DEPARTMENT of PUBLIC WORKS and HIGHWAYS DAVAO OCCIDENTAL DISTRICT ENGINEERING OFFICE REGION XI Malita, Davao Occidental

Total Page:16

File Type:pdf, Size:1020Kb

DEPARTMENT of PUBLIC WORKS and HIGHWAYS DAVAO OCCIDENTAL DISTRICT ENGINEERING OFFICE REGION XI Malita, Davao Occidental fag^ 1 of 6 Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DAVAO OCCIDENTAL DISTRICT ENGINEERING OFFICE REGION XI Malita, Davao Occidental Contract ID : 17LE0116 Contract Name: Construction of 2 Units 1 Storey - 2 Classroom School Building Location: Kidaman ES, Jose Abad Santos, Davao Occidental CONTRACT AND AGREEMENT KNOW ALL MEN BY THESE PRESENTS: THIS CONTRACT AGREEMENT, made this 5^ day of December 2017 between: The GOVERNMENT OF THE REPUBLIC OF THE PHILIPPINES through the Department of Public Works and Highways (DPWH) represented herein by RODRIGO C. LARETE - Caretaker, Office of the District Engineer, duly authorized for this purpose, with main office address at Davao Occidental District Engineering Office, Buhangin, Malita, Davao Occidental hereinafter referred to as the "PROCURING ENTITY"; -and- FORTSTONE CONSTRUCTION ENTERPRISES, a single proprietorship partnership corporation oint venture organized and existing under and by virtue of laws of the Republic of the Philippines, with main office address at Shariff Kabunsuan, Cotabato City, represented herein by KADIL T. UGALINGAN, duly authorized for this purpose, hereinafter referred to as the "CONTRACTOR;" WTTNESSETH: WHEREAS, the PROCURING ENTITY is desirous that the CONTRACTOR execute the Works under CID # 17LE0116 - CONSTRUCTION OF 2 UNITS 1 STOREY - 2 CLASSROOM SCHOOL BUILDING, KIDAMAN ES, JOSE ABAD SANTOS, DAVAO OCCIDENTAL hereinafter called Works", and the PROCURING ENTITY has accepted the Calculated Bid for the CONTRACTOR he execution and completion of the Works at the calculated unit bid prices shown in the hed Bill of Quantities, or a total Contract price of FIVE MILLION NINE HUNDRED Y SEVEN THOUSAND THIRTEEN PESOS & 32/100 (Php 5,957,013.32), to be leted within ONE HUNDRED TWENTY (120) calendar days upon effectivity of this act; , THEREFORE, for and consideration of the forgoing premises, the parties hereto agree as s: In this CONTRACT AGREEMENT, words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract hereinafter referred to. The following documents shall be attached, deemed to form, and be read and construed as part of this CONTRACT AGREEMENT, and shall be interpreted in the following order of priority: a.This Contract Agreement b.Documents forming part of the Contract Agreement: ^^OD# 17LE0116 fjfjContract and Agreement ^Page 2 of 6 (1)Bidding Documents with Bulletins (2)Specifications (3)Drawings (4)Special Conditions of Contract (SCC) (5)General Conditions of Contract (GCC) (6)Performance Security (7)Integrity Pledge under Department Order No. 86, series of 2013 (lO)Other Documents (a)Construction Methods (b)Construction Schedule in the form of PERT/CPM Diagram or Precedence Diagram and Bar Chart with S-Curve, or other approved tools of project scheduling, and Cash Flow. (c)Manpower Schedule (d)Equipment Utilization Schedule (e)Construction Safety and Health Program initially approved by the Head of the Procuring Entity (f)Contractor's All Risk Insurance (CARI) 3. In consideration of the payments to be made by the PROCURING ENTITY to the CONTRACTOR as hereinafter mentioned, the CONTRACTOR hereby covenants with the PROCURING ENTITY to execute and complete the Works and remedy any defects therein in conformity with the provisions of this CONTRACT AGREEMENT in all respects. The following are the quantities and items of Work included in the scope of work: Item No. Description Quantity Unit Unit Cost (Php) Total Amount (Php) FACILITIES FOR ENGINEER Provision of Field Office for the Engineer A.l.l(8) 4.00 mo. 30,000.00 120,000.00 (Rental Basis) OTHER GENERAL REQUIREMENT B.5 Project Billboard 1.00 each 5,070.00 5,070.00 B.7 Occupational Safety and Health 4.00 month 15,100.00 60,400.00 B.9 Mobilization & Demobilization 1.00 I.S 19,000.00 19,000.00 EARTHWORKS 803(1) a Structure Excavation (Common Soil) 4,032.00 cu.m 63.07 254,298.24 Embarkment (From Structure 29.70 cu.m 227.61 6,760.02 804(1) a Excavaton) 804 (l)b Embankment (Borrow) 204.70 cu.m 799.62 163,682.21 804(4) Grave Fill 38.98 cu.m 1,253.11 48,846.23 PLAIN & REINFORCED CONCRETE WORKS Structural Concrete (Footings 8i Slab 900(l)C2 46.04 cu.m 13,568.04 624,672.56 on Fill) Class A, 28 days Structural Concrete (Footings & Tie 12.60 cu.m 13,718.30 172,850.58 900(1) a Beams) Class A, 28 days DPWH-INFR-51-2016 CID# 17LE0116 Contract and Agreement Page 3 of 6 Structural Concrete (Columns) Class 11.12 cu.m 14,890.89 165,586.70 900(l)C4 A, 28 days Structural Concrete (Beams) Class A, 900(l)C6 17.72 cu.m 15,209.44 269,511.28 28 days Reinforcing Steel, Grade 40 10,520.30 kg- 90.69 954,086.01 9O2(l)al (Deformed) 903(1) Forms and Falseworks 383.64 sq.m. 755.49 289,836.18 TERMITE CONTROL WORKS 1000(1) Soil Poisoning 61.26 sq.m. 555.64 34,038.51 MASONARY WORKS ISO mm CHB Non-Load Bearing 223.04 1,064.14 237,345.79 1046 (2) a2 (Including Rienforanq Steel) sq.m. FABRICATED MATERIALS 1004(2) a Finishing Hardware (Lodrsets) 8.00 set 1,625.00 13,000.00 1004 (2) g Finishing Hardware (Hinges) 32.00 PC 104.00 3,328.00 'S 1009(1) a Jalousie Windows (Glass) 57.10 sq.m. 1,424.16 81,319.54 Frames (Jambs, Sills, Head, Transoms 8t 8.00 set 2,268.50 18,148.00 1010 (1) mullions) Doors Frames 1010 (2) b Doors (Wood Panel) 15.12 sq.m. 4,711.64 71,240.00 1005 (5) Grille Windows 18.72 sq.m. 1,755.00 32,853.60 Carpentry & Joinery Works 1003 (17) 1.00 Is 16,380.00 16,380.00 (Blackboard) FINISHING WORKS 1021 (l)a Cement Floor Finish (Plain) 297.96 sq.m. 357.83 106,619.03 1072 (1) Cement Plaster Finish 587.92 sq.m. 286.65 168,527.27 1053 (3) al GI Pipe Railings (38 mm dla.) 36.00 Meter 302.25 10,881.00 ceiling (4.5mm, Metal Frame, Fiber 1003 (l)al 344.84 sq.m. 626.66 216,097.43 I Cement Board) 1038 (1) Reflective Insulation 344.84 sq.m. 435.50 150,177.82 PAINTING WORKS 1032(1) a Painting Works (Masonry/Concrete) 903.88 sq.m. 269.13 243,261.22 1032 (1) c Painting Works (Steel) 40.06 sq.m. 456.34 18,280.98 1032 (1)b Painting Works (Wood) 82.92 sq.m. 377.65 31,314.74 DPWH-INFR-51-2016 CID# 17LE0U6 Contract and Agreement Page 4 of 6 ROOF AND ROOF FRAMING WORKS Fabricated Metal Roofing Accessory 36.00 m 429.00 15,444.00 1013 (2) a (Ridge roll, gauge 26) Fabricated Metal Roofing Accessory 39.36 442.00 17,397.12 1013 (2) b (Flashing, gauge 26) m Prepainted Metal Sheets, Long span, 203.84 sq.m. 560.61 114,274.74 1014 (I)b2 Rib type, Above 0.427mm 1047 (2) a Structural Steel (Trusses) 2,703.10 kgs. 119.74 323,669.19 1047 (2) b Structural Steel (Purlins) 5,363.26 kgs. 103.34 554,239.29 1047 (3) a Metal Structure Accessories, Bolts 37.88 kgs. 132.00 5,000.16 1047 (7) b Metal Structure Accessories, Sagrod 85.24 pcs. 249.60 21,275.90 Metal Structure Accessories, 32.00 Each 202.80 6,489.60 1047 (3) c Turnbuckle Metal Structure Accessories, Cross 341.08 kg 78.00 26,604.24 1047(4) Bracing Metal Structure Accessories, Steel 406.04 kg 218.40 88,679.14 1047 (6) Plates ELECTRICAL 1100(30) Conduits, Boxes & Fittings 1.00 Lumpsum 33,234.50 33,234.50 1101(42) Wires & Wiring Devices 1.00 LS 64,220.00 64,220.00 Power Load Center, Swltchgear & 1.00 LS 14,332.50 14,332.50 1102 (27) Panel Boards 1103 (1) Lighting Fixtures 1.00 LS 64,740.00 64,740.00 TOTAL CONTRACT COST PHP 5,957,013.32 4. In consideration of the execution and completion of the Works by the CONTRACTOR, the PROCURING ENTITY hereby covenants to pay the CONTRACTOR the unit prices in the CONTRACTOR'S Calculated Bid, as applied to the actual quantities accomplished as certified by the PROCURING ENTITY under the provisions of this CONTRACT AGREEMENT, at the times and in the manner prescribed by this CONTRACT AGREEMENT. WWH-rNFR-51-2016 OD# 17LE0116 Contract and Agreement Page 5 of 6 IN WITNESS WHEREOF, the parties hereto set their respective hands on the day, month, and year first above written. PROCURING ENTTTY: CONTRACTOR: Represented by: Represented by: KADIL.T. UGALINGA/ N r Proprietor Witnessed by: EN . UY Ac mtll tive DPWH-1NFR-51-2016 OD# 17LE0116 Contract and Agreement Page 6 of 6 Republic of the Philippines) Js.s BEFORE ME, Notary Public for and in the Municipality of Malita, Davao Occidental personally appeared RODRIGO C. LARETE - Caretaker, Office of the District Engineer (Party of the first part) DPWH, Engineering District Office, Malita with Tax Identification No. 142-841-085 and FORTSTONE CONSTRUCTION ENTERPRISES represented by KADIL T. UGAUNGAN with PRC License No. 0025150. known to me and known to be the same person who executed the foregoing CONTRACT AND AGREEMENT and they acknowledge to me that the same is their true act and deed for and in behalf of the parties they represent. DEC 0 IN WITNESSED WHEREOF, I have hereunto affixed my signature and seal this day of , 2017. Doc No. :. Page No. :. Book No. :_ Jt*- Series of 2017: DPWH-INFR-51-2016.
Recommended publications
  • Peoples Manual
    TABLE OF CONTENTS 1. Overview 1. Purpose of the Manual 2. Structure of the Manual 3. Coverage of the Manual 4. FOI Receiving Officer 5. FOI Decision Maker 6. Appeals and Review Committee 2. Definition of Terms 3. Protection of Privacy 4. Standard Procedure 1. Receipt of Request for Information 2. Initial Evaluation a. Sufficient Request b. Request relating to more than one office under the Regional Office c. Requested information is not in the custody of the Regional Office or any of its PSTCs/CSTC d. Requested information is already posted and available online e. Requested information is substantially similar or identical to the previous request 3. Transmittal of request by the FRO to Decision Maker 4. Role of Decision Maker in processing the request 5. Role of FRO to transmit the information to the requesting party 6. Extension of Time 5. Remedies in Case of Denial of Request 6. Request Tracking System 7. Fees 8. Administrative Lialibility 9. Annexes a. FOI FAQs b. Executive Order No. 02, S. 2016 c. FOI Receiving Officers, Decision Makers, and Appeals Committee of DOST Region XI d. List of Exceptions to FOI e. FOI Request Flow Chart f. FOI Request Form REPUBLIC OF THE PHILIPPINES DEPARTMENT OF SCIENCE AND TECHNOLOGY REGIONAL OFFICE NO. XI Friendship Cor. Dumanlas Road, Bajada, Davao City SECTION 1: OVERVIEW 1. Purpose: The purpose of the FOI Manual is to provide the process to guide and assist the REGIONAL OFFICE (RO) including its Provincial Science and Technology Centers (PSTCs/CSTC) in dealing with requests of information received under the Executive Order (EO) No.
    [Show full text]
  • Republic Act No. 11220
    H. No. 6715 Jl^public of fl{e |ll|ilippini>8 Congress nf tl|B ^ijilippines to ^^plipiiteentl} (Jlatigrpsa ®l{irb ^guIatj^PSBion Begun and held in M etro Manila, on Monday, the tw enty-third day of July, tw o thousand eighteen. [R e p u b l i c a c t N o . 11220] AN ACT SEPARATING THE SOUTHERN PHILIPPINES AGRI-BUSINESS, MARINE AND AQUATIC SCHOOL OF TECHNOLOGY (SPAMAST)-DIGOS CITY CAMPUS IN THE CITY OF DIGOS, DAVAO DEL SUR, FROM THE SPAMAST IN THE MUNICIPALITY OF MALITA, DAVAO OCCIDENTAL, AND CONVERTING IT INTO A STATE COLLEGE TO BE KNOWN AS THE DAVAO DEL SUR STATE COLLEGE, AND APPROPRIATING FUNDS THEREFOR Be it enacted by the Senate and House of Representatives of the Philippines in Congress assembled: Section l. Separation/Establishment. - The Southern Philippines Agri-Business, Marine and Aquatic School of Technology (SPAMAST)-Digos City Campus in the City of Digos, Province of Davao del Sur, is hereby separated from the SPAMAST in the Municipality of Malita, Davao Occidental, and converted into a state college to be known as the Davao del Sur State College, and integrating therewith the SPAMAST-Digos City Campus in Barangay Matti, Digos City, the SPAMAST Laboratory and Production Campus in the Municipality of Matanao, the SPAMAST Extension Classes in Barangay Kapatagan, Digos City, and the SPAMAST Extension Campus in the Municipality of Sulop, all located in the Province of Davao del Sur. Its main campus shall be in Digos City. After the effectivity of this Act, the Davao del Sur State College, hereinafter referred to as the College, shall exist independently, separate and distinct from the SPAMAST in Malita, Davao Occidental, to be governed by their respective charters.
    [Show full text]
  • ADDRESSING ILLEGAL WILDLIFE TRADE in the PHILIPPINES PHILIPPINES Second-Largest Archipelago in the World Comprising 7,641 Islands
    ADDRESSING ILLEGAL WILDLIFE TRADE IN THE PHILIPPINES PHILIPPINES Second-largest archipelago in the world comprising 7,641 islands Current population is 100 million, but projected to reach 125 million by 2030; most people, particularly the poor, depend on biodiversity 114 species of amphibians 240 Protected Areas 228 Key Biodiversity Areas 342 species of reptiles, 68% are endemic One of only 17 mega-diverse countries for harboring wildlife species found 4th most important nowhere else in the world country in bird endemism with 695 species More than 52,177 (195 endemic and described species, half 126 restricted range) of which are endemic 5th in the world in terms of total plant species, half of which are endemic Home to 5 of 7 known marine turtle species in the world green, hawksbill, olive ridley, loggerhead, and leatherback turtles ILLEGAL WILDLIFE TRADE The value of Illegal Wildlife Trade (IWT) is estimated at $10 billion–$23 billion per year, making wildlife crime the fourth most lucrative illegal business after narcotics, human trafficking, and arms. The Philippines is a consumer, source, and transit point for IWT, threatening endemic species populations, economic development, and biodiversity. The country has been a party to the Convention on Biological Diversity since 1992. The value of IWT in the Philippines is estimated at ₱50 billion a year (roughly equivalent to $1billion), which includes the market value of wildlife and its resources, their ecological role and value, damage to habitats incurred during poaching, and loss in potential
    [Show full text]
  • Butuan City at a Glance Xxii
    CITATION: Philippine Statistics Authority, 2015 Census of Population, Report No. 2 – Demographic and Socioeconomic Characteristics Butuan City, June 2017 ISSN 0117-1453 ISSN 0117-1453 REPORT NO. 2 22001155 CCeennssuu s s ooff PPooppuullaattiioonn DDeemmooggrraapphhiicc aanndd SSoocciiooeeccoonnoommiicc CChhaarraacctteerriissttiiccss BBUUTTUUAANN CCIITTYY Republic of the Philippines Philippine Statistics Authority SOLID • RESPONSIVE • WORLD ---CLASS REPUBLIC OF THE PHILIPPINES PRESIDENT RODRIGO ROA DUTERTE REPUBLIC OF THE PHILIPPINES PHILIPPINE STATISTICS AUTHORITY LISA GRACE S. BERSALES, Ph.D. Undersecretary National Statistician and Civil Registrar General Copyright © 2016 by Philippine Statistics Authority (PSA) PSA Complex, East Avenue, Diliman Quezon City, Philippines FOREWORD The 2015 Census of Population (POPCEN 2015) was the third population census conducted in between two decennial censuses. Mid-decade censuses were also conducted in 1995 and 2007. POPCEN 2015 Report No. 2 was one of the publications prepared by the Philippine Statistics Authority (PSA) to disseminate the results of POPCEN 2015. This report provides census data on the characteristics of the population at the national, regional, provincial, and city/municipality levels. Specifically, it contains the profile of the population with respect to age, sex, marital status, religious affiliation, school attendance and education, literacy, overseas worker indicator, and usual activity/occupation. PSA acknowledges the contribution of all national and local government agencies, local government units, and private offices and organizations for their invaluable assistance extended during the nationwide census-taking. Utmost gratitude is given to all respondents who patiently provided answers to the census questions, and to all hired census enumerators and supervisors for their hard work in completing the census. We salute all our census PSA field office officials and staff for making POPCEN 2015 a success.
    [Show full text]
  • 2016 Annual Report
    Region XI Region XI 1 TABLE OF CONTENTS Davao Region Today: A Socio-Demographic Overview Page 4 Population Matters in Davao Region Page 5 Responsible Parenthood and Page 6–7 Family Planning (RP-FP) Adolescent Health and Development (AHD) Page 8–9 Population and Development Page 10 New Initiatives Page 11 Knowledge and Resource Sharing Page 12 Capability Building for POPCOM XI Stafff Page 13 Gender and Development Page 14 POPCOM - Region XI with Program Partners and Stakeholders Page 15–17 2016 Financial Statement Page 18 2016 Organizational Chart Page 19 Region XI 3 Davao Region : A Socio-Demographic Overview Davao Region is an administrative region in the Philippines, designated as Region XI. It is situated at the southeastern portion of Mindanao, comprising five provinces: Compostela Valley, Davao del Norte, Davao del Sur, Davao Oriental and Davao Occidental, the newly created province. The region en closes the Davao Gulf, and its regional center is Davao City. Dávao is the Hispanicized pronunciation of ‘daba-daba’, the Bagobo word for "fire" (the Cebuano translation is ‘kalayo’). Many historians believe that the name Davao is the mixture of the three names that three different tribes, the earliest settlers in the region, had for the Davao River. The Manobos, an aboriginal tribe, referred to the Davao Rivers as ‘Davohoho’. Another tribe, the Bagobos, referred to the river as ‘Davohaha’, which means "fire", while another tribe, the Guiangan tribe, called thePage river4 as ‘Duhwow’. Even before the Philippine independence in 1946, the entire region was already a single province called Davao Province, with Davao City serving as its capital.
    [Show full text]
  • Davao Region
    2020 FISHERIES SITUATIONER REPORT: DAVAO REGION Date of Release: 11 May 2021 Reference No. 2021- SR-21RSSO11-04 Fisheries production decelerates by 5.6 percent Overall, the total volume of fisheries production of Davao Region was estimated at 45,556.23 metric tons during the year 2020. It decelerated by 5.6 percent compared from the previous year’s record of 48,245.89 metric tons. Within the five-year period, Davao Region’s fisheries production showed a downward trend from 58,019.74 metric tons recorded in 2016 to the present production. Figure 1. Volume of Fisheries Production (in Thousand Metric Tons): Davao Region, 2016 – 2020 80.00 Commercial Marine Municipal Inland Municipal Aquaculture 70.00 58.02 56.67 60.00 51.98 48.25 45.56 50.00 29.28 24.50 25.36 24.05 25.93 40.00 Metric Tons)Metric 0.21 30.00 0.17 0.24 0.25 20.00 23.01 0.36 27.63 22.88 21.46 17.62 (inThousand 10.00 5.56 4.33 3.50 0.00 2.49 1.65 2016 2017 2018 2019 2020 Year Source: Philippine Statistics Authority More than half (56.9 percent) of the 2020 regional fisheries outputs was attributed in the aquaculture subsector (or 25,926.11 metric tons). Municipal fisheries contributed 39.5 percent, composed of marine and inland fisheries at 38.7 percent (17,622.17 metric tons) and 0.80 percent (355.48 metric tons), respectively. Meanwhile, commercial fisheries’ total output showed the least contribution at 3.6 percent (1,652.47 metric tons).
    [Show full text]
  • Local-Budget-Circular-No
    REPUBLIC OF THE PHILIPPINES DEPARTMENT OF BUDGET AND MANAGEMENT GENERAL SOLANO STREET, SAN MIGUEL, MANILA LOCAL BUDGET CIRCULAR No. 125 April 7, 2020 To : Local Chief Executives, Members of the Local Sanggunian, Local Budget Officers, Local Treasurers, Local Planning and Development Coordinators, Local Accountants, and All Others Concerned Subject : GUIDELINES ON THE RELEASE AND UTILIZATION OF THE BAYANIHAN GRANT TO CITIES AND MUNICIPALITIES 1.1 LEGAL BASIS Section 4 of Republic Act (RA) No. 11469 (the Bayanihan to Heal as One Act) granted the President the power to adopt various temporary emergency measures to respond to crisis brought about by the Coronavirus Disease 2019 (COVID-19) pandemic. Under Section 4 (g) thereof, the President is empowered to ensure that all local government units (LGUs) are acting within the letter and spirit of all the rules, regulations and directives issued by the National Government pursuant to the said law, and are implementing standards of Community Quarantine consistent with what the National Government has laid down for the subject area, while allowing the LGUs to continue exercising their autonomy on matters undefined by the National Government or are within the parameters it has set, and are fully cooperating towards a unified, cohesive and orderly implementation of the national policy to address COVID-19. Further, Section 4 (v) of the same law provides: "Section 4. Authorized Powers. - Pursuant to Article VI, Section 23 (2) of the Constitution, the President is hereby authorized to exercise powers
    [Show full text]
  • National Economic and Development Authority Region XI, Davao City
    National Economic and Development Authority Region XI, Davao City NEDA Regional Office XI | NEDA-RDC XI Center | Km. 7, Bangkal, Davao City 8000 Tels. +63 (82) 296-0160 to 64 | e-mail:[email protected] 2nd Quarter (Q2) 2017 Regional Economic Situationer The CY 2017 Second Quarter Regional Economic Situationer (QRES) provides a snapshot of the performance of Davao Region’s economy by highlighting key socioeconomic indicators and assessing their performance vis-à-vis the same quarter of the previous year. The QRES also provides a brief development outlook for the Region for the succeeding months. Prices and Inflation Price movements of basic commodities in Davao Region posted an average of 2.9 percent in second quarter of 2017, 0.3 percentage point lower than the level recorded in same quarter in 2016. The slight decrease in the regional inflation could be attributed to higher inflation rates of electricity, gas and other fuels and water supply services. The purchasing power of the peso was 0.63. By commodity group, inflation decelerated for 7 commodities, while 4 commodities experienced higher prices during the quarter. Food and non-alcoholic beverages posted a 2.5 percent inflation rate, lower by 1.1 ppt from the same quarter of 2016, while clothing and footwear saw a 1.4 ppt decreased in inflation, from 6.2 percent in Q2 2016 to 4.8 percent in Q2 2017. Inflation rate for furnishings and household equipment was at 2.6 percent, lower by 1.7 ppt from the 4.3 percent inflation rate in Q2 2016. For recreation and culture, a lower inflation rate of 1.5 percent was recorded for the quarter, lower by 1 ppt from Q2 2016, while prices for education changed very little with an inflation rate of 2.6 percent, just 0.2 ppt lower from its inflation rate in Q2 2016.
    [Show full text]
  • Local GIA: Revised As of June 30
    Republic of the Philippines DEPARTMENT OF SCIENCE AND TECHNOLOGY ' ISO 9001 REGIONAL OFFICE NO. XI SOCOTEC COM= GIA MONITORING AS OF JUNE 30, 2018 LOCAL GIA: S&T Approaches to National Development (STAND) in the Davao Region Projects Responsible Unit Project Title Brief Description Location Project Cost I. DIFFUSION AND TRANSFER OF KNOWLEDGE AND TECHNOLOGIES; AND OTHER RELATED PROJECTS AND ACTIVITIES Community Empowerment thru Science and Technology CSTC Community Empowerment thru Science and Technology The CV. 2018 implementation of the CEST Davao City project will be as follows: Marilog District, Davao city 335,097.11 (CEST) Davao City - Provision of Supplies to Underserved Provision of iron-fortified rice and complementary foods to selected Localities of Marilog District undernourished children of Marilog District Provision of agricultural and food processing supplies to Lord of Creation Ecological Farmers Association (LOCREFA) Provision of food and personal care supplies to identified underprivileged families of Marilog District PSTC-DN Community Empowerment thru Science and Tecnology Provision of dairy processing equipment, food safety training and consultancy, Talaingod, Davao del Norte 138,809.81 (CEST) and human resource capability building. Provision of or access to S&T information materials/ provision of STARBOOKS PSTC-DS Community Empowerment through Science and The project aims to make science and technology more tangible at the grassroots Sulop, Davao del Sur 125,598.05 Technology (CEST) Program for Sulop, Davao del Sur level, help lessen and address the poverty incidence of the municipality to an acceptable level, and fast-track the adoption and development of science and technology-based enterprises in the municipality of Sulop, Davao del Sur.
    [Show full text]
  • Club Health Assessment MBR0087
    Club Health Assessment for District 301 E through March 2020 Status Membership Reports Finance LCIF Current YTD YTD YTD YTD Member Avg. length Months Yrs. Since Months Donations Member Members Members Net Net Count 12 of service Since Last President Vice Since Last for current Club Club Charter Count Added Dropped Growth Growth% Months for dropped Last Officer Rotation President Activity Account Fiscal Number Name Date Ago members MMR *** Report Reported Report *** Balance Year **** Number of times If below If net loss If no report When Number Notes the If no report on status quo 15 is greater in 3 more than of officers that in 12 within last members than 20% months one year repeat do not have months two years appears appears appears in appears in terms an active appears in in brackets in red in red red red indicated Email red Clubs less than two years old 135283 Agusan River 06/20/2018 Active(1) 26 2 1 1 4.00% 25 1 4 3 M,MC,SC 0 134267 Bayugan City Green Valley 04/11/2018 Active(2) 26 0 0 0 0.00% 26 4 3 S,T,M,VP,MC N/R SC 136523 Bukidnon Lake Apo 06/14/2019 Active(1) 19 6 8 -2 -9.52% 0 1 1 2 M,VP,MC,SC N/R 138102 Bukidnon Lucky 9 Spring 05/21/2019 Cancelled(8*) 0 0 20 -20 -100.00% 0 1 5 None N/R 90+ Days 135253 Bukidnon Maradugao 06/21/2018 Cancelled(8*) 0 0 20 -20 -100.00% 20 2 3 1 None P,S,T,M,VP N/R 90+ Days MC,SC 139416 Cagayan De Oro Uptown 02/11/2020 Newly 21 21 0 21 100.00% 0 6 M,VP,MC,SC N/R Premier Chartered 134268 Davao City Eagle 04/06/2018 Active 19 2 14 -12 -38.71% 20 1 1 MC 17 137803 Davao Occidental Host 04/17/2019 Active
    [Show full text]
  • Coronavirus Disease-2019
    NATIONAL TASK FORCE CORONAVIRUS DISEASE-2019 SITUATIONAL REPORT NO. 367 Issued on 1200H, 03 April 2021 Report Coverage: 02 April 2021 GLOBAL SITUATION Status of Filipinos Overseas 4,963 Middle East and Africa 675 9,078 129,619,536 2,255 Europe 130 Total Cases World Wide 3,275 2,240 Asia and the Pacific 21 3,144 590 Americas 223 223 901 Countries and Territories Affected 0 2,000 4,000 6,000 8,000 10,000 Recoveries Deaths Confirmed Source: WHO as of 03 April 2021 PHILIPPINE SITUATION TOTAL NEW REMARKS TOTAL +12,576 CASES 784,043 ACTIVE - Positivity Rate CASES 165,715 21.1% DEATHS 13,423 +103 1.71% Case Fatality Rate RECOVE +599 Case Recovery Rate RIES 604,905 77.2% Summary of Cases per Region 500,000 450,000 400,000 350,000 300,000 250,000 200,000 150,000 100,000 50,000 0 Confirmed Deaths Recoveries P-D-I-T-R STRATEGY With reference to the National Action Plan (NAP) for COVID-19, the National Task Force is intensifying efforts to PREVENT the spread of the COVID-19, TEST individuals and communities, ISOLATE those that are identified to be confirmed cases, TREAT and provide with appropriate health care, and REINTEGRATE them back to the community. PREVENT PREVENT enables to change mindsets and behaviors to advocate for a shared responsibility in ensuring compliance to minimum public health standards and protocols and address stigma and division in the communities, workplaces, schools. To implement the PREVENT strategy, community quarantine declarations are made in various localities, enforcing stricter regulations and disease preventive measures particular for areas with high cases.
    [Show full text]
  • Position on Renaming Compostela Valley to Davao De
    Unit 1510, West Tower, Philippine Stock Exchange Center, Ortigas Pasig City Tel. Nos. (02) 687-5399; 631-0170; 631-0197 Fax Nos. (02) 687-4048. February 1, 2017 HON. PEDRO B. ACHARON JR. Chairperson Committee on Local Government House of Representatives Batasan Complex, Quezon City Dear Cong. Acharon, Greetings from the League of Provinces! The League of Provinces of the Philippines (LPP) formally registers the approval to the passage of the House Bill No. 4633, entitled: “AN ACT RENAMING THE PROVINCE OF COMPOSTELA VALLEY INTO DAVAO DE ORO PROVINCE, AMENDING FOR THE PURPOSE PERTINENT PORTIONS OF REPUBLIC ACT NO. 8470”. Introduced by Reps. Ma. Carmen S. Zamora and Ruwel Peter S. Gonzaga. In support to the above proposed legislative measure, may we respectfully forward to your good office the herein attached position paper/comments of the Province Compostella Valley for your information and consideration. Thank you very much. Sincerely Yours, SANDRA T. PAREDES Executive Director Republic of the Philippines Province of Compostela Valley OFFICE OF THE GOVERNOR 4th Floor, Capitol Building, Cabidianan, Nabunturan, Compostela Valley Province Members of the Committees Committee on Local Government House of Representatives Batasang Pambansa, Quezon City Thru: Rep. Pedro Acharon Chair Committee on Local Government House of Representatives Mr. Chair Recently, the two representatives of Compostela Valley namely Rep. Maricar Zamora (1st District) and Rep. Ruwel Peter Gonzaga (2nd District) filed House Bill No. 4633 or “AN ACT RENAMING THE PROVINCE OF COMPOSTELA VALLEY INTO DAVAO DE ORO PROVINCE, AMENDING FOR THE PURPOSE PERTINENT PORTIONS. The mentioned House bill is in positive response with the resolution passed and endorsed by the Sangguniang Panlalawigan of Compostela Valley led by Vice Gov.
    [Show full text]