Civil & Architectural
Total Page:16
File Type:pdf, Size:1020Kb
Introduction COMO W.L.L. has been continually building values since its foundation. Quality, Technology and Adaptability have been the foremost values adopted by the company. The concern for quality is nurtured at every level. Being at the technological forefront of our business has further strengthened this commitment to excellence. Our workforce is not only highly qualified but also highly adaptable. The ability to take on challenges has enabled us to successfully execute projects that have been new to our experience. COMO Construction offers a full range of construction services. The project teams maintain a strong foundation of trust and mutual respect generated through positive relationships with clients, architects, engineers, contractors, subcontractors and suppliers. A company-wide policy encouraging shared performance responsibility ensures the highest degree of professional service and results on all projects undertaken. Since its foundation, the company has been producing outstanding records in a wide range of construction works. From development, the company has a rich experience in these fields. The Company has built a base of loyal clients on the strength of our reputation for service and competitive costing. COMO’s success in the construction sector is due in part to our commitment to teamwork. OUR MISSION The mission of COMO is to build on our reputation for integrity, excellence, experience and leadership as one of Qatar’s finest construction organization by: . Continuously improving the quality of our work and services. Constantly striving to exceed each client’s expectations. Maintaining our dedication to the highest moral principles. Providing our people with a challenging, secure and safe environment in which to achieve our objectives. Services Offered ARCHITECTURAL & FIT OUT MODULAR BUILDING CIVIL & ARCHITECTURAL Sectors: Oil & Gas Industry Power Plants Chemical Plants Marine Works Sewage Treatment Plants Industrial Buildings Water Pump Station Multi-purpose Buildings Substations Modular Accommodation & Site Facilities Certified ISO Company Policy Statement S a f e t y COMO applies a “Zero Harm” philosophy to all of our operations. We are committed creating an environment that makes safety our number one priority while conducting our business. This is reflected in our Corporate Values Statement which states the principles under which we operate. Achieving “Zero Harm” is no small undertaking. In an industry that is often driven by deadlines, maintaining the discipline to pre-plan and integrate safety into all activities requires diligence. Our policies and procedures mandate the planning of tasks so that they become ingrained as habits. Safety is always paramount before executing any activity. We continuously monitor and improve our policies, procedures and behaviors using inspections, self-audits and the implementation of industry best practices. COMO employees from every branch participate in industry organizations with the goal ofof assistingassisting inin thethe developmentdevelopment ofof newnew bestbest practices forfor integration into our operations. integrationSafety trainingintoisourprovidedoperationsat all. Safetylevels oftrainingthe companyis provided. at all levels of the company. Both employees and suppliers can expect an environment that is true to the belief that everyone has the right to return home safely at the end of the workday. Company Organization Chart Currently Ongoing P r o j e c t s START / PROJECT OWNER OF SN PROJECT NAME MAIN CONTRACTOR LOCATION AWARD AMOUNT THE PROJECT DATE (QAR) AS OF JANUARY 2019 CONSTRUCTION OF SITE OFFICES AND EXTERNAL FERNAS QATAR RAS 07.01.201 1 WORKS FOR EPIC FIRE WATER NETWORK CONSTRUCTION 1,091,388.00 PETROLEUM LAFFAN 9 PROJECT COMPANY , INC. RAYTHEON DESIGN, SUPPLY & INSTALLATION OF 09.12.201 2 BL HARBERT INTEGRATED QATAR 603,457.47 PREFABRICATED CANOPIES FOR QEWR PROJECT 8 DEF. SYSTEM ANGRY BIRDS OUTDOOR ADDITIONAL WORKS AT TALAL BIN FAMILY ENTERTAINMENT CENTER DOHA 25.04.201 3 ATL21.SE.JV MOHAMMED QATAR 1,382,213.00 FESTIVAL MALL (SLAB ON GRADE & BOUNDARY 8 TRADING WALL) ARCHITECTURAL FINISHES FAST TRACK FOR RED 05.05.201 448,880,000.0 4 ISG QATAR RAIL QATAR LINE NORTH UNDERGROUND 6 0 ARCHITECTURAL SUBCONTRACT WORKS GOLD LINE UNDERGROUND FOR 4 STATIONS 05.04.201 347,005,717.7 5 ICC JV QATAR RAIL QATAR (STATIONS: NATIONAL MUSEUM OF QATAR, RAS 7 0 BU ABBOUD, SOUQ WAQIF, BIN MAHMOUD) MANPOWER SUPPLY FOR GOLD LINE UNDERGROUND PROJECT FOR 4 STATIONS 31.05.201 6 ICC JV QATAR RAIL QATAR (STATIONS: NATIONAL MUSEUM OF QATAR, RAS 7 571,556.00 BU ABBOUD, SOUQ WAQIF, BIN MAHMOUD) SUPPLY AND INSTALLATION OF PLASTER – 05.11.201 7 GOLDLINE UNDERGROUND DOHA METRO ICC JV QATAR RAIL QATAR 460,074.23 7 PROJECT TALAL BIN SNOW DUNES FIT-OUT WORKS AT FAMILY 02.04.201 8 ATL21.SE.JV MOHAMMED QATAR ENTERTAINMENT CENTER DOHA FESTIVAL CITY 7 9,404,553.71 TRADING CIVIL & ASSOCIATED BUILDING WORKS FOR AL 132/11KV AL THUMAMAH CENTRAL SS (NEW) 10.12.201 9 SIEMENS W.L.L. KAHRAAMA THUMAMA 13,013,008.00 QATAR POWER TRANSMISSION SYSTEM 5 H EXPANSION PROJECT PHASE 12 AL 26.03.201 10 UMM AL HOUL IWPP - BUILDING WORKS SAMSUNG C & T MANATEQ WAKRAH 6 8,038,800.00 SHERATON 11 AL HUDA RESTURANT AT SHERATON CAR PARK AL DIAR QATARIA ASHGHAL - CAR PARK 200,000.00 Major Completed Projects TOTAL VALUE OF MAIN OWNER OF THE DATE / YEAR WORK SN PROJECT NAME LOCATION CONTRACTOR PROJECT COMPLETED COMPLETED (QAR) ANGRY BIRDS OUTDOOR GENERATOR ROOM, TALAL BIN 2017.11- 1 MANHOLE AND CIVILWORKS AT FAMILY ATL.21.SE.JV MOHAMMED DOHA 1,164,266.86 2018.12 ENTERRAINMENT CENTER DOHA FESTIVAL CITY TRADING RED LINE NORTH UNDERGROUND DOHA – 7 STATION 2017.08- 2 ISG QATAR RAIL QATAR 4,885,803.84 (FRONT OF HOUSE) 2018.11 SUPPLY & INSTALLATION OF MODULAR BUILDING FOR FISHERAPPEL 3 COMO MESAIEED 2018.10 310,217.75 THE QTA AL ENNA FESTIVAL T SUPPLY AND INSTALLATION OF SITE OFFICE FOR THE QATAR 2018.07- 4 EPIC FOR REPLACEMENT OF CRUDE OIL TRANSFER AL BALAGH DUKHAN 387,968.00 PETROLEUM 2018.10 LINES AT DUKHAN GULF EARTH DISMANTLING & ERECTION OF MODULAR CABIN FOR 2018.06- 5 COMO MOVING QATAR 622,333.05 NPP SITE OFFICE 2018.08 (GEM) EXECUTION OF ARCHITECTURAL FINISHING WORKS(SCREED, BLOCK WALL & PLASTER) FOR “BACK 2016.01- 6 ISG JV QATAR RAIL QATAR 6,844,195.00 OF HOUSE” FOR DOHA METRO PROJECT – RED LINE 2018.08 NORTH UNDERGROUND. RAYTHEON 2017.10- 7 TEMPORARY MAN CAMP & FACILITIES FOR QEWR BL HARBERT INTEGRATED QATAR 12,513,462.87 2017.12 DEF. SYSTEM SHAQAB 2014.03- 8 AL MANAL FOOD FACTORY COMO DOHA 60,210,510.00 ABELA 2017.12 ENGINEERING, FABRICATION, SUPLY & CONSTRUCTION QATAR 2016.02- 9 SHELL GTL RAS LAFFAN OF OFFICES FOR THE FIELD FACILITIES PROJECT KENTZ W.L.L. 2017.06 22,522,544.22 RELOCATION AND INSTALLATION OF ENGINEERING DAEWOO 2017.02- 10 OFFICE - CONSTRUCTION AND UPGRADING OF E-RING ASHGHAL QATAR E & C 2017.08 807,500.48 ROAD NORTH/SOUTH LINK (P008-C2) EPC STORAGE SHED FACILITIES AT CATHODE RODDING 2015.10- 11 COMO QATALUM MESAIEED 3,306,859.72 HOP AND RELINING FACILITY 2016.12 QAL-ENG-0005B-15 | BOOSTER SECTION CIVIL AND 2015.10- 12 COMO QATALUM MESAIEED 1,928,947.07 ELECTRICAL WORKS 2016.10 CONSTRUCTION OF MODULAR BUILDING & 2015.09- 13 GEM NPP MESAIEED 1,275,392.83 WORKSHOP 2016.03 SUPPLY AND INSTALLATION OF MODULAR CABIN FOR 2015.09- 14 GEM NPP MESAIEED SITE OFFICE 2016.03 1,736,462.81 DESIGN AND CONSTRUCTION OF SITE OFFICES FOR IDRIS SHP 2015.11- 15 ASHGHAL DOHA IDRIS MTS - 02 PROJECT CONTRACTS 2016.04 3,956,278.00 HYUNDAI 2014.01- 16 TILE INSTALLATION AT HMC ASHGHAL DOHA 2,806,035.54 E & C 2016.04 NOH2 JV SUPPLY & INSTALLATION OF MODULAR BUILDING 2015.05 - 17 COMO (QDVC & BIN RAYYAN 1,120,168.96 LABORATORY 2015.07 OMRAN) BUILDING & FACILITIES FOR HANDLING OFF SPEC QATAR 2014.10 - 18 BUTTS WITH DUST COLLECTING IN ANODE SERVICE VHE MESAIEED 1,167,632.80 ALUMINUM 2015.06 PLANT FOR QATAR ALUMINUM LIMITED DESIGN & CONSTRUCTION OF SITE FACILITIES AND LS CABLE & QATAR RAS 2014.07 ‐ 20 1,379,346.00 LAYDOWN AREA SYSTEM PETROLEUM LAFFAN 2014.10 21 YARD UTILITIES FOR TEMPORARY FACILITY HYUNDAI NEW PORT MESAIEED ‐ 1,862,937.56 Major Completed Projects TOTAL VALUE OF MAIN OWNER OF THE DATE / YEAR SN PROJECT NAME LOCATION WORK CONTRACTOR PROJECT COMPLETED COMPLETED RENOVATION AND FITOUT WORKS FOR VODAFONE DATA 2013.06- 22 VODAFONE QATAR 567,739.78 SHOW ROOM AND KIOSKS SELECT 2017.04 NEW PORT MESAIEED 2013.02 - 23 CANAL PROJECT MEDCO 1,368,900.00 PROJECT – NPP 2013.03 NEW PORT MESAIEED 2013.01 - 24 CANAL PROJECT MEDCO 1,237,173.80 PROJECT – NPP 2013.02 NEW PORT MESAIEED 2012.07 - 25 CONSTRUCTION OF TEMPORARY SITE FACILITIES MEDCO PROJECT – NPP 2013.01 44,842,914.80 QATAR ELECTRICITY CHLORINE DIOXIDE SYSTEM FOR QATAR ELECTRICITY & RAS ABU - 2012.02 - 26 ISIA S.p.A 1,073,892.02 WATER COMPANY- RAS ABU FONTAS WATER FONTAS 2012.05 COMPANY (QEWC) GULF 2500 M3/DAY SWRO DESALINATION PLANT 2011.09 - 27 PROTEC CEMENT UM BAB 3,380,109.39 TURNKEY(SEA WATER INTAKE) 2012.10 COMPANY DOHA NORTH SEWERAGE TREATMENT AND ASSOCIATED WORKS CIVIL PROJECT 682/1, STRUCTURE UMM 2010.05 - 28 CFE ME ASHGHAL 18,759,247.29 WORKS FOR 1 DAY EMERGENCY LAGOON (LAGOON1) SALAL ALI 2010.03 & PS3 ODOUR CONTROL FACILITY STORAGE BUILDING - DNST UMM 2012.07 - 29 CFE ME ASHGHAL 1,845,800.73 CP 682/1 SALAL ALI 2013.03 UMM 2012.07 - 30 SUBSTATION G - DNST CP 682/1 CFE ME ASHGHAL 1,534,873.03 SALAL ALI 2012.09 UMM 2012.07 - 31 SUBSTATION E - DNST CP 682/1 CFE ME ASHGHAL 5,293,385.76 SALAL ALI 2012.09 VCU COLLEGE DOHA, 32 MIGRANT WORKER HOUSING PROTOTYPE - 2011 - 2012 QATAR QATAR 2,100,000.00 HYUNDAI 33 QAFCO 05 EXPANSION PROJECT QAFCO MESAIEED 2008 - 2011 E & C 36,883,954.89 RAS GIRTAS INDEPENDENT WATER & POWER PLANT PROJECT (C HYUNDAI E POWER RAS 34 2008 - 2011 IWPP) & C COMPANY LAFFAN 82,877,927.30 (RGPC) SHAQAB ABELA AL KHOR, 35 CONSTRUCTION OF WARE HOUSE - 2010 3,230,000.00 CATERING QATAR SERVICES CIVIL & STRUCTURAL CONSTRUCTION OF TEMPORARY LYCEE DOHA, 36 - 2010 1,089,810.00 CLASSROOMS IN FRENCH SCHOOL BONAPARTE QATAR FLOUR CONSTRUCTION & MEP WORKS MESS HALL 3,000 RAS 37 - MIDEAST 2009 2,800,000.00 SQM.