APPENDIX 2 Cycling, Walking and Safer Streets (CWSS)
Total Page:16
File Type:pdf, Size:1020Kb
APPENDIX 2 Cycling, Walking and Safer Streets (CWSS) Projects 2017/18 Shared Use Paths / Community Schemes / Safer Routes to Schools 1 Bridge of Earn to Glenfarg to Milnathort CWSS £20,000.00 Provision of Green Route signing for proposed Green Route between Bridge of Earn to Glenfarg to Milnathort. Ward 8 & 9. See Plan No 1 2 Kintillo, Bridge of Earn CWSS £60,000.00 Provision of shared use path, dropped kerbs and warning signs. Ward 9. See Plan No 2 3 B996/C416 Junction, Glenfarg CWSS £44,000.00 Provision of shared use path, dropped kerbs and warning signs. Ward 8. See Plan No 3 4A City Centre, Perth CWSS £16,000.00 Provision of corduroy tactile paving and other minor measures to improve the city centre for pedestrians with visual and mobility impairment. Ward 10. See Plan No 4A 4B Town Centre, Crieff CWSS £7,000.00 Provision of minor measures to improve the centre of Crieff for pedestrians with visual and mobility impairment. Ward 6. See Plan No 4B 4C Town Centre, Blairgowrie CWSS £7,000.00 Provision of minor measures to improve the centre of Blairgowrie for pedestrians with visual and mobility impairment. Ward 3. See Plan No 4C 5 Longforgan – Phase 1 CWSS £16,000.00 Sustrans £16,000.00 Provision of 2.5m wide shared use path in Mary Findlay Drive east to Main Street. An application for match funding from Sustrans has been submitted for this project. Ward 1. See Plan No 5 Shared Use Paths/Community Links or Safer Routes to Schools continued 6 Lawgrove Place, Inveralmond CWSS £2,000.00 Provision of 2.5m wide shared use path for cyclists and pedestrians from Lawgrove Place to River Almond cycle path. Scheme delayed in 2016/17 due to flood defence works. Ward 11. See Plan No 6 7 Marshall Way, Luncarty CWSS £18,000.00 Provision of 2.5m wide shared use path and build-out in Marshall Way linking Marshall Way to Luncarty Primary School. Ward 5. See Plan No 7 8 A94 Main Road, Woodside RF £10,000.00 Provision of 2.0m wide footpath link from Campmuir Road junction to bus stop to facilitate pedestrians. Ward 2. See Plan No 8 9 B935 Main Street, Forgandenny RF £8,000.00 Provision of footpath link from Kinnaird Road junction to bus stop to facilitate pedestrians. Ward 9. See Plan No 9 10 B935 Pitkeathly, Bridge of Earn RF £10,000.00 Provision of footpath link from Craigrownie to Quarry Hall path to facilitate pedestrians. Ward 9. See Plan No 10 11 B9099 Murthly Road, Stanley RF £20,000.00 Provision of footpath link between Mill Street and Airntully Road to facilitate pedestrians. Ward 5. See Plan No 11 12 B8081 Moray Street, Blackford RF £5,000.00 Provision of footpath link between The Morays and Blackford Primary School, adjacent to the park, to facilitate pedestrians. Ward 7. See Plan No 12 Engineering Administration £15,000.00 TOTAL CWSS (Eng. Admin.) £15,000.00 CWSS (Works) £190,000.00 Sustrans £16,000.00 Rural Footways £53,000.00 .