Details Put on Website Regarding Contracts Concluded During May, 2017

Total Page:16

File Type:pdf, Size:1020Kb

Details Put on Website Regarding Contracts Concluded During May, 2017 ANNEXURE-II DETAILS PUT ON WEBSITE REGARDING CONTRACTS CONCLUDED DURING MAY, 2017 Civil : Rs.1.00 Cr and above. Store Purchase : Rs.2 Cr. and above. Electrical / Mech. Rs.30 lakhs & above Service Contracts: 2 largest contracts Consultancy : 2 largest value contracts Supplies of medicines: 4 largest value contracts Nos. and names Nos.and Value of Scheduled Type of Last date of parties names of Whether Fax LOI No./ contract date of S. NIT No.& Mode of Date of Bidding of receipt Nos. of qualified after parties not contract Detailed LOI Name of (in comple- No. date Tender public- (Single/ of tender tenders technical qualified awarded No./ Contractor lakhs) tion of Nature of work enquiry cation of Two Bid recd. evaluation after tech / to lowest Contract No. & M/s. supplies NIT system) M/s. commercial tenderer / date evalua tion evaluated 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 VSP-27 Design, Engineering, Open 2.11.16 Two bid 29.12.16 2 1.ACME NA Yes FAX LOA No. M/s.ACME Supply ( for site Automation. VSP/ Automation 18.10.17 2. Sensor & CONT/E(062) Pvt.Ltd., 18(k), basis) of the work System /05/ Light “one number 100 AMR/17/ Industrial Ton Electronic Road PC(Elec)/235 Area, Bhilai – Weighbridge at dt 18.5.2017 490 026 Ferro Alloy Stores (Spec.No.VSP- Detailed LOA : DEIA/Weighbridge- To be issued 005, Rev.1) 82 2 VSP-27 Erection, Testing Open 2.11.16 Two bid 29.12.16 2 1.ACME NA Yes FAX LOA No. M/s.ACME and commissioning Automation. VSP/ Automation CONT/E(062)/0 18.11.17 2. Sensor & of the work “one 5/ AMR/17/ Pvt.Ltd., System number 100 Ton PC(Elec)/236 18(k), Light electronic Road dtd 18.5.2017 Industrial Weighbridge at Area, Bhilai – Detailed LOA : Ferro Ally Stores To be issued 490 026 ((Spec.No.VSP- DEIA/Weighbridge- 005, Rev.1) ANNEXURE-II DETAILS PUT ON WEBSITE REGARDING CONTRACTS CONCLUDED DURING APRIL, 2017 Civil : Rs.1.00 Cr and above. Store Purchase : Rs.2 Cr. and above. Electrical / Mech. Rs.30 lakhs & above Service Contracts: 2 largest contracts Consultancy : 2 largest value contracts Supplies of medicines: 4 largest value contracts Nos. and names Nos.and Value of Schedu Type of Last date of parties names of Whether Fax LOI No./ contract led date S. NIT No.& Mode of Date of Bidding of receipt Nos. of qualified after parties not contract Detailed LOI Name of (in of No. date Tender public- (Single/ of tender tenders technical qualified awarded No./ Contractor lakhs) comple- Nature of work enquiry cation of Two Bid recd. evaluation after tech / to lowest Contract No. & M/s. tion of NIT system) M/s. commercial tenderer / date supplies evalua tion evaluated 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 VSP-29 of Laying of Nitrogen Open 11.11.16 Two 17.12.16 04 1.Spacetech M/s.HiTech Yes VSP/CONT/C(0 M/s.SpaceTe 190.32 21.12.17 8 months 2016-17 2.Vishnu Infra 01)/056/17/PC pipe work at VSP- ch Projects & from LOA dtd & /CIVIL/107 & 11.11.16 Supply and 3.Ravi 108 dtd 11.4.17 Systems Fabrication, krishna pvt.Ltd., AA- Erection, Testing DLOA: 24, Salt Lake and commissioning VSP/CONT/C(0 city, Kolkata- 01)/056/17/PC of Pipe work /CIVIL/121 700064 including structural &122 dtd work. 22.4.17 2 VSP-38 of Design, engineering and Nomina 07.01.17 Two 28.01.17 Nomin M/s.ABB Ltd NA YES FAX LOA No. M/s.ABB India 512.48 21.9.17 2016-17 Supply of all equipment tion ation VSP/CONT/EXP Ltd., PA-CT, Plot 5 Months dtd /items (for site) including Extended N/E(014)/91/1 no.4A, 5&6, 2nd 07.01.17 one week commissioning spares for 7/PC/ELEC/189 Phase, Poonya 4.2.17. VSP-6.3 MTPA Expansion &190 Dtd Industrial Area, Project – Electrical, 10.02.17 21.4.2017. Bangaluru- Instrumentation and 560058 Level-I Automation, FDA DLOA No. and Telecommunication VSP/CONT/ system at CRMP EXPN/E(014)/9 (SPEC.No.VSP-6.3-05-ELI- 1/17/ 001) and storage at site, PC/ELEC/193 & handling, erection, 194 commissioning and PG Tests of equipment/items Dtd 24.4.2017 including supervision of all site services and insurance for VSP 6.3 MTPA expansion project electrical, instrumenta - tion and LEVEL-I Automation, FDA & telecommunication system at CRMP. 3 VSP-39 OF Design, manufacture, and Open 11.1.17 Two 8.2.17 2 1.Kalathil Nil Yes FAX LOA M/s.Kalathil 184.99 28.10.17 2016-17 supply of plant, Bros No.VSP/CONT/ Brothers Dtd machinery and equipment (Extended 2.Sreevan MECH/EXPN/C Construction 11.1.17 for “Mechanical Utilities One constrn. RMP/17/PC/ Co., Pvt.Ltd., week) and Aux.works of 500 MECH/356 & D.No.10-10-94, TPD Vertical Shaft Kiln-2 20.2.17 357 Dtd 28.4.17 Ground floor, at CRMP” complete in all Sairam nagar, respects as per New Gajuwaka, Spec.No.VSP-6.3-05-UTL- Visakhapatnam 001 AND Storage, handling, erection (including associated civil structural works if any ), commissioning and PG test of Plant and equipment including supervision of all site services and insurance of equipment for mechanical, utilities and aux.works of 500 TPD Vertical shaft kiln-2 at CRMP Complete in all respects as per Spec.No.VSP-6.3-05-UTL- 001. 4 Nomina Conducting a study and FAX LOI No. M/s.MN tion preparation of study Nomina 8.2.17 1 MN Dastur Co Nil Yes VSP/CONT/ M 17 06.05.17 tion (Extended) Dastur & report for interconnection (099)/197/17/ 5 weeks of TB-4 and TB-5 PROJ/CONT/17 Co.,(P) Ltd., 20.2.17 discharges to existing cold 0 Dtd P-17, blast Headers- 1&2 and 01.04.17DLOA : Mission laying of a separate Cold FAX LOI No. Road, Blast header from Blower VSP/CONT/ House to BF-1&2 end at M(099)/197/ Extension, VSP. 17/PROJ/CONT Kolkata-700 /129 Dtd 013. 25.04.17 5 Nomina Providing consulting Nomina NA Nominat NA NA Nomination MN Dastur Yes FAX LOI No. M/s.MN Dastur 85.56 25.10.19 tion Engineering Services for tion ion Co VSP/CONT/ M & Co.,(P) Ltd., P- Installation of High (099)/ 198/ 17, Mission Pressure Nitrogen Road, Extension, Compressor with 17/PROJ/CONT Kolkata-700 interconnection to / 218 Dtd 013. existing Air Seperation 25.04.17 Plant – 1 at VSP. ANNEXURE-II DETAILS PUT ON WEBSITE REGARDING CONTRACTS CONCLUDED DURING MARCH, 2017 Civil : Rs.1.00 Cr and above. Store Purchase : Rs.2 Cr. and above. Electrical / Mech. Rs.30 lakhs & above Service Contracts: 2 largest contracts Consultancy : 2 largest value contracts Supplies of medicines: 4 largest value contracts Horticulture: Rs.2 lakhs & above Nos. and Nos.and Value of Schedu Type of Last date names of names of Whether Fax LOI No./ contract led date S. NIT No.& Mode of Date of Bidding of Nos. of parties parties not contract Detailed LOI Name of (in lakhs) of No. date Tender public- (Single/ receipt tenders qualified after qualified awarded No./ Contractor comple- Nature of work enquiry cation of Two Bid of tender recd. technical after tech / to lowest Contract No. & M/s. tion of NIT system) evaluation commercial tenderer / date supplies M/s. evalua tion evaluated 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 C I V I L : 1 VSP-28 Construction of Shed with Open 9.11.16 Two 9.2.16 08 (o5) (03) Yes VSP/CONT/C( M/s.Durga 251.49 11.3.18 . of 16-17 labs, parking shed and 1)Tauman 1)KV 091)/077/17/ Engineering 9.11.16 extension of toilet block engg Ltd Ramana PC/ Civil/60 Enterprises, D.No. 2)HSCL Reddy in existing R&D Centre at dtd 2.3.17. 30-9-11/1, 3)Durga 2)IND Power Civil Defence Building of Ramalayam engg.enter 3) jai VSP – Spec.No.VSP-DECS- 4)BTL infra Enterprises backside, MIS-RDC-16-01. 5)K.Ganga Vadlapudi, RHC, Raju. Visakhpatnam-46 M E C H & E L E C : 2 VSP-02 Design, Engineering, Global 23.4.16 Two 7.6.16 04 (03) 1)Anupam Yes VSP/17/PC/M M/s.Cimolai Tech 7076 6.3.18 of 16-17 manufacture, assembly, 1) Cimolai Industries ECH/ CDY/201 Spa special 23.4.16 testing, supply, erection, Technology dtd 6.3.2017. Equipments, Italy. commissioning of 12 nos. Spa. 2)Mi Jack of RTG Cranes. (Spec.No. 3)Heneen VSP-CDY—MMH-0005. Weihva 3 VSP-36 Manufacture and supply Nomina 28.12.16 Two 28.12.16 01 Jiangsu Yes VSP/CONT/ M/s.Jiangsu 339.69 16.6.17 of 16-17 of Refractories for CRMP tion Nuoming EXPN/29/17/ Nuoming High 28.12.16 Kiln-2 at VSP. High ------ PROJ CONT/ Temperature Rfy. Temperature MECH/ 227 Matl. Co., Ltd., Refy Baihe Road, Yixing Matl.Co., Ltd dtd 16.3.17. Economic Devpt. Zone, Yixing City, Jiangsu Province, 214267, China. 4 Nominat Design. Manufacture, Nomina 31.3.16 Nominati 31.3.17 01 BHEL Yes VSP/CONT/ M/s.BHEL, Ek Tara 3519.23 30.6.18 ion supply of all eqpt., tion on Non-AMR/ Bldg., 39, Sarojini Dismantling, Erection, 033/17/PC/M Devi Road, Testing and commi ------- ech /271 Secunderabad- dtd 31.3.17.
Recommended publications
  • LHA Recuritment Visakhapatnam Centre Screening Test Adhrapradesh Candidates at Mudasarlova Park Main Gate,Visakhapatnam.Contact No
    LHA Recuritment Visakhapatnam centre Screening test Adhrapradesh Candidates at Mudasarlova Park main gate,Visakhapatnam.Contact No. 0891-2733140 Date No. Of Candidates S. Nos. 12/22/2014 1300 0001-1300 12/23/2014 1300 1301-2600 12/24/2014 1299 2601-3899 12/26/2014 1300 3900-5199 12/27/2014 1200 5200-6399 12/28/2014 1200 6400-7599 12/29/2014 1200 7600-8799 12/30/2014 1177 8800-9977 Total 9977 FROM CANDIDATES / EMPLOYMENT OFFICES GUNTUR REGISTRATION NO. CASTE GENDER CANDIDATE NAME FATHER/ S. No. Roll Nos ADDRESS D.O.B HUSBAND NAME PRIORITY & P.H V.VENKATA MUNEESWARA SUREPALLI P.O MALE RAO 1 1 S/O ERESWARA RAO BHATTIPROLU BC-B MANDALAM, GUNTUR 14.01.1985 SHAIK BAHSA D.NO.1-8-48 MALE 2 2 S/O HUSSIAN SANTHA BAZAR BC-B CHILAKURI PETA ,GUNTUR 8/18/1985 K.NAGARAJU D.NO.7-2-12/1 MALE 3 3 S/O VENKATESWARULU GANGANAMMAPETA BC-A TENALI. 4/21/1985 SHAIK AKBAR BASHA D.NO.15-5-1/5 MALE 4 4 S/O MAHABOOB SUBHANI PANASATHOTA BC-E NARASARAO PETA 8/30/1984 S.VENUGOPAL H.NO.2-34 MALE 5 5 S/O S.UMAMAHESWARA RAO PETERU P.O BC-B REPALLI MANDALAM 7/20/1984 B.N.SAIDULU PULIPADU MALE 6 6 S/O PUNNAIAH GURAJALA MANDLAM ,GUNTUR BC-A 6/11/1985 G.RAMESH BABU BHOGASWARA PET MALE 7 7 S/O SIVANJANEYULU BATTIPROLU MANDLAM, GUNTUR BC-A 8/15/1984 K.NAGARAJENDRA KUMAR PAMIDIMARRU POST MALE 8 8 S/O.
    [Show full text]
  • Annexure to Trade Notice No. 01/2017 (General No
    Annexure to Trade Notice No. 01/2017 (General No. 1/2017) Dated. 21.06.2017 issued from F.No. V/39/16/2017-CC(VZ)Estt.P.F.I ANNEXURE - I Visakhapatnam Zone : Visakhapatnam Commissionerate and Kakinada Sub-Commissionerate No. of Sl.No. Commissionerate Name Jurisdiction Divisions Divisions This Commissionerate will have the jurisdiction over (i) Visakhapatnam North Visakhapatnam Srikakulam, Vizianagaram, (ii) Visakhapatnam Central 01 4 Commissionerate Visakhapatnam & East Godavari (iii) Visakhapatnam South Districts of Andhra Pradesh (iv) Vizianagaram Division State Kakinada Sub- This Sub-Commissionerate will (i) Kakinada Division Commissionerate have the jurisdiction over East 02 2 (ii) Rajamahendravaram (stationed at Rajamahendravaram) Godavari District of Andhra (Under Visakhapatnam Division Commissionerate) Pradesh State Page 1 of 13 Annexure to Trade Notice No. 01/2017 (General No. 1/2017) Dated. 21.06.2017 issued from F.No. V/39/16/2017-CC(VZ)Estt.P.F.I Sl. GST Division Name Jurisdiction No. of Ranges Ranges No. (i) Bheemunipatnam This Division will have jurisdiction over GVMC (Greater (ii) Madhurawada Visakhapatnam Municipal Corporation) ward Nos. 1 to 19 & (iii) Muvvalavanipalem Bheemunipatnam, Padmanabham & Anandapuram Mandals (iv) Maddilapalem Visakhapatnam (v) Akkayyapalem 01 of Visakhapatnam District. This Division will also have 10 North (vi) Seethammapeta residuary jurisdiction over any other area which is not (vii) Dwarakanagar mentioned or existing in any division under Visakhapatnam (viii) Srinagar District. (ix) Aseelmetta
    [Show full text]
  • A Comparative Study of Seaweed Flora Over a Period of Time with Reference to Climate Change in Visakhapatnam Coast, Andhra Pradesh, India
    Available online a t www.pelagiaresearchlibrary.com Pelagia Research Library Advances in Applied Science Research, 2015, 6(6):187-193 ISSN: 0976-8610 CODEN (USA): AASRFC A comparative study of seaweed flora over a period of time with reference to climate change in Visakhapatnam Coast, Andhra Pradesh, India Vishnupriya Sowjanya I. and P. S. Raja Sekhar Department of Environmental Sciences, Andhra University, Visakhapatnam, A.P., India _____________________________________________________________________________________________ ABSTRACT A comparative study on present status of marine macro algal flora in relation to their occurrence, distribution and diversity was carried out at along the Visakhapatnam coast intertidal shores areas of Bay of Bengal, East coast of India over a period of five decades with reference to climate change. A total of 48 seaweeds species were recorded, of which 18 species (37%) belong to Chlorophyta, 9 species (19%) belong to Phaeophyta and 21 species (44%) belong to Rhodophyta. A total of 10 macroalgae species were newly recorded, while, 41 species were found to be absent during the present study when compared to 1964 data obtained from this coast. In the present study, the impacts of Hudhud, severe tropical cyclone on intertidal macro algae was observed. Cyclone development in East coast of India was observed in the months of September – November, when prominent growth of macroalgae was recorded. Climate change not only increases the impact of environmental stressors but also intensify their frequency of occurrence. Keywords: Seaweeds, Visakhapatnam coast, Bay of Bengal, Climate change, Hudhud cyclone. _____________________________________________________________________________________________ INTRODUCTION Seaweeds are macroscopic marine algae that are differentiated into three distinct divisions, Chlorophyta (green algae), Phaeophyta (brown algae) and Rhodophyta (red algae).
    [Show full text]
  • Fishing Villages and Landing Centres • There Are 555 Marine Fishing Villages Wherein Fishermen Reside
    TM Cadalmin Varna MARINE FISHFOLK HOUSEHOLDS AND POPULATION Marine Ornamental Fish Feed FISHINGCRAFTIN180,000THEFISHERY MARINEFISHFOLKHOUSEHOLDSANDPOPULATION 160,000 Fishermen families 9000 NonͲmotorized 140,000 180,000 population Motorized 8000 160,000 Fishermenfamilies 120,000 Mechanized ‘Varna’ is a scientifically evaluated, slow sinking 7000 100,000 140,000 population marine ornamental fish feed. 6000 80,000 120,000 5000 100,000 Constituents: 38% protein, 9% fat, 39% carbohydrates, 60,000 4000 40,000 80,000 7% ash (minerals) and less than 2% fiber. Contents 60,000 3000 20,000 are marine protein, soy protein, wheat flour, oil 40,000 2000 0 vitamins, minerals, colour imparting nutrients like 20,000 1000 0 Guntur Nellore carotenoids from natural sources, immune promoters, Krishna Godavari 0 Godavari Prakasam probionts and antioxidants. Srikakulam East Guntur Nellore Krishna West Vijayanagaram Visakhapatnam Godavari Godavari Prakasam Guntur Nellore Krishna Srikakulam Godavari Godavari Availability in particle size: Prakasam East Srikakulam DISTRICTS West Vijayanagaram Visakhapatnam 0.25mm, 0.75 mm and 1 mm. East West Vijayanagaram Visakhapatnam Recommended usage: Feed 2-3 % of the fish body DISTRICTS DISTRICTS weight once in a day. DISTRIBUTIONOFFISHINGALLIEDACTIVITIES DISTRIBUTIONOFOCCUPIEDFISHERFOLK Otherthanfishing Others 2% For further information please contact: The Director, 2% Marketingoffish 28% Central Marine Fisheries Research Institute Labourer Ernakulam North PO, Cochin-682018 25% Activefishermen E-mail: [email protected],
    [Show full text]
  • District Census Handbook, Visakhapatnam, Part XIII a & B
    CENSUS OF INDIA 1981 SERIES 2 ANDHRA PRADESH DISTRICT CENSUS HANDBOOK VISAKHAPATNAM PARTS XIII-A & B (ii) ANALYTICAL NOTE.. VILLAGE & TOWN PC_A S. S. JAYA RAO OF THE INDIAN ADMINISTRATIVE SERVICE DIRECTOR OF CENSUS OPERATIONS ANDHRA PRADESH PUBLISHED BY THE GOVERNMENT OF ANDHRA PRADESH 1988 SRI VARAHA NARASIMHA SWAMY The motif presented on the cover page repre­ sents the sculptured Shfine of the diety 'Sri Varaha Narasimha Swamy" of Simhachalam near Vishakhapatnam city. Simhachalam is a sacred place of pilgrimage in Vishakhapatnam district and ranks with Benaras and Tirupati, This hill temple is dedicated to Lord Narasimha, the Man-Lion incarnation of Lord Vishnu. In honour of this diety, a number of people of the district are named as Simha­ chalam, Simhadri, Narasimham and so on. The way upto the temple runs through terraced fields of pineapples dotted with jack, mango and other trees. It passes up a broad flight of weI/­ kept stone steps. over a thousand' in number, on either side of which trees have been planted to provide shade. There is a ghat road from the foot of the hill leading to the temple. Architec­ turally, the temple deserves high praise. The temple comprises a square shrine. surmounted by a high tower. a portico in front with a small circular tONer over it, a square sixteen pillared Mandapam. all made of dark granite richly and delicately covered with conventional and floral ornament and scenes from the Vaishnavite Purana. One of the pillars of the mandapam is called the 'Kappam Starnbharn' and people believe that. this pillar has the power of curing cattle diseases and 6150 barren women will be blessed with issues.
    [Show full text]
  • Visakhapatnam Steel Plant Rashtriya Ispat Nigam Ltd
    Visakhapatnam Steel Plant Rashtriya Ispat Nigam Ltd. Half yearly Rashtriya Ispat Nigam Limited - Visakhapatnam Steel Plant Environment (RINL-VSP), a Navratna PSE, is the country’s first shore based inte- Compliance grated steel plant. The company is 100% owned by GoI. Report The plant is a 3 Million ton Integrated Steel Plant being expanded to in respect of stipulated 7.3 Million tons and is a market leader in long products conditions while issuing Environmental Clearance For submission to Ministry of Environment and Forests Central Pollution Control Board & Andhra Pradesh Pollution Control Board Period : April’14 To Sep’14 First Integrated Steel Plant to be certified for Quality, Health & Safety, Environment & Energy– ISO 9001, OHSAS 18001, ISO 14001 & ISO 50001 First Steel plant in India to be certified for CMMI Level 3 for Information Technology Address for correspondence: Phone: 0891-2518002 Environment Management Department Fax: 0891-2518631 Visakhapatnam Steel Plant E-mail: [email protected] Rastriya Ispat Nigam Ltd.-530032 COMPLIANCE REPORT ON IMPLEMENTATION OF CONDITIONS LAID DOWN BY THE DEPARTMENT OF ENVIRONMENT WHILE ACCORDING CLEARANCE TO VSP AS PER DEPARTMENT OF ENVIRONMENT LETTER NO. 11011/1/87-IA Condition: I. a) ENVIRONMENT MANAGEMENT PLAN (EMP) MUST BE PREPARED WHICH AMONG OTHERS, SHOULD CONTAIN RESULTS OF AIR AND WATER QUALITY MONITORING TO BE DONE IN THE PROJECT AREA. Status: Environment management plan which contains results of air and water quality moni- toring along with the other details was provided and submitted. Besides, half-yearly re- ports are being submitted with the results, regularly. Condition: b) CONTINUOUS MONITORING OF AIR AND WATER QUALITY MUST BE INITIATED IMME- DIATELY.
    [Show full text]
  • List of Scholars - Partly Assisted B R E a D SOCIETY, Hyderabad 1 Mr
    List of Scholars - Partly Assisted B R E A D SOCIETY, Hyderabad 1 Mr. S Santosh Amba Prasad (2 / 2002) 11 Mr. K Damodaram (24 / 2003) S/o S.N.Sharma S/o Venkatesh 12-11-21/1 Warsiguda, Hyderabad, Pin: 500061, Hyderabad Gobbillakotur, Palamaner, Pin: 517408, Chittoor Dist. Dist. Inter - I B.Tech. - I B.Tech. - II 12 Mr. R Siva Reddy (28 / 2003) S/o Rami Reddy 2 Ms. M Radha Spandana Kumari (7 / 2002) Kotha Indlu, Sivaramapuram Po, Via Kuppam, Pin: 517425, D/o Ratna Babu Chittoor Dist. Ravipadu Po, Narasaraopeta Mdl, Guntur Dist. Inter - I MBBS - I 13 Mr. Shaik Mahammad Ghani (29 / 2003) MBBS - II S/o Abdul Salam Shaik 3 Ms. E Sandhya (10 / 2002) Turakapalem Po, Dokiparru Sivaru, Medikondur Mdl, Pin: 522438, Guntur Dist. D/o Paramatma Rao c/o DSN Murthy, 1-18-84/1 MES Colony, Venkatapuram, Inter - I Alwal, Pin: 500015, Hyderabad Dist. 14 Mr. BSVGSS Achary (32 / 2003) MBBS - I S/o Surya Prakasa Rao MBBS - II 21-10/2-103 Budameru Bridge, Vijayadurga Nagar, 4 Mr. Veerapalli Vinod Babu (11 / 2002) Vijayawada, Pin: 520011, Krishna Dist. Inter - I S/o Venkata Subba Naidu D.Kasipentla Po, Chandragiri Mdl, Pin: 517112, Chittoor Dist. 15 Mr. S Sai Krishna (36 / 2003) S/o Ramesh Kumar MBBS - I Papannapeta Po, Pin: 502303, Medak Dist. 5 Mr. Rachuru Rakesh (16 / 2002) Inter - I S/o Krishnamurthy 16 Mr. T Govinda Rao (38 / 2003) Venugopalswamy Garden, Navlakh Gardens, Mypaud Road, Nellore, Pin: 524002, Nellore Dist. S/o Bhaskara Rao MBBS - I Penubarthi, Po Thadivalasa, Pin: 532484, Srikakulam Dist.
    [Show full text]
  • 2021032290.Pdf
    SPECIAL RECRUITMENT DRIVE FOR FILLING OF BACKLOG VACANCIES RESERVED FOR DIFFERENTLY ABLED PERSONS, VISAKHAPATNAM DISTRICT -2020 PROVISIONAL MERIT LIST (GROUP-IV) NO. OF VACANCIES : 3 NAME OF THE POST : JUNIOR ASSISTANT (GROUP-A) RESERVED CATEGORY : A-VH (General : 2, Women : 1) REQUISITE QUALIFICATION: MUST HAVE PASSED ANY DEGREE Marks / GPA obtained in qalifying Exam Qualification Native District (As Category % of Sl. Name of the Name of Father / Date of Birth s processed Address for communication mentioned in the Gender Age of disabi Remarks No. candidate Husband (DD/MM/YYYY) by the application) disability lity candidate Maximum Marks Percentag Marks obtained e of Marks 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 D.NO.58-15-60, SANTHI NAIDU NAGAR, NAD KOTHA ROAD, 1 SRINIVASA RAO VISAKHAPATNAM F 11/11/1995 24 VH 40 B.COM 10 8.74 87.40 I TO X STUDY APARANJITHA VISAKHAPATNAM - 9177562387 DEKKATHIPALEM (V), BHEEMUNIPATNAM, 2 KARRI SIVA KUMAR TIRUPATHI RAO VISAKHAPATNAM M 20/02/1997 23 VH 100 B.COM 10 8.52 85.20 NO STUDY VISAKHAPATNAM- 7032221976 BANGARAMMAPALEM, CHELLURI S.RAYAVARAM, 3 BANGARI VISAKHAPATNAM M 18/06/1997 23 VH 75 B.A 10 8.49 84.90 IX TO X STUDY KODANDARAO VISAKHAPATNAM - 7893814732 D.NO.19-17-21/1, VANGALA NELLIMUKKU, PEDA 4 NOOKA RAJU VISAKHAPATNAM M 22/12/1998 21 VH 100 B.COM 10 8.3 83.00 I TO X STUDY NIKHILESH KUMAR GANTYADA, VISAKHAPATNAM - 7396802065 SEEMUNAPALLI (V), CHODAVARAM, 5 YELLAPU GANESH GANGARAJU VISAKHAPATNAM M 04/06/1992 28 VH 40 B.A 10 8.13 81.30 IV TO X STUDY VISAKHAPATNAM- 9553878500 Page 1 of 14 Marks / GPA obtained in qalifying Exam Qualification Native District (As Category % of Sl.
    [Show full text]
  • HEAVY WATER PLANT, MANUGURU Annual Immovable Property Return for the Year 2017 18/05/2018 Name Designation M.H.S.RAO SO/E
    HEAVY WATER PLANT, MANUGURU Annual Immovable Property Return for the year 2017 18/05/2018 Name Designation M.H.S.RAO SO/E Description & Location of Status of Property Area Value in Acquired in the Name of Date of Acquistion Property Rupees EMANI VILLAGE,GUNTUR DIST, Free Hold 1500 Sq.ft. 600000 M. VENKATESWARLU 01/10/1930 AP ASWAPURAM VILLAGE, Free Hold 231 Sq.y 1000000 M H S RAO 31/05/1988 BHADRADRI KOTHAGUDEM DIST. TS RAJENDRA NAGAR, Free Hold 300 Sq.y 2000000 M H S RAO 31/05/2004 HYDERABAD. Page 1 of 347 HEAVY WATER PLANT, MANUGURU Annual Immovable Property Return for the year 2017 Name Designation M.I.S.REDDY SA/G Description & Location of Status of Property Area Value in Acquired in the Name of Date of Acquistion Property Rupees H. No. 3-18-78-, Pragathinagar, Free Hold 1200Sq. ft. 1485000 Self 08/07/2009 Ramanthapur, Hyderabad Page 2 of 347 HEAVY WATER PLANT, MANUGURU Annual Immovable Property Return for the year 2017 Name Designation B.DAMODHAR SA/G Description & Location of Status of Property Area Value in Acquired in the Name of Date of Acquistion Property Rupees Nil Nil Nil Nil Nil Page 3 of 347 HEAVY WATER PLANT, MANUGURU Annual Immovable Property Return for the year 2017 Name Designation S.V.N.PRASAD SO/F Description & Location of Status of Property Area Value in Acquired in the Name of Date of Acquistion Property Rupees 506B,VARUN Free Hold 845 SQ.FT 400000 SELF 30/12/2002 ENCLAVE,ECIL,HYDERABAD. SHANKAR NAIDU Free Hold 220 SQ.YARD 120000 SELF 20/02/2000 COLONY,THIRUCHNOOR,AP STATE.
    [Show full text]
  • Provisional Vacancy Postion of Sgts in Plain Area (Visakhapatnam District)
    PROVISIONAL VACANCY POSTION OF SGTS IN PLAIN AREA (VISAKHAPATNAM DISTRICT) No of Reason for Details of the Name Subje category SNO Name of the Mandal Name of the school of the vacancie arising court case ct (I/II/III/IV) post s vacancy pending if any 1 ANAKAPALLE M MPPS A.H.Colony 1 "8" years II 2 ANAKAPALLE M MPPS Kundroom 1 "8" years II 3 ANAKAPALLE M MPPS Mamidipalem 1 "8" years II 4 ANAKAPALLE M MPPS R.V.Palem 1 "8" years II 5 ANAKAPALLE M MPPS S.S.V.Palem 1 "8" years I 6 ANAKAPALLE M MPPS Thumpala-I 1 "8" years II 7 ANAKAPALLE M MPPS V.R.Peta 1 "8" years I 8 ANAKAPALLE M MPUPS Bowlavada 1 "8" years II 9 ANAKAPALLE M MPUPS Sirasapalli 1 "8" years I 10 ANAKAPALLE M MPPS Venkupalem(S) 1 "8" years II 11 ANAKAPALLE M MPUPS Gopalapuram 1 "8" years I 12 ANAKAPALLE M MPUPS Y.V.Palem 1 "8" years I 13 ANAKAPALLI M MPPS, Dibbapalem SGT 1 PROM VAC 2 14 ANAKAPALLI M MPPS, Golagam(BC.Colony) SGT 1 PROM VAC 1 15 ANAKAPALLI M MPPS, GURANNAPALEM SGT 1 Clear Vacancy 2 16 ANAKAPALLI M MPPS, K KOPPAKA SGT 1 Clear Vacancy 1 17 ANAKAPALLI M MPPS, K V CHELU SGT 1 PROM VAC 1 18 ANAKAPALLI M MPPS, KOTHURU - N SGT 1 Clear Vacancy 1 19 ANAKAPALLI M MPPS, KOTHURU - N SGT 1 Clear Vacancy 1 20 ANAKAPALLI M MPPS, KOTHURU(C) SGT 1 Clear Vacancy 2 21 Anakapalli M MPPS, Kunchangi Col.
    [Show full text]
  • Numerical Studies on Marine Macro Algae Species Richness and Diversity Patterns in Visakhapatnam Coast, Bay of Bengal, India
    J. Algal Biomass Utln. 2016, 7 (2): 112- 121 Numerical Studies on Marine Macro Algae ISSN: 2229 – 6905 Numerical Studies on Marine Macro Algae Species Richness and Diversity Patterns in Visakhapatnam Coast, Bay of Bengal, India Vishnupriya Sowjanya, I1 and P. S. Raja Sekhar2 Department of Environmental Sciences, Andhra University, Visakhapatnam – 530 003, Andhra Pradesh, India. ABSTRACT: Vishnupriya Sowjanya, I and P. S. Raja Sekhar. Visakhapatnam coastline offer a variety of 2016. Numerical Studies on Marine Macro Algae habitats from outcrops of rocky boulders, crevices to intertidal rock pools, which are support the growth of Species Richness and Diversity Patterns in abundant and diversified marine algae species. This study Visakhapatnam Coast, Bay of Bengal, India. J. Algal on species richness and diversity will help us to obtain Biomass Utln. 7 (2): 112- 121 insights into the range of variation in seaweed communities at Visakhapatnam Coast. A total of 48 seaweed species of which, 18 species belongs to Keywords: Visakhapatnam Coast, seaweeds, Chlorophyta, 9 species to Phaeophyta and 21 species to importance of Value Index (IVI), species Richness Rhodophyta were recorded in the present study. Species and Diverist richness is affected by seasonality and tidal inundation, where, species evenness is relatively unaffected by the rare species in the quadrat and by spatial distribution. INTRODUCTION: Seaweeds refer to several species of marine macro algae that are differentiated in to three distinct divisions: (i) Chlorophyta (green algae), (ii) Phaeophyta (brown algae) and (iii) Rhodophyta (red algae). Seaweeds are among the most important primary producers and act as ecological engineers on rocky coasts of the World’s Oceans.
    [Show full text]
  • Assessment of Coastal Water Quality Through Weighted Arithmetic Water Quality Index Around Visakhapatnam, Bay of Bengal, India
    ISSN(Online): 2319-8753 ISSN (Print): 2347-6710 International Journal of Innovative Research in Science, Engineering and Technology (An ISO 3297: 2007 Certified Organization) Vol. 4, Issue 12, December 2015 Assessment of Coastal Water Quality through Weighted Arithmetic Water Quality Index around Visakhapatnam, Bay of Bengal, India Vishnupriya Sowjanya, I. 1, B. V. Pavan 2 , P. S. Raja Sekhar 3 Research Scholar, Department of Environmental Sciences, Andhra University, Visakhapatnam, A.P., India1 M.Tech Student, Centre for Water Resources, I.S.T, JNTUH, Hyderabad, India2 Professor, Department of Environmental Sciences, Andhra University, Visakhapatnam, A.P., India3 ABSTRACT: Water quality is of influential and significant importance because of its role to human health, aquatic life, ecological integrity and sustainable economic growth. Thus, continuous assessment and monitoring of water bodies is important. This study is aimed at monitoring the water quality of coastal waters of Visakhapatnam coast. 'Weighted Arithmetic Water Quality Index' (WQI) is a numeric expression used to evaluate the quality of a given water body and to be easily understood by managers and public. High values of WQI were observed in sampling stations of S1 and S4 indicating poor quality of water, whereas, low values of WQI were recorded in all other field stations indicating suitability of those areas for human activities like recreation. Thus, 'Weighted Arithmetic Water Quality Index' proved to be a good measure for categorizing quality of coastal waters of Visakhapatnam. KEYWORDS: 'Weighted Arithmetic Water Quality Index' (WQI), Seasonal variations, Coastal waters, Visakhapatnam. I. INTRODUCTION The coastal environment, as a complex system is mainly influenced by various physical, chemical biological processes.
    [Show full text]