Elr Data File - Naj2 Northolt Jcn - Ashendon Jcn (2Nd Part of Neasden S

Total Page:16

File Type:pdf, Size:1020Kb

Elr Data File - Naj2 Northolt Jcn - Ashendon Jcn (2Nd Part of Neasden S ELR DATA FILE - NAJ2 NORTHOLT JCN - ASHENDON JCN (2ND PART OF NEASDEN S www.railwaydata.co.uk M. Ch. Type Name Details ID 0m 02ch Bridge Long Drive (south Ruislip Station) - Single Span Steel Deck Underline Bridge | Steel (Beam) 1 0m 04ch Bridge Stn Subway South Ruislip Underline Bridge | Cast in-situ reinforced Concrete (Slab) 2 0m 07ch Station South Ruislip SRU 0m 38ch Bridge Bridgewater Road - 2 Span Steel Deck Underline Bridge | Steel (Beam) 3 0m 55ch Bridge Yeading Brook Underline Bridge | Brick (Arch) 5 0m 58ch Bridge West End Road - 2 Span Steel Deck Underline Bridge | Steel (Beam) 6 1m 31ch Bridge Private Foobridge To Lul Depot Footbridge | Steel (Beam) 8A 1m 51ch Bridge Carries Siding Over L T Met Lines Underline Bridge | Steel (Beam) 10A 1m 51ch Bridge Passes Over L T Met Lines Underline Bridge | Steel (Beam) 10 1m 68ch Bridge Stn Ft Br W Ruislip- 3moreopenings Over L .t. (lul Bridge) Footbridge | Other 10B 1m 67ch Station West Ruislip WRU 1m 77ch Bridge Stn Ft Br W Ruislipadjbr12wasonceat1m75c Footbridge | Other 11 1m 78ch Bridge Longlane Stn Rd 4openingsunderrdiadjshop Overline Bridge | Steel (Beam) 12 2m 17ch Bridge Footpath And Ruislip Feeder Underline Bridge | Brick (Arch) 13 2m 50ch Bridge Ickenham Garden Rd And River Pinn Underline Bridge | Brick (Arch) 14 2m 50ch Bridge River Pinn Road Over River Side of Line Bridge | Steel (Beam) 15 2m 58ch Bridge Harefield Rd. Brakespeare Rd South - Single Span Brick Arch Underline Bridge | Brick (Arch) 16 3m 32ch Bridge Harefield Road Overline Bridge | Brick (Arch) 18 3m 47ch Bridge Denham East Jct Underline Bridge | Early Steel (Slab) 19 4m 00ch Bridge Denham Viaduct Viaduct | Brick (Arch) 20 0m 2ch LEVEL 0m 45ch +430 1m 50ch LEVEL 2m 10ch -520 2m 22ch LEVEL 2m 39ch +660 2m 42ch +260 2m 50ch +225 3m 3ch LEVEL 3m 18ch -225 3m 52ch LEVEL 3m 66ch +225 1 (NAJ2 000.01 - 004.03) M. Ch. Type Name Details ID 4m 18ch Bridge Colne Viaduct Viaduct | Brick (Arch) 21 4m 50ch Bridge Denham Footpath - Single Span Brick Arch Underline Bridge | Brick (Arch) 22 4m 51ch Station Denham DNM 4m 51ch Bridge Denham Station Footbridge Span 1 Of 1 Footbridge 22A 4m 61ch Bridge North Orbital Road A412 Underline Bridge | Brick (Arch) 23 5m 05ch Bridge Tilehouse Lane Underline Bridge | Brick (Arch) 24 5m 37ch Bridge Slade Oak Lane (at Denham Golf Club Station) Underline Bridge | Steel (Beam) 25 5m 42ch Station Denham Golf Club DGC 6m 16ch Bridge Chalfont No1 M25 And River Misbourne Viaduct | Brick (Arch) 26 6m 31ch Bridge Cartbridge Road Over Stream Side of Line Bridge | Brick (Arch) 27 6m 37ch Bridge Chalfont Viaduct No 2 (amersham Road. A413 - Road Runs Beneath) Viaduct | Brick (Arch) 28 6m 52ch Bridge Mill Lane Overline Bridge | Early Steel 29 6m 77ch Bridge Marsham Lane Overline Bridge | Brick (Arch) 30 6m 77ch Tunnel Gerrards Cross Tunnel 6m 77ch - 7m 12ch (0.19 miles) - 7m 19ch Station Gerrards Cross GER 7m 18ch Bridge Stn Footbridge Gerrards Cross Footbridge | Other 32 7m 42ch Bridge Layters Way (footpath Linking Layters Way And Orchehill Rise & Orchehill Avenue) Footbridge | Steel (Truss) 33 7m 59ch Bridge Bull Lane Overline Bridge | Brick (Arch) 34 4m 28ch +264 4m 59ch +175 7m 3ch +264 7m 39ch +254 2 (NAJ2 004.03 - 008.03) M. Ch. Type Name Details ID 8m 08ch Bridge Siblets Wood Footbridge | Steel 34A 8m 31ch Bridge Footpath Overline Bridge | Steel (Beam) 35 8m 52ch Bridge Mumfords Lane Overline Bridge | Steel (Beam) 36 8m 78ch Bridge Occ Bridge. Potkiln Valley (beaconsfield)- Single Span Brick Arch Underline Bridge | Brick (Arch) 37 9m 27ch Bridge Birchland Wood Footbridge | Steel 37A 9m 37ch Bridge Potkiln Lane Overline Bridge | Brick (Arch) 38 9m 69ch Bridge Farm Lane Underline Bridge | Brick (Arch) 39 9m 76ch Station Seer Green SRG 9m 76ch Bridge Seer Green Station Footbridge Footbridge | Other (Beam) 40 10m 06ch Bridge Beaconsfield Golf Club Underline Bridge | Steel (Slab) 41 10m 42ch Bridge Occupation Bridge Overline Bridge | Early Steel (Beam) 42 10m 58ch Bridge Golf Club Footbridge Footbridge | Steel (Beam) 42A 10m 62ch Bridge Seers Green (footpath Between Longbottom Lane And Amersham Road) Underline Bridge | Pre-cast Concrete (Slab) 43 11m 02ch Bridge Amersham Road A355 Overline Bridge | Pre-tensioned Concrete (Beam) 44 11m 21ch Bridge One Tree Lane Footbridge | Post-tensioned Concrete (Beam) 45 11m 41ch Station Beaconsfield BCF 11m 42ch Bridge Stn Footbridge Beaconsfield Footbridge | Other 46 11m 50ch Bridge Penn Road Overline Bridge | Brick (Arch) 47 11m 50ch Bridge Penn Rd Fb Cantileverd From Br47 (beaconsfield) - Single Span Conc Deck Footbridge | Pre-cast Concrete (Beam) 47A 11m 68ch Bridge Occupation - Public Footbridge (between Baring Road And Gregories Road) Overline Bridge | Brick (Arch) 48 10m 52ch LEVEL 10m 73ch -460 11m 63ch -225 3 (NAJ2 008.03 - 012.03) M. Ch. Type Name Details ID 12m 30ch Bridge Holtspur Top Lane Underline Bridge | Brick (Arch) 49 12m 52ch Bridge Occupation Bridge Underline Bridge | Brick (Arch) 50 12m 73ch Bridge Riding Lane Underline Bridge | Brick (Arch) 51 13m 12ch Tunnel Whitehouse Tunnel 13m 12ch - 13m 28ch (0.2 miles) - 13m 46ch Bridge Chepping Wycombe Footbridge | Steel (Beam) 52A 13m 70ch Bridge Derehams Lane Underline Bridge | Brick (Arch) 53 14m 14ch Bridge Rayners Avenue Underline Bridge | Brick (Arch) 54 14m 19ch Bridge Magpie Lane Underline Bridge | Brick (Arch) 55 14m 40ch Bridge Hammersley Lane Underline Bridge | Brick (Arch) 56 14m 58ch Bridge Gomm Road Underline Bridge | Brick (Arch) 57 15m 00ch Bridge Cock Lane Adj Br 58 Footbridge | Steel (Beam) 57A 15m 01ch Bridge Wycombe Marsh Or Cock Lane Overline Bridge | Pre-tensioned Concrete (Beam) 58 15m 10ch Bridge Micklefield Road (pedestrian Subway) Underline Bridge | Brick (Arch) 59A 15m 10ch Bridge Micklefield Road Underline Bridge | Brick (Arch) 59 15m 34ch Bridge Hatters Lane B1339 Overline Bridge | Pre-tensioned Concrete (Beam) 60 15m 50ch Bridge Spring Gardens Footbridge | Cast Iron Subject To Tensile Stress / Early Steel 61 15m 63ch Bridge Bushbys (gomme's) Overline Bridge | Steel (Beam) 62 15m 73ch Bridge Gordon Road Underline Bridge | Brick (Arch) 63 13m 29ch -750 14m 10ch LEVEL 14m 36ch +300 14m 50ch LEVEL 4 (NAJ2 012.03 - 016.03) M. Ch. Type Name Details ID 16m 19ch Bridge High Wycombe Subway - Between Station Road & Duke Street Underline Bridge | Early Steel (Arch) 64 16m 26ch Bridge Stn Subway High Wycombe Underline Bridge | Steel (Beam) 65 16m 30ch Station High Wycombe HWY 16m 38ch Bridge Amersham Road A404 Overline Bridge | Early Steel / Wrought Iron 66 16m 38ch Bridge Footbridge Footbridge | Steel (Truss) 66A 16m 47ch Bridge Footbridge - Castle Hill Footbridge | Early Steel (Beam) 67 16m 54ch Bridge Priory Road Underline Bridge | Steel (Beam) 68 16m 61ch Bridge Hughenden Viaduct(temple End Viaduct. High Wycombe) Viaduct | Brick (Arch) 69 16m 72ch Bridge Bellfield Road Underline Bridge | Brick (Arch) 72 17m 14ch Bridge The Pastures Underline Bridge | Steel (Beam) 73A 17m 42ch Bridge Downley Overline Bridge | Steel (Beam) 74 17m 79ch Bridge Pickton Overline Bridge | Steel (Beam) 75 18m 09ch Bridge Plomer Hill Overline Bridge | Pre-tensioned Concrete (Beam) 76 18m 25ch Bridge Brench Overline Bridge | Steel (Beam) 77 18m 65ch Bridge Cookshall Lane Underline Bridge | Pre-tensioned Concrete (Beam) 79 18m 79ch Bridge Gomms Subway Underline Bridge | Brick (Arch) 80 19m 38ch Bridge Bradenham Road A4010 - Single Skew Span Brick Arch Underline Bridge | Brick (Arch) 81 19m 72ch Bridge Abramdown(haveringdown) Underline Bridge | Steel (Slab) 83 20m 02ch Bridge Averingdown Farm - Single Span Steel Deck Underline Bridge | Steel (Slab) 84 16m 28ch -600 16m 35ch LEVEL 16m 39ch LEVEL 16m 43ch LEVEL 16m 50ch LEVEL 16m 51ch +141 16m 53ch LEVEL 16m 55ch +380 16m 60ch LEVEL 17m 5ch +179 18m 44ch +550 18m 52ch +400 19m 18ch +164 5 (NAJ2 016.03 - 020.03) M. Ch. Type Name Details ID 20m 02ch Bridge Averingdown Farm - Single Span Steel Deck Underline Bridge | Steel (Slab) 84 20m 33ch Bridge Lower Manor Farm Underline Bridge | Steel (Slab) 85 21m 11ch Bridge Landers Underline Bridge | Steel (Slab) 86 21m 21ch Bridge Slough Lane Underline Bridge | Steel (Beam) 87 21m 26ch Bridge Stn Footbridge Saunderton Footbridge | Other (Beam) 88 21m 26ch Station Saunderton SDR 21m 65ch Bridge Haw Lane Underline Bridge | Pre-tensioned Concrete (Beam) 89 22m 34ch Bridge Lee Road Overline Bridge | Brick (Arch) 90 22m 34ch Bridge Lee Road Overline Bridge | Brick (Arch) 91 22m 74ch Bridge Over The Up Line (occupation) Overline Bridge | Brick (Arch) 92 23m 27ch Crossing Ridgway Path Public Footpath Crossing with Whistleboard - 23m 31ch Tunnel Saunderton Tunnel 23m 31ch - 23m 35ch (0.050 miles) - 23m 44ch Bridge Upper Icknield Way - U/s Overline Bridge | Brick (Arch) 94 23m 51ch Bridge Upper Icknield Way - D/s Underline Bridge | Pre-cast Concrete 95 23m 68ch Crossing Bledlow Cum Saunderton Public Footpath Crossing with Whistleboard - 21m 20ch +264 21m 36ch +164 22m 0ch +164 22m 18ch LEVEL 22m 36ch +164 22m 65ch LEVEL 22m 74ch -100 23m 40ch -88 6 (NAJ2 020.03 - 024.03) M. Ch. Type Name Details ID 24m 20ch Bridge Picts Lane Overline Bridge | Steel (Beam) 96 24m 36ch Bridge New Station Footbridge At Princess Risborough Footbridge | Steel (Beam) 96A 24m 41ch Station Princes Risborough PRR 24m 61ch Bridge Summerleys Road. B4444 Underline Bridge | Steel (Beam) 98 24m 74ch Bridge Park Mill (selbys) - Single Span Brick Arch Underline Bridge | Brick (Arch) 99 25m 54ch Bridge Lower Icknield Way. B4009 Underline Bridge | Brick (Arch) 100 26m 00ch Bridge Boxers Underline Bridge | Brick (Arch) 101 26m 15ch Bridge Clarke Underline Bridge | Brick (Arch) 102 27m 13ch Bridge Ilmer Underline Bridge | Brick (Arch) 103 27m 30ch Crossing Longwick Cum Ilmer No.12 Public Footpath Crossing - 24m 18ch -161 24m 36ch -264 24m 45ch LEVEL 24m 62ch -200 25m 78ch LEVEL 26m 16ch -176 27m 76ch -200 7 (NAJ2 024.03 - 028.03) M.
Recommended publications
  • 31645 Highspeed Rail Bill.Indd
    31645 HighSpeed Rail Bill Modified—26 July 2013 4:45 AM Public Bill Committee HIGH SPEED RAIL (preparation) BILL WRITTEN EVIDENCE PUBLISHED BY AUTHORITY OF THE HOUSE OF COMMONS LONDON – THE STATIONERY OFFICE LIMITED PBC (Bill 010) 2013 - 2014 31645 HighSpeed Rail Bill Modified—26 July 2013 4:45 AM © Parliamentary Copyright House of Commons 2013 This publication may be reproduced under the terms of the Open Parliament Licence, which is published at www.parliament.uk/site-information/copyright/ Enquiries to the Office of Public Sector Information, Kew, Richmond, Surrey TW9 4DU; e-mail: [email protected] Distributed by TSO (The Stationery Office) and available from: Online The Houses of Parliament Shop www.tsoshop.co.uk 12 Bridge Street, Parliament Square London SW1A 2JX Mail, Telephone, Fax & E-mail Telephone orders: 020 7219 3890 TSO General enquiries: 020 7219 3890 PO Box 29, Norwich NR3 1GN Fax orders: 020 7219 3866 Telephone orders/General enquiries: 0870 600 5522 Email: shopwparliament.uk Order through the Parliamentary Hotline Lo-call 0845 7 023474 Internet: Fax orders: 0870 600 5533 http://www.shop.parliament.uk E-mail: customer.serviceswtso.co.uk Textphone: 0870 240 3701 TSOwBlackwell and other Accredited Agents 31645 31645 HighSpeed Rail Bill Modified—26 July 2013 4:45 AM High Speed Rail (Preparation) Bill: Written evidence 3 Contents Camden London Borough Council (HSR 01) Dr Paul Hoad (HSR 02) Dr Chris Eaglen LLB (HSR 03) Andrew Bodman (HSR 04) Wendover HS2 action group (WHS2) (HSR 05) HS2 Action Alliance (HSR 06) Greengauge
    [Show full text]
  • Chiltern Main Line: London-Birmingham
    Chiltern Main Line: London-Birmingham Streckenbeschreibung zur Chiltern Main Line London-Birmingham Zitat von Aerosoft Die Strecke von London nach Birmingham ist als Chiltern Main Line bekannt und führt von der Londoner Endstation Marylebone nordwestlich zum Birmingham Snow Hill. Diese hochpräzise Chiltern Main Line Route führt Sie etwa 112 Meilen von London nach Birmingham, durch 40 detaillierte Stationen und bietet zahlreiche kundenspezifische Gebäude und Sehenswürdigkeiten. Strecken Features: Streckenklasse: Modern Streckenlänge: ca. 112 Meilen Wunderschöne, detaillierte und eindrucksvolle Landschaften von London Marylebone bis Birmingham Snow Hill 14 Standardszenarien enthalten Quick Drive fähig 40 individuell gefertige Stationen Viele Gebäude und Objekte Stationen: London Marylebone West Hampstead* (London Underground) Kilburn* (London Underground) Willesden Green* (London Underground) Dollis Hill* (London Underground) Neasden* (London Underground) Wembley Stadium Sudbury & Harrow Road Sudbury Hill Harrow Northolt Park South Ruislip* (London Underground) Ruislip Gardens* (London Underground) West Ruislip Denham Denham Golf Club Gerrards Cross Seer Green and Jordans Beaconsfield High Wycombe Saunderton Princes Risborough Haddenham and Thame Parkway Bicester Village Bicester North Kings Sutton Banbury Leamington Spa Warwick Warwick Parkway Hatton Lapworth Dorridge Widney Manor Solihull Olton Acocks Green Tyseley Small Heath Birmingham Moor Street Birmingham Snow Hill *Hinweis: Die mit einem Sternchen gekennzeichneten Stationen der Londoner
    [Show full text]
  • Annual Report 2006
    widening markets 2006 providing value… annual report JOHN LAING plc annual report 2006 . ed Office: +44 (0)20 7901 3200 +44 (0)20 7901 3520 el: Register Allington House, 150 Victoria Street, London SW1E 5LB England No. 1345670 Registered T Fax: JOHN LAING plc Further copies of this statement are available from the address below or website at by visiting the Company’s www.laing.com email: [email protected] www.laing.com Forward-looking statements Certain statements contained in this document, including those in the “Operating and Financial Review” constitute statements that are, or may be deemed to be, “forward-looking statements”. In some cases, these forward-looking statements can be identified by the use of forward-looking terminology, including the terms “believes”, “estimates”, “forecasts”, “plans”, “anticipates”, “targets”, “aims”, “continues”, “expects”, “intends”, “may”, “will”, “would” or “should” or, in each case, their negative or other variations or comparable terminology. These forward- looking statements involve known and unknown risks, uncertainties and other factors and include statements regarding the Group’s intentions, beliefs or current expectations concerning, among other things, the Group’s results of operations, financial condition, liquidity, prospects, growth, strategies and the industries in which the Group operates. By their nature, forward-looking statements involve risk and uncertainty because they relate to future events and circumstances. A number of factors could cause actual results and developments to differ materially from those expressed or implied by the forward-looking statements including, without limitation: conditions in the operating margins, anticipated investments and capital expenditures, changing business or other market conditions and general economic conditions.
    [Show full text]
  • Chapter 07: Travel
    Chapter 7 Travel Here are a few of the more memorable events relating to people encountered whilst travelling. In recent years Margaret and I have taken to cruises. Margaret enjoys these because of the high level of service; for me, the interest is meeting people from diverse places. Some of the experiences include: Rio-de-Janeiro In Carnival, I rate this the number one location to return to. I find it impossible to put into words the all-pervading atmosphere. The whole thing just oozed sensuality and two hundred drummers at one hit got your attention. At 8.0am when the last, and poorest of the poor, Samba School paraded, there was such a welling up of support that it had me, of all people, in tears. The downside of course is law and order. One night a youth tried to snatch my watch, but maybe he was attempting to get some money to buy some bread to feed his mother in the flavella. A more serious problem was on the only occasion when I left the hotel with any money in order to buy presents. I strayed from the main street, felt insecure as a press of people assembled round me and started to put my hand into my pocket containing the wallet. On feeling my hand withdrawn from the pocket I spun round to be confronted by three men. Good morning! The police were quite efficient and I then had to go to American Express for a voucher for more funds, with my passport (they gave me 98 cents to the pound!).
    [Show full text]
  • HS2 Property Compensation Consultation 2013
    High Speed Two: Property Compensation Consultation 2013 Consultation Summary Report March 2014 A report to HS2 Ltd and the Department for Transport Prepared by Dialogue by Design Contents Executive summary 3 Glossary of terms 7 Chapter 1 About the consultation 10 Chapter 2 Participation 15 Chapter 3 Methodology 20 Chapter 4 Reading the report 27 Chapter 5 General comments on the proposals for long-term discretionary property compensation 29 Chapter 6 Comments on the proposed assessment criteria 41 Chapter 7 Comments on the express purchase scheme 50 Chapter 8 Comments on the long-term hardship scheme 58 Chapter 9 Comments on the sale and rent back scheme and alternative approach to renting properties back to their former owners 69 Chapter 10 Comments on the voluntary purchase scheme 79 Chapter 11 Comments on property bond schemes 87 Chapter 12 Comments on the rural support zone 97 Chapter 13 Other comments 103 Appendix 1 List of participating organisations 113 Appendix 2 Organised submissions 117 Appendix 3 Codes by theme and by question 123 High Speed Two: Property Compensation Dialogue by Design 2 of 173 Consultation 2013 Classification: Not restricted Executive summary This report provides a summary of the responses to the Government’s Property Compensation Consultation 2013 for Phase One of High Speed Two (HS2) between London and the West Midlands. The consultation began on Thursday 12 September 2013 and closed on Wednesday 4 December 2013. The purpose of the consultation was to enable the Government to make informed decisions on a set of compensation measures, based on the views of those individuals and organisations who expressed their opinions on the proposals.
    [Show full text]
  • REGISTER of SPONSORS (Tiers 2 & 5 and Sub Tiers Only)
    REGISTER OF SPONSORS (Tiers 2 & 5 and Sub Tiers Only) DATE: 29-March-2018 Register of Sponsors Licensed Under the Points-based System This is a list of organisations licensed to sponsor migrants under Tiers 2 & 5 of the Points-Based System. It shows the organisation's name (in alphabetical order), the sub tier(s) they are licensed for, and their rating against each sub tier. A sponsor may be licensed under more than one tier, and may have different ratings for each tier. No. of Sponsors on Register Licensed under Tiers 2 and 5: 29,017 Organisation Name Town/City County Tier & Rating Sub Tier ?What If! Ltd London Tier 2 (A rating) Tier 2 General Tier 2 (A rating) Intra Company Transfers (ICT) @ Home Accommodation Services Ltd London Tier 2 (A rating) Tier 2 General Tier 5 (A rating) Creative & Sporting ]performance s p a c e [ london london Tier 5 (A rating) Creative & Sporting 01 Telecom Limited Brighton Tier 2 (A rating) Tier 2 General 0-two Maintenance London Tier 2 (A rating) Tier 2 General 1 Stop Print Ltd Ilford Tier 2 (A rating) Tier 2 General 1 Tech LTD London Tier 2 (A rating) Tier 2 General 10 Europe Limited Edinburgh Tier 2 (A rating) Tier 2 General Tier 2 (A rating) Intra Company Transfers (ICT) 10 GROUP LTD T/A THE 10 GROUP LONDON Tier 2 (A rating) Tier 2 General 1000heads Ltd London Tier 2 (A rating) Tier 2 General Page 1 of 1909 Organisation Name Town/City County Tier & Rating Sub Tier 1000mercis LTD London Tier 2 (A rating) Tier 2 General 100Starlings Ltd London Tier 2 (A rating) Tier 2 General 101 Ways Limited London Tier
    [Show full text]
  • Issue 13 1 July 2005 Contents
    RailwayThe Herald 1 July 2005 No.13 TheThe complimentarycomplimentary UKUK railway railway journaljournal forfor thethe railwayrailway enthusiastenthusiast Wembley names Mark 3 DVT Nine-Car Meridian into traffic ECML in chaos after wires come down Tunnel collapses at Gerrards Cross ClassIn 87 Line -Up This at Wembley plusIssue Notable Workings and more! RailwayThe Herald Issue 13 1 July 2005 Contents Editor’s comment Newsdesk 3 Welcome to this weeks issue of All the latest news from around the UK network. Including Gerrards Cross tunnel Railway Herald. Although we’re collapse, Hull Trains names first Pioneer unit, Alloa line delayed by a year and nine- covering two weeks there’s plenty car Meridian trains to enter traffic with Midland Mainline. going on around the country and this issue is packed full of news and Pictorial Gallery 8 information. A special two-page gallery section, looking at a special line up of the five celebrity We’ve also launched two new Class 87 locomotives at Alstom Wembley. sections, Rolling Stock News and Charter Workings, in response to our feedback request a couple of issues Rolling Stock News 10 ago. We welcome information for A brand new section of Railway Herald, dedicated to news and information on the both sections from readers. UK Rolling Stock scene. Please do feel free to pass the journal on to any friends or colleagues who you think would be Notable Workings 11 interested. All of our back-issues are Areview of some of the more notable, newsworthy and rare workings from the past week available from the website.
    [Show full text]
  • Independent Reporter a Halcrow Group Limited
    Independent Reporter A Annual Return 2006 Final Report Halcrow Group Limited Halcrow Group Limited Vineyard House 44 Brook Green London W6 7BY Tel +44 (0)20 7602 7282 Fax +44 (0)20 7603 0095 www.halcrow.com Halcrow Group Limited has prepared this report in accordance with the instructions of their clients, ORR and Network Rail, for their sole and specific use. Any other persons who use any information contained herein do so at their own risk. © Halcrow Group Limited 2006 Independent Reporter A Annual Return 2006 Final Report Contents Amendment Record This report has been issued and amended as follows: Issue Revision Description Date Initial 0 1 Draft report compiled 21/07/06 MNG 1 0 Interim report 21/07/06 DJM 1 1 Final report (hard copy) 17/08/06 DJM 1 2 Final report (internet version) 28/09/06 DJM Independent Reporter Annual Return 2006 Final Report 1 Executive summary 1.1 Reporter’s scrutiny and opinion Commentary on Annual Return 2006 1.1.1 I am pleased to report we have experienced co-operation at all levels within Network Rail which has allowed our audit plan to be largely delivered to programme. Where additional supporting information has been requested by the audit teams it has generally been made available although we have been constrained on occasions by the inability of some information management systems to provide the data required or where data could not be provided within the timeframe of the audit. 1.1.2 The figures contained in the Annual Return 2006 indicate that Network Rail has achieved the required regulatory targets, with the exception of Broken Rails (M1) where the target has not been met for the first time since regulatory targets were introduced for this measure.
    [Show full text]
  • Train Fares and Ticketing
    House of Commons Transport Committee How fair are the fares? Train fares and ticketing Sixth Report of Session 2005–06 Volume II Oral and written evidence Ordered by The House of Commons to be printed 10 May 2006 HC 700–II Published on 19 May 2006 by authority of the House of Commons London: The Stationery Office Limited £18.50 The Transport Committee The Transport Committee is appointed by the House of Commons to examine the expenditure, administration, and policy of the Department for Transport and its associated public bodies. Current membership Mrs Gwyneth Dunwoody MP (Labour, Crewe) (Chairman) Mr David Clelland MP (Labour, Tyne Bridge) Mr Jeffrey M. Donaldson MP (Democratic Unionist, Lagan Valley) Clive Efford MP (Labour, Eltham) Mrs Louise Ellman MP (Labour/Co-operative, Liverpool Riverside) Mr Robert Goodwill MP (Conservative, Scarborough & Whitby) Mr John Leech MP (Liberal Democrat, Manchester, Withington) Mr Eric Martlew MP (Labour, Carlisle) Mr Lee Scott MP (Conservative, Ilford North) Mr Graham Stringer MP (Labour, Manchester Blackley) Mr David Wilshire MP (Conservative, Spelthorne) Powers The Committee is one of the departmental select committees, the powers of which are set out in House of Commons Standing Orders, principally in SO No 152. These are available on the Internet via www.parliament.uk. Publications The Reports and evidence of the Committee are published by The Stationery Office by Order of the House. All publications of the Committee (including press notices) are on the Internet at www.parliament.uk/transcom. A list of Reports of the Committee in the present Parliament is at the back of this volume.
    [Show full text]
  • 117 Behind the Scenes at Wembley June 2007 Five Go to Llangollen the Magazine of the Marlow & District Railway Society
    Edition Contents: The Great Briton 117 Behind the Scenes at Wembley June 2007 Five go to Llangollen The Magazine of the Marlow & District Railway Society President: Sir William McAlpine Bt Chairman: Tim Speechley. 11 Rydal Way, High Wycombe, Bucks., HP12 4NS. Tel.: 01494 638090 email: [email protected] Vice-Chairman Julian Heard. 58 Chalklands, Bourne End, Bucks., SL8 5TJ. Tel.: 01628 527005 email: [email protected] Treasurer: Peter Robins. 95 Broome Hill, Cookham, Berks., SL6 9LJ. Tel.: 01628 527870 email: [email protected] Secretary: Malcolm Margetts. 4 Lodge Close, Marlow, Bucks., SL7 1RB. Tel.: 01628 486433 email: [email protected] Webmaster: Tim Edmonds. 90 Green Hill, High Wycombe, Bucks., HP13 5QE. Tel.: 01494 526346 email: [email protected] Committee: Roger Bowen. 10 Cresswell Way, Holmer Green, High Wycombe, Bucks., HP15 6TE Tel.: 01494 713887 email: [email protected] Outings Organiser: Mike Hyde. 11 Forty Green Drive, Marlow, Bucks., SL7 2JX. Tel.: 01628 485474 email: [email protected] Donkey Editor: Mike Walker, Solgarth, Marlow Road, Little Marlow, Marlow, Bucks., SL7 3RS. Tel.: 01628 483899 email: [email protected] Website: www.mdrs.org.uk TIMETABLE - Forthcoming meetings Page 2 CHAIRMAN'S NOTES Tim Speechley 2 SOCIETY & LOCAL NEWS 3 A TRIP TO LONDON Malcom Stotter 4 THE GREAT BRITAIN Mike Hyde 5 BEHIND THE SCENES AT WEMBLEY Mike Hyde 7 FIVE GO TO LLANGOLLEN Mike Walker 11 25 AND 50 YEARS AGO Tim Edmonds 13 CHILTERN SPLENDOUR 15 FRONT COVER PHOTOGRAPHS Top: Pannier 6430 between 2 Auto coaches at Llangollen Railway’s Steel, Steam and Stars Gala (Article page 11).
    [Show full text]
  • View the Manual
    ROUTE GUIDE 1 Londo n - Aylesbury – Route Guide Route Guide Route expansion for Train Simulator CONTENTS INTRODUCTION .................................................................................................................... 2 Train Simulator requirements.................................................................................................. 3 Scenery quality and display settings ....................................................................................... 3 2D/3D Track Switcher ............................................................................................................. 4 STATIONS .............................................................................................................................. 4 FEATURES TO LOOK OUT FOR ON THE ROUTE ............................................................. 26 LONDON UNDERGROUND SIGNALLING .......................................................................... 41 SCENARIOS......................................................................................................................... 45 QUICK DRIVE ...................................................................................................................... 47 CREDITS .............................................................................................................................. 48 COPYRIGHT ........................................................................................................................ 49 INTRODUCTION This London-Aylesbury route runs
    [Show full text]
  • Gerrards Cross Tunnel Gerrards Cross, BUCKINGHAMSHIRE - UK
    Tunnel Monitoring Automated Cyclops monitoring with alarm system Gerrards Cross Tunnel Gerrards Cross, BUCKINGHAMSHIRE - UK Rapid mobilisation of automated monitoring system to verify tunnel stability On 30th June 2005 Gerrards Cross railway tunnel suffered a partial collapse. Sol Data were approached to undertake the monitoring of the tunnel structure which is used to accommodate rail services on the South Buckinghamshire train line to and from central London It was essential to confirm the structural stability of the tunnel in order to allow mainline rail services to re-start. Jackson Civil Engineering looked to Sol Data to design and install an appropriate monitoring system. Sol Data mobilised to sit e and installed 4 CYCLOPS monitoring system and 300 prism targets. Above – Installation inside the tunnel of the CYCLOPS systems using a ‘Cheery Picker’. Below – The Tunnel is re-activated under the safe watch of the CYCLOPS systems. The system was installed, configured and commissioned within 1 week, and when Network Rail were satisfied that the structure was being closely scrutinised for any potential further movemen t decided to restart mainline rail services, mitigating the financial loss to the network operator and ensuring the safety of passengers using the service. The system is operational 24 hours a day and transmits the recorded co- ordinates of the prisms to a central processing computer, allowing the team of on-site engineers to determine the stability of the tunnel immediately. QUICK FACTS • 4 No. CYCLOPS Units. • 300 Prism Targets. • Real-time 3D monitoring of OWNER : NETWORK RAIL absolute prism co-ordinates. CONTRACTOR : JACKSON CIVIL ENGINEERING • Alarms configured to predefined limits.
    [Show full text]