29102015O24w9vgpannexure
Total Page:16
File Type:pdf, Size:1020Kb
STANDARD TEMPLATE FORM – I, PRE FEASIBILITY REPORT & ENVIRONMENTAL MANAGEMENT PLAN & APPROVED MINING PLAN Of MINING OF BLACK GALAXY GRANITE – 1.0 HA SURVEY NO: 106/1P OF BUDHAWADA VILLAGE & CHIMAKURTHY MANDAL, PRAKASAM DISTRICT, ANDHRA PRADESH. By M/s. K.L. GRANITES PRIVATE LIMITED, D.NO: 1601, KANCHANAGANGA CO-OP SOCIETY LIMITED, J.P.ROAD, ANDHERI WEST, MUMBAI MAHARASHTRA - 400052 STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS/ ACTIVITIES S.No. Information required Information to be furnished by the proponent 1. Name of the project or activity M/s. K.L. Granites Private Limited Mining of Black Galaxy Granite – 1.0 Ha 2. Name of the organization/owner. Sri. Nawal B Agarwal Director 3. Address for communication # 1601, Kanchanaganga Co-Op Housing Society Limited, J.P.Road, Andheri West, Mumbai, Maharashtra -400052. 4. Telephone numbers 08592283066 5. Email ID of the organization or - contact person 6. Location of the Proposed project or Sy.No: 106/1P, activity Budhawada Village, Chimakurty Mandal, Prakasham District, Andhra Pradesh. 7. Appraisal Category (B2 or B1) Category B2 8. Nearest habitation and distance Ramatirtham - 1.3 Kms (NNW) from the project or activity 9. Installed capacity / Production 4,647 m3/annum Capacities 10. Specify the Fuel (Coal / CNG / Not applicable biomass/Others) and quantity required 11. Details of Land use/Land Cover The area is located on Topo Sheet No: 57 M/14 at the junction of Latitude 150 35’20.40” N and Longitude 790 48’ 39.14” E . The general height of the lease and adjacent to it is of the order of 60 mts above MSL. 12. Occupancy, ownership of the land Patta Land in which the activity is proposed: (Government land / Private land / Forest land /Revenue land /Temple land /leased land/ land belongs to other Department) 13. If it is a Forest land, the following Non Forest land details shall be furnished: (Whether it is a Reserved forest / Protected forest/Demarcated forest/ National Parks/ Sanctuaries/any land in possession of Forest Department.) (The village map with Sy. No. indicating nearest forest boundary line from the site shall be enclosed) 14. Total investment of the project/ Rs. 100 Lakhs activity. Funds allocated for EMP Rs. 3.78 Lakhs (Capital Cost) (capital cost and recurring cost per Rs. 2.25 Lakhs (Recurring Cost) annum) 15. Brief description of the project with During mining operations fugitive special reference to specific dust emissions will be generated, pollution and its control measures. which will be controlled by adopting wet drilling and Water sprinkling. Domestic waste water will be sent to Septic tank followed by soak pit. Noise levels may be increased during operations and these will be controlled with use of latest noise controlled equipment and conducting their periodical maintenance. 16. Compliance report on the following : i. Status of compliance of the Not Applicable conditions and environmental safeguards stipulated in the earlier clearance letters. ii. Details of the court cases, if any, No court case is pending against the pending in any Court of Law proposed project against the project as well as any directions passed by the Court relating to the project directly or indirectly. iii. Details of the notices, if any, Not Applicable given to the project under Section 5 of the Environmental (Protection) Act, 1986 and Section 18 of the Air (Prevention & Control of Pollution) Act, 1981. 17. Whether the project attracts the No provisions laid under the OM dt.16.11.2010 issued by the MoEF, GOI, w.r.t. violation of EIA Notification, 2006 and its amendments there of ? (Yes / No) Present stage and status of the Existing Mine and applied for EC Project : 18. Name of the Consultant: M/s.Vison Labs, Flat No. 205, N-Mart Building, Opp. RTA Office, Moosarambagh, Malakpet, Hyderabad - 500 036. FORM – 1 (As per new Notification of MoEF dated 01-12-2009 vide S.O 3067 (E)) (I) BASIC INFORMATION S.No. Item Details 1. Name of the project/s M/s. K.L. Granites Private Limited Mining of Black galaxy Granite – 1.0 Ha 2. S.No. in the schedule Item -1(a) 3. Proposed capacity /area/length/ Production capacity- 4,647 m3/annum tonnage to be handled/ command Mine Lease area – 1.0 Hectares area/lease area/ number of wells to be drilled. 4. New/Expansion/Modernization Existing Mine 5. Existing Capacity/Area etc. Not Applicable 6. Category of Project i.e. ‘A’ or ‘B’ Category B 7. Does it attract the general condition? No If yes, please specify. 8. Does it attract the specific condition? No If yes, please specify. 9. Location Latitude & Longitudes: 150 35’20.40” N – 790 48’ 39.14” E Plot/Survey/Khasra No. Sy.No: 106/1P, Village Budhawada Village, Tehsil Chimakurty Mandal, District Prakasham District, State Andhra Pradesh. 10. Nearest railway station/airport along Ongole – 28.0 Kms (ESE) with distance in kms. Vijayawada Airport – 150 Kms 11. Nearest Town, city, district Chimakurti – 5.0 Kms (E) Headquarters with distance in km. Prakasham - 28.0 km (ESE) 12. Village Panchayats, Zilla Parishad, Chimakurthy Panchayath, Municipal Corporation, Local body Chimakurthy Mandal, (complete postal addresses with Prakasham District, telephone nos. to be given) 13. Name of the applicant Sri. Nawal B Agarwal Director 14. Registered Address # 1601, Kanchanaganga Co-Op Housing Society Limited, J.P.Road, Andheri West, Mumbai, Maharashtra - 400052. 15. Address for correspondence: Name Sri. Nawal B Agarwal, Designation (Owner/Partner /CEO) Director Address # 1-7-70, Kanchanaganga Co-Op Housing Society Limited, J.P.Road, Andheri West, Mumbai, Maharashtra. Pin code 4000523 E-mail -- Telephone No. 08592283066 Fax No -- 16. Details of Alternative Sites examined, Not Applicable as this is a site specific if any. Location of these sites should project. be shown on a topo sheet. 17. Interlinked Projects Not Applicable 18. Whether separate application of Not Applicable interlinked project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves None approval/clearance under: if yes, details of the same and their status to be given. i. The Forest (Conservation) Act, 1980? ii. The Wildlife (Protection) Act, 1972? iii. The C.R.Z. Notification, 1991? 22. Whether there is any Government DMG Proceeding No: 47796/R3- Order/Policy relevant /relating to 1/2011, Dated 29-12-2011and the the site? lease was executed vide ADMG Proceeding No: 6041/Q/2007 Dated 11-01-2012 for a period of 20 Years and Mining Plan approval Lr. No: 2026/MS/OGL/2015, Dated 15-10- 2015. 23. Forest land involved (hectares) No Forest Land is involved 24. Whether there is any litigation No litigation or court case is pending pending against the project and/or against the proposed project. land in which the project is propose to be set up? a) Name of the Court b) Case No. c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist Yes/ Details thereof (with confirmation No approximate quantities / rates, wherever possible) with source of information data 1.1 Permanent or temporary change Yes The mining will be done by in land use, land cover or opencast semi mechanized topography including increase in method. There will be intensity of land use (with respect permanent changes in land to local land use plan) use, land cover and topography. 1.2 Clearance of existing land, No Not Applicable vegetation and buildings? 1.3 Creation of new land uses? Yes The mining activity will result in pits: therefore land use of Mine Lease area will be changed. At the end of the mining operation, proposed lease area are would be used as water reservoir. 1.4 Pre-construction investigations Yes Preliminary investigations e.g. bore houses, soil testing? have been carried out at the proposed QL area and the reserves were estimated. 1.5 Construction works? Yes No major construction activities are proposed during plan period. Only temporary Office rooms, Rest shelter, Drinking water facilitates, First Aid room are provided in the quarry lease area. 1.6 Demolition works? No No demolition works involved. 1.7 Temporary sites used for No No need for construction of construction works or housing of housing for workers. The construction workers? labourers come from nearby villages and go back at the end of shift. 1.8 Above ground buildings, No Not Applicable structures or earthworks including linear structures, cut and fill or excavations. 1.9 Underground works including No No underground mining or mining or tunneling? tunneling is envisaged. 1.10 Reclamation works? Yes The entire area will be converted to water reservoir. 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing Yes Proposed average annual processes? production of Black Galaxy Granite will be 4,647 m3 Open cast semi-mechanized method will be followed. 1.14 Facilities for storage of goods or Yes Stock yard and waste dump materials? yard facilities are identified for storage of blocks and waste rock in the quarry lease area. 1.15 Facilities for treatment or disposal Yes About 7,841 m3 of waste in of solid waste or liquid effluents? every year and about 39,205 m3 of waste in first plan period and about 1,01,933 m3 of waste in entire lease period of the mine will be generated. The waste that will be generated will be dumped in existing waste dump temporarily located in Sy.No: 140/1 of Budhawada Village, Chimakurthy Mandal, Prakasham District to a total extent of 5.69 Acres, which is located in NW direction.