Company Profile 2013

www.jec.qa Table of Contents

Introduction 03 - 07 CEO's Message Corporate Profile Legal & Financial Statement Key Personnel Clients

Capabilities 08 - 11

Project’s Portfolio 12 - 54 Project’s Summary 13 - 18 Selected Project’s 19 - 52 Highways, Roads & Infrastructure 19 - 32 Oil & Gas, Petrochemical and Industrial 33 - 41 Pipeline Construction 42 - 44 Power Generation, Substations & Desalination Plants 45 - 47 Sewage Treatment Plants and Pumping Stations 48 - 50 Landmark Buildings 51 - 54

Resources 55 - 58 Offices, Fabrication Workshop & PMV Facilities Equipment Fleet Staff & Manpower

Sustainability 59 - 67 Integrated Management System (IMS) ISO & OHSAS Certifications Quality & HSE Policies Safety Certifications & Achievements Appreciations

Affiliates 68 - 73

Company Profile 2013 02 CEO's Message

For over 15 years AlJaber Engineering (JEC) has been a cornerstone of development and infrastructure projects in the State of . As one of the largest general contractors in Qatar we have been a consistent player in the nation’s extraordinary growth.

Qatar, under the wise leadership of His Highness The Emir, Sheikh Hamad Bin Khalifa Al Thani, is becoming increasingly international as an emerging diplomatic and travel hub. This is being delivered on the back of Qatar National Vision 2030 which supports strong public policy towards diversifying the national economy away from a dependence on oil and gas exports. This policy has already succeeded in dramatic fashion with Qatar’s successful bid for the FIFA World Cup 2022, supporting the nation’s upward trajectory.

AlJaber Engineering has been taking a leading role in providing general contracting services with uncompromised commitment to Quality, Health, Safety and Environment. We do this through the combination of an open relationship with our employees based on mutual trust, transparency, accountability and discipline.

To that end, we continue to invest in the most qualified, best-in-class talent to manage operations and project delivery. Our management team is backed by an international workforce of over 8,000, each trained to industry best practice and operating to fully accredited management systems, health, safety and environmental sustainability standards. This amounts to our ultimate goal of ensuring continued precision in everything we do. We use state-of-the-art equipment to help in participating in upcoming challenging large-scale projects.

We are proud of our achievements to date and we are committed to continually enhancing our capabilities to ensure we remain at the forefront of our industry both in terms of client and project needs.

Osama Hadid Chief Executive Officer

Company Profile 2013 03 Corporate Profile

AlJaber Engineering (JE) is a leading general contractor based in the State of Qatar. Established in 1995 as part of Al Jaber Group - a major conglomerate with over 30 companies- JE has successfully completed numerous large-scale turnkey projects for many prestigious clients in different sectors including: Highways, Roads and Infrastructure Engineering, Procurement, Installation & Commissioning (EPIC) Oil, Gas, Petrochemical and Industrial Pipeline Construction Power Generation, Substations & Desalination Plants Sewage Treatment Plants and Pumping Stations Maintenance of Oil & Gas and Petrochemical Installations Landmark Buildings Our commitment to execute projects with highest quality, on schedule and within budget while adhering to excellent standards of health, safety and environmental positioned JE to be recognized as an icon in the construction community in Qatar. We have recently established an office in Iraq to undertake projects in contribution to the large ongoing developments.

In line with the growing demands to build Qatar’s infrastructure and new developments, JE has invested in its resources to meet international standards and upgraded its fleet of equipment in preparation to participate in upcoming diverse projects.

Company Profile 2013 04 Legal & Financial Statement

Certificate Document No. Expiry Date Trade License 25964 09-06-2013 Commercial Registration 21753 10-08-2013 Contractor's Classification Certificate 1602 09-01-2014 KAHRAMAA Grade “A” Contractors Certificate 1028 15-03-2013 Fire Alarm Certificate 1381 14-11-2013 Fire Protection (Defence) Certificate 1381 14-11-2013

Annual Turnover for the Last Six Years 1200

1000

800

600

400

200

522 781 694 1025 1128 870 0 2007 2008 2009 2010 2011 2012

Million Q.R.

Company Profile 2013 05 Key Personnel

SL. Name Position 01 Mr. Osama Hadid Chief Executive Officer (CEO) 02 Mr. Hisham Hadid Director 03 Mr. Amr Nadim Executive Manager – Engineering 04 Mr. Alex Calfat Executive Manager – Commercial 05 Mr. Mardig Djansezian Executive Manager – Operations M&E 06 Mr. Husam Orabi Corporate Business Development Manager 07 Mr. Thomas Anderson Corporate QHSE Manager 08 Mr. Derrick Anderson Commercial Manager 09 Mr. Mohammad Rizk Technical Manager 10 Mr. Imad Samaha Projects Manager – Civil 11 Mr. N. Benergy Projects Manager – M&E 12 Mr. Ayman Amer Procurement Manager 13 Mr. Amir Naguib Planning Manager 14 Mr. Ahmed Hadid Financial Planning & Analysis Manager 15 Mr. Osama Al Tawil Finance Manager 16 Mr. Thaer Abu Shaikha Accounting Manager 17 Mr. Anas Al-Ereksousi Personnel Manager 18 Mr. Nicholas Andreopoulos PMV Manager 19 Mr. Antonios Petrides Service Manager 20 Mr. Wasseem Salah Head of Cost Control Department 21 Mr. Carlos Haddad Head of Estimation - Civil 22 Mr. Suhail Ismail Head of Estimation - M&E 23 Mr. Prakash Melwyn Serrao Head of IT 24 Mr. Mohan Lal Head of Recruitment 25 Mr. Asoka Lelwala Head of QS

Company Profile 2013 06 Clients

Oil & Gas, Petrochemical & Industrial

Large International EPC Contractors

Government Clients

Large Developers

Company Profile 2013 07 Capabilities

Company Profile 2013 08 Capabilities Highways, Roads and Infrastructure: ALJABER ENGINEERING is a leading general contractor executing turnkey Highways, Roads, Infrastructure and mega earth moving projects. JE focus areas are: • Highways and roads. • Underpasses, bridges and interchanges. • Major earth and reclamation works. • Turnkey Infrastructure Projects. • Site development works for industrial and petrochemical plants. • Pipeline construction (water, sewage and drainage). • Treated sewage effluent system (TSE). • Drainage and sewage systems. • Electrical and telecommunication networks. • Street lighting. • Signalization and traffic light systems. • Tunneling including related electrical and mechanical works. JE strength includes; • JE owns the largest fleet of construction and earthmoving equipment in Qatar. • Concrete supply through JE affiliated company Al Wataniya, Total production capacity 100,000m3 / Month in four different locations (Lusail, , and Ras Laffan). • Asphalt works through JE Affiliated company Al Jaber Makhlouf with own fleet of equipment for production and delivery of Asphalt, total capacity of 10,000 tons/day. • JE owns onsite crushing and screening plants utilized for production of fill, Structural fill, sub base and other crushed products.

Company Profile 2013 09 Capabilities Oil & Gas, Petrochemical and Industrial: ALJABER ENGINEERING has been a key contractor involved in design, Procurement and construction of turnkey Projects related to the following: • EPIC projects • Waste management facilities • Oil & Gas facilities • Water treatment plants • Power and desalination plants • Water transmission systems • Petrochemical plants • Tanks and reservoirs • Industrial plants • Maintenance of petrochemical and industrial installations • Sewage treatment plants • HV substations JE strength Includes:- Engineering: JE has a highly qualified technical team to manage the requirements and performance of design sub-contractors including any specialized services such as HAZOP. Procurement: Our Procurement team has extensive experience in man- aging and performing procurement activities for large EPIC contracts. Construction JE construction team has worked on complex projects and has technical experience to meet international contracting standards and capable to perform challeng- ing high-profile diverse projects. Civil Works: Mechanical Works: • Underground and elevated concrete structures • Supply, fabrication and erection • Silos of major process static equipment • Cooling towers • Process piping and Pipelines • Precast concrete Pipe racks • Fire fighting systems • Culverts • Pipe gantry’s and support systems • Structural Steel Works • Cranes • Industrial buildings • Supply and erection of rotary equipment • Underground utility networks • HVAC systems • Road works • Insulation, Painting and scaffolding works • Fencing Electrical and Instrumentation: • Supply and erection of major electrical equipment. • Scada systems • Power distribution systems • Structural cabling • Lighting and power • Security systems • Fire detection and alarm systems • Instrumentation and control works • Programmable logic control systems (PLC) • Telecommunication systems

Company Profile 2013 10 Capabilities Industrial and Landmark Buildings: We have successfully executed various industrial buildings on design and build basis. In addition, JE currently executing construction of landmark buildings as part of a Joint Venture with international companies. JE is a Kirby Certified builder to supply and erect Kirby Buildings in Qatar. JE focus areas are: • Landmark buildings • Structural steel buildings • Control rooms • Blast proof buildings • Temporary facilities

JE strength Includes CIVIL Works: • Enabling works • Concrete works • Curtain wall systems • Stone cladding • Steel structure • Architectural finishes

MEP Works: • Drainage • Plumbing • HVAC systems • Chilled water systems • Waste water treatments systems • Electrical (MV/HV/ELV networks) • Instrumental • Telecommunication • Lifts • Fire fighting and fire alarm systems • Building management system (BMS)

Company Profile 2013 11 Projects Portfolio

Company Profile 2013 12 Projects Summary

Highways, Roads and Infrastructure

Project Client Value: USD $ Status of Completion Qatar Electricity & Upgrading of Mesaieed Town RPS 27,900,000 Ongoing Water Co. (KAHRAMAA) Development of new camp for Internal Security Forces (ISF) Internal Security Force 662,506,000 Ongoing at Al - A Joint venture with AKTOR (ISF) UrbaCon The Base Project in North Lusail - The Island Bridge Works (Page 20) 7,946,000 Ongoing General Contracting EPIC for southern perimeter industrial fence, security patrol access Qatar Petroleum 23,985,000 Ongoing and other roads in Ras Laffan City. Al-Jawhara “Oasis of Life” Infrastructure in Al Erkyah District, Lusail. Infrastructure works consists of earthworks, asphalt works, surface Jawhara Greens 20,274,000 Ongoing drainage, foul sewerage, primary irrigation, portable water networks Company SPC and street lighting. EPIC for wet utilities distribution network (Potable water supply, fire water and sewrage) for support services for an area of approximately 3000 Hectares complete with auxiliary facilities, sub-systems and Qatar Petroleum 147,370,000 Ongoing mains network at West End extension, Ras Laffan Industrial City. (Page 22) The Base Secondary Chanel Excavation and Disposal Works in Lusail UrbaCon 7,209,600 April, 2013 (Page 21) General Contracting Reconstruction of existing roads and construction of new roads with all associated services and infrastructure including upgrade of existing Qatar Petroleum 190,000,000 February, 2012 utilities and installation of new utilities at Mesaieed Community Area. (Page 23)

Early site earth works for Barzan onshore project at Ras Laffan. Client: RasGas Main Contractor: 36,000,000 July, 2011 (Page 24) CCC / Teyseer JV Construction of road paving at Pearl GTL plant area. Strabag Qatar W.L.L. 1,272,000 January, 2011

West Bay project, Zone 66: Construction of roads and infrastructure services such as foul sewage, surface water, potable water, TSE lines, Public Works Authority 55,000,000 December, 2010 pump stations and storm water system in New Diplomatic area. (ASHGHAL) (Page 25) EPIC for new support services and site development of 3,000,000 m² Qatar Petroleum 82,000,000 November, 2010 land at Ras Laffan Industrial City. (Page 26) Construction of underground piping systems consist of installation of GRP sea water pipelines, firewater, process, potable water lines and SNC-Lavalin 96,000,000 August, 2010 major infrastructure civil works at Aluminium Smelter in Mesaieed. (Page 27) Site development of service areas and potroom building area including earth works, construction of roads, surface drainages supply and Qatar Aluminium Co. 18,071,000 October, 2009 installation of potable water lines for Qatar Aluminium Smelter in (Qatalum) Mesaieed. (Page 28)

(cont.) Company Profile 2013 13 Projects Summary

Highways, Roads and Infrastructure

Project Client Value: USD $ Status of Completion

Site preparation and earth works for Elsewedy Cables factory at Elsewedy Cables 3,500,000 February, 2009 Mesaieed.

Salwa International Highway interchanges and installation of water Public Works Authority 86,304,000 January, 2009 pipelines and street lighting. (Page 29) (ASHGHAL) Hyundai Engineering Site preparation and road works for QAFCO 5 project in Mesaieed. 8,410,000 December, 2008 & Construction Co Site preparation, ground improvement by dynamic compaction and installation of 8000 lm new security paliside fence for Qatar Qatar Aluminium Co. 34,446,000 December, 2008 Aluminium Smelter and Power Plant in Mesaieed. (Qatalum) (Page 30) Gas pipeline crossings for service area and potroom building. at Qatar Aluminium Smelter in Mesaieed. SNC-Lavalin 1,730,000 April, 2008 Jan De Nul / Construction of land water drain outfall at Ras Laffan Port. 625,000 February, 2008 Boskalis JV Soil Improvement for Boiler and Demin units in Qatar Vinyl Company. Qatar Vinyl Company 500,000 May, 2007 Al Khaleej gas project Phase 2 (AKG2): Site preparation for camp Chiyoda / 2,530,000 March, 2007 and waste water treatment area. Technip JV Ras Laffan port expansion project: Excavation and site preparation Jan De Nul / to construct a lake within Ras Laffan port expansion and construction 6,600,000 February, 2007 Boskalis JV of access road and street lighting. QatarGas 3 & 4 project: Site preparation for camp and wastewater Chiyoda / treatment (WWT) areas at Ras Laffan, in connection with Qatar Gas 30,400,000 February, 2007 Technip JV 3 project. surface and ground water scheme: Construction Public Works Authority of surface and groundwater pipelines by microtunneling and 12,500,000 September, 2006 (ASHGHAL) construction of reinforced concrete outfall structure. Design and construction of central sewage collection system and Boom 4,000,000 October, 2006 construction of precast concrete boundary wall. Construction Co. Excavation and stockpiling of hard material at Ras Laffan Cracker II Qatar Petroleum 10,000,000 May, 2006 project site. Ras Laffan Olefin project: Site preparation and installation of fence. Technip 8,000,000 April, 2006 Public Works Authority Underpass and access roads for Doha 2006 Asian Games Village 18,600,000 October, 2005 and Hamad Medical City. (Page 31) (ASHGHAL) Environmental clean-up for New Doha International Airport project site including excavation and removal of waste, transportation from New Doha International NDIA site and placement at engineered landfill site in Mesaieed. Airport (NDIA) 38,050,000 October, 2005 (Page 32) Construction of paved walk ways, unpaved track road, landscaping Qatar Petroleum 3,300,000 March, 2004 and new boundary wall at Dukhan Township.

Company Profile 2013 14 Projects Summary

Oil & Gas, Petrochemical and Industrial Projects

Project Client Value: USD $ Status of Completion

Fabrication and installation of above ground metal piping, installation of water supply pumps, emergency cooling towers, compressed air SNC-Lavalin 20,420,000 September, 2010 piping system and closed cooling medium system at Qatar Aluminium Smelter in Mesaieed. (Page 34) Mechanical and electrical works for Doha cable factory at Mesaieed Doha Cables 2,986,000 June, 2010 Industrial City. Major ground and civil works for rectifier stations at Qatar Aluminium Qatar Aluminium Co. 24,240,000 February, 2010 Smelter in Mesaieed. (Page 35) (Qatalum) EPIC for two new kangaroo cranes and upgrading of existing gabbro berths crane facilities including all mechanical and electrical works Qatar Petroleum 31,336,000 March, 2009 at Mesaieed Port. (Page 36) Installation of cathode roding equipment and induction furnace including supply and erection of all mechanical, electrical and SNC-Lavalin 7,850,000 January, 2009 instrumentation works at Qatar Aluminium Smelter in Mesaieed. (See Page 37) Al Khaleej Gas Project Phase 2 (AKG2): Civil, infrastructure and electromechanical works for camps and other facilities including Chiyoda / underground piping networks, road works, installation of treated 33,455,000 November, 2007 Technip JV effluent tanks, waste water treatment units and sludge treatment units. (Page 38) Engineering, procurement, fabrication and installation of dust General 1,600,000 August, 2007 collection towers and sunshades. (Page 39) Electric (GE) EPIC of desalinated water network including installation, testing and Qatar Petroleum 9,985,634 July, 2006 commissioning of 14 km GRP pipelines at Ras Laffan. EPIC of potable water transmission system and landscaping mains to distribute water produced by RLPC to various facilities within Qatar Petroleum 13,600,000 October 2005 Ras Laffan. (Page 40) Construction of new access platforms and walkways in Qatar Petroleum 580,000 June, 2004 Dukhan oil fields. Construction of dry storage sunshades at Camp As Sayliyah. US Army 800,000 January, 2004 EPIC of waste management facility including construction of new landfill cells, HDPE membrane, access roads, weigh scale and concrete land treatment unit with a total capacity of 2800m3 of RasGas 4,600,000 December,2002 biodegradable waste at Ras Laffan Industrial City (RLIC). (Page 41) Qatar FertilizerCo. Extension of central control room building at QAFCO. 1,800,000 March, 2002 (QAFCO)

Company Profile 2013 15 Projects Summary

Pipeline Construction

Project Client Value: USD $ Status of Completion

Design and construction of 1200 mm of 30 Km transmission Public Works Authority 44,370,000 December, 2011 main from Doha West STW to Al Rakhiya farm. (Page 43) (ASHGHAL)

Upgrading of New and Old Salwa distillate and rising mains Qatar Electricity & 32,000,000 September, 2007 (22km of pipes). (Page 44) Water Co. (KAHRAMAA)

EPIC of potable water pipeline to west side camp area at Ras Laffan CHIYODA - 21,200,000 February, 2007 in connection with RasGas expansion project. TECHNIP JV Supply and lay the extension of water distribution mains (58 km) Qatar Electricity & 4,905,000 in north Duhail Phase C & D. Water Co. (KAHRAMAA) January, 2006 Supply and lay the extension of water distribution mains (57 km) Qatar Electricity & 4,050,000 November,2005 in north Duhail Phase A & B. Water Co. (KAHRAMAA) Extension of approx. 12 km of 600 mm diameter HDPE pipes to Qatar Electricity & 13,100,000 July, 2004 supply water to motor cycle race track. Water Co. (KAHRAMAA)

Power Generation, Substations and Desalination Plants

Project Client Value: USD $ Status of Completion

Ras Abu Fontas A1 new water plant– Onshore civil works execution related to the construction of distillers and boilers areas, intake structure and potable water reservoirs for 45 Fisia Italimpianti 75,500,000 March, 2010 MIGD water desalination plant at . (Page 46) RAFB2-site-0001, Ras Abu Fontas B, expansion project: General 4,350,000 December, 2006 Fabrication of pipe rack and large bore pipes (CS & SS). Electric (GE) Qatar transmission system – Phase VI, Substations: Civil VATECH 4,900,000 March, 2006 works associated with various substations. Ras Laffan power and desalination project - Water plant island desalination unit and auxiliaries: Civil works related Fisia Italimpianti / 20,437,000 May, 2003 to the construction of 40 MIGD desalination plant at Enel Power Ras Laffan. (Page 47)

Company Profile 2013 16 Projects Summary

Sewage Treatment Plants and Pumping Stations

Project Client Value: USD $ Status of Completion

Refurbishment and upgrading works for various foul and Public Works Authority stormwater pumping stations including civil, mechanical, 53,295,000 Ongoing (Ashghal) electrical and HVAC works. (Page 49) Construction of treated sewage effluent permanent disposal Chiyoda Technip JV - 10,800,000 February, 2009 system including 21 km of HDPE pipeline at Ras Laffan. QGE (CTJV) Torishima Pump Civil works and upgrading of pumping stations. Mfg. Co. Ltd. 2,045,000 May, 2008 Design and construction of sewage treatment plant and labour compound infrastructure including boundary wall, roadworks New Doha International 13,000,000 February, 2006 and chainlink fence. Airport (NDIA) Upgrade of sewage network and refurbishment of pumping Qatar Petroleum 5,120,000 June, 2005 stations and relocation of TSE distribution mains. Ministry of Municipal Construction of treated sewage effluent network (TSE) T5 to Affairs and Agriculture 4,000,000 November, 2004 T7 including 14 km of TSE mains. (MMAA) Ministry of Municipal Construction of treated sewage effluent network (TSE) T6 to Affairs and Agriculture 13,000,000 April, 2004 T7 including 48 km of TSE mains. (Page 50) (MMAA) Ministry of Municipal Construction of additional sludge drying beds and other labour Affairs and Agriculture 1,251,000 February, 2002 accomodation facilities including one storey building. (MMAA)

Maintenance of Oil & Gas, Petrochemical and Industrial Installations

Project Client Status of Completion

Shutdown associated works for Qatar Aluminium Smelter in Mesaieed. SNC-Lavalin Completed

Qatar Vinyl Company Long term fabrication and maintenance support on call off basis. (QVC) Completed Qatar Steel Company Civil work for rolling mill major repair. Completed (QASCO) Qatar Fertilizer Co. Refurbishment of administration building ground floor corridor flooring tiles. Completed (QAFCO) Qatar Fertilizer Co. Revamp of closed cooling water cycle and civil works. Completed (QAFCO)

Surface protection of buried sealine O.S.B.L. at Ras Laffan. Qatargas Completed

ANSALDO Repair of transformer DHTS 90000/140. Completed Industrial

Company Profile 2013 17 Projects Summary

Landmark Buildings

Project Client Value: USD $ Status of Completion

Barwa Financial District. (A Joint venture with Bouygues, Barwa Real 1,301,370,000 Ongoing and Midmac Contracting). (Page 52) Estate Company

Dubai Towers (A Joint venture with Al Habtoor). (Page 53) Sama Dubai 400,000,000 Ongoing

Alwaha Club. (Page 54) RasGas 7,400,000 March, 2002

Other Buildings

Project Client Value: USD $ Status of Completion

Central warehouse at Mesaieed. Qatar Steel Co. 2,500,000 July, 2005 EPIC of 2600 m² pre-engineered steel structure store building Qatar Fertilizer Co. with all associated electrical and mechanical works at QAFCO 1,615,000 November, 2003 (QAFCO) 4 expansion project in Mesaieed. EPIC of 3240 m² new office building with all associated roads and external works including MEP, telecommunications, HVAC RasGas 2,500,000 October, 2003 and fire fighting systems at Ras Laffan. EPIC of steel frame structure bagging and storage warehouse at Q-CHEM petrochemical complex including complete civil KBR / Technip 5,420,000 January, 2002 and electro-mechanical works at Mesaieed. Design, supply, installation and commissioning of Q-Chem prefab temporary training facility, with all associated civil Q-CHEM 713,000 July, 2001 and MEP works. EPIC of temporary facilities consist of prefabricated office with all associated power supply,mechanical and electrical works KBR / Technip 1,600,000 April, 2000 for Q-Chem project at Mesaieed.

Company Profile 2013 18 Selected Projects Highways, Roads & Infrastructure

The Base Project in North Lusail - The Island Bridge Works 20 The Base Secondary Channel Excavation and Disposal Works 21 EPIC for wet utilities distribution network (Potable water supply, fire water and sewrage) for support services for an area of approximately 3000 Hectares complete with auxiliary facilities, sub-systems and mains network at Ras Laffan Industrial City 22

Reconstruction of existing roads and construction of new roads with all associated services and infrastructure including upgrade of existing utilities and installation of new utilities at Mesaieed Community Area 23 Early site earth works for Barzan onshore project at Ras Laffan 24 Construction of roads and infrastructure services such as foul sewage, surface water, potable water, TSE lines, pump stations and storm water system in New Diplomatic area 25

EPIC for new support services and site development of 3,000,000 m² land at Ras Laffan Industrial City 26

Construction of underground piping systems consist of installation of GRP sea water pipelines, firewater, process, potable water lines and major infrastructure civil works at Aluminium Smelter in Mesaieed 27 Site development of service areas and potroom building area including earth works, construction of roads, surface drainages supply and installation of potable water lines for Qatar Aluminium Smelter in Mesaieed 28

Salwa International Highway interchanges and installation of water pipelines and street lighting 29 Site preparation, ground improvement by dynamic compaction and installation of 8000 lm new security paliside fence for Qatar Aluminium Smelter and Power Plant in Mesaieed 30 Underpass and access roads for Doha 2006 Asian Games Village and Hamad Medical City 31

Environmental clean-up for New Doha International Airport project site including excavation and removal of waste, transportation from NDIA site and placement at engineered landfill site at Mesaieed 32

Company Profile 2013 19 Highways, Roads & Infrastructure

The Base Project in North Lusail - The Island Bridge Works Client: UrbaCon General Contracting Value (USD$): 7,946,000 Project Scope: The project involves the construction of a bridge to provide access to the private island (Private residence – Palace) from mainland with an approximate length of 442 m with 20m span between two piers. The major scope of works: Bridge construction including foundations, piers, superstructure, arch towers, lighting podiums and decorations. Road pavement as well as all related drainage works for the road, sidewalks and utilities trenches. Bridge lighting and decorative lighting. Completion Date: September, 2013 (Ongoing)

Company Profile 2013 20 Highways, Roads & Infrastructure

The Base Secondary Channel Excavation and Disposal Works. Client: UrbaCon General Contracting

Value (USD$): 7,209,600

Project Scope: The major scope of works consists of the following: Pre & Post excavation bathymetric surveys Island Channel Excavation 537,000 m3 Disposal of excavated material on land off-site 537,000 m3

Completion Date: April, 2013

Company Profile 2013 21 Highways, Roads & Infrastructure

EPIC for wet utilities distribution network (Potable water supply, fire water and sewrage) for support services for an area of approximately 3000 Hectares complete with auxiliary facilities, sub-systems and mains network at Ras Laffan Industrial City. Client: Qatar Petroleum Value (USD$): 147,370,000 Project Scope: Engineering, procurement and construction of major civil, mechanical, electrical, instrumentation and SCADA control works detailed as follows: Various utility pipeline Networks 230 Km Sewage pumping stations 29 Nos. Civil Works: Excavation 873,300 m3 Imported fill material 111,000 Ton Precast concrete paving 28,000 m² Major RCC/Steel structure works Road crossing (Microtunneling) Major Mechanical Works: Potable water pumping station Fire water pumping station Potable water and fire water tanks 9 Tanks Overhead cranes and manual hoist cranes 31 Cranes Major Electrical Installations: Power network (Transformers with panels, ups, etc) 30 Km Control System and Instrumentation: Telecommunication and SCADA control system Fire alarm system Fiber optic network 25 Km Completion Date: February, 2013 (Ongoing)

Company Profile 2013 22 Highways, Roads & Infrastructure

Reconstruction of existing roads and construction of new roads with all associated services and infrastructure including upgrade of existing utilities and installation of new utilities at Mesaieed Community Area. Client: Qatar Petroleum Value (USD$): 190,000,000 Project Scope: The project scope includes all associated civil, mechanical, electrical, instrumentation and telecommunication works. Design Works: - Coordination of existing and future utility services - Traffic management strategy and traffic phasing - Reinforced concrete protection slab and culverts Road Works and Street Lighting: 39 Km Conversion of existing Mesaieed Main Roundabout and Police Roundabout to Traffic Signal Junctions Electricity and Power Network (LV/MV/HV/EHV): 187 Km Potable Water Network: 9 Km Telecommunication Network: 34 Km Utility Duct Network: 29 Km Treated Sewer Effluent Network (TSE): 18 Km Surface Water Drainage Network: 70 Km Foul Sewer Network: 5 Km Landscaping Network: 200 Km Irrigation Network: 250 Km

Completion Date: February, 2012

Company Profile 2013 23 Highways, Roads & Infrastructure

Early site earth works for Barzan onshore project at Ras Laffan. Client: RasGas Main Contractor: CCC / Teyseer JV Value (USD$): 36,000,000

Project Scope: Earth works for Barzan onshore early site project total area of 1,560,000 m² detailed as follows: Grubbing, removal and transport vegetation 1,560,000 m² Remove, transport and depose marine deposit 1,512,000 m3 Remove, transport and stockpile dune sand 400,000 m3 Excavation (suitable soil, soft rock and hard rock) 940,000 m3 Fill material 698,600 m3 Imported fill 1,521,000 m3 Completion Date: July, 2011

Company Profile 2013 24 Highways, Roads & Infrastructure

Construction of roads and infrastructure services such as foul sewage, surface water, potable water, TSE lines, pump stations and storm water system in New Diplomatic area.

Client: Public Works Authority (ASHGHAL)

Value (USD$): 55,000,000

Project Scope: Electrical work, storm drainage, telecommunication services, service water, TSE lines, irrigation and landscape works. Security wall, CCTV cameras, gates, fiber optic cables, road blocks, security rooms, special signage and other necessary security items. Hard and soft landscaping and irrigation system. Construction of roads (12.1 km) Completion Date: December, 2010

Company Profile 2013 25 Highways, Roads & Infrastructure

EPIC for new support services and site development of 3,000,000 m² land at Ras Laffan Industrial City. Client: Qatar Petroleum

Value (USD$): 82,000,000

Project Scope: Design, procurement and construction of storm water drainage system, duct banks, road grading and sabkha treatment and construction of internal and external roads detailed as follows: Excavation 435,000 m3 Imported fill 2,060,000 m3 Concrete 42,000 m3 Concrete culverts (600 & 1000mm diameter) 13 Km Construction of roads 145,000 m² Completion Date: November, 2010

Company Profile 2013 26 Highways, Roads & Infrastructure

Construction of underground piping systems consist of installation of GRP sea water pipelines, firewater, process, potable water lines and major infrastructure civil works at Aluminium Smelter in Mesaieed.

Client: Qatar Aluminium Co. (Qatalum) EPC Contractor: SNC-Lavalin Value (USD$): 96,000,000 Project Scope: This project includes underground piping works and major civil works for Qatar Aluminium plant detailed as follows: Total excavation 325,000 m3 Dewatering 74,000 m3 Sheet piling 38,500 m² Concrete works 15,500 m3 Piping works 73 Km Ducting works 58 Km Completion Date: August, 2010

Company Profile 2013 27 Highways, Roads & Infrastructure

Site development of service areas and potroom building area including earth works, construction of roads, surface drainages supply and installation of potable water lines for Qatar Aluminium Smelter in Mesaieed.

Client: Qatar Aluminium Co. (Qatalum) EPC Contractor: SNC-Lavalin Value (USD$): 18,071,000 Project Scope: Engineering and Technical Services: Engineering and details design Compaction test of the existing sub grade and newly constructed roads Survey of existing utility services Earth Works: Grading and leveling 3,000 m3 Sub grade of road system and the drainage ditches 25,000 m3 Site filling of utility corridor and underground pipelines 10,000 m3 Construction of Road System and Surface Drainage Road base with well graded crushed stone (0-25mm) 52,000 m3 Lining of the open ditches with well graded crushed stone 9,000 m3 Surfacing of the road base with a layer of 70mm of compacted asphalt for roads 87,000 m3 Curbstone, temporary road signs, chain-link fence Supply & Installation of Potable Water Line Permanent pipeline 300 Lm Temporary pipeline including fire hydrants 4,000 Lm Concrete Works 1,100 m3 Completion Date: October, 2009

Company Profile 2013 28 Highways, Roads & Infrastructure

Salwa International Highway interchanges and installation of water pipelines and street lighting. Client: Public Works Authority (ASHGHAL)

Value (USD$): 86,304,000

Project Scope: Water Pipes: Laying of D.I pipes from 200mm to 400mm diameter 2300 LM Removal of existing water D.I. pipes 400mm & 500mm diameter 15,000 LM Street Lighting Columns Foundation: 1200 sets Cable trenches 34,000 Lm Construction works for ten (10) Interchanges: Site clearance, demolition and earthworks Sub-base and road base Flexible surfacing Road marking Bridge structure works

Completion Date: January, 2009

Company Profile 2013 29 Highways, Roads & Infrastructure

Site preparation, ground improvement by dynamic compaction and installation of 8000 lm new security paliside fence for Qatar Aluminium Smelter and Power Plant in Mesaieed. Client: Qatar Aluminium Co. (Qatalum) Value (USD$): 34,446,000 Project Scope: Site clearance (180 Hectares), scarification and compaction of existing ground (179 Hectares). Placing and compaction of fill materials for the platform construction of the aluminium and power plant (4,540,000 m3). Ground improvement for the power plant area (25 Hectares) using wick drains and surcharge loading (placing and relocating to power plant area) of (750,000 m3). Ground improvement for the carbon plant (12 Hectares), using dynamic compaction. Removal of existing security fence (3,000 M) and installation of new security palisade fence (8,000 M) to the perimeter of the aluminium and power plant. Completion Date: December, 2008

Company Profile 2013 30 Highways, Roads & Infrastructure

Underpass and access roads for Doha 2006 Asian Games Village and Hamad Medical City. Client: Public Works Authority (ASHGHAL) Value (USD$): 18,600,000

Project Scope: Transformation of the existing Al Razi Roundabout into a large elliptical roundabout with two underpasses including all associated road works, concrete works and diversion/replacement of existing underground utilities. Upgrade of Ahmed Bin Ali Street (C Ring Road) between the existing Bin Omran Roundabout and Rayyan Street including all associated diversions and replacement of existing underground utilities. Excavation works for the overall car park, situated within the boundaries of the large elliptical roundabout. Completion Date: October, 2005

Company Profile 2013 31 Highways, Roads & Infrastructure

Environmental clean-up for New Doha International Airport project site including excavation and removal of waste, transportation from NDIA site and placement at engineered landfill site at Mesaieed. Client: New Doha International Airport (NDIA) Value (USD$): 38,050,000

Project Scope: Excavation and removal of 8,000,000 m3 waste from the NDIA site and placement at engineered landfill site at Mesaieed. Demolition and removal of all direct structures. Removal of stagnant water from the northern lagoon and leachate from the made ground with all associated environmental aspects. Stock piling of the waste removed to the new landfill site until the landfill is ready to receive waste materials. Fencing for stock piling areas and wheel washing systems for transporting trucks.

Completion Date: October, 2005

Company Profile 2013 32 Selected Projects Oil & Gas, Petrochemical and Industrial Projects

Fabrication and installation of above ground metal piping, installation of water supply pumps, emergency cooling towers, compressed air piping system and closed cooling medium system at Qatar Aluminium Smelter in Mesaieed 34 Major ground and civil works for rectifier stations at Qatar Aluminium Smelter in Mesaieed 35 EPIC for two new kangaroo cranes and upgrading of existing gabbro berths crane facilities including all mechanical and electrical works at Mesaieed Port 36 Installation of cathode roding equipment and induction furnace including supply and erection of all mechanical, piping, electrical and instrumentation works at Qatar Aluminium Smelter in Mesaieed 37 Civil, infrastructure and electromechanical works for camps and other facilities including underground piping networks, road works, installation of treated effluent tanks, waste water treatment units and sludge treatment units 38 Engineering, procurement, fabrication and installation of dust collection towers and sunshades 39 EPIC of potable water transmission system and landscaping mains to distribute water produced by RLPC to various facilities within Ras Laffan 40 EPIC of waste management facility including construction of new landfill cells, HDPE membrane, access roads, weigh scale and concrete land treatment unit with a total capacity of 2800m3 of biodegradable waste at Ras Laffan Industrial City (RLIC) 41

Company Profile 2013 33 Oil & Gas, Petrochemical and Industrial Projects

Fabrication and installation of above ground metal piping, installation of water supply pumps, emergency cooling towers, compressed air piping system and closed cooling medium system at Qatar Aluminium Smelter in Mesaieed. Client: Qatar Aluminium Co. (Qatalum) EPC Contractor: SNC-Lavalin Value (USD$): 20,420,000

Project Scope: Fabrication and erection of pipes and connection to potable, process and fire water tanks. In water supply area. Installation of water supply pumps. Installation of emergency cooling tower. Fabrication and erection of compressed air piping system. Fabrication and erection of closed cooling medium system. Completion Date: September, 2010

Company Profile 2013 34 Oil & Gas, Petrochemical and Industrial Projects

Major ground and civil works for rectifier stations at Qatar Aluminium Smelter in Mesaieed. Client: Qatar Aluminium Company (Qatalum)

Value (USD$): 24,240,000

Project Scope: Excavation for foundations Filling to structures and embankment Fire rated concrete works and surface painting Water proofing, and fencing works Miscellaneous metal works Completion Date: March, 2010

Company Profile 2013 35 Oil & Gas, Petrochemical and Industrial Projects

EPIC for two new kangaroo cranes and upgrading of existing gabbro berths crane facilities including all mechanical and electrical works at Mesaieed Port. Location: Mesaieed Port

Client: Qatar Petroleum Value (USD$): 31,336,000

Project Scope: The scope includes engineering, procurement, construction and commissioning of two kangaroo cranes with a rated capacity of 1,100 ton/hour each including all related electrical and mechanical works as follows: Two kangaroo crane with a rated capacity of 1,100 ton/hour HV electrical power supply for the new kangaroo cranes Four new grabs and ropes for the two existing kangaroo cranes Fresh-water based dust suppression systems for the two existing kangaroo cranes Video camera system The scope also includes all related mechanical and electrical works to upgrade the following: A mobile harbour crane A hopper LV electrical power supply and sockets for mobile hopper Completion Date: March, 2009

Company Profile 2013 36 Oil & Gas, Petrochemical and Industrial Projects

Installation of cathode roding equipment and induction furnace including supply and erection of all mechanical, piping, electrical and instrumentation works at Qatar Aluminium Smelter in Mesaieed. Client: Qatar Aluminium Co. (Qatalum) EPC Contractor: SNC-Lavalin Value (USD$): 7,850,000

Project Scope: All associated mechanical, piping, electrical and instrumentation works to install the following: Cathode roding equipment Induction furnace Overhead cranes Emergency water pumps Completion Date: January, 2009

Company Profile 2013 37 Oil & Gas, Petrochemical and Industrial Projects Civil, infrastructure and electromechanical works for camps and other facilities including underground piping networks, road works, installation of treated effluent tanks, waste water treatment units and sludge treatment units. Client: Chiyoda - Technip J.V. Value (USD$): 33,455,000

Project Scope: This project consists of the following: Civil and infrastructure works: Underground networks (HDPE 40 to 410 mm) GRP pipeline 10" diameter Foundations for the waste water treatment, potable water / firewater and power generation units Road works and street lighting Sludge building Galvanized fence Construction of secondary substations and diesel generators buildings Mechanical, electrical and instrumentation works: Installation of secondary package substations Cable laying Instrumentation works Diesel storage tanks Structural steel works Above ground galvanized steel piping Supply and installation of 2 Nos. vertical, GLS bolted potable water tanks (3200 m3) each, with aluminium dome cover Supply and installation of 4 Nos. vertical, GLS bolted treated effluent tanks (1600 m3) each, with aluminium dome cover Installation of the waste water treatment units Installation of sludge treatment unit Completion Date: November, 2007

Company Profile 2013 38 Oil & Gas, Petrochemical and Industrial Projects

Engineering, procurement, fabrication and installation of dust collection towers and sunshades. Client: General Electric (GE)

Value (USD$): 1,600,000 Project Scope: Fabrication and erection of structural steel "Dust Collection Towers" 201 Ton Checkered plates 18 Ton Gratings 190 m² Supply and installation of H2 sunshade 28 Ton Aluminium sheeting 430 m² Completion Date: August, 2007

Company Profile 2013 39 Oil & Gas, Petrochemical and Industrial Projects

EPIC of potable water transmission system and landscaping mains to distribute water produced by RLPC to various facilities within Ras Laffan. Client: Qatar Petroleum Value (USD$): 13,600,000

Project Scope: Detailed engineering, procurement, construction, installation, testing and commissioning of: Water potable (WP) transmission system (FRP) to distribute the water produced by Ras Laffan Power Company to existing reservoirs in Ras Laffan City, with all associated control and monitoring systems.

Water landscaping (WL) transmission system (FRP, uPVC and CS) to distribute water from Ras Laffan Power Company, Oryx GTL plant, Ras Laffan City camp waste water treatment plant and the JGC waste water treatment plant to various facilities.

Completion Date: October, 2005

Company Profile 2013 40 Oil & Gas, Petrochemical and Industrial Projects

EPIC of waste management facility including construction of new landfill cells, HDPE membrane, access roads, weigh scale and concrete land treatment unit with a total capacity of 2800m3 of biodegradable waste at Ras Laffan Industrial City (RLIC). Client: RasGas Value (USD$): 4,600,000

Project Scope: The scope consists of the following: Construction of new landfill containing three equal cells with an approximate capacity of 60,000 m3. The cells were lined internally with HDPE membrane. Access road of 4.00m wide with an approximate length of 2500 M. Guard house of 6.00 x 9.00 (M) concrete building. Weigh scale area. Concrete land treatment unit with an approximate total capacity of 2800 m3 of biodegradable waste. Completion Date: December, 2002

Company Profile 2013 41 Selected Projects Pipeline Construction

Design and construction of 1200 mm of 30 Km transmission main from Doha West STW to Al Rakhiya farm 43 Upgrading of New and Old Salwa distillate and rising mains (22km of pipes) 44

.

Company Profile 2013 42 Pipeline Construction

Design and construction of 1200 mm of 30 Km transmission main from Doha West STW to Al Rakhiya farm. Client: Public Works Authority (Ashghal) Value (USD$): 44,370,000 Project Scope: The project consists of design, procurement and construction of 1200 mm diameter GRP mains detailed as follows: 1200 mm diameter GRP main 30 Km 500 mm diameter GRP main 720 M Air valves, washout and connection chambers Flow control valves and flow meters.

Completion Date: December, 2011

Company Profile 2013 43 Pipeline Construction

Upgrading of New and Old Salwa distillate and rising mains (22 Km of pipes) Client: Qatar Electricity & Water Co. (KAHRAMAA)

Value (USD$): 32,000,000

Project Scope: Replacement of 1200 mm, 900 mm rising mains and associated pipe works from Old Salwa reservoir station and New Salwa reservoir station. Replacement of existing 1200 and 1400 mm pipe works and construction of new 1400 mm distillate main segment including all associated pipe works from New Salwa to immigration interchange. Extension of new 600 mm rising main and associated pipe works along Waab Street, from Fourosiyah to Khalifa Stadium.

Completion Date: September, 2007

Company Profile 2013 44 Selected Projects Power Generation, Substations and Desalination Plants Major civil works related to the construction of distillers and boilers areas, intake structure and potable water reservoirs for 45 million gallons per day water desalination plant at Ras Abu Fontas 46 Civil works related to the construction of 40 million gallons per day water desalination plant at Ras Laffan 47

Company Profile 2013 45 Power Generation, Substations and Desalination Plants

Major civil works related to the construction of distillers and boilers areas, intake structure and potable water reservoirs for 45 million gallons per day water desalination plant at Ras Abu Fontas. Client: Fisia Italimpianti Value (USD$): 75,500,000 Project Scope: Distillers area and intake structure Intake and outfall structures Road works Pipe trenches Local control room, Chlorination building and CO2 production building Equipment and pipe rack foundations Water basins and pumps well Seawater screening and pumping station Boilers area Storage tanks Local control rooms Pipe rack and equipment foundations Boilers and stack foundations (3 Nos.) Switchgear and control room buildings Potable water reservoirs Potable water reservoirs 102,000 m3 (2 Nos.) Potable water pumping station Equipment foundations Flow meters and valve pits Completion Date: March, 2010

Company Profile 2013 46 Power Generation, Substations and Desalination Plants

Civil works related to the construction of 40 million gallons per day water desalination plant at Ras Laffan. Client: Fisia Italimpianti and Enel Power

Value (USD$): 20,437,000

Project Scope: All associated civil works to build 40 million gallons per day desalination, blending and demineralization plants. Installation of temporary facilities and lay down area for this project and future expansion Bulk earth works Concrete foundations for 4 main desalination units Supply and discharge stations including U.G. GRP pipe works Onsite GRP pipelines of various diameters Main pumps structure and chemical dosing units Re-mineralization structure including water tight structure Main switchgear and control buildings (3 Nos.) Electro-chlorination building (1 No.) New roads and walkways with all associated civil works Construction of cooling tower Construction of 220 KVA cable corridor involves 80,000 m3 of excavation Completion Date: May, 2003

Company Profile 2013 47 Selected Projects Sewage Treatment Plants and Pumping Stations Refurbishment and upgrading works for various foul and stormwater pumping stations including civil, mechanical, electrical and HVAC works 49 Construction of treated sewage effluent network (TSE) T6 to T7 including 48 km of TSE mains 50

Company Profile 2013 48 Sewage Treatment Plants and Pumping Stations

Refurbishment and upgrading works for various foul and stormwater pumping stations including civil, mechanical, electrical and HVAC works. Client: Public Works Authority (Ashghal) Value (USD$): 53,295,000 Project Scope: The refurbishment and upgrading of four (4) foul pumping stations and two (2) storm water pumping stations including: - Civil works - Temporary bypass works, wet and dry well works - Rising main works and mechanical works Completion Date: January, 2014 (Ongoing)

Company Profile 2013 49 Sewage Treatment Plants and Pumping Stations

Construction of treated sewage effluent network (TSE) T6 to T7 including 48 km of TSE mains Client: Ministry of Municipal Affairs and Agriculture (MMAA)

Value (USD$): 13,000,000

Project Scope: Construction of 48 Km of treated sewage effluent network to service the north of Doha area including: Various TSE mains HDPE pipes 300 – 600 (mm) D.I. pipes laid over the channel hung on the parapet of the bridge Air valves circular type Gate valves circular type Washouts circular type Distribution chambers rectangular type TSE pipes installed by non-disruptive method Partial TSE mains HDPE ducts installed by NDM Remote control irrigation systems for primary and secondary roads

Completion Date: April, 2004

Company Profile 2013 50 Selected Projects Landmark Buildings Barwa Financial District 52

Dubai Towers 53

Alwaha Club 54

Company Profile 2013 51 Landmark Buildings

Barwa Financial District A Joint Venture with Bouygues and Midmac Contracting.

Client: Barwa Real Estate Company Value (USD$): 1,301,370,000 Project Scope: The Barwa Financial District (BFD) is situated in Doha’s new business district in with approximately built-up area of 700,000 m² as detailed below: Elevated car parking 15 Podiums : Retail + Technical 9 Towers : Offices – Shell & Core Hotel & Convention Center Primary substation Energy Center Completion Date: April, 2014 (Ongoing)

Company Profile 2013 52 Landmark Buildings

Dubai Towers A Joint Venture with Al Habtoor

Client: Sama Dubai

Value (USD$): 400,000,000

Project Scope: Construction of a new mixed-use corporate tower in the West Bay district of Doha. It will contain world-class retail, offices, hotel, serviced apartments and residential units. It has been envisioned that upon completion, the project will be the tallest building in Doha housing both residential and commercial establishments. The scope consists an 84-storey tower with total built-up area of 295,000 m² detailed as below: Residential space 31 floors Office space 29 floors Five-star boutique hotel 13 floors Retail space 2 floors Ballroom Meeting facilities Business center Swimming pool and Spa Associated facilities Completion Date: Ongoing

Company Profile 2013 53 Landmark Buildings

Alwaha Club

Client: RasGas Value (USD$): 7,400,000 Project Scope: Construction of one storey concrete structure building with a total buit-up area of 7300 m² includes a metal decking roofing for the multipurpose hall with all associated MEP, telecommunications, HVAC and fire fighting system. Restaurant, snack bar and private dining room Lounge and meeting rooms Recreational rooms Multi-purpose hall that functions as a theatre Gymnasium Children’s nursery Administration offices External swimming pool Shaded paddling pools Play areas and mini golf course Completion Date: March, 2002

Company Profile 2013 54 Resources

Company Profile 2013 55 Resources

Offices JE’s head office is located close to the airport on Museum Road. Our offices are equipped with latest IT infrastructure to meet the international standards and requirements in order to meet our local and international clients’ expectations.

Fabrication Workshop JE’s philosophy is to achieve maximum efficiency of fabrication productivity. JE has established state of art fabrication workshop facilities equipped with new machines, equipment and tools. Our fabrication workshop is situated in close to the Ras Laffan Industrial City where all the major clients are located.

PMV Facilities JE has invested heavily in purchasing new equipment to be able to execute the upcoming mega projects. In addition, JE has established two central PMV workshops located in Salwa Indus- trial Area and Al Khor Industrial Area. Our continuous preventative maintenance is carried out by a dedicated and trained team. JE has the largest fleet count in the State of Qatar exceeding 1,700 pieces of machinery.

Company Profile 2013 56 Equipment Fleet

Descriptions No. Descriptions No. Lifting Equipment 60 Others 693 Mobile Crane 22 Generator 172 Tower Crane 3 Tower Lights 161 Man Lift 3 Concrete Mixer 17 Forklift & Tele Handler 14 Power Floats 12 Self Loader 18 High Water Pressure Pump 11 Earth Works 631 Asphalt Cutters 7 Trencher 7 Vibrators 58 Bulldozer 12 Hydro Testing Pump 20 Back Hoe (JCB) 21 Air Compressor 19 Excavator 109 Dewatering Pump (6” & 3”) 155 Loader 55 Welding Machine 27 Uni-Loader 26 Power Screen & Vibratory Screen 18 Tankers (Water & Diesel) 28 Tracked Jaw Crusher & 13 Roller 55 Impact Crushers Compactor 71 Kerb Casting Machine 1 Grader 17 Interlock Laying Machine 1 Tipper Truck – 19m³ 128 Transit Mixer 1 Tipper Truck – 23m³ 42 Tipper Trailer – 32m³ 49 Vehicles 436 Articulated Dump Truck 11 Buses 76 Transport Equipment 19 Pickups 207 Trailer with Low Bed & Flat Bed 19 Cars 153 Recovery Trucks & Pickup 3 Grand Total 1842

Company Profile 2013 57 Staff & Manpower

Descriptions No. Management Staff 191 Top Management 8 Estimation Department 31 Procurement Department 17 Contracts Department 23 Projects Control Department 20 Management Information System (MIS) Department 15 Accounts Department 23 Human Resources Department 54

Projects Staff 6,852 Operation Civil 460 Operation MEP 70 Quality, Health, Safety & Environment 345 Project Technical Staff 65 HR Department Support Staff (Site Admin & Camps) 52 Project Workforce (Skilled & Unskilled Labor) 3,870 Drivers & Operators 1,400 PMV Department 575 MEP Fabrication Workshop 15 Grand Total 7, 043

Company Profile 2013 58 Sustainability

Company Profile 2013 59 Integrated Management System (IMS)

Quality, Health, Safety and Environment The protection of human health, personal safety JE places emphasis on internally improving the and environmental rank at the highest level of physical and social environments in which employ- importance to JE. We operate in a diligent and ees operate in. We constantly perform risk man- responsible manner consistent with other world- agement techniques to identify the dangers class corporations and aligned with our stated employees can encounter in the workplace. QHSE business goals and policy. Preventing these problems are highly beneficial and results have shown that a safe and hygienic JE empowers and supports our associates in their environment has led to a higher productivity. Our ongoing efforts to prevent accidents of all kinds and standards of procedure and policies are imple- to promote a safe environment wherever they go. mented to ensure employee safety and health is an We use comprehensive management systems to action taken proactively and controlled by the top demonstrate our commitment to Quality, Health, management. Safety and the protection of our Environment and to the principles of our QHSE Policy, bringing value In QHSE (quality, health, safety and environment), to our associates, customers and the community. JE continues to be one of the leading performers within our industry sectors. Responsibility for Quality, Health, Safety and Envi- ronment rests at the top management level of JE is striving to continually improve the perfor- AlJaber Engineering and is transferred to down the mance in QHSE management system and continu- line for implementation. Everyone in our organiza- ally improving our quality, health, safety and tion is accountable for QHSE performance in their environment performance is one of our key strate- respective area. JE embarked upon a number of gic objectives. AlJaber Engineering’s QHSE objec- behavioral safety initiatives to complement our tives are given equal value with other business procedures and to seek to ensure that everyone objectives and being monitored by top manage- engages fully in matters. ment.

The quality of everything we make and do brings value to our customers and justifies their decision to do business with us.

Company Profile 2013 60 ISO & OHSAS Certifications

Company Profile 2013 61 Quality & HSE Policies

QUALITYQUALITY POLICY POLICY

It is theIt policyis the Pofolicy AlJaber of AlJaber Engineering Engineering Company (JE) to topro pviderovide Quality Quality Economical, Engineering and Economical,Construction Engineering Services and Construction to the customer's Services satisfaction. to the customer’s In order to achieve this Policy, the satisfaction.following In order shall tobe achieveestablished this and Policy, complied the following with: shall be established and complied with: Identify customer requirements, meet the requirements and carry out the services * Identify withcustomer team requirements,spirit. meet the requirements and carry out the services with team spirit. Ensure compliance with all applicable regulations and requirements regarding the * Ensure complianceservices pro withvided. all applicable regulations and requirements regarding the services provided. Provide efficient services to meet customer specification and needs by procuring * Provide theefficient proper services mate tori meetals andcustomer maintaining specificati equipmentons and need and by procuring necessary the infrastructure in proper matea highrials state and maintainingof repair. equipment and necessary infrastructure in a high state of repair. Recruit highly qualified staff and improve the skill of employees in order to * Recruit highlymaintain qualified the qualitystaff and of imp productsrove the andskills servicesof employees that in meet, order orto maintain exceed, the the customer quality ofexpectati products onands. services that meet, or exceed, the customer expectations.

* OptimizeOptimize the performance the performance and maintain and strict maintain monitoring strict of mo thenitoring project ofthroughout the project its duration throughout its in order toduration meet the in client order requirements. to meet the client requirements.

* ContinuallyContinually identify, identify,assess and assess implement and implement the measures the and measures steps that and imp stepsrove thatthe company’s improve the Quality Mcompany'sanagement QualitySystem. Management System.

OSAMA HADID

OSAMA HADID CHIEF EXECUTIVE OFFICER

Chief Executive Officer

JEC/IMS/PL/02 – Rev. 5 – Dated: 01.11.12

Company Profile 2013 62 Quality & HSE Policies

HSE POLICY HSEAlJaber POLICY Engineering is dedicated to the concept that all accidents are preventable and we are committed to a zero accident policy. To achieve and enhance this commitment to our AlJaberpolicy, Engineering and foster is adedicated culture of to continuous the concept improvement that all accidents of our are safety health and environmen- preventabletal duties, and the we following are committed shall tobe a followed:zero accident policy. To achieve and enhance this commitment to our policy, and foster a culture of continuousComply improvement with applicable of our safetylegal andhealth other and business environment requirements. duties, the In those areas specific to followingthe shall Civil be Engineering followed: Construction Industry, Seek to apply more stringent standards and procedures where appropriate. * Comply with applicable legal and other business requirements. In those areas specificEmphasize to the Civil the Engineering awareness Constructionand training Industry,of all persons seek toworking apply for, more or on behalf of AlJaber stringentEngineering. standards and procedures where appropriate. * EmphasizeThe Health the awareness and Safety and of training its employees, of all persons subcontractors working for, orand on other behalf persons of who may be AlJaberaffected Engineering. by the company's activities, are of foremost consideration. The Health and Safety of its employees, subcontractors and other persons who may * Take appropriate precautions to prevent all incidents, which may harm people, damage be affected by the company’s activities, are of foremost consideration. property and pollute the environment. * Take appropriate precautions to prevent all incidents, which may harm people, damage propertyTaking and pollute care of the health environment. of employees, ensuring safety at work places and protecting the environment is everyone's responsibility. The HSE personnel will work as catalysts to * Takingensure care that of health all sites' of employees,personnel fulfill ensuring their safety respective at work responsibilities. places and protecting the environment is everyone’s responsibility. The HSE personnel will work as catalysts to ensure that all sites’Protect personnel the fulfillenvironment their respective by maintaining responsibilities. low levels of generated waste through various activities and minimize the consumption of resources. * Protect the Environment by maintaining low levels of generated waste through various activities, and minimizeEnsure thethe consumption safe operation of resources. of all industrial equipment machinery and plant. * Ensure the safe operation of all industrial equipment machinery and plant. Continually identify the potential areas for HSE Management System improvement and * Continuallyestablish identify the necessary the potential measures areas for to HSE implement Management such System improvements. improvement and establish the necessary measures to implement such improvements. Ensure that any party performing business with AlJaber is complying with all of the * Ensureabove. that any party performing business with AlJaber Engineering is complying with all of the above. OSAMA HADID

OSAMA HADID

Chief Executive Officer

CHIEF EXECUTIVE OFFICER

JEC/IMS/PL/01 – Rev. 5 – Dated: 01.11.12

Company Profile 2013 63 Safety Certifications & Achievements

2 Million Man Hours without a lost time incident. Presented By NDIA.

20,000,000 Man Hours with no lost time incidents . Presented by CTJV.

1,000,000 Man Hours without lost time accident at NDIA. Presented by NDIA.

5,000,000 Man Hours without lost time injury at Ras Abu Fontas - A1 Project. Presented by Fisia Italimpianti.

Company Profile 2013 64 Safety Certifications & Achievements

Company Profile 2013 65 Safety Certifications & Achievements

Company Profile 2013 66 Appreciations

Company Profile 2013 67 Affiliates

Company Profile 2013 68 Arabian Specialized Materials Al Wataniya Concrete ASMA is the trading arm of AlJaber Engineering and Al Wataniya is the leading producer and supplier of they have been serving the market over the last fifteen Ready-mix concrete in Qatar. They operate twelve years with a variety of specialty products, fixtures and plants in four strategic locations across the country equipment. They have provided construction materials (Lusail, Mesaieed, Salwa and Ras Laffan) to fulfill the and solutions to numerous clients in several industries escalating demand of their products. They implement a including infrastructure, buildings, water, electricity, oil & dynamic quality control program to deliver durable and gas, and petrochemicals. high performance concrete (HPC). Furthermore, they ASMA provides a wide range of products such as: have a total production capacity of more than 100,000 Formwork and scaffolding m³/month. Garbage and linen chutes Al Wataniya Concrete offers the following products and services: BMU window cleaning systems Glass-reinforced plastics (GRP) Ready-mix concrete High-density polyethylene (HDPE) Precast concrete PPR Pipes Product testing laboratories Construction chemicals Contact Details: Decking, flooring and floor coating P.O. Box: 24381 Stainless steel works Tel: +974 4483 8751 Water and drainage valves Fax: +974 4483 2334 Bearing pads and gaskets Email: [email protected] Website: www.watancon.com Ductile iron pipes and fittings and many more

Contact Details: P.O. Box: 55289 Tel: +974 4421 3636 Fax: +974 4421 3737 Email: [email protected] Website: www.asmaqatar.com

Company Profile 2013 69 AlJaber & Makhlouf Confidence Equipment and Al Jaber & Makhlouf is one of Qatar’s leading companies Transportation Company in the production and laying of asphalt materials, road Confidence Equipment and Transportation (CET) offers works and related services in the oil & gas fields, petro- solutions for water tankers, sewage removal, garbage chemicals, water, electricity and infrastructure for material as well as the transportation of these activities. government, public and private entities. They have With more than 170 employees at their disposable, over 33 years of experience in undertaking and they are one of the market leaders in catering to completing projects for international clients. various sectors and provide assistance for any rental of Their primary activities include: equipment that aid companies in their operations. Earth and sub-base works Confidence handles the following activities: Asphalt works Rental of treated water tankers Infrastructure development Rental of water tankers Road marking Supply of water Integrated paving solutions Removal of sewage water Asphalt stamping and coding Removal of garbage material

Contact Details: Contact Details: P.O. Box: 23792 P.O. Box: 24430 Tel: +974 4432 4661 Tel: +974 4469 0714 Fax: +974 4432 3319 Fax: +974 4469 0735 Email: [email protected] Email: [email protected] Website: www.jabmak.com

Company Profile 2013 70 Arabian Supply Center Arabian Projects Development Company Arabian Supply Center (ASC) has been supplying spare APDC is involved in Business Development and offers parts for the construction industry and transportation marketing strategies for foreign companies aiming to sell their products and services in the Qatari Market. sector, since 2008. Recently we have added heavy They have partnered with many international companies equipment spare parts to our portfolio. in the Qatari market and have a standing reputation Our global supply base and exclusive distributorship that has attracted more companies within the region. rights in Qatar offers us an added advantage to provide ADPC offers the following services: quality parts at the right price. We import high quality Establishing all ground work needed to facilitate daily parts and accessories from original equipment manufac- operations for a new company. turers (OEM) and trusted sources in Italy, Switzerland, Provides support in understanding legislation and legal Australia, Germany, Holland, France, and the U.S. systems in Qatar. for brands such as Mercedes Benz trucks & trailers, Offers expertise in analyzing short - term and long - MAN trucks, Caterpillar, Komatsu, etc. term trends. ASC has built its reputation on the sound principles of Assistance in development of planning to foster growth in a dynamic environment. quality products and customer service. Our teams of experts have years of extensive experience in this Contact Details: market. Our professional management team and trained P.O. Box: 55289 sales personnel are highly qualified to meet your needs. Tel: +974 4421 3636 Fax: +974 4421 3737 ASC offers the following products: E-mail: [email protected] Clutches Hand Tools Engine Parts Website: www.asmaqatar.com Air Brake System Filters Transmission Batteries Cooling Systems Undercarriage Bearings Tires Gearboxes

Contact Details: P.O. Box: 10882 Tel: +974 4458 0623, +974 4458 0635 Fax: +974 4458 0562 Tremix AlJaber

Email: [email protected] Tremix Al Jaber is a joint venture company formed in Website: asc.com.qa 2005 between Technical Readymix (Tremix), a leading concrete supplier based in the United Arab Emirates and AlJaber Group, a well-established contracting company in Qatar, in order to supply the total ready-mix concrete requirement of the New Doha International Airport. To date, over 2 million cubic meters of concrete have been supplied making the project one of the largest infrastruc- ture projects in Qatar.

Contact Details: P.O Box: 22804 Tel: + 974 4467 6086 Fax: +974 4467 6082 E-mail: [email protected]

Company Profile 2013 71 Delmon Scaffolding BIMTEC Delmon Scaffolding has diverse expertise in the BIMTEC has initiated operations in an effort to support manufacturing, supply, and hiring of various types of the Building Information Modeling (BIM) boom that is scaffolding and formwork systems in the major rapidly impacting all phases of the Architecture, developments in Qatar. Their abilities cover both Engineering, and Construction (AEC) industry. We lead steel and aluminum works and along with their with Building Information Modeling Training/ Production technical expertise, Delmon is widely renowned for services /and BIM Projects management to the their high-quality finishes. architectural and engineering design disciplines Delmon Scaffolding has the following scope of work: (Structural, MEPFF, Civil), construction managers, Access scaffolding system Project managers and owner representatives firms, on Quick strike decking system the concepts of gauging a project throughout the buildings Wall formwork system life-cycle rather than simply a picture in time. Tower scaffold system (mobile & stationary) Contact Details: Consulting and engineering services P.O Box: 24761 Contracting services Tel: +974 4477 1779 Personnel training Fax: +974 4467 8410 Operation and maintenance services Email: [email protected] Website: www.bimtechnologies.net Contact Details: P.O. Box: 17096 Tel: +974 4435 3131 Fax: +974 4435 3232 Email: [email protected] Website: www.delmongroup.net

Company Profile 2013 72 International Drilling Group EMCON International Drilling Group (IDG) is a leading company Emirates Concrete & Steel Protective Coating Works in the horizontal directional drilling (HDD) field and (EMCON) was established in 1978 and started its experienced and capable of dealing with all kinds of Painting and Special Coating Division in 1987. Today soil conditions (soft, hard, rock, etc.,) and in the most EMCON is one of the leaders in UAE in the following remote and difficult places. IDG has established a wide fields: reputation for serving the HDD pipeline industry and Application of Specialized protective coating system cabling as a competent contractor using the most and flooring system from Jotun, BASF, Fosroc, Henkel-Polybit, Hempel and Corrotech. advanced technology for the gas, fuel, water, fiber optical, electrical and telephone cables projects. All types of Epoxy Spray Systems on buildings, Plants and Structures. Their services include the following: Special effect paints, Calligraphy and Multicolor Horizontal directional drilling paints. Consultation, planning, management and execution EMCON has manpower exceeding 300 highly skilled of related construction works employees and access to additional workforce in Dubai/Doha. EMCON has Airless Spray equipment, Contact Details: Blast Track Machines, Water Jetting equipment, P.O. Box: 47530 Compressors, Sand Blasting equipment, Guniting and Tel: +974 4435 8738 Shotcreting equipments. Fax: +974 4462 6067 Email: [email protected] Contact Details: Website: www.intdrillinggroup-co.com P.O Box: 124288 Tel: +971 4347 3400 Fax: +971 4347 3402 Email: [email protected] Website: www.emconblocks.com

Company Profile 2013 73 LLC General Contractor Tel: +974 4444 6206, Fax: +974 4444 6361 P.O. Box: 22801, Doha - Qatar E-mail: [email protected] www.jec.qa