Item No. RE 2014-15 Allocation Particulars

Item No. RE 2014-15 Allocation Particulars

8.1.1 SOUTH EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 NEW LINES (CONSTRUCTION) A - Works in Progress 1 Howrah-Amta, Bargachia-Champadanga-Tarakeshwar, Amta-Bagnan & new material Cap. 1,51,00 modification for Janghipara-Furfura Sharif (12.3 km) 2 Bowaichandi-Arambagh (31 km) Cap. 1,90,00 3 Digha-Jaleswar (41 km) with new material modification for Digha-Egra (31 km) Cap. 28,00 4 Tamluk-Digha, Deshpran-Nandigram with material modification for Kanthi-Egra (26.2 Cap. 12,10,00 km), Nandakumar-Bolaipanda (27 km) - new line & Nandigram - Kandiamari (Nayachar) (7 km) - new line 5# Badutola-Jhargram via Lalgarh (54 km) Cap. 2,00 TOTAL-WORKS IN PROGRESS Cap. 15,81,00 B - New Works 6 Works costing below Rs.2.5 crore each Cap. .. TOTAL-NEW WORKS Cap. .. TOTAL-New Lines (Construction) Cap. 15,81,00 GAUGE CONVERSION A - Works in Progress 7 Ranchi-Lohardaga with extension to Tori (113 km) Cap. 60,00,00 C.Fund .. EBR 25,00,00 8 Rupsa-Bangriposi (90 km) Cap. 6,95,00 Dep(RVN) .. EBR .. 9 Bankura - Damodar Vally (96 Km) GC with Bowai Chandi - Khana (22 km) NL, Cap. 10,00,00 Rainagar-Masagram (20.9 km) NL, Bankura - Mukut Monipur (57 km) NL & Mukut Monipur-Uparsol (26.7 km) NL , Bankura (Kalabati)-Purulia via Hura - (65 km) NL & Mukut Monipur-Jhilim C.Fund .. DRF .. TOTAL-WORKS IN PROGRESS Cap. 76,95,00 EBR 25,00,00 TOTAL-Gauge Conversion Cap. 76,95,00 EBR 25,00,00 DOUBLING A - Works in Progress 10 Padapahar-Banspani Cap. 4,00,00 C.Fund .. 11 Rajkharswan-Chakradharpur - 3rd line (20 km) Cap. 2,11,00 12 Banspani-Jaruli (9 km) Cap. 4,55,00 C.Fund .. 13 Barbil-Barajamda (10 km) Cap. 1,85,00 C.Fund .. 14 Bimlagarh-Dumetra Cap. 3,10,00 C.Fund .. 8.1.2 SOUTH EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 DOUBLING 15 Rajkharsawan-Sini - 3rd line Cap. 19,34,00 C.Fund .. 16 Panskura-Kharagpur - 3rd line (44.7 km) with new material modification for Panskura- Dep(RVN) .. Ghatal (32.8 km) - new line 17 Rajgoda-Tamluk (13.5 km) - Phase-II of Panskura-Haldia doubling Cap. 68,00 EBR .. 18 Champajharan-Bimlagarh (21 km) Cap. 17,30,00 19 Tamluk Jn. Cabin-Basulya Sutahata (24.4 km) Cap. 15,00,00 EBR .. 20 Goelkera-Monoharpur - 3rd line (40 km) C.Fund .. Dep(RVN) .. EBR .. 21 Muri-North Outer Cabin/Muri - Doubling of section with provision of 2nd bridge over Cap. 1,69,00 Subarnarekha C.Fund .. 22 Dongaposi-Rajkharsawan - 3rd line Cap. 86,36,00 23 Tikiapara-Santragachi - 4th line (5.6 km) Dep(RVN) .. 24 Sini-Adityapur (22.5 km) - 3rd line Cap. 57,92,00 25 Kharagpur-Gokulpur via Girimaidan (6 km) Cap. 3,11,00 26 Kharagpur-Narayangarh - 3rd line (20 km) Cap. 1,01,00 27 Manoharpur-Bondamunda - 3rd line (30 km) Cap. 1,23,00 28 Andul-Baltikuri (7.25 km) Cap. 85,00 TOTAL-WORKS IN PROGRESS Cap. 220,10,00 Dep(RVN) .. TOTAL-Doubling Cap. 220,10,00 Dep(RVN) .. TRAFFIC FACILITIES-YARD REMODELLING & OTHERS A - Works in Progress 29 Santragachi - Island platform between 1st loop & R3 by dismantling R1 & R2 with DF(3) 1,00 common loop signalling facility 30 Tatanagar & Adityapur - Yard remodelling DF(3) 1,00,00 31 Barajamda - Modification of station yard DF(3) 40,00 32 Barbil - Connecting line Nos 5 & 6 and one addl. loading line No 7 on Barajamda end Cap. 1,06,00 with main line 33 Nimpura - Signalling facility for despatching up trains between line No.5, 6, 7, 12, 14, Cap. 1,35,00 15, 16, 17 & 18 of reception yard west cabin towards Adra & Tata ends EBR .. 34 Ranchi - Construction of platform No 4 & 5 DF(3) 1,71,00 35 Barbil - Development of goods shed as freight terminal DF(3) 65,00 36 Chakradharpur Division - Simultaneous reception & despatch facilities (8 stations) DF(3) 46,25 8.1.3 SOUTH EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 TRAFFIC FACILITIES-YARD REMODELLING & OTHERS 37 Ramgarh Town - Yard remodelling, Mael - 2nd loop, Barkipona - Addl.loop & DF(3) 3,25,00 Harubera - 2nd loop 38 Gamharia - Extension of all lines with construction of road under bridge DF(3) 94,00 39 Dongaposi - Bypass line for connection with Kharagpur-Nagpur trunk route avoiding Cap. 25,00 Rajkharswan C.Fund .. 40 Kharagpur-Bhadrak - Addl loops in down direction (3 stations) & up direction (2 DF(3) 4,80,00 stations) 41 Jharsuguda - Development of goods shed as freight terminal DF(3) 1,11,00 42 Adra Division - Tokenless block working (10 block sections) DF(3) 25,00 43 Illoo - Addl loop line DF(1) 50,00 44 Barbenda (Block Cabin) - Upgradation of interlocking from standard-I to III with DF(3) 21,00 central panel 45 Rangra - Development of hot axle siding into full length loading line DF(3) 24,00 46 Kastur - Addl loop facility with central panel DF(3) 73,85 47 Urma - Addl loop facility with central panel DF(3) 1,75,00 48 Sonamukhi & Bhowaichandi - Crossing station with 2 loops each DF(3) 2,50,00 49 Karampada Yard - Extension of CSL at all lines (1 to 6) & shifting of level crossing DF(3) 10,00 50 Balasore - Development & upgradation as freight terminal DF(3) 12,50 51 Namkum - Goods terminal facility for handling full block rakes in one spur with direct DF(3) 40,00 reception & despatch facilities 52 Santragachi - Development of circulating area, essential passenger amenities & road DF(3) 1,00 connectivity with Kona expressway 53 Shalimar - Development of coaching terminal by provision of essential passenger DF(3) 1,00 amenities 54 Hijli - Addl dock platform for electrical multiple units & related activities DF(3) 41,00 55 Sankrail - Freight terminal Cap. 15,00 56 Sankrail-Santragachi - Link line (14.5 km) via flyover from down side to up side DF(3) 1,00 57 Works costing below Rs.2.5 crore each Cap. 48,00 DRF 23,00 DF(1) 49,00 DF(2) 1,00 DF(3) 7,80,00 DF(4) 20,00 TOTAL-WORKS IN PROGRESS Cap. 3,29,00 DRF 23,00 DF(1) 99,00 DF(2) 1,00 DF(3) 28,88,60 DF(4) 20,00 B - New Works 58 Works costing below Rs.2.5 crore each Cap. 1,00 DRF 1,00 DF(1) 1,00 DF(2) 1,00 DF(3) 3,00 8.1.4 SOUTH EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 TOTAL-NEW WORKS Cap. 1,00 DRF 1,00 DF(1) 1,00 DF(2) 1,00 DF(3) 3,00 TOTAL-Traffic Facilities-Yard Remodelling & Others Cap. 3,30,00 DRF 24,00 DF(1) 1,00,00 DF(2) 2,00 DF(3) 28,91,60 DF(4) 20,00 COMPUTERISATION A - Works in Progress 59 South Eastern Railway - Extension of unreserved ticketing system to balance A, B, C DF(1) 20,00 & D category stations 60 South Eastern Railway - Extension of unreserved ticketing system at E-category DF(1) 80,00 stations 61 South Eastern Railway - Extension of automatic ticket vending machines Cap. 60,00 62 Works costing below Rs.2.5 crore each DRF 3,68,00 DF(1) .. DF(3) .. TOTAL-WORKS IN PROGRESS Cap. 60,00 DRF 3,68,00 DF(1) 1,00,00 DF(3) .. B - New Works 63 South Eastern Railway - Repl of system peripherals of unreserved ticketing system DRF 1,00 (Phase-IV) 64 South Eastern Railway - Repl of datacom equipment for unreserved ticketing system DRF 1,00 (Phase-IV) 65 Works costing below Rs.2.5 crore each DRF 30,00 DF(1) .. DF(3) .. TOTAL-NEW WORKS DRF 32,00 DF(1) .. DF(3) .. TOTAL-Computerisation Cap. 60,00 DRF 4,00,00 DF(1) 1,00,00 DF(3) .. LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT A - Works in Progress 66 Leased Assets - Payment of Capital component of lease charges to Indian Railway C.Fund 454,76,00 Finance Corporation TOTAL-WORKS IN PROGRESS C.Fund 454,76,00 TOTAL-Leased Assets - Payment of Capital Component C.Fund 454,76,00 ROAD SAFETY WORKS-LEVEL CROSSINGS. A - Works in Progress 67 Adra, Chakradharpur & Kharagpur Divisions - Manning of unmanned level crossings Cap. .. (4, 5 & 7 Nos respectively) S.Fund 1 8.1.5 SOUTH EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 ROAD SAFETY WORKS-LEVEL CROSSINGS. 68 South Eastern Railway - Interlocking of B-class level crossing gates (18 Nos) S.Fund 20,00 69 South Eastern Railway - Manning of unmanned level crossings (170 Nos) S.Fund 2,00,00 70 Kharagpur & Chakradharpur Divisions - Interlocking of level crossing gates (12 Nos) S.Fund 90,00 71 Manning of level crossings on Southern,South Central,South Eastern,Western, S.Fund 75,00 Central,South East Central,South Western & West Central Railways (340 Nos) 72 Chakradharpur Division - Interlocking of level crossing gates in automatic block S.Fund 1,70,00 section (16 Nos) 73 South Eastern Railway - Interlocking of level crossing gates outside station limits (18 S.Fund 2,50,00 Nos) 74 Adra, Chakradharpur, Kharagpur & Ranchi Divisions - Pre-cast fibre RCC block at S.Fund 1,90,23 level crossings (320 Nos) 75 Works costing below Rs.2.5 crore each S.Fund 8,35,76 TOTAL-WORKS IN PROGRESS S.Fund 18,31,00 B - New Works 75a South Eastern Railway - Interlocking of level crossing gates (7 Nos) S.Fund .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    26 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us