Introduction

COMO W.L.L. has been continually building values since its foundation.

Quality, Technology and Adaptability have been the foremost values adopted by the company. The concern for quality is nurtured at every level.

Being at the technological forefront of our business has further strengthened this commitment to excellence.

Our workforce is not only highly qualified but also highly adaptable. The ability to take on challenges has enabled us to successfully execute projects that have been new to our experience.

COMO Construction offers a full range of construction services. The project teams maintain a strong foundation of trust and mutual respect generated through positive relationships with clients, architects, engineers, contractors, subcontractors and suppliers.

A company-wide policy encouraging shared performance responsibility ensures the highest degree of professional service and results on all projects undertaken.

Since its foundation, the company has been producing outstanding records in a wide range of construction works. From development, the company has a rich experience in these fields.

The Company has built a base of loyal clients on the strength of our reputation for service and competitive costing. COMO’s success in the construction sector is due in part to our commitment to teamwork.

OUR MISSION

The mission of COMO is to build on our reputation for integrity, excellence, experience and leadership as one of ’s finest construction organization by:

. Continuously improving the quality of our work and services.

. Constantly striving to exceed each client’s expectations.

. Maintaining our dedication to the highest moral principles.

. Providing our people with a challenging, secure and safe environment in which to achieve our objectives. Services Offered

ARCHITECTURAL & FIT OUT

MODULAR BUILDING

CIVIL & ARCHITECTURAL

Sectors:

Oil & Gas Industry Power Plants

Chemical Plants Marine Works

Sewage Treatment Plants Industrial Buildings

Water Pump Station Multi-purpose Buildings

Substations Modular Accommodation & Site Facilities Certified ISO Company Policy Statement S a f e t y

COMO applies a “Zero Harm” philosophy to all of our operations. We are committed creating an environment that makes safety our number one priority while conducting our business. This is reflected in our Corporate Values Statement which states the principles under which we operate.

Achieving “Zero Harm” is no small undertaking. In an industry that is often driven by deadlines, maintaining the discipline to pre-plan and integrate safety into all activities requires diligence. Our policies and procedures mandate the planning of tasks so that they become ingrained as habits. Safety is always paramount before executing any activity. We continuously monitor and improve our policies, procedures and behaviors using inspections, self-audits and the implementation of industry best practices. COMO employees from every branch participate in industry organizations with the goal ofof assistingassisting inin thethe developmentdevelopment ofof newnew bestbest practices forfor integration into our operations. integrationSafety trainingintoisourprovidedoperationsat all. Safetylevels oftrainingthe companyis provided. at all levels of the company. Both employees and suppliers can expect an environment that is true to the belief that everyone has the right to return home safely at the end of the workday. Company Organization Chart Currently Ongoing P r o j e c t s

START / PROJECT OWNER OF SN PROJECT NAME MAIN CONTRACTOR LOCATION AWARD AMOUNT THE PROJECT DATE (QAR) AS OF JANUARY 2019 CONSTRUCTION OF SITE OFFICES AND EXTERNAL FERNAS QATAR RAS 07.01.201 1 WORKS FOR EPIC FIRE WATER NETWORK CONSTRUCTION 1,091,388.00 PETROLEUM LAFFAN 9 PROJECT COMPANY , INC. RAYTHEON DESIGN, SUPPLY & INSTALLATION OF 09.12.201 2 BL HARBERT INTEGRATED QATAR 603,457.47 PREFABRICATED CANOPIES FOR QEWR PROJECT 8 DEF. SYSTEM ANGRY BIRDS OUTDOOR ADDITIONAL WORKS AT TALAL BIN FAMILY ENTERTAINMENT CENTER 25.04.201 3 ATL21.SE.JV MOHAMMED QATAR 1,382,213.00 FESTIVAL MALL (SLAB ON GRADE & BOUNDARY 8 TRADING WALL)

ARCHITECTURAL FINISHES FAST TRACK FOR RED 05.05.201 448,880,000.0 4 ISG QATAR RAIL QATAR LINE NORTH UNDERGROUND 6 0

ARCHITECTURAL SUBCONTRACT WORKS GOLD LINE UNDERGROUND FOR 4 STATIONS 05.04.201 347,005,717.7 5 ICC JV QATAR RAIL QATAR (STATIONS: NATIONAL MUSEUM OF QATAR, RAS 7 0 BU ABBOUD, SOUQ WAQIF, BIN MAHMOUD) MANPOWER SUPPLY FOR GOLD LINE UNDERGROUND PROJECT FOR 4 STATIONS 31.05.201 6 ICC JV QATAR RAIL QATAR (STATIONS: NATIONAL MUSEUM OF QATAR, RAS 7 571,556.00 BU ABBOUD, SOUQ WAQIF, BIN MAHMOUD) SUPPLY AND INSTALLATION OF PLASTER – 05.11.201 7 GOLDLINE UNDERGROUND ICC JV QATAR RAIL QATAR 460,074.23 7 PROJECT

TALAL BIN SNOW DUNES FIT-OUT WORKS AT FAMILY 02.04.201 8 ATL21.SE.JV MOHAMMED QATAR ENTERTAINMENT CENTER DOHA FESTIVAL CITY 7 9,404,553.71 TRADING CIVIL & ASSOCIATED BUILDING WORKS FOR AL 132/11KV AL THUMAMAH CENTRAL SS (NEW) 10.12.201 9 SIEMENS W.L.L. KAHRAAMA THUMAMA 13,013,008.00 QATAR POWER TRANSMISSION SYSTEM 5 H EXPANSION PROJECT PHASE 12

AL 26.03.201 10 UMM AL HOUL IWPP - BUILDING WORKS SAMSUNG C & T MANATEQ WAKRAH 6 8,038,800.00

SHERATON 11 AL HUDA RESTURANT AT SHERATON CAR PARK AL DIAR QATARIA ASHGHAL - CAR PARK 200,000.00 Major Completed Projects

TOTAL VALUE OF MAIN OWNER OF THE DATE / YEAR WORK SN PROJECT NAME LOCATION CONTRACTOR PROJECT COMPLETED COMPLETED (QAR) ANGRY BIRDS OUTDOOR GENERATOR ROOM, TALAL BIN 2017.11- 1 MANHOLE AND CIVILWORKS AT FAMILY ATL.21.SE.JV MOHAMMED DOHA 1,164,266.86 2018.12 ENTERRAINMENT CENTER DOHA FESTIVAL CITY TRADING

RED LINE NORTH UNDERGROUND DOHA – 7 STATION 2017.08- 2 ISG QATAR RAIL QATAR 4,885,803.84 (FRONT OF HOUSE) 2018.11

SUPPLY & INSTALLATION OF MODULAR BUILDING FOR FISHERAPPEL 3 COMO 2018.10 310,217.75 THE QTA AL ENNA FESTIVAL T SUPPLY AND INSTALLATION OF SITE OFFICE FOR THE QATAR 2018.07- 4 EPIC FOR REPLACEMENT OF CRUDE OIL TRANSFER AL BALAGH DUKHAN 387,968.00 PETROLEUM 2018.10 LINES AT DUKHAN GULF EARTH DISMANTLING & ERECTION OF MODULAR CABIN FOR 2018.06- 5 COMO MOVING QATAR 622,333.05 NPP SITE OFFICE 2018.08 (GEM) EXECUTION OF ARCHITECTURAL FINISHING WORKS(SCREED, BLOCK WALL & PLASTER) FOR “BACK 2016.01- 6 ISG JV QATAR RAIL QATAR 6,844,195.00 OF HOUSE” FOR DOHA METRO PROJECT – 2018.08 NORTH UNDERGROUND. RAYTHEON 2017.10- 7 TEMPORARY MAN CAMP & FACILITIES FOR QEWR BL HARBERT INTEGRATED QATAR 12,513,462.87 2017.12 DEF. SYSTEM SHAQAB 2014.03- 8 AL MANAL FOOD FACTORY COMO DOHA 60,210,510.00 ABELA 2017.12 ENGINEERING, FABRICATION, SUPLY & CONSTRUCTION QATAR 2016.02- 9 SHELL GTL RAS LAFFAN OF OFFICES FOR THE FIELD FACILITIES PROJECT KENTZ W.L.L. 2017.06 22,522,544.22 RELOCATION AND INSTALLATION OF ENGINEERING DAEWOO 2017.02- 10 OFFICE - CONSTRUCTION AND UPGRADING OF E-RING ASHGHAL QATAR E & C 2017.08 807,500.48 ROAD NORTH/SOUTH LINK (P008-C2) EPC STORAGE SHED FACILITIES AT CATHODE RODDING 2015.10- 11 COMO QATALUM MESAIEED 3,306,859.72 HOP AND RELINING FACILITY 2016.12 QAL-ENG-0005B-15 | BOOSTER SECTION CIVIL AND 2015.10- 12 COMO QATALUM MESAIEED 1,928,947.07 ELECTRICAL WORKS 2016.10 CONSTRUCTION OF MODULAR BUILDING & 2015.09- 13 GEM NPP MESAIEED 1,275,392.83 WORKSHOP 2016.03 SUPPLY AND INSTALLATION OF MODULAR CABIN FOR 2015.09- 14 GEM NPP MESAIEED SITE OFFICE 2016.03 1,736,462.81 DESIGN AND CONSTRUCTION OF SITE OFFICES FOR IDRIS SHP 2015.11- 15 ASHGHAL DOHA IDRIS MTS - 02 PROJECT CONTRACTS 2016.04 3,956,278.00 HYUNDAI 2014.01- 16 TILE INSTALLATION AT HMC ASHGHAL DOHA 2,806,035.54 E & C 2016.04 NOH2 JV SUPPLY & INSTALLATION OF MODULAR BUILDING 2015.05 - 17 COMO (QDVC & BIN RAYYAN 1,120,168.96 LABORATORY 2015.07 OMRAN) BUILDING & FACILITIES FOR HANDLING OFF SPEC QATAR 2014.10 - 18 BUTTS WITH DUST COLLECTING IN ANODE SERVICE VHE MESAIEED 1,167,632.80 ALUMINUM 2015.06 PLANT FOR QATAR ALUMINUM LIMITED DESIGN & CONSTRUCTION OF SITE FACILITIES AND LS CABLE & QATAR RAS 2014.07 ‐ 20 1,379,346.00 LAYDOWN AREA SYSTEM PETROLEUM LAFFAN 2014.10

21 YARD UTILITIES FOR TEMPORARY FACILITY HYUNDAI NEW PORT MESAIEED ‐ 1,862,937.56 Major Completed Projects

TOTAL VALUE OF MAIN OWNER OF THE DATE / YEAR SN PROJECT NAME LOCATION WORK CONTRACTOR PROJECT COMPLETED COMPLETED

RENOVATION AND FITOUT WORKS FOR VODAFONE DATA 2013.06- 22 VODAFONE QATAR 567,739.78 SHOW ROOM AND KIOSKS SELECT 2017.04

NEW PORT MESAIEED 2013.02 - 23 CANAL PROJECT MEDCO 1,368,900.00 PROJECT – NPP 2013.03

NEW PORT MESAIEED 2013.01 - 24 CANAL PROJECT MEDCO 1,237,173.80 PROJECT – NPP 2013.02

NEW PORT MESAIEED 2012.07 - 25 CONSTRUCTION OF TEMPORARY SITE FACILITIES MEDCO PROJECT – NPP 2013.01 44,842,914.80 QATAR ELECTRICITY CHLORINE DIOXIDE SYSTEM FOR QATAR ELECTRICITY & RAS ABU - 2012.02 - 26 ISIA S.p.A 1,073,892.02 WATER COMPANY- WATER FONTAS 2012.05 COMPANY (QEWC) GULF 2500 M3/DAY SWRO DESALINATION PLANT 2011.09 - 27 PROTEC CEMENT UM BAB 3,380,109.39 TURNKEY(SEA WATER INTAKE) 2012.10 COMPANY DOHA NORTH SEWERAGE TREATMENT AND ASSOCIATED WORKS CIVIL PROJECT 682/1, STRUCTURE UMM 2010.05 - 28 CFE ME ASHGHAL 18,759,247.29 WORKS FOR 1 DAY EMERGENCY LAGOON (LAGOON1) SALAL ALI 2010.03 & PS3 ODOUR CONTROL FACILITY STORAGE BUILDING - DNST UMM 2012.07 - 29 CFE ME ASHGHAL 1,845,800.73 CP 682/1 SALAL ALI 2013.03 UMM 2012.07 - 30 SUBSTATION G - DNST CP 682/1 CFE ME ASHGHAL 1,534,873.03 SALAL ALI 2012.09 UMM 2012.07 - 31 SUBSTATION E - DNST CP 682/1 CFE ME ASHGHAL 5,293,385.76 SALAL ALI 2012.09 VCU COLLEGE DOHA, 32 MIGRANT WORKER HOUSING PROTOTYPE - 2011 - 2012 QATAR QATAR 2,100,000.00

HYUNDAI 33 QAFCO 05 EXPANSION PROJECT QAFCO MESAIEED 2008 - 2011 E & C 36,883,954.89

RAS GIRTAS INDEPENDENT WATER & POWER PLANT PROJECT (C HYUNDAI E POWER RAS 34 2008 - 2011 IWPP) & C COMPANY LAFFAN 82,877,927.30 (RGPC) SHAQAB ABELA , 35 CONSTRUCTION OF WARE HOUSE - 2010 3,230,000.00 CATERING QATAR SERVICES CIVIL & STRUCTURAL CONSTRUCTION OF TEMPORARY LYCEE DOHA, 36 - 2010 1,089,810.00 CLASSROOMS IN FRENCH SCHOOL BONAPARTE QATAR FLOUR CONSTRUCTION & MEP WORKS MESS HALL 3,000 RAS 37 - MIDEAST 2009 2,800,000.00 SQM. LAFFAN LTD. RENOVATIONS & ALTERATIONS OF ASIAN GAMES DOHA, 38 - ASHGHAL 2009 ACCOMMODATION. QATAR 26,300,000.00

CONSTRUCTION & MEP WORKS ACCOMMODATION AL KHOR, 39 - STRABAG 2008 BLOCK. QATAR 5,560,000.00 Major Completed Projects

TOTAL VALUE OF MAIN OWNER OF THE DATE / YEAR SN PROJECT NAME LOCATION WORK CONTRACTOR PROJECT COMPLETED COMPLETED AL AMERICAN 40 DESIGN, MEP & FINISHING RECREATIONAL FACILITIES. - SAILIYAH, 2007 1,980,000.00 BASE QATAR JUST AL KHOR, 41 WAREHOUSE & COLD STORAGE. - 2007 1,320,000.00 ORGANIC QATAR SHAQAB RAS ABELA 42 CONSTRUCTION & MEP WORKS AL HUDA BAKERY. - LAFFAN, 2007 1,420,000.00 CATERING QATAR SERVICES SUPPLY, DELIVERY & COMMISSIONING WORKS FOR MESAIEED MESAIEED, 43 - 2007 DOMESTIC KITCHEN. HOUSING QATAR 1,120,000.00 RAS SUPPLY, DELIVERY & COMMISSIONING WORKS FOR 44 - DODSAL AKG LAFFAN, 2007 MESS HALL. 1,120,000.00 QATAR RAS SUPPLY, DELIVERY & COMMISSIONING WORKS FOR AL JABER & 45 - LAFFAN, 2007 2,000,000.00 KITCHEN & MESS HALL. PARTNERS QATAR SHAQAB RAS DESIGN,CONSTRUCTION & INSTALLATION WORKS FOR ABELA QATAR 46 LAFFAN, 2006 - 2009 CENTRAL FOOD PROCESSING UNIT CATERING PETROLEUM 72,000,000.00 QATAR SERVICES M a j o r C l i e n t s

COMO Construction is building a wide range of projects for a diverse client base. Each project encompasses both the high quality and value that COMO brings to each of its buildings.

ISG Major Projects

ARCHITECTURAL & FIT OUT Major Projects

ALYSJ – Qatar Rail Project G o l d L i n e Underground

ALYSJ JV is the main contractor for the construction of the Doha Metro Gold Line Underground that extends from Ras Bu Abboud Station to Sports City with an estimated 32 km route length for 10 stations. ICC JV – Italiana Costruzioni & COMO are the Fit-out contractors for the 4 stations (Qatar National Museum, Ras Bu Abboud, Souq Waqif, Bin Mahmoud) covering all external Hard landscaping and all interior Architectural Finishes for the Entrance Shelters, Station Subways, etc. Major Projects

ALYSJ – Qatar Rail Project G o l d L i n e Underground Major Projects

ISG – Qatar Rail Project R e d Line North Underground ISG

ISG JV is the main contractor for the construction of the Red Line North Underground which extends in a northerly direction from the station of Mushaireb, for approximately 13 km, through seven new underground stations.

ICC JV – Italiana Costruzioni & COMO are the Fit-out contractors for the 7 stations (, Corniche, , DECC, , Katara, Legtaifiya) handling the architectural finishes and commissioning of interior and public areas and building component of shelters. Major Projects

ISG – Qatar Rail Project Red Line North Underground ISG

Back of House Block Works

Front of House Fit out Works Major Projects

ISG – Qatar Rail Project Red Line North Underground ISG

Station Fit-out Works Major Projects

Doha Festival City - Family Entertainment Center Project Snow Dunes Fit - O u t W o r k s

ATL.21.SE.JV is Main Contractor the Family Entertainment Center (FEC) in Doha Festival City.

The FEC is a major entertainment Hub that includes Virtuocity, Angry Birds, Snow Dunes, Juniverse and Atrium. COMO scope is to supply, install, test, commissioning and maintenance of complete fit-out works for the Snow Dunes Park. Major Projects

Doha Festival City - Family Entertainment Center Project Snow Dunes Fit - O u t W o r k s Major Projects

ABM Military College S h a h a n i a

COMO completed all the audio visual and electrical installation in the Army College under the main contractor TECHNO Q and NASPAK. COMO executed all cable pulling, equipment installation, conduit, cable tray installation and electrical works. Major Projects

MODULAR BUILDING Major Projects

B.L. Harbert Personnel Accommodation for QEWR Project

BL Harbert International (BLHI) provides preconstruction, design-build and MEP engineering services for U.S. Government secure facilities. BLHI is the Main Contractors for the Qatar Early Warning Radar Project (QEWR) where COMO was subcontracted for the design and construction (turn key) of the Technician’s Accommodation – A project completed in 90 days from signing of contact. Major Projects

B.L. Harbert Personnel Accommodation for QEWR Project

Modular Site Office - Erection Works Major Projects

Shell Project (Qatar Kentz) Temporary Site Facilities, RLIC ( 6 , 8 8 4 M 2 )

Qatar Kentz has been awarded a four-year multi-million-dollar call-off contract, by Qatar Shell for its Pearl Gas-To-Liquids (GTL) in Qatar, the world’s largest GTL plant.

COMO provided subcontract work for the project which involved the Engineering, Fabrication, Supply and Construction of the 6,884 m2 Site Modular Offices and other associated works.

Modular Site Office - Erection Works Major Projects

Shell Project (Qatar Kentz) Temporary Site Facilities, RLIC ( 6 , 8 8 4 M 2 )

Modular Site Office Shell Support Office

Modular Site Office Ceiling & Vinyl Installation Works Major Projects

MEDCO Site Office & Camp Facilities Doha New Port Project

This project required the construction and EPIC (Engineering, Procurement, Installing and Commissioning) of Temporary Site Facilities at the Doha New Port.

COMO provided a turnkey solution with the modular units within the project duration of 20 weeks.

The MEDCO Camp with a surface area of 32,000 sqm., includes the accommodation for 700 people, offices for another 250 people, kitchen, mess hall, laboratory, clinic, and recreational rooms. The project also included electrical, drainage, potable water and road networks. Major Projects

MEDCO Site Office & Camp Facilities Doha New Port Project Major Projects

Migrant Worker Housing Prototype Virginia Commonwealth University in Qatar

COMO built the prototye of the workers accommodation for Qatar Foundation Major Projects

C I V I L CONSTRUCTION Major Projects

SAMSUNG Project U m m A l H o u l IWPP

SAMSUNG was awarded the EPC of Umm Al Houl Power for Independent Water and Power Project With an intended capacity is approximately 2520 MW of net electrical power and 136.5 MIGD of net water adjacent to Qatar Economic Zone

COMO was subcontracted for the Civil Building works of the Potable Water Forwarding Pump Shelter and Water & Waste Water Treatment Building. Major Projects

SAMSUNG Project U m m A l H o u l IWPP

Interior Works / Facilities Major Projects

QATALUM Project Mesaieed Industrial City

Qatalum is an equal joint venture between Qatar Petroleum and Hydro Aluminium of Norway produces more than 610,000 tons of high-quality primary aluminium products per annum from twin 1.2 kilometre potlines.

COMO completed two EPC contracts for Qatalum: 1. Storage Shed Facility and Cathode Rodding Shop and Relining Facility, and; 2. Booster Section Civil & Electrical Works

CRS & Relining Qatalum Project Major Projects

QATALUM Project Mesaieed Industrial City

Booster Rectiformer Qatalum Project - Mesaieed Major Projects

Siemens Project K a h r a m a a – Al Thumamah 132/66KV C e n t r a l S u b s t a t i o n

SIEMENS has awarded the largest contract to-date in Qatar for the expansion of the country's power transmission network to deliver 18 turnkey substations for the Phase 12 KAHRAMAA Power Transmission network.

COMO was subcontracted for the Civil and Associated Building works for the 132/66kV Al Thumamah Central Substation which includes Earth Works, Concrete Works, Block Works, Waterproofing Work, etc. Major Projects

Siemens Project K a h r a m a a – Al Thumamah 132/66KV Central Sub - s t a t i o n Major Projects

Central Food Processing Unit Project A t R a s L a f f a n Industrial City

CENTRAL FOOD PROCESSING UNIT RAS LAFFAN (QATAR PETROLEUM)

COMO has completed all the Civil works, Steel Structure, Interior works, Cold Storage and MEP installation including the design of the substation, transformer, and low voltage panels, domestic and sewage water line, and equipment installation. Major Projects

Central Food Processing Unit Project A t R a s L a f f a n Industrial City

CENTRAL FOOD PROCESSING UNIT RAS LAFFAN (QATAR PETROLEUM) Major Projects

IWPP Project A t R a s L a f f a n Industrial City

HYUNDAI E & C (HDEC) has been awarded with the construction of the Ras Laffan C Combined Power Plant (IWPP), which supplies power and water to 3 cities in Qatar including Doha and responsible for 30% of power generation in Qatar.

COMO entered into the project as a main subcontractor for HDEC for Package A Building works which includes Structural Work (RC & Steel Frame Building) and Civil Building Erection Works (Earth Work, Reinforced Concrete Work, Steel Structure Work, Masonry, Plaster, Waterproofing, Interior Fit-out Works, Panel & Roof Work, Door & Window works and other civil miscellaneous works)

Gas Turbine Building - HVAC Room # 2 Local Electrical Building C-IWPP Project Ras Laffan C-IWPP Project Ras Laffan Major Projects

IWPP Project A t R a s L a f f a n Industrial City

Fire Station Building

Gas Turbine Building Floor Slab & HVAC Accu. Floor Pads

Electronic & Electrical Building Gate House Major Projects

QAFCO – 5 Project Mesaieed Industrial City

QAFCO-5&6 Fertilizer Project is the world’s biggest integrated plant for all processes, including ammonia plants and urea plant were HYUNDAI E & C (HDEC) is the main contractor. COMO hasHYUNDAIbuilt a partnership with HDEC and was Subcontracted for the QAFCO-5 Package 1 Building works (Utility Building, A5&U5 Building, CoGen2 Building, CCR2, Gate House, Workshop and Mosque). Works include but not limited to: Scaffolding works, Earth works, Concrete works, Masonry, Painting, Waterproofing, Roof works, Door & Window works, Exterior and Interior Finishing works, and Steel works. Utility Building QAFCO-5 Project Mesaieed Major Projects

QAFCO – 5 Project Mesaieed Industrial City

Utility Building

Cogen-2 Building Major Projects

QAFCO – 5 Project Mesaieed Industrial City

Scaffolding & Formwork System in Utility Building

Blast Proof Concrete Wall - CCR-2

COMO Construction Yard Amonia 5 & Urea 5 Major Projects

Doha North Sewerage Treatment Plant

Doha North Sewage Treatment Works (DNSTW) is a significant sewage treatment project that targeted to serve a population of 900,000 citizens by 2020 with peak capacity of 439,000m³ of wastewater per day with CFE Middle East as its Main Contractor

COMO was awarded the subcontract of the Civil Structure Works including tests for the 1- Day Emergency Lagoon (Lagoon 1). The works includes complete formwork for the walls: blinding concrete, slab and wall bases, earthworks, metal works, waterproofing and reinforcement works as well as 2 substation and 1 pump station. Major Projects

Doha North Sewerage Treatment Plant

One day Emergency Lagoon

LDP-northeast side Lagoon

Substation G & E Major Projects

Temporary Sewage Treatment Plant U m m B a r k a h

COMO was appointed with the subcontract for the Civil work for the Temporary Sewage Treatment Works.

Platform Receiving Tank

Reception Facilities Major Projects

Al Manal Food Factory Project New , Qatar

COMO is the Main Contractor for the Al Manal Food Factory turn-key project with a total foot print area of 5,191 square meter with a total built-up area of 10,382 square meter and maximum height of 14.0 meters. Major Projects

Al Manal Food Factory Project New Industrial Area, Qatar COMO Company Divisions

COMO Modular Solutions a division of COMO that specializes on design and build of modular and prefabricated site office facilities and accommodation. Services includes: (1) Solar Street Light & (2) Marquee Tents

Our knowledge and experience of the construction industry accommodation and site offices allows us to offer costs savings in numerous areas including utilities, especially waste water treatment and power generation.

A turn- key camp with all civil works, paving, utilities, furniture, fixtures and fittings for 1000 persons can be commissioned within 20 weeks from a contract award.

Similarly a fully operational two story site office of 1500 square meters can be commissioned in sixty days from a contract award.

Our units are 100% recyclable and fire resistant and offer excellent thermal insulation with UV values as low as 0.30 W/m2K and joints are designed to prevent sand penetration. The units all carry the CE mark and meet European manufacturing standards including ISO 9001, 14001 and OHSAS 18001 As the units are modular they can be dismantled back to flat pack and easily be re-located. The effective life span of the units are in excess 20 years which ensures their economical viability. COMO Company Divisions

FastPOD modular units, offer a quick and convenient space solution. Our services are exclusively designed to cater to the growing demands for temporary modular solutions in Qatar.

Fast Solution

Fast Delivery

Quick Highlights of our Porta-Cabins:

. Meets the Qatar Foundation Guidelines . Qatar Civil Defense Compliant . Fire Rated (60mm Compressed mineral wool sandwich panels) FastPOD rental prices are most Competitive in the . Quick installation and dismantling market and all our Porta-Cabins are relatively NEW . Easy transportation (ISO container size) in condition. We also cater to all sizes of Temporary . High resistance to weather conditions and Permanent modular unit requirements such as: . High insulation against sound

. Construction Site Offices . Accommodation Units . Meeting Rooms . Mess Halls . Class Rooms . Promotional and Marketing Offices. . Outdoor Events (Promotions, Sporting Events, Kiosks) . Prayer Hall . Security Cabins . Storage Containers . Mobile Laboratories . School Class Rooms . Site Clinics . Cold Storage COMO Company Divisions

COMO FMS is a Full Facilities Management Services company based in Qatar, formed in 2002 and now one of the leading company in the field.

The company currently manages Residential, Commercial and Industrial projects. It specializes in the field of support services, providing expertise, management, distribution and logistics supports to renowned, multinational clients.

FMS uses a state of the art CMMS system in all its practices (Infor EAM-Enterprise Asst Management) and ensures that all its projects are managed with optimum efficiency and one of the proud member of International Facilities Management Association – IFMA, British Institute of Facilities Management – BIFM and is Services Offered : OHSAS 18001:2007 certified. . Call Center (Arabic / English) . Civil & Architectural works . HVAC System . Electrical Systems . Building Management System . Green Building Management System . Housekeeping and Cleaning . Security . pest Control . Waste Management . Landscaping . CCTV . Catering Contact Information