Introduction
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Conditions and Valorization of Tourism in Shtip, an Old Town in the Republic of Macedonia
International Journal of Latest Engineering and Management Research (IJLEMR) ISSN: 2455-4847 www.ijlemr.com || Volume 03 - Issue 02 || February 2018 || PP. 96-104 Conditions and valorization of tourism in Shtip, an old town in the Republic of Macedonia Nikola V. Dimitrov1, Simona Atanasova2 1(Faculty of Tourism and Business Logistics, Goce Delchev University – Shtip, Republic of Macedonia) 2(Student of the second cycle studies at the Faculty of Tourism and Business Logistics, Goce Delchev University – Shtip, Republic of Macedonia) Abstract: For a scientists is a challenge to explore the beginning and the course of tourism in smaller cities. The emergence of tourism in Shtip is from a recent date. However, through the example of tourism in Shtip, we identify two historical periods: the preturism and the period of tourism. Thus, the first period lasts until the appearance of the first hotel in 1912, and the second from the middle of the twenties of the 20th century.Serious data on the tourism in Shtip are obtained from the end of the 1950's onwards.The analysis is based on primary and secondary data sources. From the analysis we learn that the tourism in Shtip in recent years has been growing with real development perspectives of diverse tourist offer and production. Keywords: Conditions, Perspectives, Republic of Macedonia, Shtip, Valorization. 1. INTRODUCTION City of Stip is the largest city in the eastern part of the Republic of Macedonia (RM).The city is located between the heights of the hills of Isar (450 m above sea level), Meri (420 m above sea level) and Cumlac (peak Klisse Bair 591 m above sea level), and extends along the banks of the river Otinja (2 km) and the river Bregalnica (5 km). -
December 2020 Contract Pipeline
OFFICIAL USE No Country DTM Project title and Portfolio Contract title Type of contract Procurement method Year Number 1 2021 Albania 48466 Albanian Railways SupervisionRehabilitation Contract of Tirana-Durres for Rehabilitation line and ofconstruction the Durres of- Tirana a new Railwaylink to TIA Line and construction of a New Railway Line to Tirana International Works Open 2 Albania 48466 Albanian Railways Airport Consultancy Competitive Selection 2021 3 Albania 48466 Albanian Railways Asset Management Plan and Track Access Charges Consultancy Competitive Selection 2021 4 Albania 49351 Albania Infrastructure and tourism enabling Albania: Tourism-led Model For Local Economic Development Consultancy Competitive Selection 2021 5 Albania 49351 Albania Infrastructure and tourism enabling Infrastructure and Tourism Enabling Programme: Gender and Economic Inclusion Programme Manager Consultancy Competitive Selection 2021 6 Albania 50123 Regional and Local Roads Connectivity Rehabilitation of Vlore - Orikum Road (10.6 km) Works Open 2022 7 Albania 50123 Regional and Local Roads Connectivity Upgrade of Zgosth - Ura e Cerenecit road Section (47.1km) Works Open 2022 8 Albania 50123 Regional and Local Roads Connectivity Works supervision Consultancy Competitive Selection 2021 9 Albania 50123 Regional and Local Roads Connectivity PIU support Consultancy Competitive Selection 2021 10 Albania 51908 Kesh Floating PV Project Design, build and operation of the floating photovoltaic plant located on Vau i Dejës HPP Lake Works Open 2021 11 Albania 51908 -
Energy and Water Services Regulatory Commission of the Republic of North Macedonia in 2018
ENERGY AND WATER SERVICES REGULATORY COMMISSION OF THE REPUBLIC OF NORTH MACEDONIA APRIL 2019 ANNUAL REPORT 201 8 Annual Report of the Energy and Water Services Regulatory Commission of the Republic of North Macedonia in 2018 ENERGY AND WATER SERVICES REGULATORY COMMISSION OF THE REPUBLIC OF NORTH MACEDONIA ___________________________________________________________________ The Annual Report of the Energy and Water Services Regulatory Commission of the Republic of North Macedonia for 2018 has been prepared in accordance with Article 36 from the Energy Law, which establishes the obligation of the Energy and Water Services Regulatory Commission to submit the Annual Report for its operation during the previous year to the Assembly of the Republic of North Macedonia, not later than 30th of April of the current year. The Annual Report of the Energy and Water Services Regulatory Commission for 2018 contains detailed information on the performance of the competences according to the Energy Law and the Law on Setting Prices of Water Services, as well as information on the material-financial operation. The Energy Law also determines that the Annual Report of the Energy and Water Services Regulatory Commission needs to be submitted to the Government of the Republic of North Macedonia and the Ministry competent for the performance of the assignments within the energy area, so that they could be informed, as well as to the Energy Community Secretariat. The Report contains overview of the activities performed by the Energy and Water Services Regulatory Commission during 2018, with special review of: − State of the energy markets, − State of the prices and tariffs regulation, − Preparing regulatory acts, − International activities and − Financial Statement of the Energy and Water Services Regulatory Commission. -
Kocani Construction of 10 Local Roads
PROJECT APPRAISAL DOCUMENT KOCANI CONSTRUCTION OF 10 LOCAL ROADS NOVEMBER 2014 Prepared by Marjan Nikolov CENTER FOR ECONOMIC ANALYSES (CEA) CONTENT CONTENT ............................................................................................................... 2 1. PROJECT DESCRIPTION ............................................................................. 3 A. General information on municipality ...................................................................................... 3 B. Demographic and economic profile ........................................................................................ 4 C. General description of project ................................................................................................. 9 2. SOCIAL IMPACT OF THE PROJECT ......................................................... 13 A. Sociological Study ................................................................................................................. 13 B. Resettlement issues................................................................................................................ 15 C. Conclusion on the project potential success .......................................................................... 15 3. ENVIRONMENTAL IMPACT OF THE PROJECT........................................ 16 A. Location of sub-projects ........................................................................................................ 16 B. Main sub-project activities with environmental impact ....................................................... -
Environment Sector
Transport Sector Section 1 On-going projects (in implementation phase) Project duration Nr. Project title Total investment Grant/ Loan/ National Co- Project brief description (location included) (preparation+ (sector included) cost Source Source financimg implementation TRANSPORT Construction of motorway Kicevo- 598.000.000 EXIM 1. The length of the road is 57 km and is part of Corridor VIII. 2014-2023 PESR Ohrid € bank Construction of express road Stip- 2. The road section is in a length of 23.5 km. 2018-2021 45.020.000 € EBRD Radovis Construction of express road Stip- 3. The road section is divided in two sections with total length of 28 km. 2017-2021 51.000.000 € EBRD Krupiste-Kocani 15% Construction of the road section Construction of an express road in a total length of 15.5 km as part of branch X-D of IPA II 4. 2018-2022 28.000.000 € National Drenovo-Interchange Gradsko Corridor X (85%) budget Construction of express road Raec Construction of an express road in a total length of 10 km as part of branch X-D of 5. 2016-2022 45.000.000 € EBRD bridge-Drenovo (Faris gorge- Corridor X (Contract is terminated in September 2019) ConstructionDrenovo of gorge)express way 6. Kumanovo – border with Bulgaria The total length of the section is 23 km. 2018-2022 63.500.000 € WB (section Rankovci – Kriva Palanka) Rehabilitation of regional road 7. The road is with total length is 3.30 km. 2017-2019 1.113.000€ PESR Matejce – Lipkovo Construction of a bridge near Konjare 8. A bridge is being constructed over the river Pcinja. -
5.4.11.01 680 Poljodelstvo, Ovo[Tarstvo I Lozarstvo
POLJODELSTVO, OVO[TARSTVO I LOZARSTVO, 2010 F I E L D C R O P S , O R C H A R D S AND VINEYARDS, 2010 5.4.11.01 680 REPUBLIKA MAKEDONIJA DR@AVEN ZAVOD ZA STATISTIKA REPUBLIC OF MACEDONIA STATE STATISTICAL OFFICE POLJODELSTVO, OVO[TARSTVO I LOZARSTVO, 2010 F I E L D C R O P S , O R C H A R D S AND VINEYARDS, 2010 STATISTI^KI PREGLED: Zemjodelstvo 5.4.11.01 STATISTICAL REVIEW: Agriculture 680 Skopje, juni 2011 / Skopje, June 2011 Izdava~: DR@AVEN ZAVOD ZA STATISTIKA NA REPUBLIKA MAKEDONIJA, ul. "Dame Gruev" br.4, Skopje Publisher: STATE STATISTICAL OFFICE OF THE REPUBLIC OF MACEDONIA, "Dame Gruev"- 4, Skopje Telefon/Phone +389/02/3295-600 Faks/Fax +389/02/3111-336 WEB-stranica/WEB site: http://www.stat.gov.mk Odgovara m-r Blagica Novkovska, direktor Person responsible: Blagica Novkovska M.Sc., Director VE MOLIME PRI KORISTEWETO NA OVAA PUBLIKACIJA, NAVEDETE GO IZVOROT WHEN USING DATA CONTAINED HERE, PLEASE CITE THE SOURCE CIP - Katalogizacija vo publikacija Nacionalna i univerzitetska biblioteka "Sv. Kliment Ohridski", Skopje 31:633/635(497.7)”2010" 633/635(497.7)"2010"(083.41) POLJODELSTVO, ovo{tarstvo i lozarstvo, 2010 = Field crops, orchards and vineyards : 2010 . - Skopje : Dr`aven zavod za statistika na Republika Makedonija = Skopje: State Statistical Office of the Republic of Macedonia, 2010. - 61 str. : tabeli; 29 sm.- (Statisti~ki pregled / Dr`aven zavod za statistika na Republika Makedonija. Zemjodelstvo = Statistical review / State Statistical Office of the Republic of Macedonia, ISSN 0580-454X. Agriculture, ISSN 1857-520X ; 5.4.10.01 (654)) Tekst naporedno mak. -
On the Basis of Article 65 of the Law on Real Estate Cadastre („Official Gazette of Republic of Macedonia”, No
On the basis of article 65 of the Law on Real Estate Cadastre („Official Gazette of Republic of Macedonia”, no. 55/13), the Steering Board of the Agency for Real Estate Cadastre has enacted REGULATION FOR THE MANNER OF CHANGING THE BOUNDARIES OF THE CADASTRE MUNICIPALITIES AND FOR DETERMINING THE CADASTRE MUNICIPALITIES WHICH ARE MAINTAINED IN THE CENTER FOR REC SKOPJE AND THE SECTORS FOR REAL ESTATE CADASTRE IN REPUBLIC OF MACEDONIA Article 1 This Regulation hereby prescribes the manner of changing the boundaries of the cadastre municipalities, as well as the determining of the cadastre municipalities which are maintained in the Center for Real Estate Cadastre – Skopje and the Sectors for Real Estate Cadastre in Republic of Macedonia. Article 2 (1) For the purpose of changing the boundaries of the cadastre municipalities, the Government of Republic of Macedonia shall enact a decision. (2) The decision stipulated in paragraph (1) of this article shall be enacted by the Government of Republic of Macedonia at the proposal of the Agency for Real Estate Cadastre (hereinafter referred to as: „„the Agency„„). (3) The Agency is to submit the proposal stipulated in paragraph (2) of this article along with a geodetic report for survey of the boundary line, produced under ex officio procedure by experts employed at the Agency. Article 3 (1) The Agency is to submit a proposal decision for changing the boundaries of the cadastre municipalities in cases when, under a procedure of ex officio, it is identified that the actual condition/status of the boundaries of the cadastre municipalities is changed and does not comply with the boundaries drawn on the cadastre maps. -
Macedonian Post» – Skopje MKA MK
Parcel Post Compendium Online MK - Republic of North Macedonia State-owned joint stock company for postal traffic MKA «Macedonian Post» – Skopje Basic Services CARDIT Carrier documents international Yes transport – origin post 1 Maximum weight limit admitted RESDIT Response to a CARDIT – destination No 1.1 Surface parcels (kg) 30 post 1.2 Air (or priority) parcels (kg) 30 6 Home delivery 2 Maximum size admitted 6.1 Initial delivery attempt at physical Yes delivery of parcels to addressee 2.1 Surface parcels 6.2 If initial delivery attempt unsuccessful, Yes 2.1.1 2m x 2m x 2m No card left for addressee (or 3m length & greatest circumference) 6.3 Addressee has option of paying taxes or Yes 2.1.2 1.5m x 1.5m x 1.5m Yes duties and taking physical delivery of the (or 3m length & greatest circumference) item 2.1.3 1.05m x 1.05m x 1.05m No 6.4 There are governmental or legally (or 2m length & greatest circumference) binding restrictions mean that there are certain limitations in implementing home 2.2 Air parcels delivery. 2.2.1 2m x 2m x 2m No 6.5 Nature of this governmental or legally (or 3m length & greatest circumference) binding restriction. 2.2.2 1.5m x 1.5m x 1.5m Yes (or 3m length & greatest circumference) 2.2.3 1.05m x 1.05m x 1.05m No 7 Signature of acceptance (or 2m length & greatest circumference) 7.1 When a parcel is delivered or handed over Supplementary services 7.1.1 a signature of acceptance is obtained Yes 3 Cumbersome parcels admitted No 7.1.2 captured data from an identity card are No registered 7.1.3 another form of evidence -
Watershed, Macedonia
293 A summary of the environmental and socio-economic characteristics of the Crna Reka (Crna River) watershed, Macedonia Zoran Spirkovski Trajce Talevski Dusica Ilik-Boeva Goce Kostoski Odd Terje Sandlund NINA Publications NINA Report (NINA Rapport) This is a new, electronic series beginning in 2005, which replaces the earlier series NINA commis- sioned reports and NINA project reports. This will be NINA’s usual form of reporting completed re- search, monitoring or review work to clients. In addition, the series will include much of the insti- tute’s other reporting, for example from seminars and conferences, results of internal research and review work and literature studies, etc. NINA report may also be issued in a second language where appropriate. NINA Special Report (NINA Temahefte) As the name suggests, special reports deal with special subjects. Special reports are produced as required and the series ranges widely: from systematic identification keys to information on impor- tant problem areas in society. NINA special reports are usually given a popular scientific form with more weight on illustrations than a NINA report. NINA Factsheet (NINA Fakta) Factsheets have as their goal to make NINA’s research results quickly and easily accessible to the general public. The are sent to the press, civil society organisations, nature management at all lev- els, politicians, and other special interests. Fact sheets give a short presentation of some of our most important research themes. Other publishing In addition to reporting in NINA’s own series, the institute’s employees publish a large proportion of their scientific results in international journals, popular science books and magazines. -
(Ipa) Rural Development Programme 2014-2020
EN ANNEX THE REPUBLIC OF NORTH MACEDONIA EU INSTRUMENT FOR PRE-ACCESSION (IPA) RURAL DEVELOPMENT PROGRAMME 2014-2020 Table of Contents 1. TITLE OF RURAL DEVELOPMENT PROGRAMME ............................................................ 10 2. COUNTRY PROFILE ................................................................................................................... 10 2.1 Geographical area covered by the Programme ...................................................................... 10 3. DESCRIPTION OF THE CURRENT SITUATION ................................................................... 11 3.1 General socio-economic context .................................................................................................. 11 3.1.1 Definition of areas related to Programme implementation ..................................................... 11 3.1.2 Demographic situation ............................................................................................................................ 12 3.1.3 Administrative system ............................................................................................................................. 13 3.1.4 Economic Drivers, Productivity and Growth .................................................................................. 15 3.1.5 Labour market ............................................................................................................................................. 20 3.1.6 Education system ...................................................................................................................................... -
Conditions and Valorization of Tourism in Shtip, an Old Town in the Republic of Macedonia
CORE Metadata, citation and similar papers at core.ac.uk Provided by UGD Academic Repository International Journal of Latest Engineering and Management Research (IJLEMR) ISSN: 2455-4847 www.ijlemr.com || Volume 03 - Issue 02 || February 2018 || PP. 96-104 Conditions and valorization of tourism in Shtip, an old town in the Republic of Macedonia Nikola V. Dimitrov1, Simona Atanasova2 1(Faculty of Tourism and Business Logistics, Goce Delchev University – Shtip, Republic of Macedonia) 2(Student of the second cycle studies at the Faculty of Tourism and Business Logistics, Goce Delchev University – Shtip, Republic of Macedonia) Abstract: For a scientists is a challenge to explore the beginning and the course of tourism in smaller cities. The emergence of tourism in Shtip is from a recent date. However, through the example of tourism in Shtip, we identify two historical periods: the preturism and the period of tourism. Thus, the first period lasts until the appearance of the first hotel in 1912, and the second from the middle of the twenties of the 20th century.Serious data on the tourism in Shtip are obtained from the end of the 1950's onwards.The analysis is based on primary and secondary data sources. From the analysis we learn that the tourism in Shtip in recent years has been growing with real development perspectives of diverse tourist offer and production. Keywords: Conditions, Perspectives, Republic of Macedonia, Shtip, Valorization. 1. INTRODUCTION City of Stip is the largest city in the eastern part of the Republic of Macedonia (RM).The city is located between the heights of the hills of Isar (450 m above sea level), Meri (420 m above sea level) and Cumlac (peak Klisse Bair 591 m above sea level), and extends along the banks of the river Otinja (2 km) and the river Bregalnica (5 km). -
Annex 1: List of Rural Areas
Annex 1: List of rural areas Municipality Settlements designated as Rural areas (LAU 2) List of settlement on the level of the municipality with ≤ 30 000 inhabitants (Census 2002) Aerodrom Village: Dolno Lisiche. Arachinovo Villages: Arachinovo, Grushino, Mojanci and Orlanci. Berovo City: Berovo and villages: Budinarci, Vladimirovo, Dvorishte, Machevo, Mitrashinci, Ratevo, Rusinovo and Smojmirovo. Bitola Villages: Bareshani, Bistrica, Bratin Dol, Brusnik, Bukovo, Velushina, Gabalavci, Gopesh, Gorno Egri, Gorno Orizari, Graeshnica, Dihovo, Dolenci, Dolno Egri, Dolno Orizari, Dragarino, Dragozani, Dragosh, Drevenik, Gjavato, Zabeni, Zlokukjani, Kazani, Kanino, Karamani, Kishava, Kravari, Krklino, Kremenica, Krstoar, Kukurechani, Lavci, Lazec, Lera, Lisolaj, Logovardi, Lopatica, Magarevo, Malovishte, Metimir, Medzitlija, Nizepole, Novo Zmirnovo, Oblakovo, Oleveni, Optichari, Orehovo, Ostrec, Poeshevo, Porodin, Ramna, Rashtani, Rotino, Svinishte, Sekirani, Snegovo, Sredno Egri, Srpci, Staro Zmirnovo, Strezevo, Trn, Trnovo, Capari, Crnobuki and Crnovec. Bogdanci City: Bogdanci and villages: Gjavato, Selemli and Stojakovo. Bogovinje Villages: Bogovinje, Gorno Palchishte, Gorno Sedlarce, Dolno Palchishte, Jelovjane, Kamenjane, Zerovjane, Novake, Novo Selo, Pirok, Rakovec, Selce Kech, Sinichane and Urvich. Bosilovo Villages: Borievo, Bosilovo, Gecherlija, Drvosh, Ednokukevo, Ilovica, Monospitovo, Petralinci, Radovo, Robovo, Saraj, Sekirnik, Staro Baldovci, Turnovo, Hamzali and Shtuka. Brvenica Villages: Blace, Brvenica, Volkovija, Gurgurnica,