Volume 1 UGANDA Diagnostic Trade Integration
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Losing Ground.Pdf
The Unprecedented Shrinking of Public Spaces LOSING and Land in Ugandan GROUND? Municipalities A publication of the Cities Alliance Joint Work Programme for Equitable Economic Growth in Cities By Paul. I. Mukwaya, Dmitry Pozhidaev, Denis Tugume, and Peter Kasaija © UNCDF and Cities Alliance 2018 AUTHORS Paul. I. Mukwaya, Department of Geography, Geo-informatics and Climatic Sciences, Makerere University, Kampala, Uganda Dmitry Pozhidaev, United National Capital Development Fund, Kampala, Uganda Denis Tugume, Department of Geography, Geo-informatics and Climatic Sciences, Makerere University, Kampala, Uganda Peter Kasaija, Department of Geography, Geo-informatics and Climatic Sciences, Makerere University, Kampala, Uganda JWP MANAGEMENT AND COORDINATION Rene Peter Hohmann, Cities Alliance Fredrik Bruhn, Cities Alliance GRAPHIC DESIGN Creatrix Design Group This publication was produced by Cities Alliance and the United Nations Capital Development Fund (UNCDF) as part of the Cities Alliance Joint Work Programme (JWP) for Equitable Economic Growth in Cities. The U.K. Department for International Development (DFID) chairs the JWP, and its members are the United Nations Capital Development Fund (UNCDF), UN-Habitat, Women in Informal Employment: Globalizing and Organizing (WIEGO), Commonwealth Local Government Forum (CLGF), Ford Foundation, Institute for Housing and Development Studies (IHS) at Erasmus University Rotterdam and the World Bank. Disclaimer: The views expressed in this publication are those of the author(s) and do not necessarily represent those of the Cities Alliance, the United Nations, including UNCDF and UNOPS, or the UK Department for International Development (DFID). 2 Losing Ground? SUMMARY There is increasing importance being attached to is to promote economic growth that benefits ALL public spaces and other municipal assets, such as citizens. -
STATEMENT by H.E. Yoweri Kaguta Museveni President of the Republic
STATEMENT by H.E. Yoweri Kaguta Museveni President of the Republic of Uganda At The Annual Budget Conference - Financial Year 2016/17 For Ministers, Ministers of State, Head of Public Agencies and Representatives of Local Governments November11, 2015 - UICC Serena 1 H.E. Vice President Edward Ssekandi, Prime Minister, Rt. Hon. Ruhakana Rugunda, I was informed that there is a Budgeting Conference going on in Kampala. My campaign schedule does not permit me to attend that conference. I will, instead, put my views on paper regarding the next cycle of budgeting. As you know, I always emphasize prioritization in budgeting. Since 2006, when the Statistics House Conference by the Cabinet and the NRM Caucus agreed on prioritization, you have seen the impact. Using the Uganda Government money, since 2006, we have either partially or wholly funded the reconstruction, rehabilitation of the following roads: Matugga-Semuto-Kapeeka (41kms); Gayaza-Zirobwe (30km); Kabale-Kisoro-Bunagana/Kyanika (101 km); Fort Portal- Bundibugyo-Lamia (103km); Busega-Mityana (57km); Kampala –Kalerwe (1.5km); Kalerwe-Gayaza (13km); Bugiri- Malaba/Busia (82km); Kampala-Masaka-Mbarara (416km); Mbarara-Ntungamo-Katuna (124km); Gulu-Atiak (74km); Hoima-Kaiso-Tonya (92km); Jinja-Mukono (52km); Jinja- Kamuli (58km); Kawempe-Kafu (166km); Mbarara-Kikagati- Murongo Bridge (74km); Nyakahita-Kazo-Ibanda-Kamwenge (143km); Tororo-Mbale-Soroti (152km); Vurra-Arua-Koboko- Oraba (92km). 2 We are also, either planning or are in the process of constructing, re-constructing or rehabilitating -
Speech to Parliament by H.E. Yoweri Kaguta Museveni President of The
Speech to Parliament By H.E. Yoweri Kaguta Museveni President of the Republic of Uganda Parliamentary Buildings - 13th December, 2012 1 Rt. Hon. Speaker, I have decided to use the rights of the President, under Article 101 (2) of the 1995 Constitution of the Republic of Uganda, to address Parliament. I am exercising this right in order to counter the nefarious and mendacious campaign of the foreign interests, using NGOs and some Members of Parliament, to try and cripple or disorient the development of the Oil sector. If the Ugandans may remember, this is not the first time these interests try to distort the development of our history. When we were fighting the Sudanese-sponsored terrorism of Kony or when we were fighting the armed cattle- rustlers in Karamoja, you remember, there were groups, including some religious leaders, Opposition Members of Parliament as well as NGOs, which would spend all the 2 time denouncing us, the Freedom Fighters. They were denouncing those who were fighting to defend the lives and properties of the people, rather than denouncing the terrorists, the cattle-rustlers and their external-backers (in the case of Kony) as well as their internal collaborators. It would appear as if the wrong-doer was the Government, the NRM, rather than the criminals. We, patiently, put up with that malignment at the same time as we fought, got injured or killed, against the enemy until we achieved victory. Eventually, we won, supported by the ordinary people and the different people’s militias. There is total peace in the whole country and yet the misleaders of those years have not apologized to the Ugandans for their mendacity. -
Kampala Industrial and Business Park Infrastructure Scheme
Kampala Industrial and Business Park Infrastructure Scheme ESIA Volume I: Non-Technical Summary June 2019 QUEENSLAND & LEEDS CONSULTING ENGINEERS LTD QUEENSLAND & LEEDS CONSULTING ENGINEERS LTD 27 Binayomba Road Bugolobi PO Box 22428 Kampala, Uganda +256 414268466 Queensland.Leeds@engine er.com QUEENSLAND & LEEDS CONSULTING ENGINEERS LTD Kampala Industrial and 408382 ESIA-I A Business https://mottmac.sharepoint.com/teams/pj-d2237/do/Develop/02-Working Park documents/03_ESIA/Volume I Non-Technical Summary - JV Template.docx Infrastructure Queensland & Leeds Scheme ESIA Volume I: Non-Technical Summary June 2019 QUEENSLAND & LEEDS CONSULTING ENGINEERS LTD Registered number 80020001207621 Queensland & Leeds | Kampala Industrial and Business Park Infrastructure Scheme ESIA Volume I: Non-Technical Summary Information class: Standard This document is issued for the party which commissioned it and for specific purposes connected with the above- captioned project only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party which commissioned it. 408382 | ESIA-I | A | June 2019 Queensland & Leeds | Kampala Industrial and Business Park Infrastructure Scheme ESIA Volume I: Non-Technical Summary Contents Non-Technical Summary 1 Introduction 1 The Scheme 1 The Assessment 2 Environmental and Social Management Plan 8 What Happens Next? 8 408382 | ESIA-I | A | June 2019 The Namanve Forest Reserve is located to the south, with the KIBP proposed Non-Technical Summary to take 0.95km2 of this area. -
Vote:213 Mission in Rwanda
Vote Performance Report Financial Year 2018/19 Vote:213 Mission in Rwanda QUARTER 1: Highlights of Vote Performance V1: Summary of Issues in Budget Execution Table V1.1: Overview of Vote Expenditures (UShs Billion) Approved Cashlimits Released Spent by % Budget % Budget % Releases Budget by End Q1 by End Q 1 End Q1 Released Spent Spent Recurrent Wage 0.529 0.132 0.132 0.117 25.0% 22.2% 88.9% Non Wage 2.408 1.581 1.581 1.012 65.7% 42.0% 64.0% Devt. GoU 0.020 0.010 0.010 0.003 50.0% 15.0% 29.4% Ext. Fin. 0.000 0.000 0.000 0.000 0.0% 0.0% 0.0% GoU Total 2.957 1.723 1.723 1.132 58.3% 38.3% 65.7% Total GoU+Ext Fin 2.957 1.723 1.723 1.132 58.3% 38.3% 65.7% (MTEF) Arrears 0.000 0.000 0.000 0.000 0.0% 0.0% 0.0% Total Budget 2.957 1.723 1.723 1.132 58.3% 38.3% 65.7% A.I.A Total 0.000 0.000 0.000 0.000 0.0% 0.0% 0.0% Grand Total 2.957 1.723 1.723 1.132 58.3% 38.3% 65.7% Total Vote Budget 2.957 1.723 1.723 1.132 58.3% 38.3% 65.7% Excluding Arrears Table V1.2: Releases and Expenditure by Program* Billion Uganda Shillings Approved Released Spent % Budget % Budget %Releases Budget Released Spent Spent Program: 1652 Overseas Mission Services 2.96 1.72 1.13 58.3% 38.3% 65.7% Total for Vote 2.96 1.72 1.13 58.3% 38.3% 65.7% Matters to note in budget execution Variances were due to the fact that this finacial year funds released were for six months thus leading to unspent balances that will be utilised in the subquent Quater. -
Uganda Road Fund Annual Report FY 2011-12
ANNUAL REPORT 2011-12 Telephone : 256 41 4707 000 Ministry of Finance, Planning : 256 41 4232 095 & Economic Development Fax : 256 41 4230 163 Plot 2-12, Apollo Kaggwa Road : 256 41 4343 023 P.O. Box 8147 : 256 41 4341 286 Kampala Email : [email protected] Uganda. Website : www.finance.go.ug THE REPUBLIC OF UGANDA In any correspondence on this subject please quote No. ISS 140/255/01 16 Dec 2013 The Clerk to Parliament The Parliament of the Republic of Uganda KAMPALA. SUBMISSION OF UGANDA ROAD FUND ANNUAL REPORT FOR FY 2010/11 In accordance with Section 39 of the Uganda Road Act 2008, this is to submit the Uganda Road Fund Annual performance report for FY 2011/12. The report contains: a) The Audited accounts of the Fund and Auditor General’s report on the accounts of the Fund for FY 2011/12; b) The report on operations of the Fund including achievements and challenges met during the period of reporting. It’s my sincere hope that future reports shall be submitted in time as the organization is now up and running. Maria Kiwanuka MINISTER OF FINANCE, PLANNING AND ECONOMIC DEVELOPMENT cc: The Honourable Minister of Works and Transport cc: The Honourable Minister of Local Government cc: Permanent Secretary/ Secretary to the Treasury cc: Permanent Secretary, Ministry of Works and Transport cc: Permanent Secretary Ministry of Local Government cc: Permanent Secretary Office of the Prime Minister cc: Permanent Secretary Office of the President cc: Chairman Uganda Road Fund Board TABLE OF CONTENTS Abbreviations and Acronyms iii our vision iv -
Planned Shutdown Web October 2020.Indd
PLANNED SHUTDOWN FOR SEPTEMBER 2020 SYSTEM IMPROVEMENT AND ROUTINE MAINTENANCE REGION DAY DATE SUBSTATION FEEDER/PLANT PLANNED WORK DISTRICT AREAS & CUSTOMERS TO BE AFFECTED Kampala West Saturday 3rd October 2020 Mutundwe Kampala South 1 33kV Replacement of rotten vertical section at SAFARI gardens Najja Najja Non and completion of flying angle at MUKUTANO mutundwe. North Eastern Saturday 3rd October 2020 Tororo Main Mbale 1 33kV Create Two Tee-offs at Namicero Village MBALE Bubulo T/C, Bududa Tc Bulukyeke, Naisu, Bukigayi, Kufu, Bugobero, Bupoto Namisindwa, Magale, Namutembi Kampala West Sunday 4th October 2020 Kampala North 132/33kV 32/40MVA TX2 Routine Maintenance of 132/33kV 32/40MVA TX 2 Wandegeya Hilton Hotel, Nsooda Atc Mast, Kawempe Hariss International, Kawempe Town, Spencon,Kyadondo, Tula Rd, Ngondwe Feeds, Jinja Kawempe, Maganjo, Kagoma, Kidokolo, Kawempe Mbogo, Kalerwe, Elisa Zone, Kanyanya, Bahai, Kitala Taso, Kilokole, Namere, Lusanjja, Kitezi, Katalemwa Estates, Komamboga, Mambule Rd, Bwaise Tc, Kazo, Nabweru Rd, Lugoba Kazinga, Mawanda Rd, East Nsooba, Kyebando, Tilupati Industrial Park, Mulago Hill, Turfnel Drive, Tagole Cresent, Kamwokya, Kubiri Gayaza Rd, Katanga, Wandegeya Byashara Street, Wandegaya Tc, Bombo Rd, Makerere University, Veterans Mkt, Mulago Hospital, Makerere Kavule, Makerere Kikumikikumi, Makerere Kikoni, Mulago, Nalweuba Zone Kampala East Sunday 4th October 2020 Jinja Industrial Walukuba 11kV Feeder Jinja Industrial 11kV feeders upgrade JINJA Walukuba Village Area, Masese, National Water Kampala East -
Transportation As a Medium for Spatial Interaction: a Case Study Of
t' TRANSPORTATION AS A MEDIUM FOR SPATIAL INTERACTION: A CASE STUDY OF KENYA’S RAILWAY NETWORK. ^ BY STEPHEN AMBROSE LULALIRE/ONGARO DEPARTMENT OF GEOGRAS’Hy ' UNIVERSITY OF NAIROBI A THESIS SUBMITTED TO THE UNIVERSITY OF NAIROBI IN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR THE AWARD OF THE DEGREE OF MASTER OF ARTS IN ECONOMIC GEOGRAPHY. 1995 QUOTES "It is not uncommon thing for a line to open-up a country, but this line literally created a country". Sir Charles Elliot, 1903. (Kenya Railways Museum Annex) "The degree of civilization enjoyed by a nation may be measured by the character of its transportation facilities." Byers, M.L. 1908. DEDICATION I dedicate this thesis to the memory of my Jate grandfather, Topi Mutokaa iii DECLARATION This thesis is my original work and has, to the best of my knowledge, not been submitted for a degree in any other university. (Master of Arts Candidate) r / This thesis has been submitted for examination with our approval as University of Nairobi supervisors. iv ACKNOWLEDGEMENTS I take this opportunity to acknowledge the help and guidance that was extended to me during the course of conducting this study. It was instrumental in the conduct and final production of this work. I am heavily indebted to Professor Reuben B. Ogendo, a father-figure who has been my university supervisor since July 1988. He encouraged me to pursue a postgraduate course and has been a source of valuable guidance. I gained a lot from his probing questions and incisive advice. I am thankful for the guidance that I received from Mr. -
Uganda National Roads Network
UGANDA NATIONAL ROADS NETWORK REPUBLIC OF SOUTH SUDAN Musingo #" !P Kidepo a w K ± r i P !P e t Apoka gu a K m #" lo - g - L a o u k - #" g u P i #" n d Moyo!P g o i #"#" - t #"#" N i k #" KOBOKO M e g a #" #" #" l Nimule o #"!P a YUMBE #" u!P m ng m o #" e #" Laropi i #" ro ar KAABONG #" !P N m K #" (! - o - te o e om Kaabong#"!P g MOYO T c n o #" o #" L be Padibe !P - b K m !P LAMWO #" a oboko - Yu Yumbe #" om r K #" #" #" O #" Koboko #" #" - !P !P o Naam REGIONS AND STATIONS Moy n #" Lodonga Adjumani#" Atiak - #" Okora a #" Obongi #" !P #" #" a Loyoro #" p #" Ob #" KITGUM !P !P #" #" ong !P #" #" m A i o #" - #" - K #" Or u - o lik #" m L Omugo ul #" !P u d #" in itg o i g Kitgum t Maracha !P !P#" a K k #" !P #" #"#" a o !P p #" #" #" Atiak K #" e #" (!(! #" Kitgum Matidi l MARACHA P e - a #" A #"#" e #" #" ke d #" le G d #" #" i A l u a - Kitgum - P l n #" #" !P u ADJUMANI #" g n a Moyo e !P ei Terego b - r #" ot Kotido vu #" b A e Acholibur - K o Arua e g tr t u #" i r W #" o - O a a #" o n L m fe di - k Atanga KOTIDO eli #" ilia #" Rh #" l p N o r t h #"#" B ino Rhino !P o Ka Gulu !P ca #" #"#" aim ARUA mp - P #" #" !P Kotido Arua #" Camp Pajule go #" !P GULU on #" !P al im #" !PNariwo #" u #" - K b A ul r A r G de - i Lira a - Pa o a Bondo #" Amuru Jun w id m Moroto Aru #" ctio AMURU s ot !P #" n - A o #" !P A K i !P #" #" PADER N o r t h E a s t #" Inde w Kilak #" - #" e #" e AGAGO K #"#" !P a #" #" #" y #" a N o #" #" !P #" l w a Soroti e #"#" N Abim b - Gulu #" - K d ilak o b u !P #" Masindi !P i um !P Adilang n - n a O e #" -
Conference Brochure
CONFERENCE BROCHURE 13-14 June 2017 | Sandton Convention Centre | Johannesburg, South Africa Africa’s largest and only rail exhibition 100 Speakers| 7500 attendees | 850 VIP buyers | 250 exhibitors #africarail /africarail Created by: Visit www.terrapinn.com/africarail “It is a very informative conference and “Plenty of knowledge regarding African “This is a must attend event for the rail “Congratulations, one of the best and a good opportunity to network” railways is shared during the event.” industry!” most professional conferences outside Hlengiwe Sayd, Director, Department Of Transport Arvind Khare, Former CEO, Campanhia Dos Matthias Handschin, Business Development Europe!” Caminhos De Ferro Da Beira S.A.R.L. - C.C.F.B. Director, Alstom Christoph Uhl, VP Sales, Voith Turbo GmbH & Co KG “Its extremely informative and great place for networking“ Edwin Besa, Chief Director: Financial Analyst, Department of Public Enterprises – 2 – – 3 – OUR STORY AFRICA’S LONGEST RUNNING AND MOST SUCCESSFUL RAILWAYS EVENT NOW ENTERS ITS 20TH SUCCESSFUL YEAR. From humble beginnings as a small conference with a handful of exhibition stands, it now takes up 2 massive halls at the Sandton Convention Centre in Johannesburg. And has grown to become Africa’s most important and best supported railways conference and exhibition. For 2 decades, Africa Rail has become the undisputed leader. It is an unrivalled platform for the continent’s railways industry to come together … to learn, to network and to do business. Billions of dollars of business have either been initiated, Its where they open the doors to fantastic opportunities. concluded or influenced at this show. And it continues to Its where they form new and lucrative relationships & provide the meeting place for buyers, sellers and their partnerships. -
Original Order Series 5-(0G,2- 1
UI'JA M 1 R- CODE CABLES - lNCoK1NG- 3 NOV l4-~3 - 3 API<. lqqL.{ (FR.OM Ut-JOMUR.') CON"F l DE NTI 1=\ l.- PLEASE RET'AIN 1JN ARCHIVES APR. 2...00 ., cYWG 1 ORIGINAL ORDER SERIES 5-(0G,2- 1 .......li,,: BOX 3 FILE 2.. ACC. 19'1BI0282.- I INCOMING CODE CABLES No. Prefix Date Origin Subject. I(; (J,b- DO! ghlJ'I3 Ce.lfli.:t:~/LPI)I)/'(JI,~SX~ 1- g,,{/Ol/ fs II I, .. II Il'lJJ~- POl I J,-!II ?~/S ;f/Otl '(') I,lpte.' f) () ? It It (vf'.- 005 221/1 II 'I /t -2 L. 4/..o f5 'I ., 1eU..e -170ft z. c(III 'A~" -/<> VA.."h~(,)~ M~ J/'6ub /6-21. ~. 11 It e"'~·t9().f 1l"!'1 !)JJ().fl!iI.e ~J /.1A~ . /,J~u: f3 ? ~ I evR~vpb 19/;1 " <;~ 22-71 ,UN r:r II I Cv,R-Pp:j //1- p~)~_{)1 v , i- It i 'f (!V;e. ()pj' "J,/I1... " -A/? l.. t 4 r--: CvR ... PCI? J/;'l- I~..d ~~A:1 J -e , " Cp;{;,P.f .. } i'! Ci/!Z'V/o l. /Il- 'spli/ -S/;1./( 5 '" .. ·~i:J;uf. :-tlje .1)il Ilh1. • Il:>J'7 P... /,,4/7 /.f .., j.de" oII IJlll :/~ -I, v. "Art~ k - 4~~ ~a,"'~A U"fA)~,~ ~ I/ '- ZA Ie p,.e ,Of Z 11/1z 77' t -/2 'o(:"t- ~j .. :(J/(- 01'1 ?~? " lr~lQp. l-t· e» bee- 7::1 + 4- r,.b~ -OIS bzlt 1- If/~t.~jQ, 21 - 2· 2 J~C t{j "",/il-O/6 1?~/1'2 -'jo 10 I.r.e~ 27- 2: Z .. -
KIBP Media Tour
KIBP Media Tour UIA officials led by Eng Dr Frank Sebbowa, Executive Director UIA, hosted various members of the media fraternity to a tour round the Kampala Industrial Business Park (KIBP) in Namanve. KIBP is among the 22 Industrial Parks planned across the Country to create jobs and ease land access for investors. Eng Dr Sebbowa (3rd left) entering Fols Logistics, a rice processing firm that produces Kingdom rice for both national and regional consumption. The company which employs 230 employees (98% Ugandans), sits on 3.4 acres at the KIBP and began implementing its investment just 6 months ago. According to the General Manager, the factory produces 300 tonnes per day and has close to 70% of the market share for rice The KIBP located 11 km East of Kampala, is a 2,200 acre facility, in which all the land (so far) has been allocated to 260 prospective investors for development in various subsectors such as agro processing, mineral processing, ICT, logistics and freight as well as Tourism. Inside Fols Logistics Twenty (20) industries are currently in operation within the KIBP - Namanve industrial park and directly employing 9200 Ugandans within the park, eighty two (82) projects have commenced construction in the KIBP and have created an additional 17,000 indirect short term contract/ technical jobs during the construction period while 158 industries are still clearing their paper work in form of environmental impact assessment, architectural designs, land titling, soil tests as well as hydrological tests. These too create employment to the various white collar professionals such as Architects, Environmental Consultants, Civil Engineers, Quantity Surveyors etc.