Government of India Ministry of Tourism Rajya Sabha Unstarred Question No. †1891 Answered on 09.07.2019 Inclusion of Places Re

Total Page:16

File Type:pdf, Size:1020Kb

Government of India Ministry of Tourism Rajya Sabha Unstarred Question No. †1891 Answered on 09.07.2019 Inclusion of Places Re GOVERNMENT OF INDIA MINISTRY OF TOURISM RAJYA SABHA UNSTARRED QUESTION NO. †1891 ANSWERED ON 09.07.2019 INCLUSION OF PLACES RELATED TO LORD RAM IN RAMAYANA CIRCUIT †1891. SHRI RAM NATH THAKUR: Will the Minister of TOURISM be pleased to state: (a) the details of the places related to lord Ram included in the proposed Ramayana circuit to promote the religious tourism in Bihar; (b) the planning of Government for the development of this circuit and infrastructure at these religious places for the tourists; and (c) the amount made available for this purpose so far and details of the work completed? ANSWER MINISTER OF STATE FOR TOURISM (INDEPENDENT CHARGE) (SHRI PRAHLAD SINGH PATEL) (a) to (c): The Ministry of Tourism has initially identified fifteen destinations for development under the Ramayana Circuit theme of Swadesh Darshan Scheme namely Ayodhya, Nandigram, Shringverpur & Chitrakoot (Uttar Pradesh), Sitamarhi, Buxar & Darbhanga (Bihar), Chitrakoot (Madhya Pradesh), Mahendragiri (Odisha), Jagdalpur (Chattisgarh), Nashik & Nagpur (Maharashtra), Bhadrachalam (Telangana), Hampi (Karnataka) and Rameshwaram (Tamil Nadu). The Ministry has requested the State Governments to formulate project proposals to be undertaken under the Ramayana circuit for development. The projects are sanctioned subject to their adherence to relevant scheme guidelines, submission of suitable detailed project reports, availability of funds and utilization of funds released earlier. Based on the above, the Ministry has sanctioned the following projects under the Ramayana Circuit theme of Swadesh Darshan Scheme: (Amt. in crore) S. Name of State & Project Name Amt. Amt. No. Year Sanctioned Released 1. Uttar Pradesh Development of Chitrakoot and 69.45 52.17 (2016-17) Shringverpur 2. Uttar Pradesh Development of Ayodhya 133.31 66.65 (2017-18) The work is under progress for both the projects. ******* .
Recommended publications
  • Temples Name Sates Vaishno Devi Jammu & Temple, Kashmir Dedicated to Shakti, Mata Rani Badrinath Temple Uttarakhand Kedarnath Temple Uttarakhand
    Temples Name Sates Vaishno Devi Jammu & Temple, Kashmir Dedicated to Shakti, Mata Rani Badrinath Temple Uttarakhand Kedarnath Temple Uttarakhand Golden Temple Amritsar, Punjab Markandeshwar Temple Haryana Hadimba devi Temple Himachal Pradesh Laxminarayan Temple ( New Delhi Birla Mandir ) Dilwara Temple Mount Abu, Rajasthan Kashi Vishwanath Temple- Varanasi, Uttar Dedicated to Lord Ganesha Pradesh Swaminarayan Akshardhan Delhi Temple Mahabodhi Temple Bodhgaya , Bihar Dakshnineswar kali Temple Kolkata Jagannath Temple - Puri, Odisha Dedicated to Jagannath God Kandariya Mahadev Madhya Temple- Part of Pradesh Khajuraho Temple Somnath Gujarat (Saurashtra ) Temple Siddhivinayak Temple- Located in Dedicated to Lord Ganesha Prabhadevi, Mumbai Maharashtra Balaji Venkateshwara Andhra Swamy Temple- Dedicated Pradesh to Lord Venkateshwara Lord Karnataka kalabhairah wara Temple Shi Dharmasthala Karnataka Manjunatheswara Temple Shi Dharmasthala Karnataka Manjunatheswara Temple Mureshwar Temple Karnataka Virupaksha Temple Karnataka Gomateshwara Bahubali Karnataka Temple Nataraja Temple- Tamil Nadu Dedicated to Lord Shiva Brihadeshwara Temple Thanjavur,Ta mil Nadu Jumbukeshwarar Temple Tamil Nadu Ranganathaswamy Temple- Tamil Nadu Dedicated to Lord Shiva Ekambareswarar Temple Kanchipuram, Tamil Nadu Sripuram Golden Temple- Vellore, Tamil Dedicated to Lord Shiva Nadu Padmanabhaswa Kerala my Temple Richest Temple of the world Sabarimala Temple Kerala Sukreswar Temple- Dedcated Assam to Lord Shiva Kamakhya Temple Assam Angkor Wat Temple- Largest Cambodia
    [Show full text]
  • Chief Engineers of At{ States/ Uts Pubtic Works Subject: Stand
    p&M n No. NH- 1501 7 / 33 t2A19 - lllnt r Govennment of India $ Ministry of Road Transport & Highways (Ptanning Zone) Transport Bhawan, 1, Partiarnent street, I.{ew Dethi - 110001 Dated the 16th August, 2019 To 1. The PrincipaL secretaries/ secretaries of atl states/ UTs Pubtic Works Departments dealing with National Highways, other centratty Sponsored Schemes & State Schemes 2. Engineers-in-Chief/ The Chief Engineers of at{ States/ UTs pubtic works Departments deating with National Highways, Other Centpatty Sponsored Schemes 3. The Chairman, Nationa[ Highways Authority of India (NHAI), G-5&6, Sector-10, Dwarka, New Dethi- 1rc075 4. The Managing Director, NHIDCL, 3'd Floor, PTI Buitding, 4-parliament Street, New Dethi - 110001 5. Director General (Border Roads), Seema Sadak Bhawan, 4- partiament Street, New Dethi - 1 10001 6. Att CE ROs / SE ROs Subject: Standard Operating Procedure for installation of kilometer stone as per rationalization in the numbering system of NHs and thereby renumbered NHs- Reg. Sir/ Madam, Ptease find enctosed herewith the Standard Operating Procedure for installation of kilometer stone as per rationalization in the numbering system of NHs and thereby renumbered NHs. State wise sanction ceiting is enclosed at Enclosure-;. is 2' lt requested to bring these to the notice of att concerned for comptiance with immediate effect and untiI further orders. 3- This issues with the concurrence of the Finance wing vide u.o. No. 356/TF-ll, dated 25 and approvat of the competent Authority. rs faithfulty, (5.P. Choudhary) Under Secretary to the rnment of India Tet. No. 01 1-23n9A28 f,nctosure: As above Page 1 of 57 c:\users\Hemont Dfiawan\ Desktop\Finat_sop_NH_km*stone*new_l.JH_ l6.0g.2019.doc - No.
    [Show full text]
  • The National Waterway (Kakinada-Puducherry Stretch of Canals and the Kaluvelly Tank, Bhadrachalam-Rajahmundry Stretch of River G
    THE NATIONAL WATERWAY (KAKINADA-PUDUCHERRY STRETCH OF CANALS AND THE KALUVELLY TANK, BHADRACHALAM-RAJAHMUNDRY STRETCH OF RIVER GODAVARI AND WAZIRABAD-VIJAYAWADA STRETCH OF RIVER KRISHNA) ACT, 2008 # NO. 24 OF 2008 $ [17th November, 2008.] + An Act to provide for the declaration of the Kakinada-Puducherry stretch of canals comprising of Kakinada canal, Eluru canal, Commamur canal, Buckingham canal and the Kaluvelly tank, Bhadrachalam-Rajahmundry stretch of river Godavari and Wazirabad- Vijayawada stretch of river Krishna in the States of Andhra Pradesh and Tamil Nadu and the Union territory of Puducherry to be a national waterway and also to provide for the regulation and development of the said stretch of the rivers and the canals for the purposes of shipping and navigation on the said waterway and for matters connected therewith or incidental thereto. BE it enacted by Parliament in the Fifty-ninth Year of the Republic of India as follows:- @ 1. % Short title and commencement. ! 1. Short title and commencement. – (1) This Act may be called the National Waterway (Kakinada-Puducherry stretch of Canals and Kaluvelly Tank, Bhadrachalam-Rajahmundry stretch of River Godavari and Wazirabad-Vijayawada stretch of River Krishna) Act, 2008. (2) It shall come into force on such date as the Central Government may, by notification in the Official Gazette, appoint. @ 2. % Declaration of certain stretches of rivers and canals as National Waterway. ! 2. Declaration of certain stretches of rivers and canals as National Waterway. -The Kakinada-Puducherry stretch of canals comprising of Kakinada canal, Eluru canal, Commamur canal, Buckingham canal and the Kaluvelly tank, Bhadrachalam- Rajahmundry stretch of river Godavari and Wazirabad-Vijayawada stretch of river Krishna, the limits of which are specified in the Schedule, is hereby declared to be a National Waterway.
    [Show full text]
  • Car Package New Size 2
    Tour Code: AP 03 Tour Code: AP 04 Nagarjuna Sagar-Srisailam Tour : Pancharamas-Annavaram-Bhadrachalam Tour 2 Days / 1 Night ` 7,199/- 5 Days / 4 Nights ` 17,799/- Departure :These tours can be arranged any time during the year. Departure :These tours can be arranged any time during the year. Places Covered : Nagarjuna Sagar, Ethipothala Water Falls -Srisailam Places Covered : Vijayawada-Mangala giri-Amaravathi-Rajahmundry- Papihills-Bhadrachalam-Dwaraka Tirumala Temple Nagarjunasagar Dam Day 01: Vijayawada Parnasala, Pick-up from Vijayawada - Transfer to Bhadrachalam Hotel. - Places of visits: Amaravathi (60 kms. / 1.5 hr) is an ancient Buddhist sculpture. Acharya Nagarjuna constructed the country’s largest stupa here, 2000 years back. It also has an Amareswara temple, one of the PANCHARAMAS. Later visit to Mangalagiri (45 kms. / 1 hr) - A renowned temple of Lord Narasimha situated on a hillock in Mangalagiri. The unique feature of this temple is that the mouth of the idol accepts half the quantity of Panakam (jaggery dissolved in water) offered by devotees. Proceed to Vijayawada (15kms.) and visit Sri Kanaka Durga Temple - One of the most popular temple in Vijayawada. It is located on hill Indrakeeladri overlooking the city as well as the River Krishna. Overnight stay. Day 02: Vijayawada-Rajahmundry After breakfast departure to Ksheeraramam (145 kms. / 3 hrs.) one of Day 01: Hyderabad-Nagarjuna Sagar-Sri sailam the PANCHARAMAS at Palakollu which is located near Narsapuram, proceed to Penugonda (17 kms. ) Sri Vasavi Kanyaka Parameswari Departure to Nagarjuna Sagar (170 kms. / 3 hrs.) Places of visits: Temple and departure to Ryali (26 kms. ) Sri Janganmohini Keshava Nagarjuna Sagar Dam (Largest Dam in India), Museum, Ethipothala Swamy Temple.
    [Show full text]
  • ICF Hindu Temple of Oklahoma Calendar of Events 2012 Vaishno Devi Temple
    ICF Hindu Temple of Oklahoma Calendar of Events 2012 Vaishno Devi Temple The first mention of the Mother Goddess is in the epic Mahabharat. When the armies of Pandavas and Kaurvas were arrayed in the battlefield of Kurukshetra, Arjun, the chief warrior of Pandavas upon the advice of Sri Krishna; meditated upon the Mother Goddess and sought Her bless- ings for victory. This is when Arjun addresses the Mother Goddess as ‘Jambookatak Chit- yaishu Nityam Sannihi- talaye’, which means ‘you who always dwell in the temple on the slope of the mountain in Jamboo’ (probably referring to the present day Jammu). Navratri Festival is cele- brated every year in Katra, the base camp of Sri Mata Vaishno Devi. On this auspicious occasion entire Katra town is decorated tastefully and people from the region participate in large numbers. In order to visit the Holy Shrine of Mata Vaishno Deviji, one has to reach Katra, a small town situated around 50 kms. from Jammu, the winter capi- tal of the state of Jammu & Kashmir. Katra serves as the base camp for the yatra. Katra is well connected to Jammu and Jammu, in turn, is well con- nected to the rest of the country by air, rail, and road. January 2012 Pushya - Magha Masa (Begins on 23rd ) Khara (Margazhi -Thai) (Dhanus - Makara) Sun Mon Tue Wed Thu Fri Sat 1 New Year 2 3 4 5 6 7 Muttangi Vaikuntha Ekadasi Sri Durga Pooja 6:30 PM Sri Venkateswara Seva 10:00 AM Pooja 6:30 PM Abhishekam 10:30 AM Ashtami 13:28:29 Navami 16:05:38 Dasami 18:42:43 Ekadasi 21:05:42 Dwadasi 23:03:17 Trayodasi 24:28:09 Chaturdasi 25:17:00
    [Show full text]
  • Assessment of Water Quality of Godavari River at Nashik, Maharashtra, India
    International Journal of Civil Engineering and Technology (IJCIET) Volume 7, Issue 1, Jan-Feb 2016, pp. 83-92, Article ID: IJCIET_07_01_007 Available online at http://iaeme.com/Home/issue/IJCIET?Volume=7&Issue=1 Journal Impact Factor (2016): 9.7820 (Calculated by GISI) www.jifactor.com ISSN Print: 0976-6308 and ISSN Online: 0976-6316 © IAEME Publication ASSESSMENT OF WATER QUALITY OF GODAVARI RIVER AT NASHIK, MAHARASHTRA, INDIA Jyotiprakash G. Nayak Research Scholar, Department of Civil & Water Management, Shri Guru Gobindsinghji Institute of Engineering & Technology, Nanded, Maharastra, India Dr. L. G. Patil Associate Professor, Department of Civil & Water Management, Shri Guru Gobindsinghji Institute of Engineering & Technology, Nanded, Maharastra, India ABSTRACT Godavari is the second largest river in India. It originates from Triambakeswar, Nashik, Maharashtra and finally discharges into the Bay of Bengal near Narasapuram in West Godavari district of Andhra Pradesh. The study covers about 24 km of river starting from Gangapur dam to Dasak village. Fifteen locations were selected for collection of water samples from the river and water samples were analysed for water quality parameters. It was observed that untreated or partially treated sewage alongwith industrial wastewater is entering into the river at twelve prominent locations in the study stretch. This data was used to compute the value of National Sanitation Foundation Water Quality Index(NSFWQI), mostly applicable in USA and India. The results of NSFWQI of Godavari river indicates that its water quality as ‘Good’ (70-90) from Gangapur dam to Someshwar, ‘Bad’ (25-50) from Aanadwalli bridge to Samtanagar and ‘Very bad’ (0-25) at Agartakli STP downstream.
    [Show full text]
  • Study on Backwater Effect Due to Polavaram Dam Project Under Different Return Periods
    water Article Study on Backwater Effect Due to Polavaram Dam Project under Different Return Periods Amarnath C R 1 and Shashidhar Thatikonda 2,* 1 Research Scholar, Department of Civil Engineering, Indian Institute of Technology Hyderabad, Kandi, Telangana 502285, India; [email protected] 2 Faculty, Department of Civil Engineering, Indian Institute of Technology Hyderabad, Kandi, Telangana 502285, India * Correspondence: [email protected] Received: 29 December 2019; Accepted: 18 February 2020; Published: 20 February 2020 Abstract: In this study, we present a scenario to evaluate the backwater impacts on upstream of the Polavaram dam during floods. For this purpose, annual peak discharges across the different gauge stations in river stretch considered for flood frequency analysis. Statistical analysis is carried out for discharge data to estimate probable flood discharge values for 1000 and 10,000 years return period along with 0.1 and 0.14 million m3/s discharge. Furthermore, the resulting flood discharge values are converted to water level forecasts using a steady and unsteady flow hydraulic model, such as HEC-RAS. The water surface elevation at Bhadrachalam river stations with and without dam was estimated for 1000 and 10,000 years discharge. Unsteady 2D flow simulations with and without the dam with full closure and partial closure modes of gate operation were analysed. The results showed that with half of the gates as open and all gates closed, water surface elevation of 62.34 m and 72.34 m was obtained at Bhadrachalam for 1000 and 10,000 years. The 2D unsteady flow simulations revealed that at improper gate operations, even with a flow of 0.1 million m3/s, water levels at Bhadrachalam town will be high enough to submerge built-up areas and nearby villages.
    [Show full text]
  • Q1. What Are the Tenets of the Newly Launched Samagra Shiksha Scheme? Q2
    19-05-2018 Q1. What are the tenets of the newly launched samagra Shiksha Scheme? Q2. What is The Ramayana Circuit? Q3. Is “Indo-Pacific” a sphere of influence? Explain. Q4. What are disruptive technologies? How is it different from sustaining technologies? Q1. What are the tenets of the newly launched samagra Shiksha Scheme? Human Resource Development Minister Prakash Javadekar launched Samagra Shiksha scheme for school education. The scheme focuses on improving quality of education, enhancing the Learning outcomes and using technology to empower children and teachers. The Minister said, an annual grant of five thousand to 20 thousand rupees will be provided for strengthening libraries in schools. The scheme will be focus on digital education. Samagra Shiksha is not just a new name but an entirely new thought It is an overarching program for boosting quality school education with the inclusion of --- Digital technology -- introducing skill development at the school level Samagra Shiksha is a program that unifies learning from the pre-school to class 12 levels and encapsulates elements of the Sarva Shiksha Abhiyan, Rashtriya Madhyamk Shiksha Abhiyan and teacher education. The objectives of the scheme include ---provision of quality education ----enhancing learning outcomes of students www.brainyias.com 19-05-2018 ---bridging social and gender gaps in school education and promoting vocationalisation of education -- Strengthening teacher education institutions like SCERTs and Diets to improve quality of teachers -- annual grant of Rs 5,000 to Rs 20,000 per school for strengthening of libraries The Samagra Shiksha Abhiyan aims to treat education holistically as a continuum from pre-school to class 12.
    [Show full text]
  • Government of India Ministry of Tourism Lok Sabha
    GOVERNMENT OF INDIA MINISTRY OF TOURISM LOK SABHA UNSTARRED QUESTION NO.†1001 ANSWERED ON 17.12.2018 DEVELOPMENT OF RAMAYANA CIRCUIT †1001. SHRIMATI KAMLA DEVI PAATLE: Will the Minister of TOURISM be pleased to state: (a) whether the Government proposes to develop Ramayan Circuit for the promotion of tourism; (b) if so, the details thereof and the funds allocated in this regard during the last two years; (c) whether the Government has included Jagdalpur of Chhattisgarh in Ramayana circuit which has Ram Van Gaman Path, Ratanpur-Shivrinarayan-Sirpur-Aarang-Phingeshwar- Sitara (Saptrishi Mandal), Jagdalpur-Sukma-Ramoram in it; (d) whether the Government has any proposal to include Rajmergarh-Kabir Chabutra, Kurdargarh, Kotmisunar, Kukodayal Reserve, Baranbapara, Kodardam-Raipur in eco- tourism circuit; and (e) if so, the details thereof? ANSWER MINISTER OF STATE FOR TOURISM (INDEPENDENT CHARGE) (SHRI K.J. ALPHONS) (a) to (e): Ramayana Circuit is one of the fifteen thematic circuits identified for development under the Swadesh Darshan scheme of Ministry of Tourism. The Ministry has initially identified fifteen destinations for development under the Ramayana Circuit theme namely Ayodhya, Nandigram, Shringverpur & Chitrakoot (Uttar Pradesh), Sitamarhi, Buxar & Darbhanga (Bihar), Chitrakoot (Madhya Pradesh), Mahendragiri (Odisha), Jagdalpur (Chattisgarh), Nashik & Nagpur (Maharashtra), Bhadrachalam (Telangana), Hampi (Karnataka) and Rameshwaram (Tamil Nadu). The details of projects sanctioned under the Ramayana Circuit theme of Swadesh Darshan
    [Show full text]
  • S.No Name of Zone Commissioner Ate Division Range Postal
    Contact Details of Seva Kendra Ahmedabad S.No Name of Zone Commissioner Division Phone number Fax no. (with STD Email Id Range Postal Address ate (with STD code) code) 1 2 3 4 5 6 7 8 9 GROUND Floor, GST Bhavan, Near AHMEDABAD centralexcisetech1@gmail. 1 AHMEDABAD ZONE HQ Polytechnic, 079-26301076 SOUTH com Ambawadi, Ahmedabad-380015 3RD FLOOR, SAHAJANAND ARCADE, AHMEDABAD 2 AHMEDABAD ZONE V NR. HELMET CIRCLE, 079 - 27911969 079 - 27911304 [email protected] SOUTH MEMNAGAR, AHMEDABAD - 380054 AHMEDABAD 3 AHMEDABAD ZONE V I -do- 079 - 27911341 N.A. [email protected] SOUTH AHMEDABAD 4 AHMEDABAD ZONE V II -do- 079-27910294 N.A. [email protected] SOUTH AHMEDABAD 5 AHMEDABAD ZONE V III -do- 079 - 27911587 N.A. [email protected] SOUTH AHMEDABAD 6 AHMEDABAD ZONE V IV -do- 079 - 27911281 N.A. [email protected] SOUTH AHMEDABAD 7 AHMEDABAD ZONE V V -do- 079 - 27911558 N.A. [email protected] SOUTH - [email protected] 3rd Floor, Central Tax Building, Near AHMEDABAD 8 AHMEDABAD ZONE II - Polytechnic, 079-26300071 SOUTH Ambawadi, Ahmedabad-380015 AHMEDABAD - [email protected] 9 AHMEDABAD ZONE II I -do- 079-26302639 SOUTH AHMEDABAD - [email protected] 10 AHMEDABAD ZONE II II -do- 079-26306959 SOUTH AHMEDABAD - [email protected] 11 AHMEDABAD ZONE II III -do- 079-26306145 SOUTH AHMEDABAD - [email protected] 12 AHMEDABAD ZONE II IV -do- 079-26307155 SOUTH AHMEDABAD - [email protected] 13 AHMEDABAD ZONE II V -do- 079-26306011 SOUTH DIVISION-I, AHMEDABAD-I, 4TH AHMEDABAD FLOOR, CENTRAL 14 AHMEDABAD ZONE 079-26300574 SOUTH EXCISE
    [Show full text]
  • Surveys Completed During the Last 10 Years.Xlsx
    Details of Surveys completed during the last 10 years as on 26.08.2014 S.No Name of the Project Plan Rly State State State Year of Length Cost ROR Current Status head 1 2 3 Completion (Km) (crore) (%age) 1 Khandwa - Nardana via Khargone, NL CR MP MAH 2004-05 225 520 -2.46 Completed & project shelved Sendhwa 2 Solapur-Tuljapur-Osmanabad NL CR MAH 2004-05 80 189 -4.45 Completed & project shelved 3 Jeypore-Malkangiri NL ECOR ORI 2004-05 130 562 10.27 Completed & project shelved 4 Ponduru-Rajam NL ECOR AP 2004-05 19 53 4.64 Completed & project shelved 5 Aurangabad - Bihta via Anugrah Narain NL ECR BIH 2004-05 118 410 -ve Work sanctioned. Road, Arwal & Paliganj 6 Chatra-Gaya NL ECR JRKD BIH 2004-05 97 416 -12.64 Work sanctioned. 7 Chhapra-Muzaffarpur via Garkha Maker NL ECR BIH 2004-05 85 378 -ve Work sanctioned. and Rewaghat 8 Dehri-on-Sone to Banjari NL ECR BIH JRKD 2004-05 36 106 -4.15 Work sanctioned. 9 Jhajha-Girdih via Sonuchakai NL ECR JRKD BIH 2004-05 82 629 -9 Work sanctioned. 10 Bandel-Naihati - Bye pass NL ER WB 2004-05 9 30 14.53 Completed & project shelved 11 Bariarpur-Mananpur via Kharagpur, NL ER BIH 2004-05 68 292 -ve Work sanctioned. Laxmipur, Barhat 12 Pirpainiti to MGR NL ER BIH 2004-05 17 45 -17 Completed & project shelved 13 Sultanganj-Kathuria via Asarganj, NL ER BIH 2004-05 75 331 -8 Work sanctioned. Tarapore, Belhar 14 Anandnagar to Kaptanganj NL NER UP 2004-05 60 145 -3.83 Completed & project shelved 15 Golagokaran Nath-Shahjanpur via NL NER UP 2004-05 67 172 -14.92 Completed & project shelved Mohammadi 16 Hathua-Deoria via Line bazar, Salarkhurd, NL NER BIH 2004-05 85 200 -9.38 Work sanctioned.
    [Show full text]
  • Name Middle Name Last Name Address Country State City PIN Details Amount Transfer to IEPF DILIP P SHAH IDBI BANK, C.O
    Biocon Limited Amount for unclaimed and unpaid Final dividend for the FY 2006-07 Folio NO/Demat Due date for Name Middle Name Last Name Address Country State City PIN details Amount transfer to IEPF DILIP P SHAH IDBI BANK, C.O. G.SUBRAHMANYAM HEAD INDIA MAHARASHTRA MUMBAI 400093 BIO022473 150.00 23-AUG-2014 CAP MARK SERV PLOT 82/83 ROAD 7 STREET NO 15 MIDC, ANDHERI.EAST, MUMBAI SURAKA IDBI BANK LTD C/O G SUBRAMANYAM HEAD INDIA MAHARASHTRA MUMBAI 400093 BIO043568 150.00 23-AUG-2014 CAPITAL MKT SER C P U PLOT NO 82/83 ROAD NO 7 ST NO 15 OPP RAMBAXY LAB ANDHERI MUMBAI (E) RAMANUJ MISHRA IDBI BANK LTD C/O G SUBRAHMANYAM INDIA MAHARASHTRA MUMBAI 400093 BIO047663 150.00 23-AUG-2014 HEAD CAP MARK SERV CPU PL 82/83 RD 7 ST 15 OPP SPECAILITY RANBAXY LAB MIDC ANDHERI EAST MUMBAI URMILA LAXMAN SAWANT C/O KOTAK MAHINDRA BANK LTD VINAYA INDIA MAHARASHTRA MUMBAI 400098 BIO043838 150.00 23-AUG-2014 BHAVYA COMPLEX 5TH FLR 159-A CST ROAD KALINA SANTACRUZ E MUMBAI PHONE- 56768300 NEHA KAMLESH SHAH G SUBRAHMANYAM HEAD CAPITAL MARKET INDIA MAHARASHTRA MUMBAI 400093 BIO043408 150.00 23-AUG-2014 SERVISES CENTRAL PROCESSING UNIT PLOT NO 82/83 ROAD NO 7 STREET NO 5 MIDC ANDHERI (E) MUMBAI NO NA INDIA DELHI NEW DELHI BIO054733 150.00 23-AUG-2014 NO NA INDIA DELHI NEW DELHI BIO054734 150.00 23-AUG-2014 NO NA INDIA DELHI NEW DELHI BIO054748 150.00 23-AUG-2014 NO 305 GOLF MANOR WIND TUNNEL ROAD 23-AUG-2014 MANISH SALNI MURUGESHPALYA BANGALORE INDIA KARNATAKA BANGALORE 560017 BIO038066 150.00 33 GOVINDAPPA ROAD BASAVANGUDI L VENKATA NARAYANAN BANGALORE INDIA KARNATAKA
    [Show full text]