Imperial College Building Bridges 2007 Expedition Report

Total Page:16

File Type:pdf, Size:1020Kb

Imperial College Building Bridges 2007 Expedition Report IMPERIAL COLLEGE BUILDING BRIDGES 2007 EXPEDITION REPORT An expedition to complete the construction of a footbridge across the North Rukuru River at Uledi, on the north western corner of the Nyika National Park, in Northern Malawi. Imperial College BUILDING BRIDGES 2007 Expedition Report Northern Malawi Thursday 28 th June - Wednesday 1 st August 2007 Aim To complete the construction of a suspended footbridge across the North Rukuru River near Uledi, and to protect the adjacent river bank. www.imperial.ac.uk/expeditions Editor DANIEL CARRIVICK 25 Hamilton Road, Tiddington, Stratford-Upon-Avon, Warwickshire, CV37 7DD. England [email protected] Published by: Imperial College London, South Kensington, London, SW7 2AZ. Mar 2008. All information published here is given in good faith and is correct and accurate to the best of our knowledge. We therefore accept no responsibility for any loss, injury or inconvenience sustained from anyone using this report. -0- IMPERIAL COLLEGE BUILDING BRIDGES 2007 EXPEDITION REPORT Contents Maps A & B – Malawi maps (fold out sheet) Summary 2 Introduction 3 Expedition members 4 Naomi Bessey 4 Daniel Carrivick 4 Harriet Kirk 5 Jumana Al-Zubaidi 6 Li-Teck Lau 6 Engineering Report 7 Summary 7 Background 7 Aim 7 Planning and Preparation 7 Method 8 Results & Future Work 17 Discussion 17 Bibliography 18 Administration & Logistics 20 Training 20 Permission & Permits 21 Fund Raising 21 Finances 22 Insurance 23 Travel 23 Food 24 Accommodation 26 Communications 27 Clothing & Equipment 28 Risks 29 Medical Issues 30 Environmental Impact 31 Photography 32 Diary 34 Leaving London 34 Shopping in Lilongwe 35 To Nyika National Park 36 Arrival in Uledi 37 Handrail Cable Installation 38 Walkway Cable Installation 39 Installing the Suspender Cables 40 Laying the Decking 41 Concreting the Cables 42 Protecting the East Bank 43 Protecting the West Bank 44 Official Opening 45 Leaving Uledi 46 Snorkelling at Nkhata Bay 47 Back to Lilongwe 48 Conclusion 49 Acknowledgements 50 Appendices 51 Appendix A – Group Equipment List 51 Appendix B – Personal Clothing & Equip 53 Appendix C – First Aid Kit List 54 Appendix D – Construction Equipment 56 Appendix E – Food List 58 Appendix F – Finances 60 Appendix G – Risk Assessment 62 Appendix H – 2006 Expedition Summary 63 Appendix J – Tambuka Words 64 Address List 64 Bibliography 65 Books 65 Maps 66 Distribution List 66 Bridge Plans – Design sketches 68 Maps C & D – Uledi maps (fold out sheet) -1- IMPERIAL COLLEGE BUILDING BRIDGES 2007 EXPEDITION REPORT Below – Harriet walks the next piece of decking out to be laid. Inset – Naomi slides the suspender cables into position. SUMMARY By Daniel Carrivick OUTCOME This team of five students from Imperial College, London travelled to Malawi to complete the construction of a footbridge across the North Rukuru River at Uledi, on the north western corner of Nyika National Park. This work followed on from the previous expedition in 2006, which surveyed the site, laid down the foundations, and constructed the towers and anchorage for a thirty-seven metre span suspended bridge. The team achieved their aim, much to the appreciation and delight of the community and the national park, who now use the bridge daily to cross the river to collect firewood and patrol against poachers. EXPEDITION SUMMARY This expedition was organised by Naomi Bessey and Daniel Carrivick who were part of the team that travelled to Malawi in the summer of 2006. They were joined by Harriet Kirk, who acted as chief site engineer having helped with the design the previous year, and two other civil engineering undergraduates: Li-Teck Lau and Jumana Al-Zubaidi. The first week was spent in Lilongwe collecting food and equipment supplies while clearing the import duty on the cables, which had been flown out the previous year by airfreight. After several visits to the Malawi Revenue Authority (MRA) and with the help of senior officials from the Department of National Parks & Wildlife (DNPW), the team finally got the permission they required and the import duty was subsequently waived. Having collected the half tonne shipment of cables and accessories from the airport, the team travelled north, stopping overnight at Mzuzu to collect perishable foods, and again at Chelinda to meet park officials, pick up their scout and collect wood from the sawmill. To the teams’ relief the site was in much a similar state as to how it was left ten months previously - just a lot more overgrown. The wet season had brought more rain than normal, but the river had stayed within its banks and did not flood the surrounding area. Work soon began on clearing the site and unearthing the access pits, which had been filled in for safety. Within a few days of arriving in Uledi, one member of the team became ill with a high temperature and feverish symptoms. No improvement was seen over the next few days so the individual was sent to Mzuzu to see a doctor who diagnosed Malaria. A course of drugs were taken and the patient recovered fully within a week. However further tests done back home suggest this person never contracted Malaria. Some thirty people were employed from the community to assist with the completion of the bridge. A new minimum daily wage was adhered to which saw workers pay increase by 23% (real terms) from the previous year. The working day remained the same, from 7:30 am to 4:30 pm with a break for lunch between 11:30 am and 1 pm, over the hottest part of the day. Temperatures often reached the low to mid twenties centigrade and the strong sun was made bearable by the cool river and sometimes strong winds. Daylight hours were from 6 am to 6 pm so it was often dark by the time the team ate in the evening, once all the equipment had been removed from the site, the fire lit and the food cooked. The workers were mainly given the task of collecting materials. Vast quantities of earth were moved to build embankments on the approach to each tower. A soft engineering approach was used to build retaining walls for this earth. This involved filling woven sacks with earth and staking them with metal rods into the ground. Meanwhile sand and gravel were gathered for concreting and boulders were used for armouring the bank and towers. The whole workforce helped to unroll the cables and carry them across difficult terrain to the site. A great deal of manpower was again required to haul the cables across the river. The cables were then fastened once they had been raised into place using a sequence of pulleys and grips. Members of the expedition team used specialist high ropes equipment to fasten adjoining cables and lay the decking. The bridge was left to settle under its own weight before the final adjustments were made and the cables concreted into place. With the bridge out of bounds while the concrete set, work concentrated on clearing the river channel from low branches, protecting the river bank in front of the towers and building up the earth embankments behind the towers. The large felled branches were sectioned and manhandled upstream where they were held in place on the east bank by stakes. The area behind each log was then backfilled with large boulders. These were covered with a steel mesh to hold everything in place forming a new tiered riverbank. Meanwhile the west bank was covered with steel mesh, which was weighed down with some left-over lengths of railway track and pinned against the river cliff with twenty inch long metal stakes driven into the earth. The mesh was designed to hold loose blocks of rock in place to prevent collapse and further erosion of the bank. A last minute rush ensured all the finishing touches were applied to the bridge before the opening ceremony held at 2 pm on Wednesday 25 th July. The chief of Uledi and the senior national park officer from Chelinda both spoke to a large crowd that had assembled, before jointly declaring the bridge open. Officials then crossed the bridge one at a time, followed by the local workers and the rest of the community. Useful tools and leftover materials were then handed over to the chiefs for the community to use in the future. That evening a meal was enjoyed by all and the celebrations went on long after darkness. Having successfully completed the bridge the team headed down to the Lake Malawi via Vwasa Marsh Nature Reserve for a few days of well earned rest and relaxation before returning safely home to England. -2- IMPERIAL COLLEGE BUILDING BRIDGES 2007 EXPEDITION REPORT INTRODUCTION By Naomi Bessey The North Rukuru River divides the community of Uledi, a remote farming community in Northern Malawi, situated on the north western corner of Nyika National Park (maps A & B) . Biosearch Expeditions, who visited the area in 2004, discovered that it was not possible to cross the river during the rainy season. The community was therefore effectively split in two for up to six months every year when the rains came. A bridge would allow the National Park scouts stationed in Uledi to patrol against poachers in the park all year round; villagers would also be able to gain year-round access to the school and markets. In addition, scientific surveys on the National Park’s flora and fauna could be carried out at different times of the year providing more complete data, than at present. In the summer of 2006, a five person expedition team, led by Daniel Carrivick and Naomi Bessey, set out to construct a footbridge across the North Rukuru.
Recommended publications
  • Circular Options for Building Services: Case Studies; 22 Gordon Street, Arup Circular Building Final Report: December 2018
    Circular options for building services: Case Studies; 22 Gordon Street, Arup Circular Building Final Report: December 2018 Ben Croxford (UCL), Ramon Mendoza (UCL), Simon-Joe Portal (Arup), Dimitrios Rovas (UCL) Project funders: The Bartlett Innovation Fund, and Arup UCL Institute for Environmental Design and Engineering (IEDE), The Bartlett, UCL Faculty of the Built Environment Executive summary The circular economy concept has gained momentum over recent years, but few have analysed its application to the building services sector. This project aims to contribute to unravelling this opportunity (and its constraints) as a joint interest between UCL IEDE, UCL Estates, and Arup, to create useful guidelines for the industry. Building services fall within the ‘sweet spot’ for applying circular economy strategies. Some of the sector’s biggest issues such as; specialty equipment with high (upfront) costs, fast obsolescence, maintenance issues and costs, and the well-known performance gap can be dealt with by applying some of the strategies discussed in this report. Using the Ellen MacArthur Foundation’s building blocks and ReSOLVE levers framework, the CIBSE TM56 report on Resource Efficiency in Building Services, and circular case studies found in the industry, this paper sets the base to understand the application of circular economy to building services. Two case studies are analysed: 22 Gordon Street, as a business-as-usual design and construction project with a standard RIBA stages process and The Circular Building by Arup, as a temporary test lab where circular strategies were tested and products assembled together and successfully dismantled at the end of use. Interviews were carried out with four decision-makers involved in the design of 22 Gordon Street and three in The Circular Building to understand the decisions (and reasons) that influenced the selection of certain building services and their circularity according to the previous literature guidelines reviewed.
    [Show full text]
  • Steel Focus 6
    FriDay 27/07/2012 in association with The british FriDay 27/07/2012 www.bdonline.co.uk 8 STEEL FOCUS STructuraL Steel Design awards 2012 constructional Steelwork 9 www.bdonline.co.uk Association and Tata steel seat building. Although the team fixed directly onto the outside AWARD considered using a steel arch, of the bowl, and seating terraces The Velodrome has distinctive it always favoured a cable-net were fixed directly to the inside cedar cladding and a lightweight Olympic double London 2012 roof solution, which had rarely with air-handling units inte- cable-net roof. been used in the UK on such a grated into the voids within the VELODRoME large scale. skeletal bowl structure. “Shrink- The structure consists of in- wrapping” the building envelope leads 2012’s Olympic Park, situ concrete for the lower bowl, on to the steel skeleton in this and structural steel for the cedar- way reduced the surface area and London clad upper bowl, topped by an cost of cladding. undulated steel perimeter ring The Velodrome achieved a steel winners Architect Hopkins Architects truss, which restrains the roof Breeam “excellent” rating, assist- Structural engineer cables. The cable-net includes 14 ed by its 29% recycled content, Expedition Engineering km of steel cable, with 36 main lightweight structure and use of Two of the sporting venues built for the cables arranged in pairs at 3.6m natural ventilation. Steelwork contractor centres. It is pulled down hard The judges were impressed by 2012 games are among the six top winners Watson Steel Structures Ltd on to the seating bowl structure the use of lean, sustainable de- for this year’s Structural Steel Design (Severfield-Rowen PLC) below, giving the venue its dis- sign to achieve an iconic sporting Main contractor ISG Construction tinctive roof form.
    [Show full text]
  • Roller Burnishing, Deep Rolling, Combined Skive-Burnishing Tools
    Tools & Solutions for Metal Surface Improvement Roller burnishing, Deep rolling, Combined skive-burnishing ECOROLL© AG ECOROLL© Corporation WERKZEUGTECHNIK TOOL TECHNOLOGY Mailing address: Address: Postfach 3142 502 TechneCenter Drive D-29231 Celle Germany Suite C Street address: Milford, OH 45150 USA Hans-Heinrich-Warnke Str. 8 D-29227 Celle Germany Phone: (00)1-513-248-4700 FAX: (00)1-513-248-4265 Phone: ++49(0) 5141-9865-0 E-Mail: [email protected] FAX: ++49(0) 5141-881440 Web: www.ecoroll.com E-Mail: mail@ec oroll.de Web: www.ecoroll.de . for a smooth operation © ECOROLL AG/ECOROLL Corp. 11-2006 Subject to revision ECOROLL AG Werkzeugtechnik & ECOROLL Corporation We design, manufacture and sell high quality tools and machines for improving metal surfaces and components. ECOROLL tools and solutions can be applied across a wide range of industries: • Automotive, aircraft and aerospace industries • Machine and engine construction • Power generation industry • Oil and gas industry • Medical technology Roller burnishing • Produces mirror-fi nish surfaces • Achieves a high surface bearing ratio • Increases hardness, decreases friction and wear • Features a short cycle, complete processing in one setting Deep rolling • Increases service life and fatigue strength • Induces residual compressive stresses and work hardening in the surface layer • Prevents or hinders stress corrosion crack formation or growth • Produces mirror-fi nish surfaces • Can process a wide variety of components • Features a short cycle, complete processing in one setting Combined skive- burnishing • For hydraulic and pneumatic cylinders • Mirror-fi nish surfaces decrease friction and wear • Decreases irregularities in circular form • Enhanced cutting speed up to 300 m per minute • Feed rates of 3–6 mm per revolution 2 ++49 (0) 5141-9865-0 www.ecoroll.com (00)1-513-248-4700 © ECOROLL AG/ECOROLL Corp.
    [Show full text]
  • STRUCTURAL STEEL DESIGN AWARDS 2017 Steel Sector’S Professionalism Highlighted at Awards
    www.newsteelconstruction.com STRUCTURAL STEEL DESIGN AWARDS 2017 25 No 9 October 2017 Vol In this issue Cover Image The Leadenhall Building, London Architect: Rogers Stirk Harbour + Partners Structural engineer: Ove Arup & Partners Ltd Steelwork contractor: Severfield Main contractor: Laing O’Rourke Client: C C Land Photo: © Thomas Graham/Arup October 2017 Vol 25 No 9 EDITOR Nick Barrett Tel: 01323 422483 Editor’s comment Editor Nick Barrett says a strong case for steel as a superior [email protected] 5 material for promoting collaborative working is made by this year’s crop of Structural DEPUTY EDITOR Martin Cooper Tel: 01892 538191 Steel Design Award winners. [email protected] PRODUCTION EDITOR Andrew Pilcher Tel: 01892 553147 News The Structural Steel Design Awards (SSDA) celebrated its 49th year with a [email protected] PRODUCTION ASSISTANT 6 ceremony at the Museum of London. Alastair Lloyd Tel: 01892 553145 [email protected] COMMERCIAL MANAGER Sector Focus: Structural Components NSC provides an overview of cellular beams, Fawad Minhas Tel: 01892 553149 [email protected] 10 examining types available and their key benefits. NSC IS PRODUCED BY BARRETT BYRD ASSOCIATES ON BEHALF OF THE BRITISH CONSTRUCTIONAL Structural Steel Design Awards A special feature detailing all of this year’s winners STEELWORK ASSOCIATION AND STEEL FOR LIFE IN ASSOCIATION WITH THE STEEL CONSTRUCTION 11 and shortlisted projects. INSTITUTE The British Constructional Steelwork Association Ltd 4 Whitehall Court, Westminster, London SW1A 2ES Introduction and Judges David Lazenby, Chairman of the SSDA judging panel was Telephone 020 7839 8566 Website www.steelconstruction.org 12 greatly impressed with the quality of submissions for this year’s Awards.
    [Show full text]
  • Collaboration and Conflict in Transnationally-Dispersed
    Syracuse University SURFACE Dissertations - ALL SURFACE December 2017 Collaboration and Conflict in rT ansnationally-Dispersed Zimbabwean Families William John Suk Syracuse University Follow this and additional works at: https://surface.syr.edu/etd Part of the Social and Behavioral Sciences Commons Recommended Citation Suk, William John, "Collaboration and Conflict in rT ansnationally-Dispersed Zimbabwean Families" (2017). Dissertations - ALL. 822. https://surface.syr.edu/etd/822 This Dissertation is brought to you for free and open access by the SURFACE at SURFACE. It has been accepted for inclusion in Dissertations - ALL by an authorized administrator of SURFACE. For more information, please contact [email protected]. Abstract Approximately one quarter of Zimbabwean adults left their country of birth during the past twenty years. These sojourners are increasingly dispersed as tightening immigration regimes in preferred destinations and fluctuating global opportunities lead them to places with fewer historical links to Zimbabwe. This dispersive process fractures many families between multiple international locations. Nevertheless, the idea of family remains centrally important to diasporans, who work with relatives around the world to care for children and elders, to acquire important documents like passports, and to prepare for an eventual return home. Following from performative and relational theorizations of kinship, this dissertation argues that collaborative projects are crucibles in which families are forged and reconfigured. This exploration of how dispersion shapes family life deploys three analytical lenses: history, space and technology. Contemporary journeys are historically linked to a century of dispossession and labor-migration in Southern Africa. Colonial governments used onerous “bioinformational regimes” to subjugate Africans and profit from their labor.
    [Show full text]
  • MAGAZINE Gear Technology and Automation Systems
    2016 / 2017 EN I DE MAGAZINE Gear Technology and Automation Systems Gear Technology: Internal gears with that Liebherr finish // P. 18 Automation Systems: Bin picking: We are targeting your workpiece // P. 20 In Practice: Case studies // P. 24 New vision system We are targeting your workpiece The Executive Directors of Liebherr-Verzahntechnik GmbH (from left to right): Dr. Klaus Finkenwirth, Dr. Christian Lang and Dr. Hans Gronbach Dear readers, We’re delighted that you are holding the fourth edition of Liebherr’s gear-cutting technology and automation systems magazine. This issue will showcase an abundance of innovations – you’ll see how we are transforming gear-skiving into a reliable pro- cess and thus creating new gear machining opportunities. We will present our new gear-shaping machine, which was specifically designed for high precision shaping of small pinions and multiple gear teeth, meeting the high standards of the aero- space industry. To round off the gear-cutting technology topics is our new grinding heads for internal gear teeth. Our automation division has revolutionary technology to offer as well – a new im- age recognition system for our bin picking robot application. Smaller components can now be picked from deeper bins in shorter cycle times. We also showcase the newly developed LP100 loading gantry, which coincides with the “rightsizing” trend. Every user can now find the optimum size of loading gantry for their needs in Liebherr’s portfolio. We would also like to introduce a new colleague, who has joined the Management Board of Liebherr-Verzahntechnik GmbH – Dr. Hans Gronbach. Dr. Gronbach has been the Chief Development and Design Engineering Officer since June 2016, and is responsible for championing innovation.
    [Show full text]
  • Automated Distribution Centre for Corus Mill Steel Stars at Film Studios
    JANUARY 2007 VOL15 NO1 NEW STEEL CONSTRUCTION www.new-steel-construction.com Automated Distribution Centre for Corus mill Steel stars at film studios Tied arch bridge a railway first Innovation gets top marks at Bristol school New Steel Constr 24/10/06 2:59 pm Page 1 When you want outstanding quality, service and support, ask for it by name. Advance™ is the new name for structural sections from Corus Whether you you are aar constructione a construction client, designer client, designer or contractoror contractor,, therthere ear ear manye many advantages advantages to to naming Corusnaming Corusas the as supplierthe supplier of of structural structural sections for your prsectionsoject. for Our your new project. Advance Our new™ Advancesection™ range provides morsectione prrangeoduct provides choice mor eand product is the choice easiest way to comply withand is thethe easiestnew Construction way to comply with Pr oductsthe new Regulations. Construction Products Regulations. To find out more about our new Advance™ sections range and how the changes will affect you visit www.advancesections.com or telephone +44 (0) 1724 405060. The things you can’t see make the difference 2 NSC January 2007 CONTENTS JANUARY 2007 VOL15 NO1 NEW STEEL CONSTRUCTION www.new-steel-construction.com Cover Image 007 STAGE, PINEWOOD STUDIOS Client: Pinewood Studios Architect: Foster Willis Structural Engineer: Adams Kara Taylor & Bourne Engineering Steelwork Contractor: Bourne Steel EDITOR 5 Editor’s comment Last year was an exceptional year for the UK’s Nick Barrett Tel: 01323 422483 [email protected] constructional steelwork sector and there is more to come in 2007, DEPUTY EDITOR argues Nick Barrett.
    [Show full text]
  • Nce June 2019
    Future of Skills p29 Edinburgh shop redevelopment p46 Market report p59 New Civil Engineer JUNE 2019 INNOVATION INSPIRATION AND IMPACT WE REVEAL THE CIVILS FIRMS MAKING THE BIGGEST WAVES Shining a light on effective stormwater management Accelerating urbanisation. Climate change. Extreme rainfall. 3 million UK properties risk fl ooding from surface water. See how we are rising to the challenge of excessive rainfall. wavin.co.uk/spotlight In partnership with 07940_WAV_Spotlight Ad_NCE_265x210_AW.indd 1 29/03/2019 12:07 New Civil Engineer INFRASTRUCTURE ARGUMENT NEEDS YOUR SUPPORT MARK HANSFORD EDITOR ight now you need not look too far for doom and gloom. central London stations needed major makeovers. Not least London Indeed, this month’s Inside Track is a wall-to-wall tale of Bridge with its British Construction Industry Award-winning redevel- woe with the latest in the Crossrail débâcle (rampant opment. The project also untangled complex track layouts with the R cost increases laid bare) the obvious stand-out story, help of some pretty hefty new infrastructure – notably the Borough but High Speed 2 and Tideway run it close with their Market Viaduct and Bermondsey Dive Under. And of course, gluing it own problems with procurement and unforeseen ground conditions. all together and unlocking extra capacity was a world first – the intro- And while it is fair and proper and right that within our industry we duction of Automatic Train Operation (ATO) overlaid on the European are open and transparent about the mistakes so that others can learn Train Control System of signalling. from them, we must also project confidence to the wider world and sell these projects.
    [Show full text]
  • New York City Department of Transportation (NYCDOT) Decreased to 793
    Appendix A BRIDGE CAPITAL PROGRAM East River Bridge Rehabilitation Plans A-1 Bridges Under Construction A-2 Component Rehabilitation A-3 Bridges Under Design A-4 216 2017 BRIDGES AND TUNNELS ANNUAL CONDITION REPORT APPENDIX A-1 MANHATTAN BRIDGE REHABILITATION ITEMS TOTAL ESTIMATED COST Est. Cost ($ in millions) Repair floor beams. (1982) 0.70* Replace inspection platforms, subway stringers on approach spans. (1985) 6.30* Install truss supports on suspended spans. (1985) 0.50* Partial rehabilitation of walkway. (1989) 3.00* Rehabilitate truss hangers on east side of bridge. (1989) 0.70* Install anti-torsional fix (side spans) and rehabilitate upper roadway decks on approach spans on east side; replace drainage system on approach spans, install new lighting on entire upper roadways east side, including purchase of fabricated material for west side of bridge. (1989) 40.30* Eyebar rehabilitation - Manhattan anchorage Chamber “C.” (1988) 12.20* Replacement of maintenance platform in the suspended span. (1982) 4.27* Reconstruct maintenance inspection platforms, including new rail and hanger systems and new electrical and mechanical systems; over 2,000 interim repairs to structural steel support system of lower roadway for future functioning of roadway as a detour during later construction contracts. (1992) 23.50* Install anti-torsional fix on west side (main and side spans); west upper roadway decks, replace drainage systems on west suspended and approach spans; walkway rehabilitation (install fencing, new lighting on west upper roadways
    [Show full text]
  • Workers Compensation Classifications Numerical Listing
    Florida Underwriting Guide FLORIDA ASSOCIATION OF INSURANCE AGENTS 367 WORKERS COMPENSATION CLASSIFICATIONS NUMERICAL LISTING Following is a listing of all Workers Compensation manual classifications, in numerical order. Special Florida classifications are indicated by “FL” following the classification wording. Code Classification Wording 0005 Farm: Nursery Employees & Drivers (FL) Tree or Shrub & Drivers 0008 Farm: Gardening – market or truck – & Drivers Farm: Potato & Drivers (FL) Farm: Vegetable & Drivers 0016 Fruit Picking By Contractors & Drivers (FL) Farm: Orchard & Drivers Farm: Turpentine & Drivers 0030 Sugar Cane Plantation & Drivers (FL) 0034 Farm: Egg or Poultry Producer & Drivers 0035 Farm: Florists & Drivers (FL) 0036 Farm: Dairy & Drivers 0037 Farm: Field Crops & Drivers Farm: NOC & Drivers 0042 Landscape Gardening & Drivers 0050 Grove Caretaking By Contractor & Drivers (FL Farm Machinery Operation – by contractor – & Drivers Hay Baling & Drivers 0052 Orchard and Grove Owners and Operators – All Operations & Drivers (FL) 0079 Vineyard & Drivers (FL) 0083 Farm: Cattle or Livestock Raising NOC & Drivers 0106 Tree Pruning, Spraying, Repairing, Trimming or Fumigating & Drivers 0113 Farm: Fish Hatchery & Drivers 0153 Lawn or Shrub Spraying & Drivers (FL) 0169 Farm: Goat or Sheep Raising & Drivers 0170 Farm: Animal Raising & Drivers 0173 Berry Farm & Drivers (FL) 0251 Irrigation Works Operation & Drivers 0400 Cotton Compressing & Drivers 0401 Cotton Gin Operation & Local Managers, Drivers 0917 Domestic Service Contractor – Inside 1005 Coal Mining – Surface & Drivers 1164 Mining NOC – not coal – Underground – & Drivers 1165 Mining NOC – not coal – Surface & Drivers 1218 Fuller’s Earth Mining & Drivers (FL) Phosphate Mining & Drivers (FL) 1320 Gas or Oil Lease Operator – Natural Gas – All Operations & Drivers Oil or Gas Lease Operator – All Operations & Drivers 1322 Oil or Gas Well: Cleaning or swabbing of Old Wells having previously produced gas or oil – by contractor – no drilling – & Drivers 1430 Lead Mfg.
    [Show full text]
  • A Revolution in Metalworking Fluids
    a revolution in metalworking fluids soluble & neat metalworking fluids smart engineering solutions Metalworking fluids are one of the most complex liquids owing to their chemistry and the environment in which they have to perform. The wide range of materials and applications means that it is not possible to develop one formulation that fits all requirements. It is therefore essential to offer a wide product range so that customers can confidently choose the metalworking fluid best suited to their process and application. As well as performance requirements, we recognise our customers’ commercial needs. By offering a range of high performance products we can help the customer balance criteria such as surface finish, the severity of the working environment and productivity, against cost. High performance chemistry comes at a higher price; for example, the machining of aerospace titanium compared to steel, requires smart and different engineering solutions. Complex chemistry, new materials and difficult applications require smart Gun Drilling Human Health engineering solutions. High Speed Quality Multi Material Environment Grinding Tapping HSE Cast Iron Reduce Coolant Usage Skiving Multi-applit cation Training CGI Low Residue Magnesium n ISO TRGS 611 Low Foaming Water Quality Roller Burnishine g Value Added Proposition m Acrylic Ejector Drilling Stainless Steel Performance Marine Alloys In nconel Increase Tool Life Assurance Aerospace Aluminium o Copper Brass Legislation Rer duce Operating Costs i Non Staining v Titanium Health & Safety Low Misting Equipment Turning Drilling n Operator Acceptance Boring Steel Financial Savings Low Odour E Composites Tungsten Carbide Cost Calculator Milling Sawing Production Efficiency Surface Finish Threading Reaming Technical Service Nickel Aluminium Extended Solution Life Innovation Innovation in materials and On the following pages, the table and graphs will help you identify candidate products in the engineering techniques must be Q8Oils range.
    [Show full text]
  • Download Article 503KB
    INFINITY CROSSES THE TEES WEALTH CREATION of the vehicles moving across FORCES TO the bridge. The self-weight of a OVERCOME pedestrian bridge is much less Arches work well under than the moving loads – people uniform loads as they stay in – making the bending forces in compression. However, when an arch a problem. the loads are non-uniform, Pedestrian bridges are often bending is introduced to the subject to changing forces arch. In bridges that carry roads because of the way people this isn’t too great a problem as walk across them, and because the self-weight of the structure pedestrians tend to group in is much more than the loads non-uniform ways when they to allow water traffic underneath DESIGN the bridge, meant that it had CONSIDERATIONS to have a longer span to allow The design of the Infinity a gradual rise and fall in height. Footbridge was guided by Lifts, which would have allowed many considerations including a shorter length, were dismissed the location of the central because they would have pier, maintenance problems broken the linearity of the path experienced on local bridges and increased construction and and striking a balance between maintenance costs. rigidity, cost, and thinness These constraints led to of form. main spans of 60 m and 120 m, INFINITY The design of the bridge also one of the longest spans for had to accommodate existing a pedestrian bridge in the uses of the river. A 1,000-metre UK. Starting out as a rough rowing course runs diagonally up sketch made during a train the river on the proposed site of journey back from the site, CROSSES THE TEES the bridge, making a symmetrical the bridge is an asymmetrical bridge with a single support double tied-arch with one arch out of the question because twice the height and length Stockton-on-Tees’ Infinity Footbridge opened In 2003, the Royal Institute of the area.
    [Show full text]