Item No. RE 2014-15 Allocation Particulars

Total Page:16

File Type:pdf, Size:1020Kb

Item No. RE 2014-15 Allocation Particulars 8.1.1 SOUTH EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 NEW LINES (CONSTRUCTION) A - Works in Progress 1 Howrah-Amta, Bargachia-Champadanga-Tarakeshwar, Amta-Bagnan & new material Cap. 1,51,00 modification for Janghipara-Furfura Sharif (12.3 km) 2 Bowaichandi-Arambagh (31 km) Cap. 1,90,00 3 Digha-Jaleswar (41 km) with new material modification for Digha-Egra (31 km) Cap. 28,00 4 Tamluk-Digha, Deshpran-Nandigram with material modification for Kanthi-Egra (26.2 Cap. 12,10,00 km), Nandakumar-Bolaipanda (27 km) - new line & Nandigram - Kandiamari (Nayachar) (7 km) - new line 5# Badutola-Jhargram via Lalgarh (54 km) Cap. 2,00 TOTAL-WORKS IN PROGRESS Cap. 15,81,00 B - New Works 6 Works costing below Rs.2.5 crore each Cap. .. TOTAL-NEW WORKS Cap. .. TOTAL-New Lines (Construction) Cap. 15,81,00 GAUGE CONVERSION A - Works in Progress 7 Ranchi-Lohardaga with extension to Tori (113 km) Cap. 60,00,00 C.Fund .. EBR 25,00,00 8 Rupsa-Bangriposi (90 km) Cap. 6,95,00 Dep(RVN) .. EBR .. 9 Bankura - Damodar Vally (96 Km) GC with Bowai Chandi - Khana (22 km) NL, Cap. 10,00,00 Rainagar-Masagram (20.9 km) NL, Bankura - Mukut Monipur (57 km) NL & Mukut Monipur-Uparsol (26.7 km) NL , Bankura (Kalabati)-Purulia via Hura - (65 km) NL & Mukut Monipur-Jhilim C.Fund .. DRF .. TOTAL-WORKS IN PROGRESS Cap. 76,95,00 EBR 25,00,00 TOTAL-Gauge Conversion Cap. 76,95,00 EBR 25,00,00 DOUBLING A - Works in Progress 10 Padapahar-Banspani Cap. 4,00,00 C.Fund .. 11 Rajkharswan-Chakradharpur - 3rd line (20 km) Cap. 2,11,00 12 Banspani-Jaruli (9 km) Cap. 4,55,00 C.Fund .. 13 Barbil-Barajamda (10 km) Cap. 1,85,00 C.Fund .. 14 Bimlagarh-Dumetra Cap. 3,10,00 C.Fund .. 8.1.2 SOUTH EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 DOUBLING 15 Rajkharsawan-Sini - 3rd line Cap. 19,34,00 C.Fund .. 16 Panskura-Kharagpur - 3rd line (44.7 km) with new material modification for Panskura- Dep(RVN) .. Ghatal (32.8 km) - new line 17 Rajgoda-Tamluk (13.5 km) - Phase-II of Panskura-Haldia doubling Cap. 68,00 EBR .. 18 Champajharan-Bimlagarh (21 km) Cap. 17,30,00 19 Tamluk Jn. Cabin-Basulya Sutahata (24.4 km) Cap. 15,00,00 EBR .. 20 Goelkera-Monoharpur - 3rd line (40 km) C.Fund .. Dep(RVN) .. EBR .. 21 Muri-North Outer Cabin/Muri - Doubling of section with provision of 2nd bridge over Cap. 1,69,00 Subarnarekha C.Fund .. 22 Dongaposi-Rajkharsawan - 3rd line Cap. 86,36,00 23 Tikiapara-Santragachi - 4th line (5.6 km) Dep(RVN) .. 24 Sini-Adityapur (22.5 km) - 3rd line Cap. 57,92,00 25 Kharagpur-Gokulpur via Girimaidan (6 km) Cap. 3,11,00 26 Kharagpur-Narayangarh - 3rd line (20 km) Cap. 1,01,00 27 Manoharpur-Bondamunda - 3rd line (30 km) Cap. 1,23,00 28 Andul-Baltikuri (7.25 km) Cap. 85,00 TOTAL-WORKS IN PROGRESS Cap. 220,10,00 Dep(RVN) .. TOTAL-Doubling Cap. 220,10,00 Dep(RVN) .. TRAFFIC FACILITIES-YARD REMODELLING & OTHERS A - Works in Progress 29 Santragachi - Island platform between 1st loop & R3 by dismantling R1 & R2 with DF(3) 1,00 common loop signalling facility 30 Tatanagar & Adityapur - Yard remodelling DF(3) 1,00,00 31 Barajamda - Modification of station yard DF(3) 40,00 32 Barbil - Connecting line Nos 5 & 6 and one addl. loading line No 7 on Barajamda end Cap. 1,06,00 with main line 33 Nimpura - Signalling facility for despatching up trains between line No.5, 6, 7, 12, 14, Cap. 1,35,00 15, 16, 17 & 18 of reception yard west cabin towards Adra & Tata ends EBR .. 34 Ranchi - Construction of platform No 4 & 5 DF(3) 1,71,00 35 Barbil - Development of goods shed as freight terminal DF(3) 65,00 36 Chakradharpur Division - Simultaneous reception & despatch facilities (8 stations) DF(3) 46,25 8.1.3 SOUTH EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 TRAFFIC FACILITIES-YARD REMODELLING & OTHERS 37 Ramgarh Town - Yard remodelling, Mael - 2nd loop, Barkipona - Addl.loop & DF(3) 3,25,00 Harubera - 2nd loop 38 Gamharia - Extension of all lines with construction of road under bridge DF(3) 94,00 39 Dongaposi - Bypass line for connection with Kharagpur-Nagpur trunk route avoiding Cap. 25,00 Rajkharswan C.Fund .. 40 Kharagpur-Bhadrak - Addl loops in down direction (3 stations) & up direction (2 DF(3) 4,80,00 stations) 41 Jharsuguda - Development of goods shed as freight terminal DF(3) 1,11,00 42 Adra Division - Tokenless block working (10 block sections) DF(3) 25,00 43 Illoo - Addl loop line DF(1) 50,00 44 Barbenda (Block Cabin) - Upgradation of interlocking from standard-I to III with DF(3) 21,00 central panel 45 Rangra - Development of hot axle siding into full length loading line DF(3) 24,00 46 Kastur - Addl loop facility with central panel DF(3) 73,85 47 Urma - Addl loop facility with central panel DF(3) 1,75,00 48 Sonamukhi & Bhowaichandi - Crossing station with 2 loops each DF(3) 2,50,00 49 Karampada Yard - Extension of CSL at all lines (1 to 6) & shifting of level crossing DF(3) 10,00 50 Balasore - Development & upgradation as freight terminal DF(3) 12,50 51 Namkum - Goods terminal facility for handling full block rakes in one spur with direct DF(3) 40,00 reception & despatch facilities 52 Santragachi - Development of circulating area, essential passenger amenities & road DF(3) 1,00 connectivity with Kona expressway 53 Shalimar - Development of coaching terminal by provision of essential passenger DF(3) 1,00 amenities 54 Hijli - Addl dock platform for electrical multiple units & related activities DF(3) 41,00 55 Sankrail - Freight terminal Cap. 15,00 56 Sankrail-Santragachi - Link line (14.5 km) via flyover from down side to up side DF(3) 1,00 57 Works costing below Rs.2.5 crore each Cap. 48,00 DRF 23,00 DF(1) 49,00 DF(2) 1,00 DF(3) 7,80,00 DF(4) 20,00 TOTAL-WORKS IN PROGRESS Cap. 3,29,00 DRF 23,00 DF(1) 99,00 DF(2) 1,00 DF(3) 28,88,60 DF(4) 20,00 B - New Works 58 Works costing below Rs.2.5 crore each Cap. 1,00 DRF 1,00 DF(1) 1,00 DF(2) 1,00 DF(3) 3,00 8.1.4 SOUTH EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 TOTAL-NEW WORKS Cap. 1,00 DRF 1,00 DF(1) 1,00 DF(2) 1,00 DF(3) 3,00 TOTAL-Traffic Facilities-Yard Remodelling & Others Cap. 3,30,00 DRF 24,00 DF(1) 1,00,00 DF(2) 2,00 DF(3) 28,91,60 DF(4) 20,00 COMPUTERISATION A - Works in Progress 59 South Eastern Railway - Extension of unreserved ticketing system to balance A, B, C DF(1) 20,00 & D category stations 60 South Eastern Railway - Extension of unreserved ticketing system at E-category DF(1) 80,00 stations 61 South Eastern Railway - Extension of automatic ticket vending machines Cap. 60,00 62 Works costing below Rs.2.5 crore each DRF 3,68,00 DF(1) .. DF(3) .. TOTAL-WORKS IN PROGRESS Cap. 60,00 DRF 3,68,00 DF(1) 1,00,00 DF(3) .. B - New Works 63 South Eastern Railway - Repl of system peripherals of unreserved ticketing system DRF 1,00 (Phase-IV) 64 South Eastern Railway - Repl of datacom equipment for unreserved ticketing system DRF 1,00 (Phase-IV) 65 Works costing below Rs.2.5 crore each DRF 30,00 DF(1) .. DF(3) .. TOTAL-NEW WORKS DRF 32,00 DF(1) .. DF(3) .. TOTAL-Computerisation Cap. 60,00 DRF 4,00,00 DF(1) 1,00,00 DF(3) .. LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT A - Works in Progress 66 Leased Assets - Payment of Capital component of lease charges to Indian Railway C.Fund 454,76,00 Finance Corporation TOTAL-WORKS IN PROGRESS C.Fund 454,76,00 TOTAL-Leased Assets - Payment of Capital Component C.Fund 454,76,00 ROAD SAFETY WORKS-LEVEL CROSSINGS. A - Works in Progress 67 Adra, Chakradharpur & Kharagpur Divisions - Manning of unmanned level crossings Cap. .. (4, 5 & 7 Nos respectively) S.Fund 1 8.1.5 SOUTH EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 ROAD SAFETY WORKS-LEVEL CROSSINGS. 68 South Eastern Railway - Interlocking of B-class level crossing gates (18 Nos) S.Fund 20,00 69 South Eastern Railway - Manning of unmanned level crossings (170 Nos) S.Fund 2,00,00 70 Kharagpur & Chakradharpur Divisions - Interlocking of level crossing gates (12 Nos) S.Fund 90,00 71 Manning of level crossings on Southern,South Central,South Eastern,Western, S.Fund 75,00 Central,South East Central,South Western & West Central Railways (340 Nos) 72 Chakradharpur Division - Interlocking of level crossing gates in automatic block S.Fund 1,70,00 section (16 Nos) 73 South Eastern Railway - Interlocking of level crossing gates outside station limits (18 S.Fund 2,50,00 Nos) 74 Adra, Chakradharpur, Kharagpur & Ranchi Divisions - Pre-cast fibre RCC block at S.Fund 1,90,23 level crossings (320 Nos) 75 Works costing below Rs.2.5 crore each S.Fund 8,35,76 TOTAL-WORKS IN PROGRESS S.Fund 18,31,00 B - New Works 75a South Eastern Railway - Interlocking of level crossing gates (7 Nos) S.Fund .
Recommended publications
  • September 12, 2009 Distances in Kilometers Between Stations on the Ramkanali
    September 12, 2009 SER ADRA A DIVISION Distances in kilometers between stations on the Ramkanali Jn. - Chourashi section STATION ENGG. DISTANCE Ramkanali Jn. Chourashi ALPHA CODE RKI Ramkanali Jn. 0.000 CRS Chourashi 6.850 6.850 6.850 1 September 12, 2009 SER ADRA A DIVISION Distances in kilometers between stations on the Damodar Jn. - Radhanagar section STATION ENGG. DISTANCE Damodar Jn. Radhanagar ALPHA CODE DMA Damodar Jn. 0.000 RDR Radhanagar 6.960 6.960 6.960 1 September 12, 2009 SER ADRA A DIVISION Distances in kilometers between stations on the Damodar Jn. - Mohisila section STATION ENGG. DISTANCE Damodar Jn. Mohisila ALPHA CODE DMA Damodar Jn. 0.000 MOH Mohisila 8.130 8.130 8.130 2 September 12, 2009 SER ADRA A DIVISION Distances in kilometers between stations on the Mohuda - Khanodih section STATION ENGG. DISTANCE Mohuda Kharkhari Khanodih ALPHA CODE MHQ Mohuda 0.000 KHRI Kharkhari 5.330 5.330 KNF Khanodih 9.630 9.630 4.300 9.630 4.300 3 September 12, 2009 SER ADRA A DIVISION Distances in kilometers between stations on the Talgoria - Bokaro Steel City section STATION ENGG. DISTANCE Talgoria Bandhdih CHASS Ispatnagar Bokaro Steel City ALPHA CODE TLE Talgoria 0.000 BDIH Bandhdih 7.900 7.900 CHAS CHASS 13.250 13.250 5.350 IPTN Ispatnagar 21.100 21.100 13.200 7.850 BKSC Bokaro Steel City 37.750 37.750 29.850 24.500 16.650 37.750 29.850 24.500 16.650 4 September 12, 2009 SER ADRA A DIVISION Distances in kilometers between stations on the Purulia Jn.
    [Show full text]
  • The List of Legal Services Clinic at Police Station/ Front Office/ Jails/ Observation Homes/ JJB/ Child Welfare Centres/ Other Legal Services Clinics
    The list of Legal Services Clinic at Police Station/ Front office/ Jails/ Observation Homes/ JJB/ Child Welfare Centres/ Other Legal Services Clinics S. No. Name of the SLSA/ Name of the women PLV Presently working in Legal Services Contact Number DLSA/ TLSC Clinic at Police Station/ Front office/ Jails/ Observation Homes/ JJB/ Child Welfare Centres/ Other Legal Services Clinics. 1. Andhra Pradesh DLSA, Smt.N.Saraswathi Legal Services Clinic at Govt. General 9985484118 Ananthapuramu Hospital, Ananthapuramu Kum.G.Rajeswari Legal Services Clinic at Sathya Sai Old 9441465550 Age home, Ananthapuramu Kum. Vadde Gowari Legal Services Clinic at Ammaodi Old 8520843384 age home, Ananthapuramu Kum.K.Lakshmi Legal Services Clinic at Vasavi Old age 9059666247 home Kum. S.Sailavathi Legal Services Clinic at Marthadu 9985859635 village, Garladinne Mandal MLSC, Dhamavaram Kum. Kotla Salamma Legal Services Clinic at Ramgiri MRO 7702732433 office, Ramgiri PS MLSC,Gooty Smt.B.Aruna Front office 8096159278 MLSC, Hindupur Smt. M.Naga Jyothi Legal Services Clinic at Police Station 9849721460 Kum.B.Sanneramma Village Legal Services Clinic at MRO 7330915325 office, Parigi Kum.S.Beebijan Village Legal Services Clinic at MRO 7799636235 office, Hindupur Kum.B.Susella Village Legal Services Clinic at MRO 7036013195 office, Lepakshi Kum.S.Kalavathi Village Legal Services Clinic at MRO 9440617153 office, Govt. Hospital, Hindupur Kum.M.Obulamma Sub-Jail, Hindupur 8897419845 Smt.K.Padmavathi Village Legal Services Clinic at MRO 9948925666 office, Chilamathur MLSC, Kadiri
    [Show full text]
  • 8.1.1 ¢ [ रेल े South Eastern Railway
    8.1.1 दO>ण पूव रेलवे SOUTH EASTERN RAILWAY 20192019----2020 के िलए पƗरसंपिēयĪ कƙ खरीद , िनमाϕण और बदलाव Assets-Acquisition, Construction and Replacement for 2019-20 (Figures in thousand of Rupees)(आंकड़े हजार Đ . मĞ) पूंजी पूंजी िनिध मूआिन िविन संिन रारेसंको जोड़ िववरण Particulars Capital CF DRF. DF SF RRSK TOTAL 11 (a) New Lines (Construction) 6,00 .. .. .. .. .. 6,00 14 G Gauge Conversion 1,01,00 .. .. .. .. .. 1,01,00 15 ह Doubling 50,00 .. .. .. .. .. 50,00 16 - G Traffic Facilities-Yard 44,34,02 .. 5,90 6,79,00 .. 79,52,99 130,71,91 G ^ G Remodelling & Others 17 Computerisation 2,01,00 .. 5,00,00 17,01 .. .. 7,18,01 21 Rolling Stock 7,29,51 .. .. .. .. 18,32,95 25,62,46 22 * 4 - Leased Assets - Payment 583,19,70 231,50,30 .. .. .. .. 814,70,00 of Capital Component 29 E G - Road Safety Works-Level .. .. .. .. .. 61,84,08 61,84,08 Crossings. 30 E G -/ Road Safety Works-Road .. .. .. .. .. 177,61,00 177,61,00 Over/Under Bridges. 31 Track Renewals .. .. .. .. .. 658,05,01 658,05,01 32 G Bridge Works .. .. .. .. .. 44,91,38 44,91,38 33 G Signalling and .. .. .. .. .. 125,95,28 125,95,28 Telecommunication 36 ^ G - G Other Electrical Works 1,39,48 .. 4,46,62 3,76,99 .. 3,38,53 13,01,62 K excl TRD 37 G G Traction Distribution 1,00,99 .. .. .. .. 41,30,18 42,31,17 Works 41 U Machinery & Plant 2,43,54 .
    [Show full text]
  • Environmental & Social Impact Assessment
    ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT HVDS & GIS SUB-PROJECT OF HOWRAH Public Disclosure Authorized DISTRICT UNDER WBEDGMP Document No.: IISWBM/ESIA-WBSEDCL/2019-2020/003 Version: 1.2 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized July 2020 ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT FOR HVDS & GIS SUB-PROJECT OF HOWRAH DISTRICT UNDER WBEDGMP WITH WORLD BANK FUND ASSISTANCE Document No.: IISWBM/ESIA-WBSEDCL/2019-20/003 Version: 1.2 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED Vidyut Bhavan, Bidhan Nagar Kolkata – 700 091 Executed by Indian Institute of Social Welfare & Business Management, Kolkata – 700 073 July, 2020 CONTENTS Item Page No LIST OF FIGURE LIST OF TABLE LIST OF ACRONYMS & ABBREVIATIONS EXECUTIVE SUMMARY i-xiii 1.0 INTRODUCTION 1 - 7 1.1. Background 1 1.2. Need of ESIA 1 1.3. Objectives of the Study 2 1.4. Scope of the Study 2 1.5. Engagement & Mobilization of Consultant for the Study 4 1.6. Structure of the Report 6 2.0 PROJECT DETAIL 8-27 2.1 National & State Programs in Power Sector 8 2.1.1 Country and Sector Issues 8 2.2.2 West Bengal Power Sector 8 2.2 Project Overview 10 2.3 Proposed Project Development Objectives and Benefits 16 2.4 Project Location and Consumer Profile 17 2.4.1 Location 17 2.4.2 Consumer Details 19 2.4.3 Annual Load Growth 21 Item Page No 2.5 Project Description and Key Performance Indicators 22 2.5.1 Implementing Agency 22 2.5.2 Co-financing 22 2.5.3 Project Components 22 2.5.4 Key Performance Indicators 25 3.0 POLICY AND REGULATORY FRAMEWORK
    [Show full text]
  • Analysing the Anti CAA Violence in West Bengal
    December 2020 Dr. Syama Prasad Mookerjee Research Foundation Analysing the Anti CAA Violence in West Bengal Dr Mohit Ray Shri Sujit Sikdar Published by DR SYAMA PRASAD MOOKERJEE RESEARCH FOUNDATION & REFUGEE CELL, BJP WEST BENGAL Analysing the Anti CAA Violence in West Bengal (Analysis of the anti-CAA Violence in West Bengal between 13th - 15th December, 2019 in the light of the Newspaper Reports) Dr Mohit Ray Shri Sujit Sikdar (Translated from original Bengali by Ms Ahana Chaudhuri) Background The Citizenship Amendment Bill (henceforth CAB) was passed in the Lok Sabha on 10th December 2019. On the very next day, i.e. 11th December 2019, the Bill was passed in the Rajya Sabha. On 12th December, the President of India signed the Bill; and the Citizenship Amendment Act (CAA) came into force. The law was brought into existence through completely democratic and constitutional means. It is absolutely normal for political parties in the opposition to hold different views when a particular law is enacted in a democracy. Even protests against the law at various levels can be lodged as a democratic way of dissent. However, the violence that took place between 13th and 15th December 2019, in West Bengal in the name of protest, and those who perpetrated atrocities, reminded many of the days preceding the formation of Pakistan in 1946. Newspaper accounts and analyses of those terrible days are recorded in this booklet so that in the days to come, the people of West Bengal do not forget those three days when the state had virtually turned into a mini-Pakistan.
    [Show full text]
  • Industrial Park Profile of WBSIDC
    Industrial Park Profile INVEST IN BENGAL of WBSIDC West Bengal Small Industries Development Corporation Limited INVEST IN BENGAL Industrial Park Profile of WBSIDC West Bengal Small Industries Development Corporation Limited Industrial Park Profile of WBSIDC © WBSIDC January 2018 Ambari-Falakata Industrial Estate • Location Ambari Falakata Industrial Estate, Mogradangi, P.O. Payachari, Dist. Jalpaiguri, Latitude : 26.595255 (N), Longitude: 88.516511 (E) • Year of establishment 2009 • Accessibility » Situated at 0.5 KM from NH31B. » Nearest Railway Station: Ambari Falakata Railway Station » Nearest Airport: Bagdogra Airport, Jaipaiguri, West Bengal • Area 61.84 Acre • No. of Plot/Shed/Stall/Bldg Space 183 • No. of Functioning Units NA • No. of Non Functioning Units Allotment started recently • Rate Rs. 1.50 Lakh/Kattah with Rebate. (15% up to 30 Kattah / 25% above 30 to 60 K / 35% above 60K). • Type of Industries Allotment started recently. • Lease Period for units For 99 Years • Common Infrastructure » Internal Road connected with Main Road with Gates & Securities » Surface drainage network » Street lights » Power supply to individual units provided directly by the Service Provider WBSEDCL. • Maintenance By WBSIDC Ltd • Vacancy Position 144 Plots • Contact Person (SAE/Association) » SAE: Mr. Gopal Karmakar, Mobile No: 9434431276 » Association: Not yet formed. • Employment » Direct : Allotment started recently » Indirect: Allotment started recently. 5 Industrial Park Profile of WBSIDC Ashokenagar Industrial Estate • Location Ashokenagar Industrial Estate, Badamtola, P.O. & P.S. Ashokenagar, Dist. North 24 Parganas, Pin – 743222, Latitude: 22.836189 (N), Longitude: 88.612604 (E) • Year of establishment: 1989 • Accessibility » Situated on Jessore Road. » Nearest Railway Station: Ashokenagar Railway Station » Nearest Airport: Netaji Subhas Chandra Airport (CCU), Kolkata • Area 4.68 Acre • No.
    [Show full text]
  • Rajya Sabha Debates
    40 Written Answers to [RAJYA SABHA] Starred Questions 12 34 5 678 16 West Bengal 106.96 53.48 53.48 26.74 27.85 4.00 17 H.P. 32.2 16.10 16.10 8.05 8.39 1.16 18 Bihar 175.96 87.98 87.98 43.99 45.83 5.59 19 Orissa 83.92 41.96 41.96 20.98 21.85 3.58 20 Assam 35.88 17.94 . 17.94 8.97 9.34 1.86 21 North East 36.6 18.30 18.30 9.15 9.53 1.20 22 J&K 26.2 13.10 13.10 6.55 6.83 1.20 Adarsh Railway Stations *619. SHRI BHUPENDER YADAV: Will the Minister of RAILWAYS be pleased to state: (a) whether some railway stations in the country have been declared as Adarsh Railway Stations; (b) if so, the names thereof and the details of the development work undertaken at each of these stations during 2011-12 and 2012-13 so far; and (c) the amount sanctioned and spent during the above mentioned period on such projects, State-wise, indicating the Budgetary allocations made during the year 2012-13 ? THE MINISTER OF RAILWAYS (SHRI MUKUL ROY): (a) Yes, Sir. (b) Names of the stations identified for development under the 'Adarsh' Station Scheme, zone-wise is given in the Statement-I (See below). Development work viz. improvement to facade of station building, circulating area, lighting arrangement, waiting halls, provision of water coolers, passenger guidance system, pay and use toilet, public address system and Unreserved Ticketing System (UTS) are undertaken, depending upon the category of station, while developing stations under Adarsh station scheme.
    [Show full text]
  • Speech of Kumari Mamata Banerjee Introducing the Railway Budget 2009-2010 on 3Rd July 2009
    Speech of Kumari Mamata Banerjee Introducing the Railway Budget 2009-2010 On 3rd July 2009 1. Madam Speaker, I rise to present the Budget Estimates for the year 2009- 10 for the Indian Railways. I am extremely honoured presenting the first railway budget in the august House presided by the first lady Lok Sabha Speaker of the country. 2. This is the first Railway budget that I will be presenting as a Minister in the UPA government. I thank our respected Prime Minister, Dr. Manmohan Singh Ji for his valued guidance and support and I am also thankful to our honourable Finance Minister for his kind support. I have presented two Railway Budgets earlier and this will be my third Railway Budget. 3. Madam, I know how our Hon’ble Members of Parliament representing people from all parts of the country have high expectations from Indian Railways. They want new projects in their states and constituencies. They also want more new lines, more budget provisions and existing projects to be expedited. They want more trains and better services. 4. Railway is the visible face of the government and we are proud of it. Madam, therefore standing before the august House, please permit me to raise a question as to whether railway projects are to be measured only on the scale of “economic viability” or do we also need to look at the “social viability” of these projects ? Are the fruits of development to be restricted only to a privileged few and not to the teeming populations in remote and backward areas of our country? These projects may be economically unviable but are an economic necessity for the people of those regions who have remained victims of backwardness and poverty.
    [Show full text]
  • West Bengal Police Directorate Writers’ Buildings 2 Nd, Floor, Ii Nd Block Kolkata - 700 001
    MANUAL – 9 DIRECTORY OF OFFICER & EMPLOYEES SECTION- 4(1)(B)(IX) WEST BENGAL POLICE DIRECTORATE WRITERS’ BUILDINGS 2 ND, FLOOR, II ND BLOCK KOLKATA - 700 001 CONTROL ROOM – 2214 4031 UNITS / OFFICER LOCATION OF OFFICE STD OFFICE NOS. DG & IGP WB WRITERS’ BUILDINGS, KOLKATA - 700 001 033 2214-5400 2214-5486 ( FAX ) ADG ( ADMN.) WB WRITERS’ BUILDINGS, KOLKATA - 700 001 033 2214-4038 ADG ( MOD & CORD ) WB WRITERS’ BUILDINGS, KOLKATA - 700 001 033 2214-4416 IGP ( HQRS. ) WB WRITERS’ BUILDINGS, KOLKATA - 700 001 033 2214-3406 IGP ( ORG. ) WB WRITERS’ BUILDINGS, KOLKATA - 700 001 033 2214-4044 IGP ( ADMN. ) WB WRITERS’ BUILDINGS, KOLKATA - 700 001 033 2214-4041 IGP ( LAW & ORDER ) WB WRITERS’ BUILDINGS, KOLKATA - 700 001 033 2214-5401 / 5417 SPL. IGP & DIG ( HQRS.) WB WRITERS’ BUILDINGS, KOLKATA - 700 001 033 2214-5088 SPL. IGP & DIG (MOD & WRITERS’ BUILDINGS, KOLKATA - 700 001 033 2214-1261 CORD) WB SPL. IGP & DIG ( ADMN.) WB WRITERS’ BUILDINGS, KOLKATA - 700 001 033 2214-5009 SPL. IGP & DIG ( ORG. ) WB WRITERS’ BUILDINGS, KOLKATA - 700 001 033 2214-5537 DIG ( IPS CELL ) WB WRITERS’ BUILDINGS, KOLKATA - 700 001 033 2214-4778 DIG ( P & W ) WB WRITERS’ BUILDINGS, KOLKATA - 700 001 033 2214-1198 AIG ( S ) WB WRITERS’ BUILDINGS, KOLKATA - 700 001 033 2214-4042 DY. SP, DGP’S CONTROL WRITERS’ BUILDINGS, KOLKATA - 700 001 033 2214-5823 ROOM DGP’S CONTROL ROOM WRITERS’ BUILDINGS, KOLKATA - 700 001 033 2214-4031 2214-5486 ( FAX ) POLICE DIRECTORATE PBX WRITERS’ BUILDINGS, KOLKATA - 700 001 033 2214-5411 TO 5416 INTELIGENCE BRANCH 13, LORD SINHA ROAD, KOLKATA - 700 071.
    [Show full text]
  • List of Roads Maintained by Different Divisions in Alipurduar District
    LIST OF ROADS MAINTAINED BY DIFFERENT DIVISIONS IN ALIPURDUAR DISTRICT DIVISION: ALIPURDUAR CONSTRUCTION DIVISION, PWD Sl. Name of the Road No. Length (in km) Category 1 Alipurduar Patlakhowa Road (Sonapur to Alipurduar) SH 17.60 2 Alipurduar Volka Road SH 21.25 3 Buxa Forest Road (0.00 kmp to 16.00 kmp) (Alipurduar to Rajabhatkhawa) SH 16.00 4 Buxa Forest Road (16.00 kmp to 25.50 km) MDR 9.50 5 Buxirhat Jorai Road (10.65 km to 17.80 km) MDR 7.15 6 Cross Road Within Town MDR 8.91 7 Kumargram Jorai Road MDR 25.00 TOTAL 105.41 DIVISION: ALIPURDUAR HIGHWAY DIVISION, P.W (Roads) Dtte. Sl. Name of the Road No. Length (in km) Category 1 Alipurduar Kumargram Road MDR 20.00 2 Buxa to Jayanti Road MDR 5.20 3 Dalgaon Gomtu (Bhutan) Road MDR 10.00 4 Dalgaon Lankapara Road MDR 18.00 5 Dhupguri Falakata Road (15.23 km to 21.70 km) MDR 6.47 6 Ethelbari to Khagenhat Road MDR 10.00 7 Falakata Madarihat Road SH 22.70 8 Ghargharia to Salbari Road VR 4.10 9 Hantapara to Totopara Road VR 7.00 10 Hatipota to Samuktala Road MDR 16.05 11 Jayanti Dhawla Road MDR 15.00 12 Kalchini to Jaygaon Road MDR 9.25 13 Kalchini to Paitkapara Road MDR 17.84 14 Link Road From Falakata P.S to Falakata Petrol Pump MDR 0.80 15 Madarihat to Hantapara Road MDR 7.00 16 Rajabhatkhawa Joygaon Road (upto Old Hasimara) SH 24.50 17 Silbari to Salkumarhat Road MDR 10.85 18 Sinchula Hill Road ODR 5.00 19 Sonapur More of NH-31 to Hasimara on NH-31 via Chilapata Forest MDR 25.40 20 Tapsikhata to Salbari Road MDR 3.60 21 Telipara to Tiamarighat Road MDR 13.84 22 Union Academy to Godamdabri Road(Via Hamiltonganj Bazar) MDR 2.50 TOTAL 255.10 1 LIST OF ROADS MAINTAINED BY DIFFERENT DIVISIONS IN COOCHBEHAR DISTRICT DIVISION: COOCHBEHAR DIVISION, PWD Sl.
    [Show full text]
  • Sl No Code Institute Name District Nodal Institute Phone Address Pin No. Contact No. Viii+ Viii+ Viii+ Viii+ X+ 1 1 Balrampur In
    SL NO CODE INSTITUTE NAME DISTRICT NODAL INSTITUTE PHONE ADDRESS PIN NO. CONTACT NO. VIII+ VIII+ VIII+ VIII+ X+ BALRAMPUR INSTITUTE OF WOMEN'S POLYTECHNIC, 14/118, UDAY SANKAR SARANI, P.O- 1 1 KOLKATA/SOUTH 3324220227 700033 9433501682 TMSR EHMW 23WM VOCATIONAL AID JODHPUR PARK TOLLYGUNJ,KOLKATA WOMEN'S POLYTECHNIC, 2 13 NAKTALA HIGH SCHOOL KOLKATA/SOUTH 3324110395 348/165, N.S.C. BOSE ROAD 700047 9831089315 TMSR VIDE JODHPUR PARK DHAKURIA RAMCHANDRA HIGH WOMEN'S POLYTECHNIC, 3 19 KOLKATA/SOUTH 10, STATION ROAD 700031 TMSR SCHOOL JODHPUR PARK KOLKATA SOCIO CULTURAL WOMEN'S POLYTECHNIC, 4 21 KOLKATA/SOUTH 3324847280 2/27 PODDAR NAGAR, 700068 9433097372 TMSR TAIL RESEARCH INSTITUTE JODHPUR PARK SRI AUROBINDA ENGINEERING WOMEN'S POLYTECHNIC, C/2, RAMKRISHNA UPANIBESH, 5 23 KOLKATA/SOUTH 700092 23WM EHMW INSTITUTE JODHPUR PARK SULEKHA, SUKANTA SETU, JADAVPUR, WOMEN'S POLYTECHNIC, 6 25 BINODINI GIRLS HIGH SCHOOL KOLKATA/SOUTH 9062211165 2, BANK PLOT, DHAKURIA 700031 24731513 TAIL JODHPUR PARK WOMEN'S POLYTECHNIC, 7 26 SILENCE TRAINING INSTITUTE KOLKATA/SOUTH 24743761 2/1A, MONOHARPUKUR 2ND LANE 700029 9831168483 CMAT JODHPUR PARK ASWININAGAR J.N. MONDAL BIRLA INSTITUTE OF 8 28 KOLKATA/NORTH 3325712143 P.O. - ASWININAGAR, BAGUIATI 700059 9433114392 EHMW SDEP TMSR INSTITUTION TECHNOLOGY WOMEN'S POLYTECHNIC, 9 29 CHETLA SRI AURABINDA VIDYAPITH KOLKATA/SOUTH 9163271481 29/2, CHETLA CENTRAL ROAD 700027 9433111358 TAIL TOMK JODHPUR PARK MAHENDRA NATH HIGH SCHOOL WOMEN'S POLYTECHNIC, 10 32 KOLKATA/SOUTH 3324622860 ASHOK ROAD, P.O. - GARIA 700084 9830812847 TMSR SDEP (H.S.) JODHPUR PARK BIRLA INSTITUTE OF 11 33 SHREE GOPAL VIDYAMANDIR KOLKATA/NORTH 3325579366 11 G.
    [Show full text]
  • Inventory of HW Generating and Recycling Units in West Bengal
    HAZARDOUS WASTE GENERATING UNITS IN WEST BENGAL [as per the Hazardous Waste (Management, Handling & Transboundary Movement) Rules, 2008] 2014-15 DIST. North 24 Parganas HW generating HW generation in MTA as Total HW Quantity of HW in MTA streams as per per quantity of Type & Quantity of Products generating Sl. No Name Address HW manufactured process as Disposal in Sch-1 Sch-2 Sch-1 Sch-2 generation Recyclable Incinerable per Sch-1 landfills (MTA) 1. ABP Pvt. Ltd.- Barasat PO. Jaganathpur, Nilgunj, PS. Printing Press 5 5.1 5.250 13.639 5.250 8.389 Barasat, Kolkata- 700126 (Newspaper – 40150 MTA) 21 21.1 8.389 Dist. 24 Parganas(N) 33 33.3 0 2. ABP Pvt. Ltd. - Salt Lake GN- 39, Sector- V, Salt Lake Printing Press 21 21.1 0.000 14.020 14.020 City, PO. Sech Bhawan, PS. (Newspaper – 9125 MTA) 33 33.3 14.020 Salt Lake, Dist. 24 5 5.1 0.000 Parganas(N) 3. Agarpara Kutir Shilpa South Station Road, Dyeing & Bleaching 5 5.1 0.120 15.120 15.000 0.120 Pratisthan P.O.-Agarpara, (Jute Dyeing-7500000 metre/A) 34 34.3 15.000 Dist. 24 Parganas(N) 4. Agni Battery 348, Main Road, West Non-ferrous metal casting B4 0.636 0.636 0 0.636 Masunda, New Barrackpore, (Lead Acid Battery plates- 5.4 MTA) PS. Ghola, PIN. 700131 Dist. 24 Parganas(N) 5. Amit Paridhan Pvt. Ltd. Vill: Dhabdhara (Bira), P.S.: Dyeing & bleaching of grey fabrics 5 5.1 0.000 4.8 4.8 [NEW UNIT] Habra, P.O.: Rautara, District: [125 MT/month].
    [Show full text]