Surface Mining Reclamation and Enforcement, Interior § 715.14

Total Page:16

File Type:pdf, Size:1020Kb

Surface Mining Reclamation and Enforcement, Interior § 715.14 Surface Mining Reclamation and Enforcement, Interior § 715.14 to public health or safety nor will they premining natural slopes in the area as pose any actual or probable threat of defined in paragraph (a). water flow diminution or pollution. (a) Slope measurements. (1) To deter- (7) The use or uses will not involve mine the natural slopes of the area be- unreasonable delays in reclamation. fore mining, sufficient slopes to ade- (8) Necessary approval of measures to quately represent the land surface con- prevent or mitigate adverse effects on figuration, and as approved by the reg- fish and wildlife has been obtained ulatory authority in accordance with from the regulatory authority and ap- site conditions, must be accurately propriate State and Federal fish and measured and recorded. Each measure- wildlife management agencies. ment shall consist of an angle of incli- (9) Proposals to change premining nation along the prevailing slope ex- land uses of range, fish and wildlife tending 100 linear feet above and below habitat, forest land, hayland, or pas- or beyond the coal outcrop or the area ture to a postmining cropland use, to be disturbed; or, where this is im- where the cropland would require practical, at locations specified by the continous maintenance such as seed- regulatory authority. Where the area ing, plowing, cultivation, fertilzation, has been previously mined, the meas- or other similar practices to be prac- urements shall extend at least 100 feet ticable or to comply with applicable beyond the limits of mining disturb- Federal, State, and local laws, shall be ances as determined by the regulatory reviewed by the regulatory authority authority to be representative of the to assure that— premining configuration of the land. (i) There is a firm written commit- Slope measurements shall take into ac- ment by the permittee or by the land- count natural variations in slope so as owner or land manager to provide suffi- to provide accurate representation of cient crop management after release of the range of natural slopes and shall applicable performance bonds to assure reflect geomorphic differences of the that the proposed postmining cropland area to be disturbed. Slope measure- use remains practical and reasonable; ments may be made from topographic (ii) There is sufficient water avail- maps showing contour lines, having able and committed to maintain crop sufficient detail and accuracy con- production; and sistent with the submitted mining and (iii) Topsoil quality and depth are reclamation plan. shown to be sufficient to support the (2) After the disturbed area has been proposed use. graded, the final graded slopes shall be (10) The regulatory authority has measured at the beginning and end of provided by public notice not less than lines established on the prevailing 45 days nor more than 60 days for inter- slope at locations representative of ested citizens and local, State and Fed- premining slope conditions and ap- eral agencies to review and comment proved by the regulatory authority. on the proposed land use. These measurements must not be made so as to allow unacceptably steep [42 FR 62680, Dec. 13, 1977; 43 FR 2721, Jan. 19, slopes to be constructed. 1978] (b) Final graded slopes. (1) The final graded slopes shall not exceed either § 715.14 Backfilling and grading. the approximate premining slopes as In order to achieve the approximate determined according to paragraph orginal contour, the permittee shall, (a)(1) and approved by the regulatory except as provided in this section, authority or any lesser slope specifed transport, backfill, compact (where ad- by the regulatory based on consider- visable to ensure stability or to pre- ation of soil, climate, or other charac- vent leaching of toxic materials), and teristics of the surrounding area. grade all spoil material to eliminate Postmining final graded slopes need all highwalls, spoil piles, and depres- not be uniform. The requirements of sions. Cut-and-fill terraces may be used this paragraph may be modifed by the only in those situations expressly iden- regulatory authority where the mining tified in this section. The postmining is reaffecting previously mined lands graded slopes must approximate the that have not been restored to the 63 VerDate Mar<15>2010 18:05 Jul 24, 2014 Jkt 232125 PO 00000 Frm 00073 Fmt 8010 Sfmt 8010 Q:\30\30V3.TXT 31 § 715.14 30 CFR Ch. VII (7–1–14 Edition) standards of this section and sufficient shall apply to surface mining oper- spoil is not available to return to the ations which remove entire coal seams slope determined according to para- in the upper part of a mountain, ridge, graph (a)(1). Where such modifications or hill by removing all of the overbur- are approved, the permittee shall, as a den, and where the requirements for minimum, be required to— achieving the approximate original (i) Retain all overburden and spoil on contour of this section cannot be met. the solid portion of existing or new Final graded top plateau slopes on the benches; and mined area shall be less than 1v:5h so (ii) Backfill and grade to the most as to create a level plateau or gently moderate slope possible to eliminate rolling configuration and the outslopes the highwall which does not exceed the of the plateau shall not exceed 1v:2h, angle of repose or such lesser slopes as except where engineering data substan- is necessary to assure stability. tiates and the regulatory authority (2) On approval by the regulatory au- finds that a minimum static safety fac- thority and in order to conserve soil tor of 1.5 (or higher factors specified by moisture, ensure stability, and control the regulatory authority) will be at- erosion on final graded slopes, cut-and- tained. Although the area need not be fill terraces may be allowed if the ter- restored to approximate original con- races are compatible with the tour, all highwalls, spoil piles, and de- postmining land use approved under pressions except as provided in para- § 715.13, and are appropriate substitutes graphs (d) and (e) of this section shall for construction of lower grades on the be eliminated. All mountaintop re- reclaimed lands. The terraces shall moval operations shall in addition meet the following requirements: meet the provisions of § 716.3 of this (i) Where specialized grading, founda- chapter. tion conditions, or roads are required (d) Small depressions. The requirement for the approved postmining land use, of this section to achieve approximate the final grading may include a terrace original contour does not prohibit con- of adequate width to ensure the safety, struction of small depressions if they stability, and erosion control necessary are approved by the regulatory author- to implement the postmining land use ity to minimize erosion, conserve soil plan. moisture or promote revegetation. (ii) The vertical distance between These depressions shall be compatible terraces shall be as specified by the with the approved postmining land use regulatory authority to prevent exces- and shall not be inappropriate sub- sive erosion and to provide long-term stitutes for construction of lower stability. grades on the reclaimed lands. Depres- (iii) The slope of the terrace outslope sions approved under this section shall shall not exceed 1v:2h (50 percent). Out- have a holding capacity of less than 1 slopes which exceed 1v:2h (50 percent) cubic yard of water or, if it is nec- may be approved if they have a min- essary that they be larger, shall not re- imum static safety factor of more than strict normal access throughout the 1.5 and provide adequate control over area or constitute a hazard. Large, per- erosion and closely resemble the sur- manent impoundments shall be gov- face configuration of the land prior to erned by paragraph (e) of this section mining. In no case may highwalls be and by § 715.17. left as part of terraces. (e) Permanent impoundments. Perma- (iv) Culverts and underground rock nent impoundments may be retained in drains shall be used on the terrace only mined and reclaimed areas provided all when approved by the regulatory au- highwalls are eliminated by grading to thority. appropriate contour and the provisions (3) All operations on steep slopes of for postmining land use (§ 715.13) and 20 degrees or more or on such lesser protection of the hydrologic balance slopes as the regulatory authority de- (§ 715.17) are met. No impoundments fines as a steep slope shall meet the shall be constructed on top of areas in provisions of § 716.2 of this chapter. which excess materials are deposited (c) Mountaintop removal. The require- pursuant to § 715.15 of this part. Im- ments of this paragraph and of § 716.3 poundments shall not be used to meet 64 VerDate Mar<15>2010 18:05 Jul 24, 2014 Jkt 232125 PO 00000 Frm 00074 Fmt 8010 Sfmt 8010 Q:\30\30V3.TXT 31 Surface Mining Reclamation and Enforcement, Interior § 715.14 the requirements of paragraph (j) of § 715.17 have been met and that the im- this section. poundments have been approved by the (f) Definition of thin and thick restored regulatory authority as meeting the overburden. The thin overburden provi- requirements of this part and all other sions of paragraph (g) of this section applicable Federal and State regula- may apply only where the final thick- tions. ness is less than 0.8 of the initial thick- (h) Thick overburden. In surface coal ness. The thick overburden provisions mining operations where the volume of of paragraph (h) of this section may spoil is demonstrated to be more than apply only where the final thickness is sufficient to achieve the approximate greater than 1.2 of the initial thick- original contour surface coal mining ness.
Recommended publications
  • South Palo Alto Tunnel with At-Grade Freight
    RAIL FACT SHEETS South Palo Alto Tunnel with At-Grade Freight About the Tunnel with At-Grade Freight For the tunnel alternative, the railroad tracks will be lowered in a trench south of Oregon Expressway to approximately Loma Verde Avenue. The twin bore tunnel will begin near Loma Verde Avenue and extend to just south of Charleston Road. The railroad tracks will then be raised in trench to approximately Ferne Avenue. The new electrified southbound railroad tracks will be built at the same horizontal location as the existing railroad track, however, the northbound track will be moved to the east within the limits of the tunnel to accommodate the spacing required between the twin bores. The railroad tracks in the trench and tunnel will carry only passenger trains. The freight trains will remain at-grade. The roadways at Meadow Drive and Charleston Road remain at their existing grade and will have a similar configuration that exists today with the addition of Class II buffered bike lanes on Charleston Road. This will require expanding the width of the road to maintain bike lanes through the overpass of the railroad. By the numbers Neighborhood Considerations • Diameter of twin bores is 30 feet. • Alma Street will permanently be reduced to one lane • Railroad track is designed for 110 mph. in each direction from south of Oregon Expressway to Ventura Avenue and from Charleston Road to Ferne • Meadow Drive and Charleston Road are Avenue. designed for 25 mph. • The train tracks will be approximately 70 feet below the Proposed Ground Level View - Looking Southwest • Maximum grade on railroad is 2%.
    [Show full text]
  • Harvesting Peat from the Bog to Your Operation
    MEDIA & FERTILIZER Harvesting Peat from the Bog to your Operation Figure 1. A virgin sphagnum bog in Quebec, Canada. Learn what’s involved in harvesting, packaging and shipping peat for horticulture production. The Canadian Peat Moss Industry By Neil Mattson, Bill Miller and Jeff Bishop • In 1999, 1.2 million metric tons of peat (10 million cubic meters) was harvested in Canada. n the 1960s, professors at Cornell University Harvesting and Processing were among the fi rst to advocate the use of peat When a company wants to open a new peat • It is estimated that 70 million metric tons in their soilless Peat-Lite mixes for greenhouse bog for harvesting, surveys are conducted to of peat accumulates annually in Canada, so production. Several properties of peat moss determine if a site contains horticulture grade current harvesting represents 1.7 percent Ihave led to its widespread adoption by the industry sphagnum. Th e peat should have a depth of at of annual accumulation. Thus, peat is over the intervening decades; these include: high least 2 meters, as it is desirable that a bog be able accumulating some 60 times faster than water holding and cation exchange capacity, lack to be harvested for many years (Figure 2). Ditches it is being harvested. of residual herbicides and weed seeds compared are built to drain surface water and access roads • Canada is estimated to contain 280 mil- to soil and composts, and low incidence of root- lion acres of peat land. In contrast, the peat borne pathogens. industry harvests on ca. 42,000 acres.
    [Show full text]
  • CHAPTER 9. SITE DEVELOPMENT Article 1. Grading, Excavation and Filling Sec
    Walnut Creek Municipal Code TITLE 9. BUILDING REGULATIONS CHAPTER 9. SITE DEVELOPMENT CHAPTER 9. SITE DEVELOPMENT Article 1. Grading, Excavation and Filling Sec. 9-9.01. Purpose. It is the declared intent of the City of Walnut Creek to promote the conservation of natural resources, including the natural beauties of the land, streams and water sheds, hills and vegetation, and as described in Sec. 10-2.1301 of the Walnut Creek Municipal Code and Government Code §65560(b) (1) to protect the health and safety, including the reduction or elimination of the hazards of earth slides, mud flows, rock falls, undue settlement, erosion, siltation and flooding, or other special conditions as described in Government Code §65560(b) (4) by minimizing the adverse effects of grading, cut and fill operations, water runoff and soil erosion. Therefore, the following regulatory provisions of this chapter are hereby adopted for the purpose of stringent control of all aspects of grading operations. (§1, Ord. 1193, eff. December 26, 1973) Sec. 9-9.02. Permits Required. No person shall do any grading without first having obtained a grading permit from the City except for the following: a. An excavation below finished grade for basements and footings of a building, retaining wall, swimming pool or other structure authorized by a valid building permit. This statement shall not exempt from permit requirements any fill made with the material from such excavation nor exempt any excavation having an unsupported height greater than five feet after the completion of such structure; b. Cemetery graves; c. Refuse disposal sites controlled by other regulations; d.
    [Show full text]
  • Slope Stabilization and Repair Solutions for Local Government Engineers
    Slope Stabilization and Repair Solutions for Local Government Engineers David Saftner, Principal Investigator Department of Civil Engineering University of Minnesota Duluth June 2017 Research Project Final Report 2017-17 • mndot.gov/research To request this document in an alternative format, such as braille or large print, call 651-366-4718 or 1- 800-657-3774 (Greater Minnesota) or email your request to [email protected]. Please request at least one week in advance. Technical Report Documentation Page 1. Report No. 2. 3. Recipients Accession No. MN/RC 2017-17 4. Title and Subtitle 5. Report Date Slope Stabilization and Repair Solutions for Local Government June 2017 Engineers 6. 7. Author(s) 8. Performing Organization Report No. David Saftner, Carlos Carranza-Torres, and Mitchell Nelson 9. Performing Organization Name and Address 10. Project/Task/Work Unit No. Department of Civil Engineering CTS #2016011 University of Minnesota Duluth 11. Contract (C) or Grant (G) No. 1405 University Dr. (c) 99008 (wo) 190 Duluth, MN 55812 12. Sponsoring Organization Name and Address 13. Type of Report and Period Covered Minnesota Local Road Research Board Final Report Minnesota Department of Transportation Research Services & Library 14. Sponsoring Agency Code 395 John Ireland Boulevard, MS 330 St. Paul, Minnesota 55155-1899 15. Supplementary Notes http:// mndot.gov/research/reports/2017/201717.pdf 16. Abstract (Limit: 250 words) The purpose of this project is to create a user-friendly guide focusing on locally maintained slopes requiring reoccurring maintenance in Minnesota. This study addresses the need to provide a consistent, logical approach to slope stabilization that is founded in geotechnical research and experience and applies to common slope failures.
    [Show full text]
  • Section 31 22 13 ‐ Site Grading
    University of Houston Master Construction Specifications Insert Project Name SECTION 31 22 13 ‐ SITE GRADING PART 1 ‐ GENERAL 1.1 SCOPE OF WORK A. This Section pertains to the earthwork generally consisting of excavation, filling, backfilling and subgrade preparation as required for construction of site retaining walls/structures, slab on grade walks, pavement surfaces, landscaped areas and the general shaping of the site as shown, described or reasonably inferred on the drawings. B. Subsurface data is available from the *Owner. Contractor is urged to carefully analyze the site conditions. C. This section excludes work necessary for building pad preparations. Work within the building footprint and surrounding 5 feet shall be accomplished under technical specification 31 23 00 Excavation and Fill prepared by *STRUCTURAL ENGINEER]. D. Construction Means, Methods, Techniques, Sequences and Procedures: 1. The Contractor is solely responsible for, and has sole control over, construction means, methods, techniques, sequences and procedures, and for coordinating all portions of the Work. 2. Shoring that is required to complete the Work, is considered a method or technique and is the sole responsibility of the Contractor. If a regulatory agency requires a licensed engineer to design, approve or provide drawings for shoring, then it is the sole responsibility of the Contractor to engage the services of a qualified Engineer for shoring design services. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Drawings and general provisions of the Contract, including A‐procurement and Contracting Requirements, Division 00 and Division 01 apply to this section. B. Section 31 11 00 Clearing and Grubbing C. Section 31 23 33 Trenching, Backfilling and Compaction D.
    [Show full text]
  • Steep Slopes
    FACT SHEET : 12 FACT SHEET: 12 Steep Slopes iTRaC is the Nashua Regional Steep slopes are legally defined as hillsides Figure 1: Example of a 15% slope Planning having a 15 foot, or greater, vertical rise Commission’s over 100 feet of horizontal run, or 15% slope 15% slope new approach 75’ to community (Figure 1). They are often undesirable ar- planning that eas for development due to the difficulty focuses on 500’ integrating of building on steep grades. On the other transportation, hand, these slopes can provide wildlife land use and environmental habitat, recreational opportunities, and Steep slopes have a ≥15 ft vertical rise over a planning. The scenic views, preserving the unique and 100 ft horizontal run, or a 15% slope. program was developed to culturally valuable environmental qualities assist that people treasure in New Hampshire. communities in dealing with the challenges of growth in a Difficulties Developing Steep Slopes coordinated Strategies for Developing Steep Slopes way that sustains Erosion ~ The loss of vegetation and Vegetation can stabilize soil and prevent erosion community disruption of natural drainage patterns on steep slopes by binding loose soil with roots character and brought about by development on a sense of and slowing the passage of water down the place. steep slopes can cause erosion problems slope. Replanting disturbed locations after con- leading to potential flooding, stream struction with a combination of trees, shrubs, sedimentation, and slope instability. and groundcover is key. Infrastructure ~ Providing infrastructure to hillside development can be expensive Berms are long earthen mounds running per- to engineer and construct.
    [Show full text]
  • Chapter 1 Overview and History of the Expanded Shale, Clay and Slate
    Chapter 1 Overview and History of the Expanded Shale, Clay and Slate Industry April 2007 Expanded Shale, Clay & Slate Institute (ESCSI) 2225 E. Murray Holladay Rd, Suite 102 Salt Lake City, Utah 84117 (801) 272-7070 Fax: (801) 272-3377 [email protected] www.escsi.org CHAPTER 1 1.1 Introduction 1.2 How it started 1.3 Beginnings of the Expanded Shale, Clay and Slate (ESCS) Industry 1.4 What is Rotary Kiln Produced ESCS Lightweight Aggregate? 1.5 What is Lightweight Concrete? 1.6 Marine Structures The Story of the Selma Powell River Concrete Ships Concrete Ships of World War II (1940-1947) Braddock Gated Dam Off Shore Platforms 1.7 First Building Using Structural Lightweight Concrete 1.8 Growth of the ESCS Industry 1.9 Lightweight Concrete Masonry Units Advantages of Lightweight Concrete Masonry Units 1.10 High Rise Building Parking Structures 1.11 Precast-Prestressed Lightweight Concrete 1.12 Thin Shell Construction 1.13 Resistance to Nuclear Blast 1.14 Design Flexibility 1.15 Floor and Roof Fill 1.16 Bridges 1.17 Horticulture Applications 1.18 Asphalt Surface Treatment and Hotmix Applications 1.19 A World of Uses – Detailed List of Applications SmartWall® High Performance Concrete Masonry Asphalt Pavement (Rural, City and Freeway) Structural Concrete (Including high performance) Geotechnical Horticulture Applications Specialty Concrete Miscellaneous Appendix 1A ESCSI Information Sheet #7600 “Expanded Shale, Clay and Slate- A World of Applications…Worldwide 1-1 1.1 Introduction The purpose of this reference manual (RM) is to provide information on the practical application of expanded shale, clay and slate (ESCS) lightweight aggregates.
    [Show full text]
  • Fundamentals of Site Grading Design
    188.pdf A SunCam online continuing education course Fundamentals of Site Grading Design by Joshua A. Tiner, P.E. 188.pdf Fundamentals of Site Grading A SunCam online continuing education course Table of Contents A. Introduction B. Basics • Background: • Existing Conditions: • Contour Lines: • Spot Elevations / Spot Grades: • Other Standard Annotations: • Slope • Plan Setup • Limit of Disturbance / Transition between Existing and New Grades • The Inverse Slope/Contour Calculation Method C. Design Parameters and Other Limitations • Design Parameters • Positive Drainage • Rules of Thumb o Maximum Access Drive Slope: 8% o Maximum Parking Lot Slope: 5% o Maximum Slope in Maintainable Grassed Landscaped Areas 3:1 o Maximum Slope in Stabilized Landscaped Areas 2:1 o Slopes exceeding 2:1 o Minimum Slope of Asphalt: 1.5% o Minimum Slope of Concrete: 0.75% o Minimum Slope of Concrete Curb: 0.75% o Loading Dock grading: 2.0% for 60’ • ADA Requirements • Cut-Fill Analysis • Rock Ledge walls D. Other Grading Features • Berms • Swales • Ridge Lines • Retaining Walls E. Problem Areas and Other Locations of Importance • Landscaped Islands and Peninsulas • ADA Parking Spaces • Longitudinal Islands with Sidewalks • Flush Ramps • Drainage Outfall Location • Setting the Finished Floor • Property Line grading F. Summary and Conclusion www.SunCam.com Copyright 2014 Joshua A. Tiner, P.E. Page 2 of 24 188.pdf Fundamentals of Site Grading A SunCam online continuing education course A. Introduction This course is developed to identify the fundamentals of site grading design to those who are not experienced with site grading design, as well as a refresher to anyone who has worked in Civil Engineering and/or Land Development.
    [Show full text]
  • Stallion Synopsis For: Not This Time Prepared By: Alan Porter Prepared For: Taylor Made Stallions
    STALLION SYNOPSIS FOR: NOT THIS TIME PREPARED BY: ALAN PORTER PREPARED FOR: TAYLOR MADE STALLIONS INC Pedigree Consultants are able to help you in all facets of your thoroughbred investment. Not only are we able to proven mating advice but we are also able to advise on mare selection, management and promotion of stallions, and selection and purchase of racing and breeding stock. For more information on the services visit www.pedigreeconsultants.com, email [email protected] or call +1 859 285 0431. NOT THIS TIME The most brilliant two-year-old son of sire of sires, Giant’s Causeway, Not This Time was also arguably the fastest and most spectacular two-year-old of his crop. In addition to being by Storm Cat’s leading sire son, he is out of record-breaking graded and multiple stakes winning Miss Macy Sue – also dam of brilliant Breeders’ Cup Mile (gr. I) victor Liam’s Map – and descends from Ta Wee, a two-time Champion Sprinter who is half-sister to the legendary Dr. Fager. Giant’s Causeway has demonstrated an affinity for the Fappiano branch of Mr. Prospector, and Fappiano is particularly interesting here, as he is out of a mare by Dr. Fager, which should work extremely well with remarkable strong Tartan Farm/Genter heritage in the dam of Not This Time (which includes inbreeding to Dr. Fager’s brilliant half-sister, Ta Wee). We can note that Unbridled’s Song – a grandson of Fappiano – is the sire of Not This Time’s brilliant half-brother Liam’s Map.
    [Show full text]
  • Unstable Slope Advisory for Solid Waste Landfill Facilities (GD #586)
    GUIDANCE DOCUMENT #586 Division of Materials & Waste Management October 2014 (originally published on May 29, 2004)1 Unstable Slope Advisory for Solid Waste Landfill Facilities Applicable Rules MSW: OAC 3745-27-19(E)(1)(c) ISW: OAC 3745-29-19(E)(1)(c) RSW: OAC 3745-30-14(E)(1)(c) Tires: OAC 3745-27-75(E)(19) C&DD: OAC 3745-400-11(E)(1) DMWM Cross-Referenced guidance document: #660 Geotechnical and Stability Analyses for Ohio Waste Containment Facilities Purpose This document outlines the operational and construction practices of material placement for maintaining stable waste slopes and the structural integrity of engineered components. Applicability This document applies to operating municipal (MSW), industrial (ISW) and residual (RSW) solid waste landfills, scrap tire monofills, and construction and demolition debris (C&DD) landfills. Background Operational and construction practices have a profound impact upon the stability of waste slopes and in maintaining the integrity of the engineered components. Excavated and constructed slopes (including waste slopes) can fail if sound operating and construction practices are not followed. Several incidents involving failure of slopes and damage to engineered components have occurred at solid waste landfills around the state. Each incident can, in part, be attributed to construction and operational errors, specifically over-steep waste slopes. The operators at the facilities where these failures occurred placed waste at a grade that exceeded the shear resistance of the affected material, or the shear forces induced by waste placement exceeded the shear resistance of one of the geosynthetic and/or soil interfaces. Additionally, each of these facility operators incurred significant cost to assess and repair damage to the engineered components of the facility.
    [Show full text]
  • Appendix D General Earthwork and Grading Specifications for Rough Grading
    Appendix D General Earthwork and Grading Specifications for Rough Grading LEIGHTON AND ASSOCIATES, INC. General Earthwork and Grading Specifications 1.0 General 1.1 Intent These General Earthwork and Grading Specifications are for the grading and earthwork shown on the approved grading plan(s) and/or indicated in the geotechnical report(s). These Specifications are a part of the recommendations contained in the geotechnical report(s). In case of conflict, the specific recommendations in the geotechnical report shall supersede these more general Specifications. Observations of the earthwork by the project Geotechnical Consultant during the course of grading may result in new or revised recommendations that could supersede these specifications or the recommendations in the geotechnical report(s). 1.2 The Geotechnical Consultant of Record Prior to commencement of work, the owner shall employ the Geotechnical Consultant of Record (Geotechnical Consultant). The Geotechnical Consultants shall be responsible for reviewing the approved geotechnical report(s) and accepting the adequacy of the preliminary geotechnical findings, conclusions, and recommendations prior to the commencement of the grading. Prior to commencement of grading, the Geotechnical Consultant shall review the "work plan" prepared by the Earthwork Contractor (Contractor) and schedule sufficient personnel to perform the appropriate level of observation, mapping, and compaction testing. During the grading and earthwork operations, the Geotechnical Consultant shall observe, map, and document the subsurface exposures to verify the geotechnical design assumptions. If the observed conditions are found to be significantly different than the interpreted assumptions during the design phase, the Geotechnical Consultant shall inform the owner, recommend appropriate changes in design to accommodate the observed conditions, and notify the review agency where required.
    [Show full text]
  • 4.4.5. Slope Stability
    Final Report Main Report 4.4.5. Slope Stability The following three methods are indicated as the slope stability estimation methods in the “ Manual for Zonation on Seismic Geotechnical Hazards” by TC4, ISSMFE (1993). 1) Method Grade 1: simple and synthetic analysis by using seismic intensity or magnitude without information of geological condition 2) Method Grade 2: rather detail analysis with geological information by using site reconnaissance result or existing geological information 3) Method Grade 3: detail analysis by using geological investigation result and numerical analysis It is considered that Method Grade 3 is appropriate in quality and content, compared to the other estimation items of the Study. This method requires information on detailed shape of slope, load conditions and strength of soils. Slopes in the Study Area are categorised as follows: Large-scale slope - The northern edge of the Study Area is at the foot of the Alborz Mountains and steep slopes are distributed throughout. - The northern half of the Study Area consists of alluvial fans. A gentle slope with the same gradient is prevalent in the area. - A deep valley is distributed alongside a major river in the northern part of the Study Area. - Elevation data from the Beautification Organisation is available. It is possible to determine the slope gradient within every 50-mesh unit. Statistical treatment is applicable. Small-scale slope - Cut slopes are distributed alongside major highways in the northern part of the Study Area. Most of these have no slope protection and tall buildings are constructed on top of the slopes. - Information on location of slope, shape of slope and soil strength is not available.
    [Show full text]