Vauxhall Station

Total Page:16

File Type:pdf, Size:1020Kb

Vauxhall Station Vauxhall Station On the instruction of SWR Retail Opportunity On the instruction of SWR Retail Premises to Let VAUXHALL STATION, SW8 1SS RETAIL PREMISES Vauxhall station has eight platforms and is located between South Lambeth Road to the East and South Lambeth Place to the WestThe station has interchange with Vauxhall Underground and Bus station located at the Western entrance. The station is on the boundary of zones 1 and 2 of the London Travelcard area. Passenger data from the Office for the Rail Regulator stipulate that in 2018/19 the station had in excess of 21 million passenger entries and exits Description Insurance Unit A2 is located within the Arch that connects the The tenant will be responsible for a contribution of the main pedestrian walkway with the northern entrance Building Insurance (Rent). Currently £410 per annum. to platform 7-8. Shop Fitting The landlord has recently undertaken works to dryline The incoming tenant will be required to provide the arch. The tenant will have use of the station WC detailed annotated shop fit plans and signage facilities but subject to consents there is an option to proposals demonstrating a high quality shopfit for the install within the demise. Superior Landlord and Landlord’s approval. 44.4 sq m 478 sq ft Business Rates The payment of business rates will be the Lease Details responsibility of the tenant. The Valuation Office The premises are being offered by way of a new lease Agency advise that the premise s are Local authority to 17th August 2024, subject to a rent review at the reference 04560000010004. end of the third year. The lease will be excluded from the security of tenure and compensation provisions of The rates liability for the property is as follows: - the 1954 Landlord & Tenant Act. Standard railway Rateable Value: £8,400.00 lease terms will apply. The lease will not permit assignment or sub-letting. Based on the current Small business multiplier of 0.491 for 2019/20 Rates Payable 19/20 rate year: If the tenant requires a longer lease or flexibility of a £4,124.40. shorter lease then please advise. Subject to the consent of the Superior Landlord, Network Rail Utilities Infrastructure Limited and Department for Transport, The tenant will be responsible for all utilities a longer term may be available. The incoming tenant consumed and in the event that the operator uses the will be expected to pay the landlord and if a longer landlord’s refuse and recycling bins then a contribution lease is required, the superior landlords legal costs. will be made towards removal. Minimum Guaranteed Rent User Offers in excess of £28,000.00 per annum plus vat An end user that will cater for passengers' needs and along with supporting turnover rent provision. complement the existing tenant mix of the station is required. Existing retailers include Costa, Digby’s Subject to the landlord's formal approval, a rent free Patisserie and Knot Pretzels. period may be available for the period of shopfit. Energy Performance The EPC has been ordered. AmeyTPT Limited and their clients give notice that: (i) These particulars do not form part of any offer or contract and must not be relied upon as statements or representations of fact. (ii) No person in the employment of AmeyTPT Limited has any authority to make or give any representation or warranty whatever in relation to this property. (iii) Floor areas, measurements or distances given are approximate. Unless otherwise stated, any rents, or outgoings quoted are exclusive of VAT. (iv) Any descriptions given of the property cannot be taken to imply it is in good repair, has all necessary consents, is free of defects. On the instruction of SWR Retail Premises to Let AmeyTPT Limited and their clients give notice that: (i) These particulars do not form part of any offer or contract and must not be relied upon as statements or representations of fact. (ii) No person in the employment of AmeyTPT Limited has any authority to make or give any representation or warranty whatever in relation to this property. (iii) Floor areas, measurements or distances given are approximate. Unless otherwise stated, any rents, or outgoings quoted are exclusive of VAT. (iv) Any descriptions given of the property cannot be taken to imply it is in good repair, has all necessary consents, is free of defects. On the instruction of SWR Retail Premises to Let AmeyTPT Limited and their clients give notice that: (i) These particulars do not form part of any offer or contract and must not be relied upon as statements or representations of fact. (ii) No person in the employment of AmeyTPT Limited has any authority to make or give any representation or warranty whatever in relation to this property. (iii) Floor areas, measurements or distances given are approximate. Unless otherwise stated, any rents, or outgoings quoted are exclusive of VAT. (iv) Any descriptions given of the property cannot be taken to imply it is in good repair, has all necessary consents, is free of defects. On the instruction of SWR Retail Premises to Let AmeyTPT Limited and their clients give notice that: (i) These particulars do not form part of any offer or contract and must not be relied upon as statements or representations of fact. (ii) No person in the employment of AmeyTPT Limited has any authority to make or give any representation or warranty whatever in relation to this property. (iii) Floor areas, measurements or distances given are approximate. Unless otherwise stated, any rents, or outgoings quoted are exclusive of VAT. (iv) Any descriptions given of the property cannot be taken to imply it is in good repair, has all necessary consents, is free of defects. On the instruction of GTR Unit 3 – Catering / Retail Opportunity Viewing is by appointment only through sole agents, Amey TPT. For further details relating to this property please contact us: Eva Puchowska – Assistant Surveyor Email : [email protected] Tel : 020 7921 9582 Ian Chalmers –Portfolio Manager Email : [email protected] Tel : 020 7921 2935 Please visit tpt.amey.co.uk/properties/ for terms and conditions and more information on similar properties across the United Kingdom @TPTRetail [email protected] 020 7921 2930 AmeyTPT Limited and their clients give notice that: (i) These particulars do not form part of any offer or contract and must not be relied upon as statements or representations of fact. (ii) No person in the employment of AmeyTPT Limited has any authority to make or give any representation or warranty whatever in relation to this property. (iii) Floor areas, measurements or distances given are approximate. Unless otherwise stated, any rents, or outgoings quoted are exclusive of VAT. (iv) Any descriptions given of the property cannot be taken to imply it is in good repair, has all necessary consents, is free of defects. .
Recommended publications
  • Statement of Case Made by First MTR South Western Trains Limited 22Nd
    ADA49_SWR Statement of Claim Page 1 of 105 ADA49: Statement of Case made by First MTR South Western Trains Limited 22nd January 2020 22/1/20 ADA49_SWR Statement of Claim Page 2 of 105 1. DETAILS OF PARTIES 1.1 The names and addresses of the parties to the reference are as follows:- (a) First MTR South Western Trains Limited, a company registered in England under number 2904587 having its registered office at 4th Floor, Capital House, 25 Chapel Street, London, NW1 5DH (“SWR”) ("the Claimant")); and (b) Network Rail Infrastructure Limited, a company registered in England under number 2904587 having its registered office at 1 Eversholt Street, London NW1 2DN ("Network Rail") ("the Defendant")). (c) Correspondence details of SWR’s contacts are as follows: a) Dave Waldron, Current Performance Manager SWR, South Bank Central, 30 Stamford Street, London SE1 9LQ: [email protected] : 07585 405449; and b) David Rourke, Regulatory Access Manager SWR, South Bank Central, 30 Stamford Street, London SE1 9LQ: [email protected] : 07814 347296. 2 THE CLAIMANT’S’ RIGHT TO BRING THIS REFERENCE 2.1 This matter is referred to an Access Dispute Adjudication (“ADA”) for determination in accordance with Schedule 8 paragraph 16.1 of the Track Access Contract dated 20th May 2004 between SWR and Network Rail (“the Agreement”1). The clause in question, namely Schedule 8 paragraph 16.12, reads as follows: 2.2 Having followed the process outlined in Schedule 8 paragraph 16.1, above (including making a joint submission to the Delay Attribution Board, which was considered at a hearing on 19th November 2019, the conclusions arising from 1 This was the Track Access Contract that was in place, between the parties, at the time of each of the three incidents from which this Statement of Claim arises.
    [Show full text]
  • Wessex Capacity Alliance
    Project Waterloo Station upgrade Location London, UK Client Network Rail Expertise Rail systems, civil, structural, building services, geotechnical, environmental and fire engineering; security and ergonomic design International rescue Joined-up thinking and clever engineering have allowed a former international terminal to be brought back to life as part of a bigger, better Waterloo Station Waterloo Station upgrade I Mott MacDonald I 3 “ By signing up to the charter we are all pulling in the same direction, delivering value for money.” David Barnes Wessex Capacity Alliance deputy manager Britain’s Improving the passenger experience for the 99M people who use Waterloo Station every year involves busiest railway much more than the word ‘upgrade’ implies. There station, London is major viaduct reconstruction, a new connection to London Underground, demolition of some sections Waterloo, is of platforms and extension of others, construction undergoing a of a new roof and pedestrian bridge, and a huge amount of new railway infrastructure to be installed. £400M upgrade to increase Programmed around the normal working of the station and right under the public’s nose, the first nine months capacity. on site saw demolition taking place only a nibble at a time – a portion of track removed here or a new piece of infrastructure installed there – to limit disturbance. Waterloo Station is served by the South West Mainline, the Reading and Windsor lines and suburban lines connecting London with the South and South West of England. By 2043, the number of journeys made on the route is expected to increase by 40%. Anyone using the service at peak time will be familiar with how busy trains can become.
    [Show full text]
  • Dust Monitoring on the London Underground Network
    Report No. 4RS-APO-153196-R517226-Rev01 RESPIRABLE AIRBORNE DUST MONITORING AT VARIOUS LONDON UNDERGROUND STATIONS AND TRAIN LINES Prepared for: Mrs Louise Dearman Occupational Hygiene Adviser Tfl – RAIL and Underground 1st Floor Petty France London SW1H 0BD Issue Date: 22nd September 2016 Prepared by: Ms A. Popa Technologist Signature: .......................... Certified by: Mr J. Bailey Senior Consultant Signature: ............................ VAT Registration No: 691 5975 82 Registered Office: Unit 3, Metro Centre, Britannia Way, London, NW10 7PA Registered in England No: 3256863 Respirable Airborne Dust Monitoring At Various London Underground Stations And Train Lines CONDITIONS OF ISSUE OF REPORTS. THIS REPORT IS ISSUED IN CONFIDENCE AND SHALL NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN APPROVAL FROM 4-RAIL SERVICES. FURTHER INFORMATION. REQUESTS FOR ADDITIONAL INFORMATION ON THE SUBJECT OF THIS REPORT OR OTHER QUERIES SHOULD BE ADDRESSED TO THE AUTHOR. REPORT ISSUE DATE REVISION DETAILS REVISION INITIAL 8TH JULY 2016 ISSUED FOR COMMENT REV 01 22ND SEPTEMBER 2016 REPORT UPDATED TO INCLUDE A REPEAT OF THE DISTRICT LINE TRAIN CAB MONITORING, FOLLOWING DAMAGED FILTER RESULTS. 4-RAIL Services Report No. 4RS-APO-153196-R517226 - Rev01 Page 2 of 69 Respirable Airborne Dust Monitoring At Various London Underground Stations And Train Lines CONTENTS Page Executive Summary .................................................................................................................... 4 1.Introduction ..............................................................................................................................
    [Show full text]
  • 156 Wimbledon – Clapham Junction – Vauxhall
    156 Wimbledon – Clapham Junction – Vauxhall 156 Mondays to Fridays WimbledonSirCyrilBlackWay 0530 0545 0600 0615 0627 0639 0649 0659 0709 0719 0825 1905 1917 1929 WimbledonStation 0532 0547 0602 0617 0629 0641 0651 0701 0711 0721 Then 0828 Then 1908 1920 1932 WimbledonParkTheWoodman 0539 0554 0610 0625 0637 0649 0701 0712 0722 0732 about 0841 about 1919 1931 1943 SouthfieldsCommunityCollege 0542 0557 0613 0628 0640 0654 0706 0717 0727 0737 every8-9 0846 every10 1923 1935 1947 WandsworthBuckholdRoad 0546 0601 0618 0633 0645 0701 0713 0724 0734 0744 minutes 0853 minutes 1930 1942 1954 ClaphamJunctionStJohn'sHill 0554 0611 0628 0643 0657 0713 0725 0736 0746 0756 until 0905 until 1943 1955 2007 BatterseaParkStation 0601 0620 0638 0657 0712 0729 0741 0752 0802 0812 0921 1955 2007 2019 VauxhallStationBusStation 0608 0627 0645 0704 0720 0737 0749 0800 0810 0820 0928 2003 2015 2027 WimbledonSirCyrilBlackWay 1941 1953 2005 2017 2029 2041 2053 2105 2117 2129 2141 2153 ##05 ##17 ##29 0005 WimbledonStation 1944 1956 2007 2019 2031 2043 2055 2107 2119 2131 2143 2155 ##07 ##19 ##31 0007 WimbledonParkTheWoodman 1955 2007 2018 2028 2040 2052 2104 2116 2128 2140 2152 ##04 ##15 ##27 ##38 Then 0014 SouthfieldsCommunityCollege 1959 2010 2021 2031 2043 2055 2107 2119 2131 2143 2155 ##07 ##18 ##30 ##41 every12 0017 WandsworthBuckholdRoad 2006 2016 2026 2036 2048 2100 2112 2124 2136 2148 ##00 ##12 ##23 ##34 ##45 minutes 0021 ClaphamJunctionStJohn'sHill 2018 2028 2038 2048 2059 2109 2121 2133 2145 2157 ##09 ##20 ##31 ##42 ##53 until 0029 BatterseaParkStation
    [Show full text]
  • South London Sub-Regional Transport Plan
    1 2 Contents Mayoral foreword 2 London Councils foreword 2 Executive summary 3 Chapter 1: Introduction 7 Chapter 2: Supporting economic development and population growth 27 Chapter 3: Enhancing the quality of life for all Londoners 61 Chapter 4: Improving the safety and security of all Londoners 79 Chapter 5: Improving transport opportunities for all Londoners 85 Chapter 6: Reducing transport‟s contribution to climate change & 91 improving its resilience Chapter 7: Supporting delivery of London 2012 Olympic and 95 Paralympic Games and its legacy Chapter 8: Key places in north sub-region 96 Chapter 9: Delivery of the Plan and sustainability assessment 105 Chapter 10: Next steps 108 Appendices Appendix 1: Implementation Plan 113 Appendix 2: Roles and responsibilities for managing London‟s strategic road corridors 118 1 Mayoral foreword London Councils‟ foreword Following my election in 2008, I set out my desire for TfL to “listen and learn Boroughs play a key role in delivering the transport that London needs and deserves. from the boroughs...help them achieve their objectives and... negotiate However, there are many transport issues that cross borough boundaries and this is solutions that will benefit the whole of London” (Way to Go, November 2008). where the Sub-regional Transport Plans (SRTPs) are particularly important. The SRTPs TfL thus embarked on a new collaborative way of working based on sub-regions. fill the gap between the strategic policies and proposals in the Mayor‟s Transport Strategy (MTS) and the local initiatives in boroughs‟ Local Implementation Plans (LIPs). As well as better collaboration, the sub-regional programme has led to an We have very much welcomed the GLA and TfL‟s willingness to engage with London improved modelling and analytical capability, that has enabled changes within Councils and the boroughs on the development of the SRTPs over the last couple of the sub-regions to be better understood and provided for.
    [Show full text]
  • Long Leasehold Vacant Possession Investment Opportunity
    1 Long Leasehold Vacant Possession Investment Opportunity Exceptional commercial opportunities within the prestigious Nine Elms neighbourhood in Battersea VISUAL OF THE COMMERCIAL ACCOMMODATION WELCOME TO 2 Nine Elms represents a beautiful new riverside neighbourhood with some fantastic 3 bars and restaurants, flourishing from the influx of new quality residential and office accommodation. Lexington Gardens forms part of the Nine Elms development, sitting alongside complementary mixed use developments including Embassy Gardens and the new US Embassy. The investment into the public realm of Nine Elms has resulted in a truly unique, tranquil place to live and work, despite the proximity to London’s West End. Please read on to explore the commercial opportunity, whether that be for an office, gym, restaurant, wellness, healthcare or café, we welcome all Use Class E & F occupiers. We hope you enjoy! Computer generated image of the railway arches along Ponton Road. A CITY ON YOUR DOORSTEP The American The Embassy Residence Nine Elms Chelsea Harvey Nichols London Waterloo Underground Station Vauxhall Eye Station (Completion 2021) Station Battersea Underground Station Knightsbridge Harrods Hyde Park Mayfair Battersea Vauxhall (Completion 2021) Power Station Pimlico St James's Park Westminster Bridge The City The Shard Royal Hospital Chelsea Thames Clipper Marylebone Victoria Station 4 5 Computer generated image. CONNECTIVITY THE BRAND NEW BILLION-POUND NORTHERN LINE EXTENSION PUTS THE WEST AND THE CITY ON YOUR DOORSTEP KING’S CROSS/ST. PANCRAS Lexington Gardens is a 3 minute walk from the new Nine Elms Underground station (completion 2021), connecting you to London Bridge in 9 minutes and the City in 11 minutes.
    [Show full text]
  • Keybridge House, Vauxhall SW8 a Brand New Apartment to Let in Keybridge House, Vauxhall, SW8 Through Knight Frank Battersea & Nine Elms
    Keybridge House, Vauxhall SW8 A brand new apartment to let in Keybridge House, Vauxhall, SW8 through Knight Frank Battersea & Nine Elms. Located on the fifth floor with lift and offering 570 sq ft of living space, this apartment comprises of one double bedroom with Firstbuilt inparagraph, storage, one editorial bathroom style, and short, an open considered plan kitchen headline / benefitsreception ofroom. living here. One or two sentences that convey what you would say in person. The property additionally benefits from two forms of outside Secondspace, including paragraph, a private additional northeast details facing of note balcony about theleading off property.from the livingWording / kitchen to add area value and and offering support views image of Vauxhallselection. Park Temand avolum spacious is solor and si secure aliquation private rempore roof terrace, puditiunto perfect qui utatisfor adit,entertaining animporepro friends experit and family et dolupta in the ssuntio summer mos months. apieturere There are ommostifloor to ceiling squiati windows busdaecus throughout cus dolorporum the apartment volutem. flooding the property with natural light. Third paragraph, additional details of note about the property. WordingResidents to in add Keybridge value and House support further image benefit selection. from a Tem24-hour volumconcierge is solor and si residents aliquation gym. rempore puditiunto qui utatis adit, animporepro experit et dolupta ssuntio mos apieturere ommostiAvailable tosquiati let through busdaecus Knight cus Frank dolorporum on a furnished volutem. basis. EPC. B XXX1 1 1 X GreatKeybridge Missenden House 1.5 is locatedmiles, London along Lambeth Marlebone Road, 39 minutes, located next Amershamto Vauxhall 6.5 Park miles, and M40 is only J4 0.5 10 miles,miles from Beaconsfield Vauxhall 11Station.
    [Show full text]
  • London Underground Limited
    Background Paper 1 Developing the Network 1 Introduction 1.1 Bus use has increased by over two-thirds since 1999, driven by sustained increases in the size and quality of the network, fares policy and underlying changes in London’s economy. The bus network is constantly evolving as London develops and the needs and aspirations of passengers and other stakeholders change. Enhancements take place not only to the service pattern but across all aspects of the service. • Capacity. The level of bus-km run has increased by around 40 per cent over the same period. Network capacity has increased by a faster rate, by around 55 per cent, with increases in average vehicle size. Additionally, much improved reliability means that more of the scheduled capacity is delivered to passengers. • Reliability. Effective bus contract management, in particular the introduction of Quality Incentive Contracts, has driven a transformation of reliability. This has been supported by bus priority and by the effects of the central London congestion charging scheme. Service control has been made more efficient and effective by iBus, TfL’s automatic vehicle location system. 4.0 3.5 3.0 2.5 2.0 1.5 Excess Wait Time (mins) 1.0 0.5 0.0 1977 1979 1981 1983 1985/86 1987/88 1989/90 1991/92 1993/94 1995/96 1997/98 1999/00 2001/02 2003/04 2005/06 2007/08 2009/10 2011/12 2013/14 Figure 1: Excess Waiting Time on high-frequency routes – since 1977 • Customer service. All bus drivers must achieve BTEC-certification in customer service and other relevant areas.
    [Show full text]
  • Tfl Investment Programme Report – Second Quarter 2013/14
    Agenda Item 4 Transport for London Projects and Planning Panel Subject: TfL Investment Programme Report – Second Quarter 2013/14 Date: 13 November 2013 1 Purpose 1.1 The Investment Programme report for the second quarter of 2013/14 (23 June – 15 September 2013) is attached to inform the Panel of TfL’s Investment Programme performance. 2 Recommendation 2.1 The Panel is asked to note this report. 3 Contact 3.1 Contact: Steve Allen, Managing Director, Finance Number: 020 7126 4918 Email: [email protected] Investment Programme Report Second Quarter June – September 2013/14 Table of Contents 1. Programme Highlights and Key Concerns............................................................................. - 3 - 2. Projects (over £50m) and Programmes (over £10m per annum) ............................................ - 5 - Sub-Surface Railway (SSR) Upgrade ................................................................................. - 6 - Track Renewal (BCV/SSR) .............................................................................................. - 12 - Civils (BCV/SSR) ............................................................................................................ - 14 - Track (JNP) ................................................................................................................... - 16 - Cooling the Tube Programme ....................................................................................... - 18 - SSR Major Power Works (Signalling)..............................................................................
    [Show full text]
  • Vauxhall Nine Elms Battersea Opportunity Area Planning Framework
    Vauxhall Nine Elms Battersea Opportunity Area Planning Framework March 2012 Copyright Acknowledgements Greater London Authority Project Team Colin Wilson March 2012 Tava Walton Claire O’Brien Lee Campbell Published by Yogesh Patil Jasper den Boeft Greater London Authority Far more people than it is possible to City Hall thank individually have contributed to the The Queen’s Walk production of the framework. They include the major landowners and their planning, More London transport and design teams; officers of Transport for London, Design for London London SE1 2AA and English Heritage; consultants who have contributed to the various technical studies and reports; the design review team Enquiries 020 7983 4100 at Design Council CABE; and many others. Without them, neither the framework nor the Minicom 020 7983 4458 progress that has already been made towards its implementation would have been possible. www.london.gov.uk Special thanks go to present and past officers and members of Lambeth and Wandsworth Cover photograph © Colin Wilson Councils for their continuing hard work and commitment to the project; and to Urban Graphics and Z Mapping for their assistance with the production of the document itself. Vauxhall Nine Elms Battersea Opportunity Area Planning Framework March 2012 i Vauxhall Nine Elms Battersea Opportunity Area Planning Framework Mayor’s foreword I am delighted to introduce this Opportunity homes and 20-25,000 jobs, supported in developers, under the guidance of the Area Planning Framework for Vauxhall Nine transport terms by a two-station extension Strategy Board. Sir Simon Milton was an Elms Battersea. of the Northern line from Kennington to integral part of this process until his untimely Battersea via Nine Elms.
    [Show full text]
  • The Iron Road Book and Railway Companion from London to Birmingham, Manchester, and Liverpool
    LIB R.AHY OF THE U N I VLR.S ITY OF ILLINOIS 385!0942 C&si 1838 I'll V, WATFORD •STATION Bushev <rvove bJlxtr<r Bey/tie i jfhtir i' tLuTon Jmu Benton ''f'Boisdon Hbnwev, BaiLBoads Canals. Turnpike Bonis irossBoads County Hound™■ THE IRON ROAD BOOK AND <smasmsra<i>sf FROM LONDON TO BIRMINGHAM, MANCHESTER, AND LIVERPOOL, CONTAINING AN Account of the Towns, Villages, Mansions, fyc. ON EACH SIDE OF THE LINE ; Times of Arrival and departure of the Trains AT THE SEVERAL STATIONS, Coaches and Omnibuses to the Towns in the Vicinity, WITH TABLES OF DISTANCES AND FARES FROM STATION TO STATION &C. &C. JUustratetr toitfj JRaps ot tf)e entire Htne. v Bv FRANCIS COGHLAN, : Author of Guides to * Paris,’ ‘St. Petersburgh, * The Rhine,’ * Belgium, ‘ Switzerland,’ * London,’ &c. HonDon: A H. BAILY & Co., 83, Cornhill. 1838. cur i* INTRODUCTION. LONDON £LN& BZIUVIZNGHAIVZ RAILWAY. J . The Act of Parliament for forming this great undertaking was obtained in May 1833, and the works were commenced in June 1834. 1 In July 1837, 24£ miles of the line, adjoining London, were opened to the public. Seventy-seven miles are now opened (viz. forty-eight from the London end, and twenty-nine from the Birmingham end) and in the ensuing autumn the whole of the line ; will be completed. Embankments, &c. v A level line for the Railway was obtained by cutting through the hills, and using the earth therefrom to form embankments. The country throughout is of ^ an undulating character, so that there is scarcely a *s mile throughout the whole length in which cuttings or embankments were not necessary.
    [Show full text]
  • Transport for London Briefing for the Construction Sector 27 July 2020 Introduction
    Transport for London briefing for the construction sector 27 July 2020 Introduction In line with the Government’s easing of lockdown measures, we are working You can help us get more of the to get London back to work safely and construction sector moving and sustainably. This toolkit sets out our working safely, sustainably and latest travel advice for the construction as quickly as possible by: sector as more of its workforce returns to sites across the Capital. • Enabling and encouraging your workforce to walk 1. Our plan and cycle all or part of their journey 2. Help us to help you – what we ask of the construction sector • Helping your workforce to travel at quieter times on the 3. Travel advice for your workforce network by changing your operating hours or staggering 4. Annex – travel advice for your your shifts workforce in Vauxhall Nine Elms, Westminster, The City, • Reducing and retiming the Canary Wharf and Stratford goods and services to and from your site See page 5 for further details of how you can help. 1. Our plan We are implementing our plan to get • To support social distancing and London moving and working again, as help ensure the safety of your safely and sustainably as possible: workforce and others travelling on London’s streets, we have launched • Safety is always our number one the Streetspace for London plan. priority and so our services now Delivered in partnership with London’s must operate differently to enable boroughs, the plan includes new social distancing cycle lanes, widened footways and other changes to London’s streets.
    [Show full text]