Churachandpur College
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Stratified Random Sampling - Manipur (Code -21)
Download The Result Stratified Random Sampling - Manipur (Code -21) Species Selected for Stratification = Cattle + Buffalo Number of Villages Having 100 + (Cattle + Buffalo) = 728 Design Level Prevalence = 0.126 Cluster Level Prevalence = 0.03 Sensitivity of the test used = 0.9 Total No of Villages (Clusters) Selected = 85 Total No of Animals to be Sampled = 1785 Back to Calculation Number Cattle of units Buffalo Cattle DISTRICT_NAME BLOCK_CODE BLOCK_NAME VILLAGE_NAME Buffaloes Cattle + all to Proportion Proportion Buffalo sample Bishnupur 2 Bishnupur Potsangbam And Upokpi 19 253 272 303 20 1 19 Bishnupur 15 Kumbi Kumbi (NP) - Ward No.3 32 296 328 328 20 2 18 Bishnupur 2 Bishnupur Nachou 0 704 704 726 21 0 21 Nambol (M Cl) (Part) - Bishnupur 29 Nambol 15 1200 1215 1222 21 0 21 Ward No.15 Chandel 3 Chakpikarong Charoiching 1 105 106 129 19 0 19 Chandel 24 Machi Laiching Minou 5 113 118 118 19 1 18 Chandel 51 Tengnoupal A.Khullen 0 124 124 124 19 0 19 Chandel 4 Chandel Khudei Khunou 14 114 128 145 19 2 17 Chandel 4 Chandel New Chayang 0 173 173 173 20 0 20 Chandel 24 Machi Laiching Khunou 17 165 182 216 20 2 18 Chandel 24 Machi M.Ringpam 0 190 190 190 20 0 20 Chandel 24 Machi Konaitong 0 196 196 196 20 0 20 Chandel 24 Machi Khunbi 0 222 222 222 20 0 20 Chandel 24 Machi Heinoukhong 0 249 249 249 20 0 20 Chandel 3 Chakpikarong Khullenkhallet 111 140 251 314 20 9 11 Chandel 4 Chandel Beru Khudam 0 274 274 274 20 0 20 Chandel 24 Machi Laiching Kangshang 0 308 308 414 20 0 20 Churachandpur 46 Singngat Tuikuimuallum 4 116 120 120 19 1 18 Churachandpur -
Forest Cover Map of Manipur
INITIAL ENVIRONMENT ASSESSMENT REPORT(IEAR) FOR T & D NETWORK IN IMPHAL EAST, CHURACHANDPUR, Public Disclosure Authorized THOUBAL AND TAMENGLONG DISTRICTS UNDER NERPSIP TRANCHE-1, MANIPUR Alt-1 Public Disclosure Authorized Public Disclosure Authorized Alt-3 Prepared By ENVIRONMENT AND SOCIAL MANAGEMENT POWER GRID CORPORATION OF INDIA LTD (A GOVERNMENT OF INDIA ENTERPRISE ) Public Disclosure Authorized For MANIPUR STATE POWER COMPANY LIMITED (ELECTICITY DEPARTMENT , GOVT. OF MANIPUR ) MANIPUR/IEAR/TRANCHE-1/2015 July’5 CONTENTS Section Description Page No. Section - I : Project Description - 1-4 - Background - 1 - Benefits of The Project - 2 - Project Justification - 2 - Project Highlights 3 - Project Scope & Present Study - 3 Section - II : Baseline Data - 5-10 - Manipur - 5 Section- III : Policy, Legal & Regulatory Framework - 11-16 - Environmental - 11 - Social - 15 Section- IV : Criteria for Route/Site Selection - 17-22 - Route Selection - 17 - Study of Alternatives - 17 - Transmission lines - 18 - Evaluation of Alternatives Route Alignment for 33 kV line from - 18 33/11 kV Thangal S/S (New) to 33/11 kV Khoupom S/S (existing) - Substation - 21 Section - V : Potential Environmental Impact, their Evaluation & - 23-32 Management - Impact Due to Project Location & Design - 23 - Environmental Problem Due to Design - 26 - Environmental Problems during Construction Phase - 28 - Environmental Problems resulting from Operation - 30 - Critical Environmental Review Criteria - 30 - Public Consultation - 31 - Conclusion - 32 Section- VI : Implementation -
Final Report Manipur State
Directorate General NDRF & Civil Defence (Fire) Ministry of Home Affairs East Block 7, Level 7, NEW DELHI, 110066, Fire Hazard and Risk Analysis in the Country for Revamping the Fire Services in the Country Final Report – State Wise Risk Assessment, Infrastructure and Institutional Assessment of Phase IV States (Arunachal Pradesh, Assam, Chhattisgarh, Jharkhand, Manipur, Meghalaya, Mizoram, Nagaland, Orissa, Sikkim, Tripura, and West Bengal) November 2012 Submitted by RMSI A-8, Sector 16 Noida 201301, INDIA Tel: +91-120-251-1102, 2101 Fax: +91-120-251-1109, 0963 www.rmsi.com Contact: Sushil Gupta General Manager, Risk Modeling and Insurance Email:[email protected] Fire-Risk and Hazard Analysis in the Country Table of Contents Table of Contents .................................................................................................................. 2 List of Figures ....................................................................................................................... 5 List of Tables ........................................................................................................................ 6 Acknowledgements ............................................................................................................... 9 Executive Summary ............................................................................................................ 10 1 Introduction .................................................................................................................. 18 1.1 Background.......................................................................................................... -
Census Atlas, Part-XII, Series-15, Manipur
CENSUS OF INDIA 2001 SERIES-IS PART-XII MANIPUR CENSUS ATLAS dt> iJ. iir'~ {.~ ~ ~'II:, I/s 0 l \ ~ PEOPLE ORIENTED DIRECTORATE OF CENSUS OPERATIONS, MANIPUR • The maps included in this publication are based upon Survey ofIndia map with the permission of the Surveyor General ofIndia. • The territorial waters of India extend into the sea to a distance of twelve nautical miles measured from the appropriate base line. • The interstate boundaries between Arunachal Pradesh, Assam and meghalaya shown in this publication are interpreted from the N orth- Eastern areas (Reorganisation) Act, 1971 but have yet to be verified. © Government ofIndia, Copyright, 2008 FOREWARD Census ofIndia, is perhaps, one of the largest castes and scheduled tribes, education and producer of maps in the country and in each census housing characteristics of the Statef\Jnion territory. decade nearly 10,000 maps of different categories The unit of the presentation of data is district/sub and themes are published. Earlier to 1961 Census, district. The adoption of GIS technique has not the maps were published in the census reports/tables only made this work more comprehensive but has as supporting documents. During Census 1961, a helped improve the quality of Census Atlas 2001 of new series of 'Census Atlas of States and Union State and Union territories. territories' was introduced which has been continued in the subsequent censuses. The maps have been prepared mostly by choropleth technique but other cartographic Census Atlas of States and Union territories methodologies, such as bar and sphere diagrams, 2001 are based on census data co't'ering different pyramids, isotherms and isohyets have also been themes. -
1 District Census Handbook-Churachandpur
DISTRICT CENSUS HANDBOOK-CHURACHANDPUR 1 DISTRICT CENSUS HANDBOOK-CHURACHANDPUR 2 DISTRICT CENSUSHANDBOOK-CHURACHANDPUR T A M T E MANIPUR S N A G T E L C CHURACHANDPUR DISTRICT I O L N R G 5 0 5 10 C T SENAPATI A T D I S T R I DISTRICT S H I B P Kilpmetres D To Ningthoukhong M I I From From Jiribam Nungba S M iver H g R n Ira N A r e U iv k R ta P HENGLEP ma Lei S Churachandpur District has 10 C.D./ T.D. Blocks. Tipaimukh R U Sub - Division has 2 T.D. Blocks as Tipaimukh and Vangai Range. Thanlon T.D. Block is co-terminus with the Thanlon r R e Sub-Diovision. Henglep T.D. Block is co-terminus with the v S i r e R v Churachandpur North Sub-Division. Churachandpur Sub- i i R C H U R A C H A N D P U R N O R T H To Imphal u l Division has 5 T.D. Blocks as Lamka,Tuibong, Saikot, L u D L g Sangaikot and Samulamlan. Singngat T.D. Block is co- l S U B - D I V I S I O N I S n p T i A a terminus with the Singngat Sub-Division. j u i R T u INDIAT NH 2 r I e v i SH CHURACHANDPUR C R k TUIBONG ra T a RENGKAI (C T) 6! ! BIJANG ! B G ! P HILL TOWN (C T) ! ZENHANG LAMKA (C T) 6 G! 6 3 M T H A N L O N CCPUR H.Q. -
Manipur Floods, 2015
Joint Needs Assessment Report on Manipur Floods, 2015 Joint Needs Assessment Report This report contains the compilation of the JNA –Phase 01 actions in the state of Manipur, India in the aftermath of the incessant rains and the subsequent embankment breaches which caused massive floods in first week of August 2015 affecting 6 districts of people in valley and hills in Manipur. This is the worst flood the state has witnessed in the past 200 years as observed on traditional experiences. Joint Needs Assessment Report: Manipur Floods 2014 Disclaimer: The interpretations, data, views and opinions expressed in this report are collected from Inter-agency field assessments Under Joint Need assessment (JNA) Process, District Administration, individual aid agencies assessments and from media sources are being presented in the Document. It does not necessarily carry the views and opinion of individual aid agencies, NGOs or Sphere India platform (Coalition of humanitarian organisations in India) directly or indirectly. Note: The report may be quoted, in part or full, by individuals or organisations for academic or Advocacy and capacity building purposes with due acknowledgements. The material in this Document should not be relied upon as a substitute for specialized, legal or professional advice. In connection with any particular matter. The material in this document should not be construed as legal advice and the user is solely responsible for any use or application of the material in this document. Page 1 of 27 | 25th August 2014 Joint Needs Assessment Report: Manipur Floods 2014 Contents 1 Executive Summary 4 2 Background 5 3 Relief Measures GO & NGO 6 4 Inherent capacities- traditional knowledge 6 5 Field Assessment: 7 6 Sector wise needs emerging 7 6.1 Food Security and Livelihoods 7 a. -
Manipur Priority List 2007-08
Manipur Priority List 2007-08 Sl.No Name of the project Esti mated cost (Rs in lakhs) Power 1 Loktak Down stream H.E. Project (2X33 MW), Tamenglong district 10000.00 2 Installation of 2x1 MVA 33/11 KV sub-station at Chakpi Karong, 551.96 Chandel District 3 Installation of 2x12.5 MVA 132/33 KV sub-station at Chandel 1827.43 4 Installation of 2x1 MVA 33/11 KV sub-station at Henglep, 389.87 Churachandpur Total 127 69.26 Health Sect or 5 Construction and equipping of 50 bedded Bishnupur district 2584.58 hospital, Bishnupur Total 2584. 58 Water Supp ly 6 Augmentation of water supply scheme at Chingai Sub-Divisional 400.00 headquarter ( 0.17 MLD), Ukhrul 7 Augmentation of Water Supply Scheme for Singngat and its 250.92 surrounding villages. (0.30MLD), Churachandpur 8 Augmentation of Water Supply Scheme at Tengnoupal and its 211.88 surrounding area (0.240) M.L.D, Chandel Total 862.80 Roa ds & Br idges 9 Impvovement of road from Serou Part III to Tayang Salup via Ema 800.00 Nungthong Lairembi Temple – 0 to 20 km., Chandel 10 Improvement of road from NH-39 to Thiyam via Thoubal 1405.00 Wangmataba to D.C. Office, Thoubal 11 Upgradation of Imphal-Mayang Imphal Road (0.00km-4.00 km), 500.00 Imphal West & Thoubal 12 Construction of RCC bridge over Imphal River at Mongkhang 577.00 Lambi/Waikhom Leika Mapa, Imphal East 13 Widening and Improvement of Road from Khongman Mangil to 1392.00 Khongman Okram Chuthek, Imphal East 14 Construction of bridge over Iril river at Chingaren mapa, Imphal 530.00 East 15 Construction of RCC bridge over Iril River at Keirao -
1 April, 2014 to 30 September, 2014
1st Half Yearly Monitoring Final Report 2014-15 of MANIPURUNIVERSITY (Monitoring Institute Sarva Shiksha Abhiyan, Manipur University) MI/SSA/MU Nodal Officer DR. L. LEIREN SINGH Department of Education, Manipur University On MDM for the State of MANIPUR Period: 1st April, 2014 to 30th September, 2014 District Covered Churachandpur and Thoubal Districts 2014-15 FINAL REPORT ON MDM MONITORING AND SUPERVISION Period : 1st April, 2014 to 30th September, 2014 Name of State : Manipur Name of MI : MI/SSA-RTE/MDM Department of Education, Manipur University, Canchipur Districts : Churachandpur and Thoubal Districts Name of Districts Visited: Name of Districts Total No. of School No. of Schools visited Churachandpur District 582 40 Thoubal District 575 40 Source: http://schoolreportcards.in 2014 29 CONTENT 1 Foreword Page-No 2 Acknowledgement 3 Map of the Sample District Churachandpur District Map Thoubal District Map 4 General Information of Churachandpur and Thoubal Districts 5 Churachandpur District 1-10 6 Thoubal District 11-20 7 Executive Summary of MDM Churachandpur District 21-24 8 Executive Summary of MDM Thoubal District 25-28 9 Overall Performance Score Card of the two districts 29-30 10 Charts giving detailed information about various MDM intervention 31-33 11 Photo Plates Churachandpur District (Annexure I) 34-34 12 Photo Plates Thoubal District (Annexure II) 35-36 13 List of sample Schools Churachandpur District with DISE Code (Annexure III) 37-37 14 List of sample Schools Thoubal District with DISE Code (Annexure IV) 38-38 30 MANIPUR UNIVERSITY CANCHIPUR: IMPHAL FOREWORD The Department of Education, Manipur University, Canchipur, the Monitoring Institute (MI) in-charge of Monitoring Mid-Day-Meal of 2 (two) districts of Churachandpur and Thoubal districts of the state of Manipur feel privileged to be one of the Monitoring Institutions across the country for the broad based monitoring of SSA, MDM and RTE 2009 activities. -
Project Proposals for PMAY-Housing for All(Urban)
Presentation on Project Proposals for PMAY-Housing for All(Urban) Central Sanctioning & Monitoring Committee (CSMC) 8th December, 2016 MANIPUR Background- Housing for All(U) PMAY-HFA(U) is a National Flagship Programme launched in June 2015. At its launch, only Class-I towns were eligible for coverage under this Mission. On the request of State Govt., all the 28 towns of Manipur have been included under HFA(U) mission. Only 27 towns are considered at present as Moreh STC is not having an elected ULB at present. The required MoU has already been signed for successful implementation of the mission. The detailed norms for ‘Enhancement’ under 4th vertical of BLC was issued by the Ministry in June 2016 only. Follow-up Actions to CSMC dated 27.10. 2016 As per CSMC Follow-up Actions Demand Survey Completed in 18 towns Demand Survey Completed in 20 towns (20432 (17491 applicants) for BLC & 20 towns for applicants) for BLC & 21 towns for CLSS (8082 CLSS (7946 applicants). Demand survey to applicants). Demand survey in remaining towns be completed within next 2 months are expected to be completed by 31 Dec 2016 MIS entry for 4 towns of Kakching, Jiribam, Sugnu & Lamsang are in full swing. 1234 out of To initiate MIS entry 3090 beneficiaries are attached till 11.30 AM of 8/12/ 16. Unit design redesigned incorporating the To incorporate earthquake resistant relevant codes in consultation with Engg Section measures in unit design by adopting of PDA, Manipur. The revised design was appropriate ISI codes/ BMTPC publications appraised by SLAC State Govt. -
Chapter 1: Introduction
Chapter 1: Introduction 1.1. District Profile The district of Kakching came into existence on the 8thDecember 2016 when the State Government announced the formation of 7 new district through a notification of the Government of Manipur, (Secretariat: Revenue Department Order No. 16/20/2016-R dated 8th December 2016), (Manipur Extraordinary Gazette No. 408 of 9.12.2016). It is situated in the southeastern part of Manipur. It is bounded by Thoubal and Imphal West districts on the north, Tengnoupal and Chandel districts on the east, Bishnupur districts on the west and Chandel district on the south. Its average elevation is not very much different from the rest of the Manipur Valley, which is about 790 metres on an average above the mean sea level. Although the district is a part of the valley, the area of the district is not entirely plain. Many rivers flow through the district and many lakes dot its surface, some of which are closely inter-twined with many folk tales and stories. 4(four) Assembly Constituencies namely Hiyanglam Assembly Constituency, Wabgai Assembly Constituency, Sugnu Assembly Constituency and Kakching Assembly Constituency fall under the District.Kakching district comprises of two sub-divisionsnamely Kakching and Waikhong. It has 3 Municipal Councils namely, Kakching, Sugnu and Kakching Khunou. The district has two community development blocks one each at Kakching and Waikhong sub-division. 1.2. Administrative Setup The District Magistrate-cum-Deputy Commissioner (Collector) is the head of the district. He is assisted in this work by other officers and staff as are appointed from time to time. -
Churachandpur District District Health Action Plan for the Year 2010-11
2 N D D R A F T CHURACHANDPUR DISTRICT DISTRICT HEALTH ACTION PLAN FOR THE YEAR 2010-11 PREPARED BY:::: DISTRICT PLANNING TEAM CHURACHANDPUR DEPARTMENT OF HEALTH & FAMILY WELFARE GOVERNMENT OF MANIPUR CCP PIP 2010 -11 PREFACE The Program Implementation Plan (PIP) for the Churachandpur District is prepared for the year 2010-11 as per the guidelines and directions from the Ministry of Health & Family Welfare, Government of India. An elaborate exercise was undertaken for reflecting the District needs in various Health sections. The District Planning Team conducted Capacity Building for Health Management, Meetings with blocks level officers, Open Sessions during ASHA training, and compilation of collected data from ASHA and ANMs for unearthing the problems and issues in the Block level- wise/PHCs. In addition to the District Planning Team visits various Health Institutions to curve out the actual adverse Health situation prevailing in the District. The District Planning Team also trained to Some Senior Medical Officers of CHC/PHCs, BPMUs, District Health Program Officers of the various Vertical Health. They were also involved in the making of this Integrated District Health Action Plan 2010-11. Also desk reviews, analysis of the available Block/PHCs data and indicators, were collected for preparing this District PIP 2010-11. The requirements of the District for NRHM initiatives are projected yearly reasonably in the District PIP. The District will also ensure adequate monitoring and evaluation for assessing the improvement in the progress of activities using available data for taking corrective measures wherever necessary in the coming year 2010-11. The District is thankful to the SHMS, Manipur officials for their directions and help by giving us various Training relating to framing of PIP without which it would have been difficult to frame the District PIP 2010-11 in time. -
Cscs with Solar Power Pack
MANIPUR STATE INFORMATION TECHNOLOGY SOCIETY (A Government of Manipur Undertaking) 4th Floor, Western Block, New Secretariat, Imphal – 795001 www.msits.gov.in; Email: [email protected] Phone: 0385-24476877 Common Service Centres with Solar Installed (As on 25th March, 2013) Total : 235 Solar Sl. CSC Location & VLE Contact District BLOCK CSC Name Name of VLE Power No Address Number pack status 1 Imphal-East Imphal East - I CIC, Imphal East I Bdo (1) A. Bobby Singh (2) L. 9612970997 / Installed CD Block Block Office,Sawombung,Imphal Premananda Singh 912357848 East -I 2 Imphal-East Imphal East - I CSC-Pukhao Pukhao Naharup, Terapur Ngagom Dolen 8974906844 / Installed CD Block Naharup Bazar 8974102402 3 Imphal-East Imphal East - I CSC-Keibi Khullen Keibi Khullen Makha Ningthoukhongjam 9862902035 / Installed CD Block Leikai Inaotomba Meitei 9862626488 4 Imphal-East Imphal East - I CSC-Yumnam Yumnam Khunou Parking H Somendro Singh 9862771626 / Installed CD Block Khunou Area 8974901484 5 Imphal-East Imphal East - I CSC-Pangei Pangei Bazar Mayengbam Bhabeshwor 9856898843 Installed CD Block Singh 6 Imphal-East Imphal East - I CSC-Koirengei Koirengei Bazar Heisnam Sarjit Meitei 9436274413 / Installed CD Block 9862489094 7 Imphal-East Imphal East - CSC-Keirao Keirao Wangkhem Saleibam Sunder Singh 9856215950 / Installed II CD Block Wangkhem Mamang Leikai 9862626330 8 Imphal-East Imphal East - CSC-Karpur Karpur Shungba Village G. Lansailung 9615432147 / Installed II CD Block Shungba 9856063740 9 Imphal-East Imphal East - CSC- Poiroukhongj Poiroutongba