World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 05/20/2005 Report No.: 32443 Public Disclosure Authorized 1. Project Statistics Country: Philippines Project ID: P079661 Project Name: Manila Third Sewerage Project Task Team Leader: Luiz Claudio Martins Tava Estimated Appraisal Date: March 16, 2005 Estimated Board Date: June 21, 2005 Managing Unit: EASUR Lending Instrument: Specific Investment Loan Sector: Sewerage (50%);Sanitation (50%) Theme: Pollution management and environmental health (P);Access to urban services and housing (S) IBRD Amount (US$m.): 64.00 IDA Amount (US$m.): 0.00 Public Disclosure Authorized GEF Amount (US$m.): 0.00 PCF Amount (US$m.): 0.00 Other financing amounts by source: BORROWER 20.13 20.13 Environmental Category: A - Full Assessment Simplified Processing Simple [] Repeater [] Is this project processed under OP 8.50 (Emergency Recovery) Yes [ ] No [X] 2. Project Objectives The development objectives of MTSP are twofold: Public Disclosure Authorized (a) to increase the coverage and effectiveness of sewerage service delivery in participating areas of Metro Manila through an integrated approach involving septage management, sewage management, and heightened consumer awareness of water pollution problems and their solutions; and (b) to establish the viability of new approaches for wastewater management in Metro Manila. 3. Project Description Component 1: The Sewage Management component will involve construction of various sewage treatment plants (STP), interceptor sewers, pumping stations, repair of existing drainage and upgrading of communal septic tanks to provide secondary treatment. The component will benefit a population of about 1.0 million. Proposed locations are as Public Disclosure Authorized follows: ? Taguig Sewerage System includes the construction of four STPs (Hagonoy, Taguig, Tapayan and Labasan), which will use existing flood retention ponds as secondary clarifiers during the dry season. Treated effluent will discharge in Laguna de Bay. ? Riverbanks Sewerage System includes the construction of three STPs (Poblacion, Capitolyo, and Ilaya). The Capitolyo and Ilaya STPs will be underground, and the Poblacion STP will be on a platform above a flood retention pond. Treated effluent will discharge in the Pasig River. ? Quezon City-Marikina Sewerage System includes an underground STP along the Marikina River. The service area includes residential barangays and sub-divisions in Quezon City and two low-income sub-divisions in Marikina City. Treated effluent would discharge to the Marikina River. ? Quezon City Sanitation Upgrading includes the modification of two communal septic tanks in Quezon City to modern STPs. Their service areas will be extended to include parts of adjacent catchments. Rehabilitation of existing separate sewerage and extension of the service area of the existing STPs are also included.The treated effluent would discharge in local drainage canals. ? Sanitation for Low-income Communities includes the construction of two STPs serving Pinagsama, Taguig and East Bank, Taytay (along the Manggahan Floodway). The plants would serve low-income communities with poor or non-existent sanitation facilities. Treated effluent would discharge to the Pinagsama Creek and the Manggahan Floodway, respectively. The STPs constructed under this component will use recognized biological treatment processes, including SBR and oxidation ditches. Generated sludge would be hauled to the septage treatment plants for dewatering. Component 2: The Septage Management component will involve provision of vehicles for pumping-out septage from septic tanks (fecal tankers), septage treatment plants and safe disposal. The component would benefit a population of about 2.3 million. The component will include the following: ? Provision of (a) about seventy fecal tankers from 5 to 10 m3 capacities provided with vacuum pumping; and (b) specialized equipment for transport and application of dewatered septage on soil; ? Construction of septage treatment plant (SPTP) with a capacity of about 800 m3/d of raw septage, located in Taguig Industrial Complex and serving mainly the cities of Mandaluyong, Pasig, Makati and Taguig; and construction of a septage treatment plant (SPTP) with a capacity of about 600 m3/d of raw septage, located in San Mateo and serving mainly Quezon and Marikina Cities and San Juan. Component 3: Technical Assistance: The Technical Assistance component would enhance the proposed project investments through (a) a public information campaign on the environmental benefits of and best practices for proper disposal of sewage; and (b) preparation of follow-on programs for sewage and sanitation improvements. 4. Project Location and salient physical characteristics relevant to the safeguard analysis The MTSP covers the Eastern Concession zone of Metro Manila, covering primarily the 7 cities of Mandaluyong, Makati (Partly), Quezon (Partly), Pasig, San Juan, Pateros and Taguig. The population within the MWCI concession area (East zone) is predicted to increase from 5.3 million persons in 2004 to 8.2 million in 2021. There are no indications that the population growth will subside even after this period of sustained growth. Land uses vary in areas where the Project components are to be situated. Facilities for the Riverbanks Sewerage Systems, the Quezon City-Marikina Sewerage System, the Quezon City Sanitation Upgrading and Sanitation of Low Income Communities are situated within low-income residential areas. The South (Taguig) Septage Treatment Facility is situated within the waste treatment area in a controlled industrial zone, while the North (San Mateo) Septage Treatment Facility is located in a predominantly rural town where a wide area is still used for farming, poultry, piggery and quarrying. At the Taguig Sewerage System subcomponent, land use is predominantly agricultural and shoreland. The lahar disposal sites situated north of Metro Manila are in sugarcane farms and idle agricultural lands. The Project Region lies on the southern portion of the Luzon Central Plain. The regional landscape exhibits contrasting relief from the gently sloping to rugged terrain of the uplands to a central valley plain. The valley is drained by the Marikina River, which flows southwards to join the Pasig River. The Pasig River empties into Manila Bay and drains the Laguna Lake. The Pasig River System is a complex network of waterways that includes Marikina, San Juan, Esteros, and canals, which have the following characteristics: ? It is the main outlet of the Laguna Lake with a total surface area of 850 km2 and a drainage area of 2,750 km2. Waters coming from the Laguna Lake meanders through 27 kilometers of relatively flat coastal and highly urbanized plains of Metro Manila. Populations of around 10 million discharge their wastes into the Pasig River. ? There are over 300 industrial firms along the banks of the Pasig River system, about one-half have been found to be polluting the water in varying degrees. River pollution is further aggravated by oil spills, from about 300 gasoline stations, several oil depots, and barges, tanks and boats docking in the area. ? Marikina River, with its headwaters in the Sierra Madre mountains, joins the Pasig River 19 kilometers upstream of Manila Bay, with an estimated catchments at the junction of 515 km2 ? San Juan River, which drains most parts of Quezon City and San Juan, unites with the Pasig River about 9 kilometers upstream and has a catchments area of about 86 km2. The San Juan River is the most polluted major water body in the Pasig River system. ? The Pasig River is tidal, and the freshwater base flow varies substantially according to season. High flows of as much as 275 m3/sec usually occur between the rainy season of June to October, while low flows of about 12 m3/s occur between April and May. Even smaller base flows are possible during which periods the water quality deteriorates even further. Also during the low flow season, the Pasig River reverses its flow direction due to the high tides at Manila Bay, and polluted waters can return into Laguna Lake. Recent statistics show domestic wastewater as the main contributor (70%) to the pollution loading into the Pasig and Marikina Rivers, the two main rivers in the metropolis, and the Laguna Lake. Due to this pollution, there is insufficient oxygen within the waterways to support aquatic life. Fecal Coliform levels exceed the standards of the Department of Environment and Natural Resources (DENR) by several orders of magnitude most of the year. In terms of health impact, the 2003 Philippine Environment Monitor states that 31% of all illness in 2003 is water related, accounting for nearly 5 million of the reported illnesses. Moreover, it is estimated that 17 billion pesos is lost annually in the Philippine economy due to degradation of the marine environment. 5. Environmental and Social Specialists on the Team Mr Luiz Claudio Martins Tavares (EASUR) Mr Lars C. Lund (EASSD) Mr Teck Ghee Lim (EASSD) Mr Jitendra J. Shah (EASEN) Mr Glenn S. Morgan (EASES) 6. Safeguard Policies Triggered Yes No Environmental Assessment (OP/BP 4.01) X Natural Habitats (OP/BP 4.04) X Forests (OP/BP 4.36) X Pest Management (OP 4.09) X Cultural Property (OPN 11.03) X Indigenous Peoples (OD 4.20) X Involuntary Resettlement (OP/BP 4.12) X Safety of Dams (OP/BP 4.37) X Projects on International Waterways (OP/BP 7.50) X Projects in Disputed Areas (OP/BP 7.60) X II. Key Safeguard Policy Issues and Their Management A. Summary of Key Safeguard Issues 1. Describe any safeguard issues and impacts associated with the proposed project. Identify and describe any potential large scale, significant and/or irreversible impacts: The Pasig River System is a complex network of waterways that includes Marikina, San Juan, Esteros, and canals, which have the following characteristics: ? It is the main outlet of the Laguna Lake with a total surface area of 850 km2 and a drainage area of 2,750 km2. Waters coming from the Laguna Lake meanders through 27 kilometers of relatively flat coastal and highly urbanized plains of Metro Manila.
Recommended publications
  • "0.4 Lilj. -2 Fit3 28
    THIRTEENTH CONGRESS OF THE REPUBLIC ) OF THE PHILIPPINES 1 "0.4 LilJ.-2 fit3 28 First Regular Session ) SENATE S. NO. -I282 Introduced by Senator Biazon EXPLANATORY NOTE Republic Act No. 7227 created the Bases Conversion Development Authority (BCDA) in order to accelerate the sound and balanced conversion into alternative productive uses of the former US. Bases, Clark and Subic and their extensions, to raise funds by the sale of portions of Metro Manila military camps, ! and to apply said funds as provided herein for the development and conversion to productive civilian use of the lands covered under the 1947 Military Bases Agreement between the Philippines and the United States of Americas, as amended. Thus, the law provided that the largest share from the net proceeds of the sale of former military bases should fund the AFP Modernization program As mandated in Republic Act No. 7898, the funds for the modernization of the Armed Forces of the Philippines may be generated through the sale, lease or joint ventures of portions of military reservations and lands. The share of the AFP in BCDA controlled areas under RA 7229 is limited only to the net proceeds of the actual sale and it is not proportionate to its stake, considering that it is the custodian and owner of these properties. In 1997, revenues generated by the BCDA from the sale of former military camps reached P6.617 billion, mostly from the Fort Bonifacio project. This brings to P25.869 billion the total amount of revenues from such sales remitted by BCDA to the National Treasury since 1993.
    [Show full text]
  • Aura C. Matias, Ph.D. Email: [email protected] [email protected]
    Aura C. Matias, Ph.D. email: [email protected] [email protected] 11 September 1960 Quezon City, Philipipnes Married to: Renato B. Matias Children: Raymund Arthur C. Matias Anthony Ray C. Matias Alyssa Rae C. Matias Grand daughter: Kyla Denise H. Matias C U R R E N T E MPLOYMENT / APPOINTMENTS National Academy of Science & Technology (NAST) Department of Science & Technology (DOST) ACADEMICIAN Since July 15, 2011 Department of Industrial Engineering & Operations Research University of the Philippines Diliman, Quezon City PROFESSOR 12 January 1, 2015 – present University Council Committee on Academic Programs & Policies University of the Philippines Diliman CHAIRMAN September 2011 – December 2015 MEMBER January 2016-present College Committee on Energy Engineering Program College of Engineering, University of the Philippines Diliman, Quezon City (UPCOE) September 2004 – present MEMBER College Committee on Environmental Engineering Program College of Engineering, University of the Philippines Diliman, Quezon City (UPCOE) September 2016 – present MEMBER September 2004 – May 2008 International Journal of Human Factors in Manufacturing & Service Industries John Wiley Publications, U.S.A. MEMBER, EDITORIAL BOARD July 1996 - present Technical Panel for Engineering, Technology and Architecture (TPETA) Commission on Higher Education MEMBER, T ASK FORCE FOR INDUSTRIAL May 1996 – present ENGINEERING PROGRAMS 11/21/16 Aura C. Matias Page 2 Task Force for Industrial Engineering Program & Task Force for the Monitoring of Centers of Excellence & Centers of Development (COE/COD) Office of Programs and Standards-Engineering and Architecture Unit Commission on Higher Education (CHED) MEMBER, INDUSTRIAL ENGINEERING PROGRAMS January 1, 2004 – present Public Management Development Program (PMDP) Development Academy of the Philippines (DAP) September 15, 2016 – present FACULTY ADVISER Muti-Sectoral Advisory Board (MSAB), 51st Engineer Brigade, AFP May 1, 2015 – present VICE CHAIRPERSON Voyager Innovations, Inc.
    [Show full text]
  • FOURTEENTH CONGRESS of the REPUBLIC ') 4 Jljn 33 of THE
    FOURTEENTH CONGRESS OF THE REPUBLIC ') OF THE PHILIPPINES 1' .C , .\ First Regular Session ) 4 JljN 33 SENATE Introduced by Senator Biazon EXPLANATORY NOTE This bill seeks to rectify existing infirmities in Republic Act No. 7227 which created the Bases Conversion and Development Authority (BCDA), as amended by Republic Act No. 7917, by harmonizing its goal of accelerated economic development in former military base lands with that of Republic Act No. 7898, which mandated the modernization of the Armed Forces of the Philippines (AFP). In passing Republic Act No. 7227, it was the intent of the gth Congress that alternative uses of military base lands in Metro Manila and other military reservations covered by the 1947 RP-US Military Bases Agreement would promote the economic and social development of Central Luzon and of the whole country. One of the overriding concerns at that time was the need to generate funds to modernize the AFP into a credible force and thus fill the void in the national defense capability which was created by the departure of US military forces in Clark Air Base, Subic Naval Base and their extensions. Thus, the law provided that the largest percentage share from the net proceeds of the sale of former military bases should fund the modernization of the AFP. However, the main mandate of the BCDA is to make money not only from the sale of former base lands, but also through lease and joint-venture arrangements while Republic Act No.7898 provides that funds for the modernization of the AFP may be generated through the sale, lease or joint-ventures of portions of military reservations.
    [Show full text]
  • Pasig-Marikina River Channel Improvement Project (Phase Iii)
    3. EIS (Review Report) PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT (PHASE III) SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT IN ACCORDANCE WITH JICA GUIDELINES FOR ENVIRONMENTAL AND SOCIAL CONSIDERATIONS OCTOBER 2011 PHASE IV (Improvement of Upper Marikina River & Construction of MCGS) PHASE II & III (Improvement of Pasig River) PHASE III (Improvement of Lower Marikina River) Project Location Map TABLE OF CONTENTS Project Location Map List of Tables List of Figures Abbreviations and Measurement Units CHAPTER 1 INTRODUCTION…………………………………………………… 1 1.1 Purpose of Review and Supplemental Study…………..……………………… 1 1.2 Scope of Work…………………………………………………………………. 1 1.3 General Description of the Project…………………………………………….. 1 CHAPTER 2 REVIEW OF ECC AND EIS(1998)………………………………..... 3 2.1 Validity of ECC………………………………………………………………… 3 2.2 Compatibility of EIS(1998) with PEISS Requirements……………………….. 3 2.3 Compatibility of EIS(1998) with JICA Guidelines……………………………. 3 2.3.1 Overall Comparisons between EIS(1998) and JICA Guidelines……... 4 2.3.2 Public Consultation and Scoping……………………………………... 5 2.3.3 Summary of Current Baseline Status of Natural and Social Environment………………………………………………………….. 6 CHAPTER 3 CURRENT LEGAL FRAMEWORK FOR ENVIRONMENTAL AND SOCIAL CONSIDERATIONS IN THE PHILIPPINES…… 8 3.1 Overall Legal Framework……………………………………………………… 8 3.2 Procedures……………………………………………………………………… 8 3.3 Projects Covered by PEISS…………………………………………………….. 9 3.4 Responsible Government Institutions for PEISS………………………………. 11 3.5 Required Documents under PEISS…………………………………………….. 12 CHAPTER 4 SUPPLEMENTAL STUDY………………………………………… 17 4.1 Scope of Supplemental Study………………………………………………….. 17 4.2 Physical Environment…………………………………………………………. 17 4.2.1 Area of Concern………………………………………………………. 17 4.2.2 Air Quality Noise and Vibration……………………………………… 18 4.2.3 Water Resources……………………………………………………… 21 4.2.4 Water Quality…………………………………………………………. 21 4.2.5 Watershed…………………………………………………………….
    [Show full text]
  • Annual Procurement Plan FY 2021
    Page 1 of 14 National Housing Authority (NHA) Annual Procurement Plan for FY 2021 -Consulting Services Is this an Early Schedule for Each Procurement Activity Source of I Estimated Budget (PhP) Remarks Code Procurement PMOf Procurement Funds (brief description of Mode of Procurement AdvertisemenV Submissfon/O Notice of Contract Total MOOE CO (PAP) ProgramfProject End-User Activity? Posting of pening of Bids Award Signing Program/Activity/Project) (Yes/No) fBIREI COMMUNITY SUPPORT SERVICES DEPARTMENT (CSSD) Consulting Services for the 1 review and Development of CSSD NO NP-53.9 - Small Value Procurement iridkateQate NlA ltll;ic8te"Oate. InCIicateDale Others 350,000.00 350,000.00 0.00 Source of Fund: EquipmentOuUay CBE Manual of Operations Consulting Services for 2 CSSD NO NP-53.9 - Small Value Procurement Indic"aIeDate NlA Others 605,000.00 605,000.00 0.00 Source of Fund: Equipment Oullay Customer Satisfaction Survey 1_"'" 1ndIea •• "... ProductionlPrinting of CBE 3 Manual of Operations CSSD NO NP-53.9 - Small Value Procurement InditateDate NfA _Dale fndiCafeDate Others 440,000.00 440,000.00 0.00 Source of Fund: Equipment Outlay Operations " Total Contract Price for CSSDD 1,045,000.00 1,045,000.00 0.00 .",', ;.; CORPORATE OPERATION AND SYSTEMS DEVELOPMENT DEPARTMENT (COSDD) ,~ e-' .. :fiI·;';ilI Procurement and Conduct of iOc ISO 1 Recertification/Certiflcanon: ",Ie .. it~ Maintenance/Surveillance ~/ Audits; I:; " " Recertification/Certification 1.1 COSDD NO NP-53.9 - Small Value Procurement Ina~Date NfA _oar. ~eDate Others 650,000.00
    [Show full text]
  • AFPPS Procurement Guide
    2nd Edition (2017) Webpage: www.afpps.com.ph “Whilst the amateur thinks operations, the professional thinks logistics ” - MAJ GEN NORMAN SWARTZGOPF US ARMY GENERAL This handbook is designed to guide the readers on the Procurement System of the Armed Forces of the Philippines in order to provide easy and convenient reference on its underlying processes. TABLE OF CONTENTS • AFP Procurement Service (AFPPS) - - - - - - - - - - - - - - - - - - 1 • AFPPS Vision, Mission, Capabilities - - - - - - - - - - - - - - - - - 3 • AFPPS Organizational Chart - - - - - - - - - - - -- - - - - - - - - - - 4 • Procurement Centers - - - - - - - - - - - - - - - - - - - - - - - - - - - 5 • Philippine Army Contracting Offices - - - - - - - - - - - - - - - - - 6 • Philippine Airforce Contracting Offices - - - - - - - - - - - - - - - 8 • Philippine Navy Contracting Offices - - - - - - - - - - - - - - - - - 9 • GHQ/ KBUs/ AFPWSSUs Contracting Offices - - - - - - - - - - - 10 • Bids and Awards Committee (BAC) Secretariats - - - - - - - - - 11 • Acronyms and Terminologies - - - - - - - - - - - - - - - - - - - - - - 14 • Some Significant Provisions of RA 9184 and its IRR- - - - - - - 15 • APP Preparation Flow Chart for Major Services - - - - - - - - - - 21 • APP Preparation Flow Chart for Program 4 Units - - - - - - - - - 22 • APP Preparation Flow Chart for Key Budgetary Units - - - - - - 23 • Procurement Methods - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 24 • Bid, Performance and Warranty Securities - - - - - - - - - - - - - - - - - - 25 • Government
    [Show full text]
  • PA Citizen's Charter 2019
    PHILIPPINE ARMY CITIZEN’S CHARTER 2019 (1st Edition) PHILIPPINE ARMY CITIZEN’S CHARTER 2019 (1st Edition) 1 I. Mandate The Philippine Army organizes, trains and equips forces for the conduct of prompt and sustained operations on land. II. Vision By 2028, a world- class Army that is a source of national pride. III. Mission To develop, organize, train, equip, support, and sustain Army Forces for the conduct of prompt and sustained ground operations to accomplish the AFP mission. IV. Service Pledge We the officer, enlisted personnel and civilian employees of the Philippine Army, undertake to uphold: ❖ Honor ❖ Duty, and ❖ Patriotism We also commit to attend to all applicants or requesting parties who are within the premises of the agency prior to the end of official working hours and during lunch break. We therefore, guarantee that our services shall be in accordance with law, rules and regulations, so help us God. 2 V. List of Service Headquarters Philippine Army (Central Office) External Services Appeal for Re-entry/Re-CAD of Officers............................................................ 6 Appeal for Re-Instatement of former Enlisted Personnel................................... 7 Authentication of Documents............................................................................. 8 Claims for Special Financial Assistance (SFA KIA) –PMS................................ 9 Disposition of Domestic-Related Complaints/Reports....................................... 10 Investigation of other ESPA-Related Complaints/Reports ………...…………..
    [Show full text]
  • -- This Bill Seeks to Rectify Existing Infirmities in Republic Act 7227 Which Created the Bases Conversion and Development
    .-- This Bill seeks to rectify existing infirmities in Republic Act 7227 which created the Bases Conversion and Development Authority (BCDA), as amended by Republic Act 7917 by harmonizing its goal of accelerated economic development in former military base lands with that of Republic Act 7898, which mandated the modernization of the Armed Forces of the Philippines (AFP). In passing Republic Act 7227, it was the intent of the gth Congress that alternative uses of military base lands in Metro Manila, and ether military reservations covered by the 1947 RP-US Military Bases Agreement would promote the economic and social development of Central Luzon and of the whole country. One of the overriding concerns at that time was the need to generate funds to modernize the AFP into a credible force and thus fill the void in the national defense capability which was created by the departure of US military forces in Clark Air Base, Subic Naval Base and their extensions. Thus, the law provided that the largest percentage share from the net proceeds of the sale of former military bases should fund the modernization of the AFP. However, the main mandate of the BCDA is to make money - not only from the sale of former base lands but also through lease and joint venture arrangements. While Republic Act 7898 provides that funds for the modernization of the AFP may be generated through the sale, lease or joint-ventures of portions of military reservations, the share of the AFP in BCDA controlled areas under Republic Act 7227 is limited only to the net proceeds of the actual land sale.
    [Show full text]
  • Summary of Processing and Disbursement Projections
    TA 4293: PHILIPPINES CAPACITY BUILDING FOR HOUSING MICROFINANCE FINAL REPORT b. Electricity; c. Sanitation, sewerage and solid waste management services and/or facilities; d. Access to primary roads and means of transportation; e. Footpaths, drainage and road networks; f. Community facilities such as open spaces, community/health/livelihood/daycare centers; and g. Schools. The provision of these basic services and facilities shall be planned and given priority for implementation by the City Government and other concerned agencies in cooperation with the private sector and the community beneficiaries. The City Government shall ensure that these basic services are provided at the most cost-efficient rates. SECTION 24. LIVELIHOOD COMPONENT – To the extent feasible, socialized housing and resettlement projects shall be located near areas where employment opportunities are accessible. The City Government shall also provide assistance in helping the community beneficiaries gain access to affordable shelter finance, microenterprise or skills training, and microfinance facilities. ARTICLE IX - RELATED STRATEGIES SECTION 25. COMMUNITY PARTICIPATION – The Board shall adopt a community-driven approach to planning and development, and shall afford the program beneficiaries or their duly designated representatives an opportunity to be heard and to participate in the decision-making process over matters involving the protection and promotion of their collective interests and welfare which shall include appropriate documentation and feedback mechanisms. They shall also be encouraged to organize themselves and undertake self-help cooperative housing and other livelihood activities. The communities shall assist the City in preventing the incursion of lawless elements, professional squatters and members of squatting syndicates into their areas. SECTION 26.
    [Show full text]
  • The Philippine Crocodiles
    MARITIME REVIEW A Publication of The Maritime League Issue No. 17-2 March-April 2017 NAVAL BASES FOR NEW SEA FRONTIER NS Bicobian FVR: P. Du30's Top Priority CONTENTS CONTENTS The Maritime League CHAIRMAN EMERITUS Hon. Fidel V. Ramos HONORARY CHAIRMAN Hon. Arthur P. Tugade TRUSTEE AND PRESIDENT Commo. Carlos L. Agustin AFP (Ret) TRUSTEE AND VICE PRESIDENT Herminio S. Esguerra TRUSTEE AND TREASURER RAdm. Margarito V. Sanchez AFP (Ret) TRUSTEE AND AUDITOR Edgar S. Go TRUSTEES Plaridel M. Abaya Vicente F. Aldanese , Jr. Doris Teresa M. Ho Hector E. Miole Manila North Harbour Port, Inc. VAdm. Eduardo Ma R. Santos AFP (Ret) Alberto H. Suansing Commo. Gilbert D. Rueras PCG (Ret) Sets the pace as partner for growth Delfin J. Wenceslao SECRETARY anila North Harbour Port, Atty. David R. Simon Inc. (MNHPI) continues Mto scale a sterling record ASSISTANT SECRETARY for port operations, steadfast on its John Paul D. Agustin modernization program for the Manila North Harbor. SECRETARIAT Rosalie F. Ricafort Keen on providing the environment for growth, new equipment are set in Maritime Review place together with enhanced IT and management services. EDITORIAL BOARD Berths now accommodate longer and bigger vessels. MNHPI produc- Chairman tivity is at a record pace and port VAdm. Emilio C. Marayag AFP (Ret) capacity has increased to 2.5 million Vice Chairman TEUs. RAdm. Quiricio Evangelista AFP (Ret) With a global outlook, MNHPI continues to delivery quality services Members Commo. Mariano S. Sontillanosa AFP (Ret) and improve port facilities, spurring Capt. Tomas D. Baino PN (Ret) economic growth and building the John Paul D.
    [Show full text]
  • G.R. No. 192896. July 24, 2013
    ~epubhc of tbe !lbilipptnes $->uprente QCourt ;fflflnnila FIRST DIVISION DREAM VILLAGE NEIGHBORHOOD G.R. No. 192896 ASSOCIATION, INC., represented by its Incumbent President, GREG SERIEGO, SERENO, C.J, Petitioner, Chairperson, LEONARDO-DE CASTRO, BERSAMIN, VILLARAMA, JR., and -versus- REYES, JJ. BASES CONVERSION Promulgated: DEVELOPMENT AUTHORITY, Respondent. L2 4 .2013 DECISION REYES, J.: Before us on Petition for Review 1 under Rule 45 of the Rules of Court is the Decision2 dated September I 0, 2009 and Resolution3 dated July 13, 20 I 0 of the Court of Appeals (CA) in CA-G.R. SP No. 85228 nullifying and setting aside for lack of jurisdiction the Resolution4 dated April 28, 2004 of the Commission on the Settlement of Land Problems (COSLAP) in COS LAP Case No. 99-500. The fallo of the assailed COS LAP Resolution reads, as follows: WHEREFORE, premises considered, judgment is hereby rendered as follows: Rollo. pp. 24-46. Penned by Associate Justice Priscilla J. Baltazar--Padilla. with Associate Justices Josefina Guevara­ Salonga and Celia C. Librea-Leagogo. concurring; id. at 55-67. 1 ld.at71-72. ld.at 112-116. Decision 2 G.R. No. 192896 1. Declaring the subject property, covering an area of 78,466 square meters, now being occupied by the members of the Dream Village Neighborhood Association, Inc. to be outside of Swo-00-0001302 BCDA property. 2. In accordance with the tenets of social justice, members of said association are advised to apply for sales patent on their respective occupied lots with the Land Management Bureau, DENR-NCR, pursuant to R.A.
    [Show full text]
  • Newsletter 2Ndedit.Pub
    About O C D INSIDE Serving the Nation, Protecting the People Disasters impact our nation more As the Office of Civil Defense than the number of deaths, injuries commemorates its 60th Founding Pre-Disaster and missing, and even more than the Anniversary, it is reminded of the sad Risk Assessment amount of damages to infrastructure, realities that disasters bring to our agriculture and economy. Beyond the country and our people. Given the page 4 statistics are stories of despair, fear primary mission of administering the and hopelessness from people country’s disaster risk reduction and Earthquake Drill affected, especially from those who management (DRRM) program, OCD page 5 are already suffering from poverty. unceasingly work to reduce the Families lose breadwinners. vulnerabilities and raise the Communities lose livelihood. Filipinos capabilities of communities against Disaster Consciousness lose opportunities with economic and natural and man-made hazards. social development either held back Month or delayed due to disasters. Under principles of good governance, page 6 OCD continues to build a culture of It is in this same context that the excellence within the organization in NDRRMC, MTRCB Office of Civil Defense was born. The order to facilitate the delivery of people’s suffering during World War programs, projects and actions. In Partnership II, the country’s vulnerability and the context of DRRM, this culture of page 7 exposure to hazards, and the nuclear excellence means more and better arms race of world superpowers government actions that will ensure prompted the government to pass the communities are better prepared. New NDDRM Civil Defense Act of 1954, Operations Center establishing the National Civil Sixty years may have passed, yet page 8 Defense Administration, or NCDA.
    [Show full text]