ERAS News EAST RIDING ARCHAEOLOGICAL SOCIETY No
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Elsecar Conservation Area Appraisal Workshop Held: 19Th February 2008 at Milton Hall
Elsecar Conservation Area Appraisal Version 1.1 1. Introduction Elsecar • Explanation of a Conservation Area, relevant guidance and why an appraisal has been undertaken 2. Location and Scope of Conservation Area • Landscape and surrounding setting • General character and plan form 3. Historical Context and Development • Origins and historical development of the area • Archaeology 4. Townscape Analysis • Current Uses/ Activities • Prominent buildings/ Landmarks • Open Space • Public Realm • Buildings that have a positive, neutral or negative effect on the character of the Conservation Area • Sites that have a positive, neutral or negative effect on the character of the Conservation Area • The character and contribution of Green spaces and their relative biodiversity value 5. Architectural Analysis • Local building materials • Vernacular styles • Key unlisted buildings/ types or groups of unlisted buildings and features • Listed buildings • Aesthetic Appeal of buildings and spaces • The relationship between buildings within the Conservation Area 6. The Character and Appearance of the Conservation Area • Summary of the current character and appearance of the area 7. Proposals for the Future Preservation and Enhancement of the Conservation Area • Policy background • Specific policy guidance for future development in the Conservation Area • Evaluation of proposals for future extension of the Conservation Area 1 Version 1.1 8. Glossary of Terms Elsecar Further Reading Appendices • Appendix A Listed Building Profiles • Appendix B Ancient Monuments profiles • Appendix C Report on Consultation Undertaken Contact Details 2 Version 1.1 1. Introduction Figure 1: The location of Elsecar in relation to surrounding settlements Elsecar 1.1. This document is an appraisal of the Conservation Area that covers the village of Elsecar around 6 miles to the south east of Barnsley. -
Support Barnsley's Museums
Cannon Hall is a stunning Georgian country house museum with outstanding fine and decorative art collections, set in Barnsley Museums 70 acres of historic parkland and beautiful landscaped gardens. It is the perfect day out for all the family. is made up of five magnificent Bark House Lane, Cawthorne, Barnsley, S75 4AT [email protected] attractions. All are 01226 772002 • www.cannon-hall.com free to enter and each has its own The Cooper Gallery is a vibrant art gallery in the heart unique identity. of Barnsley town centre. Explore galleries showcasing the beautiful collection of fine art and enjoy our exciting programme of temporary exhibitions, events and arts workshops. Cooper Gallery, Church Street, Barnsley, S70 2AH [email protected] 01226 242905 • www.cooper-gallery.com As well as soaking up the warm, spring as the celebration of one of Barnsley’s sunshine - why not soak up the relaxing influential industries in the exhibition visitors can uncover the incredible Experience Barnsley atmosphere at Barnsley Museums’ five Tins!Tins!Tins! at Experience Barnsley - story of Barnsley told through centuries-old artefacts, fantastic sites. there is something for everyone to enjoy. documents, films and recordings that have been donated by people living and working in the borough. Whether you are hankering after the great So if you are looking for unique outdoors, inspiring local history, a trip out destinations to spend quality time with Town Hall, Church Street, Barnsley, S70 2TA with the family, art exhibitions, fun events, family, friends and loved ones this spring, [email protected] retail therapy or even a bite to eat, then Barnsley’s museums are the perfect place look no further as Barnsley Museums have for you. -
Beer Matters Is © CAMRA Ltd
Issue 505 March 2020 sheffield.camra.org.uk /sheffieldcamra @shfcamra Issue 505 2 March 2020 The free magazine of CAMRA Sheffield & District Issue 505 March 2020 Letter from the Chair 5 Branch AGM Pubs 5 WhatPub survey volunteers 3,000 monthly Beer Week heritage walks Editor circulation Beers by Queers at Dev Cat Andy Cullen Live music and good beer [email protected] Kelham Island Tavern Articles, comments and suggestions are most welcome so please send Breweries 10 them in* Welbeck Abbey Kelham Island Bradfield Advertising St Mars of the Desert Alan Gibbons Abbeydale [email protected] Wards & Vaux Blue Bee Quarter Page £50+VAT Steel City Half Page £70+VAT Full Page £100+VAT Inside Front Cover £110+VAT Back Cover £120+VAT Awards 16 Discounts for regular placements Pub of the Month PDFs or high-res bitmaps (300 dpi) only please Design from £30 Updates from £10 Travel 18 Hopping around Bosnia A Grand Day Out.. on the Next copy deadline Nottingham Road Friday 6 March RambAles return! Opinions expressed are those of the Festivals 24 author and may not represent those Sheffield Beer Week of CAMRA, the local branch or editor. Festival news Beer Matters is © CAMRA Ltd. Festival guide *For legal reasons a full name and address must be provided with all contributions. Diary 30 Committee 30 Issue 505 March 2020 Branch AGM WhatPub survey Dear CAMRA member, volunteers needed! As chairman of CAMRA Sheffield & District I would like to take WhatPub (whatpub.com) is this opportunity to ask members to actively support the Shef- the rather handy public face field branch in 2020. -
Your Primary Care Network Details You Will Need the Following CCG Area: Eroy Details to Claim Your Quality Points for the PCN Domain: Your PCN Name: Holderness
Your Primary Care Network Details You will need the following CCG Area: ERoY details to claim your Quality Points for the PCN Domain: Your PCN Name: Holderness Your PCN Lead is: Pawel Stawicki (Boots, 124 Queen St, PCN Lead Name PCN Lead Pharmacy Name FJM51) PCN Lead ODS Code Your Deputy PCN Lead is: Mike Stride, Boots, 94-96 Queen St) PCN Clinical Director Name: Dr David Fitzsimons & Dr Steph Mason The GPs included in this PCN are: The Pharmacies included in this PCN are: South Holderness Medical Practice Boots Hedon Hedon Group Practice Boots Thorngumbald Church View Surgery, Hedon Boots 124 Queen St Boots 94-96 Queen St East Riding Hedon P Rowbotham This PCN’s Gaggle Group email is: [email protected] This gaggle group has been set up so that you can communicate with all members of this group. To communicate with all members of the gaggle group please send your email to the gaggle group email above. Please Note: You need to send your email from the email address below which is included in the group: Boots Hedon [email protected] Boots Thorngumbald [email protected] Boots 124 Queen St [email protected] Boots 94-96 Queen St [email protected] East Riding Hedon [email protected] P Rowbotham [email protected] Please do not unsubscribe from the group. If you change your NHS shared mail address, please let the LPC know. Prepared by Humber LPC November 2019 . -
A63 Castle Street Improvements, Hull Environmental Statement
A63 Castle Street Improvements, Hull Environmental Statement Volume 3 Appendix 11.3 ROAD DRAINAGE AND THE WATER ENVIRONMENT – FLOOD RISK MODELLING TECHNICAL REPORT TR010016/APP/6.3 HE514508-MMSJV-EWE-S0-RP-LE-000005 7 September 2018 Collaborative Delivery Framework A63 Castle Street Improvements, Hull Environmental Statement – Volume 3, Appendix 11.3 A63 Castle Street Improvements, Hull Environmental Statement Appendix 11.3 Flood risk modelling technical report Revision Record Rev No Date Originator Checker Approver Status Suitability P01.1 08.04.14 A Velkov I Struthers / J J McKenna S0 For review Ball P01.2 22.01.18 S Hughes J Franklin - Updated P01.3 11.05.18 S Hughes I Struthers J McKenna Updated P01 31.07.18 S Hughes I Struthers J McKenna Shared S4 P02 07.09.18 S Hughes I Struthers J McKenna Shared S4 This document was prepared on behalf of Highways England by Mott MacDonald Sweco JV for Highways England's Collaborative Delivery Framework (CDF). It was issued for the party which commissioned it and for specific purposes connected with the above- captioned project only. It should not be relied upon by any other party or used for any other purpose. Mott MacDonald Sweco JV accepts no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from Highways England. -
The Original Magazine for Model Engineers
THE ORIGINAL MAGAZINE FOR MODEL ENGINEERS Vol. 220 No. 4580 • 16 February - 1 March 2018 Join our online community www.model-engineer.co.uk FORK COAL MINING MUSEUM ENDS Bushells of Snoring Romney Hythe and Dymchurch COVER FEATURE ENGINEERING GROUP Bolton Tram £3.99 Just a small selection from our current stock Buy online now at: www.gandmtools.co.uk Large Old Blacksmiths 12” x 12” Swage Block Blacksmiths & Stand, VGC, £450.00 plus vat. Anvil with Stand, Approx 2.5 CWT, Boley & Leinen Watchmakers Lathe with £450.00 plus vat. Case, Collets, Tooling, £450.00 plus vat. Cowells Wheel & Pinion Cutting Attachment, VGC, £950.00 plus vat. Alexander Cabinet Mounted Cutter Denford Microrouter with Control Box, Grinder, 3ph, 1ph, £850.00 plus vat. £650.00 plus vat. Sweeney & Blocksidge No 1 Europa Milltech Bench Flypress, Choice of 10, 1500VS Vertical £110.00 plus vat. turret Mill, DRO, Power Feed, Tooling, 3ph, £3250.00 plus vat. Harrison Vertical Mill, Gearbox Problems, 1ph, 240 Volt, Hence Price £750.00 plus vat. • Telephone enquiries welcome on any item of stock. • We hold thousands of items not listed above. • All items are subject to availability. • All prices are subject to carriage and VAT @ 20%. • We can deliver to all parts of the UK and deliver worldwide. • Over 7,000 square feet of tools, machines and workshop equipment. Opening times: 9am -1pm & 2pm – 5pm Monday to Friday. Closed Saturdays, except by appointment. tel: 01903 892510 • www.gandmtools.co.uk • e-mail: [email protected] G and M Tools, The Mill, Mill Lane Ashington, West Sussex RH20 3BX Published by MyTimeMedia Ltd. -
Allocations Document
East Riding Local Plan 2012 - 2029 Allocations Document PPOCOC--L Adopted July 2016 “Making It Happen” PPOC-EOOC-E Contents Foreword i 1 Introduction 2 2 Locating new development 7 Site Allocations 11 3 Aldbrough 12 4 Anlaby Willerby Kirk Ella 16 5 Beeford 26 6 Beverley 30 7 Bilton 44 8 Brandesburton 45 9 Bridlington 48 10 Bubwith 60 11 Cherry Burton 63 12 Cottingham 65 13 Driffield 77 14 Dunswell 89 15 Easington 92 16 Eastrington 93 17 Elloughton-cum-Brough 95 18 Flamborough 100 19 Gilberdyke/ Newport 103 20 Goole 105 21 Goole, Capitol Park Key Employment Site 116 22 Hedon 119 23 Hedon Haven Key Employment Site 120 24 Hessle 126 25 Hessle, Humber Bridgehead Key Employment Site 133 26 Holme on Spalding Moor 135 27 Hornsea 138 East Riding Local Plan Allocations Document - Adopted July 2016 Contents 28 Howden 146 29 Hutton Cranswick 151 30 Keyingham 155 31 Kilham 157 32 Leconfield 161 33 Leven 163 34 Market Weighton 166 35 Melbourne 172 36 Melton Key Employment Site 174 37 Middleton on the Wolds 178 38 Nafferton 181 39 North Cave 184 40 North Ferriby 186 41 Patrington 190 42 Pocklington 193 43 Preston 202 44 Rawcliffe 205 45 Roos 206 46 Skirlaugh 208 47 Snaith 210 48 South Cave 213 49 Stamford Bridge 216 50 Swanland 219 51 Thorngumbald 223 52 Tickton 224 53 Walkington 225 54 Wawne 228 55 Wetwang 230 56 Wilberfoss 233 East Riding Local Plan Allocations Document - Adopted July 2016 Contents 57 Withernsea 236 58 Woodmansey 240 Appendices 242 Appendix A: Planning Policies to be replaced 242 Appendix B: Existing residential commitments and Local Plan requirement by settlement 243 Glossary of Terms 247 East Riding Local Plan Allocations Document - Adopted July 2016 Contents East Riding Local Plan Allocations Document - Adopted July 2016 Foreword It is the role of the planning system to help make development happen and respond to both the challenges and opportunities within an area. -
National Reports 2016 - 2018
CONGRESSO XVII - CHILE NATIONAL REPORTS 2016 - 2018 EDITED BY JAMES DOUET TICCIH National Reports 2016-2018 National Reports on Industrial Heritage Presented on the Occasion of the XVII International TICCIH Congress Santiago de Chile, Chile Industrial Heritage: Understanding the Past, Making the Future Sustainable 13 and 14 September 2018 Edited by James Douet THE INTERNATIONAL COMMITTEE FOR THE CONSERVATION OF INDUSTRIAL HERITAGE TICCIH Congress 2018 National Reports The International Committee for the Conservation of the Indus- trial Heritage is the world organization for industrial heritage. Its goals are to promote international cooperation in preserving, conserving, investigating, documenting, researching, interpreting, and advancing education of the industrial heritage. Editor: James Douet, TICCIH Bulletin editor: [email protected] TICCIH President: Professor Patrick Martin, Professor of Archae- ology Michigan Technological University, Houghton, MI 49931, USA: [email protected] Secretary: Stephen Hughes: [email protected] Congress Director: Jaime Migone Rettig [email protected] http://ticcih.org/ Design and layout: Daniel Schneider, Distributed free to members and congress participants September 2018 Opinions expressed are the authors’ and do not necessarily re- flect those of TICCIH. Photographs are by the authors unless stated otherwise. The copyright of all pictures and drawings in this book belongs to the authors. No part of this publication may be reproduced for any other purposes without authorization or permission -
Pam Cartwright
ERAS News EAST RIDING ARCHAEOLOGICAL SOCIETY No. 78 SEPTEMBER 2012 Taking readings for a pseudo-section profile on a LEADER Project site. Photo: N.Reily Local News ~ LEADER Heritage at Risk Project ~ IARSS Conference ~ Industrial Archaeology Heritage Open Days ~ Visibility on Clay ~ Snippets of Significance ~ Events & ERAS Diary 1 Contents Local News …………………………………. 3 LEADER Project …………..……………….. 4 Iron Age Research Student Seminars ….….. 6 The Newcomen Engine …………..………… 8 Courses and Events …………..…………….. 8 Heritage Open Days ………………………... 9 Snippets of Significance ……………..……. 10 Visibility on Clay ………..……………….. 10 Back issues of ERAS News ......................... 10 ERAS Diary ……………...……..….……… 11 Comments or contributions are always welcome. Please send to the editor, Kate Dennett, 455 Chanterlands Ave. Hull. HU5 4AY Tel. 01482 445232 [email protected] Ideas for publicity can be sent to Samantha Braham [email protected] Items for the website, can be sent to Dave Clarke [email protected] ERAS is REGISTERED CHARITY No. 500878 2 ERAS LOCAL NEWS . (N&P) Mr C S and Mrs J ? Collect your Volume 13 also A Esnee? Is this you?? The printers have said they expect to deliver the new Standing Order Mystery - volume during the week beginning 10 September so it Our retiring treasurer Lesley Jackson asked me to try to should be available for distribution, at the September find a couple of mystery standing order payers who appear lecture meeting. Members always receive the newest in the bank statements and cannot be linked up with the publication for free, and can buy earlier ones at the normal membership list. The first one is missing a surname and price, or sometimes at a reduced price depending on how the second one may be a typo or possibly ‘A Esnee’ is many we have left. -
Appendix 3.2: Route Corridor Investigation Study
T N E M U C O D 6.3.2 Appendix 3.2: Route Corridor Investigation Study River Humber Gas Pipeline Replacement Project Under Regulation 5(2)(a) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 Application Reference: EN060004 April 2015 May 2013 Number 9 Feeder Replacement Project Final Route Corridor Investigation Study Number 9 Feeder Replacement Project Final Route Corridor Investigation Study Table of Contents 1 Introduction 2 Appendix 5 Figures 2 Route Corridor and Options Appraisal Methodology 4 Figure 1 – Area of Search 61 Figure 2 – Route Corridor Options 62 3 Area of Search and Route Corridor Identification 5 Figure 2 (i) – Route Corridor 1 63 4 Route Corridor Descriptions 7 Figure 2 (ii) – Route Corridor 2 64 5 Route Corridor Evaluation 8 Figure 2 (iii) – Route Corridor 3 65 Figure 2 (iv) – Route Corridor 4 66 6 Statutory Consultee and Key Stakeholder Consultation 14 Figure 2 (v) – Route Corridor 5 67 7 Summary and Conclusion 15 Figure 3 – Primary Constraints 68 8 Next Steps 15 Figure 4 – Secondary Constraints 69 Figure 5 – Additional Secondary Constraints 70 9 Abbreviations and Acronyms 15 Figure 6 – Statutory Nature Conservation Sites 71 10 Glossary 16 Figure 7 – Local Nature Conservation Sites 72 Appendix 1 - Population and Planning Baseline 17 Figure 8 – Historic Environment Features 73 Figure 9 – National Character Areas 74 Appendix 2 - Engineering Information 19 Figure 10 – Landscape Designations 75 Appendix 3 - Environmental Features 23 Figure 11 – Landscape Character 76 Appendix -
Withernsea and Southern Holderness Education Action Zone Account 1 April 2004 to 9 January 2005
SCHOOL STANDARDS AND FRAMEWORK ACT 1998 Account, prepared pursuant to Schedule 1, para 7(1) of the School Standards and Framework Act 1998, of the Withernsea and Southern Holderness Education Action Zone for the period ended 9 January 2005, together with the Comptroller and Auditor General’s Certificate and Report thereon. (In continuation of House of Commons Paper No. 1107 of 2003-2004) Presented pursuant to School Standards and Framework Act 1998, Sch. 1, s 11, para 7(3) Withernsea and Southern Holderness Education Action Zone Account 1 April 2004 to 9 January 2005 ORDERED BY THE HOUSE OF COMMONS TO BE PRINTED 23 FEBRUARY 2005 LONDON: The Stationery Office 20 May 2005 HC 340 £8.50 The National Audit Office scrutinises public spending on behalf of Parliament. The Comptroller and Auditor General, Sir John Bourn, is an Officer of the House of Commons. He is the head of the National Audit Office, which employs some 800 staff. He, and the National Audit Office, are totally independent of Government. He certifies the accounts of all Government departments and a wide range of other public sector bodies; and he has statutory authority to report to Parliament on the economy, efficiency and effectiveness with which departments and other bodies have used their resources. Our work saves the taxpayer millions of pounds every year. At least £8 for every £1 spent running the Office. This account can be found on the National Audit Office web site at www.nao.org.uk Withernsea and Southern Holderness Education Action Zone Account 1 April 2004 to 9 January -
Corporate Plan Performance Report
Corporate Plan Performance Report Working together for a brighter future, a better Barnsley Working together – with our communities A brighter future – people achieve their potential A better Barnsley – our residents think and feel we are making a difference together 2015/16 Quarter 2 (July – September) 1 About this report This report summarises our performance against the priorities and outcomes in Quarter 2 (Q2) of 2015/16. It details the practical steps we have taken to improve performance. Key The report uses the following symbols and colours to illustrate our progress towards targets set against our headline indicators for each quarter, the background shows how well we have performed: RAG PIs Performance against indicator is in line with targets for this point of the year Performance has been satisfactory and within 10% of the target for this point of the year Performance is more than 10% below target for this point of the year The Direction of Travel (DoT) shows how we performed against the previous quarter: Performance is improving Performance is remaining static Performance is declining Performance against the indicators is summarised in the title of each of the outcomes in the report, as follows: RAG Outcomes Green Performance against majority of indicators is in line with targets for this point of the year Performance is mixed, some indicators will be on track to achieve targets and others will Amber require improvement to achieve targets Red Performance against majority of indicators is below target for this point of the year This report is best viewed or printed in colour. All information included in the tables is based on performance in Q2.