Schedule of Decisions
Total Page:16
File Type:pdf, Size:1020Kb
Schedule of Decisions Control of Development and Advertisements The Development Control Committee received and considered the following applications: Item no: 01 Appn Ref No: Applicant: Parish: 16/1095 Riverside Group Carlisle Date of Receipt: Agent: Ward: 22/12/2016 16:02:45 Morton Location: Grid Reference: Land between Seatoller Close, Highfield Avenue 338106 554196 and Ashness Drive, (Isobel's Green), Carlisle Proposal: Installation Of Sustainable Urban Drainage System (SUDS Pond) Grant Permission 1. The development shall be begun not later than the expiration of 3 years beginning with the date of the grant of this permission. Reason: In accordance with the provisions of Section 91 of the Town and Country Planning Act 1990 (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004). 2. The approved documents for this Planning Permission comprise: 1. the submitted planning application form received 22nd December 2016; 2. the Red Line Boundary Plan (drawing no. K33457/A3/10A) received 3rd January 2017; 3. the Layout Plan (drawing no. K33457/A1/11) received 4th January 2017; 4. the Surface Water Drainage Details (drawing no. K33457/A1/02) received 22nd December 2016; 5. the Drainage Layout (drawing no. K33457/A3/01B) received 22nd December 2016; 6. the Topographical Survey (drawing no. 16F198/001) received 22nd December 2016; 7. the Sustainable Drainage Scheme Feasibility Study received 22nd December 2016; 8. the Design and Access Statement received 22nd December 2016; 9. the Eden Rivers Trust - Sustainable Drainage System received 22nd December 2016; 10. the Notice of Decision; and 11. any such variation as may subsequently be approved in writing by the Local Planning Authority. Reason: To define the permission. 3. Before any development takes place, a plan shall be submitted for the prior approval of the Local Planning Authority reserving adequate land for the parking of vehicles engaged in construction operations associated with the development hereby approved, and that land, including vehicular access thereto, shall be used for or be kept available for these purposes at all times until completion of the construction works. The plan shall demonstrate the provision within the site for the parking, turning and loading and unloading of vehicles and for vehicles to enter and leave the site in a forward direction. The plan shall also include details of the anticipated number and type of vehicles to visit the site and measures the applicant intends to take to ensure the footway and carriageway remain safe at all times. Reason: The carrying out of this development without the provision of these facilities during the construction work is likely to lead to inconvenience and danger to road users and to support Local Transport Policy LD8. 4. The access and parking/turning requirements shall be substantially met before any building work commences on site so that constructional traffic can park and turn clear of the highway. Reason: The carrying out of this development without the provision of these facilities during the construction work is likely to lead to inconvenience and danger to road users and to support Local Transport Policy LD8. 5. The SUDS pond shall not be brought into use until full details of the proposed boundary treatment to be installed around the pond have been submitted to and approved in writing by the Local Planning Authority. The boundary treatment shall then be installed in accordance with these details. Reason: In the interests of the safety of young children. 6. The SUDS pond shall not be brought into use until full details of the proposed landscaping to be planted around the edge of the pond have been submitted to and approved in writing by the Local Planning Authority. The landscaping shall then be installed in accordance with these details. Reason: To ensure that suitable landscaping is provided to enhance biodiversity in accordance with Policy GI3 of the Carlisle District Local Plan 2015-2030 and in the interests of the safety of young children. 7. Prior to the SUDS pond being brought into use, the applicant shall submit details of its proposed future maintenance and management for approval in writing by the Local Planning Authority. The SUDS pond shall then be maintained and managed in accordance with these details. Reason: To ensure that the SUDS pond is maintained and managed in accordance with Policy CC5 of the Carlisle District Local Plan 2015-2030. Relevant Development Plan Policies Item no: 02 Appn Ref No: Applicant: Parish: 16/0097 Mr Wannop Stanwix Rural Date of Receipt: Agent: Ward: 01/02/2016 23:00:13 Positive Planning Solutions Stanwix Rural Location: Grid Reference: Land adj Croft House, Brunstock, Carlisle, CA6 4QG 341647 559470 Proposal: Erection Of Dwellings (Outline) Members resolved to give authority to the Corporate Director (Economic Development) to issue approval for the proposal subject to a S106 legal agreement for a contribution towards affordable housing. Item no: 03 Appn Ref No: Applicant: Parish: 16/0974 Riverside Carlisle Carlisle Date of Receipt: Agent: Ward: 11/11/2016 11:02:51 Storm Tempest Ltd Morton Location: Grid Reference: Land to the rear of Ellesmere Way/Lyndhurst 337873 554225 Gardens, Carlisle CA2 6LZ Proposal: Creation Of 23no. Car Parking Spaces For Residents (2No. Spaces For Disabled Persons) Together With Construction Of Access Road; Installation Of Street Lighting; Footpaths And Retaining Wall Members resolved to give authority to the Corporate Director (Economic Development) to issue approval for the proposal subject to the receipt of a formal response from Cumbria County Council as the Highway Authority that raises no objection. Item no: 04 Appn Ref No: Applicant: Parish: 16/1089 Messrs Cooper Wetheral Date of Receipt: Agent: Ward: 20/12/2016 Jock Gordon Architectural Wetheral SVS Ltd Location: Grid Reference: Land between Wetheral Methodist Church and 346159 554478 Redcroft, Wetheral, Carlisle Proposal: Removal Of Condition 6 (Surface Water Drainage Standards) And Variation Of Condition 10 (Visibility Splays) Of Previously Approved Permission 15/0943 Grant Permission 1. In case of any "Reserved Matter" application for approval shall be made not later than 3rd December 2016, and the development shall be begun not later than whichever is the later of the following dates: i) The expiration of 3 years from 3rd December 2015, or ii) The expiration of 2 years from the final approval of the reserved matters, or, in the case of approval on different dates, the final approval of the last such matter to be approved. Reason: In accordance with the provisions of Section 92 of the Town and Country Planning Act 1990. (as amended by The Planning and Compulsory Purchase Act 2004). 2. The approved documents for this Outline Planning Permission comprise: 1. the Planning Application Form received 20th December 2016; 2. the Plan Showing Visibility Splays received 3rd March 2017 (Drawing No. 3023/1F); 3. the Foul/Surface Water Drainage received 2nd March 2017; 4. the Notice of Decision; 5. any such variation as may subsequently be approved in writing by the Local Planning Authority. 3. Before any work is commenced, details of the layout, scale, appearance, access and landscaping of the site (hereinafter called "reserved matters") shall be submitted to and approved by the local planning authority. Reason: The application was submitted as an outline application in accordance with the provisions of Article 3 of the Town and Country Planning (General Development Procedure) (England) Order 2015. 4. Samples or full details of all materials to be used on the exteriors shall be submitted to and approved in writing by the Local Planning Authority before any work is commenced. The development shall then be undertaken in accordance with the approved details. Reason: To ensure the materials are appropriate to the building and character of the area in accordance with Policy SP6 of the Carlisle District Local Plan 2015-2030. 5. Details of the relative heights of the existing and proposed ground levels and the height of the proposed finished floor levels of the dwellings and garages shall be submitted to and approved in writing by the Local Planning Authority before any site works commence. The development shall then be undertaken in accordance with the approved details. Reason: In order that the approved development is appropriately located within the topography of the land in accordance with Policy SP6 of the Carlisle District Local Plan 2015-2030. 6. No development approved by this permission shall be commenced until a scheme for the provision of surface water drainage works has been approved in writing by the Local Planning Authority. Such a scheme shall be constructed and completed in accordance with the approved plans. Reason: To ensure a satisfactory means of surface water disposal and in accord with Policy CC5 of the Carlisle District Local Plan 2015-2030. 7. No development approved by this permission shall be commenced until a scheme for the conveyance of foul drainage has been submitted to and approved in writing by the Local Planning Authority. The development shall then be undertaken in accordance with the approved plans. No part of the development shall be brought into use until such time that the foul drainage system has been constructed and completed in accordance with the approved plans. Reason: To prevent pollution of the water environment in accordance with Policy IP6 of the Carlisle District Local Plan 2015-2030. 8. Prior to the commencement of development