5012P Gradiometer Mechanical “Ball-In-Tube” Grade (Slope) Indicator

Total Page:16

File Type:pdf, Size:1020Kb

5012P Gradiometer Mechanical “Ball-In-Tube” Grade (Slope) Indicator 5012P Gradiometer Mechanical “Ball-in-Tube” Grade (Slope) Indicator Page 1 of 1 Part Number Shown: 5012P “Gradiometer” Inc. ® Accurate, Rugged Inclinometer for Measuring Slope or Grade Features 2 Scales: Inch per Ft-Rise and % Grade Easily installed – quick retrofitting Weatherproof - will not rust or hang up Quick and accurate visual reference en en consentof Rieker UV Resistant Operational from -50° F to +180° F Extremely shock and vibration resistant Description A Gradiometer is any of various surveying instruments for measuring angles of elevation, slope, or incline, as of an embankment or roadway. Also called clinometer or inclinometer, the 5012P provides accurate measurement of slope in Percent Grade and Inch Per Foot Rise. Rieker manufacturers these manual type gradiometers (or inclinometers) using precise glass tube and ball construction. All our tubes are filled with a special dampening fluid that controls the movement of the ball. The fluid combined with large, clear number and degree markings make it easy to get quick, accurate readings under a wide variety of severe environmental conditions. Applications Plows, graders, excavators, trenchers, and pavers are only a few examples of the types of applications well suited for gradiometers. Contact us today for a quote. OEMs welcome, quantity pricing available. GENERAL TECHNICAL DATA DIMENSIONS 8.0"W X 2.875"H X 0.375"D (203,2MM X 73MM X 9,6MM) 8/26/15 UPPER ±1.5 INCH PER FOOT RISE, IN 0.125” (1/8”) INCREMENTS MEASURING RANGE LOWER ±13% GRADE, IN 1% INCREMENTS CASE MATERIAL BLACK ACRYLIC, ENGRAVED MARKINGS FILLED WHITE TUBE CONSTRUCTION CLEAR GLASS TUBE FILLED WITH DAMPENING FLUID; BLACK BALL OPERATING TEMPERATURE -50° F TO +180° F (-46ºC TO +82ºC) Inc. All Inc. Rights Reserved. ® -2015Rieker RIEKER INC • 34 MOUNT PLEASANT ROAD • ASTON • PA • 19014 • USA e content e presentedis provided forinformational purposes onlyand subject change. to 610-500-2000 fax: 610-500-2002 [email protected] www.riekerinc.com Theinformation and materialpresented may not be published, broadcast,rewritten, or redistributed without the expresswritt Th ©2002 FORMNUMBER: MI0004_04/05UPDATED: .
Recommended publications
  • Use of Inclinometer for Landslide Identification with Relevance to Mahawewa Landslide
    Use of Inclinometer for Landslide Identification with Relevance to Mahawewa Landslide M.P.N.C. Amarathunga National Building Research Organization, Jawaththa Road, Colombo 05 R.M.S. Bandara National Building Research Organization, Jawaththa Road, Colombo 05 ABSTRACT: Instrumentation can be used to characterize the location of shallow and deep failure planes as well as measure the direction of landslide movement. Subsurface movements or ground deformations can be characterized in a variety of ways using different sensor technologies and data acquisition methods. Inclinometer can acquire subsurface movements automatically at frequent time intervals and provide a useful tool for geologists and engineers to enhance subsurface characterization, improve geotechnical design, and monitor construction activities in real time. The Mahawewa landslide is a massive slope failure that is partial reactivation of ancient landslide in Walapane of Nuwaraeliya District. In January 2007 and February 2011 the landslide was reactivated. From July 2010 to present, we have conducted monitoring of installed instrument and general geological inspection. Ongoing monitoring has revealed that the landslide movement continues after the 2007 reactivation and still continues movement can observed. We have identified two slip surfaces at the head of the landslide according to the analyzed inclinometer data. The landslide head shows a slump and the toe part is a debris flow. Therefore this can be categorized as a complex landslide. Both the acceleration stage and the failure stage of this landslide show correlation to rainfall. Hence to control this landslide have to control both surface and subsurface water. 1 INTRODUCTON with JICA and automatic rain gauges, Strain The Mahawewa landslide is a massive slope failure gauges, extensometers, inclinometer and that is partial reactivation of ancient landslide in piezometer were installed in Mahawewa area for Walapane of Nuwaraeliya District.
    [Show full text]
  • Existing Critical Tunnel Online Monitoring
    INSTRUMENTATION & MONITORING OF CRITICAL TUNNELLING INFRASTRUCTURE IN URBAN ENVIRONS Mr. Amod Gujral1 and Mr. Prateek Mehrotra2 1 Managing Director, Encardio-rite Group of Companies, A-7 Industrial Estate, Talkatora Road, Lucknow, UP-226011, India, [email protected] 2 Vice President Technical, Encardio-rite Group of Companies, A-7 Industrial Estate, Talkatora Road, Lucknow, UP-226011, India, [email protected] ABSTRACT As megacities struggle to provide infrastructure, residential and commercial spaces to its increasing number of residents in a limited land mass, existing structures- both surface and underground are bound to get affected by new constructions. In such a scenario, implementing an effective instrumentation and monitoring (I&M) programme for the structures within the zone of influence of construction, becomes extremely essential. Benefits of a well-executed I&M program are manifold- from providing design verification to ensuring safety during and after the construction. In the paper, the author presents a case study of I&M program executed by his organization in a megacity in the Middle East. An existing metro and a busy road tunnel under water were located within the zone of influence of the project’s construction activities. Ensuring their safety during the construction was on the top propriety of all project stakeholders as well as the asset owners. The paper starts off with a brief overview of the project with salient features of the construction methodologies deployed, followed by the instrumentation & monitoring scheme finalized by the project designers. Details of key parameters to be monitored and which instruments were selected for the purpose, has been described.
    [Show full text]
  • South Palo Alto Tunnel with At-Grade Freight
    RAIL FACT SHEETS South Palo Alto Tunnel with At-Grade Freight About the Tunnel with At-Grade Freight For the tunnel alternative, the railroad tracks will be lowered in a trench south of Oregon Expressway to approximately Loma Verde Avenue. The twin bore tunnel will begin near Loma Verde Avenue and extend to just south of Charleston Road. The railroad tracks will then be raised in trench to approximately Ferne Avenue. The new electrified southbound railroad tracks will be built at the same horizontal location as the existing railroad track, however, the northbound track will be moved to the east within the limits of the tunnel to accommodate the spacing required between the twin bores. The railroad tracks in the trench and tunnel will carry only passenger trains. The freight trains will remain at-grade. The roadways at Meadow Drive and Charleston Road remain at their existing grade and will have a similar configuration that exists today with the addition of Class II buffered bike lanes on Charleston Road. This will require expanding the width of the road to maintain bike lanes through the overpass of the railroad. By the numbers Neighborhood Considerations • Diameter of twin bores is 30 feet. • Alma Street will permanently be reduced to one lane • Railroad track is designed for 110 mph. in each direction from south of Oregon Expressway to Ventura Avenue and from Charleston Road to Ferne • Meadow Drive and Charleston Road are Avenue. designed for 25 mph. • The train tracks will be approximately 70 feet below the Proposed Ground Level View - Looking Southwest • Maximum grade on railroad is 2%.
    [Show full text]
  • Inclinometer Monitoring System for Stability Analysis: the Western Slope of the Bełchatów Field Case Study
    Studia Geotechnica et Mechanica, Vol. 38, No. 2, 2016 DOI: 10.1515/sgem-2016-0014 INCLINOMETER MONITORING SYSTEM FOR STABILITY ANALYSIS: THE WESTERN SLOPE OF THE BEŁCHATÓW FIELD CASE STUDY MAREK CAŁA, JOANNA JAKÓBCZYK, KATARZYNA CYRAN AGH University of Science and Technology, Al. Mickiewicza 30, 30-059 Kraków, Poland, Phone: +48 12 617 46 95, e-mail: [email protected], [email protected]) Abstract: The geological structure of the Bełchatów area is very complicated as a result of tectonic and sedimentation processes. The long-term exploitation of the Bełchatów field influenced the development of horizontal displacements. The variety of factors that have impact on the Bełchatów western slope stability conditions, forced the necessity of complex geotechnical monitoring. The geotechnical monitoring of the western slope was carried out with the use of slope inclinometers. From 2005 to 2013 fourteen slope inclinometers were installed, however, currently seven of them are in operation. The present analysis depicts inclinometers situated in the north part of the western slope, for which the largest deformations were registered. The results revealed that the horizontal dis- placements and formation of slip surfaces are related to complicated geological structure and intensive tectonic deformations in the area. Therefore, the influence of exploitation marked by changes in slope geometry was also noticeable. Key words: slope inclinometer, geotechnical monitoring, horizontal displacement analysis, the exploitation influence, Bełchatów open pit mine 1. INTRODUCTION The aim of the borehole monitoring in the western slope of Bełchatów field was to measure the dis- placement values and their increments as with the The necessity of geotechnical monitoring in the function of the hole depth.
    [Show full text]
  • Harvesting Peat from the Bog to Your Operation
    MEDIA & FERTILIZER Harvesting Peat from the Bog to your Operation Figure 1. A virgin sphagnum bog in Quebec, Canada. Learn what’s involved in harvesting, packaging and shipping peat for horticulture production. The Canadian Peat Moss Industry By Neil Mattson, Bill Miller and Jeff Bishop • In 1999, 1.2 million metric tons of peat (10 million cubic meters) was harvested in Canada. n the 1960s, professors at Cornell University Harvesting and Processing were among the fi rst to advocate the use of peat When a company wants to open a new peat • It is estimated that 70 million metric tons in their soilless Peat-Lite mixes for greenhouse bog for harvesting, surveys are conducted to of peat accumulates annually in Canada, so production. Several properties of peat moss determine if a site contains horticulture grade current harvesting represents 1.7 percent Ihave led to its widespread adoption by the industry sphagnum. Th e peat should have a depth of at of annual accumulation. Thus, peat is over the intervening decades; these include: high least 2 meters, as it is desirable that a bog be able accumulating some 60 times faster than water holding and cation exchange capacity, lack to be harvested for many years (Figure 2). Ditches it is being harvested. of residual herbicides and weed seeds compared are built to drain surface water and access roads • Canada is estimated to contain 280 mil- to soil and composts, and low incidence of root- lion acres of peat land. In contrast, the peat borne pathogens. industry harvests on ca. 42,000 acres.
    [Show full text]
  • CHAPTER 9. SITE DEVELOPMENT Article 1. Grading, Excavation and Filling Sec
    Walnut Creek Municipal Code TITLE 9. BUILDING REGULATIONS CHAPTER 9. SITE DEVELOPMENT CHAPTER 9. SITE DEVELOPMENT Article 1. Grading, Excavation and Filling Sec. 9-9.01. Purpose. It is the declared intent of the City of Walnut Creek to promote the conservation of natural resources, including the natural beauties of the land, streams and water sheds, hills and vegetation, and as described in Sec. 10-2.1301 of the Walnut Creek Municipal Code and Government Code §65560(b) (1) to protect the health and safety, including the reduction or elimination of the hazards of earth slides, mud flows, rock falls, undue settlement, erosion, siltation and flooding, or other special conditions as described in Government Code §65560(b) (4) by minimizing the adverse effects of grading, cut and fill operations, water runoff and soil erosion. Therefore, the following regulatory provisions of this chapter are hereby adopted for the purpose of stringent control of all aspects of grading operations. (§1, Ord. 1193, eff. December 26, 1973) Sec. 9-9.02. Permits Required. No person shall do any grading without first having obtained a grading permit from the City except for the following: a. An excavation below finished grade for basements and footings of a building, retaining wall, swimming pool or other structure authorized by a valid building permit. This statement shall not exempt from permit requirements any fill made with the material from such excavation nor exempt any excavation having an unsupported height greater than five feet after the completion of such structure; b. Cemetery graves; c. Refuse disposal sites controlled by other regulations; d.
    [Show full text]
  • Slope Stabilization and Repair Solutions for Local Government Engineers
    Slope Stabilization and Repair Solutions for Local Government Engineers David Saftner, Principal Investigator Department of Civil Engineering University of Minnesota Duluth June 2017 Research Project Final Report 2017-17 • mndot.gov/research To request this document in an alternative format, such as braille or large print, call 651-366-4718 or 1- 800-657-3774 (Greater Minnesota) or email your request to [email protected]. Please request at least one week in advance. Technical Report Documentation Page 1. Report No. 2. 3. Recipients Accession No. MN/RC 2017-17 4. Title and Subtitle 5. Report Date Slope Stabilization and Repair Solutions for Local Government June 2017 Engineers 6. 7. Author(s) 8. Performing Organization Report No. David Saftner, Carlos Carranza-Torres, and Mitchell Nelson 9. Performing Organization Name and Address 10. Project/Task/Work Unit No. Department of Civil Engineering CTS #2016011 University of Minnesota Duluth 11. Contract (C) or Grant (G) No. 1405 University Dr. (c) 99008 (wo) 190 Duluth, MN 55812 12. Sponsoring Organization Name and Address 13. Type of Report and Period Covered Minnesota Local Road Research Board Final Report Minnesota Department of Transportation Research Services & Library 14. Sponsoring Agency Code 395 John Ireland Boulevard, MS 330 St. Paul, Minnesota 55155-1899 15. Supplementary Notes http:// mndot.gov/research/reports/2017/201717.pdf 16. Abstract (Limit: 250 words) The purpose of this project is to create a user-friendly guide focusing on locally maintained slopes requiring reoccurring maintenance in Minnesota. This study addresses the need to provide a consistent, logical approach to slope stabilization that is founded in geotechnical research and experience and applies to common slope failures.
    [Show full text]
  • Retaining Walls and Earth Retention
    20 SE Licensure and 26 GeoLegend: 38 Nature Sides with 44 Soil Nailing in Partial Practice Laws Harry Poulos the Hidden Flaw the 2010s MARCH // APRIL 2016 Retaining Walls AND Earth Retention Proudly published by the Geo-Institute of ASCE SierraScape Vegetated Wall Whatever you’re facing, Tensar Geogrid primary reinforcement we’ll help you face it. Tensar Retaining Wall Systems conquer any type of site Reinforced fill Mesa Wall challenge by combining structural integrity with functionality Retained and aesthetics. We oer a variety of facing options including Granular fill fill stone, vegetated, and architectural because there is no such Finished grade thing as one-size-fits-all. For more information on our complete line of retaining walls and steepened slope solutions, visit Foundation tensarcorp.com or call 800-TENSAR-1. March // April 2016 Features 38 Nature Sides with the Hidden Flaw 66 Highway Retaining Walls Are Assets Lessons learned from failures of earth-support systems. A risk-based approach for managing them. By James W. Niehoff By Mo Gabr, Cedrick Butler, William Rasdorf, Daniel J. Findley, and Steven A. Bert 44 Soil Nailing in the 2010s Its evolution and coming of age. By Carlos A. Lazarte, Helen D. Robinson, ON THE COVER and Allen W. Cadden Clockwise from top left corner: Stabilization of loess bluff using soil nail, anchored, and MSE 52 Emergency Retaining Wall walls along Mississippi River in Natchez, MS Replacement (courtesy of Hayward Baker, Inc.); Permanent The East 26th Street slide repair in Baltimore, MD. soil nail wall in the mid-western U.S. (courtesy of By Joseph K.
    [Show full text]
  • Section 31 22 13 ‐ Site Grading
    University of Houston Master Construction Specifications Insert Project Name SECTION 31 22 13 ‐ SITE GRADING PART 1 ‐ GENERAL 1.1 SCOPE OF WORK A. This Section pertains to the earthwork generally consisting of excavation, filling, backfilling and subgrade preparation as required for construction of site retaining walls/structures, slab on grade walks, pavement surfaces, landscaped areas and the general shaping of the site as shown, described or reasonably inferred on the drawings. B. Subsurface data is available from the *Owner. Contractor is urged to carefully analyze the site conditions. C. This section excludes work necessary for building pad preparations. Work within the building footprint and surrounding 5 feet shall be accomplished under technical specification 31 23 00 Excavation and Fill prepared by *STRUCTURAL ENGINEER]. D. Construction Means, Methods, Techniques, Sequences and Procedures: 1. The Contractor is solely responsible for, and has sole control over, construction means, methods, techniques, sequences and procedures, and for coordinating all portions of the Work. 2. Shoring that is required to complete the Work, is considered a method or technique and is the sole responsibility of the Contractor. If a regulatory agency requires a licensed engineer to design, approve or provide drawings for shoring, then it is the sole responsibility of the Contractor to engage the services of a qualified Engineer for shoring design services. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Drawings and general provisions of the Contract, including A‐procurement and Contracting Requirements, Division 00 and Division 01 apply to this section. B. Section 31 11 00 Clearing and Grubbing C. Section 31 23 33 Trenching, Backfilling and Compaction D.
    [Show full text]
  • Steep Slopes
    FACT SHEET : 12 FACT SHEET: 12 Steep Slopes iTRaC is the Nashua Regional Steep slopes are legally defined as hillsides Figure 1: Example of a 15% slope Planning having a 15 foot, or greater, vertical rise Commission’s over 100 feet of horizontal run, or 15% slope 15% slope new approach 75’ to community (Figure 1). They are often undesirable ar- planning that eas for development due to the difficulty focuses on 500’ integrating of building on steep grades. On the other transportation, hand, these slopes can provide wildlife land use and environmental habitat, recreational opportunities, and Steep slopes have a ≥15 ft vertical rise over a planning. The scenic views, preserving the unique and 100 ft horizontal run, or a 15% slope. program was developed to culturally valuable environmental qualities assist that people treasure in New Hampshire. communities in dealing with the challenges of growth in a Difficulties Developing Steep Slopes coordinated Strategies for Developing Steep Slopes way that sustains Erosion ~ The loss of vegetation and Vegetation can stabilize soil and prevent erosion community disruption of natural drainage patterns on steep slopes by binding loose soil with roots character and brought about by development on a sense of and slowing the passage of water down the place. steep slopes can cause erosion problems slope. Replanting disturbed locations after con- leading to potential flooding, stream struction with a combination of trees, shrubs, sedimentation, and slope instability. and groundcover is key. Infrastructure ~ Providing infrastructure to hillside development can be expensive Berms are long earthen mounds running per- to engineer and construct.
    [Show full text]
  • Chapter 1 Overview and History of the Expanded Shale, Clay and Slate
    Chapter 1 Overview and History of the Expanded Shale, Clay and Slate Industry April 2007 Expanded Shale, Clay & Slate Institute (ESCSI) 2225 E. Murray Holladay Rd, Suite 102 Salt Lake City, Utah 84117 (801) 272-7070 Fax: (801) 272-3377 [email protected] www.escsi.org CHAPTER 1 1.1 Introduction 1.2 How it started 1.3 Beginnings of the Expanded Shale, Clay and Slate (ESCS) Industry 1.4 What is Rotary Kiln Produced ESCS Lightweight Aggregate? 1.5 What is Lightweight Concrete? 1.6 Marine Structures The Story of the Selma Powell River Concrete Ships Concrete Ships of World War II (1940-1947) Braddock Gated Dam Off Shore Platforms 1.7 First Building Using Structural Lightweight Concrete 1.8 Growth of the ESCS Industry 1.9 Lightweight Concrete Masonry Units Advantages of Lightweight Concrete Masonry Units 1.10 High Rise Building Parking Structures 1.11 Precast-Prestressed Lightweight Concrete 1.12 Thin Shell Construction 1.13 Resistance to Nuclear Blast 1.14 Design Flexibility 1.15 Floor and Roof Fill 1.16 Bridges 1.17 Horticulture Applications 1.18 Asphalt Surface Treatment and Hotmix Applications 1.19 A World of Uses – Detailed List of Applications SmartWall® High Performance Concrete Masonry Asphalt Pavement (Rural, City and Freeway) Structural Concrete (Including high performance) Geotechnical Horticulture Applications Specialty Concrete Miscellaneous Appendix 1A ESCSI Information Sheet #7600 “Expanded Shale, Clay and Slate- A World of Applications…Worldwide 1-1 1.1 Introduction The purpose of this reference manual (RM) is to provide information on the practical application of expanded shale, clay and slate (ESCS) lightweight aggregates.
    [Show full text]
  • Horizontal Digitilt Inclinometer Probe Manual
    Horizontal Digitilt Inclinometer Probe 50302999 Copyright ©2004 Slope Indicator Company. All Rights Reserved. This equipment should be installed, maintained, and operated by technically qualified personnel. Any errors or omissions in data, or the interpretation of data, are not the responsibility of Slope Indicator Company. The information herein is subject to change without notification. This document contains information that is proprietary to Slope Indicator company and is subject to return upon request. It is transmitted for the sole purpose of aiding the transaction of business between Slope Indi- cator Company and the recipient. All information, data, designs, and drawings contained herein are propri- etary to and the property of Slope Indicator Company, and may not be reproduced or copied in any form, by photocopy or any other means, including disclosure to outside parties, directly or indirectly, without permis- sion in writing from Slope Indicator Company. SLOPE INDICATOR 12123 Harbour Reach Drive Mukilteo, Washington, USA, 98275 Tel: 425-493-6200 Fax: 425-493-6250 E-mail: [email protected] Website: www.slopeindicator.com Contents Introduction . 1 Components . 2 Installation of Casing . 4 Taking Readings. 6 Data Reduction . 9 Maintenance. 12 Good Practices . 14 Horizontal Digitilt Inclinometer Probe, 2005/2/23 Introduction About Horizontal 85mm (3.34") Inclinometer casing is installed in a horizontal Inclinometers trench or borehole with one set of grooves aligned to vertical. When the far-end of the casing is not accessible, a dead-end pul- ley and cable-return pipe are installed along with the casing. The probe, control cable, pull-cable, and readout unit are used to survey the casing.
    [Show full text]