S.A

 HEAD OFFICE : 36 OMORFOKLISIAS STR., 142 34 , TEL.: +30 210 27 19 941-2, FAX.: +30 210 27 19 056  WORK SHOP : AGHIAS SOFIAS & NOE STR., 193 00 , GREECE, TEL. +30 210 55 95 562  https://www.etmer.gr e-mail : [email protected]

THE COMPANY

The Construction company, ET.M.ER, was established in 1981 and operates in its current form since 2002. Its main activity includes heavy mechanical engineering projects, such as chemical industries (i.e. refineries), pharmaceutical and food industries, energy-production companies, oil companies, etc. The presence of ET.M.ER in the mechanical engineering projects field, longstanding and highly respected, has (practically) been recognized by the sector in which ET.M.ER is activated. It is indicative that major companies from Greece and abroad have repeatedly entrusted ET.M.ER with their own major infrastructure projects, such as the establishment of their facilities, as well as their upgrade and maintenance. ET.M.ER has gain its collaborators and stakeholders esteem due to the responsible studying and executing any project, the compliance with the agreed delivery deadlines, the experience which is a guarantee that ET.M.ER offers superior services. Top priority was, and keeps being, the quality insurance of any construction and the compliance with "Health and Safety" systems, during all the undertaken projects. ET.M.ER has its registered seat in Athens. Its prefabrication and assembly unit is located in the company's privately owned premises in Aspropyrgos of 12.000 sq.m. ET.M.ER is managed by its founders, Mr. Konstantinos Stamatopoulos, businessman, and Mr. Efstathios Servos, mechanical engineer. The company is staffed with skilled engineers and scientifically trained personnel with respective specialties.

S.A

 HEAD OFFICE : 36 OMORFOKLISIAS STR., 142 34 ATHENS – GREECE, TEL.: +30 210 27 19 941-2, FAX.: +30 210 27 19 056  WORK SHOP : AGHIAS SOFIAS & NOE STR., 193 00 ASPROPYRGOS, GREECE, TEL. +30 210 55 95 562  https://www.etmer.gr e-mail : [email protected]

GENERAL INFORMATION ABOUT THE COMPANY

CORPORATE NAME : ET.M.ER TECHNICAL SOCIETE ANONYME

DISTINCTIVE TITLE : ET.M.ER S.A.

VAT No : 0 9 5 4 9 3 4 5 1

COMMERCIAL REG. No : 5 3 2 3 6 / 0 1 A T / B / 0 2 / 4 2 8

TECHNICAL REG. No : 2 8 0 6 7

H E A D Q U A R T E R

ADDRESS : 36, OMORFOKLISSIAS STREET, NEA IONIA/ATHENS/GREECE

POSTAL CODE : 1 4 2 3 4

TELEPHONE NUMBERS : +30 210 27.19.941 - 2

FACSIMILE : +30 210 27.19.056

E-mail : [email protected]

WEBSITE : www.etmer.gr

B R A N C H – C O N S T R U C T I O N S

ADDRESS : AGHIAS SOFIAS & NOE STR., THESI DYO PEFKA / ASPROPYRGOS / GREECE

POSTAL CODE : 1 9 3 0 0

TELEPHONE : +30 210 55.95.562

FACSIMILE : +30 210 55.95.562

S.A

 HEAD OFFICE : 36 OMORFOKLISIAS STR., 142 34 ATHENS – GREECE, TEL.: +30 210 27 19 941-2, FAX.: +30 210 27 19 056  WORK SHOP : AGHIAS SOFIAS & NOE STR., 193 00 ASPROPYRGOS, GREECE, TEL. +30 210 55 95 562  https://www.etmer.gr e-mail : [email protected]

ORGANIZATION CHART

BOARD OF DIRECTORS PRESIDENT

CEO

SECRETARY

FINANCE & ADMINISTRATIVE TECHNICAL DEPARTMENT DEPARTMENT OF MANAGEMENT PURCHASING COMMERCIAL DEPARTMENT QUALITY, SAFETY, DEPARTMENT DEPARTMENT HEALTH & ENVIRONMENT

ACCOUNTANT PROJECT MANAGER SITE MANAGER SAFETY ENGINEER WAREHOUSE TENDERS MATERIAL EQUIPMENT

PERSONNEL TRAINING CONTRACTS PERSONNEL PROJECTS DESIGN PROJECT A CHECK PAYROLL WAREHOUSE BALANCES QA / QC BUDGET CASH FLOW PREVENTIVE TARGETS SECURITIES MAINTENANCE WAREHOUSE BANKS EQUIPMENT MATERIAL EQUIPMENT CREDIT INVOICING POLICY PROJECT B

WAREHOUSE MATERIAL EQUIPMENT

S.A

 HEAD OFFICE : 36 OMORFOKLISIAS STR., 142 34 ATHENS – GREECE, TEL.: +30 210 27 19 941-2, FAX.: +30 210 27 19 056  WORK SHOP : AGHIAS SOFIAS & NOE STR., 193 00 ASPROPYRGOS, GREECE, TEL. +30 210 55 95 562  https://www.etmer.gr e-mail : [email protected]

LIST OF MAIN CUSTOMERS

 HELLENIC PETROLEUM S.A.

 MOTOR OIL (HELLAS) CORINTH REFINERIES S.A.

 BP HELLAS S.A.

 DELTA ICE CREAM INDUSTRY S.A.

 DELTA DAIRY INDUSTRY S.A.

 R.AP.I RHODES-ALEXANDROUPOLI OIL FACILITIES S.A.

 ASPROFOS S.A.

 EKO ELDA S.A.

 CYCLON HELLAS S.A.

 DELTA ROMANIA S.A.

 ELAIS S.A.

METRO S.A.

 DEMO S.A.

 TECHNIPETROL HELLAS S.A.

 IREM S.p.A.

 NESTLE ICE CREAM S.A.

 NESTLE ICE CREAM BULGARIA S.A.

 HELLENIC FUELS S.A.

 3P ROMANIA

 PUBLIC POWER CORPORATION

 TECHNIP S.A.

S.A

 HEAD OFFICE : 36 OMORFOKLISIAS STR., 142 34 ATHENS – GREECE, TEL.: +30 210 27 19 941-2, FAX.: +30 210 27 19 056  WORK SHOP : AGHIAS SOFIAS & NOE STR., 193 00 ASPROPYRGOS, GREECE, TEL. +30 210 55 95 562  https://www.etmer.gr e-mail : [email protected]

FINANCIAL DATA

COOPERATING BANKS

NATIONAL BANK OF GREECE ALPHA BANK OF GREECE LAST YEARS TURNOVER

TURNOVER 18.000.000,00 €

16.000.000,00 €

14.000.000,00 €

12.000.000,00 €

10.000.000,00 €

8.000.000,00 €

6.000.000,00 €

4.000.000,00 €

2.000.000,00 €

0,00 € 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Our company having overcome the obstacle of the deep Greek crisis (years 2008-2014), through very careful defense policies, has come back to grinding wheels increase of its turnover, with expansionary policies both in domestic and international market.

S.A

 HEAD OFFICE : 36 OMORFOKLISIAS STR., 142 34 ATHENS – GREECE, TEL.: +30 210 27 19 941-2, FAX.: +30 210 27 19 056  WORK SHOP : AGHIAS SOFIAS & NOE STR., 193 00 ASPROPYRGOS, GREECE, TEL. +30 210 55 95 562  https://www.etmer.gr e-mail : [email protected]

COMPANY ACTIVITIES

Our Company is active in projects of heavy industry, foods and pharmaceuticals. Specifically:

 HEAVY INDUSTRY Individual activities - Turn around projects Turn around projects consist of work performed in a span of a few days when manufacturing plants are closed and include all nature of technical works. - Special projects Special projects concern projects of particular expertise, capability and technical support. - Mixed projects Mixed projects concern either integrated projects (complete building of new factory-plant), or expansion of already existing installations and include all nature of technical works (e.g. construction, engineering, electrical etc). - Refinery projects Refinery projects concern all nature of works resulting in petroleum refinery plants or in the operation of the plants or in T/A, and include expansions – modernization of existing plants and construction of new plants. - Manufacturing maintenance projects These concern projects performed mainly during the operation of the manufacturing plants so they can safely continue their operation or are performed over a span of few days (T/A). - Fuel installations These concern projects at fuel installations and include all nature of works (new installations, expansion – modernization of existing etc). - Ports – Energy projects These concern projects related to underwater works such as the replacement of underwater fuel pipelines, repair of shafts supporting marine piers-platforms.

 FOODS The projects at food companies concern the execution of all nature of works (construction of new factories, expansion of existing plants, modernization of the operation of existing facilities, maintenance etc).

 PHARMACEUTICALS The projects at pharmaceutical companies concern the execution of all nature of works with the quality and special specifications required (construction of new factories, expansion of existing plants, modernization of the operation of existing facilities, maintenance etc).

TABLE OF COMPLETED PROJECTS IN GREECE

WORKS WORKS YEAR OWNER AREA PROJECT TITLE BUDGET (€) DURATION CATEGORY

HELLENIC PETROLEUM ASPROPYRGOS TUBES REPLACEMENT IN THE RADIANT AREA 2021 15 days 9-11 208.860,00 S.A. REFINERY OF L-3901

Duration 6,5 Contract FCC FLUE GAS SECTION 2020 T/A REVAMPING months HELLENIC PETROLEUM ASPROPYRGOS 1-4-5-6-7-8-9-10-11- 9.095.882,84 2020 AND MAINTENANCE ACTIVITIES OF Turn around S.A. REFINERY 12-13-14 estimated cost U-3600/4100/4200/4250 (T/A) 9th/2020 10.200.000,00 45 days

CORINTH INSTALLATION OF VESSELS V-1457, V-1454, V- 2020 MOTOR OIL HELLAS A.E. 12 days 1 52.000,00 REFINERY 1455, E-1452

CORINTH 2020 MOTOR OIL HELLAS A.E. CNG TERMINAL INTERCONNECTION 60 days 1-6-7-8 169.300,00 REFINERY

MECHANICAL UPGRATING WORKS OF UNIT U-7500 / U-7600 Turn around CORINTH 2020 MOTOR OIL HELLAS A.E. CONTRACTING PIPING WORKS (PROJECTS (T/A) 1st/2020 1-6-7-8-9-10-11-12-14 254.661,00 REFINERY 7653-7833-8254-8271-8326-8331-8610-8636- 30 days 8551-8684-8791-8799-8682-7988-8786)

PROJECT DESCRIPTION BY CATEGORY 1. Mechanical equipment installation 4. Electrical works 7. Iron construction 10. Vessels – tank repairs 12. Stainless steel piping works 2. Civil works 5. Instrument installation & adjustment 8. Sandblasting - painting 11. Repair – maintenance of mechanical 13. Insulation 3. Construction of vessels - tanks 6. Carbon steel piping works 9. Alloy steel piping works equipment 14. Supply of materials & equipment

Page 1 of 20 TABLE OF COMPLETED PROJECTS IN GREECE

WORKS WORKS YEAR OWNER AREA PROJECT TITLE BUDGET (€) DURATION CATEGORY

Duration 65 days CORINTH MECHANICAL UPGRATING WORKS OF UNIT 2020 MOTOR OIL HELLAS A.E. Turn around 1-6-7-8-10-11-12-14 460.808,00 REFINERY U-7600 (T/A) 1st/2020 30 days

Turn around CORINTH TURN AROUND WORKS OF UNIT U-7300 / 8300 2020 MOTOR OIL HELLAS A.E. (T/A) 1st/2020 1-6-7-8-9-10-11-12-14 1.699.774,00 REFINERY / 6700 / 6750 / 3800 / 5700 / 4900 / 4950 30 days

Duration 2 months HELLENIC PETROLEUM ASPROPYRGOS MECHANICAL WORKS BIOETHERS PROJECT 2019 Turn around 1-6-7-8-9-11-12-13-14 888.618,32 S.A. REFINERY U-4400 (T/A) 11th/2019 30 days

Duration 60 days CORINTH 2019 MOTOR OIL HELLAS A.E. ΤURN ΑROUND WORKS U-3700 (EQUIPMENT) Turn around 1-6-7-8-9-10-11-12-14 1.195.082,00 REFINERY (T/A) 9th/2019 30 days

Duration 75 days CORINTH REPLACEMENT OF PIPES IN UNIT 2019 MOTOR OIL HELLAS A.E. Turn around 1-6-7-8-9 318.550,00 REFINERY U-3200 / 3300 / 3400 / 3500 (T/A) 9th/2019 30 days

PROJECT DESCRIPTION BY CATEGORY 1. Mechanical equipment installation 4. Electrical works 7. Iron construction 10. Vessels – tank repairs 12. Stainless steel piping works 2. Civil works 5. Instrument installation & adjustment 8. Sandblasting - painting 11. Repair – maintenance of mechanical 13. Insulation 3. Construction of vessels - tanks 6. Carbon steel piping works 9. Alloy steel piping works equipment 14. Supply of materials & equipment

Page 2 of 20 TABLE OF COMPLETED PROJECTS IN GREECE

WORKS WORKS YEAR OWNER AREA PROJECT TITLE BUDGET (€) DURATION CATEGORY

Turn around CORINTH UPGRATING WORKS OF UNIT U-3200 / 3300 / 1-6-7-8-9-10-11-12-14 2019 MOTOR OIL HELLAS A.E. (T/A) 9th/2019 1.110.434,00 REFINERY 3400 30 days

MECHANICAL WORK IN TOWERS, REACTORS, TRANSFER LINES, VESSELS, FILTERS AND Turn around HELLENIC PETROLEUM ELEFSINA 2019 VALVES AT THE REFINERIES OF ELEFSINA (T/A) 10th/2019 1-6-7-8-9-10-11-12-14 1.020.885,00 S.A. REFINERY (EL.PE) DURING TURN AROUND (T/A) OF THE 35 days U-32 - FLEXICOKER

SUPPLY OF THE MATERIALS AND THE STEEL HELLENIC PETROLEUM ASPROPYRGOS 2019 WORKS TO BE PERFORMED RELATED TO THE 16 months 7-8-14 2.049.023,71 S.A. REFINERY FCC FLUE GAS SECTION 2020 T/A PROJECT

Duration 78 days CORINTH UPGRATING WORKS OF UNIT U-1500 / U-2100 / 2019 MOTOR OIL HELLAS A.E. Turn around 1-6-7-8-9-10-11-12-14 2.549.952,80 REFINERY U-2200 / U-2300 / U-2500 (T/A) 2nd/2019 23 days

Turn around CORINTH CONVERSION OF DISK C-2152 AND SAFETY 2019 MOTOR OIL HELLAS A.E. (T/A) 2nd/2019 1-6-7-8-10-11 246.395,45 REFINERY VALVES C-2251 & C-2301 23 days

PROJECT DESCRIPTION BY CATEGORY 1. Mechanical equipment installation 4. Electrical works 7. Iron construction 10. Vessels – tank repairs 12. Stainless steel piping works 2. Civil works 5. Instrument installation & adjustment 8. Sandblasting - painting 11. Repair – maintenance of mechanical 13. Insulation 3. Construction of vessels - tanks 6. Carbon steel piping works 9. Alloy steel piping works equipment 14. Supply of materials & equipment

Page 3 of 20 TABLE OF COMPLETED PROJECTS IN GREECE

WORKS WORKS YEAR OWNER AREA PROJECT TITLE BUDGET (€) DURATION CATEGORY

CORINTH 2018 MOTOR OIL HELLAS A.E. RELU-7151 HEATER H-351 APH REVAMPING 5 months 1-3-6-7-8-14 443.114,00 REFINERY

Contract WORKS FOR METAL SHEETING IN TANKS OF HELLENIC PETROLEUM ASPROPYRGOS 2 years 1.300.000,00 2018 THE REFINERIES OF HELLENIC PETROLEUM IN 3-6-7-10-14 S.A. REFINERY Current project 520.431,00 until ASPORPYRGOS, ELEFSINA, MEGARA 12th/2020

CORINTH PARTS REPLACEMENT OF PIPELINES DURING 2018 MOTOR OIL HELLAS A.E. 60 days 1-6-7-8-9 183.760,00 REFINERY S/D 2018 ON UNIT U-200

ERECTION OF FURNACE F-202N, DISMANTLING CORINTH 2018 MOTOR OIL HELLAS A.E. F-201A F-201B & F-202 AND ERECTION OF 7 months 1-3-6-7-8-9-14 909.251,71 REFINERY COMBUSTION AIR PREHEATING SYSTEM

RELOCATION OF EASTERN SIDE OF THE CONVECTION L-2001/51 – DISMANTLING AND 5 months HELLENIC PETROLEUM ASPROPYRGOS RE-ASSEMBLY AFTER INSPECTIO AND REPAIR Turn around 2017-2018 1-6-7-8-10-11-13-14 301.252,52 S.A. REFINERY OF THE NORTHERN AND SOUTHERN SIDES OF (T/A) 2nd/2018 THE FURNACE AT THE REFINERY OF EL.PE IN 15 days ASPROPYRGOS

PROJECT DESCRIPTION BY CATEGORY 1. Mechanical equipment installation 4. Electrical works 7. Iron construction 10. Vessels – tank repairs 12. Stainless steel piping works 2. Civil works 5. Instrument installation & adjustment 8. Sandblasting - painting 11. Repair – maintenance of mechanical 13. Insulation 3. Construction of vessels - tanks 6. Carbon steel piping works 9. Alloy steel piping works equipment 14. Supply of materials & equipment

Page 4 of 20 TABLE OF COMPLETED PROJECTS IN GREECE

WORKS WORKS YEAR OWNER AREA PROJECT TITLE BUDGET (€) DURATION CATEGORY

MECHANICAL WORK IN TOWERS, REACTORS, TRANSFER LINES, VESSELS, FILTERS AND Turn around HELLENIC PETROLEUM ELEFSINA 2017 VALVES AT THE REFINERIES OF ELEFSINA (T/A) 7th/2017 1-6-7-9-10-11-12 1.062.302,00 S.A. REFINERY (EL.PE) DURING TURN AROUND (T/A) OF THE 45 days U-32 - FLEXICOKER

REVAMPING OF U-200 FURNACE, ERECTION OF PIPES, PIPE RACK AND INSTALLATION OF CORINTH 2017-2018 MOTOR OIL HELLAS Α.Ε. INTERNALS OF TOWERS C-201, C-205 AT 14 months 1-6-7-8-9-10-11-12-14 2.894.430,80 REFINERY MOTOR OIL HELLAS REFINERIES IN AGIOI THEODOROI, CORINTHIA

WORKS FOR METAL SHEETING IN TANKS OF HELLENIC PETROLEUM ASPROPYRGOS 2016-2018 THE REFINERIES OF HELLENIC PETROLEUM IN 20 months 3-6-7-10-14 663.608,00 S.A. REFINERY ASPORPYRGOS

HELLENIC PETROLEUM ELEFSINA UPGRADE PROJECT 2 – COKE LOADING SYSTEM 2016 8 months 6-14 78.383,00 S.A. REFINERY START-UP AT THE REFINERIES OF ELEFSINA

WORKS FOR THE REPAIR OF THE HELLENIC PETROLEUM ASPROPYRGOS UNDERGROUND PIPES Φ8’’, Φ12’’, Φ16’’ AND 2016-2017 16 months 6 144.931,00 S.A. REFINERY Φ48’’ IN THE REFINERIES OF EL.PE ASPROPYRGOS

PROJECT DESCRIPTION BY CATEGORY 1. Mechanical equipment installation 4. Electrical works 7. Iron construction 10. Vessels – tank repairs 12. Stainless steel piping works 2. Civil works 5. Instrument installation & adjustment 8. Sandblasting - painting 11. Repair – maintenance of mechanical 13. Insulation 3. Construction of vessels - tanks 6. Carbon steel piping works 9. Alloy steel piping works equipment 14. Supply of materials & equipment

Page 5 of 20 TABLE OF COMPLETED PROJECTS IN GREECE

WORKS WORKS YEAR OWNER AREA PROJECT TITLE BUDGET (€) DURATION CATEGORY

Total duration CORINTH PROJECTS FOR THE REVAMPING OF UNITS 2 months 2016 MOTOR OIL HELLAS Α.Ε. 2-6-7-8-9-14 157.815,00 REFINERY FUEL, PETROL, FCC Turn around (T/A) 15 days

Total duration CORINTH REVAMPING UNITS OF FUELS & PETROL AND 2 months 2016 MOTOR OIL HELLAS Α.Ε. 2-6-7-8-9-11-12-14 2.158.627,00 REFINERY EQUIPMENT DURING GENERAL SHUT DOWN Turn around (T/A) 15 days

Total duration CORINTH REVAMPING OF UNITS FCC /3100/3700 AND 2 months 2016 MOTOR OIL HELLAS Α.Ε. 2-6-7-8-9-11-14 1.105.821,00 REFINERY EQUIPMENT DURING GENERAL SHUT DOWN Turn around (T/A) 14 days

HELLENIC PETROLEUM ELEFSINA 2015-2016 INSTALLATION OF NEW EXCHANGER-33-Ε-002Β 6 months 1-2-6-7-8-9-13-14 255.103,57 S.A. REFINERY

BLINDS WORKS OPEN CLOSE MANHOLES AND HELLENIC PETROLEUM ELEFSINA 2015 OTHER MECHANICAL WORKS ON UNIT U-32 2 months 9-11 732.091,00 S.A. REFINERY DURING S/D

PROJECT DESCRIPTION BY CATEGORY 1. Mechanical equipment installation 4. Electrical works 7. Iron construction 10. Vessels – tank repairs 12. Stainless steel piping works 2. Civil works 5. Instrument installation & adjustment 8. Sandblasting - painting 11. Repair – maintenance of mechanical 13. Insulation 3. Construction of vessels - tanks 6. Carbon steel piping works 9. Alloy steel piping works equipment 14. Supply of materials & equipment

Page 6 of 20 TABLE OF COMPLETED PROJECTS IN GREECE

WORKS WORKS YEAR OWNER AREA PROJECT TITLE BUDGET (€) DURATION CATEGORY

AF142205 << ENERGY SAVING ON UNITS HELLENIC PETROLEUM ASPROPYRGOS U-3100,U-3400,U-4600>> 1-2-4-5-6-7-8-9-11-12- 2015 5 months 685.436,13 S.A. REFINERY AF142209 << ENERGY SAVING ON UNITS 13-14 U-3200,U-4100,U-4600>>

HELLENIC PETROLEUM ASPROPYRGOS MAINTENANCE WORKS IN FURNACES 2015 3 months 7-9-11 428.578,85 S.A. REFINERY L-3101 & L-3901

HELLENIC PETROLEUM ASPROPYRGOS 2014-2015 TANK MAINTENANCE P-8758C 16 months 2-10-6-14 296.380,72 S.A. REFINERY

Installation of mechanical equipment and piping CORINTH PIPEWORKS 2014-2015 THISVI VIOTIA of the machine HYDROTESTER and 11 months 1-6-7-8-13-14 360.000,00 S.A. MECHANICAL EXPANDER

HELLENIC PETROLEUM ELEFSINA Maintenance works at the Flexicoker unit during 2014 34 days 6-7-8-9-10-11-12 718.886,00 S.A. REFINERY S.D. of March 2014

Total project Revamp and maintenance works on gasoline CORINTH 3 months 2013 MOTOR OIL HELLAS S.A. units U-1500/5300/2100/2200/2500 1-6-7-8-9-11-12-13 2.573.277,00 REFINERY Turn around Turn around (T/A) 2013 (T/A) 18 days

PROJECT DESCRIPTION BY CATEGORY 1. Mechanical equipment installation 4. Electrical works 7. Iron construction 10. Vessels – tank repairs 12. Stainless steel piping works 2. Civil works 5. Instrument installation & adjustment 8. Sandblasting - painting 11. Repair – maintenance of mechanical 13. Insulation 3. Construction of vessels - tanks 6. Carbon steel piping works 9. Alloy steel piping works equipment 14. Supply of materials & equipment

Page 7 of 20 TABLE OF COMPLETED PROJECTS IN GREECE

WORKS WORKS YEAR OWNER AREA PROJECT TITLE BUDGET (€) DURATION CATEGORY

CORINTH Maintenance works on unit U-100 2013 MOTOR OIL HELLAS S.A. 8 days 1-6-7-8-9-11-13 260.016,00 REFINERY Turn around (T/A) 2013

T-101 Partial shell replacement of atmospheric HELLENIC PETROLEUM THESSALONIKI Turn around 1-3-4-5-6-8-9-10-11- 2012 pipe still column 995.641,00 S.A. REFINERY (T/A) 30 days 13 Turn around (T/A) 2012

HELLENIC PETROLEUM ELEFSINA Fabrication and erection works on unit 70 2010 - 2012 18 months 6-7-8-9 6.200.000,00 S.A. / IREM REFINERY (Area 3) - E.R.U.P U-70

Mechanical works for the interconnection of the HELLENIC PETROLEUM ASPROPYRGOS 2011 industrial complex A.I.C. with Hellenic Fuels 5 months 1-6-7-8-9 741.328,00 S.A. REFINERY (EL.KA) – (A' phase works within A.I.C. area)

Replacing lines spools in lubricants units during general turn around (T/A) CORINTH Turn around 2011 MOTOR OIL HELLAS S.A. Turn around (T/A) works in U-200 / 300 / 400 / 1-6-7-8-9-10-11-13 394.227,00 REFINERY (T/A) 10 days 500 / 4950 / 2600 / 7000 Replacement of 1st Bank F-3202

HELLENIC PETROLEUM ASPROPYRGOS Maintenance works on unit U-3300 Turn around 2011 1-6-7-8-9-10-11-13 607.956,00 S.A. REFINERY Turn around (T/A) 2011 (T/A) 22 days

Total project HELLENIC PETROLEUM ASPROPYRGOS Total tube replacement on economizer GROUP I 6 months 2011 1-6-7-10-11-13-14 273.121,00 S.A. REFINERY & GROUP II at the boiler K-1001 C/D Turn around (T/A) 31 days

PROJECT DESCRIPTION BY CATEGORY 1. Mechanical equipment installation 4. Electrical works 7. Iron construction 10. Vessels – tank repairs 12. Stainless steel piping works 2. Civil works 5. Instrument installation & adjustment 8. Sandblasting - painting 11. Repair – maintenance of mechanical 13. Insulation 3. Construction of vessels - tanks 6. Carbon steel piping works 9. Alloy steel piping works equipment 14. Supply of materials & equipment

Page 8 of 20 TABLE OF COMPLETED PROJECTS IN GREECE

WORKS WORKS YEAR OWNER AREA PROJECT TITLE BUDGET (€) DURATION CATEGORY

Opening - closing - inspection & maintenance HELLENIC PETROLEUM ELEFSINA 2010 works on propane & butane tanks 6 months 1-6-7-8-10-11 218.005,00 S.A. REFINERY ΤΚ-113, 67 & 68

TAVROS 2010 NESTLE ICE CREAM S.A. Various maintenance works on ice cream plant 3 months 1-3-7-9-12-14 109.057,00 ATTICA

TANK FARMS ASPROPYRGOS Construction of a new additive unit and 2010 HELLENIC FUELS S.A. KALAMATA – 7,5 months 1-2-6-7-8 412.489,00 maintenance works on existing equipment HGOUMENITSA -THESSALONIKH

ASPROPYRGOS Mechanical works for the infusion system of 2010 HELLENIC FUELS S.A. 3,5 months 1-6-7-8-10-11 310.176,00 ATTICA additives

HELLENIC PETROLEUM ASPROPYRGOS 2010 Interconnection of U-2600 with merichem skids 4 months 1-2-4-5-6-7-8-9-13 246.729,00 S.A. REFINERY

ASPROPYRGOS Revamp and modernization of fuel facilities at 2009 ΒΡ HELLAS S.A. 8 months 1-2-3-4-5-6-7-8 644.939,00 ATTICA Aspropyrgos plant and jetty

PROJECT DESCRIPTION BY CATEGORY 1. Mechanical equipment installation 4. Electrical works 7. Iron construction 10. Vessels – tank repairs 12. Stainless steel piping works 2. Civil works 5. Instrument installation & adjustment 8. Sandblasting - painting 11. Repair – maintenance of mechanical 13. Insulation 3. Construction of vessels - tanks 6. Carbon steel piping works 9. Alloy steel piping works equipment 14. Supply of materials & equipment

Page 9 of 20 TABLE OF COMPLETED PROJECTS IN GREECE

WORKS WORKS YEAR OWNER AREA PROJECT TITLE BUDGET (€) DURATION CATEGORY

TANK FARMS HGOUMENITSA - 2009 ΒΡ HELLAS S.A. Revamp and modernization of fuel facilities 12 months 1-2-6-7-8 469.029,00 THESSALONIKH - LINOPERAMATA

Erection works relevant to the implementation of Total project HELLENIC PETROLEUM ASPROPYRGOS the revamping of unit 2600 & maintenance 5 months 1 - 2 -3-4-5-6-7-8-9-10- 2009 2.720.280,00 S.A. REFINERY works of unit 2500 & 2600. Turn around 11-12-13 Turn around (T/A) 2009 (T/A) 30 days

Various mechanical works for the expansion of KRIONERI 2009 DEMO S.A. the pharmaceutical industry (new plant 3rd 6 months 1-7-9-11-12 274.010,00 ATTICA phase)

HELLENIC PETROLEUM ASPROPYRGOS 2009 Erection works of the FCC slurry oil unit phase II 3 months 1-2-4-5-6-7-8 126.719,00 S.A. REFINERY

HELLENIC PETROLEUM ASPROPYRGOS Maintenance works during shut-down on unit Turn around 2009 1-6-7-9-11-12 81.750,00 S.A. REFINERY F.C.C. (T/A) 10 days

PROJECT DESCRIPTION BY CATEGORY 1. Mechanical equipment installation 4. Electrical works 7. Iron construction 10. Vessels – tank repairs 12. Stainless steel piping works 2. Civil works 5. Instrument installation & adjustment 8. Sandblasting - painting 11. Repair – maintenance of mechanical 13. Insulation 3. Construction of vessels - tanks 6. Carbon steel piping works 9. Alloy steel piping works equipment 14. Supply of materials & equipment

Page 10 of 20 TABLE OF COMPLETED PROJECTS IN GREECE

WORKS WORKS YEAR OWNER AREA PROJECT TITLE BUDGET (€) DURATION CATEGORY

HELLENIC PETROLEUM THESSALONIKI Turn around 2009 Maintenance works on tower T-101 1-7-8-9-11-12 128.333,00 S.A. REFINERY (T/A) 19 days

HELLENIC PETROLEUM ASPROPYRGOS Turn around 2009 Maintenance works on furnace L-3101 A/B 9-11 130.880,00 S.A. REFINERY (T/A) 7 days

CORINTH 2009 - 2010 MOTOR OIL HELLAS S.A. Project 2279 - New CDU Complex * 12 months 1-6-7-8-12 4.734.907,00 REFINERY

CORINTH D.S.-2008/8 Maintenance works of catalytic Turn around 2008 MOTOR OIL HELLAS S.A. 1-3-6-7-8-9-10-11-13 1.196.272,00 REFINERY reforming unit U-2100, U-2200 (T/A) 13 days

Partial works CORINTH 2006 - 2008 MOTOR OIL HELLAS S.A. Maintenance works on furnace F-3202 Turn around 1-6-7-8-9-11 455.390,00 REFINERY (T/A) 12 days

D.S.-2008/44 Maintenance works on fluidized CORINTH Turn around 1-2-6-7-8-9-10-11-12- 2008 MOTOR OIL HELLAS S.A. catalytic units U-3200 / 3300 / 3400 / 3500 / 1.149.516,00 REFINERY (T/A) 26 days 13 3800 FCC

Construction of pipe lines for the interconnection ELEFSINA 2007 - 2008 EKO S.A. between EL.PE E.I.C. and EKO tank farm at 9 months 1-2-4-5-6-7-8-13 1.727.699,00 REFINERY Elefsina

PROJECT DESCRIPTION BY CATEGORY 1. Mechanical equipment installation 4. Electrical works 7. Iron construction 10. Vessels – tank repairs 12. Stainless steel piping works 2. Civil works 5. Instrument installation & adjustment 8. Sandblasting - painting 11. Repair – maintenance of mechanical 13. Insulation 3. Construction of vessels - tanks 6. Carbon steel piping works 9. Alloy steel piping works equipment 14. Supply of materials & equipment

Page 11 of 20 TABLE OF COMPLETED PROJECTS IN GREECE

WORKS WORKS YEAR OWNER AREA PROJECT TITLE BUDGET (€) DURATION CATEGORY

Partial works for Maintenance works on towers, pressure vessels HELLENIC PETROLEUM ELEFSINA 2 years 1-3-4-5-6-7-8-9-10-11- 2008 - 2010 and piping works based on contract S-007/06 2.721.561,00 S.A. REFINERY Turn around 12-13-14 Turn around (T/A) 2008 (T/A) 60 days

HELLENIC PETROLEUM ELEFSINA 1-6-7-8-9-10-11-12- 2007 - 2008 S-016/05 Various piping and mechanical projects 18 months 3.327.800,00 S.A. REFINERY 13-14

ASPROPYRGOS 2007 - 2008 BP HELLAS S.A. Expansion and revamp of tank facilities 12 months 1-2-3-4-5-6-7-8-14 4.191.498,00 ATTICA

ASPROPYRGOS Revamp and modernization of fuel facilities on 2008 BP HELLAS S.A. 11 months 1-2-3-4-5-6-7-8 1.960.217,00 ATTICA tank farm and jetty

TANK FARMS HGOUMENITSA 2008 BP HELLAS S.A. Revamp and modernization of fuel facilities 10 months 1-2-6-7-8 1.165.227,00 - CORFU - THESSALONIKH

ASPROPYRGOS 2007 BP HELLAS S.A. Interconnecting works of track loading islands 6 months 1-2-4-5-6-7-8 900.222,00 ATTICA

KRIONERI Construction of new drug – production units 2006-2008 DEMO S.A. 28 months 1-2-3-6-7-8-9-12-14 2.655.000,00 ATTICA (new factory 2nd phase)

PROJECT DESCRIPTION BY CATEGORY 1. Mechanical equipment installation 4. Electrical works 7. Iron construction 10. Vessels – tank repairs 12. Stainless steel piping works 2. Civil works 5. Instrument installation & adjustment 8. Sandblasting - painting 11. Repair – maintenance of mechanical 13. Insulation 3. Construction of vessels - tanks 6. Carbon steel piping works 9. Alloy steel piping works equipment 14. Supply of materials & equipment

Page 12 of 20 TABLE OF COMPLETED PROJECTS IN GREECE

WORKS WORKS YEAR OWNER AREA PROJECT TITLE BUDGET (€) DURATION CATEGORY

Partial works ASPROPYRGOS Fuel pipeline replacement between BP jetty and 2007-2008 BP HELLAS S.A. Total project 1-2-6-7-8 507.365,00 ATTICA onshore installation 10 months

TANK FARMS KALAMATA - HGOUMENITSA 2007 BP HELLAS S.A. - CORFU - Projects for the modernization of fuel facilities 8 months 1-2-6-7-8 1.474.203,00 THESSALONIKH - LINOPERAMATA

HELLENIC PETROLEUM ASPROPYRGOS Welding repairs – Heat treatments - PWHT of Turn around 2007 10 462.259,00 S.A. REFINERY spherical tank Ρ-8852 (T/A) 57 days

HELLENIC PETROLEUM ASPROPYRGOS Maintenance works on furnace L-3101 (Α&Β Turn around 2007 7-8-9-11-13 147.689,00 S.A. REFINERY ΒΟΧ) Turn around (T/A) 2007 (T/A) 10 days

CORINTH Jetty pile foundation maintenance works for Partial works for Port and jetty special 2003 - 2007 MOTOR OIL HELLAS S.A. 648.000,00 REFINERY hydrocarbons loading 4 years project 2-7-10-14

Maintenance and cleaning of the distillation HELLENIC PETROLEUM ELEFSINA Turn around 1-3-4-6-7-8-10-11-12- 2006 towers and pressure vessels of the HDS unit 142.211,00 S.A. REFINERY (T/A) 12 days 13-14 Turn around (T/A) 2006

PROJECT DESCRIPTION BY CATEGORY 1. Mechanical equipment installation 4. Electrical works 7. Iron construction 10. Vessels – tank repairs 12. Stainless steel piping works 2. Civil works 5. Instrument installation & adjustment 8. Sandblasting - painting 11. Repair – maintenance of mechanical 13. Insulation 3. Construction of vessels - tanks 6. Carbon steel piping works 9. Alloy steel piping works equipment 14. Supply of materials & equipment

Page 13 of 20 TABLE OF COMPLETED PROJECTS IN GREECE

WORKS WORKS YEAR OWNER AREA PROJECT TITLE BUDGET (€) DURATION CATEGORY

ASPROPYRGOS Partial replacement of underground gasoline, 2006 BP HELLAS S.A. 6 months 2-6-8 519.116,00 ATTICA diesel and jet pipelines from tank farm to pier

Partial works ASPROPYRGOS Mechanical works on equipment and pipelines on 1-2-3-4-5-6-7-8-10-11- 2006 BP HELLAS S.A. Total project 829.117,00 ATTICA BP Aspropyrgos and Skaramanga facilities 13-14 6 months

TANK FARMS 1-2-3-4-5-6-7-8-10-11- 2006 BP HELLAS S.A. KALAMATA - Revamp and modernization of fuel facilities 10 months 456.957,00 13-14 LINOPERAMATA

TANK FARM Partial works for 2005 - 2006 BP HELLENIC S.A. Modernization of fuel facilities 1-2-6-7-8-11-13-14 531.171,00 LESVOS 11 months

HELLENIC PETROLEUM ELEFSINA Revamp of crude oil desalination vessels CDU III Turn around 2006 1-4-5-6-7-8-10-11 125.138,00 S.A. REFINERY & IV (T/A) 30 days

HELLENIC PETROLEUM ELEFSINA Convection section replacement and Turn around 2005 - 2006 1-6-7-8-9-11-12-13 496.121,00 S.A. REFINERY maintenance of air preheater 3 – H – 01 A/B (T/A) 30 days

TAVROS 2006 DELTA ICE CREAM S.A. Waste water treatment plant revamping 4,5 months 1-7-12-14 150.747,00 ATTICA

PROJECT DESCRIPTION BY CATEGORY 1. Mechanical equipment installation 4. Electrical works 7. Iron construction 10. Vessels – tank repairs 12. Stainless steel piping works 2. Civil works 5. Instrument installation & adjustment 8. Sandblasting - painting 11. Repair – maintenance of mechanical 13. Insulation 3. Construction of vessels - tanks 6. Carbon steel piping works 9. Alloy steel piping works equipment 14. Supply of materials & equipment

Page 14 of 20 TABLE OF COMPLETED PROJECTS IN GREECE

WORKS WORKS YEAR OWNER AREA PROJECT TITLE BUDGET (€) DURATION CATEGORY

TAVROS 1-2-3-4-5-6-7-8--10- 2005 - 2006 DELTA ICE CREAM S.A. New coconut oil unit installation 3 months 272.692,00 ATTICA 11-12-13-14

DENDROPOTA- Fabrication and erection of new truck loading 2005 - 2006 EKO S.A. MOS 140 days 1-2-4-5-6-7-8-14 577.199,00 islands (A' depot) THESSALONIKI

HELLENIC PETROLEUM ELEFSINA 2005 - 2006 New plant air unit erection 3 months 1-2-4-5-6-7-8-14 270.928,00 S.A. REFINERY

Total project HELLENIC PETROLEUM ELEFSINA 9 months 1-2-3-4-5-6-7-8--9-10- 2005 CDU # 3 optimization project 1.537.150,00 S.A. REFINERY Turn around 11-12-13 (T/A) 25 days

HELLENIC PETROLEUM ELEFSINA Rehabilitation works on fuel tanks TK-19 & TK- 2005 6,8 months 1-2-6-7-8-10-11 778.166,00 S.A. REFINERY 52

ASPROPYRGOS 2005 ΒΡ HELLAS S.A. Modernization works on fuel facilities 8 months 1-2-3-6-7-8-10 626.017,00 ATTICA

Maintenance works on fuel units U-2100, 2200, CORINTH Turn around 1-2-3-6-7-8-9-10-11- 2005 MOTOR OIL HELLAS S.A. 2500 549.850,00 REFINERY (T/A) 20 days 12-14 Turn around (T/A) 2005

PROJECT DESCRIPTION BY CATEGORY 1. Mechanical equipment installation 4. Electrical works 7. Iron construction 10. Vessels – tank repairs 12. Stainless steel piping works 2. Civil works 5. Instrument installation & adjustment 8. Sandblasting - painting 11. Repair – maintenance of mechanical 13. Insulation 3. Construction of vessels - tanks 6. Carbon steel piping works 9. Alloy steel piping works equipment 14. Supply of materials & equipment

Page 15 of 20 TABLE OF COMPLETED PROJECTS IN GREECE

WORKS WORKS YEAR OWNER AREA PROJECT TITLE BUDGET (€) DURATION CATEGORY

TANK FARMS KALAMATA - 2005 ΒΡ HELLAS S.A. Modernization works of fuel facilities 10,5 months 1-2-6-7-8-11-13-14 384.201,00 CORFU - LINOPERAMATA

CORINTH 2004 - 2005 MOTOR OIL HELLAS S.A. Project 2141- Refinery expansion 2005 spec.* 15 months 1-2-4-5-6-7-9-11-12 4.600.000,00 REFINERY

Partial works 2003 - 2004 - HELLENIC PETROLEUM ELEFSINA S-53041 Maintenance works on equipment and 1-2-3-6-7-8-9-10-11- Total duration 1.223.379,00 2005 S.A. REFINERY pipes in all refinery units 12 3 years

Total project Modernization works on sulphur units U-3500 & TURN - KEY PROJECT HELLENIC PETROLEUM ASPROPYRGOS 11 months 2004 U-3700 A/B (1-2-3-4-5-6-7-8-9-10- 1.791.021,00 S.A. REFINERY Turn around Turn around (T/A) 2004 11-12-13) (T/A) 32 days

HELLENIC PETROLEUM ASPROPYRGOS Ρ-8805 Roof plates replacement and tank 2004 2,5 months 10 260.881,00 S.A. REFINERY rehabilitation works

TAVROS 2003 - 2004 DELTA ICE CREAM S.A. Revamp of ammonia units and milk receval unit 17 months 1-2-3-4-5-6-7-8-9 857.562,00 ATTICA

PROJECT DESCRIPTION BY CATEGORY 1. Mechanical equipment installation 4. Electrical works 7. Iron construction 10. Vessels – tank repairs 12. Stainless steel piping works 2. Civil works 5. Instrument installation & adjustment 8. Sandblasting - painting 11. Repair – maintenance of mechanical 13. Insulation 3. Construction of vessels - tanks 6. Carbon steel piping works 9. Alloy steel piping works equipment 14. Supply of materials & equipment

Page 16 of 20 TABLE OF COMPLETED PROJECTS IN GREECE

WORKS WORKS YEAR OWNER AREA PROJECT TITLE BUDGET (€) DURATION CATEGORY

Modernization of loading islands, maintenance ASPROPYRGOS 2003 - 2004 ΒΡ HELLAS S.A. works on land facilities and general revamp of 16 months 1-2-3-6-7-8-10 663.702,00 ATTICA offshore jetty

CORINTH Maintenance works on U-2100, 2200, 2500 and Partial works for 1-2-3-6-7-8-9-10-11- 2003 - 2004 MOTOR OIL HELLAS S.A. 1.184.100,00 REFINERY U-3700, 4200, 4300 3 months 12-14

TANK FARMS HGOUMENITSA - CORFU - Partial works for 2003 - 2004 ΒΡ HELLAS S.A. THESSALONIKH Modernization works of fuel facilities 1-2-6-7-8-10 719.698,00 13 months - LINOPERAMATA - LESVOS

ELEFSINA S-2933 Propane and butane spheres & bullets 2003 - 2004 PETROLA HELLAS AEBE 19 months 1-6-8-10 390.567,00 REFINERY maintenance works

CORINTH 2003 MOTOR OIL HELLAS S.A. Maintenance works on sphere T-3451 2 months 10 118.000,00 REFINERY

RHODES- ALEXANDROUPOLIS OIL 2003 RODOS Construction of a new fuel tank No 4 8 months 1-2-3-4-5-6-7-8-14 218.966,00 PRODUCTS FACILITIES S.A.

PROJECT DESCRIPTION BY CATEGORY 1. Mechanical equipment installation 4. Electrical works 7. Iron construction 10. Vessels – tank repairs 12. Stainless steel piping works 2. Civil works 5. Instrument installation & adjustment 8. Sandblasting - painting 11. Repair – maintenance of mechanical 13. Insulation 3. Construction of vessels - tanks 6. Carbon steel piping works 9. Alloy steel piping works equipment 14. Supply of materials & equipment

Page 17 of 20 TABLE OF COMPLETED PROJECTS IN GREECE

WORKS WORKS YEAR OWNER AREA PROJECT TITLE BUDGET (€) DURATION CATEGORY

TAVROS Erection of C.I.P. and milk ageing ice cream 2000 - 2002 DELTA ICE CREAM S.A. 27 months 1-2-4-5-7-9-12-14 2.242.110,00 ATTICA units

ASPROPYRGOS Revamp of pump stations and erection of new Partial works for 2001 - 2002 ΒΡ HELLAS S.A. 1-2-6-7-8-14 762.600,00 ATTICA transfer lines 14 months

RHODES- ALEXANDROUPOLIS OIL ALEXANDROU- 2002 Subsea unloading pipeline 8'' maintenance works 10 days Special subsea project 108.000,00 PRODUCTS FACILITIES POLI S.A.

SKARAMAGAS Modernization works on a vapor recovery unit 2002 ΕΚΟ - ΕLDA 8 months 1-2-3-4-5-6-7-8-13-14 556.700,00 ATTICA (VRU)

LINOPERAMATA 2002 BP HELLAS S.A. Replacement of subsea piping for fuels loading 4 months 2-4-5-6-7-8-14 851.400,00 CRETE

DELTA DAIRY INDUSTRY AG.STEFANOS 2002 Expansion of ammonia engine room 4 months 1-6-7-11-14 325.700,00 S.A. ATTICA

Total project ELEFSINA Maintenance works on furnace and air preheater 24 months 2001 - 2002 PETROLA HELLAS S.A. 1-6-7-8-9-10-11-13-14 705.515,00 REFINERY ( Units CDU III & CDU IV) Turn around (T/A) 30 days

PROJECT DESCRIPTION BY CATEGORY 1. Mechanical equipment installation 4. Electrical works 7. Iron construction 10. Vessels – tank repairs 12. Stainless steel piping works 2. Civil works 5. Instrument installation & adjustment 8. Sandblasting - painting 11. Repair – maintenance of mechanical 13. Insulation 3. Construction of vessels - tanks 6. Carbon steel piping works 9. Alloy steel piping works equipment 14. Supply of materials & equipment

Page 18 of 20 TABLE OF COMPLETED PROJECTS IN GREECE

WORKS WORKS YEAR OWNER AREA PROJECT TITLE BUDGET (€) DURATION CATEGORY

CORINTH Maintenance works on U-300 and replacement of Turn around 2001 MOTOR OIL HELLAS S.A. 1-6-7-9-11-14 485.700,00 REFINERY distillation tower C-205 (T/A) 14 days

Partial works KRIONERI Construction of new drug production units (new 1999 - 2003 DEMO S.A. Total project 1-2-4-5-6-7-12-14 935.493,00 ATTICA factory 1st phase) 18 months

ASPROPYRGOS Revamp of fuel tanks and construction of pipes 2000 BP HELLAS S.A. 9 months 6-7-8-10-14 677.650,00 ATTICA for hydrocarbons

Construction of temporary railway platform at 2000 ATTICA METRO S.A. ATHENS 40 days 2-4-5-6-7-14 452.630,00 Syntagma station (line 3)

TECHNIPETROL HELLAS CORINTH 1999 Project 1908 Modernization of F.C.C. unit 41 days 1-6-7-9-11-12 233.777,00 S.A. REFINERY

TAVROS 1998 DELTA ICE CREAM S.A. Construction of new pasteurization unit 3 months 1-2-3-4-5-6-7-8-9-14 1.308.877,00 ATTICA

HELLENIC REFINERIES ASPROPYRGOS Turn around 1995 Mechanical works for F.C.C. unit modification 1-6-7-8-9-11-12-13 211.641,00 OF ASPROPYRGOS S.A. REFINERY (T/A) 35 days

DELTA DAIRY INDUSTRY AG.STEFANOS 1-3-6-7-8-9-11-12-13- 1995 New equipment installation and piping works 6 months 696.000,00 S.A. ATTICA 14

PROJECT DESCRIPTION BY CATEGORY 1. Mechanical equipment installation 4. Electrical works 7. Iron construction 10. Vessels – tank repairs 12. Stainless steel piping works 2. Civil works 5. Instrument installation & adjustment 8. Sandblasting - painting 11. Repair – maintenance of mechanical 13. Insulation 3. Construction of vessels - tanks 6. Carbon steel piping works 9. Alloy steel piping works equipment 14. Supply of materials & equipment

Page 19 of 20 TABLE OF COMPLETED PROJECTS IN GREECE

WORKS WORKS YEAR OWNER AREA PROJECT TITLE BUDGET (€) DURATION CATEGORY

ELECTRICAL PUBLIC POWER Converter's replacement on A' & B' body boiler of 1992 - 1993 STATION 4 months 7-9-13 110.651,00 CORPORATION S.A. 9th unit AG.GEORGIOU

* Note : The project was executed in J/V with company BIEK. Etmer' s participation 50 % .

PROJECT DESCRIPTION BY CATEGORY 1. Mechanical equipment installation 4. Electrical works 7. Iron construction 10. Vessels – tank repairs 12. Stainless steel piping works 2. Civil works 5. Instrument installation & adjustment 8. Sandblasting - painting 11. Repair – maintenance of mechanical 13. Insulation 3. Construction of vessels - tanks 6. Carbon steel piping works 9. Alloy steel piping works equipment 14. Supply of materials & equipment

Page 20 of 20 TABLE OF COMPLETED PROJECTS ABROAD

WORKS WORKS YEAR OWNER AREA PROJECT TITLE BUDGET (€) DURATION CATEGORY

NESTLE ICE CREAM VARNA Installation and connection of the new 2009 20 days 1-7-12 86,000.00 BULGARIA S.A. BULGARIA pasteurization unit

NESTLE ICE CREAM VARNA 2008 Plant modernization activities 3,5 months 1-3-6-7-9-11-12-13-14 640,000.00 BULGARIA S.A. BULGARIA

Partial DELTA ICE CREAM BUCHAREST Erection of new ice cream factory. completion 1998 - 2000 1-2-3-6-7-8-9-12-13 2,258,000.00 ROMANIA ROMANIA Partial erection with expansions Total duration 3,5 years

1-2-3-4-5-6-7-8-9-12- 1995 3P ROMANIA IASI ROMANIA Erection of a polymer factory 5,5 months 1,760,000.00 13

PROJECT DESCRIPTION BY CATEGORY 1. Mechanical equipment installation 4. Electrical works 7. Iron construction 10. Vessels – tank repairs 12. Stainless steel piping works 2. Civil works 5. Instrument installation & adjustment 8. Sandblasting - painting 11. Repair – maintenance of mechanical 13. Insulation 3. Construction of vessels - tanks 6. Carbon steel piping works 9. Alloy steel piping works equipment 14. Supply of materials & equipment

Page 1 of 1

S.A

 HEAD OFFICE : 36 OMORFOKLISIAS STR., 142 34 ATHENS – GREECE, TEL.: +30 210 27 19 941-2, FAX.: +30 210 27 19 056  WORK SHOP : AGHIAS SOFIAS & NOE STR., 193 00 ASPROPYRGOS, GREECE, TEL. +30 210 55 95 562  https://www.etmer.gr e-mail : [email protected]

PICTURES OF PROJECTS

PROJECT : Modernization works on sulphur units U-3500 & U-3700 A/B in HELPE Refineries in Aspropyrgos

PROJECT : Modernization works on sulphur units U-3500 & U-3700 A/B in HELPE Refineries in Aspropyrgos

S.A

 HEAD OFFICE : 36 OMORFOKLISIAS STR., 142 34 ATHENS – GREECE, TEL.: +30 210 27 19 941-2, FAX.: +30 210 27 19 056  WORK SHOP : AGHIAS SOFIAS & NOE STR., 193 00 ASPROPYRGOS, GREECE, TEL. +30 210 55 95 562  https://www.etmer.gr e-mail : [email protected]

PROJECT : Revamp of Ammonia Units and Milk receval unit in DELTA Ice Cream SA

PROJECT : Revamp of Ammonia Units and Milk receval unit in DELTA Ice Cream SA

S.A

 HEAD OFFICE : 36 OMORFOKLISIAS STR., 142 34 ATHENS – GREECE, TEL.: +30 210 27 19 941-2, FAX.: +30 210 27 19 056  WORK SHOP : AGHIAS SOFIAS & NOE STR., 193 00 ASPROPYRGOS, GREECE, TEL. +30 210 55 95 562  https://www.etmer.gr e-mail : [email protected]

PROJECT: Maintenance works on equipment and pipes in all refinery units in HEL.PE SA

S.A

 HEAD OFFICE : 36 OMORFOKLISIAS STR., 142 34 ATHENS – GREECE, TEL.: +30 210 27 19 941-2, FAX.: +30 210 27 19 056  WORK SHOP : AGHIAS SOFIAS & NOE STR., 193 00 ASPROPYRGOS, GREECE, TEL. +30 210 55 95 562  https://www.etmer.gr e-mail : [email protected]

PROJECT: Maintenance works on equipment and pipes in all refinery units in HEL.PE SA

PROJECT : Erection of CIP and milk ageing ice cream units in DELTA Ice Cream SA

S.A

 HEAD OFFICE : 36 OMORFOKLISIAS STR., 142 34 ATHENS – GREECE, TEL.: +30 210 27 19 941-2, FAX.: +30 210 27 19 056  WORK SHOP : AGHIAS SOFIAS & NOE STR., 193 00 ASPROPYRGOS, GREECE, TEL. +30 210 55 95 562  https://www.etmer.gr e-mail : [email protected]

PROJECT : Erection of CIP and milk ageing ice cream units in DELTA Ice Cream SA

PROJECT: Convection section replacement and maintenance of air preheater 3-Η-01 Α/Β in HEL.PE Refineries in Elefsina

S.A

 HEAD OFFICE : 36 OMORFOKLISIAS STR., 142 34 ATHENS – GREECE, TEL.: +30 210 27 19 941-2, FAX.: +30 210 27 19 056  WORK SHOP : AGHIAS SOFIAS & NOE STR., 193 00 ASPROPYRGOS, GREECE, TEL. +30 210 55 95 562  https://www.etmer.gr e-mail : [email protected]

PROJECT: 2141- Refinery expansion 2005 spec. in MOH Korinthos

PROJECT: 2141- Refinery expansion 2005 spec. in MOH Korinthos

S.A

 HEAD OFFICE : 36 OMORFOKLISIAS STR., 142 34 ATHENS – GREECE, TEL.: +30 210 27 19 941-2, FAX.: +30 210 27 19 056  WORK SHOP : AGHIAS SOFIAS & NOE STR., 193 00 ASPROPYRGOS, GREECE, TEL. +30 210 55 95 562  https://www.etmer.gr e-mail : [email protected]

Project: 2141- Refinery expansion 2005 spec. in MOH Korinthos

PROJECT: 2141- Refinery expansion 2005 spec. in MOH Korinthos S.A

 HEAD OFFICE : 36 OMORFOKLISIAS STR., 142 34 ATHENS – GREECE, TEL.: +30 210 27 19 941-2, FAX.: +30 210 27 19 056  WORK SHOP : AGHIAS SOFIAS & NOE STR., 193 00 ASPROPYRGOS, GREECE, TEL. +30 210 55 95 562  https://www.etmer.gr e-mail : [email protected]

ET.M.ER’s FACILITIES ASPROPYRGOS ATTIKI

MAIN SHED (1000 SQ.M.) (FRONT SIDE)

MAIN SHED (BACK VIEW)

S.A

 HEAD OFFICE : 36 OMORFOKLISIAS STR., 142 34 ATHENS – GREECE, TEL.: +30 210 27 19 941-2, FAX.: +30 210 27 19 056  WORK SHOP : AGHIAS SOFIAS & NOE STR., 193 00 ASPROPYRGOS, GREECE, TEL. +30 210 55 95 562  https://www.etmer.gr e-mail : [email protected]

VIEW OF TWO SHEDS AND PLOT OF LAND

SECOND SHED (1700 SQ.M.) AND PLOT OF LAND

S.A

 HEAD OFFICE : 36 OMORFOKLISIAS STR., 142 34 ATHENS – GREECE, TEL.: +30 210 27 19 941-2, FAX.: +30 210 27 19 056  WORK SHOP : AGHIAS SOFIAS & NOE STR., 193 00 ASPROPYRGOS, GREECE, TEL. +30 210 55 95 562  https://www.etmer.gr e-mail : [email protected]

QUALITY OF WORKS

Our company policy aims primarily to provide the market services of a consistently high quality level. Under this policy recognizes that energy resources are not inexhaustible and therefore must be used responsibly. The contribution to the protection of the environment is not limited in its effort to reduce the environmental impact of its actions but extends to the effort to increase the environmental awareness of its customers, as well as to support actions outside the ET.M.ER SA having to do with the overall protection of the environment for future generations. To meet this objective applies an Environmental Management System. At the same time our company policy extends to the health and safety of workers but also of all those who visit or live near our facilities or premises which performs its work. To meet this objective, implementing a Health and Safety System. Basic principle and commitment of ET.M.ER SA and philosophy of each executive are:  The maximum satisfaction of customer needs from the first time you come in contact with the ET.M.ER SA and every time, at the lowest possible cost.  The company's compliance and monitoring compliance with this objective not only with national and ECC legislation and the audit requirements but also with national and international standards relating to Quality, Environment and Health and Safety.  Achieving total annual objectives and measurable quality, environmental and health and safety objectives set by ET.M.ER SA.  The continuous improvement in the market position of the company, and all of its results.  The ET.M.ER SA aims to save natural resources and prevent pollution by promoting eco-efficient practices in the operation of all its sectors.  Uses efficient waste management systems that contribute to save natural resources.  Reduces specific energy consumption, water and paper - adopting appropriate practices.  Adopt ecological criteria in the procurement of goods and services to the extent practicable.  Avoids the use of harmful substances, products and processes where possible.  Maintains and cleans the areas using ecological methods and materials.  Instruct and sensitize all staff, both in matters of ecological practices and energy saving, as in environmental management and control, during their work. Also the continuous improvement of the conditions relating to the health and safety of workers.  To achieve the above, the Management of ET.M.ER SA :

S.A

 HEAD OFFICE : 36 OMORFOKLISIAS STR., 142 34 ATHENS – GREECE, TEL.: +30 210 27 19 941-2, FAX.: +30 210 27 19 056  WORK SHOP : AGHIAS SOFIAS & NOE STR., 193 00 ASPROPYRGOS, GREECE, TEL. +30 210 55 95 562  https://www.etmer.gr e-mail : [email protected]

 Has adopted a Quality Management System, Environmental Management and Health & Safety in accordance with International Standards ISO 9001: 2015 ISO 14001: 2015 and OHSAS 18001: 2007, which is applied throughout the company and in all activities that affect the quality of services and customer satisfaction.  Continuously it reviews and improves the characteristics of the services, where possible, the effectiveness of its processes and the entire Quality System Environmental Management and Health and Safety.  Sets measurable objectives for quality, environment and Health & Safety at the corporate level, at the functional level segments and / or processes and in the implementation of projects. These objectives are established and evaluated as to the degree of their achievement in the context of the Review of the Quality System, Environmental Management and Health and Safety of the management of the company.  Provide the necessary resources for unhindered, efficient and effective operation of each division of the company.  Invests in continuous training, information and education of its staff in order to promote quality, environmental protection and health and safety in every activity.  Monitors, measures and evaluates the critical parameters and processes to ensure the quality, environmental protection and Health and Safety.  Recognizes the health and safety of staff as a prerequisite for the empowerment of people and their effectiveness. Adopting the principle of continuous improvement the ET.M.ER. SA recognizes and rewards teamwork, individual effort, invests in people and respects the customer and the environment. All the above guarantee the compliance of the Management and Staff of ET.M.ER. SA with the requirements for Quality, Environment and Health and Safety, according to ISO 9001: 2015, ISO 14001: 2015 and OHSAS 18001: 2007.

S.A

 HEAD OFFICE : 36 OMORFOKLISIAS STR., 142 34 ATHENS – GREECE, TEL.: +30 210 27 19 941-2, FAX.: +30 210 27 19 056  WORK SHOP : AGHIAS SOFIAS & NOE STR., 193 00 ASPROPYRGOS, GREECE, TEL. +30 210 55 95 562  https://www.etmer.gr e-mail : [email protected]

CERTIFICATIONS