COMMITTED TO EXCELLENCE

COMPANY PROFILE

www.jec.qa T +974 4040 9600, F +974 4040 9797, P.O.Box 22801, - | [email protected]

ALJABER ENGINEERING | CORPORATE PROFILE 3

CONTENTS

04 CHAIRMAN’S MESSAGE 05 VISION & MISSION 06 CEO’S MESSAGE 07 COMPANY PROFILE 11 CAPABILITIES 19 PROJECTS PORTFOLIO 30 SELECTED PROJECTS 31 HIGHWAYS, ROADS AND INFRASTRUCTURE 59 LANDMARK BUILDINGS 71 OIL & GAS, PETROCHEMICAL AND INDUSTRIAL 81 POWER GENERATION, SUBSTATIONS AND DESALINATION PLANTS 87 SEWAGE TREATMENT PLANTS, DISTRICT COOLING PLANTS AND PUMPING STATIONS 91 PIPELINE CONSTRUCTION 97 HOTELS 100 RESOURCES 108 AFFILIATES

JEC_PRO_VER_10A_2021 CHAIRMAN’S MESSAGE

In response to our Nation’s Vision and enhanced economic growth, AlJaber Engineering has consistently been involved in the development of Qatar’s construction market and is proud to be recognized as one of the largest general contractors in Qatar.

With diversified, yet distinguished, construction capabilities in the Qatari market, JEC has successfully completed several prestigious projects and continue to participate in large scale projects; both independently or in joint venture with international companies.

JEC’s future challenge in this dynamic market, is to take full advantage of its competitiveness and available opportunities. From this perspective, JEC has been restructured to become recognized with high competence in the market to the highest international standards.

We are all working together to support JEC’s Mission to deliver projects for the benefit of our clients, partners, employees and the society.

Mohamed Sultan Al Jaber Chairman ALJABER ENGINEERING | CORPORATE PROFILE 5

OUR VISION

JEC’s vision is to be Qatar’s premier general contractor always striving to deliver construction works to complex projects with excellence. Our track record has proven that regardless of all challenges, we deliver the work to the highest standards on time and within budget.

OUR MISSION

AlJaber Engineering endeavors to be the market leader and preferred general contractor, widely recognized for superior construction expertise. We achieve consistency in the delivery of high quality services and add value for clients through proactivity, transparency in communication, timely completion of projects, and high quality performance. We practice sustainability to safeguard our environment, and maintain the highest levels of professionalism, honesty, and trust in our relationships with clients, employees, and affiliates. WELCOME MESSAGE

From a modest beginning in 1995, to becoming a leading contractor in Qatar, the emergence of AlJaber Engineering evolved through a journey that has taken just over two decades of planning, hard work and dedication. This commitment has made AlJaber Engineering a recognized brand for the successful delivery of numerous prestigious projects in the State of Qatar.

Under the leadership of His Highness The Emir, Sheikh Tamim bin Hamad Al Thani, together with Qatar National Vision 2030, our country is rapidly emerging as an international business and travel hub, playing host to a variety of international conferences and sports events. This vision has culminated in Qatar’s successful bid to host the FIFA World Cup 2022. AlJaber Engineering and its affiliates are proud to have been entrusted to participate in the construction of several venues and the country’s infrastructure.

AlJaber Engineering is firmly committed to Quality, Health, Safety and the Environment. We continue to invest in qualified talent and modern equipment to undertake large and complex projects. Our management leads a workforce of over 12,000, who are trained to industry’s best practices and operate to fully accredited and ISO certified management systems. This enables us to achieve our goal of successfully delivering large-scale projects and expanding our operations into the region, where we hope to replicate our local success.

We are proud of our achievements and are committed to further enhancing our capabilities to ensure that we remain at the forefront of the industry, responding to the needs of Qatar and the region.

Osama Hadid Managing Director & CEO ALJABER ENGINEERING | CORPORATE PROFILE 7

COMPANY PROFILE

AlJaber Engineering (JEC) is a leading general contractor based in the State of Qatar. Established in 1995 as part of Al Jaber Group - a major conglomerate with over 30 companies - JEC has successfully completed numerous large-scale turnkey projects for many prestigious clients in different sectors including:

• Highways, Roads and Infrastructure • Engineering, Procurement, Installation & Commissioning (EPIC) • Oil, Gas, Petrochemical and Industrial • Pipeline Construction • Power Generation, Substations & Desalination Plants • Sewage Treatment Plants and Pumping Stations • Maintenance of Oil & Gas and Petrochemical Installations • Landmark Buildings

Our commitment to execute projects with the highest quality, on schedule and within budget while adhering to excellent standards of health, safety and environmental positioned JEC to be recognized as an icon in the construction community in Qatar. We have recently established an office in Oman, Kuwait and Somalia to undertake projects in contribution to the large ongoing developments.

In line with the growing demands to build Qatar’s infrastructure and new developments, JEC has invested in its resources to meet international standards and upgraded its fleet of equipment in preparation to participate in upcoming diverse projects. LEGAL & FINANCIAL STATEMENT

Certificate Document No. Expiry Date Trade License 25964 02-06-2022 Commercial Registration 21753 05-02-2022 Contractor’s Classification Certificate 1602 11-03-2022 KAHRAMAA Grade “A” Contractors Certificate 1028 28-03-2022 Fire Alarm Certificate 1381 23-10-2021 Fire Protection (Defence) Certificate 1381 23-10-2021

ANNUAL TURNOVER ( Million USD ) 900

800

725 712 700 700 685

650

600

500

450

400

310 300 273

236 201 200 190

100

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 ALJABER ENGINEERING | CORPORATE PROFILE 9

Key Personnel

SL. Name Position

1. Osama Hadid Managing Director & CEO

2. Hisham Hadid Executive Director & Deputy CEO

3. Antoine Hayek Advisor to CEO

4. Ahmad AlNaser Executive Director - MEP

5. Amr Nadim Operations Director

6. Laith Toma Operations Director

7. Mark Mussell Construction Support Director

8. Mahmoud Noureldin Business Development Director

9. Wesam Shafeq Sriyani Controls Manager

10. Anas Al Ereksousi Corporate HR Manager

11. Ahmed Hadid Corporate Finance Director - Affiliates

12. Majdi Abd Al-Majeed Finance & Accounts Manager

13. Carlos Haddad Sr. Estimation Manager

14. Mohamed Hegazy Sr. Procurement Manager

15. Azad Mohideen Sr. Commercial Manager

16. Ziad Hodroge Head of Claims and Disputes

17. Samer Abu Laila Corporate IT Manager

18. Rafiq Tarhini Corporate PMV Manager CLIENTS

AlJaber Engineering has successfully associated with many prestigious clients from different industries such as:

Oil & Gas, Petrochemical & Industrial

Large International EPC Contractors

Government Clients

Large Developers ALJABER ENGINEERING | CORPORATE PROFILE 11

CAPABILITIES

ALJABER ENGINEERING | CORPORATE PROFILE 13

HIGHWAYS, ROADS AND INFRASTRUCTURE

AlJaber Engineering is a leading general contractor executing Highways, Roads, Infrastructure and major earth moving projects.

JEC’S FOCUS AREAS ARE: • Highways and roads. • Underpasses, bridges and interchanges. • Major earth and reclamation works. • Turnkey Infrastructure Projects. • Site development works for industrial and petrochemical plants. • Pipeline construction (water, sewage and drainage). • Treated sewage effluent system (TSE). • Drainage and sewage systems. • Electrical and telecommunication networks. • Street lighting. • Signalization and traffic light systems. • Tunneling including related electrical and mechanical works.

JEC’S STRENGTH INCLUDES: • JEC owns the largest fleet of construction and earthmoving equipment in the State of Qatar. • Concrete supply through JEC affiliated company Al Wataniya, total production capacity 100,000m3/ month in four different locations (Lusail, Doha, Mesaieed and Ras Laffan). • Asphalt works through JEC affiliated company Al Jaber Makhlouf with own fleet of equipment for production and delivery of Asphalt, total capacity of 10,000 tons/day. • JEC owns onsite crushing and screening plants utilized for production of fill, structural fill, sub base and other crushed products. PETROCHEMICAL, INDUSTRIAL AND OIL AND GAS

AlJaber Engineering has been a key contractor for design, procurement and construction of turnkey projects related to the following:

• EPIC projects • Waste management facilities

• Oil & Gas facilities • Water treatment plants

• Power and desalination plants • Water transmission systems

• Petrochemical plants • Tanks and reservoirs • Maintenance of petrochemical and • Industrial plants industrial installations • Sewage treatment plants • HV substations

Engineering JEC’s has a highly qualified technical team to manage the requirements and performance of design sub-contractors including any specialized services such as HAZOP.

Procurement JEC’s Procurement team has extensive experience in managing and performing procurement activities for large EPIC contracts.

Construction JEC’s construction team has worked on complex projects, with technical experience to meet international contracting standards, capable to perform high-profile projects. ALJABER ENGINEERING | CORPORATE PROFILE 15

CIVIL WORKS • Underground and elevated concrete structures • Silos • Cooling towers • Precast concrete pipe racks • Culverts • Structural steel works • Industrial buildings • Underground utility networks • Road works • Fencing

MECHANICAL WORKS • Supply, fabrication and erection of major process static equipment • Process piping and pipelines • Fire fighting systems • Pipe gantry’s and support systems • Cranes • Supply and erection of rotary equipment • HVAC systems • Insulation, painting and scaffolding works

ELECTRICAL & INSTRUMENTS • Supply and erection of major electrical equipment. • Power distribution systems • Lighting and power • Fire detection and alarm systems • Programmable logic control systems (PLC) • Scada systems • Structural cabling • Security systems • Instrumentation and control works • Telecommunication systems

ALJABER ENGINEERING | CORPORATE PROFILE 17

LANDMARK BUILDINGS

JEC have successfully executed various industrial buildings on design and build basis. In addition, JEC is currently executing the construction of landmark buildings as part of a Joint Venture with international companies.

JEC is a Kirby Certified Builder for supply and erection of Kirby Buildings in Qatar.

JEC’S FOCUS AREAS ARE • Landmark buildings • Structural steel buildings • Control rooms • Blast proof buildings • Temporary facilities

JEC’S STRENGTHS INCLUDE CIVIL WORKS: • Enabling works • Concrete works • Curtain wall systems • Stone cladding • Steel structure • Architectural finishes

MEP WORKS: • Drainage • Plumbing • HVAC systems • Chilled water systems • Waste water treatment systems • Electrical (MV/HV/ELV networks) • Instrumentation • Telecommunication • Lifts • Fire fighting and fire alarm systems • Building Management System (BMS)

ALJABER ENGINEERING | CORPORATE PROFILE 19

PROJECTS PORTFOLIO HIGHWAYS, ROADS AND INFRASTRUCTURE

Project Client Value (USD) Status of Completion

Construction of a Terminal Sewage Pumping Station at Doha North STW – Package 3 Public Works Authority 36,500,000 Ongoing

Roads and Infrastructure in and Fereej Al Manaseer Public Works Authority 168,000,000 Ongoing

Construction of North Development - Parks and Roads Public Works Authority 134,000,000 Ongoing

Construction of Roads and Infrastructure in Al Sheehaniya - Package 1 Public Works Authority 87,000,000 Ongoing

Construction of Strategic Trunk Sewer from Sheehaniya to Doha North STW Public Works Authority 100,000,000 Ongoing Package 2

Qatar Company for Airports Operation and Remote Transfer Baggage Facility – “Building” Package No. HIAEP-0014 119,500,000 Ongoing Management (MATAR)

Roads and Infrastructure in Semaisma - Package 4 Public Works Authority 79,000,000 Ongoing

ISF Correctional Facilities and Female Forces Internal Security Force (ISF) 47,000,000 Ongoing

Al Rayyan Stadium SC2022 Support Works - Package 06 Public Works Authority 74,000,000 May. 2020

CPC02-08b Design and Build of ISF Training Village Internal Security Force (ISF) 20,000,000 Ongoing

Section 3 - Design & Build - Development of Zone 2 and Zone 7 Internal Security Force (ISF) 7,000,000 Ongoing

ISF-DP-CPC02 / Preliminary Phase Works Construction of Shaded Stage in ISF Internal Security Force (ISF) 15,500,000 Ongoing

Infrastructure & Boundary Wall for ISF (CPC02-14) Internal Security Force (ISF) 30,000,000 Ongoing

Engineering, Supply, Fabrication, Delivery, Installation, Testing, and Handing Over of North & Southbound, Viaduct Structures and Two Pedestrian Underpasses for Tekfen Construction 58,000,000 Mar. 2020 Construction of East Industrial Road between Al Muntazah Street and West Corridor (P017 C2) Project Client Value (USD) Status of Completion

Design & EXPRESSWAY: Construction of surface water drainage works, potable water and storm water drainage Tekfen Construction 92,000,000 Apr. 2020 works

Hamad Port Project - Strategic Food Security Facilities Hamad Port Project Steering Committee 456,000,000 Ongoing

Lusail Real Estate Development Company CP12-E Additional Dredging of Southern Marina Channel 33,000,000 Oct. 2015 W.L.L

Roads & Infrastructure in Wadi Aba Seleel – Package 1A, Advanced Grading & Public Works Authority 44,000,000 May. 2016 Temporary Roads (QS004-P01A)

36,000,000 Camp at Abu Nakhlah Aljaber Engineering WLL Oct. 2015

51,000,000 Construction of CP08-A3: Enabling Works - Qetaifan Islands Lusail Real Estate Development Co. W.L.L. Feb. 2017

Doha Metro project - Gold Line (A Joint Venture with Aktor, Yapi Merkezi, STFA and Qatar Rail 3,358,000,000 Ongoing Larsen & Toubro)

Design and Construct New Orbital Highway and Truck Route Mesaieed to Salwa Road Public Works Authority 1,687,000,000 Ongoing (A Joint Venture with Leighton Contracting Qatar)

Site Preparation Works for GASAL Project GASAL Q.S.C 8,000,000 Sep. 2014

Construction of CP7A-1B waterfront commercial / Seef Lusail Infrastructure works Lusail Real Estate Development Co. W.L.L. 39,000,000 Dec. 2016

2,000,000 Rasgas flow assurance project - Site preparation works RasGas Company Ltd. May. 2014

48,000,000 Feb. 2015 Construction of CP7C-1C, enabling works for Commercial Boulevard Lusail Real Estate Development Co. W.L.L.

Qatar Electricity & Water Corporation- Upgrading of Mesaieed Town RPS 28,000,000 Feb. 2018 KAHRAMAA

Development of new camp for Internal Security Forces (ISF) at Al (A Joint Internal Security Force (ISF) 663,000,000 Ongoing venture with AKTOR).

20,000,000 Coast Guard Base - Expansion of the main navigational channel & turning basin Urbacon General Contracting Aug. 2014 Project Client Value (USD) Status of Completion

The Base Project in North Lusail - The Island Bridge Works UrbaCon General Contracting 8,000,000 Jan. 2014

EPIC for southern perimeter industrial fence, security patrol access and other roads in Qatar Petroleum 24,000,000 Dec. 2013 Ras Laffan City

Al-Jawhara “Oasis of Life” Infrastructure in Al Erkyah District, Lusail. Infrastructure works consists of earthworks, asphalt works, surface drainage, foul sewerage, primary Jawhara Greens Company SPC 20,000,000 Nov. 2013 irrigation, portable water networks and street lighting

The Base Secondary Chanel Excavation and Disposal Works in Semisima. UrbaCon General Contracting 7,000,000 Apr. 2013

Reconstruction of existing roads and construction of new roads with all associated services and infrastructure including upgrade of existing utilities and installation of new Qatar Petroleum 190,000,000 Feb. 2012 utilities at Mesaieed Community Area

Early site earth works for Barzan onshore project at Ras Laffan RasGas- Main Contractor: CCC /Teyseer JV 36,000,000 Jul. 2011

Construction of road paving at Pearl GTL plant area Strabag Qatar W.L.L. 1,000,000 Jan. 2011

West Bay project. Zone 66: Construction of roads and infrastructure services such as foul sewage, surface water, potable water, TSE lines, pump stations and storm water Public Works Authority (ASHGHAL) 55,000,000 Dec. 2010 system in New Diplomatic area

EPIC for new support services and site development of 3,000,000 m2 land at Ras Qatar Petroleum 82,000,000 Nov. 2010 Laffan Industrial City

Construction of underground piping systems consist of installation of GRP sea water pipelines, firewater, process, potable water lines and major infrastructure civil works at SNC-Lavalin 96,000,000 Aug. 2010 Aluminium Smelter in Mesaieed

Site development of service areas and potroom building area including earth works, construction of roads, surface drainages supply and installation of potable water lines Qatar Aluminium Co. (Qatalum) 18,000,000 Oct. 2009 for Qatar Aluminium Smelter in Mesaieed

Site preparation and earth works for Elsewedy Cables factory at Mesaieed. Elsewedy Cables 4,000,000 Feb. 2009 Project Client Value (USD) Status of Completion

Salwa International Highway interchanges and installation of water pipelines and street Public Works Authority (ASHGHAL) 86,000,000 Jan. 2009 lighting

Site preparation and road works for QAFCO 5 project in Mesaieed Hyundai Engineering & Construction Co 8,000,000 Dec. 2008

Site preparation, ground improvement by dynamic compaction and installation of 8000 Im new security paliside fence for Qatar Aluminium Smelter and Power Plant in Qatar Aluminium Co. (Qatalum) 34,000,000 Dec. 2008 Mesaieed

Gas pipeline crossings for service area and potroom building at Qatar Aluminium SNC-Lavalin 2,000,000 Apr. 2008 Smelter in Mesaieed

Construction of land water drain outfall at Ras Laffan Port Jan De Nul / Boskalis JV 1,000,000 Feb. 2008

Soil Improvement for Boiler and Demin units in Qatar Vinyl Company Qatar Vinyl Company 1,000,000 May. 2007

Al Khaleej gas project Phase 2 (AKG2): Site preparation for camp and waste water Chiyoda /Technip JV 3,000,000 Mar. 2007 treatment area

Ras Laffan port expansion project: Excavation and site preparation to construct a lake Jan De Nul / Boskalis JV 7,000,000 Feb. 2007 within Ras Laffan port expansion and construction of access road and street lighting Project Client Value (USD) Status of Completion

QatarGas 3 & 4 project: Site preparation for camp and wastewater treatment (WWT) Chiyoda / Technip JV 30,000,000 Feb. 2007 areas at Ras Laffan, in connection with Qatar Gas 3 project

Hamad Medical City surface and ground water scheme: Construction of surface and groundwater pipelines by micro tunnelling and construction of reinforced concrete Public Works Authority (ASHGHAL) 13,000,000 Sep. 2006 outfall structure

Design and construction of central sewage collection system and construction of Boom Construction Co. 4,000,000 Oct. 2006 precast concrete boundary wall

Excavation and stockpiling of hard material at Ras Laffan Cracker II project site Qatar Petroleum 10,000,000 May. 2006

Ras Laffan Olefin project: Site preparation and installation offence Technip 8,000,000 Apr. 2006

Environmental clean-up for Hamad International Airport project site including excavation and removal of waste, transportation from Airport site and placement at Hamad International Airport 38,000,000 Oct. 2005 engineered landfill site in Mesaieed

Underpass and access roads for Doha 2006 Asian Games Village and Hamad Medical Public Works Authority (ASHGHAL) 19,000,000 Oct. 2005 City

Construction of paved walk ways, unpaved track road, landscaping and new boundary Qatar Petroleum 3,000,000 Mar. 2004 wall at Dukhan Township OIL & GAS, PETROCHEMICAL AND INDUSTRIAL PROJECTS

Project Client Value (USD) Status of Completion

Hamad Port Project - Strategic Food Security Facilities Hamad Port Project Steering Committee 456,000,000 Ongoing

Fabrication and installation of above ground metal piping, installation of water supply pumps, emergency cooling towers, compressed air piping system and closed cooling SNC-Lavalin 20,000,000 Sep. 2010 medium system at Qatar Aluminium Smelter in Mesaieed

Mechanical and electrical works for Doha cable factory at Mesaieed Industrial City Doha Cables 3,000,000 Jun. 2010

Major ground and civil works for rectifier stations at Qatar Aluminium Smelter in Qatar Aluminium Co. (Qatalum) 24,000,000 Feb. 2010 Mesaieed EPIC for two new kangaroo cranes and upgrading of existing gabbro berths crane Qatar Petroleum 31,000,000 Mar. 2009 facilities including all mechanical and electrical works at Mesaieed Port Installation of cathode roding equipment and induction furnace including supply and erection of all mechanical, electrical and instrumentation works at Qatar Aluminium SNC-Lavalin 8,000,000 Jan. 2009 Smelter in Mesaieed

Al Khaleej Gas Project Phase 2 (AKG2): Civil, infrastructure and electromechanical works for camps and other facilities including underground piping networks, road works, Chiyoda / Technip JV 33,000,000 Nov. 2007 installation of treated effluent tanks, waste water treatment units and sludge treatment units

LANDMARK BUILDINGS

Project Client Value (USD) Status of Completion Supreme Committee for Delivery & Legacy Stadium (A Joint Venture with Tekfen) 342,000,000 Ongoing (SC)

Qatar Petroleum District. (A Joint Venture with Bouygues and Midmac Contracting) Barwa Real Estate Company 1,301,000,000 Jun. 2017

Suspended - Design Dubai Tower in Doha Meraas Development L.L.C 400,000,000 Changes

Alwaha Club RasGas 7,000,000 Mar. 2002

AlJaber Engineering Headquarters - Fox Hills Plot No. MU-B04, Lusail-Qatar AlJaber Holding 44,000,000 Sep. 2015 Project Client Value (USD) Status of Completion

Engineering, procurement, fabrication and installation of dust collection towers and General Electric (GE) 2,000,000 Aug. 2007 sunshades

EPIC of desalinated water network including installation, testing and commissioning of Qatar Petroleum 10,000,000 Jul. 2006 14 km GRP pipelines at Ras Laffan

EPIC of potable water transmission system and landscaping mains to distribute water Qatar Petroleum 14,000,000 Oct. 2005 produced by RLPC to various facilities within Ras Laffan

Construction of new access platforms and walkways in Dukhan oil fields Qatar Petroleum 1,000,000 Jun. 2004

Construction of dry storage sunshades at Camp As Sayliyah US Army 1,000,000 Jan. 2004

EPIC of waste management facility including construction of new landfill cells, HDPE membrane, access roads, weigh scale and concrete land treatment unit with a total RasGas 5,000,000 Dec. 2002 capacity of 2800 m3 of biodegradable waste at Ras Laffan Industrial City (RUC)

Extension of central control room building at QAFCO. Qatar Fertilizer Co. (QAFCO) 2,000,000 Mar. 2002

POWER GENERATION, SUBSTATIONS AND DESALINATION PLANTS

Project Client Value (USD) Status of Completion

Umm Al Houl Power Project - Package A (Civil & Building Works) & Package B (HVAC Hitachi Zosen Corporation 100,000,000 Ongoing Works)

Ras Abu Fontas A1 new water plant- Onshore civil works execution related to the construction of distillers and boilers areas, intake structure and potable water reservoirs Fisia Italimpianti 76,000,000 Mar. 2010 for 45 MIGD water desalination plant at

RAFB2 - site - 0001, Ras Abu Fontas B, expansion project: Fabrication of pipe rack and General Electric (GE) 4,000,000 Dec. 2006 large bore pipes (CS & SS)

Qatar transmission system - Phase VI, Substations: Civil works associated with various VATECH 5,000,000 Mar. 2006 substations

Ras Laffan power and desalination project - Water plant island desalination unit and auxiliaries: Civil works related to the construction of 40 MIGD desalination plant at Ras Fisia Italimpianti / Enel Power 20,000,000 May. 2003 Laffan SEWAGE TREATMENT PLANTS, DISTRICT COOLING PLANTS AND PUMPING STATIONS Project Client Value (USD) Status of Completion Engineering, Procurement, Construction, Testing & Commissioning of the District Cooling Plant - 3 in West Bay Qatar District Cooling (Q.C.S.C) 89,000,000 May. 2016

Refurbishment and upgrading works for various foul and storm water pumping stations Public Works Authority (Ashghal) 53,000,000 Jun. 2016 including civil, mechanical, electrical and HVAC works

Construction of treated sewage effluent permanent disposal system including 21 km of Chiyoda Technip JV -QGE (CTJV) 11,000,000 Feb. 2009 HDPE pipeline at Ras Laffan

Civil works and upgrading of pumping stations Torishima Pump Mfg. Co. Ltd. 2,000,000 May. 2008

Design and construction of sewage treatment plant and labour compound infrastructure New Doha International Airport (NDIA) 13,000,000 Feb. 2006 including boundary wall, roadworks and chainlink fence

Upgrade of sewage network and refurbishment of pumping stations and relocation of Qatar Petroleum 5,000,000 Jun. 2005 TSE distribution mains

Construction of treated sewage effluent network (TSE) T5 to T7 including 14 km of TSE Ministry of Municipal Affairs Agriculture 4,000,000 Nov. 2004 mains (MMAA)

Construction of treated sewage effluent network (TSE) T6 to T7 including 48 km of TSE Ministry of Municipal Affairs Agriculture 13,000,000 Apr. 2004 mains (MMAA)

Construction of additional sludge drying beds and other labour accommodation Ministry of Municipal Affairs Agriculture 1,000,000 Feb. 2002 facilities including one storey building (MMAA) PIPELINE CONSTRUCTION

Project Client Value (USD) Status of Completion

Construction of D Line TSE Pumping Station and Transmission Main C762 Public Works Authority 209,000,000 Ongoing

Construction of D line TSE Pumping Station and Transmission Main C762 ASHGHAL 209,000,000 Feb. 2022

GTC/600/2013, Pipelines for Mega Reservoirs Corridor Main 1 Package C & Qatar Electricity & Water Co. (KAHRAMAA) 437,000,000 Nov. 2017 GTC/599/2013, Pipelines for Mega Reservoirs Corridor Main 2 Package A Design and construction of 1200 mm of 30 Km transmission main from Doha West Public Works Authority (ASHGHAL) 44,000,000 Dec. 2011 STW to Al Rakhiya farm

Upgrading of New and Old Salwa distillate and rising mains (22km of pipes) Qatar Electricity & Water Co. (KAHRAMAA) 32,000,000 Sep. 2007

EPIC of potable water pipeline to west side camp area at Ras Laffan in connection with CHIYODA - TECHNIP JV 21,000,000 Feb. 2007 RasGas expansion project Supply and lay the extension of water distribution mains (58 km) in north Duhail Phase Qatar Electricity & Water Co. (KAHRAMAA) 5,000,000 Jan. 2006 C & D Supply and lay the extension of water distribution mains (57 km) in north Duhail Phase Qatar Electricity & Water Co. (KAHRAMAA) 4,000,000 Nov. 2005 A & B. Extension of approx. 12 km of 600 mm diameter HDPE pipes to supply water to motor Qatar Electricity & Water Co. (KAHRAMAA) 13,000,000 Jul. 2004 cycle race track

HOTELS

Project Client Value (USD) Status of Completion Construction of 200 Keys 5* Luxury Hotel, 50 Keys Chedi Villas, Luxury Spa, Beach Qatari Diar Ras Al Hadd Development 80,500,000 Ongoing Club & Associated Infrastructure Works Company (QDRH) - Oman MAINTENANCE OF OIL & GAS, PETROCHEMICAL & INDUSTRIAL INSTALLATIONS

Project Client Status of Completion

Shutdown associated works for Qatar Aluminium Smelter in Mesaieed SNC - Lavalin Completed

Long term fabrication and maintenance support on call off basis Qatar Vinyl Company (QVC) Completed

Civil work for rolling mill major repair Qatar Steel Company (QASCO) Completed

Refurbishment of administration building ground floor corridor flooring tiles Qatar Fertilizer Co. (QAFCO) Completed

Revamp of closed cooling water cycle and civil works Qatar Fertilizer Co. (QAFCO) Completed

Surface protection of buried sealine O.S.B.L. at Ras Laffan QatarGas Completed

Repair of transformer DHTS 90000/140 ANSALDO Industrial Completed

OTHER BUILDINGS

Project Client Value (USD) Status of Completion Central warehouse at Mesaieed Qatar Steel Co. 3,000,000 Jul. 2005 EPIC of 2600 m² pre-engineered steel structure store building with all associated Qatar Fertilizer Co. (QAFCO) 2,000,000 Nov. 2003 electrical and mechanical works at QAFCO 4 expansion project in Mesaieed EPIC of 3240 m² new office building with all associated roads and external works RasGas 3,000,000 Oct. 2003 including MEP, telecommunications, HVAC and fire fighting systems at Ras Laffan EPIC of steel frame structure bagging and storage warehouse at Q-CHEM petrochemical complex including complete civil and Electro - mechanical works at KBR / Technip 5,000,000 Jan. 2002 Mesaieed Design, supply, installation and commissioning of Q-Chem prefab temporary training Q-CHEM 1,000,000 Jul. 2001 facility, with all associated civil and MEP works

EPIC of temporary facilities consist of prefabricated office with all associated power KBR / Technip 2,000,000 Apr. 2000 supply,mechanical and electrical works for Q-Chem project at Mesaieed SELECTED PROJECTS ALJABER ENGINEERING | CORPORATE PROFILE 31

1 HIGHWAYS, ROADS & INFRASTRUCTURE

ALJABER ENGINEERING | CORPORATE PROFILE 33

DESIGN AND CONSTRUCT NEW ORBITAL HIGHWAY AND TRUCK ROUTE - MESAIEED TO SALWA ROAD - MRPSC/014/2012 2013/L (A JOINT VENTURE WITH LEIGHTON CONTRACTING QATAR).

Client Public Works Authority

Value (USD $) 1,687,000,000

Project Scope The project is located west and south of the Doha city and providing the new orbital highway connecting Mesaieed to Salwa road. The major elements are: • 57 Km of road works with 5 main interchanges - 30 Km of 14 lanes Orbital Highway - 27 Km of 8-16 lane side roads • 4 no. grade separated clover leaf type Interchange and 1 no. grade separated junction comprising 24 no. bridge structures • 18 no’s braiding and emergency exists • Pedestrian & Bicycle paths with appropriate underpass structures • New utilities such as surface drainage works, TSE Line, electrical works, street lighting works, Q-Tel, QAF, ITS Ducts • Diversion and protection of existing utilities (including QP gas pipelines) • Crossing points of EHV pylons • Landscaping (within interchange)

Completion Date Ongoing DESIGN & BUILD OF AL KHOR EXPRESSWAY: CONSTRUCTION OF SURFACE WATER DRAINAGE WORKS, POTABLE WATER AND STORM WATER DRAINAGE WORKS

Client Tekfen Construction

Value (USD $) 92,000,000

Project Scope The Main Scope of Works consists of: • Storm water line • Potable water line • TSE Network • Twin Foul Sewer Network • Laying of Pipelines and Manhole • Soakaway Trench and Catch Pit • Infiltration Ditch • Chute • Half Trapezoidal Channel • Earth Berm • Mass Concrete Berm • Rectangular Channel • Manholes • Catch Basin • Top Inlet Gully with Connection Pipe

Completion Date Ongoing ALJABER ENGINEERING | CORPORATE PROFILE 35

CP12-E ADDITIONAL DREDGING OF SOUTHERN MARINA CHANNEL

Client Lusail Real Estate Development Company W.L.L

Value (USD $) 33,000,000

Project Scope The Scope of Works included deepening the Southern Marina (By Dredging) from -3.00 ONHD to -4.50 QNHD as well as dredging additional isolated areas, including deepening of the Central Lagoon entrance.

The major work elements are: Dredging operation – average dredging productivity 60,000 m3/Day.

Transportation of dredged material to a multi-cell spoil pit.

Pumping of sea water from the spoil pit to the existing sedimentation ponds 1 & 2.

Removal of the wet silty material from the spoil pit to the “drying multi-cell pit” for drying process.

Transportation of the dried material off site to an approved municipality disposal site.

Completion Date October, 2015

ALJABER ENGINEERING | CORPORATE PROFILE 37

REMOTE TRANSFER BAGGAGE FACILITY (HIAEP-0014)

Client Qatar Company for Airports Operation and Management (MATAR)

Value (USD $) 119,500,000

Project Scope The current remote transfer baggage facility system is located at the current car rental area. This facility is intended to handle the excess of long transfer baggage demand for Qatar Airways flights, that cannot be handled within the existing terminal baggage handling system facilities.

JEC’s scope of work for the new remote transfer baggage facility system includes:

• Civil works, MEP services, and network services • Testing and commissioning • System interfaces and integration with baggage handling system and Airport infrastructure • New road connection to link the new facility with the PTC • MEP yard building of approximately 1,360 m2, open to the sky • Utility diversions • Relocation/creation of airport perimeter fence/systems. • The existing car rental parking area will be converted into a ULD storage area. • RTBF ‘Building’ external works

Completion Date Ongoing EPIC FOR WET UTILITIES DISTRIBUTION NETWORK (POTABLE WATER SUPPLY, FIRE WATER AND SEWRAGE) FOR SUPPORT SERVICES FOR AN AREA OF APPROXIMATELY 3000 HECTARES COMPLETE WITH AUXILIARY FACILITIES, SUB-SYSTEMS AND MAIN NETWORK AT RAS LAFFAN INDUSTRIAL CITY.

Client Qatar Petroleum

Value (USD $) 151,000,000

Project Scope Engineering, procurement and construction of major Civil, Mechanical, Electrical, Instrumentation and SCADA control works detailed as follows: Various utility pipeline networks 230 Km Sewage pumping stations 29 Nos. Civil Works: • Excavation 873,300 m3 • Imported fill material 111,000 Ton • Precast concrete paving 28,000 m2 • Major RCC/Steel structure works & Road crossing (Microtunneling) Major Mechanical Works: • Potable water/fire water pumping station • Potable water and fire water tanks 9 Tanks • Overhead cranes and manual hoist cranes 31 Cranes Electrical Installations: • Power network(Transformers with panels, ups, etc) 30 Km Control System and Instrumentation: • Telecommunication and SCADA control system • Fire alarm system/Fiber optic network (25 km)

Completion Date December, 2014 ALJABER ENGINEERING | CORPORATE PROFILE 39

RECONSTRUCTION OF EXISTING ROADS AND CONSTRUCTION OF NEW ROADS WITH ALL ASSOCIATED SERVICES AND INFRASTRUCTURE INCLUDING UPGRADE OF EXISTING UTILITIES AND INSTALLATION OF NEW UTILITIES AT MESAIEED COMMUNITY AREA.

Client Qatar Petroleum

Value (USD $) 190,000,000

Project Scope The project scope included all associated Civil, Mechanical, Electrical, Instrumentation and telecommunication works.

Design Works: - Coordination of existing and future utility services - Traffic management strategy and traffic phasing - Reinforced concrete protection slab and culverts • Road Works and street lighting: 39 Km • Conversion of existing Mesaieed main and Police roundabout to traffic signal junction • Electricity and Power Network(LV/MV/HV/EHV) 187 Km • Potable Water Network 9 Km • Telecommunication Network 34 Km • Utility Duct Network 29 Km • Treated Sewer Effluent Network(TSE) 18 Km • Surface Water Drainage Network 70 Km • Foul Sewer Network 5 Km • Landscaping Network & Irrigation Network 250 Km Completion Date February, 2012

ALJABER ENGINEERING | CORPORATE PROFILE 41

CONSTRUCTION OF CP08-A3: ENABLING WORKS - QETAIFAN ISLANDS

Client Lusail Real Estate Development Company W.L.L

Value (USD $) 51,000,000

Project Scope The Major Scope of the Project included:

• Design & Construction of the civil works and associated MEP works for two large diameter utility tunnels for bridges 8 and 9 • Construction of the Marafeq - designed 7 Nos. gasline crossings. • Removal of a section of the existing sea wall (198m) and construction of new realigned sea walls (152m). • Widening of the five (5) existing temporary earth bunds with pipe culverts • Raising the finished level of the existing sea wall on Qetaifan Islands from 2.0m to 2.5m QNHD by the installation of precast reinforced concrete capping blocks. • Construction of concrete block staircases adjacent to the sea wall at five (5) locations providing restricted access from the promenade to the tidal lagoon basin.

Completion Date February, 2017 EARLY SITE EARTH WORKS FOR BARZAN ONSHORE PROJECT AT RAS LAFFAN.

Client RasGas

Main Contractor CCC / Teyseer JV

Value (USD $) 36,000,000

Project Scope Earth works for Barzan onshore early site project total area of 1,560,000 m2 detailed as follows:

• Grubbing, removal and transport vegetation 1,560,000 m2 • Remove, transport and depose marine deposit 1,512,000 m3 • Remove, transport and stockpile dune sand 400,000 m3 • Excavation (suitable soil, soft rock and hard rock) 940,000 m3 • Fill material 698,600 m3 • Imported fill 1,521,000 m3

Completion Date July, 2011 ALJABER ENGINEERING | CORPORATE PROFILE 43

CONSTRUCTION OF ROADS AND INFRASTRUCTURE SERVICES SUCH AS FOUL SEWAGE, SURFACE WATER, POTABLE WATER, TSE LINES, PUMP STATIONS AND STORM WATER SYSTEM IN THE NEW DIPLOMATIC AREA.

Client Public Works Authority (ASHGHAL)

Value (USD $) 55,000,000

Project Scope • Electrical work, storm drainage, telecommunication services, service water, TSE lines, irrigation and landscape works • Security wall, CCTV cameras, gates, fiber optic cables, road blocks, security rooms, special signage and other necessary security items. • Hard and soft landscaping and irrigation system. • Construction of roads (12.1 km)

Completion Date December, 2010 CONSTRUCTION OF CP7C-1C, ENABLING WORKS FOR COMMERCIAL BOULEVARD

Client Lusail Real Estate Development Company W.L.L.

Value (USD $) 48,000,000

Project Scope The scope included early enabling works project consisting of dewatering works, bulk excavation and temporary support of excavation systems etc.

• Work site Clearance • Temporary Fencing • Temporary Access Roads • Design, installation, operation and maintenance of temporary dewatering systems and handed over to the permanent works contractor • Excavation in the dry with mechanical means and the transport of excavated materials to an authorized off-site landfill The Excavation consisted of: - Car Park 2 141,587 m3 - Car Park 3 124,613 m3 - Car Park 4 105,576 m3 - Car Park 5 15,1622 m3 - Underpass Tunnel 996,973 m3 • Lowering of Western Marina 386,000 m3 • Widening of Earth Bridge 2A 30,000 m3 (Filling with selected excavated material) • Monitoring ground movements around and within the excavations • Provision for the disposal of 3,000,000 m3 of excavated material from the stockpile generated by LREDC

Completion Date February, 2015 ALJABER ENGINEERING | CORPORATE PROFILE 45

ROADS & INFRASTRUCTURE IN WADI ABA SELEEL – PACKAGE 1A, ADVANCED GRADING & TEMPORARY ROADS (QS004- P01A)

Client Public Works Authority

Value (USD $) 44,000,000

Project Scope The purpose of this project was to provide both single lane and dual lane temporary roads in Wadi Aba Seleel within the project limits. This included advance grading and levelling of specific sections of the roadways within the main project boundary, including the construction of temporary roads, over an area of aproximately 19.7 km as follows;

Dual carriageway - 9.00km (approx.) Single Carriageway - 11.00km (approx.)

The Major quantities were: • Site Clearance - 147 Ha • Excavation - 533,200 m3 • Filling - 786,300 m3 • Roadworks (Sub-Base, Base Course & Wearing Course) - 323,500 m2 • 14m Street light Columns - 1,262 Nos. • Swales for Surface Water Drainage - 39,365 m • Gulleys & Soakaways • Road Marking & Road Signs • Kerb Stone & Precast Concrete Barricades

Completion Date May, 2016

ALJABER ENGINEERING | CORPORATE PROFILE 47

DOHA METRO PROJECT - GOLD LINE (A JOINT VENTURE WITH AKTOR, YAPI MERKEZI, STFA AND LARSEN & TOUBRO)

Client Qatar Rail

Value (USD $) 3,358,000,000

Project Scope The Doha Metro is part of the Qatar Integrated Railways Program (QIRP). The Gold Line Underground section of the network runs East/West through the heart of Doha City, starting to the East at and continuing through Al Sharq, Doha Souq, Msheireb and Al Adhawaa, before following both Street and Al Waab Street to the West of Doha and terminating at Sports City in the Al Aziziyah area.

The major elements consist of:

• 10 Nos. stations • 11.7 km of twin bored tunnels

Completion Date Ongoing EPIC FOR NEW SUPPORT SERVICES AND SITE DEVELOPMENT OF 3,000,000 M2 LAND AT RAS LAFFAN INDUSTRIAL CITY.

Client Qatar Petroleum

Value (USD $) 82,000,000

Project Scope Design, procurement and construction of storm water drainage system, duct banks, road grading and sabkha treatment and construction of internal and external roads detailed as follows:

• Excavation 435,000 m3 • Imported fill 2,060,000 m3 • Concrete 42,000 m3 • Concrete culverts (600 & 1000 mm diameter) 13 Km • Construction of roads 145,000 m2

Completion Date November, 2010 ALJABER ENGINEERING | CORPORATE PROFILE 49

CONSTRUCTION OF UNDERGROUND PIPING SYSTEMS CONSIST OF INSTALLATION OF GRP SEA WATER PIPELINES, FIREWATER, PROCESS, POTABLE WATER LINES AND MAJOR INFRASTRUCTURE CIVIL WORKS AT ALUMINIUM SMELTER IN MESAIEED.

Client Qatar Aluminium Company (Qatalum)

EPC Contractor SNC - Lavalin

Value (USD $) 96,000,000

Project Scope This project included underground piping works and major civil works for Qatar Aluminium plant detailed as follows:

• Total excavation 325,000 m3 • Dewatering 74,000 m3 • Sheet piling 38,500 m2 • Concrete works 15,500 m3 • Piping works 73 Km • Ducting works 58 Km

Completion Date August, 2010 COAST GUARD BASE - EXPANSION OF THE MAIN NAVIGATIONAL CHANNEL & TURNING BASIN

Client UrbaCon General Contracting

Value (USD $) 20,000,000

Project Scope The scope of the subcontract works included excavation, bunds creation, bunds removal and disposal of all excavated materials:

• Complete excavation of estimated quantity 1,055,000 m3 • Creation and complete removal of the bounds to seabed level or original grade level • Supply, install and operate complete dewatering system ensuring working in dry ambient surface conditions • Pre and post survey works • Removal of excavated material from the excavated areas for drying purposes • Dispose all excavated materials off site to an approved local authorities disposal location

Completion Date August, 2014 ALJABER ENGINEERING | CORPORATE PROFILE 51

ENGINEERING, SUPPLY, FABRICATION, DELIVERY, INSTALLATION, TESTING, AND HANDING OVER OF NORTH & SOUTHBOUND, VIADUCT STRUCTURES AND TWO PEDESTRIAN UNDERPASSES FOR CONSTRUCTION OF EAST INDUSTRIAL ROAD BETWEEN AL MUNTAZAH STREET AND WEST CORRIDOR (P017 C2)

Client Tekfen Construction

Value (USD $) 58,000,000

Project Scope The scope of the structural works consists of the construction of:

• 2 Carriageways Viaduct Bridge with three lanes each: 1,300m length for each carriageway • 2 Pedestrian Underpasses

Completion Date Ongoing CONSTRUCTION OF ROADS AND INFRASTRUCTURE IN AL SHEEHANIYA - PACKAGE 1

Client Public Works Authority

Value (USD $) 87,000,000

Project Scope The main objective of this project is to provide roads and infrastructure for residential and public use plots, in an area covering 55.6 hectares. The scope of work includes:

• Paved access roads of varying cross sections, with markings and signage. • Roadway junctions and road safety audits. • On-street parking • Intelligent Transportation Systems (ITS) as per the national ITS strategy. • Public transport routes. • Street lighting • A stormwater drainage collection and disposal system. • Foul sewers and associated pump stations • A treated sewage effluent (TSE) distribution system • Irrigation network • Landscaping and streetscaping improvements including lighting features. • Pedestrian footpaths • Bicycle paths

Completion Date Ongoing ALJABER ENGINEERING | CORPORATE PROFILE 53

CONSTRUCTION OF STRATEGIC TRUNK SEWER FROM SHEEHANIYA TO DOHA NORTH STW - PACKAGE 2

Client Public Works Authority

Value (USD $) 100,000,000

Project Scope The scope of this project consists of completing the proposed Sheehaniya Strategic Trunk Sewer which comprises a deep gravity tunnel sewer starting from the head manhole, running along the south side of Dukhan highway eastwards, till the intersection of Dukhan Road and Qatar National Utility Corridor “QNUC”. The sewer continues towards the north along the 100m wide drainage corridor in QNUC before it turns west towards Doha North STW where it will discharge the flow to Sheehaniya Terminal Pumping Station, located within the Doha North STW compound.

The scope of work includes provision, construction and installation of a new 600-1800mm, 39k long deep gravity sewer. The works also include the excavation of launch/reception pits required for the tunneling works, constructing 176 permanent manholes, 42 connections, and testing & commissioning. The scope also includes - and is not limited to:

• Construction of approximately 3.8km of 600mm pipeline, 5.4km of 800mm pipeline, 3.7km of 1000mm pipeline,1.5km of 1200mm pipeline, 3.4km of 1400mm pipeline & 21.42km of 1800mm pipeline using NDM. • Excavation of 201 shafts (including 40 temporary shafts for endcaps) • Construction of 176 maintenance access manholes • Installation of 40 endcaps

Completion Date Ongoing Central Doha & Corniche Beautification - Package 2A (Work Order No. 3)

Client Public Works Authority (ASHGHAL)

Value (USD $) 85,500,000

Project Scope Central Doha Beautification and Development Project scope includes the areas of Al Corniche, A-Ring road and C-Ring road. The infrastructure developments include construction of plazas, pedestrian and cycle paths, installing streetlights network, new traffic signals, road signage and pedestrian crossings.

As part of the project, Ashghal has awarded AlJaber Engineering the package of the infrastructural works in Downtown Doha - Al Corniche, covering the following scope of work: • Ø3000 Stormwater Micro Tunnel • Stormwater Attenuation Tank and Pump Station • 2 Ø1400 Gravity Outlet Pipes • New Sea Outfall Structure • Car Park Building

Completion Date December, 2021 ALJABER ENGINEERING | CORPORATE PROFILE 55

ENVIRONMENTAL CLEAN-UP FOR HAMAD INTERNATIONAL AIRPORT PROJECT SITE INCLUDING EXCAVATION AND REMOVAL OF WASTE, TRANSPORTATION FROM AIRPORT SITE AND PLACEMENT AT ENGINEERED LANDFILL SITE AT MESAIEED.

Client Hamad International Airport

Value (USD $) 38,000,000

Project Scope • Excavation and removal of 8,000,000 m3 waste from the Airport site and placement at engineered landfill site at Mesaieed. • Demolition and removal of all direct structures. • Removal of stagnant water from the northern lagoon and leachate from the made ground with all associated environmental aspects. • Stock piling of the waste removed. • Fencing for stock piling areas and wheel washing systems for transporting trucks.

Completion Date October, 2005 SITE PREPARATION, GROUND IMPROVEMENT BY DYNAMIC COMPACTION AND INSTALLATION OF 8000 LM NEW SECURITY PALISIDE FENCE FOR QATAR ALUMINIUM SMELTER AND POWER PLANT IN MESAIEED.

Client Qatar Aluminium Company (Qatalum)

Value (USD $) 34,000,000

Project Scope • Site clearance (180 Hectares), scarification and compaction of existing ground (179 Hectares). • Placing and compaction of fill materials for the platform construction of the aluminium and power plant (4,540,000 m3). • Ground improvement for the power plant area (25 Hectares) using wick drains and surcharge loading (placing and relocating to power plant area) of (750,000 m3). • Ground improvement for the carbon plant (12 Hectares), using dynamic compaction. • Removal of existing security fence (3,000 M) and installation of new security palisade fence (8,000 M) to the perimeter of the aluminium and power plant.

Completion Date December, 2008 ALJABER ENGINEERING | CORPORATE PROFILE 57

SALWA INTERNATIONAL HIGHWAY INTERCHANGES AND INSTALLATION OF WATER PIPELINES AND STREET LIGHTING.

Client Public Works Authority (ASHGHAL)

Value (USD $) 86,000,000

Project Scope Water Pipes:

• Laying of D.I Pipes from 200 mm to 400 mm diameter 2300 LM • Removal of existing water D.I pipes 400 mm & 500 mm diameter 15,000 LM

Street lighting columns foundation: 1200 sets • Cable trenches 34,000 LM

Construction works for ten (10) interchanges: • Site clearance, demolition and earthworks • Sub-base and road base • Flexible surfacing • Road marking • Bridge structure works

Completion Date January, 2009 THE BASE SECONDARY CHANNEL EXCAVATION AND DISPOSAL WORKS.

Client UrbaCon General Contracting

Value (USD $) 7,000,000

Project Scope • Pre & Post excavation bathymetric surveys • Island channel excavation 537,000 m3 • Diposal of excavated material on land off-site 537,000 m3

Completion Date April, 2013 ALJABER ENGINEERING | CORPORATE PROFILE 59

2 LANDMARK BUILDINGS

ALJABER ENGINEERING | CORPORATE PROFILE 61

AL THUMAMA STADIUM

Client Supreme Committee for Delivery & Legacy (SC)

Value (USD $) 342,000,000

Project Scope AlJaber Engineering and Tekfen for Qatar’s Al Thumama Stadium

AlJaber Engineering (JEC) together with Tekfen Construction, as joint-venture partners, have been awarded the construction contract for the stadium in the Al Thumama district of Doha, Qatar.

Al Thumama Stadium – one of the proposed venues for the 2022 FIFA World Cup Qatar – is the seventh stadium for which the main construction contract has been awarded. The venue, located just minutes from Hamad International Airport and in the center of Doha, is scheduled for completion by 2020 and will host matches up to the quarter-final stage. The 40,000 seat stadium will have a reduced capacity of 20,000 seats in its post tournament legacy mode as part of the SC’s modular stadium legacy plans.

Completion Date Ongoing

ALJABER ENGINEERING | CORPORATE PROFILE 63

QATAR PETROLEUM DISTRICT (A JOINT VENTURE WITH BOUYGUES AND MIDMAC CONTRACTING).

Client Barwa Real Estate Company

Value (USD $) 1,301,000,000

Project Scope Qatar Petroleum District is situated in Doha’s new business district in West Bay with approximate built-up area of 700,000 m2 as detailed below:

• Elevated car parking • 15 Podiums: Retail + Technical • 10 Towers: Offices - Shell & Core • Hotel & Convention Center • Primary substation • Energy Center

Completion Date June, 2017

ALJABER ENGINEERING | CORPORATE PROFILE 65

DUBAI TOWER IN DOHA

Client Meraas Development L.L.C

Value (USD $) 400,000,000

Project Scope Construction of a new mixed-use corporate tower in the West Bay district of Doha. It will contain world-class retail, offices, hotel, serviced apartments and residential units. It has been envisioned that upon completion, the project will be the tallest building in Doha housing both residential and commercial establishments.

The scope consists of a 84 - storey tower with total built-up area of 295,000 m2 detailed as below:

• Residential space 31 floors • Office space 29 floors • Five-star boutique hotel 13 floors • Retail space 2 floors • Ballroom • Meeting facilities • Business center • Swimming pool and Spa • Associated facilities

Completion Date Suspended - Design Changes

ALJABER ENGINEERING | CORPORATE PROFILE 67

ALJABER ENGINEERING HEADQUARTERS - FOX HILLS PLOT NO. MU-B04, LUSAIL-QATAR

Client AlJaber Holding

Value (USD $) 44,000,000

Project Scope The site situated at Fox-Hills District, Lusail, is being developed into an office building. The project works included the following:

• Mobilization, Fencing, Excavation, Shoring and Dewatering. • Construction, completion, handover and maintenance of an office building consisting of three • basements, ground, mezzanine, five floors and roof to a total built-up area of 14,000-m2 with required electro-mechanical services. • Hard and soft landscaping including external services.

Completion Date September, 2015 ALWAHA CLUB

Client RasGas

Value (USD $) 7,000,000

Project Scope Construction of one storey concrete structure building with a total buit up area of 7300 m2 including a metal decking roofing for the multipurpose hall with all associated MEP, telecommunications, HVAC and fire fighting system.

• Restaurant, snack bar and private dining room • Lounge and meeting rooms • Recreational rooms • Multi- purpose hall that functions as a theatre • Gymnasium • Children’s nursery • Administration offices • External swimming pool • Shaded paddling pools • Play areas and mini golf course

Completion Date March, 2002 ALJABER ENGINEERING | CORPORATE PROFILE 69

CAMP AT ABU NAKHLAH

Client Aljaber Engineering WLL

Value (USD $) 36,000,000

Project Scope Construction of new Worker’s Accommodation Facility as per the latest welfare standards. The facility was estimated for a capacity of 4,500 workers with all the welfare & recreation facilities. The major elements consisted of:

Labour Accommodation, Mess Hall & Kitchen, Camp Office & Training Room, Grocery & Retail Barber Shop, Clinic, Mosque, Guard Room, Delivery Area & Parking Money Exchange, Delivery Area & Parking, Car & Bus parking Lots, Garbage Collection Sewerage Treatment Plant, Generator Farm & Diesel Farm, Cricket Ground, Basket Ball Ground, Foot Ball Ground External Works & Utilities: • Road Works, Road Marking & Sign Boards • Hard Scaping works • Hoarding / Fencing, Gates & Barriers • Street Lighting • Drainage Network • Water Network • Fire Fighting Network • Electrical Works

Completion Date October, 2015

ALJABER ENGINEERING | CORPORATE PROFILE 71

3 OIL & GAS, PETROCHEMICAL AND INDUSTRIAL

ALJABER ENGINEERING | CORPORATE PROFILE 73

HAMAD PORT PROJECT - STRATEGIC FOOD SECURITY FACILITIES

Client Hamad Port Project Steering Committee

Value (USD $) 456,000,000

Project Scope The Strategic Food Security Facility (SFSF), located in Hamad Port; will support the Qatar National Food Security Program as: • Fully Functional Stand-Alone Terminal. • Providing Storage Facility for three Main Commodities (Rice, Sugar and Oil). • Food Commodities shall arrive in both bulk and breakbulk. • Securing the consumption for each commodity for a population of 3 Million for 2 Years. The major elements of the project shall consist of the following: • Planning of Strategic Food Security Facility conceptual facility arrangement options which are consistent with client, stakeholders and end-user. • Design and Construction of Strategic Food Security Facility - Storage of Edible Commodities. - Facility’s Networks and Utilities. • Design and Construction of all Facility’s Buildings including FF&E. • Design, Specification, Procurement, Installation and T&C of Operational Handling Equipment for Handling, Re- Loading and Transportation of Edible Commodities. • Design, Specification, Procurement and Installation of Marine Supplies and Equipment. • Preparation of Tender Documents for the Procurement of O&M Services and Facility Management Services for Strategic Food Security Facility.

Completion Date Ongoing FABRICATION AND INSTALLATION OF ABOVE GROUND METAL PIPING, INSTALLATION OF WATER SUPPLY PUMPS, EMERGENCY COOLING TOWERS, COMPRESSED AIR PIPING SYSTEM AND CLOSED COOLING MEDIUM SYSTEM AT QATAR ALUMINIUM SMELTER IN MESAIEED.

Client Qatar Aluminium Company (Qatalum)

EPC Contractor SNC - Lavalin

Value (USD $) 20,000,000

Project Scope • Fabrication and erection of pipes and connection to potable, process and fire water tanks. • In water supply area. • Installation of water supply pumps. • Installation of emergency cooling tower. • Fabrication and erection of compressed air piping system. • Fabrication and erection of closed cooling medium system.

Completion Date September, 2010 ALJABER ENGINEERING | CORPORATE PROFILE 75

MAJOR GROUND AND CIVIL WORKS FOR RECTIFIER STATIONS AT QATAR ALUMINIUM SMELTER IN MESAIEED.

Client Qatar Aluminium Company (Qatalum)

Value (USD $) 24,000,000

Project Scope • Excavation for foundations • Filling to structures and embankment • Fire rated concrete works and surface painting • Water proofing, and fencing works • Miscellaneous metal works

Completion Date March, 2010

ALJABER ENGINEERING | CORPORATE PROFILE 77

EPIC FOR TWO NEW KANGAROO CRANES AND UPGRADING OF EXISTING GABBRO BERTHS CRANE FACILITIES INCLUDING ALL MECHANICAL AND ELECTRICAL WORKS AT MESAIEED PORT.

Client Qatar Petroleum

Value (USD $) 31,000,000

Project Scope The Scope included engineering, procurement, construction and commissioning of two kangaroo cranes with a rated capacity of 1,100 ton/hour each including all related electrical and mechanical works as follows:

• Two kangaroo crane with a rated capacity of 1,100 ton/hour • HV electrical power supply for the new kangaroo cranes • Four new grabs and ropes for the two existing kangaroo cranes • Fresh-water based dust suppression systems for the two existing kangaroo cranes • Video camera system

The scope also included all related mechanical and electrical works to upgrade the following:

• A mobile harbour crane • A hopper • LV electrical power supply and sockets for mobile hopper

Completion Date March, 2009 INSTALLATION OF CATHODE ROADING EQUIPMENT AND INDUCTION FURNACE INCLUDING SUPPLY AND ERECTION OF ALL MECHANICAL, PIPING, ELECTRICAL AND INSTRUMENTATION WORKS AT QATAR ALUMINIUM SMELTER IN MESAIEED.

Client Qatar Aluminium Company (Qatalum)

EPC Contractor SNC - Lavalin

Value (USD $) 8,000,000

Project Scope All associated mechanical, piping, electrical and instrumentation works to install the following:

• Cathode roding equipment • Induction furnace • Overhead cranes • Emergency water pumps

Completion Date January, 2009 ALJABER ENGINEERING | CORPORATE PROFILE 79

CIVIL, INFRASTRUCTURE AND ELECTROMECHANICAL WORKS FOR CAMPS AND OTHER FACILITIES INCLUDING UNDERGROUND PIPING NETWORKS, ROAD WORKS, INSTALLATION OF TREATED EFFLUENT TANKS, WASTE WATER TREATMENT UNITS AND SLUDGE TREATMENT UNITS.

Client Chiyoda - Technip J.V.

Value (USD $) 33,000,000

Project Scope This project consisted of the following:

Civil and Infrastructure works: • Underground networks (HDPE 40 to 410 mm) • GRP pipeline 10” diameter • Foundations for the waste water treatment, potable water/ firewater and power generation units • Road works and street lighting • Sludge building  Galvanized fence • Construction of secondary substations and diesel generators buildings Mechanical, Electrical and Instrumentation works: • Installation of secondary package substations • Cable laying  Instrumentation works • Diesel storage tanks  Structural steel works • Above ground galvanized steel piping • Supply & installation of 2 Nos. vertical, GLS bolted potable water tanks (3200 m3) with aluminium dome cover • Supply & Installation of 4 Nos. vertical, GLS bolted treated effluent tanks (1600 m3) with aluminium dome cover • Installation of the waste water treatment units • Installation of sludge treatment unit

Completion Date November, 2007 EPIC OF POTABLE WATER TRANSMISSION SYSTEM AND LANDSCAPING MAINS TO DISTRIBUTE WATER PRODUCED BY RLPC TO VARIOUS FACILITIES WITHIN RAS LAFFAN.

Client Qatar Petroleum

Value (USD $) 14,000,000

Project Scope Detailed engineering, procurement, construction, installation, testing and commissioning of:

• Water potable (WP) transmission system (FRP) to distribute the water produced by Ras Laffan power company to existing reservoirs in Ras Laffan City, with all associated control and monitoring systems.

• Water Landscaping (WL) transmission system (FRP, UPVC & CS) to distribute water from Ras Laffan power company, Oryx GTL plant, Ras Laffan City camp waste water treatment plant and the JGC waste water treatment plant to various facilities.

Completion Date October, 2005 ALJABER ENGINEERING | CORPORATE PROFILE 81

4 POWER GENERATION, SUBSTATIONS AND DESALINATION PLANTS

ALJABER ENGINEERING | CORPORATE PROFILE 83

UMM AL HOUL POWER PROJECT - PACKAGE A (CIVIL & BUILDING WORKS) & PACKAGE B (HVAC WORKS)

Client Hitachi Zosen Corporation

Value (USD $) 100,000,000

Project Scope For Package A (Civil & Building Works) MSF Plant Area • MSF Switchgear Building – 3,540 m2 • Demister Acid Cleaning Unit • MSF Unit – 1 Nos. • Roads & Paving PWT (Remine) Plant Area • Remine Switchgear Building - 1,747 m2 Cable Trenches Equipment Foundations • Generator System Building - 168 m2 Underground Pipelines RO Plant Area Civil Works DAF - 7,648 m2 DAF Sunshades HVAC Works Cable Trenches Underground Piping Roads & Paving Building Works UF Building – I & II - 3,837 m2 each RO Building - 9,264 m2 RO Electrical Building - 4,737 m2 Control Building - 305 m2 Chemical Building - 1,075 m2 Waste Water Treatment Building - 450 m2

Completion Date Ongoing

ALJABER ENGINEERING | CORPORATE PROFILE 85

MAJOR CIVIL WORKS RELATED TO THE CONSTRUCTION OF DISTILLERS AND BOILERS AREAS, INTAKE STRUCTURE AND POTABLE WATER RESERVOIRS FOR 45 MILLION GALLONS PER DAY WATER DESALINATION PLANT AT RAS ABU FONTAS.

Client Fisia Italimpianti

Value (USD $) 76,000,000

Project Scope Distillers area and intake structure • Intake and outfall structures & Equipment and pipe rack foundations • Road works / Pipe trenches • Local control room, Chlorination building and C02 production building • Water basins and pumps well • Seawater screening and pumping station Boilers area • Storage tanks • Local control rooms, switchgear and control room buildings • Pipe rack and equipment foundations, boilers and stack foundations Potable water reservoirs • Potable water reservoirs 102,000 m2 (2 Nos.) • Potable water pumping station • Equipment foundations & Flow meters and valve pits

Completion Date March, 2010 CIVIL WORKS RELATED TO THE CONSTRUCTION OF 40 MILLION GALLONS PER DAY WATER DESALINATION PLANT AT RAS LAFFAN.

Client Fisia Italimpianti and Enel Power

Value (USD $) 20,000,000

Project Scope All associated civil works to build 40 million gallons per day, desalination, blending and demineralization plants.

• Installation of temporary facilities and lay down area for this project and future expansion • Bulk earth works • Concrete foundations for 4 main desalination units • Supply and discharge stations including U.G. GRP pipe works • Onsite GRP pipelines of various diameters • Main pumps structure and chemical dosing units • Re-mineralization structure including water tight structure • Main switchgear and control buildings (3 Nos.) • Electro - chlorination building (1 No.) • New roads and walkways with all associated civil works • Construction of cooling tower • Construction of 220 KVA cable corridor involves 80,000 m3 of excavation

Completion Date May, 2003 ALJABER ENGINEERING | CORPORATE PROFILE 87

5 SEWAGE TREATMENT PLANTS, DISTRICT COOLING PLANTS AND PUMPING STATIONS

ALJABER ENGINEERING | CORPORATE PROFILE 89

ENGINEERING, PROCUREMENT, CONSTRUCTION, TESTING & COMMISSIONING OF THE DISTRICT COOLING PLANT-3 IN WEST BAY

Client Qatar District Cooling Q.C.S.

Value (USD $) 89,000,000

Project Scope The Works included the design, supply, delivery, erection and installation on site of a district cooling plant with a guaranteed capacity of 35,000tons of mechanical refrigeration plus 5,000 tons thermal energy storage tank (TES) capacity, serving the West Bay area including architectural and civil works and all necessary mechanical, electrical, plumbing and fire (“MEPF”) equipment and installations, associated structures, and the civil works of Kahramaa substation. The major elements were:

• Construction of plant building including all civil and architectural works • MEP services complying with the final plant capacity • District Cooling Process work serving 35,000 RT plus 5,000 RT TES tank • Construction of Primary Substation

Completion Date May, 2016 REFURBISHMENT AND UPGRADING WORKS FOR VARIOUS FOUL AND STORM WATER PUMPING STATIONS INCLUDING CIVIL, MECHANICAL ELECTRICAL AND HVAC WORKS.

Client Public Works Authority (Ashghal)

Value (USD $) 53,000,000

Project Scope The refurbishment and upgrading of four (4) foul pumping stations and two (2) storm water pumping stations including:

• Civil works • Temporary bypass works, wet and dry well works • Rising main works and mechanical works

Completion Date June, 2016 ALJABER ENGINEERING | CORPORATE PROFILE 91

6 PIPELINE CONSTRUCTION

ALJABER ENGINEERING | CORPORATE PROFILE 93

GTC/600/2013, Pipelines for Mega Reservoirs Corridor Main 1 Package C & GTC/599/2013, Pipelines for Mega Reservoirs Corridor Main 2 Package A

Client Qatar General Electricity & Water Co. (KAHRAMAA)

Value (USD $) 437,000,000

Project Scope The scope of this Contract provides and completes the corridor pipelines (Corridor Mains) and fibre optic cable ducts within the southern length of the Qatar Utility Corridor (QUC) between PRPS 3 (Rawdat Rashed) and PRPS 4 (Abu Nakhla), transmission mains and corridor main pipework and connections at both PRPS 3 and 4 for Package A and northern length of the Qatar Utility Corridor (QUC) between the Dukhan Road and PRPS 3 (Rawdat Rashed) for Package B The Major Quantities: Main Utility Corridor from Rawdat Rashed ( PRPS3) to Abu Nakhla ( PRPS4): 23.95km of twin 1600 mm diameter water corridor main | 10.40km of single 1200mm diameter transmission main 0.35km of twin 1600 mm diameter branches water corridor main Northern length between the Dukhan Road and PRPS 3 (Rawdat Rashed): 1600 mm dia.: 22.9 km of twin pipeline from the Dukhan Road to PRPS 3. 1200 mm dia.: 10.7 km of pipeline from the Dukhan Road to PRPS 3. 900 mm dia.: 1.5 km of pipeline from the QUC water corridor to the west edge of the QUC. Construction of all washout, air valve and other chambers. Design and construction of trenchless road and utility crossings. Supply, installation & testing of the ducts in parallel with the pipelines for FOC. The pipeline (DI) quantities are: 1600 mm dia Pipes - 94,292 m 1400 mm dia Pipes - 32,866 m 1200 mm dia Pipes - 33,970 m 900 mm dia Pipes - 1,5361 m

Completion Date November, 2017 DESIGN AND CONSTRUCTION OF 1200 MM OF 30 KM TRANSMISSION MAIN FROM DOHA WEST STW TO AL RAKHIYA FARM.

Client Public Works Authority (Ashghal)

Value (USD $) 44,000,000

Project Scope The project included of design, procurement and construction of 1200 mm diameter GRP mains detailed as follows:

• 1200 mm diameter GRP main 30 Km • 500 mm diameter GRP main 720 M • Air valves, washout and connection chambers • Flow control valves and flow meters.

Completion Date December, 2011 ALJABER ENGINEERING | CORPORATE PROFILE 95

UPGRADING OF NEW AND OLD SALWA DISTILLATE AND RISING MAINS (22 KM OF PIPES)

Client Qatar Electricity & Water Co. (KAHRAMAA)

Value (USD $) 32,000,000

Project Scope Replacement of 1200 mm, 900 mm rising mains and associated pipe works from old Salwa Reservoir Station and New Salwa Reservoir Station.

Replacement of existing 1200 and 1400 mm pipe works and construction of new 1400 mm distillate main segment including all associated pipe works from New Salwa to Immigration Interchange.

Extension of new 600 mm rising main and associated pipe works along Waab Street, from Fourosiyah to Khalifa Stadium.

Completion Date September, 2007 CONSTRUCTION OF D LINE TSE PUMPING STATION AND TRANSMISSION MAIN C762

Client Public Works Authority (Ashghal)

Value (USD $) 209,000,000

Project Scope The Scope of Works for DS105 project has approx. 65km of proposed TSE transmission mains, starting at the existing Doha South Sewage Treatment Works (DSSTW) to Al Rakhiya Farms, and further up to New TSE storage lagoon.

D-Line Pumping Station • Pump Station (120,000m3/day over 20 hours) • Holding Tank • • D-Line TSE Transmission Main

• 1200mm dia – Micro tunnel Works 4,100 m • 800mm to 1200mm dia – DI Pipe in Trench 61,000 m • 1600mm dia – GRP Pipe Sleeves in Trench 900 m • 800mm & 1200mm dia – GRP Pipe in Trench 225 m • Chambers (Air Valve, Isolation, Washout & Tie-In) 200 Nrs

Completion Date Ongoing ALJABER ENGINEERING | CORPORATE PROFILE 97

7 HOTELS

ALJABER ENGINEERING | CORPORATE PROFILE 99

CONSTRUCTION OF 200 KEYS 5* LUXURY HOTEL, 50 KEYS CHEDI VILLAS, LUXURY SPA, BEACH CLUB & ASSOCIATED INFRASTRUCTURE WORKS - OMAN

Client Qatari Diar Ras Al Hadd Development Company (QDRH) - Oman

Value (USD $) 80,500,000

Project Scope Joint Venture Qatari Diar Ras Al Hadd development awarded AlJaber Engineering a contract to construct a hospitality facility located within the south eastern part of Al Sharqiyah region of Oman. The works to be delivered includes 200 keys of a 5* hotel, 50 keys of Chedi Villas, luxury spa beach club, associated infrastructure and landscaping works.

• 200 Keys 5-star Luxury Hotel divided into Type A guest rooms (40 sqm) at 25% and Type B guest rooms (37sqm.) at 75%. • The Spa consists of 10 treatment rooms, dry & water Gyms and an outdoor pool. • The Beach Club provides for a unique F&B outlet and boasts of a 101meter long pool. • The 25 nos. of villa units (50 Keys) are oriented and positioned to respect natural topography as well as well as to maximize views. • The specialty restaurant, a stand-alone structure on the beach offering fine dining experience. • Security block 1 (main entrance + driver room) • Security block 2 (service entrance) • Chiller yard and Substation 1 • Substation 2 (villas’ substation) • Sewerage Treatment Plant • Chain-link Fence for future development with approx. length of 3000m

Completion Date Ongoing RESOURCES ALJABER ENGINEERING | CORPORATE PROFILE 101

OFFICES JEC’s headquarters are located in Fox Hills, Lusail. Our offices are equipped with the latest IT infrastructure meeting international standards and requirements in order to fulfill local and international clients’ expectations.

FABRICATION WORKSHOP JEC’s philosophy is to achieve maximum efficiency of fabrication productivity. JEC has established state of art fabrication workshop facilities equipped with new machines, equipment and tools.

JEC’s fabrication workshop is situated in Al Khor close to the Ras Laffan Industrial City, where all the major clients are located.

PMV FACILITIES JEC has heavily invested in purchasing new equipment enabling high standard execution for the upcoming mega projects. In addition, JEC has established two central PMV workshops located in Salwa Industrial Area and Al Khor Industrial Area. Our continuous preventative maintenance is carried out by a dedicated and professional team. JEC has the largest fleet count in the State of Qatar exceeding 1,800 pieces of machinery.

ALJABER ENGINEERING | CORPORATE PROFILE 103 EQUIPMENT FLEET

Description No. Description No. Heavy Equipment 484 Light Vehicle 494 Articulated Dump Truck (40 Tons) 32 Bus - Light 14 Backhoe Loader (Jcb/Cat) 29 Car 176 Bulldozer (D8 / D9 /D10) 23 Pickup 301 Crane All Terrain (30 to 160 Tons) 8 Ambulance 2 Crane Rough Terain (25 to 90 Tons) 14 Fire Foam Truck 1 Excavator (05 to 90 Tons) 163 Forklift (03 to 12 Tons) 12 Manlift (15 To 40 M) 19 Tipping Trailer 44 Motor Grader 22 Tipping Trailer (22 CBM) 44 Roller (10 To 20 Tons) 34 Auxiliary 1666 Skid Steer Loader 33 Compressor 95 Scissor Lift 6 Concrete Mixer 27 Telescopic Handler (3.5 to 12 Tons) 14 Concrete Mixer Pump 2 Tower Cranes 7 Drum Cutter 12 Trencher (Drum) 4 Generator 279 Trencher (Boom) 3 Hand Jack Hammer 76 Wheel Loader (04 to 5.5 Cbm) 61 Highbed - Aux 14 Heavy Vehicle 191 Hydraulic Breaker 156 Bus (26 to 66 PAX) 134 Lowbed - Aux 8 Highbed Trailer 13 Plate Compactor 51 Lowbed Trailer (40 to 150 Tons) 10 Power Float 15 Recovery Van 3 Roller (1 to 2 Tons) 56 Self Loader (3 to 8 Tons) 26 Tower Light 372 Water Tanker 3 Vibrator 51 Road Sweeper 2 Water Pump 107 Tipper 187 Welding Machine 84 Tipper (6X4) (19 CBM) 10 Site Dumper 2 Tipper (8X4) (20 to 22 CBM) 177 If, Rt, Se, We, Zz 259

Grand Total 3,066

ALJABER ENGINEERING | CORPORATE PROFILE 105 STAFF & MANPOWER

Description No Management Staff 170 Executive 12 Business Development 3 Estimation Department 33 Procurement Department 17 Commercial and Contracts Department 11 Planning & Cost Control Department 17 Technical Department 2 Finance & Accounts Department 31 Information Technology 8 Human Resources Department 25 Legal Department 8 Document Control 3 Projects Staff 8,025 Operation Civil 860 Operation ME 1467 Quality, Health, Safety & Environment 345 Project Technical Staff 49 HR Department Support Staff (Site Admin & Camps) 44 Project Workforce (Skilled & Unskilled Labor) 2472 Drivers & Operators 1724 Plant, Machinery & Vehicles (PMV) 848 Crusher Operations 17 Main Store Operations 70 Security Department 129 Grand Total AlJaber Engineering Staff & Manpower 8,195 Subcontractors Staff & Manpower 5,780 Total Workforce 13,975 SUSTAINABILITY

INTEGRATED MANAGEMENT SYSTEM (IMS)

Quality, Health, Safety and Environment JEC places emphasis on internally improving the physical and social environments in which employees operate in. We constantly perform risk management techniques to identify the dangers employees can encounter in the workplace. Preventing these problems are highly beneficial and results have shown that a safe and hygienic environment has led to a higher productivity. Our standards of procedures and policies are implemented to ensure employees safety and health is an action taken proactively and controlled by the top management.

In QHSE (Quality, Health, Safety and Environment), JEC continues to be one of the leading performers within the industry sectors.

JEC is striving to continually improve the performance in the QHSE management system which is one of our key strategic objectives. AlJaber Engineering’s QHSE objectives are given equal value with other business objectives and being monitored by the executive management.

The quality of everything we do brings value to our customers and justifies their decision to entes into a business relationship with us.

The protection of human health, personal and environmental safety rank at the highest level of importance to JEC. We operate in a diligent and responsible manner consistent with other world-class corporations and aligned with our stated QHSE business goals and policies.

JEC empowers and supports the associates in their ongoing efforts to prevent accidents of all kinds and to promote a safe environment where ever they go. We use comprehensive management systems to demonstrate our commitment to Quality, Health, Safety and the protection of our Environment and to the principles of our QHSE Policy, bringing value to our associates, customers and the community.

Responsibility for Quality, Health, Safety and Environment rests at the executive management level of AlJaber Engineering and is transferred down to the line for implementation. Everyone in our organization is accountable for QHSE performance in their respective area. JEC embarked upon a number of behavioral safety initiatives to complement our procedures and to seek assurance that everyone engages all in matters. ALJABER ENGINEERING | CORPORATE PROFILE 107

CERTIFICATIONS

• ISO & OHSAS Certifications • Quality & HSE Policies • Safety Certifications & Achievements • 2 Million Man Hours without a lost time incident. Presented By NDIA. • 20,000,000 Man Hours with no lost time incidents. Presented by CTJV. • 1,000,000 Man Hours without lost time accident at NDIA. Presented by NDIA. • 5,000,000 Man Hours without LTI at Ras Abu Fontas - A1 Project.Presented by Fisia Italimpianti • 1,000,000 Man Hours without LTI & with outstanding Safety Performance. Presented By LUSAIL. • 250,000 Man-Hours without LTI under Onshore Flow Assurance Project Contract. Presented by RasGas. • 6,200,000 Man-Hours without LTI. Presented by KAHRAMAA - Water Project Department. • Appreciations JH CONSTRUCTION AL WATANIYA CONCRETE

JH CONSTRUCTION W.L.L. is a Grade A Contractor for Al Wataniya Concrete is the first company in the market Road Works and Infrastructure in Qatar. to receive certification from the National Ready Mix Concrete Association (NRMCA) and from Qatar General The Company has a proven track record of executing Organization for Standard and Metrology (QGSM). large scale, multi-dimensional projects, of expressways, development of urban & rural infrastructure, road The Al Wataniya Concrete corporate strategy is to maintenance & safety improvements, infrastructure and integrate processes and services to ensure delivery of road works for airports, educational institutions, real high quality, customer-centric timely products. estate developments, industrial & petro-chemical plants, sports stadium, commercial and residential communities. Al Wataniya prides itself for being the first company in the market to acquire NRMCA and QGSM certifications. JH Construction’s core business activities comprise of Al Wataniya’s commitment to excellence and quality earth works, Infrastructure works , road works , road is sustained by the dedication of its team-oriented, marking works , asphalt texturing and coating works and highly qualified and experienced team of engineers and landscaping works . professionals who utilize their know-how of the gulf market to deliver concrete efficiently and in a timely The Company owns large fleet of the latest equipment manner. and qualified workforce to deliver the works to the highest quality and safety standards. To this effect, Al Wataniya Concrete, established in July 2005, has positioned itself as one of the leading JH Construction motto is satisfaction of its clients producers and suppliers of ready-mix concrete in Qatar. while adopting safe working practices and protection of Al Wataniya currently operates 13 plants that are spread environment. across the State of Qatar to fulfill the country’s escalating construction and infrastructure needs.

Contact details: Contact Details: ALEX CALFAT KHALED AL NUIMAT Executive Director General Manager Mob. : +974 5588 1518 Mob. : +974 5581 7995 Tel. : +974 4035 0000 Tel. : +974 4483 8751 Fax : +974 4038 2166 Fax : +974 4483 2334 Email : [email protected] Email : [email protected] Web. : www.jhco.qa Web. : www.watancon.com ALJABER ENGINEERING | CORPORATE PROFILE 109

ARABIAN SPECIALIZED MATERIALS ARABIAN SUPPLY CENTER ISNAD AL-KHALEEJ FACILITY MANAGEMENT

Arabian Specialised Materials Company ASMA is part Established in 2008, Arabian Supply Center (ASC) ISNAD offers complete facility management solutions, of the AlJaber Group and specializes in trading, supply supplies heavy equipment & quality spare parts to from property consultancy to day-to-day operations. Our and manufacture of a wide range of quality products and the Qatari markets as well as accessories and related professional expertise is well suited for any kind of market. services to a diverse sphere of sectors and industries. products for the construction industry. Initially providing No matter what your business is or do. We provide best only its affiliates with a limited range of spare parts facility management solutions to your specific industry. ASMA has the ability to deliver the right product for trucks and trailers, it soon expanded as it obtained We assure our clients a peace of mind as their operations from the right supplier. ASMA achieve this through exclusive distributor rights for world-class brands and run seamlessly in their business environment. Our service many partnerships and associations with world-class equipment. solutions stem from a culture of continuous improvement companies in Europe, America, Canada and India. where all our people are encouraged to challenge our By 2012, within only four years of its founding, ASC ASMA has been serving the market since 1996. methods at every opportunity. These allow us to be became the exclusive dealer for AKSA generators in ASMA provided construction materials and solutions innovative in all our services. Qatar, followed by Sandvik rock tools (Rammer and to numerous clients in several industries including Bretec) in 2013. One year later ASC acquired exclusive infrastructure, buildings, railway, water, electricity, Oil & We are a leading facility management provider in Qatar. dealership for its flagship product: Hitachi construction Gas, and petrochemicals. We also ensure that our customers receive the best equipment. ASMA provides a wide range of products such as: services that is appropriate for their building and the • Formwork & Scaffolding requirements of its occupies. Our Management teams ASC’s reputation is based on three principles: providing • GRP & Steel Sectional Water Tanks take clear ownership of service deliver and look to work quality products, at the right price, and following it with • Garbage & Linen Chute System closely with our client to ensure that all the requirements excellent customer service. • General Fabrication Works are fully meet. • HVAC Ducts Our team of experts has extensive experience with our • Aluminum access covers Our Services: products and is fully prepared to meet all customer needs. • Power Cables • Facility Management Services With continued investment in people, processes and • Street Lighting Poles, Fixtures, Luminaries • Provision of Labor Accommodation Services resources, ASC is well positioned to remain one of the • Granite curbs and pavers • Maintenance Services leading suppliers of construction, industrial and transport • GRP access covers • Cleaning Services equipment, spare parts and related products in both the • GRP pipes • Laundry Services Qatari market and throughout the region. • HDPE Lining • Passive Fire Stopping system • Ironmongery & High security Locks Contact Details: YEHIA ZAKARIA Contact Details: Contact Details: Executive Manager KHALIFA AL JAJA - General Manager HISHAM HADID - Chief Executive Officer Mob. : +974 6600 1873 Mob. : +974 5583 0496 Tel. : +974 4458 0623, +974 4458 0635 Tel. : +974 4455-3038 Tel. : +974 4421 3636 Fax: +974 4421 3737 Fax : +974 4458 0562 Fax: +974 4455-4310 Email : [email protected] Email : [email protected] Email : [email protected] Web. : www.asmaqatar.com Web. : www.asc.com.qa Web. : www.isnad-qatar.com ZAD CATERING ARABIAN TECHNICAL SERVICES W.L.L. BUILDING INFORMATION MODELING TECHNOLOGIES (BIMTEC) ZAD CATERING SERVICES is one of the leading Catering ARABIAN TECHNICAL SERVICES W.L.L (ATS) is a and related Support Services Companies in Qatar. In member of Al Jaber Engineering Group of Companies Engineering Management is a specialized form of just a short period, ZAD Catering has become one of (one of the most recognized and respected entities in management that is concerned with the application the Qatar’s leading independent Contract Catering the State of Qatar). ATS is a diverse Quality, Health, of engineering principles to business practice. It is the Companies, serving three times meals/day in Remote Safety and Environment (QHSE) Management Services ability to bring together in house engineering, value Site and Industry Sectors, to whom we offer various Company that provides a full range of tailor-made and engineering, information management, site construction Catering packages. high standard services such as consultancy, management, management and process management into a unified ZAD Catering’s culture is one of pride in performance and training, auditing, supply of professionals in all fields, and BIM environment. This will yield the most efficient and integrity plus a level of commitment that comes from safety materials supplies to all sectors of the Qatari and cost effective outcome that benefits the construction employee satisfaction and motivation. Our professionals GCC markets. operations’ lifecycle. BIMTEC has shaped this platform are dedicated to providing clients with value-focused to cater to the local and international regions and has service and results. ZAD will design the Menu and ATS annual action plan is to engage with private and public excelled to become one of the most sought after EMO Serve you with Taste Quality, Hygiene and your Budget clients in the industrial, commercial and services sectors, companies in the region. Requirements. as well as clients in the public service administration and ZAD is all about great food and great service! It’s about contracting sectors, and to provide them with specialized Our offering range within the BIM/EMO Environments listening to what our clients and customers need. It’s Quality Assurance, Quality Control and HSE management from about making people feel cared for and looked after. services as a turn-key Management Services Company. Because we believe service is an honorable profession. ATS is officially registered and licensed in the State of • Virtual design Construction It’s what we love and it’s what we are good at! Qatar to: • Vertical Planning • Provide Management Consulting Services • Project Management Services Offered • Provide Technical Services • Health and Safety Simulation • Remote Site Catering • Trade in Safety Materials and Equipment • 3D Laser Scanning • Industrial Catering • Technical Services in the Field of Professionals Supply • 3D Mobile Mapping • Institutional Catering ATS will continue expanding its expert base to provide • Data Management for Facilities Management • Cafetarias quality and HSE consulting, auditing and training • Retail Shops services, and diversifying its business lines for the supply • Manpower Supply of professionals and safety materials and equipment.

Contact Details: Contact Details: YEHIA ZAKARIA YEHIA ZAKARIA Executive Manager Contact Details: Executive Manager Mob. : +974 6600 1873 RAMZI ABU QAMAR Mob. : +974 6600 1873 Tel. : +974 4455 4309 General Manager Tel. : +974 4465 9462 / 4443 8104 Fax: +974 4455-4310 Mob. : +974 5546 6669 Email : [email protected] Email : [email protected] Email : [email protected] Web. : www.zad-qatar.com Web. : www.arabiants.com Web. : www.bimtec-eng.com ALJABER ENGINEERING | CORPORATE PROFILE 111

CONFIDENCE DELMON SCAFFOLDING HYDROSERV EQUIPMENT & TRANSPORTATION Delmon Scaffolding & Formwork has been operating in HYDROSERV is a leading name in dewatering and Confidence Equipment and Transportation (CET) offers the Gulf for more than 30 years. It manufactures, supplies specialized in ground water treatment, pumping services solutions for water tankers, sewage removal, garbage and hires various types of scaffolding and formwork for fluid handling applications. With vast knowledge and material as well as the transportation of these activities. systems. Over the years Delmon has established a name experience of the complex hydrogeological conditions With more than 320 employees at their disposal, CET is in the market place for its technical expertise, quality encountered, Hydroserv can engineer a solution to safely one of the market leaders in catering to various sectors products and ability to deliver. It has branches in the manage the risks associated for any dewatering project. and providing assistance for any rental of equipment that U.A.E, Oman, Qatar, and Saudi Arabia. Hydroserv offers a complete line ground water treatment, aid companies in their operations. water pumps and related equipment for a range of In addition to D-Lock systems for Scaffolding, Delmon is applications, including diesel, hydraulic and electric CORE COMPETENCE: the exclusive distributor of ULMA products in Qatar, UAE, powered centrifugals, electric submersibles, light towers Confidence Equipment and Transportation (CET) offers Oman, Kuwait and Bahrain which can provide solutions and diesel generators. solutions for the supply of sweet water and Treated to client in order to achieve their targets in a timely The principle that we can support the growth of industry, Water (TSE), tanker rentals, removal of Sewage water, manner and within budget, for any type of structure, any infrastructure and community while protecting the Garbage material, construction waste, Hazardous & non- geometry for any kind of construction project. integrity of the natural environment is highly important to hazardous waste as well as the transportation of these us. Our approach, our equipment and our services cater activities since its inception in 2002, operating 150 plus Delmon’s scaffolding & formwork system are to site specific environmental sensitivities. vehicles in all corners of the State of Qatar with more manufactured according to specifications of the Hydroserv is also providing the services below in Oman, than 320 plus employees at their disposal, we are a International Construction Standards, Health & Safety in UAE, Kuwait as well as Qatar. well known name in the waste management industry & Workplace, Environment Management System and the Services: equipment rental Business. Engineering Council. • Dewatering NATURE OF SERVICES: • Over Pumping Works • Rental of Treated water tankers (TSE) Delmon has a reputation for providing a reliable and • Sewage Works • Rental of Sweet water tankers dependable service backed up by its vast products range, • Emergrncy Pumping • Supply of Sweet water its management and sales teams, experienced design • Pipe Laying • Removal of Sewage water engineers, supervisors and inspectors. • Rental and Sales • Removal of Garbage Material, Construction waste, Please contact us so we can become part of your team. • Pressure Washers & Wheel Washers mixed waste and other wastes. • Ground Water Treatment • Supply of 7m3 Skip boxes • Hydro-Dynamic Flushing or pipeline commissioning Contact Details: Contact Details: KHALIFA AL JAJA Contact Details: YEHIA ZAKARIA Executive Director BARRY O’ SULLIVAN Executive Manager General Manager Mob. : +974 6600 1873 Mob. : +974 5583 0496 Mob. : +974 6671 5873 Tel. : +974 4416 0164 Fax: +974 4469 0735 Tel. : +974 4435 3131 Tel. : +974 4421 1325, Fax : +974 4472 7315 Email : [email protected] Fax : +974 4435 3232 Email : [email protected] Web. : www.cetqatar.com Email : [email protected] Web. : www.hydroserv.qa A Branch of Hydroserv

SITESERV DRILLSERV URBAN CONCEPT W.L.L.

Event & Worksite Equipment Hire, throughout Middle Drillserv provides top quality drilling services for the Urban Concept W.L.L. is a Design and Build Contractor of East construction, oil, utility and domestic sectors here in Landscape and Urban Spaces. Qatar and across the GCC. With our world-class drilling It has a long history in designing large scale landscape Siteserv is a rental and services company specialising in rigs and experienced team, we aim to provide our clients and urban projects, such as the New Doha International the supply of both mechanical & non-mechanical products with cost effective drilling solutions. We are committed Airport, Barwa City, Oxyen Park Qatar Foundation, Ras to the event, construction and oil & gas industries. to customer service, client requirement and regional Abou Abboud Interchange. specification with a focus on safety. Drillserv is dedicated Presently we are building a horse race track and all the We hire out the equipment you need when you need it, to becoming the preferred contractor of choice. facilities around it for the Ministry of Youth and Sports in and we make sure it’s fully maintained, serviced and fit for Qatar. purpose immediately, efficiently and safely. Services include: We have a plant nursery for outdoor plants.

At Siteserv we pride ourselves on our reliable equipment – • Water Source Wells Our primary activities are: designed to make a real difference to our clients’ budget, • Design & Drilling of Aquifer Testing Programs deadlines and their impact on the environment – and our • Rehabilitation of Existing Wells • Landscape design and construction. emphasis on efficient and quality service. • Top-hole Drilling • Hardscape design and construction • Drilling of Seismic Up Holes • Irrigation Design and construction • Capability to drill down to 1,500m • Garden lighting design and construction. • Green roof gardening supply and construction • Turf track specialist contractor • Supplier and installer of turf reinforcement products

Contact Details: Contact Details: Contact Details: PAUL DURCAN BARRY O’ SULLIVAN FOUAD HANNA FRANGIEH General Manager General Manager Managing Director Mob. : +974 6644 7553 Mob. : +974 6671 5873 Mob. : +974 5556 6480 Tel. : +974 6644 7553 Tel. : +974 3350 6962 Tel. : +974 4450 9815 Email : [email protected] Email : [email protected] Fax : +974 4450 9815 Web. : www.siteservint.com Web. : www.drillservint.com Email : [email protected] ALJABER ENGINEERING | CORPORATE PROFILE 113

VIJAY ARABIA FIRE & SECURITY STREAM SPECIALIZED SERVICES SYSTEMS W.L.L. SSS is an organization formed by the merge between EMCON Trading & Contracting & Stream Acoustic & Thermal Co. Vijay Arabia Fire & Security Systems WLL (VASS) is one (SAT). EMCON & SAT are renowned leaders within their fields of expertise as reliable service providers by applying their of the fastest growing integrated Fire & Security Specialist vast experience with a solid support of world-class partners. Companies. Established in Qatar in 2007, VASS specializes in turnkey industrial and commercial projects. We offer our clients solutions and services complying with the latest standards and technologies and aim to be the From conceptualizing, design, supply, installation, partner of choice for our valuable clients. testing, commissioning & maintenance – complete array of solutions are offered to the customers through a SAT is a market leader in the world of Acoustics and a specialist in providing additional services in the construction professional team of more than 250 personnel. industry. EMCON is a market leader in concrete & steel protection as well as concrete refurbishment. Combined, they have successfully executed over 300 projects in Qatar. Solution Constellation offered by VASS includes: SSS carries over 15 years of experience and houses over 400 trained professionals and owns a fleet of equipment. • Fire Detection System – Addressable, Conventional, Enterprise Solutions Below is the list of services and solutions provided by SSS: • Fire Protection System – Hydrant, Sprinkler, Acoustics & Gypsum Works: Waterproofing: Foam, Gas Suppression (FM200, Novec), Pre-action • Sound Absorption • Fully Bonded Systems & Deluge Systems • Passive Fire Protection Contractor & Supplier of Fire • Sound & Impact Insulation • PVC Systems Door, Sealant, Cable coating, Mortar. • Vibration Isolation & Control • Bituminous Systems • Security Systems - Access Control, CCTV, Intruder • Drywall & Ceiling Systems • Hot/Cold Applied Liquid Waterproofing Alarm & AV systems. • Annual Maintenance for Fire Fighting and Fire Alarm Systems. Protective Coating Concrete Repair Other works and services • Surface Preparation • Concrete Rehabilitation • Guniting/Shotcrete • Protective Coating for Concrete, Steel, & Asphalt • Crack/Leakage Injection • Thermal Insulation • Industrial Coating • Structural Strengthening • Fireproofing

Contact Details: HEMAL SALOT Contact Details: General Manager MOHAMMED HAMZEH Mob. : +974 5521 5486 General Manager Tel. : +974 4019 2900 Mob. : +974 5510 2006 Fax : +974 4019 2929 Tel. : +974 4476 1417 Email : [email protected] Fax : +974 4466 2170 Web. : www.vijayarabia.com Email : [email protected] TMS FORMWORK GENERAL SYNDICATE

TMS Formwork Qatar is a complete provider of formwork, shoring and scaffolding General Syndicate W.L.L. is a leading company on the Tensile Fabric Membrane systems. We offer an advanced range of product lines, which is supported by a large Structures in Qatar since more than 15 years. group of skilled engineers, who excel in the quality of service offered. This is what General Syndicate providing Design, Engineering, Fabrication, Supply & Installation of underpins TMS’s standing in international markets. Tensile fabric Structures (PVC/PTFE Membrane), Steel Structures & Metal Fabrication, Shading Solutions (K-span / HDPE shades) TMS is aware of all the increasing challenges of the modern construction, which Our vision is to lead the way in developing manufacturing of tensile structures / covering continuously raise the bar in building higher, wider and faster. Thus our aim is to cope systems / awning and shades. with all these engineering & planning challenges to provide the best and most cost- General Syndicate provides wide range of Products specially the Tensile Membrane effective solutions through developing stronger, faster but even safer systems to our Structures such as: valuable customers. PVC / PTFE Tensile Membrane Structures • PTFE Tensile Membrane Structures TMS was one of the main formwork technology exhibitors at Bauma 2016 – Munich, • FAÇADE membrane structures Germany. Our ambitions and continuous efforts to excel have led us to success in • Covering / Sailing / Shading Structures winning and delivering on signature Projects such as the Qatar Metro & Muscat Airport. • Façade Membrane Structures • Public Parks Covering Membrane Structures Since we position ourselves as an engineering company more than just a supplier, we • Play fields / Play Areas covering membrane structures make use of all our engineering capabilities in order to sustain innovation in our products • Car Parking Shades / Walkways and services. Hence, every new TMS product or service comes out with some innovative • Sail / Canopies shades detail. We believe this is our key differentiator in the market. • Other different applications of membrane structures application: Stadiums, Wind Breakers, Swimming Pools, Seating Areas, walkways, ………. etc. Other Structural Steel & Metal Fabrication • Steel Structures • Steel Floors Metal Decking • Pipes Rolling / Fabrication Other Shading Systems / Solutions • K-SPAN Systems • HDPE Shades

Contact Details: Contact Details: KAAN ATIK KHALIFA AL JAJA General Manager CEO Mob. : +974 6693 1923 Mob. : +974 5583 0496 Tel. : +974 4493 8940 Tel. : +974 4460 4447 / 4040 9855 Fax : +974 4493 8940 Fax : +974 4040 9899 Email : [email protected] Email : [email protected] Web. : www.tms.tc Web. : www.generalsyndicate.com ALJABER ENGINEERING | CORPORATE PROFILE 115

MARKAZ BUSINESS CENTER ALJABER INFRASTRUCTURE

Markaz, at Fox Hills, in the heart of Lusail City, consists of fully Serviced Offices providing JABER INFRASTRUCTURE COMPANY – JIS was founded over a decade ago as an an ideal solution for companies to start smooth operations instantly. Markaz, a state of integral member of Al Jaber Group to provide and maintain infrastructural Construction the art Business Center, is located where the future of Doha will be built. With over 60 Services in the State of Qatar. furnished and fully serviced units, our clients feel at home with their own personalized JIS specializes in provision of quality Civil Engineering using Trenchless Technology office space, giving them the flexibility to operate their daily business, in their own way, - Micro Tunneling - Tunnel Boring Machine (TBM) from recognized and renowned instantaneously. manufacturers and professionals in infrastructural works of construction and maintenance of Foul Sewer, Surface Water and Treatment Water Effluent – TSE networks throughout Whether your partners and associates are in New York or Hong Kong, at Markaz your the State of Qatar. operations will carry on easily around the clock and throughout the week. Our luxurious JIS’s ‘State of the Art’ approach is second to none as we continually support and listen conference and meeting rooms are internet-enabled, allowing your business partners to the need of the clients in upholding the standards and specification and in providing around the world to join you within minutes. optimum engineering services and solutions in our operations. Our Environmental-friendly approach in operations has benefitted and sustained our Markaz is based at AlJaber Engineering Head Office, where warm and professional recognition in acquiring various projects nationwide of substantial values since inception. environments encourage growth and prosperity. JIS provides Quality and Timely Job Delivery Services to our valuable customers nationwide. As a Main Contractor and Subcontractor backed we vastly experienced Markaz offers a variety of services: professionals, we have grown to become an icon of quality and timely job delivery which • High Speed Internet Network are our most cherished hallmark. • 24/7 Office Access • Daily Office Cleaning Our Services are: • High-tech Fully Equipped Conference/Meeting Rooms • MICRO TUNNELING WORKS • Administrative Services • MANHOLE CONSTRUCTION • Printing & Scanning services • PRESSURE GROUTING • Business Lounge • On site IT support • CCTV • Fitness Center • Parking • Café Restaurant Contact Details: Contact Details: HOUSSAM RASSMY Markaz Management General Manager Mob. : +974 5082 1708 Mob. : +974 5584 2396 Tel. : +974 4040 9898 Tel. : +974 4418 2036 Fax : +974 4040 9899 Fax : +974 4486 2422 Email : [email protected] Email : [email protected] Web. : www.markaz.qa Web. : www.jis-qa.com COMMITTED TO EXCELLENCE www.jec.qa