TULE RED RESTORATION PROJECT

TIDAL WETLAND

The Tule Red Restoration Project is a joint effort by the State and Federal Contractors Water Agency (SFCWA) and the RESTORATION GOALS / TARGET California Department of Water Resources (DWR) to open 610 creditable acres toward the 2008 USFWS Delta more than 400 acres of wetlands to daily tides in the southern Smelt OCAP Biological Opinion, including approximately Suisun Marsh to benefit native fish species. Located in Solano 400 acres of tidal and subtidal restoration, and County’s Grizzly Bay region, the site was historically managed approximately 200 acres of subtidal enhancement. as the Tule Red Duck Club. Prior to being diked off to create freshwater habitat favored by game ducks in the early 1900’s, LOCATION AND LANDOWNER this property was estuarine tidal habitat, providing tidal The site is currently owned by Westervelt Ecological inundation and seasonal fresh water inundation during wet Services (WES). Under an agreement with SFCWA, winter periods. This restoration project involves breaching WES provided the restoration design of the tidal marsh a natural berm to allow for full daily tidal exchange through wetlands and will oversee construction by the contractor. the interior of the project site and creation of a network of When the habitat restoration construction is completed, channels to convey water across the marsh plain. plans are to transfer the site to CDFW to own and manage. SFCWA is a joint powers authority comprised of the public water agencies that contract for delivery of water from FUNDING the State Water Project (SWP) and Central Valley Project. SWP funding will be utilized for all aspects of the project SFCWA and DWR are pursuing this project to help meet the including development, design, construction and ongoing 2008 U.S. Fish and Wildlife Service (USFWS) operations, maintenance and monitoring. OCAP Biological Opinion‘s requirement to restore 8,000 acres of tidal wetlands in the Delta and Suisun Marsh.

Tule Red is the first tidal restoration project counting toward the 8,000 acre requirement to break ground in fall 2016. When completed, the project will receive approximately 600 acres of credit toward the 8,000 acre requirement; this includes credits for enhancement of existing tidal wetlands and the creation of 420 acres of new wetlands. When the habitat restoration construction is completed, the plan is to turn the project over to the California Department of Fish and Wildlife (CDFW) to own and manage the site, with funding from DWR. Due to the site’s proximity to CDFW’s Wildlife Refuge, it is anticipated that CDFW will take on responsibility for the monitoring and management of the site with DWR providing SWP funding in perpetuity.

CALIFORNIA NATURAL RESOURCES AGENCY | RESOURCES.CA.GOV/ECORESTORE CALIFORNIA ECO RESTORE PROJECTS

TIMELINE 2016 / 2017 SUTTER (Target Construction Start Dates) N COUNTY „ Site Development and Planning: Westervelt/SFCWA – beginning 2011 5 99 Dutch Slough „ Design and Permitting:Fremont Westervelt/SFCWA Weir Adult Fish Passage – completed80 2016 Hill Slough

„ Construction: Westervelt/SFCWAMcCormack Williamson – beginning Tract fall YOLO 2016, completed fallTule 2018 Red 505 COUNTY Wallace Weir Fish Rescue Facility „ Ongoing Operations, Maintenance and Monitoring: CDFW and DWR – beginning2018+ 2018 SACRAMENTO (Target Construction Start Dates) 16 COUNTY PERMITTING Bradmoor Island 99 80 All permits have beenGoat acquired Island including:

SOLANO Grizzly Slough COUNTY „ Section 404 from the U.S. Army Corps of Engineers Lisbon Weir

„ Section 401 Water LQualityower Putah Certification Creek Realignment from the 5 RegionalLower Water Yolo Ranch Quality Control Board

Prospect Island „ Section 7 from USFWS Sherman Island: Whale’s Belly „ ConservationSouthport Levee and Development Commission (BCDC): Levee

12 Twitchell Island: West End CEQA/NEPA compliance – Complete Yolo Bypass Floodplain Rest oration

Winter Island PROJECT PROPONENT TULE RED „ Byron Buck COMPLETED (Construction Completed) State and Federal Contractors Water Agency [email protected] Knights Landing Outfall Gate 680 Lindsey Slough ADDITIONAL INFORMATION Sherman Island: Mayberry Farms State and Federal Contractors Water Agency LEGEND 4 Sherman Island: Whale’s Mouth Fish Passage Improvements Sherman Island: Mayberry Slough Floodplain Restoration Setback Levee CONTRA COSTA Twitchell Island: East End COUNTY Subsidence Reversal and Carbon Storage Tidal Restoration Yolo Bypass Boundary SAN JOAQUIN 0 5 10 20 Legal Delta and Suisun Marsh COUNTY Boundaries MILES COUNTY Water Bodies

CALIFORNIA NATURAL RESOURCES AGENCY | RESOURCES.CA.GOV/ECORESTORE