Unit 15 T: 021 434 5366 Melbourne Business Park E:
[email protected] Model Farm Road www.ocallaghanmoran.com Cork Ms Liz Leacy Office of Climate Licensing Research & Resource, Environmental Inspection Agency, PO Box 3000, Johnstown Castle Estate, County Wexford 14th January 2016 Re: Application for Licence ( Reg. No: P1006-01 ) Galway Metal Company Limited, Oranmore, Dear Ms Leacy, I refer to the Agency’s letter dated the 8th January 2016 in accordance with Regulation 10(2)(b)(ii) of the EPA (Industrial Emissions)(Licensing) Regulations 2013. The requested information is set out herein. 1. Please provide up-to-date monitoring results for all emission and ambient monitoring points associated with the installation. Tables 1 to 5 contain the sewer emission, surface water, groundwater, noise and dust monitoring results for all of the emissions and ambient monitoring points at the Galway Metal Company (GMC) installation carried out in 2015, which are the most up-to date monitoring results. The Tables include the relevant emission limit values specified in the Waste Permit, and in the case of groundwater the EPA’s Interim Guideline Values and the Threshold Values from the Groundwater Regulations 2010. For inspection purposes only. Tables 6 contains the most recentConsent air of emission copyright owner moni requiredtoring for any other results use. for the fragmentation plant that will be operated at the installation. This monitoring was carried out at GMC’s sister plant in Limerick, where the fragmentation plant was located. Table 7 contains the dust deposition monitoring results for the Limerick facility. The Tables include the relevant emission limit values specified in the Waste Permit.