 sq m / 37,508 sq ft 26 AST apartments and 14 ground rents comprise Phase 2 delivered in 2014 35 AST apartments and 12 ground rents comprise Phase 4 delivered in 2017 NHBC Warranties Estimated Realisation Price (“ERP”): £8,845,000 (£236psf) Situated 1 mile (1.6 km) to Rugby town centre, a desirable market town in Warwickshire, benefitting from immediate access to retail and green space provision Ideal for commuters, Edison Place is just 500m from Rugby Station, with access to London in under an hour 2 3 M6 Location STOKE ON TRENT A426 Rugby is a market town in Warwickshire and the second largest town in the county. It is on the eastern edge of Warwickshire, near the borders of Leicestershire and Northamptonshire. It is 83 miles (134 km) north of London, 30 miles (48 km) east of Birmingham BIRMINGHAM and 11 miles (18 km) east of Coventry. The site is c.2.5 miles (4.0 km) south from RUGBY junction 1 of the M6 motorway, c.5.5 miles (8.85 km) west from junction 18 of the M1 motorway, and 5.2 miles (8.26 km) north of the M45 motorway, providing access to the wider motorway network. Rugby railway station is A4071 500m away and has a journey time, to London Euston, of approximately 50 minutes, with trains running every 30 minutes. M45 M45 4 M6 M6 A5 A426 RUGBY LONDON The site is well located 1.0 mile (1.6 km) north of Rugby town centre. The site is bound by the railway to the south and the River Avon to the north. A428 An attractive, largely pedestrianised, market town, Rugby offers a range of high street stores, as well as a thriving independent retail sector. There is also a wide variety of cafés and restaurants for people to enjoy. Edison Place benefits from being on the same road as Junction One Retail Park which boasts a Cineworld, B&M and Laura Ashley. The award winning Caldecott Park is c.0.7 miles (1.12 km) M45 away. There are a number of schools nearby, including 4 primary schools, 3 secondary schools and the renowned Rugby School. In 2009 St. Modwen signed the Development Agreement to build the new £35 million Warwickshire College adjacent to the Edison Place site. 5 Description Edison Place is part of the wider multi-million The opportunity comprises the freehold interest pound, mixed-use regeneration of the former in a portfolio of 87 units. These units are arranged within Phases 2 and 4 of St Modwen’s Edison Alstom industrial site at Leicester Road in Place masterplan. The masterplan is intersected by Rugby. The development is a sympathetic Technology Drive; Phase 2 is located north east of low rise scheme which comprises a mix the masterplan and to the north of Technology Drive. of one and two bedroom apartments, and Phase 4 is located south of Technology Drive and to three and four bedroom homes. All of the the north of the masterplan. Phase 2 was completed in 2014 while Phase 4 was completed in 2017. units have been finished to an excellent specification and have proven popular with The opportunity is split into 61 private (70%) and 26 long domestic buyers. Edison Place was first leasehold (250 years) units (30%) across 12 blocks; with launched for sale in 2015 delivering 437 each unit type reflecting a similar layout and appearance. Each of the flats are arranged over single and unbroken units in total. Site completion is expected blocks of 6-15 units. The units are well configured and by December - March 2021. There are 63 provide appropriately spacious accommodation, with units left to sell in Phase 4, 26 of which are the 1 and 2 bed unit types measuring approximately apartments. 533 sq ft and 661 sq ft respectively. 6 The accommodation is as follows: Phase Block 1 bed units 2 bed units Total Units % of Total 2 Hirst 5 3 8 9% 2 Weinstock (Long Leasehold) 8 9% 2 Chandos Court (Long Leasehold) 6 7% 2 Lindsey Court 4 2 6 7% 2 Gamage Court 2 4 6 7% 2 Railings Court 2 4 6 7% 4 Marigold House (Long Leasehold) 6 7% 4 Oliver House 15 15 17% 4 Elliot House (Long Leasehold) 6 7% 4 Ash House 3 3 6 7% 4 Susan House 8 8 9% 4 Dombey House 6 6 7% Total 87 The internal and external condition of the properties are broadly consistent across the portfolio. Each of the units present very well and have been finished to a good specification. The AST properties have the benefit of NHBC building warranties. 7 Income AST Rents The apartments are let on ASTs and currently produce a total rent passing of £498,180 per annum. Typical tenants at Edison Place are employed in London and commute daily meaning the proximity to Rugby train station draws considerable demand. Summary Beds Count Min Average Max Total Income (pa) Income (pcm) 1 15 479 533 654 11,716 £168,840 £14,070 2 30 645 661 708 25,792 £329,340 £27,445 Ground Rent £3,850 £321 Total 87 37,508 £502,030 £41,836 Assuming a 30% spend, the following number of residents in Rugby local authority could afford the average passing rents of £640 pcm for 1 beds and £703 pcm for 2 beds Number of people sharing Beds 1 person 2 persons 3 persons 4 persons 19,844 29,401 1 bed - - 62% 92% 17,915 29,415 30,097 2 bed - 56% 91% 94% Source: ASHE 2017 Ground Rents 26 units are subject to have been sold off and produce a ground rent income. These units are arranged in two blocks in Phase 2 and two blocks in Phase 4. The Management Company (being Edison Place Estate Management Company Two Limited for Phase 2 and Edison Place 4 Estate Management Company Limited for Phase 4) covenants to organise the building insurance and the maintenance for both the AST and ground rent blocks. The Management Company nominates the managing agent. The portfolio is currently managed by Trinity (Estates) Property Management Limited as agent for the relevant Management Company. The units subject to a ground rent are: Phase 2 - 14 units within Weinstock and Phase 4 - 12 units within Elliot and Marigold have Chandos Court have been sold on long leases of been sold on long leases of 250 years and pay 250 years and pay ground rent. The total annual ground rent. The total annual ground rent income ground rent income is currently £1,750 per is currently £2,100 per annum with the ground annum with the ground rent doubling every 25 rent subject to RPI linked reviews every 10 years. years (next review in 2039) 8 Site plan Hughes Co urt T ravelling C rane N S O WAY OM E l S ub S ta TH P lay Area HOUSTON 4 3 Ba lancing Po nd 1 to 86.9m S usa 8 n House e s 6 1 t ou o o Dom 6 t Br itish H 1 Housebey h Thomson-Houston s A 7 h t DOY W ar Memorial a L P E C L k OSE 6 Court 5 o s 3 ac t l 1 g D n 1 B i il se a 5 u R ROA 1 o L o Gama L t t H 6 e 1 1 t o 1 E i s o o t 6 B ll u iver g o l E e ld Court H O o 6 se 1 ig o r u t o H rt Ma 8 u o o t 1 t C ER CLOSE rs T HANSE N Hi CLO S AIN 1 E T Li t ndle o 6 y Court 8 We i nstock Co 8 o t 1 u rt AD O R Chando S A s 6 C OM o t o 1 urt H T 2 87.2m 8 2 WAY 4 2 2 2 SHERA S E M A J TE C HNOL OGY DRIVE *For illustrative purposes only Leasehold Freehold 9 This drawing is the copyright of Roberts Limbrick Ltd and should not be reproduced in whole or in Indicative floorplans part or used in any manner whatsoever without their written permission. Do Not scale off this drawing, use only figured dimensions and report any discrepancies or omissions to the Architect immediately. rev. date description The following are provided for illustrative purposes only in context of the various unit types A 03.06.16 Kitchen layouts revised comprising the portfolio Phase 2 Flats 1 and 2, Ash House W Living 10 11 9 Kitchen 12 13 23 3202m 3202m Bedroom 1 [10'-6"F] [10'-6"F] Bedroom 2 Living/Dining 14 22 15 21 16 Dining 20 19 18 17 This drawing is the copyright of Roberts Limbrick Ltd and should not be reproduced in whole or in part or used in any manner whatsoever without their written permission.
Recommended publications
  • Bus Service Motion Support Warwickshire County Council 30290C
    Bus Service Motion Support Warwickshire County Council 30290C July 20 Final Quality Assurance Document Management Document Title Bus Service Motion Support Name of File 30290 REP Bus Service Motion Support.docx Last Revision Saved On 21/07/2020 16:18:00 Version V1 V2 V3 Final Prepared by MM/JP/JA/JG MM/JP/JA/JG/SH MM/JP/JA/JG/SH MM et al Checked by SH SW SW SW Approved by SH SH SH SW Issue Date 20/03/2020 22/04/2020 6/5/2020 21/7/2020 Copyright The contents of this document are © copyright The TAS Partnership Limited, with the exceptions set out below. Reproduction in any form, in part or in whole, is expressly forbidden without the written consent of a Director of The TAS Partnership Limited. Cartography derived from Ordnance Survey mapping is reproduced by permission of Ordnance Survey on behalf of the Controller of HMSO under licence number WL6576 and is © Crown Copyright – all rights reserved. Other Crown Copyright material, including census data and mapping, policy guidance and official reports, is reproduced with the permission of the Controller of HMSO and the Queen’s Printer for Scotland under licence number C02W0002869. The TAS Partnership Limited retains all right, title and interest, including copyright, in or to any of its trademarks, methodologies, products, analyses, software and know-how including or arising out of this document, or used in connection with the preparation of this document. No licence under any copyright is hereby granted or implied. Freedom of Information Act 2000 The TAS Partnership Limited regards the daily and hourly rates that are charged to clients, and the terms of engagement under which any projects are undertaken, as trade secrets, and therefore exempt from disclosure under the Freedom of Information Act.
    [Show full text]
  • The M1, M6 and M45 Motorways (M1 Junctions 14 to 20) (Temporary Restriction and Prohibition of Traffic) Order 2009
    STATUTORY INSTRUMENTS 2009 No. 3199 ROAD TRAFFIC The M1, M6 and M45 Motorways (M1 Junctions 14 to 20) (Temporary Restriction and Prohibition of Traffic) Order 2009 Made - - - - 16 November 2009 Coming into force - -23 November 2009 WHEREAS the Secretary of State for Transport, being the traffic authority for the M1 Motorway (“the M1”), the M6 Motorway (“the M6”), the M45 Motorway (“the M45”) and connecting roads is satisfied that traffic on lengths of those motorways and some of those connecting roads in the Counties of Northamptonshire, Leicestershire and Warwickshire should be restricted and prohibited because works are proposed to be executed thereon: NOW, THEREFORE, the Secretary of State, in exercise of the powers conferred by section 14 (1)(a) and (7) of the Road Traffic Regulation Act 1984(a), and of all other powers enabling him in that behalf, hereby makes the following Order: 1. This Order may be cited as the M1, M6 and M45 Motorways (M1 Junctions 14 to 20) (Temporary Restriction and Prohibition of Traffic) Order 2009 and shall come into force on 23 November 2009. 2. In this Order: “the first length of motorway” means – (a) the northbound and southbound carriageways of the M1 between a point 5 kilometres south of the centrepoint of Junction 15 and the centrepoint of Junction 20; (b) the southbound carriageway of the M6 between the centreline of the A5 underbridge near Shawell and its junction with the M1 (M1 Junction 19); (c) the eastbound carriageway of the M45 from the centreline of the A361 overbridge near Kilsby to its junction
    [Show full text]
  • Agenda No AGENDA MANAGEMENT SHEET Environment Overview And
    Agenda No AGENDA MANAGEMENT SHEET Name of Committee Environment Overview and Scrutiny Committee Date of Committee 17th January 2006 Report Title Warwickshire Provisional Local Transport Plan 2005 - Results of Public Consultation Summary The County Council has a statutory responsibility to produce a Local Transport Plan (LTP). The LTP sets out the County’s Transport Strategy, and provides the framework for how transport and accessibility will be improved across Warwickshire over the next five years. A public consultation has been undertaken on the Provisional LTP, which was submitted to the Department for Transport in July 2005. Environment Overview and Scrutiny Committee is invited to comment on the consultation responses and the proposed response of the County Council to the concerns and issues raised by consultees. For further information Adrian Hart please contact Transport Planning Tel. (01926) 735667 [email protected] Would the recommended Yes/No decision be contrary to the Budget and Policy Framework? Background Papers Warwickshire Provisional Local Transport Plan 2005. Provisional Local Transport Plan Consultation – Research Report (November 2005). CONSULTATION ALREADY UNDERTAKEN:- Details to be specified Other Committees X Cabinet, 30th June 2005. Rugby Area Committee, 9th November 2005. North Warwickshire Area Committee, 16th November 2005. oascenv/0106/ww1 1 of 9 Other Committees (continued) Warwick Area Committee, 22nd December 2005. Stratford Area Committee, 23rd November 2005. Nuneaton and Bedworth Area Committee, 30th November 2005. Local Member(s) .......................................................................... (With brief comments, if appropriate) Other Elected Members X Councillor C K N Browne Councillor Mrs E M Goode Councillor Mrs J Lea Cabinet Member X Councillor M L M Heatley – for information.
    [Show full text]
  • The Medieval and Post Medieval Landscape of Onley Fields Farm Northamptonshire
    The Medieval and Post Medieval Landscape of Onley Fields Farm Northamptonshire Peter Wardle Colin Lacey & Heather Papworth Published by PAW Print Publishers, 38 Elvendon Rd, Goring on Thames, Berkshire, RG8 0DU. PAW Print Publishers is the publishing section of the Historic Environment Consultancy, advisers on all aspects of the historic environment. www.historicenvironment.co.uk Copyright © PAW Print Publishers 2016 First published 2016 ISBN 978-0-9562381-3-9 British Library Cataloguing in Publication Data A CIP catalogue record for this book is available from the British Library. Bibliographic Information Wardle,P., Lacey,C. & Papworth,H., 2016, The Medieval and Post Medieval Landscape of Onley Fields Farm Northamptonshire, PAW Print Publishers, Goring on Thames All Rights Reserved This book is sold subject to the condition that it shall not, by way of trade or otherwise, be lent, resold, hired out, or otherwise circulated without the publisher’s prior consent in any form of binding or cover other than that in which it is published and without a similar condition including this condition being imposed on the subsequent publisher No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording or any information storage or retrieval system, without permission in writing from the publisher. Copies of this book may be obtained from www.historicenvironment.co.uk. Designed and typeset by Peter Wardle & Colin Lacey Printed by The Historic Environment Consultancy All photographs © Dr Peter Wardle unless stated otherwise. The Medieval and Post Medieval Landscape of Onley Fields Farm Northamptonshire CV23 8AN Peter Wardle Colin Lacey & Heather Papworth Published by PAW Print Publishers Copyright © PAW Print Publishers 2016 Contents Acknowledgements ......................................................................................................................
    [Show full text]
  • Employment Land Study
    Employment Land Study Rugby Borough Council Final Report May 2015 Prepared by GL Hearn Limited 280 High Holborn London WC1V 7EE T +44 (0)20 7851 4900 glhearn.com Rugby Borough Council Employment Land Study Final Report, May 2015 GL Hearn Page 2 of 131 \\rugbyfs\LOCPLAN\ECONOMY AND EMPLOYMENT\Employment Sites - MATT\Rugby Employment Land Study 2014-15\FINAL REPORT - MAY 2015\ELR Final Report 22-05- 15.docx Rugby Borough Council Employment Land Study Final Report, May 2015 Contents Section Page 1 EXECUTIVE SUMMARY 7 2 INTRODUCTION 11 3 CONTEXT TO THE STUDY 17 4 ECONOMIC & LABOUR MARKET DYNAMICS 27 5 COMMERCIAL PROPERTY MARKET 51 6 DEMAND FORECASTS 65 7 LAND SUPPLY 80 8 SUPPLY-DEMAND BALANCE 125 9 CONCLUSIONS 127 List of Figures FIGURE 1: ANNUAL GROWTH IN GVA AT CURRENT BASIC PRICES 28 FIGURE 2: TREND IN PRODUCTIVITY (GVA PER HEAD) 29 FIGURE 3: TRENDS IN EMPLOYMENT, RUGBY BOROUGH 30 FIGURE 4: COMPOSITION OF EMPLOYMENT IN RUGBY BOROUGH BY BROAD SECTOR, 1983-2013 33 FIGURE 5: TREND IN EMPLOYMENT GROWTH, RUGBY BOROUGH 2003-13 34 FIGURE 6: GROWTH IN ACTIVE ENTERPRISES, 2004-13 38 FIGURE 7: BUSINESS BIRTHS AND DEATHS, RUGBY BOROUGH 2004-13 38 FIGURE 8: SELF-EMPLOYMENT, 2006/7 – 2013/14 39 FIGURE 9: POPULATION GROWTH INDEX, 1998-2013 40 FIGURE 10: GROWTH IN WORKING-AGE POPULATION (16-59/64) IN RUGBY BOROUGH, 1998-2013 40 FIGURE 11: AGE STRUCTURE OF RUGBY BOROUGH’S POPULATION, 2013 41 FIGURE 12: CHANGES IN POPULATION BY AGE BAND IN RUGBY BOROUGH, 1998- 2013 42 GL Hearn Page 3 of 131 \\rugbyfs\LOCPLAN\ECONOMY AND EMPLOYMENT\Employment Sites - MATT\Rugby
    [Show full text]
  • Warwickshire Minerals Plan Second Publication Sustainability Appraisal Report Appendices II Warwickshire County Council
    Warwickshire Minerals Plan Second Publication Sustainability Appraisal Report Appendices II Warwickshire County Council October 2018 Notice This document and its contents have been prepared and are intended solely as information for Warwickshire County Council and use in relation to the Sustainability Appraisal of the Warwickshire Minerals Plan. Atkins Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. Document history Purpose Revision description Originated Checked Reviewed Authorised Date Rev 1.0 Draft for WCC’s EC/CW PM CW PM 17/09/2018 comments Rev 2.0 Final for issue EC/CW PM CW PM 16/10/2018 Client signoff Client Warwickshire County Council Project Warwickshire Minerals Plan Job number 5141082 Client signature / date Page 2 of 65 Contents Chapter Page Appendix A. Site Options Assessment Methodology 5 Appendix B. Site Options Assessment Results (updated 2018) 17 B.1. Site 1 Bourton in Dunsmore, Straight Mile: Assessment and Constraints Map 17 B.2. Site 2 Lawford Heath: Assessment and Constraints Map 21 B.3. Site 3/32 Shawell Quarry: Assessment and Constraints Map 26 B.4. Site 4 Wasperton Hill Farm, Wasperton: Assessment and Constraints Map 32 B.5. Site 5 Glebe Farm, Wasperton: Assessment and Constraints Map 38 B.6. Site 6 Coney Grey Farm, Ryton: Assessment and Constraints Map 43 B.7. Site 7 Salford Priors: Assessment and Constraints Map 47 B.8. Site 9 Hams Lane, Lea Marston: Assessment and Constraints Map 51 B.9. Site 22 Brinklow (South): Assessment and Constraints Map 56 Site 23 Barnwell’s Barn Farm (North), Lawford Heath: Assessment and Constraints Map 59 B.10.
    [Show full text]
  • Princes Street, , Rugby
    Princes Street, Asking Price £115,000 Princes Street, , Rugby Complete Estate Agents are pleased to offer for sale this excellent two bedroom ground floor apartment situated in an extremely popular location and in close walking distance to Rugby Town Center and Rugby Railway Station. Excellent position for commuters. The property consists of two well proportioned bedrooms, lounge/diner, fitted kitchen and a fitted bathroom suite. This property is one of six private apartments that overlook mature front and rear gardens and the allocated off-road parking area. Entrance Hall Radiator, door to: Lounge/Diner 15'7" x 11'2" (4.76m x 3.40m) UPVC double glazed window to rear, uPVC double glazed window to side, radiator. Kitchen 8'2" x 7'6" (2.49m x 2.29m) Fitted with a matching range of base and eye level units with worktop space over with worktop space, stainless steel sink with single drainer and mixer tap, uPVC double glazed window to rear, radiator. Bedroom 1 11'10" x 11'2" (3.60m x 3.40m) UPVC double glazed window to front, radiator. Bedroom 2 8'2" x 8'5" (2.50m x 2.57m) UPVC double glazed window to front, radiator. Shower Room Three piece suite comprising deep panelled bath, pedestal wash hand basin and low-level WC, tiled splashbacks, radiator. Location The Apartment is located with in a short walk to the town center and train station. Rugby is a market town in Warwickshire, England, on the River Avon. The town has a population of 70,628 (2011 census[1]) making it the second largest town in the county.
    [Show full text]
  • Coventry Public Transport Model 2008 Local Model Validation Report
    Coventry Public Transport Model 2008 Local Model Validation Report (LMVR) November 2009 DOCUMENT CONTROL SHEET BPP 04 F8 Client: Coventry City Council / CENTRO Project: Coventry Public Transport Models Job No: B0999800 Document Title: Local Model Validation Report Originator Checked by Reviewed by Approved by ORIGINAL NAME NAME NAME NAME Firuz Sulaimi Geoff Smith DATE SIGNATURE SIGNATURE SIGNATURE SIGNATURE September 2009 Document Status: Working Draft ORIGINAL NAME NAME NAME NAME Firuz Sulaimi Geoff Smith Mike Lampkin Phil Collins DATE SIGNATURE SIGNATURE SIGNATURE SIGNATURE November 2009 Document Status: Final ORIGINAL NAME NAME NAME NAME DATE SIGNATURE SIGNATURE SIGNATURE SIGNATURE Document Status: ORIGINAL NAME NAME NAME NAME DATE SIGNATURE SIGNATURE SIGNATURE SIGNATURE Document Status: This document has been prepared by Jacobs Consultancy UK Ltd, a subsidiary of Jacobs Engineering U.K. Limited (“Jacobs”) in its professional capacity as consultants in accordance with the terms and conditions of Jacobs’ contract with the commissioning party (the “Client”). Regard should be had to those terms and conditions when considering and/or placing any reliance on this document. No part of this document may be copied or reproduced by any means without prior written permission from Jacobs. If you have received this document in error, please destroy all copies in your possession or control and notify Jacobs. Any advice, opinions, or recommendations within this document (a) should be read and relied upon only in the context of the document as a whole; (b) do not, in any way, purport to include any manner of legal advice or opinion; (c) are based upon the information made available to Jacobs at the date of this document and on current UK standards, codes, technology and construction practices as at the date of this document.
    [Show full text]
  • HMP ONLEY for Reporting Year 2017-18 Published September 2018
    Annual Report of the Independent Monitoring Board at HMP ONLEY for reporting Year 2017-18 Published September 2018 Monitoring fairness and respect for people in custody TABLE OF CONTENTS A. Introductory Sections Section Topic Page 1 Statutory Role 3 2 Executive Summary 4 3 Description of Establishment 6 B. Evidence Sections 4 Safety and Security 7 5 Equality and Fairness 10 6 Segregation/Care and Separation Unit 12 7 Accommodation (including communication) 13 8 Healthcare (including mental health and social care) 16 9 Education and Other Activities 18 10 Work, Vocational Training and Employment 20 11 Resettlement Preparation 21 C The Work of the IMB 23 D Applications to the IMB 24 Page 2 of 24 Sections 1 - 3 1. STATUTORY ROLE OF THE IMB The Prison Act 1952 requires every prison to be monitored by an independent Board appointed by the Secretary of State from members of the community in which the prison or centre is situated. The Board is specifically charged to: (1) satisfy itself as to the humane and just treatment of those held in custody within its prison and the range and adequacy of the programmes preparing them for release. (2) inform promptly the Secretary of State, or any official to whom he has delegated authority as it judges appropriate, any concern it has. (3) report annually to the Secretary of State on how well the prison has met the standards and requirements placed on it and what impact these have on those in its custody. To enable the Board to carry out these duties effectively, its members have right of access to every prisoner and every part of the prison and also to the prison’s records.
    [Show full text]
  • Stockton, Cornwood Farm Ebrochure Draft
    Cornwood Farm Stockton, Warwickshire Cornwood Farm Napton Road, Stockton, Southam Approximate distances Warwickshire, CV47 8HU • Southam 2.2 miles • Banbury 16.2 miles • Leamington Spa 7.8 miles • Birmingham 37.6 miles • Rugby 8.8 miles • M40 motorway, J12 (Gaydon) 8.7 miles A rare opportunity to purchase • Coventry 13.1 miles • M45 motorway (Dunchurch) for M1 6.5 miles a rural home with extensive commercial buildings, lake and pastureland Cornwood Farm House - Porch • Sitting room Shower room • Conservatory • Kitchen/breakfast room opening to Dining room • Utility room Garden room • Master bedroom en-suite • 3 further double bedrooms • Family bathroom • Attached annexe comprising living room, bedroom and shower room • Double garage with kitchen and heating Enclosed gardens • Off-road parking Commercial buildings - extending to about 30,163 sq ft • 2 separate gated entrances • Range of units including offices, workshops and stores • Concrete yard with parking The land - Pastureland extending to about 14 acres Well stocked fishing lake of about 0.66 acre In all the property extends to about 17.19 acres (6.95 hectares) For sale freehold as a whole Banbury 01295 271555 fishergerman.co.uk Situation Cornwood Farm is conveniently situated between Stockton and Napton on the Hill. Stockton, a mile away offers primary school, church, shop with post office, village hall, pub (The Crown Inn), with another two close by on the Grand Union canal (The Boat Inn and The Blue Lias), football and cricket clubs. Napton, also a mile away offer similar facilities and a garage with petrol filling station. As well as good motorway connections close by, there is also easy access to Leamington, Warwick Parkway and Rugby train stations with services to London from 50 minutes.
    [Show full text]
  • Lot 46 Units A-F, Central Park, Bryant Road Rugby, Warwickshire CV23 0UX
    www.acuitus.co.uk lot 46 Units A-F, Central Park, Bryant Road Rugby, Warwickshire CV23 0UX Rent Modern Retail Parade Investment • Comprises a modern parade of • On-site car parking £73,666.04 6 retail units • Nearby occupiers include Continental per annum • Adjacent to Premier Inn and Aldi Tyres, Pearson and a major modern exclusive Supermarket housing estate (gross) • Close to the M6 (Junction 1) £73,656.04 p.a.x. (net) Location Description Miles: 12 miles east of Coventry The property comprises a modern ground floor parade of 6 retail 24 miles north-west of Northampton units, which forms part of a larger modern development fronting 35 miles south-east of Birmingham the A426. The property benefits from on-site car parking. Roads: M6 (Junction 1), M1 (Junction 19), A5 Rail: Rugby Railway Station Tenure Air: Coventry Airport, Birmingham International Airport Virtual freehold. Held for a term of 999 years less 2 days from 20th April 2006 at a current rent reserved of £10 per annum. Situation The property is situated on the Central Park Local Centre which VAT forms part of a larger mixed use development, including a major VAT is applicable to this lot. new housing estate with new business space. Premier Inn and N Aldi are adjacent to the property. Continental Tyre Factory and Pearson/ Penguin are close by. Tenancy and accommodation Review/ Unit Floor Use Floor Areas (Approx) Tenant Term Rent p.a.x. (Reversion) The Property A Ground Retail 201.41 sq m (2,168 sq ft) INDIVIDUAL (t/a Monarch 10 years from 14/01/2015 £18,000 31/07/2022 Carpets)
    [Show full text]
  • Stafford Park15
    UNITS C2 & C5-C6 STAFFORD PARK 15 TELFORD | TF3 3BB HIGH YIELDING INDUSTRIAL/WAREHOUSE INVESTMENT INVESTMENT SUMMARY ◼ WELL LOCATED INDUSTRIAL UNITS 1.8 MILES FROM J5 M54 ◼ C5-C6 LET TO LVS SMALL PLASTIC PARTS LTD UNTIL 23RD JUNE 2022 AT A RENT OF £43,270 PER ANNUM (£5.00 psf) ◼ C2 LET TO PH BOILER SPARES LTD UNTIL 9TH SEPTEMBER 2020 AT A RENT OF £8,525 PER ANNUM (£5.58 psf) ◼ BUILT IN 1970’S, STEEL PORTAL FRAME CONSTRUCTION, BRICK ELEVATIONS, STEEL PROFILE ROOFS DEDICATED CAR PARKING AND YARDS ◼ LONG LEASEHOLD FOR A TERM OF 299 YEARS FROM COMPLETION WE ARE INSTRUCTED TO SEEK OFFERS IN EXCESS OF £600,000 WHICH REFLECTS A NIY OF 8.22% AFTER PURCHASERS COSTS OF 5.05%. A53 B506 1 B5060 SHREWSBURY A442 M54 A5 5 4 A449 M54 J5 TO SHREWSBU RY WISBECH TELFORD 3 M54 M6 Toll A606 STAMFORD 1 A34 2 M54 TO BIRMINGHA A5 LEICESTER M M54 A41 A449 A461 M6 A444 J4 A1139 A47 A458 A442 A452 WALSALL WOLVERHAMPTON A5 STAFFORD A49 PARK 7 PETERBOROUGH 9 A461 STAF FOR D PAR WEDNESBURY 8 K 1 STAFFOR A454 D PARK 6 A43 A4123 A41 STAF M6 FO BRIDGENORTH RD A449 PA RK 1 A41 A444 4 ST AFF RK 13 CORBY PA ORD D ST AFFORD P A5 R ARK 10 A458 PA M69 M1 RK A605 1 5 AFFOSTAF M6 T FO S R D PA CHATTERIS RK 18 A464 A6116 A442 A449 A442 A1(M) BIRMINGHAM A45 12 M5 RD PARK A49 SOLIHULL STAFFO A142 COVENTRY KETTERING ELY KIDDERMINSTER LUDLOW M42 A464 A141 A456 M42 A508 A46 M45 HUNTINGDON A449 A4177 REDDITCH A442 WELLINGBOROUGH <<Click here to open in Google Maps A435 M40 ROYAL A43 WARWICK LEAMINGTON A14 SATSPA NAV: TF3 3BB RUSHDEN A45 A423 NORTHAMPTON ST.NEOTS LEOMINSTER MAVERN M5 HILLS A6 A426 A422 A46 CAMBRIDGE A44 LOCATION WORCESTER A46 STRATFORD-UPON-AVON TRAVEL A421 M40 A428 The property is situated on Stafford Park 15, approximately 0.5 miles from the A442 Queensway Location Miles Drive Time A509 and A464 dual carriageways which provide access to Junction 4 and 5 of the M45 motorway, both A429 TOWCESTER A11 A4103 A508 M1 BEDFORD A44 approximately 2 miles away from the estate.
    [Show full text]