DAS CONSTRUCTION STANDARDS for DAS OWNED FACILITIES
Total Page:16
File Type:pdf, Size:1020Kb
DAS CONSTRUCTION STANDARDS For DAS OWNED FACILITIES March 2019 PUBLISHED BY STATE OF OREGON DEPARTMENT OF ADMINISTRATIVE SERVICES ENTERPRISE ASSET MANAGEMENT PLANNING AND CONSTRUCTION MANAGEMENT DIVISION TABLE OF CONTENTS Division 1 - General Requirements 01001 Basic Requirements 01002 Submittals 01003 Special Procedures 01004 Temporary Facilities and Controls Division 2 - Site Work 02630 Storm Drainage 02900 Landscaping Division 3 - Concrete 03521 Lightweight Insulating Concrete 03540 Cementitious Underlayment Division 4 - Masonry 04901 Brick and Stone Masonry & Repointing of Mortar Division 5 - Metals 05120 Structural Steel 05500 Metal Fabrications 05520 Handrails and Railings 05400 Cold Formed Metal Framing Division 6 - Wood and Plastic 06200 Finish Carpentry Division 7 - Thermal and Moisture Protection 07141 Hot Fluid-Applied Waterproofing 07142 Cold Fluid-Applied Waterproofing 07210 Thermal Insulation 07550 Modified Bituminous Membrane Roofing 07620 Sheet Metal Flashing and Trim 07840 Firestopping 07900 Joint Sealers Division 8 - Doors and Windows 08109 Doors-Frames-Door Hardware Division 9 - Finishes 09111 Non-Load-Bearing Metal Framing System 09260 Gypsum Board Assemblies 09900 Paints and Coatings Division 10 - Specialties 10170 Plastic Toilet Compartments 10171 Toilet Compartments & Urinal Screens 10260 Wall and Corner Guards 10270 Access Flooring 10440 Building Signage 10523 Fire Extinguishers and Cabinets 10800 Toilet, Bath and Laundry Accessories 10900 Custodial Requirements Division 11 - Equipment 11005 Fall Protection Systems Division 12 - Furnishings 12005 Office Landscape Furniture 12486 Floor Mats Division 13 - Special Construction NOT USED Division 14 - Conveying Systems 14245 Hydraulic Passenger Elevators Division 15 - Mechanical 15050 Basic Materials and Methods 15100 Plumbing Piping and Pumps Division 16 - Electrical 16050 Basic Electrical Materials and Methods 16725 Security 16780 DAS Lighting Standards Division 16 – Electrical – continued; 16785 DAS Pre - Approved Light Fixture Lists 16790 DAS Pre – Approved Lighting Controls 16795 Emergency and Standby Power systems END OF TABLE OF CONTENTS SECTION 01001 BASIC REQUIREMENTS PART 1 GENERAL GENERAL AND SUPPLEMENTARY GENERAL CONDITIONS See the current editions of the DAS General (non-alterable) Conditions and Supplementary (alterable for project specific requirements). STANDARDS Modifications to DAS-owned or DAS-operated buildings shall: Support existing building services, structures, and systems; Conform to applicable codes and be safe for occupants; Be cost effective in design, construction, installation, maintenance, and operation. For these reasons, DAS maintains and requires conformance by its Contractors to standards that meet or exceed state and local minimum codes. PERMITS Permits shall be obtained for all work performed as required by Authorities Having Jurisdiction. DAS shall receive copies of all permits and copies of all plan review and permit correspondence. O & M MANUALS Hard and electronic copies (in PDF format) are required. Submit one (1) copy to Owner’s Representative for review and approval. Upon approval by Owner’s Representative, submit hard copies and electronic copies on CD to Owners’ Representative as follows: Three (3) hard copies to Owner’s Representative. Optional hard and electronic copies to the design firm of record. Optional hard and electronic copies should be retain by Contractor. PART 2 PRODUCTS POTENTIAL PRODUCTS Some of the specific products referenced in the following divisions are listed only as the “Basis of Design”. The intent of DAS standards and the products mentioned is to set performance standards, not to limit the manufacturers that can be used. ADDITIONAL POTENTIAL PRODUCTS The following products and Specification are presented because DAS would like to use these products for guidelines in design and construction. It is recognized that individual design consultants engaged for various projects being undertaken will have their own Specification Sections, products, and nomenclature. These will vary from firm to firm and not necessarily reflect what DAS prefers to use. Design consultant Specification Sections, products, and nomenclature shall be reviewed, discussed, and approved by DAS for each individual project. PART 3 EXECUTION PRODUCT INSTALLATION It should be recognized individual design consultants engaged for various projects being undertaken will have their own Specifications Sections and nomenclature that incorporate execution phases of various Sections. These will vary from firm to firm and not necessarily reflect what DAS prefers to use. Design consultants’ Specification Sections, products, execution protocol, and nomenclature shall be reviewed, discussed, and approved by DAS for each individual project. END OF SECTION 01001 Basic Requirements SECTION 01002 SUBMITTALS SUBMITTAL PROCEDURES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Project schedule B. Schedule of values C. Product evaluation data 1.02 DEFINITIONS A. Manufacturer's Product Data: Manufacturer's product data consist of one or more levels of manufacturer’s information as described below and as requested in the submittal schedule. The three levels of information include: manufacturer's list, manufacturer's catalog data, and manufacturer's technical and engineering data. 1. Manufacturer's List: Manufacturer's list shall include a typewritten list of manufacturer's name, sizes and model or catalog numbers, referenced to the specification section. 2. Manufacturer's Catalog Data: Manufacturer's catalog data shall include standard catalog information marked to indicate specific equipment proposed and point of operation, if appropriate. Include installation instructions. 3. Manufacturer's Technical and Engineering Data: Manufacturer's technical and engineering data shall include materials, dimensions, details, installation instructions, weights, capacities, illustrations, wiring diagrams, control diagrams, piping diagrams, connection diagrams, performance data (including performance curves), mix design, and any other information required for a complete and thorough evaluation of the equipment or items specified, and to verify compliance with specifications. Control diagrams or control schematics, where specified and required by the submittal schedule, shall include a detailed schematic of the proposed control modifications and their interface with existing control equipment, where appropriate, and a manufacturer and model number listing of all proposed control components shown on the control schematic. B. Shop Drawings: Shop drawings are construction drawings of items manufactured specifically for this project. Shop drawings include dimensions, construction details, weights, and additional information to identify the physical features of the system or piece of equipment. C. Samples: Samples illustrate functional characteristics of the product with integral parts and attachment devices. Samples shall allow evaluation of full range of manufacturer's standard colors, textures, and patterns. Certificates, Test Data or Other Information: Requirements for certificates, test data, or other information will be listed under referenced specification sections. 1.03 PROCEDURES A. Deliver submittals to Engineer at address listed on title sheet of project manual. Transmit each item by cover letter or with approved transmittal form referencing the project, the Owner, and the Contractor. B. Engineer will require 15 days for review of submittal documents. C. Revise and resubmit. Resubmittals shall be complete substitutions of original submittals unless specifically noted otherwise. D. Distribute copies of reviewed submittals to concerned persons. Instruct recipients to promptly report any inability to comply with provisions. E. Submittal information required in Section 01 33 00 - 1.04 below must be provided regardless of whether the proposed item or work is in exact accordance with the specification requirements. F. No item requiring approved submittal information shall be delivered to the site or installed, or any associated work performed until required submittals have been approved for compliance with the Contract Documents by the Engineer. Any item delivered to the site or installed, or any work performed without an approved submittal, which is deficient in any way, shall be removed from the site without expense to the Owner. 1.04 SUBMITTALS REQUIRED A. Project Schedule: 1. A progress schedule for the proposed work, as outlined in the General Conditions and specified hereunder, shall be prepared and submitted for review. 2. Coordination: Contractor shall meet with Owner's representatives prior to preparing schedule to ascertain specific Owner scheduling requirements. 3. Submit three (3) copies of completed schedule for review. Upon Engineer's signed approval work may commence. 4. Format: Horizontal bar chart or CPM format at Contractor's option. a. Provide a separate time bar for work in each building in the contract. Provide a Continuous vertical line to identify the beginning work day of each week. b. Within each time bar, indicate estimated completion percent increments. c. Coordinate construction schedule with the schedule of values, list of Subcontractors, submittal schedule, payment requests, and other schedules. d. Indicate substantial completion date. 5. Schedule shall be continually updated. Submit revised schedule with each application for payment. B. Schedule of Values: 1. A schedule of values for the proposed work, as outlined in the General