Kakatiya

SRI K.CHANDRASHEKAR RAO SRI K T RAMA RAO The Hon'ble Chief Minister The Hon'ble Minister for Industries Mega Textile Textiles, Municipal Administration & Urban Development and NRI Affairs Park,

An Integrated World A Project Promoted by State Industrial Infrastructure Class Destination for Corporation Limited (TSIIC), a Undertaking Textile Value Chain INDIAN TEXTILE INDUSTRY Key Facts

Highest Share in Contains 24% of India is the second largest producer of fibre in the World Loom Capacity World Spindles & 8% world and the major fibre produced is cotton. Other (63%) of World Rotors fibres produced in India include manmade fibres, silk, jute, wool, and man-made fibers. 60% of the Indian textile Industry is cotton based. After dismantling of the multi-fibre arrangement, there has been a huge growth of the Indian Textile industry. 2nd Largest Producer 2nd Largest Textiles TELANGANA of Cotton & Silk Manufacturer Largest 3rd Producer of Cotton in India

Fibre to Retail – Total Cloth Vertically Integrated Production: 65 Telangana is one of the largest producers of long staple Value Chain Billion Square Metres cotton. The total production of cotton is around 6 Million bales per annum. TELANGANA

Telangana, the 29th State in India Mega Textile Park In Hyderabad WARANGAL Warangal The Cotton Hub of Telangana

• Warangal is the highest cotton growing district in Telangana. It is one of the regions largest cotton market yards. • The region has ginning and pressing facilities and is known for skilled Textile workers • Has presence of technical institutions • Well-connected with roads and railways • Opportunity to create large manufacturing bases • Proactive Government initiatives to support the Textile industry KAKATIYA MEGA TEXTILE PARK Warangal

Promoted by Telangana State Industrial Infrastructure Corporation (TSIIC) to support Textile & Apparel Industry 1200 ACRES Total Area Provide state-of-the-art manufacturing 1 facilities to make the units globally competitive USD 160 MILLION Estimated Development Cost Establish integrated common infrastructure 2 to help manufacturers maintain Industry standards and compliances for exports

100,000+ Set up world class common facilities with Expected Employment 3 modern technologies to enhance productivity and increase efficiencies of the Textile units

Cater to all Textile value chain activities to 4 make the Park a global sourcing hub MAJOR METROS BY ROAD LOCATION – WARANGAL • Hyderabad – 145 km Geesukonda Mandal and Sangem Mandal • Chennai – 640 km • Bangalore – 720 km • Mumbai – 850 km • Kolkata – 1370 km • New Delhi – 1520 km RAILWAY STATIONS • Warangal Railway Station ~14 km • Railway Station ~26 km (Warangal & Kazipet Railway Stations are on the trunk lines connecting Delhi with Chennai)

AIRPORTS • Hyderabad International Airport ~190 km • Airport at Warangal (Proposed)

SEAPORTS • Machilipatnam ~330 km • Kakinada ~400 km • Chennai ~652 km • Krishnapatnam ~502 km INTEGRATED TEXTILE VALUE The Kakatiya Mega Textile Park at Warangal offers industrial CHAIN space for Textile and Apparel Industry with state-of-art manufacturing facilities and integrated common infrastructure.

The Park is being developed on a vertically integrated model to cover complete Textile & Apparel value chain. The basic concept of the Park is to offer complete manufacturing eco- system for Textiles and Apparel Industry within its premises.

1190 acres of land is being developed and implemented in a phased manner to provide world class infrastructure facilities to enhance The Government of Telangana is offering best of its class productivity and increase efficiencies of Textile Industry. incentives to investors setting up units in the Kakatiya Mega Textile Park STATE-OF-THE-ART COMMON FACILITIES & INFRASTRUCTURE

COMMON FACILITIES SOCIAL INFRASTRUCTURE Road Network • Administrative Block including • Workers’ Hostel Product Display Centre • Housing Zone • Skill Development Centre • Crèche, Medical Facility • Convention & Exhibition Centre • Commercial Centres / • Warehouses Recreational Centre etc. • Market Place for Finished Goods Built to suit & Product Display Centres factory • Testing Laboratory

PREMIUM SPACE Effluent Treatment Plant with ZLD

INDUSTRIAL PLOTS PLUG & PLAY FACTORY Of different sizes and SHEDS Spacious Units specifications for various For Apparel and Garmenting Textile activities Units COMMON INFRASTRUCTURE

SITE DEVELOPMENT ROADS POWER DISTRIBUTION

Cleared, graded and leveled to • 36m RoW – Main Arterial roads • Total demand: 210 KW create a uniform terrain to enable • 30m RoW – Sub-Arterial roads • Sub-station for 210 KW construction and infrastructure • 18m RoW – Internal roads • Overhead distribution network development • Energy efficient LED fitted street lighting

SEWAGE TREATMENT WATER SUPPLY STORM WATER DRAIN

• Decentralized STP with a overall Total water requirement • Open SWD on both sides of the capacity of 15MLD • Industrial Use: 31.2 MLD road Arterial and sub-arterial • Conveyance & treated water • Potable use: 8.8 MLD roads and a few Internal roads. distribution/conveyance system • Closed SWD on one side in internal roads

LANDSCAPING EFFLUENT TREATMENT ADDITIONAL INFRA

Integrated landscape of • 20 MLD CETP with ZLD (4x5 MLD) • Waste Management facility international standards • Effluent collection system • Telecommunications • Treated water conveyance system • Truck parking & Weighbridge KEY FEATURES PRIMARY SYSTEM Roads – 6 lane primary road and 4 lane secondary road ENERGY EFFICIENT PUBLIC TRANSPORT 1 CNG/ hybrid vehicles INTEGRATED SECONDARY TRANSPORT DECONGESTED PRIMARY ROADS Shuttle buses with interchanges 2 Entries to plots via secondary / tertiary roads

SEGREGATED TRANSPORT SYSTEM TERTIARY TRANSPORT SYSTEM 3 Separate lanes for vehicular traffic, public E-Rickshaws, bicycles transport & pedestrian / cycle / e-rickshaw tracks

TRANSPORT INTERCHANGE NODES 4 Planned at approx. 1 km for seamless commuting

PARKING PROVISION 5 Designated parking for different transport modes near the interchange node

TRUCK HOLDING AREAS 6 Decongestion of the main roads, interchange nodes, entry / exit points ENVIRONMENTAL ECOLOGICAL CORRIDOR Continuous Green belt on both sides of INFRASTRUCTURE INSIDE primary road with hierarchies of greenery as landscaping, avenue plantation and buffer MEGA TEXTILE PARK zones

GREEN AREA Designated 10% green area

NET ZERO CAMPUS Zero discharge of utilities into the ground

WATER EFFICIENCY & RESUE Waste water & storm water management. Recycling of water is proposed through the ETP & STPs

ENERGY EFFICIENT BUILDINGS Development norms to incorporate energy efficient buildings in the campus PROJECT CONCEPTUALISATION

Integrated world class common infrastructure to help manufacturers maintain Industry standards and compliances for exports Common facilities with modern technologies to enhance productivity and increase efficiencies

PROJECT CONCEPTUALISATION WARANGAL DISTRICT Fact File

DEMOGRAPHY EDUCATIONAL SOCIAL

1.8 Million – Population of INSTITUTES INFRASTRUCTURE Warangal Urban and Rural • Presence of premier educational • 146 hospitals/clinics, Districts institutions like Kakatiya Medical • 17 primary health care College and National Institute of centers Technology • 3 community care • Higher institutes in centres, 9,03,344 9,09,034 Warangal (University – 1, Medical College – 1, – 3, • 10 Ayurveda clinics and Science & Technology – 5, • 5 homeopathy hospitals POPULATION Polytechnic – 2, Pharmaceutical – 2, DISTRIBUTION Law – 1, Arts – 2, Others – 5) IN 0-20 KM RADIUS • 498 primary schools with 23,218 students 1,08,956 – Households 4,22,261 – Total Population

2,10,273 2,12,088 PROPOSITION To the Investors

MANPOWER LAND FACTOR CONDITIONS Support in identifying, mobilising Customisable as per requirement Assured supply of power and and skill development of water workforce

MAXIMUM SUPPORT HOUSING • Assistance in leveraging subsidies / Support in identifying separate grants from Govt of India zone for housing for Supervisory • Structuring projects as per Scheme / Managerial staff requirements KAKATIYA MEGA TEXTILE PARK, WARANGAL

Space With INFRASTRUCTURE | UTILITIES | CONNECTIVITY

6th Floor, Parisrama Bhavan, Fateh Maidan Road, Basheer Bagh, Hyderabad – 500 004, Telangana • Phone: +91-40-23237625, 23237626 Fax: +91-40-23240205, 23241385 • Email: [email protected]

Project Advisory & Management Consultant IL&FS Cluster Development Initiative Limited