Planning Committee

8 June 2010

Applications Outstanding as of 27 May 2010

Report by Divisional Manager (County Development)

Former Applicant Proposal Location Date Decision Weeks Since Current Reference Registered Method Registration Position County WSCC/079/ Kendall Bros Variation of Condition 1 of New Wharf, Brighton 29-Oct-2009 Delegated 30 Subject Matter 09/SU (Portsmouth) planning permission Road, Shoreham, S106 & Mineral Ltd SU/233/04 to extend the West , BN43 Legal temporary permission for 6RN Agreement unloading, preparation and storage of mineral aggregates with concrete batching plant WSCC/002/ Dudman Variation of conditions of Dudmans Aggregates 05-Jan-2010 Delegated 20 Report to 10/WH Group of planning permission Limited, Valdoe be prepared Companies WH/12/84 and LV/20/84 to Quarry, New Road, extend the extraction and Westhampnett, West processing of sand and gravel Sussex until 31/12/2015 WSCC/019/ Dudman Variation of conditions of Dudmans Aggregates 13-Jan-2010 Delegated 19 Report to 10/WH Group of planning permission Limited, Valdoe be prepared Companies APP/P3800/C/01/1056992 to Quarry, New Road, extend the production of Westhampnett, West ready mixed concrete until Sussex 31/12/2015 WSCC/031/ CEMEX UK Proposed easterly extension West Heath Quarry, 16-Feb-2010 Committee 14 Additional 10/HT Operations to West Heath Quarry West Heath Common, information Ltd West Harting, West awaited Sussex, GU31 5PF WSCC/037/ Penfold Variation of Condition 1 Land at New Monks 03-Mar-2010 Delegated 12 Report to 10/L Verrall Ltd (Temporary continuation of Farm, Cecil Pashley be prepared the recycling of aggregates Way, Lancing, West beyond 30 April 2010 of Sussex planning permission ADC/60/08 (L). WSCC/039/ John Proposed extension to Brickworks, 11-Mar-2010 Committee 11 Examining 10/NH Sandford c/o existing brickworks Langhurst Wood responses Wienerberger Road, , West Ltd Sussex, RH12 4ZL WSCC/053/ The Extraction of 1.5 million Horncroft Quarry, 31-Mar-2010 Committee 8 Awaiting 10/BY Barlavington tonnes of sand, new Tripp Hill, Bury, West consultation Estate temporary access, Sussex, RH20 1EX response landscaping, erection of temporary office and plant to process the sand, weighbridge, wheel washing, water extraction borehole, earthworks and landscaping and restoration County WSCC/014/ Mr John Construction of material Hanger No 8, 05-May-2009 Committee 55 Subject Matter 09/CM Gosling, recycling facility to handle a Northwood Farm, S106 & Waste Envirowaste maximum throughput of Burndell Road, Legal (Southern) 15,500 TPA of construction Climping, West Agreement Ltd and demolition/skip waste, Sussex, bn18 0hr with associated new yard area, stockpile area and weighbridge/office facility WSCC/076/ Emsworth Construction of a noise Former Jubilee Wood 23-Oct-2009 Delegated 31 Report to 09/WE Sporting screening bund. landfill site, Marlpit be prepared Clays Limited Lane, nr Hambrook, Chichester, , PO18 8UL WSCC/003/ S Wright Development of equine Park Farm Cottage, 07-Jan-2010 Delegated 20 Subject 10/BK rehabilitation and Broxmead Lane, S106 & physiotherapy centre Bolney, West Sussex, Legal comprising treatment block, RH17 5RJ Agreement horse walker, sand school, car park, grass paddocks, exercise track and engineering operation to form a bund adjacent to the A23 (resubmission of BK/185/08) - Application 1 WSCC/018/ Dudman Variation of conditions of Dudmans Aggregates 13-Jan-2010 Delegated 19 Report to 10/WH Group of planning permission Limited, Valdoe be prepared Companies WHLV/00/289 to extend the Quarry, New Road, Importation of inert materials Westhampnett, West to acheive satisfactory Sussex restoration on site and to produce secondary aggregates for re-sale from the site, until 31/12/2015 WSCC/029/ CEMEX UK Proposed backfilling with Pendean Sand Quarry, 09-Feb-2010 Delegated 15 Additional 10/WL Operations imported inert waste material Oaklands Lane, West information Ltd to ensure long term stability Lavington, West awaited of quarry faces Sussex WSCC/033/ Ensign Upgrade the existing practice Park Golf & 19-Feb-2010 Committee 14 Additional 10/SF Leisure ground and pitch & putt Country Club, Stane information Limited course, involving the import Street, Slinfold, West awaited of inert soil Sussex, RH13 0RE WSCC/036/ Focus Change of use from sawmill Unit Z1, Mackley 03-Mar-2010 Committee 12 Additional 10/UB Recycling and timber yard to a waste Industrial Estate, information transfer station and recycling Road, Small awaited centre Dole, Henfield, West Sussex, BN5 9XG WSCC/041/ A J Pitts Building for storage of South East Corner Of 16-Mar-2010 Delegated 10 Awaiting 10/TG compost and associated Tangmere Airfield, consultation operations. Tangmere Road, response Tangmere, West Sussex WSCC/049/ Tarmac Variation of condition 1 of Portfield Quarry, 26-Mar-2010 Delegated 9 Awaiting 10/O Limited planning permission Chichester By Pass, consultation O/1952/06 to permit the Chichester, West response continued importation, Sussex, PO19 9VW stacking, recycling and resale of heavy building materials as secondary aggregates until 30 June 2015 WSCC/050/ Tarmac Proposed Variation of Portfield Quarry, 26-Mar-2010 Delegated 9 Awaiting 10/O Limited Condition 1 of permission Chichester By Pass, consultation O/1953/06 to permit the Chichester, West response continued importation, Sussex, PO19 9VW stacking, processing and resale of unprocessed aggregates at Portfield until 30 June 2015. WSCC/057/ Godfrey Change of use of part of a Stedham Saw Mills, 12-Apr-2010 Delegated 6 Examining 10/SJ/SDNP Dudman former sawmill site to a waste School Lane, responses transfer and recycling station Stedham, Midhurst, with ancillary skip hire/skip West Sussex, GU29 storage business. 0NY WSCC/058/ Ian Rowland, Variation of Condition 6 of Ford Wastewater 20-Apr-2010 Delegated 5 Awaiting 10/F c/o Southern planning permission Treatment Works consultation Water F/16/05(B) to allow sludge (WTW), Ford response Services Ltd deliveries from different Aerodrome, Arundel, sources West Sussex, BN18 0HY WSCC/064/ Nick Construction of a green waste Land at Broadbridge 12-May-2010 Delegated 2 Awaiting 10/AS Hawthorne composting and wood Farm, London Road, consultation chipping facility, ancillary Ashington, response offices and weighbridge , West associated roads, car parking Sussex, RH20 3DD and landscaping. WSCC/061/ Langmead Erection of an Anaerobic Langmead Farm, 13-May-2010 Delegated 2 Awaiting 10/NM Farm Ltd Digestion Plant Chichester Food Park, consultation A259, Runcton, response Bognor Regis, West Sussex Regulati WSCC/096/ Chief Construction of a new Fire Land South of Cheals 30-Dec-2009 Delegated 21 Awaiting on 3 09/CR Executive Station with associated Roundabout, Crawley, consultation training facilities, vehicle and West Sussex, response pedestrian access, and car RH119DW parking WSCC/025/ Executive Erection of single storey Primary 27-Jan-2010 Delegated 17 Additional 10/RW Director timber framed building with School, Tates Way, information Adults and associated site access Rudgwick, Horsham, awaited Children alterations and car parking to RH12 3HW provide new build Early Years' Unit. WSCC/038/ Executive New build 1600 place Shoreham Academy, 08-Mar-2010 Committee 11 This agenda 10/SU Director academy (Shoreham Kingston Lane, Adults and Academy) to replace existing Shoreham By Sea, Children Shoreham Academy West Sussex, BN43 (previously Kings Manor 6YT College) and construction of associated sporting facilities, including a floodlit synthetic turf pitch. Phased demolition of the existing school buildings upon completion of the new academy Regulati WSCC/059/ Executive Replace existing 1.2m chain Hassocks Infant 28-Apr-2010 Delegated 4 Awaiting on 3 10/HA Director link fence with 1.8m weld School, Chancellors consultation Minor Adults and mesh fence Park, Hassocks, West response Children Sussex, BN6 8EY WSCC/060/ Executive Introduction of an external Harlands Primary 10-May-2010 Delegated 2 Awaiting 10/HH Director front and side canopy to the School, Penland Road, consultation Adults and existing school Haywards Heath, response Children West Sussex, RH16 1PJ WSCC/062/ Executive Demolition of a detached Eastbrook Primary 13-May-2010 Delegated 2 Awaiting 10/SW Director temporary classroom and School, Gardner Road, consultation Adults and construction of a new Southwick, West response Children classroom extension Sussex, BN41 1PN WSCC/063/ Executive Replace existing 1metre high North Mundham 19-May-2010 Delegated 1 Awaiting 10/NM Director steel bow-top fence with 1.6 Primary School, consultation Adults and metre high steel bow-top School Lane, North response Children fence to increase playground Mundham, Chichester, security West Sussex, PO20 6LA