Madhya Pradesh Jal Nigam (A Govt

Total Page:16

File Type:pdf, Size:1020Kb

Madhya Pradesh Jal Nigam (A Govt MADHYA PRADESH JAL NIGAM (A GOVT. OF M.P. UNDERTAKING) TENDER DOCUMENT ON FORM-‘F’ FOR LUMP– SUM CONTRACT FOR Engineering, Procurement, Construction, Testing, Commissioning, Trial Run and Operation & Maintenance of Various Components of "Machagora Multi- Village Scheme, District Chhindwara" in Single Package on ‘Turn-Key Job Basis’ Including Trial Run and Operation & Maintenance of the Entire Scheme for 10 Years NIT No. 44/Proc./MPJNM/2019-20, Dated: 19.03.2020 Probable Amount of Contract: Rs. 846.68 Crore Earnest Money Deposit: Rs. 50.00 Lakh Date of Pre-Bid Meeting: 08.04.2020 MANAGING DIRECTOR MADHYA PRADESH JAL NIGAM nd 2 FLOOR, D-WING, VINDHYACHAL BHAWAN BHOPAL - 462004 (MP) MADHYA PRADESH JAL NIGAM (A GOVT. OF M.P. UNDERTAKING) OFFICE OF THE MANAGING DIRECTOR M.P. JAL NIGAM, BHOPAL TENDER DOCUMENT FOR LUMP-SUM CONTRACT NIT No. 44/Proc./MPJNM/2019-20 Dated: 19.03.2020 S.No. Scheme PAC (In Rs. Crore) Time for Completion 1. Machagora 846.68 36 months Total PAC 846.68 1. Due date of tender: As per critical dates on MP Procurement E-government portal. 2. Amount of Earnest Money: Rs. 50 Lakh 3. Cost of Tender Document: Rs. 50,000/- 4. The eligibility criteria will be considered on the basis of total PAC. 5. Scheme wise cost for payment will be assessed based on the ratio in the above table, and the price quoted by Contractor in its Financial Proposal. 6. The time for completion is including rainy season and will be reckoned from the date of start of work, which is 21st day from the date of issue of LOA for engineering, procurement, construction, testing, commissioning and trial run. 7. The O&M period will be considered on scheme wise basis, from the completion of trial run of the respective schemes. O&M period for the schemes can be extended based on mutual agreement. Managing Director Madhya Pradesh Jal Nigam Bhopal Page 2 MADHYA PRADESH JAL NIGAM (A GOVT. OF M.P. UNDERTAKING) INDEX S. Page Particulars No. No. 1 Part I - Essential Instructions for the Bidders 4 2 Part II – Notice Inviting Tender 8 3 Part III – Detailed Notice Inviting Tender 15 4 Tender for Lump-sum Contract - Form F 52 5 Conditions of the Contract 53 6 Annexure 1 - Joint Venture 58 Annexure A - Model rules relating to labour, Water Supply and sanitation in 7 60 labour camps 8 Annexure B - Contractors labour regulations 62 9 Annexure E - General Specifications 63 10 Annexure F - Main Items of Work 197 11 Annexure H - Break up schedule for payment 206 12 Appendix I - List of villages and its water demand 217 Drawings Note: Softcopy of DPR would be available after online payment of tender 13 document fee on the website http://www.mptenders.gov.in for tentative idea only. The link for softcopy of DPR would be made available to the prospective bidders after online payment of tender document fee. Page 3 PART I - ESSENTIAL INSTRUCTIONS FOR THE BIDDERS 1. Conditional tender shall not be accepted under any circumstances whatsoever. 2. Price escalation shall be payable as per formula given in this Notice Inviting Tender (hereinafter, NIT). 3. The bidders shall ensure that their tenders are in conformity with the conditions and clauses of this NIT and the contract agreement form in general and with regard to security deposit, mode of payment for extra work, if any, completion time, guarantee about mechanical and electrical equipment & water tightness, tests, structure stability, etc. for entire civil works in particular. 4. This tender is on turnkey job basis, hence no advance payment towards the mechanical & electrical equipment will be considered and no advance mobilization will be allowed for any purpose. 5. Return of security deposit furnished by way of unconditional and irrevocable bank guarantee shall be processed only in the manner and time prescribed in this NIT. 6. The bidder / contractor shall get the gradient/ reduced levels verified on his own at his own expenditure and responsibility. The Madhya Pradesh Jal Nigam (hereinafter, MPJN) shall not be responsible for any variations in gradient/ reduced levels. The bidder / contractor shall include all habitations / villages inside periphery of Project Area and shall include them in the design for coverage of water supply for all population inside this periphery. 7. No payment shall be made on submission of drawing and design for civil work and general arrangement drawing for mechanical and electrical equipment. All the processes, drawings and designs shall be duly checked and verified by any Indian Institute of Technology (IIT)/ National Institute of Technology (NIT). Contractor shall start work only after due approval, of their designs and drawings, by the competent authority. 8. Bidders shall keep their offer open for acceptance for a period as prescribed in this NIT i.e. 180 days from the date of submission of bid. The validity of the bid can be extended by mutual consent in writing. 9. As a matter of abundant caution, the bidders are advised to carefully read the tender document, review the DPR in the MPJN office or through softcopy and visit the site before submitting the tender. 10. The bidder shall calculate and submit online in ‘Cover 2’ its Bid Capacity as given in Schedule – G of Pre-qualification documents. The financial bids shall be opened in the descending order according to PAC of the bids due for opening on the scheduled date. The financial offer of the bidder whose bid capacity is exhausted or is lower than the probable amount of contract given in the NIT shall not be opened. Page 4 11. The contractor shall be fully responsible and accountable to obtain all required permissions from the concerned departments/authorities and shall be fully responsible for abiding by all the laws, rules, bye laws and regulations (for the time being in force in India) relating to water, power, extracting of minerals, royalty, blasting, transportation, safety, traffic regulations related to the work. 12. Variations in length and size/ class of pipeline and electrical line will be dealt with as follows: i. Addition/ deduction in sizes and lengths of pipelines shall be made as per ISSR Volume 1 to 4 published by Urban Administrative and Development Department, Govt. of M.P. enforced from 10th May 2012 with amendments up to the date of bid submission. ii. The additions/ deductions in capacity and lengths of electrical power lines shall be made as per MPKVVCL SOR 2016 with amendments up to the date of bid submission. iii. The items of work not included in the above ISSR, shall be adjusted on the basis of proper rate analysis, supported with documents, submitted by the Contractor and approved by the Managing Director. iv. The decision of Managing Director in above cases shall be final. 13. Variation/ Extra work shall be finalized by the variation approval committee (VAC) formed within the MPJN. On the recommendation of variation approval committee, the variation up to 10% of total agreement cost shall be approved by Managing Director (MD), Madhya Pradesh Jal Nigam (MPJN) and above 10% variation shall be approved by BETAC (Board Empowered Tender Approval Committee). Any additional work on account of distribution network expansion or any other reason whatsoever during the operation and maintenance period as approved by Engineer-in- Charge / MPJN, must be executed by the Contractor. The payment for the additional work will be done based on the applicable SORs at the time of execution. 14. The MPJN’s estimation for consumption of energy is specified in Annexure F. For reimbursement of energy charges calculation shall be done on pro rata basis from 1st year to end of design period. If energy consumption is more than as specified in Annexure F, then excess energy charges shall be paid by the firm. If any change in scheme components or water demand increases due to any reason & approved by MPJN, then reimbursement of payment for energy consumption excluding penalties, shall be made accordingly. 15. Madhya Pradesh Jal Nigam may appoint Supervision and Quality Control Consultant and authorize the Consultant to act as representative of the Engineer-in-Charge. 16. Amendments to NIT, if any, shall be published on web site only and not in the newspapers. 17. Site Visit and examination / knowledge of works Page 5 a. The bidders are advised to visit the sites of work, and assess its topographical, hydrological, geological conditions, etc. and obtain for itself on their own responsibility all information that may be necessary for preparing the bid and entering into the contract. Any costs incurred by the bidders against these investigations and site visits shall be at their own cost and department will not be liable to pay any such costs. It is also to be noted that no claims on variation of above data shall be admissible & considered for payment. b. The bidders are advised to inspect the site of construction before submitting their offer to ascertain the quantum of such works. The bidders shall be deemed to have full knowledge of all the relevant documents, proposed site of construction, soil samples or strata at site. 18. Land Acquisition/Forest Permission a. The contractor shall not be responsible for any acquisition of land, which shall be done by Madhya Pradesh Jal Nigam. However, the responsibility of taking the permission to lay pipeline along the road, railway lines etc., shall be that of the contractor. Madhya Pradesh Jal Nigam shall assist the contractor on receipt of such request, by issuing such letters, if so desired by the contractor. b. The contractor shall be responsible for timely submission of requirement of forest land permission/ any acquisition of land, where so ever required.
Recommended publications
  • Field Survey for Plant Pathogenic Fungi Associated with Parthenium Hysterophorus L
    1. Bioi. Control, 13: 141·144, 1999 Research Note Field survey for plant pathogenic fungi associated with Parthenium hysterophorus L. in Madhya Pradesh, India L. P. KAURAW and ARCHANA CHILE National Research Centre for Weed Science Maharajpur, Jabalpur 482004, Madhya Pradesh, India ABSTRACT: The survey conducted at eight sites, namely, Jabalpur, Katni, Mandla, Seoni, Gadarwara, Narsinghpur, Bhopal and Chargawan road in Madhya Pradesh, revealed the association of Fusarium pallidoroseum, Colletotrichum gieosporoides, Alternaria aiternata, Curvularia lunata, Sclerotium rollsii and Sclerotinia sclerotiorum fungi with Parthenium hysterophorus. KEY WORDS: Parthenium hysterophorus, plant pathogenic fungi, survey Parthenium is a pernicious exotic weed contamination of air, water and soil. There that has assumed the status of a weed due is a need to find out the suitable alternative to profuse growth, fast multiplication and method for the management of Parthenium rapid spread through seeds. It competes in India. Only a few reports are available fast with natural useful vegetation and on the occurrence of fungi to be used as suppresses it. It has the ability of prolific mycoherbicide for the management of seed bearing and rapid dissemination. Parthenium. The present work was Parthenium is a dominant type, once this undertaken to search the suitable host weed gets established, it does not allow specific indigenous fungi that can be used other plants to grow, due to secretion of for management of Parthenium in India. toxic material from roots. Parthenium plant is toxic to human beings and animals, and The survey was conducted in the state causes dermatitis, sneezing, reddening and of Madhya Pradesh. Maximum sites were swelling of eyes.
    [Show full text]
  • NAME DESIGNATION DEPARTMENT EMAIL ADDRESS Mdez Jbp
    NAME DESIGNATION DEPARTMENT EMAIL ADDRESS mdez jbp Managing Director MD EZ Office [email protected] CHIEF GENERAL MANAGER ADB- Shiv Yadav DIRECTORTECHNICAL RGGVY [email protected] Prakash Kawade C.E. C.E. SAGAR REGION [email protected] Praveen Sinha C.E. C.E. JABALPUR REGION [email protected] Santosh Tandan C.E. C.E. REWA REGION [email protected] CHIEF GENERAL MANAGER FEEDER Abhay Bishnoi C.G.M SEPARATION [email protected] CHIEF GENERAL MANAGER ADB- Ashok Dhurway C.G.M RGGVY [email protected] Amar Bahadur Singh C.G.M. HR&A CHIEF GENERAL MANAGER HR&A [email protected] CEJR jabalpur CE mpez [email protected] CErr Rewa CE mpez [email protected] CEsr Sagar CE mpez [email protected] cfo mpez cfo mpez [email protected] cgm ddugjy CGM mpez [email protected] CHIEF GENERAL MANAGER Ajay Sharma CGM RAPDRP [email protected] cgm adb cgmADB mpez [email protected] ed comm cgmcomm mpez [email protected] cgm fs cgmfs mpez [email protected] cgm hr cgmhr mpez [email protected] ed purchase Cgmpurchase mpez [email protected] cgm rapdrp cgmrapdrp mpez [email protected] Vivek Chandra G.M.& Head-IT G.M Head IT [email protected] cgmenfo ENFORCEMENT edenfo mpez [email protected] gm works EDWORKS mpez [email protected] Vipin Dhagat Chief CS&A CHIEF C.S.&A.
    [Show full text]
  • Wt4ltr Deputy Secretar5r (DAS) Phone: O 1 1-2338 1O1, 2Ggststs
    F. No.: 41912015- PMU(DASI Ministry of Informatlon and Broadeasting Shastri Bhawan, New Delhi **** Date: 2td November, 2015 hrblic Notice Reference list of urban areas to be covered in phase III of cable TV digitisation, which was issued by the Ministry on 30.4.2015. The updated list of urban areas for 16 States/UTs has been notified vide Rrblic Notice dated 16. 10.2015 Now, based on comments/data received from the State/UT Governments, the list of the following States/UTs has been updated; 1. Andhra Pradesh 2. Chhattisgarh 3. Jammu & Kashmir 4. Kerala 5. Madhya Pradesh 6. Manipur 7. Telengana 8. Daman & Diu 2. A copy of the updated list of these States/UTs is attached. Wt4ltr Deputy Secretar5r (DAS) Phone: O 1 1-2338 1O1, 2ggSTSTs 2ND UPDATED URBAN AREAS LIST FOR PHASE III OF CABLE TV DIGITISATION Andhra Pradesh S.No. Districts Urban Areas TV Households Remarks 1 Srikakulam Srikakulam (M + OG) 28,149 Palasa Kasibugga (M) 9,706 Ichchapuram (M) 6,242 Sompeta (CT) *Deleted Hiramandalam (CT) *Deleted Upgraded Palakonda 3,349 Tekkali (CT) *Deleted Rajam (NP) 7,367 Amadalavalasa (M) 6,844 Narasannapeta (CT) *Deleted Balaga (CT) *Deleted Ponduru (CT) *Deleted 2 Vizianagaram Parvathipuram (M) 9,382 Bobbili (M) 10,337 Salur (M) 8,644 Gajapathinagaram (CT) *Deleted Sriramnagar (CT) *Deleted Cheepurupalle (CT) *Deleted Tummikapalle (CT) *Deleted Kothavalasa (CT) *Deleted Vizianagaram (M + OG) 44,379 Kanapaka (CT) *Deleted Malicherla (CT) *Deleted Jarjapupeta (CT) *Deleted Upgraded Nellimarla 3,402 Chintalavalasa (CT) *Deleted Visakhapatnm All areas except Visakhapatnam 3 Greater Visakhapatnam (M. (MC)covered in Corp) ? Phase II Yelamanchali ? **Added Narsipatnam ? **Added 4 East Godavari Kakinada (M Corp.
    [Show full text]
  • Sl. No NAME of the UNIT Catgeory 1 Agrawal Distilleries Pvt Ltd, Barwaha, Khargone, Madhya Pradesh
    Final State-wise List of industries which have not submitted information through Compliance Reporting Protocol to CPCB Sl. No NAME OF THE UNIT Catgeory 1 Agrawal Distilleries Pvt Ltd, Barwaha, Khargone, Madhya Pradesh - Distillery 451001 2 Cox India Ltd, Nowgong (BKD) ,Chattarpur ,MP-471201 Distillery 3 Kedia Great Galleon Ltd.,160, Kanchan Bagh, Kanchan Bagh, Indore, Distillery Madhya Pradesh 452001 4 NavinFluorineDewas[Mainplant] Dye & Dye 5 Madhya Bharat Phosphate Pvt. Ltd., 176 AKVN Industrial Area, Fertilizer Meghanagar, Dist. Jhabua-457779, Madhya Pradesh 6 MadhyaBharatPhosphateLtd Raisen, 462046 Fertilizer 7 Bharat Oman Refineries Ltd, Agasod Bina Sagar Oil Refinery 8 M/s Vista Organics (P) Ltd., Plot no. 6, New Industrial Area- Pharma II,Mandideep, Dist. Raisen - 462040 9 Jaypee Nigrie Super Thermal Power Station Powerplant 10 Jaypee Bina Thermal Power plant, Vill- Sirchopi, Sub PO- Agasod, Powerplant Bina,Bina 11 RamnikPower&Alloys(P)Ltd,6MWBiomassBasedCaptivePowerPlant,Sa Powerplant randiIndArea,the-Waraseoni,Balaghat 12 KamalSponge&ThermalPowerPlant Powerplant 13 AmarkantakThermalPowerStation,Chachai Powerplant 14 Gwalior Sugar Co, Dabra, Dist - Gwalior, 475110, M.P Sugar 15 Jawaharlal Nehru Sahakari Agricultural Produce Processing Society Sugar Ltd. (Sugar Unit) P.O. Borawan, Dist. Khargone-451001 16 Krishak S.S.K. Maryadit, Narayanpura, Raghogarh, Awan, Guna, Sugar Madhya Pradesh - 473226, India 17 Mahakaushal Sugar & Power Industries, Bachai, Highway No. 26, Sugar Narsinghpur - 487001, 18 Morena Mandal Sahkari Shakkar Karkhana Ltd., Kailarash, Dist- Sugar Morena, M.P. 19 Narmada Sugar Mills, Gadarwara, Narsinghpur, Sugar 20 Naval singh sahakari shakkar karkhana, No-8 Naval Nagar, Post Sugar Nibola, Burhanpur - 450331, 21 NikhilSugarLtd,Barangi,Khinkia,Harda, M.P Sugar 22 Ramdev Sugar Pvt Ltd, Bankhedi, Hoshangabad, Sugar 23 Shakti Sugar Mill Pvt Ltd,Gadarwara,Narsinghpur, Sugar 24 Shrijee Sugar and power (P) Ltd., Village Sohagpur, Dist.
    [Show full text]
  • Madhya Pradesh (Preparation of City Development Plans)
    Inclusive Urban Planning in Madhya Pradesh Government of Madhya Pradesh (Preparation of City Development Plans) A successful initiative by Govt. of Madhya Pradesh Entry for Innnovations in Urban Planning Submitted to : Ministry of Urban Development Government of India Submitted by: Urban Administration and Development Department, GoMP (Preparation of City Development Plans) Govt. of Madhya Pradesh Contents 1. Background 2. The Inception 3. Cities covered 4. Target 5. The implementation process 6. Consultative approach 7. CDP requisites 8. Results achieved 9. Glimpses of City vision 10. Glimpses of City investment (Preparation of City Development Plans) Govt. of Madhya Pradesh Background/ Scenario ecognizing the growing phenomenon of urbanization, Government of India launched JNNURM in the year 2005. In order to frame-out the planned development of the cities and also to make the cities sustainable the preparation of City RDevelopment plan was made mandatory by the Govt. of India. The concept of CDP preparation was further debated in Madhya Pradesh and the need of CDPs was highly recognized. The matter was taken up at the highest level of Government and it was decided to not restrict the CDP preparation to the Million plus cities but to also extend it to all the 360 Municipalities of the State. It was also decided by the State Govt to provide funds for it and to engage leading consultants for this job. Madhya Pradesh is the first state in the country where urban development plans are being made on such a large scale. One of t he key feature in this process is the formulation of plans through consultative approach.
    [Show full text]
  • Notification for the Posts of Gramin Dak Sevaks Cycle – Ii/2019-2020 Madhya Pradesh Circle
    NOTIFICATION FOR THE POSTS OF GRAMIN DAK SEVAKS CYCLE – II/2019-2020 MADHYA PRADESH CIRCLE ESTT/14-02/GDS VACANCY/2ND CYCLE/20 Applications are invited by the respective engaging authorities as shown in the annexure ‘I’against each post, from eligible candidates for the selection and engagement to the following posts of Gramin Dak Sevaks. I. Job Profile:- (i) BRANCH POSTMASTER (BPM) The Job Profile of Branch Post Master will include managing affairs of Branch Post Office, India Posts Payments Bank ( IPPB) and ensuring uninterrupted counter operation during the prescribed working hours using the handheld device/Smartphone/laptop supplied by the Department. The overall management of postal facilities, maintenance of records, upkeep of handheld device/laptop/equipment ensuring online transactions, and marketing of Postal, India Post Payments Bank services and procurement of business in the villages or Gram Panchayats within the jurisdiction of the Branch Post Office should rest on the shoulders of Branch Postmasters. However, the work performed for IPPB will not be included in calculation of TRCA, since the same is being done on incentive basis.Branch Postmaster will be the team leader of the Branch Post Office and overall responsibility of smooth and timely functioning of Post Office including mail conveyance and mail delivery. He/she might be assisted by Assistant Branch Post Master of the same Branch Post Office. BPM will be required to do combined duties of ABPMs as and when ordered. He will also be required to do marketing, organizing melas, business procurement and any other work assigned by IPO/ASPO/SPOs/SSPOs/SRM/SSRM and other Supervising authorities.
    [Show full text]
  • Final Population Totals, Series-24
    Census of India 2001 Series 24 : Madhya Pradesh FINAL POPULATION TOTALS (State, District, Tehsil and Town) Prabhal(ar Bansod Of the Indian Administrative Service Director of Census Operations, Madhya Pradesh Bhopal Websltl:: http://www.censlJsmdia.net/ © All rights reserved wIth Government of India Data Product Number 23-006-Cen-Book Preface The final population data presented in this publication IS based on the processing and tabulation of actual data captured from each and every 202 million household schedules. In the past censuses the final population totals and their basIc characteristics at the lowest geographical levels popularly known as the Village/town Primary Census Abstract was compiled manually. The generation of Primary Census Abstract for the Census 2001 is a fully computerized exercise starting from the automatic capture of data from the Household Schedule through scanning to the compilation of Primary Census Abstract. ThiS publication titled "Final Population Totals" is only a prelude to the Primary Census Abstract. The publication, which has only one table, presents data on the total population, the Scheduled Castes population and the Scheduled Tribes population by sex at the state, district, tehsll and town levels. The vitlage-wise data IS being made available In electronic format It is expected to be a useful ready reference document for data users who are only Interested to know the basic population totals. ThiS publrcatlon IS brought out by Office of the Registrar General, India (ORGI) centrally, I am happy to acknowledge the dedicated efforts of Mr Prabhakar Bansod, Director of Census Operations, Madhya Pradesh and his team and my colleagues in the ORG! in bringing out thiS publication.
    [Show full text]
  • Western Coalfields Ltd Pench Area Office
    WESTERN COALFIELDS LTD Run Date: 27-09-2021 10:47 Page : 1 of 113 PENCH AREA OFFICE PARTY WEB PAYMENT BETWEEN 01-APR-21 To 25-SEP-21 CO6 NO PARTY_CODE/PATIENT NAME OF PARTY BILL NO INVOICE NO INVOICE CHEQUE NO CHEQUE DATE GROSS BILL DEDUCTION NET AMOUNT 356296 PE7023 PAWAN TRADERS BILL/20- 220/228/227/22 09-JUN-20 97384 28-MAY-21 10380.00 0.00 10380.00 21/3350/001465 399274 516569 RUKHMANI METALS & BILL/20- N/2021/MF/0130 04-DEC-20 95169 29-APR-21 2132.00 0.00 2132.00 GASEOUS LTD. 21/3350/003010 405791 502066 ANDHRA PRADESH HEAVY BILL/20- 0405 18-DEC-20 94439 20-APR-21 928525.28 0.28 928525.00 MACHINERY& ENGG. LTD 21/3350/003195 407813 AE7048 ANKUR TRADERS BILL/20- 88 07-JAN-21 94522 20-APR-21 1800.00 0.00 1800.00 21/3350/003315 407899 DE7017 DIRECTOR, CENTRAL BILL/20- 2020-21/TAX-34 03-NOV-20 94579 22-APR-21 85859.00 5457.00 80402.00 INSTITUTE OF MINIG & 21/3350/003317 FUEL 407919 DE7017 DIRECTOR, CENTRAL BILL/20- 2020-21/TAX-33 03-NOV-20 94580 22-APR-21 61725.00 3923.00 57802.00 INSTITUTE OF MINIG & 21/3350/003318 FUEL 410994 S0216 SWARAJ TRADING CO. BILL/20- 00018 04-JAN-21 94520 20-APR-21 25685.10 0.10 25685.00 21/3350/003438 411003 DE7004 DISHA ENTERPRISES BILL/20- 35 13-JAN-21 94530 20-APR-21 17384.00 0.00 17384.00 21/3350/003439 411018 P0092 PRATISHTHA BILL/20- 100629 02-JAN-21 94514 20-APR-21 89573.88 4072.88 85501.00 21/3350/003440 411086 615015 TIWARI ENTERPRISES BILL/20- TE/LT/1282 18-NOV-20 94814 23-APR-21 9211.12 1219.12 7992.00 21/3350/003444 411209 ME7040 MEDIHAUXE PHARMA PVT BILL/20- SB/20-21/17532 06-JAN-21 94584 22-APR-21 95872.00 0.00 95872.00 LTD 21/3350/003446 411217 S0216 SWARAJ TRADING CO.
    [Show full text]
  • Final Electoral Roll
    FINAL ELECTORAL ROLL - 2021 STATE - (S12) MADHYA PRADESH No., Name and Reservation Status of Assembly Constituency: 121- Last Part GADARWARA(GEN) No., Name and Reservation Status of Parliamentary Service Constituency in which the Assembly Constituency is located: 17- Electors HOSHANGABAD(GEN) 1. DETAILS OF REVISION Year of Revision : 2021 Type of Revision : Special Summary Revision Qualifying Date :01/01/2021 Date of Final Publication: 15/01/2021 2. SUMMARY OF SERVICE ELECTORS A) NUMBER OF ELECTORS 1. Classified by Type of Service Name of Service No. of Electors Members Wives Total A) Defence Services 143 6 149 B) Armed Police Force 0 0 0 C) Foreign Service 0 0 0 Total in Part (A+B+C) 143 6 149 2. Classified by Type of Roll Roll Type Roll Identification No. of Electors Members Wives Total I Original Mother roll Integrated Basic roll of revision 143 6 149 2021 II Additions Supplement 1 After Draft publication, 2021 0 0 0 List Sub Total: 0 0 0 III Deletions Supplement 1 After Draft publication, 2021 0 0 0 List Sub Total: 0 0 0 Net Electors in the Roll after (I + II - III) 143 6 149 B) NUMBER OF CORRECTIONS/MODIFICATION Roll Type Roll Identification No. of Electors Supplement 1 After Draft publication, 2021 0 Total: 0 Elector Type: M = Member, W = Wife Page 1 Final Electoral Roll, 2021 of Assembly Constituency 121-GADARWARA (GEN), (S12) MADHYA PRADESH A . Defence Services Sl.No Name of Elector Elector Rank Husband's Address of Record House Address Type Sl.No. Officer/Commanding Officer for despatch of Ballot Paper (1) (2) (3) (4) (5) (6)
    [Show full text]
  • District Disaster Management Plan [Narsinghpur]
    District Disaster Management Plan [Narsinghpur] For School of Good Governance & Policy Analysis, Government of Madhya Pradesh, Bhopal Prepared by Kumar Vibhanshu Indian Institute Of Forest Management, Bhopal Technical Assistance: Administrative Assistance: SEEDS Technical Services School of Good Governance and Policy Analysis District Administration of Narsinghpur 1 | P a g e P a g e | 2 Table of Contents A 1.1 DISTRICT PROFILE .................................................................................................5 A 1.1.1 Location and administrative divisions .......................................................................5 A 1.1.2 Geography and Topography .......................................................................................5 A 1.1.3 Demographic and socio economics .............................................................................6 A 1.1.4 Climate and weather ...................................................................................................8 A 1.1.5 Health (Medical) ..........................................................................................................9 A 1.1.6 Education ......................................................................................................................9 A 1.1.7 Agriculture and Land use .........................................................................................10 A 1.1.8 Housing Pattern: ....................................................................................................11 A 1.1.9 Industrial
    [Show full text]
  • Service Electors Voter List
    FINAL ELECTORAL ROLL - 2021 STATE - (S12) MADHYA PRADESH No., Name and Reservation Status of Assembly Constituency: 125-SAUSAR(GEN) Last Part No., Name and Reservation Status of Parliamentary Service Constituency in which the Assembly Constituency is located: 16- Electors CHHINDWARA(GEN) 1. DETAILS OF REVISION Year of Revision : 2021 Type of Revision : Special Summary Revision Qualifying Date :01/01/2021 Date of Final Publication: 15/01/2021 2. SUMMARY OF SERVICE ELECTORS A) NUMBER OF ELECTORS 1. Classified by Type of Service Name of Service No. of Electors Members Wives Total A) Defence Services 351 9 360 B) Armed Police Force 0 0 0 C) Foreign Service 0 0 0 Total in Part (A+B+C) 351 9 360 2. Classified by Type of Roll Roll Type Roll Identification No. of Electors Members Wives Total I Original Mother roll Integrated Basic roll of revision 350 9 359 2021 II Additions Supplement 1 After Draft publication, 2021 2 0 2 List Sub Total: 2 0 2 III Deletions Supplement 1 After Draft publication, 2021 1 0 1 List Sub Total: 1 0 1 Net Electors in the Roll after (I + II - III) 351 9 360 B) NUMBER OF CORRECTIONS/MODIFICATION Roll Type Roll Identification No. of Electors Supplement 1 After Draft publication, 2021 0 Total: 0 Elector Type: M = Member, W = Wife Page 1 Final Electoral Roll, 2021 of Assembly Constituency 125-SAUSAR (GEN), (S12) MADHYA PRADESH A . Defence Services Sl.No Name of Elector Elector Rank Husband's Address of Record House Address Type Sl.No. Officer/Commanding Officer for despatch of Ballot Paper (1) (2) (3) (4) (5) (6) (7) Assam
    [Show full text]
  • ANSWERED ON:26.04.2012 PROPOSALS from MADHYA PRADESH Tomar Shri Narendra Singh
    GOVERNMENT OF INDIA RAILWAYS LOK SABHA UNSTARRED QUESTION NO:3623 ANSWERED ON:26.04.2012 PROPOSALS FROM MADHYA PRADESH Tomar Shri Narendra Singh Will the Minister of RAILWAYS be pleased to state: (a) the details of proposals for railway projects received by the Railways from Madhya Pradesh Government during the period of 2004 to 2011; (b) the details of proposals approved and the details of proposals lying pending with the Railways; and (c) the time by which a decision on the pending proposals is likely to be taken? Answer MINISTER OF STATE IN THE MINISTRY OF RAILWAYS (SHRI K.H. MUNIYAPPA) (a) to (c): A Statement is laid on the Table of the House. STATEMENT REFERRED TO IN REPLY TO PART (a) TO (c) OF UNSTARRED QUESTION NO.3623 BY SHRI NARENDRA SINGH TOMAR TO BE ANSWERED IN LOK SABHA ON 26.04.2012 REGARDING PROPOSALS FROM MADHYA PRADESH (a) to (c): As per records, details of Railway proposals received from Government of Madhya Pradesh from 2004 onwards is not available. However, on 15.11.2011 Chief Minister, Madhya Pradesh had sent a list of Railway projects in Madhya Pradesh and their status is as under:- S. No. Name of the Project Present Status 1. Gauge Conversion of On this project, Gondia-Balaghat (422 km) Jabalpur-Gondia rail line and Balaghat-Katangi (47 km) has been completed and commissioned. Contracts for earthwork and bridges in Balaghat- Nainpur-Jabalpur awarded but work is held up for want of forestry clearance. 2. New rail line from Makroniya A survey for construction of a new BG RS of Sagar to Khajuraho via line from Chhindwara-Gadarwara-Udaipur- Karrapur-Dabanga-Dalpatpur- Jaisinagar-Saugor-Banda Badamalhara Shahgarh-Heerapur-Bada Malhera Khajuraho Rail line included in Budget 2012-13.
    [Show full text]