Fundamentals of Site Grading Design
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Heavy Equipment
Heavy Equipment Code: 5913 Version: 01 Copyright © 2007. All Rights Reserved. Heavy Equipment General Assessment Information Blueprint Contents General Assessment Information Sample Written Items Written Assessment Information Performance Assessment Information Specic Competencies Covered in the Test Sample Performance Job Test Type: The Heavy Equipment assessment is included in NOCTI’s Teacher assessment battery. Teacher assessments measure an individual’s technical knowledge and skills in a proctored prociency examination format. These assessments are used in a large number of states as part of the teacher licensing and/or certication process, assessing competency in all aspects of a particular industry. NOCTI Teacher tests typically oer both a written and performance component that must be administered at a NOCTI-approved Area Test Center. Teacher assessments can be delivered in an online or paper/pencil format. Revision Team: The assessment content is based on input from subject matter experts representing the state of Pennsylvania. CIP Code 49.0202- Construction/Heavy Career Cluster 2- 47-2073.00- Operating Engineers Equipment/Earthmoving Architecture and Construction and Other Construction Equipment Operation Equipment Operators NOCTI Teacher Assessment Page 2 of 12 Heavy Equipment Wrien Assessment NOCTI written assessments consist of questions to measure an individual’s factual theoretical knowledge. Administration Time: 3 hours Number of Questions: 232 Number of Sessions: This assessment may be administered in one, two, or three -
AAHS New Objective Grading System to Provide Prognostic Value To
New Objective Grading System to Provide Prognostic Value to Cubital Tunnel Surgery Cory Lebowitz, DO; Lauryn Bianco, MS; Manuel Pontes, PhD; Mitchel K. Freedman, DO; Michael Rivlin, MD INTRODUCTION TABLE 1: ELECTRODIAGNOSTIC GRADING SYSTEM RESULTS CONCLUSION • The use of electrodiagnostic (EDX) • • 101 patients; 60 male & 41 Electrodiagnostic studies is well documented on its female studies not only aid a value as diagnostic tool, however, little clinical diagnosis of is known about its prognostic value for • Overall quickDASH went from 38 to 41 CuTS but can cubital tunnel surgery (CuTS) provide a framework • We report which EDX results yield • Discovered a cut off of a for the outcome of prognostic value for the surgical Sensory Amplitude of 38 treatment for CuTS based on patients surgery • We form an EDX based grading quickDASH improvement • system for CuTS that is predictive of • Patients with a sensory Specifically when outcome amplitude that was looking at the considered normal MCV across the METHODS based off the literature elbow with the but abnormal (i.e <38) sensory • Patients with CuTS were treated based off our data amplitude surgically with an ulnar nerve failed to improve in decompression +/- transposition their quickDASH • The grading system • Pre & Postoperative quickDASH scores is reproducible and scores and demographics reviewed • 97 patients (96%) fit in to can aid in following • Preoperative EDX reviewed: similar patient for • EMG the grading system • 93.8% inter-observer outcome evaluation • Motor Amplitudes and clinical studies • Motor Conduction Velocities reliability to use the • Sensory Amplitude grading system • Conduction Block • Those with a grade 3 had • Grading system constructed solely on the largest quickDASH EDX: nerve conduction studies and improvement electromyography variable. -
Electrophysiological Grading of Carpal Tunnel Syndrome
ORIGINAL ARTICLE Electrophysiological Grading of Carpal Tunnel Syndrome MUHAMMAD WAZIR ALI KHAN ABSTRACT Background: Carpal Tunnel Syndrome (CTS) is the most common entrapment neuropathy caused by a conduction block of distal median nerve at wrist. Women are affected more commonly than men. Clinical signs are quite helpful in diagnosis but electrophysiological tests yield accurate diagnosis and severity grading along with follow-up and management. Aim: To utilize nerve conduction studies (NCS) to diagnose carpal tunnel syndrome and further classify its severity according to the AAEM criteria. Methods: This descriptive study was conducted at the Department of Neurology, Sh. Zayed Medical College/Hospital, Rahim Yar Khan from June 2013 to Dec 2014. Overall, 90 patients and 180 hands were evaluated through nerve conduction studies. Patients with clinically high suspicion of CTS were included for NCS. Clinical grading was done using the AAEM criteria for CTS. Other variables like duration of symptoms, handedness, bilateral disease and gender were noted. Mean and median were calculated for age of the patients. Results: Ninety patients and 126 hands were identified with carpal tunnel syndrome. Most patients (80%) were females with age range from 19 to 75 years. More than one third had bilateral disease. Dominant hand was involved in majority of the patients. Most patients had (42.8%) severe CTS as per AAEM criteria. Also duration of symptoms directly correlated with severity of disease. Conclusion: Nerve conduction study is a valuable tool in accurate diagnosis and grading of carpal tunnel syndrome. Keywords: Phalen sign, Tinel Sign, electrophysiology, median nerve INTRODUCTION 4,5,6 electrophysiological findings, are quite valuable . -
Montlake Cut Tunnel Expert Review Panel Report
SR 520 Project Montlake Cut Tunnel Expert Review Panel Report EXPERT REVIEW PANEL MEMBERS: John Reilly, P.E., C.P.Eng. John Reilly Associates International Brenda Böhlke, Ph.D., P.G.. Myers Böhlke Enterprise Vojtech Gall, Ph.D., P.E. Gall Zeidler Consultants Lars Christian Ingerslev, P.E. PB Red Robinson, C.E.G., R.G. Shannon and Wilson Gregg Korbin, Ph.D. Geotechnical Consultant John Townsend, C.Eng. Hatch-Mott MacDonald José Carrasquero-Verde, Principal Scientist Herrera Environmental Consultants Submitted to the Washington State Department of Transportation July 17, 2008 SR520, Montlake Cut, Tunnel Alternatives, Expert Review Panel Report July 17h, 2008 Page 2 TABLE OF CONTENTS 1. EXECUTIVE SUMMARY......................................................................................................................5 1.1. INTRODUCTION .......................................................................................................................................5 1.2. ENVIRONMENTAL CONSIDERATIONS ......................................................................................................5 1.3. TUNNELING METHODS CONSIDERED......................................................................................................5 Figure 1 - Immersed Tunnel Construction (General) ......................................................................................6 Figure 2 - Tunnel Boring Machine (Elbe River, Hamburg) ............................................................................6 Figure 3 – Sequential Excavation -
South Palo Alto Tunnel with At-Grade Freight
RAIL FACT SHEETS South Palo Alto Tunnel with At-Grade Freight About the Tunnel with At-Grade Freight For the tunnel alternative, the railroad tracks will be lowered in a trench south of Oregon Expressway to approximately Loma Verde Avenue. The twin bore tunnel will begin near Loma Verde Avenue and extend to just south of Charleston Road. The railroad tracks will then be raised in trench to approximately Ferne Avenue. The new electrified southbound railroad tracks will be built at the same horizontal location as the existing railroad track, however, the northbound track will be moved to the east within the limits of the tunnel to accommodate the spacing required between the twin bores. The railroad tracks in the trench and tunnel will carry only passenger trains. The freight trains will remain at-grade. The roadways at Meadow Drive and Charleston Road remain at their existing grade and will have a similar configuration that exists today with the addition of Class II buffered bike lanes on Charleston Road. This will require expanding the width of the road to maintain bike lanes through the overpass of the railroad. By the numbers Neighborhood Considerations • Diameter of twin bores is 30 feet. • Alma Street will permanently be reduced to one lane • Railroad track is designed for 110 mph. in each direction from south of Oregon Expressway to Ventura Avenue and from Charleston Road to Ferne • Meadow Drive and Charleston Road are Avenue. designed for 25 mph. • The train tracks will be approximately 70 feet below the Proposed Ground Level View - Looking Southwest • Maximum grade on railroad is 2%. -
Harvesting Peat from the Bog to Your Operation
MEDIA & FERTILIZER Harvesting Peat from the Bog to your Operation Figure 1. A virgin sphagnum bog in Quebec, Canada. Learn what’s involved in harvesting, packaging and shipping peat for horticulture production. The Canadian Peat Moss Industry By Neil Mattson, Bill Miller and Jeff Bishop • In 1999, 1.2 million metric tons of peat (10 million cubic meters) was harvested in Canada. n the 1960s, professors at Cornell University Harvesting and Processing were among the fi rst to advocate the use of peat When a company wants to open a new peat • It is estimated that 70 million metric tons in their soilless Peat-Lite mixes for greenhouse bog for harvesting, surveys are conducted to of peat accumulates annually in Canada, so production. Several properties of peat moss determine if a site contains horticulture grade current harvesting represents 1.7 percent Ihave led to its widespread adoption by the industry sphagnum. Th e peat should have a depth of at of annual accumulation. Thus, peat is over the intervening decades; these include: high least 2 meters, as it is desirable that a bog be able accumulating some 60 times faster than water holding and cation exchange capacity, lack to be harvested for many years (Figure 2). Ditches it is being harvested. of residual herbicides and weed seeds compared are built to drain surface water and access roads • Canada is estimated to contain 280 mil- to soil and composts, and low incidence of root- lion acres of peat land. In contrast, the peat borne pathogens. industry harvests on ca. 42,000 acres. -
CHAPTER 9. SITE DEVELOPMENT Article 1. Grading, Excavation and Filling Sec
Walnut Creek Municipal Code TITLE 9. BUILDING REGULATIONS CHAPTER 9. SITE DEVELOPMENT CHAPTER 9. SITE DEVELOPMENT Article 1. Grading, Excavation and Filling Sec. 9-9.01. Purpose. It is the declared intent of the City of Walnut Creek to promote the conservation of natural resources, including the natural beauties of the land, streams and water sheds, hills and vegetation, and as described in Sec. 10-2.1301 of the Walnut Creek Municipal Code and Government Code §65560(b) (1) to protect the health and safety, including the reduction or elimination of the hazards of earth slides, mud flows, rock falls, undue settlement, erosion, siltation and flooding, or other special conditions as described in Government Code §65560(b) (4) by minimizing the adverse effects of grading, cut and fill operations, water runoff and soil erosion. Therefore, the following regulatory provisions of this chapter are hereby adopted for the purpose of stringent control of all aspects of grading operations. (§1, Ord. 1193, eff. December 26, 1973) Sec. 9-9.02. Permits Required. No person shall do any grading without first having obtained a grading permit from the City except for the following: a. An excavation below finished grade for basements and footings of a building, retaining wall, swimming pool or other structure authorized by a valid building permit. This statement shall not exempt from permit requirements any fill made with the material from such excavation nor exempt any excavation having an unsupported height greater than five feet after the completion of such structure; b. Cemetery graves; c. Refuse disposal sites controlled by other regulations; d. -
Slope Stabilization and Repair Solutions for Local Government Engineers
Slope Stabilization and Repair Solutions for Local Government Engineers David Saftner, Principal Investigator Department of Civil Engineering University of Minnesota Duluth June 2017 Research Project Final Report 2017-17 • mndot.gov/research To request this document in an alternative format, such as braille or large print, call 651-366-4718 or 1- 800-657-3774 (Greater Minnesota) or email your request to [email protected]. Please request at least one week in advance. Technical Report Documentation Page 1. Report No. 2. 3. Recipients Accession No. MN/RC 2017-17 4. Title and Subtitle 5. Report Date Slope Stabilization and Repair Solutions for Local Government June 2017 Engineers 6. 7. Author(s) 8. Performing Organization Report No. David Saftner, Carlos Carranza-Torres, and Mitchell Nelson 9. Performing Organization Name and Address 10. Project/Task/Work Unit No. Department of Civil Engineering CTS #2016011 University of Minnesota Duluth 11. Contract (C) or Grant (G) No. 1405 University Dr. (c) 99008 (wo) 190 Duluth, MN 55812 12. Sponsoring Organization Name and Address 13. Type of Report and Period Covered Minnesota Local Road Research Board Final Report Minnesota Department of Transportation Research Services & Library 14. Sponsoring Agency Code 395 John Ireland Boulevard, MS 330 St. Paul, Minnesota 55155-1899 15. Supplementary Notes http:// mndot.gov/research/reports/2017/201717.pdf 16. Abstract (Limit: 250 words) The purpose of this project is to create a user-friendly guide focusing on locally maintained slopes requiring reoccurring maintenance in Minnesota. This study addresses the need to provide a consistent, logical approach to slope stabilization that is founded in geotechnical research and experience and applies to common slope failures. -
Slope Stability
Slope stability Causes of instability Mechanics of slopes Analysis of translational slip Analysis of rotational slip Site investigation Remedial measures Soil or rock masses with sloping surfaces, either natural or constructed, are subject to forces associated with gravity and seepage which cause instability. Resistance to failure is derived mainly from a combination of slope geometry and the shear strength of the soil or rock itself. The different types of instability can be characterised by spatial considerations, particle size and speed of movement. One of the simplest methods of classification is that proposed by Varnes in 1978: I. Falls II. Topples III. Slides rotational and translational IV. Lateral spreads V. Flows in Bedrock and in Soils VI. Complex Falls In which the mass in motion travels most of the distance through the air. Falls include: free fall, movement by leaps and bounds, and rolling of fragments of bedrock or soil. Topples Toppling occurs as movement due to forces that cause an over-turning moment about a pivot point below the centre of gravity of the unit. If unchecked it will result in a fall or slide. The potential for toppling can be identified using the graphical construction on a stereonet. The stereonet allows the spatial distribution of discontinuities to be presented alongside the slope surface. On a stereoplot toppling is indicated by a concentration of poles "in front" of the slope's great circle and within ± 30º of the direction of true dip. Lateral Spreads Lateral spreads are disturbed lateral extension movements in a fractured mass. Two subgroups are identified: A. -
Section 31 22 13 ‐ Site Grading
University of Houston Master Construction Specifications Insert Project Name SECTION 31 22 13 ‐ SITE GRADING PART 1 ‐ GENERAL 1.1 SCOPE OF WORK A. This Section pertains to the earthwork generally consisting of excavation, filling, backfilling and subgrade preparation as required for construction of site retaining walls/structures, slab on grade walks, pavement surfaces, landscaped areas and the general shaping of the site as shown, described or reasonably inferred on the drawings. B. Subsurface data is available from the *Owner. Contractor is urged to carefully analyze the site conditions. C. This section excludes work necessary for building pad preparations. Work within the building footprint and surrounding 5 feet shall be accomplished under technical specification 31 23 00 Excavation and Fill prepared by *STRUCTURAL ENGINEER]. D. Construction Means, Methods, Techniques, Sequences and Procedures: 1. The Contractor is solely responsible for, and has sole control over, construction means, methods, techniques, sequences and procedures, and for coordinating all portions of the Work. 2. Shoring that is required to complete the Work, is considered a method or technique and is the sole responsibility of the Contractor. If a regulatory agency requires a licensed engineer to design, approve or provide drawings for shoring, then it is the sole responsibility of the Contractor to engage the services of a qualified Engineer for shoring design services. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Drawings and general provisions of the Contract, including A‐procurement and Contracting Requirements, Division 00 and Division 01 apply to this section. B. Section 31 11 00 Clearing and Grubbing C. Section 31 23 33 Trenching, Backfilling and Compaction D. -
Steep Slopes
FACT SHEET : 12 FACT SHEET: 12 Steep Slopes iTRaC is the Nashua Regional Steep slopes are legally defined as hillsides Figure 1: Example of a 15% slope Planning having a 15 foot, or greater, vertical rise Commission’s over 100 feet of horizontal run, or 15% slope 15% slope new approach 75’ to community (Figure 1). They are often undesirable ar- planning that eas for development due to the difficulty focuses on 500’ integrating of building on steep grades. On the other transportation, hand, these slopes can provide wildlife land use and environmental habitat, recreational opportunities, and Steep slopes have a ≥15 ft vertical rise over a planning. The scenic views, preserving the unique and 100 ft horizontal run, or a 15% slope. program was developed to culturally valuable environmental qualities assist that people treasure in New Hampshire. communities in dealing with the challenges of growth in a Difficulties Developing Steep Slopes coordinated Strategies for Developing Steep Slopes way that sustains Erosion ~ The loss of vegetation and Vegetation can stabilize soil and prevent erosion community disruption of natural drainage patterns on steep slopes by binding loose soil with roots character and brought about by development on a sense of and slowing the passage of water down the place. steep slopes can cause erosion problems slope. Replanting disturbed locations after con- leading to potential flooding, stream struction with a combination of trees, shrubs, sedimentation, and slope instability. and groundcover is key. Infrastructure ~ Providing infrastructure to hillside development can be expensive Berms are long earthen mounds running per- to engineer and construct. -
Unsealed Road Grading Your Questions Answered
Unsealed Road Grading Your Questions Answered What is maintenance grading? Council grades unsealed roads to reshape and re-compact the road, to reduce lumps and bumps and ensure that the road will shed water away from the centre after rain. A grading maintenance schedule is adhered to every 6 or 12 months, depending upon the road condition, the amount of use and the effects of wet weather. What is gravel re-sheeting? Gravel re-sheeting is when new gravel is added to the road. This is due to the severe deterioration of the road that can compromise the safety of road users. The gravel is generally laid in loose layers and then trimmed and compacted using a grader, water cart and roller so that the new road generally has a depth of about 150mm. Why does my road lose gravel? Gravel wears away over time due to the combination of the environment (wetness and dryness), the type and volume of traffic and excessive traffic speed. Softer gravel rock will wear away faster than harder gravel rock. Unsealed roads are made up of a mixture of gravel of differing sizes, clay and soils. This mixture affects the strength of the pavement and how long it will last. The rock gives the pavement strength and the clay and other soils binds the gravel together. Where possible, the grader drivers will recover as much of the loose gravel as they can during the grading of a road and turn it from the edge back into the centre of the road. Why is does my road appear to be shrinking? As the road wears down over time the edges of the road pavement will wear and the width can become less.