Kenya Urban Support Program

Total Page:16

File Type:pdf, Size:1020Kb

Kenya Urban Support Program DOCUMENT OF THE WORLD BANK FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: 117002-KE PROGRAM APPRAISAL DOCUMENT ON A PROPOSED CREDIT IN THE AMOUNT OF US$300 MILLION TO THE Public Disclosure Authorized REPUBLIC OF KENYA FOR THE KENYA URBAN SUPPORT PROGRAM July 5, 2017 Public Disclosure Authorized Social, Urban, Rural, and Resilience Global Practice AFRICA “This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.” Public Disclosure Authorized CURRENCY EQUIVALENTS (Exchange Rate Effective May 31, 2017) Currency Unit = Kenya Shillings KSH 103.40 = US$1 US$1.38 = SDR 1 FISCAL YEAR July 1 – June 30 ABBREVIATIONS AND ACRONYMS APA Annual Performance Assessment CARA County Allocation of Revenue Act CEC County Executive Committee CIDP County Integrated Development Plan CoB Controller of Budget CoG Council of Governors CPCT County Program Coordination Team CPS Country Partnership Strategy CRA Commission on Revenue Allocation CUIDS County Urban Institutional Development Strategy DLI Disbursement Linked Indicator DORA Division of Revenue Act EACC Ethics and Anti-Corruption Commission EIRR Economic Internal Rate of Return ESIA Environmental and Social Impact Assessment ESSA Environment and Social Systems Assessment FM Financial Management GDP Gross Domestic Product GRS Grievance Redress Service IDeP Integrated Development Plan IFMIS Integrated Financial Management Information System IFR Interim Financial Report IGFR Intergovernmental Fiscal Relations IPF Investment Project Finance IPSAS International Public Sector Accounting Standards KDSP Kenya Devolution Support Program KenUP Kenya Urban Program KMP Kenya Municipal Program KSG Kenya School of Government Ksh Kenyan Shilling KUSP Kenya Urban Support Program MC Minimum Condition MoDP Ministry of Devolution and Planning MoPSYGA Ministry of Public Service, Youth and Gender Affairs MTEF Medium-Term Expenditure Framework MTIHUD Ministry of Transport, Infrastructure, Housing, and Urban Development MTP2 Second Medium Term Plan NEMA National Environmental Management Authority NLC National Land Commission NMT Non-Motorized Transport NPCT National Program Coordination Team NT National Treasury NUDP National Urban Development Policy OAG Office of the Auditor General PAP Program Action Plan PDO Program Development Objective PFM Public Financial Management PforR Program for Results POM Program Operations Manual PS Performance Standard PSC Program Steering Committee PTC Program Technical Committee SDHUD State Department of Housing and Urban Development SDG Sustainable Development Goal SORT Systematic Operating Risk Rating Tool ToRs Terms of Reference UAC Urban Areas and Cities UACA Urban Areas and Cities Act UDD Urban Development Department UDG Urban Development Grant UIG Urban Institutional Grant Regional Vice President: Makhtar Diop Country Director: Diariétou Gaye Global Practice Senior Director: Ede Jorge Ijjasz-Vasquez Practice Manager: Bernice Van Bronkhorst Task Team Leader: Abdu Muwonge Co-Task Team Leader: Narae Choi REPUBLIC OF KENYA Kenya Urban Support Program Table of Contents I. STRATEGIC CONTEXT ............................................................................................................................. 1 A. Country Context .................................................................................................................................... 1 B. Sector and Institutional Context ........................................................................................................... 2 C. Relationship to the CPS and Rationale for Use of Instrument.............................................................. 3 II. PROGRAM DESCRIPTION ....................................................................................................................... 5 A. Government Program ........................................................................................................................... 5 B. Program Development Objective (PDO) and Key Results ................................................................... 7 C. Program Scope ..................................................................................................................................... 8 D. Capacity Building and Institutional Strengthening ............................................................................ 14 III. PROGRAM IMPLEMENTATION ........................................................................................................... 15 A. Institutional and Implementation Arrangements ................................................................................ 15 B. Results Monitoring and Evaluation .................................................................................................... 17 C. Disbursement Arrangements .............................................................................................................. 18 IV. ASSESSMENT SUMMARY ...................................................................................................................... 19 A. Technical (including program economic evaluation) ......................................................................... 19 B. Fiduciary ............................................................................................................................................ 20 C. Environmental and Social................................................................................................................... 23 D. World Bank Grievance Redress .......................................................................................................... 25 E. Risk Assessment .................................................................................................................................. 25 F. Program Action Plan (Summary) ....................................................................................................... 26 Annex 1: Detailed Program Description .................................................................................................................. 28 Annex 2: Results Framework and Monitoring ....................................................................................................... 39 Annex 3: Disbursement Linked Indicators, Disbursement Arrangements and Verification Protocols ............. 43 Annex 4: Technical Assessment Summary .............................................................................................................. 48 Annex 5: Fiduciary Systems Assessment Summary ............................................................................................... 68 Annex 6: Environmental and Social Systems Assessment Summary .................................................................... 74 Annex 7: Systematic Operations Risk Rating (SORT) ........................................................................................... 84 Annex 8: Program Action Plan ................................................................................................................................ 85 Annex 9: Window 1 – Project Appraisal ................................................................................................................. 89 Annex 10: Implementation Support Plan ................................................................................................................ 95 PAD DATA SHEET Kenya Urban Support Program PROGRAM APPRAISAL DOCUMENT .AFRICA Social, Urban, Rural, Resilience Global Practice Report No: 117002-KE . Basic Information Date: July 5, 2017 Sectors: Sub-national government administration (100%) Country Director: Diariétou Gaye Themes: Decentralization, Urban, Governance Practice Manager Bernice Van Bronkhorst Global Practice Vice Laura Tuck President: Program ID: P156777 Team Leader(s): Abdu Muwonge Narae Choi Program Implementation Period: Start Date: July 26, 2017 End Date: July 26, 2023 Expected Financing Effectiveness Date: November 23, 2017 Expected Financing Closing Date: January 31, 2024 . Program Financing Data [ ] Loan [ ] Grant [ ] Other [X] Credit For Loans/Credits/Others (US$M): Total Program Cost: 320 Total Bank US$300 Financing: Total Cofinancing: 0 Financing 0 Gap: . Financing Source Amount (US$M) BORROWER/RECIPIENT 20 IBRD/IDA 300 Total 320 Borrower: Republic of Kenya Responsible Agency: Ministry of Transport, Infrastructure, Housing, and Urban Development Contact: Aidah Munano Title: Principal Secretary Telephone No.: +254 (20) 2713833 Email: [email protected] Responsible Agency: The National Treasury Contact: Dr. Kamau Thugge Title: Principal Secretary Telephone No.: +254 (20) 2252299 Email: [email protected] . Expected Disbursements (in USD Million) Fiscal Year 2018 2019 2020 2021 2022 2023 Annual 9.0 28.6 41.2 62.1 71.3 87.8 Cumulative 9.0 37.6 78.8 140.9 212.2 300.0 . Program Development Objective: to establish and strengthen urban institutions to deliver improved infrastructure and services in participating counties in Kenya. Compliance Policy Does the program depart from the CAS in content or in other Yes [ ] No [X] significant respects? . Does the program require any waivers of Bank policies Yes [ ] No [X] applicable to Program-for-Results operations? Have these been approved by Bank management? Yes [ ] No [ ] Is approval for any policy waiver sought from the Board? Yes [ ] No [X] Does the program meet the Regional criteria for readiness for Yes [X] No [ ]
Recommended publications
  • ESIA 1764 Kapsabet Sewerage Project
    THE REPUBLIC OF KENYA CENTRAL RIFT VALLEY WATER WATER WORKS DEVELOPMENT AGENCY (CRVWWDA) LAKE VICTORIA NORTH WATER WATER WORKS DEVELOPMENT AGENCY (LVNWWDA) KENYA TOWNS SUSTAINABLE WATER SUPPLY AND SANITATION PROGRAMME (KTSWSSP) DESIGN OF WORKS FOR REHABILITATION AND AUGMENTATION OF KAPSABET SEWERAGE PROJECT ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT STUDY REPORT (ESIA) Client / Employer: Consultant: CHIEF EXECUTIVE OFFICER PROCESL – CENTRAL RIFT VALLEY WATER WORKS ENGENHARIA DEVELOPMENT AGENCY HIDRÁULICA E MAJI PLAZA, PRISONS ROAD AMBIENTAL, S.A IN OFF ELDAMA RAVINE KABARNET ASSOCIATION WITH HIGHWAY KIRI CONSULT LIMITED P.O. BOX 2451 – 20100. P. O. Box 4125 - 00506 NAKURU, KENYA NAIROBI TEL: (051) 2213557/+254 718 313 557 EMAIL: [email protected] APRIL 2020 Design of Works for Rehabilitation and Augmentation of Kapsabet Environment and Social Impact Assessment (ESIA) for Sewerage Project Kapsabet Sewerage Project “DOCUMENT CONTROL” KENYA TOWNS SUSTAINABLE WATER SUPPLY AND SANITATION PROGRAMME (KTSWSSP) DESIGN OF WORKS FOR REHABILITATION AND AUGMENTATION OF KAPSABET SEWERAGE PROJECT EMPLOYER: Central Rift Valley Water Works Development Agency (CRVWWDA) CONSULTANT DOCUMENT TITLE ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT STUDY FOR REPORT FOR REHABILITATION AND AUGMENTATION OF KAPSABET SEWERAGE PROJECT VERSION 01 VER.: DATE: DESCRIPTION/PURPOSE OF ISSUE: PREPARED BY: ENVIRONMENTAL & SOCIAL IMPACT G. L SAKWA ASSESSMENT STUDY FOR REPORT FOR 01 12/03/2020 NEMA Lead Expert REHABILITATION AND AUGMENTATION OF No 2492 KAPSABET SEWERAGE PROJECT PROCESL & KIRI CONSULT i Design of Works for Rehabilitation and Augmentation of Kapsabet Environment and Social Impact Assessment (ESIA) for Sewerage Project Kapsabet Sewerage Project CERTIFICATION KIRI CONSULTANTS LIMITED Signed ……………………..………Date……………………………… GODWIN LIDAHULI SAKWA LEAD EXPERT NEMA REG NO. 2492 PROPONENT Signed …………………………….Date………………………….
    [Show full text]
  • PROFILES of ATTRACTION SITES-ELGEYO MARAKWET. Tourist Attractions in Elgeyo Marakwet County Include Sports Tourism, Rivers, a Na
    PROFILES OF ATTRACTION SITES-ELGEYO MARAKWET. Tourist attractions in Elgeyo Marakwet County include Sports Tourism, Rivers, A national reserve, waterfalls and the hills and escarpments. Rimoi National Reserve The National Reserve is a protected area in the kerio valley along the escarpment of the Great Rift Valley. The 66 square kilometers (25sq mi) reserve was created in 1983 and is managed by the Kenya Wildlife Service. The isolated Kerio Valley lies between the Cherangani Hills and the Tugen Hills with the Elgeyo Escarpment rising more than 1,830 meters (6,000ft) above the valley in places. The valley is 4,000 feet (1,200m) deep. It has semi-tropical vegetation on the slopes, while the floor of the valley is covered by dry thorn bush. The most comfortable time of the year is in July and August when the rains have ended and the temperatures are not excessive. The reserve is on the west side of the Kerio River, while the Lake Kamnarok National Reserve is on the east side. The reserve has beautiful scenery, prolific birdlife and camping site in the bush beside Lake Kamnarok. Gazzement of the conservation area was done to protect wildlife from rampant poaching which was going on at the time. A fence was also put up to address human wildlife conflicts. It provides unique geological scenery & biodiversity and is one of the few protected areas within the spectacular Kerio Valley. The main attraction is the groups of elephants, Culture and scenery of the Kerio valley. The Reserve has earth and gravel road network which make for an adventurous outing.
    [Show full text]
  • Kakamega National Reserve Is Accessible by All Vehicles All Year Round
    CAMPING For the more adventurous visitors, camping can never be wilder here. With guaranteed round the clock security, every second would be worth your money. Visitors can camp at the nearby Udo campsite. A number of campsites are located in the park. Please contact the warden or call KWS HQfor more information WHEN TO GO Kakamega National Reserve is accessible by all vehicles all year round. However to enjoy the beauty of the park visitors are advised to walk through the forest. WHAT TO TAKE WITH YOU Drinking water, picnic items and camping gear if you intend to stay overnight. Also useful are binoculars, camera, hat, and hiking boots. Visitors should be prepared for wet weather and wear footwear adequate for muddy and uneven trails. PLEASE RESPECT THE WILDLIFE CODE Respect the privacy of the wildlife, this is their habitat. Beware ofthe animals, they are wild and can be unpredictable. Don't crowd the animals or make sudden noises or movements. Don't feed the animals, it upsets their diet and leads to human dependence. Keep quiet, noise disturbs the wildlife and may antagonize your fellow visitors. Never drive off-road, this severely damages the habitat. When viewing wildlife keep to a minimum distance of 20 meters and pull to the side of the road so as to allow others to pass. KENYA WILDLIFE SERVICE PARKS AND RESERVES Leave no litter and never leave fires unattended or discard burning objects. • ABERDARE NATIONAL PARK. AMBOSELI NATIONAL PARK. ARABUKO SOKOKE NATIONAL RESERVE. Respect the cultural heritage of Kenya, nevertake pictures of the local people or • CENTRAL & SOUTHERN ISLAND NATIONAL PARK.
    [Show full text]
  • Curriculum Vitae
    Curriculum Vitae Name: Isaiah Bosire Omosa Sex: Male Date of birth: 8th April 1974 Passport number: A037571 Nationality: Kenyan Profession: Civil and Environmental Engineer Address: Kenyatta University, Department of Civil Engineering, P.O Box 43844-00100, Thika Road, Nairobi, Kenya. OR P.O Box 966-00520 (Ruai) Nairobi. E-mail: [email protected] Membership in Professional Societies -Registered Graduate Engineer, Engineers’ Registration Board of Kenya. -Graduate Member, Institution of Engineers of Kenya. Education 2009-2013 Doctor of Engineering ( Environmental Science), UNEP-TongJi, Institute of Environment for Sustainable Development, TongJi University, Shanghai, China. Doctoral Research Topic: Tertiary Treatment of Municipal Wastewater Using Horizontal Subsurface Flow Constructed Wetlands and UV irradiation- with reference to Kenya. 1999-2005 Master of Science (MSc.) in Civil Engineering (Environmental Health Engineering option), University of Nairobi, Kenya. M.Sc. Thesis Title: Assessment of the biological treatability of black tea processing effluent 1993-1998 Bachelor of Science (B.Sc Hons) in Civil Engineering, University of Nairobi, Kenya. Employment Records 1999-2002 Masosa construction Ltd, Projects Engineer 2004 United Nations Environment Programme (UNEP), Research Assistant (Internship) 2005 - 2006 Ministry of Roads and Public Works, Civil Engineer (Storm Water drainage, Sewerage/Foul water drainage and Estate Roads design and construction supervision). 2009-2011 Kenyatta University, Water & Environmental Engineering Department, Tutorial Fellow / Assistant Lecturer. 2011- to date Kenyatta University, Civil Engineering Department, Lecturer. Professional Experience 2001 Research on a study of water demand management for the City of Nairobi under the ‘Managing water for African Cities’ project undertaken by UN- Habitat/Nairobi City Council. 2002 Site Agent on El nino emergency repairs and extensions to Kisii, Keroka and Gesusu Water supplies in Kisii District (Contract No.
    [Show full text]
  • THE KENYA GAZETTE Published by Authority of the Republic of Kenya (Registered As a Newspaper at the G.P.O.)
    NATIONAL COUNCIL FOR LAW REPORTING LIBRARY SPECIAL ISSUE THE KENYA GAZETTE Published by Authority of the Republic of Kenya (Registered as a Newspaper at the G.P.O.) Vol. CXXII—No. 52 NAIROBI, 20th March, 2020 Price Sh. 60 GAZETTE NOTICE No. 2512 CAUSE No. 1329 OF 2019 IN THE HIGH COURT OF KENYA AT NAIROBI By Elizabeth Gicugu Ngari, of P.O. Box 27798-00200, airobi in PROBATE AND ADMINISTRATION Kenya, the deceased's widow, through Kimathi Wanjohi li & Co., advocates of Nairobi, for a grant of probate of letters of a. nistration TAKE NOTICE that applications having been made in this court intestate to the estate of Stephen Mwaura Kungu, late of Hu ma, who in: died at Huruma, on 26th April, 2019. CAUSE No. 1446 OF 2018 CAUSE No. 1420 OF 2019 By Abdul Rassul Aly, of Av. Estados Unidos America, 49, 3D, to By Leonard Ngugi Chege, of P.O. Box 60351-00200, airobi in 1700-165, Lisbon, Portugal, of P.O. Box 38955-00623, Nairobi in Kenya, the deceased's widower, through Messrs. Mwangi Chege & Kenya, the deceased's son, through Messrs. Gilani & Co., advocates Co., advocates of Nairobi, for a grant of letters of ad .nistration of Nairobi, for a grant of letters of administration intestate to the estate of Ally Devjee alias Ally Devjee Damjee, late of Portugal, who died in intestate to the estate of Grace Njambi Ngugi, late of Nairobi, who Portugal, on 26th May, 1983. died at A.I.C., Kijabe Hospital in Kenya, on 15th August, 2019. CAUSE NO.
    [Show full text]
  • Download List of Physical Locations of Constituency Offices
    INDEPENDENT ELECTORAL AND BOUNDARIES COMMISSION PHYSICAL LOCATIONS OF CONSTITUENCY OFFICES IN KENYA County Constituency Constituency Name Office Location Most Conspicuous Landmark Estimated Distance From The Land Code Mark To Constituency Office Mombasa 001 Changamwe Changamwe At The Fire Station Changamwe Fire Station Mombasa 002 Jomvu Mkindani At The Ap Post Mkindani Ap Post Mombasa 003 Kisauni Along Dr. Felix Mandi Avenue,Behind The District H/Q Kisauni, District H/Q Bamburi Mtamboni. Mombasa 004 Nyali Links Road West Bank Villa Mamba Village Mombasa 005 Likoni Likoni School For The Blind Likoni Police Station Mombasa 006 Mvita Baluchi Complex Central Ploice Station Kwale 007 Msambweni Msambweni Youth Office Kwale 008 Lunga Lunga Opposite Lunga Lunga Matatu Stage On The Main Road To Tanzania Lunga Lunga Petrol Station Kwale 009 Matuga Opposite Kwale County Government Office Ministry Of Finance Office Kwale County Kwale 010 Kinango Kinango Town,Next To Ministry Of Lands 1st Floor,At Junction Off- Kinango Town,Next To Ministry Of Lands 1st Kinango Ndavaya Road Floor,At Junction Off-Kinango Ndavaya Road Kilifi 011 Kilifi North Next To County Commissioners Office Kilifi Bridge 500m Kilifi 012 Kilifi South Opposite Co-Operative Bank Mtwapa Police Station 1 Km Kilifi 013 Kaloleni Opposite St John Ack Church St. Johns Ack Church 100m Kilifi 014 Rabai Rabai District Hqs Kombeni Girls Sec School 500 M (0.5 Km) Kilifi 015 Ganze Ganze Commissioners Sub County Office Ganze 500m Kilifi 016 Malindi Opposite Malindi Law Court Malindi Law Court 30m Kilifi 017 Magarini Near Mwembe Resort Catholic Institute 300m Tana River 018 Garsen Garsen Behind Methodist Church Methodist Church 100m Tana River 019 Galole Hola Town Tana River 1 Km Tana River 020 Bura Bura Irrigation Scheme Bura Irrigation Scheme Lamu 021 Lamu East Faza Town Registration Of Persons Office 100 Metres Lamu 022 Lamu West Mokowe Cooperative Building Police Post 100 M.
    [Show full text]
  • ANNEX 2 ICC-01/09-01/11-252-Anx2 11-08-2011 2/530 RH PT OA2
    ICC-01/09-01/11-252-Anx2 11-08-2011 1/530 RH PT OA2 ANNEX 2 ICC-01/09-01/11-252-Anx2 11-08-2011 2/530 RH PT OA2 TABLE OF CONTENTS LIST OF ACRONYMS................................................................................................................................. v Executive Summary .................................................................................................................................vii PART I ............................................................................................................................................................ 1 OVERVIEW............................................................................................................................................... 1 CHAPTER ONE........................................................................................................................................ 1 Introduction ......................................................................................................................................... 1 Setting up the Commission ............................................................................................................ 1 Establishing a communication strategy ..................................................................................... 3 Publication of Rules and Procedure............................................................................................. 4 Consultations with Government Departments and Others ................................................. 4 Role of Civil
    [Show full text]
  • County Integrated Development Plan 2018-2023
    JULY, 2018 COUNTY GOVERNMENT OF NANDI County Integrated Development Plan 2018-2023 “ACHIEVING SUSTAINABLE AND ALL INCLUSIVE SOCIAL ECONOMIC TRANSFORMATION” i Nandi County Integrated Development Plan 2018-2023 COUNTY VISION AND MISSION Vision "To be the leading county in Kenya where people are empowered economically, socially and politically through equitable sharing of resources to achieve the highest standards of living". Mission “Improve the living standards of all residents of Nandi County by offering quality and sustainable services in an equitable and transparent manner through modern technology, innovation, enhanced workforce, environmental sustainability and entrepreneurship in all spheres of life”. County Government of Nandi Tel: 053-5252355 P.O.BOX 802-30300 facebook: County government of Nandi Kapsabet twitter: @nandigov Email: [email protected] Website: www.nandi.go.ke ii Nandi County Integrated Development Plan 2018-2023 FOREWORD I am delighted to present to you the Second-Generation County Integrated Development Plan (CIDP) 2018-2023, which outlines the strategic vision and goals identified to help the County realize its transformation agenda and better service delivery to the people of Nandi. The process of formulating a new CIDP has given us an opportunity to take stock on past successes and failures, to determine our vision and future goals considering challenges ahead. Subsequently, we have put strategies for development in response to changing needs and aspirations of our people, which are in line with our campaign promise. While adhering to tenets of ‘Integrated Development Planning’ and upholding the principles of public participation at all levels of governance, development of this CIDP ensured that national government and relevant stakeholders were engaged and consulted.
    [Show full text]
  • UN-Habitat Support to Sustainable Urban Development in Kenya
    UN-Habitat Support to Sustainable Urban Development in Kenya Report on Capacity Building for County Governments under the Kenya Municipal Programme Volume 1: Embu, Kiambu, Machakos, Nakuru and Nyeri counties UN-Habitat Support to Sustainable Urban Development in Kenya Report on Capacity Building for County Governments under the Kenya Municipal Programme Volume 1: Embu, Kiambu, Machakos, Nakuru and Nyeri counties Copyright © United Nations Human Settlements Programme 2015 All rights reserved United Nations Human Settlements Programme (UN-Habitat) P. O. Box 30030, 00100 Nairobi GPO KENYA Tel: 254-020-7623120 (Central Offi ce) www.unhabitat.org HS Number: HS/091/15E Cover photos (left to right): Nyeri peri-urban area © Flickr/_Y1A0325; Sunday market in Chaka, Kenya © Flcikr/ninara; Nakuru street scene © Flickr/Tom Kemp Disclaimer The designations employed and the presentation of the material in this publication do not imply the expression of any opinion whatsoever on the part of the Secretariat of the United Nations concerning the legal status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers of boundaries. Views expressed in this publication do not necessarily refl ect those of the United Nations Human Settlements Programme, Cities Alliance, the United Nations, or its Member States. Excerpts may be reproduced without authorization, on condition that the source is indicated. ACKNOWLEDGMENTS Report Coordinator: Laura Petrella, Yuka Terada Project Supervisor: Yuka Terada Principal Author: Baraka Mwau Contributors: Elijah Agevi, Alioune Badiane, Jose Chong, Gianluca Crispi, Namon Freeman, Marco Kamiya, Peter Munyi, Jeremiah Ougo, Sohel Rana, Thomas Stellmach, Raf Tuts, Yoel Siegel.
    [Show full text]
  • ESIA 1279 Ruiru II Dam Report
    ATHI WATER SERVICES BOARD RUIRU II DAM WATER SUPPLY PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT STUDY REPORT JULY 2016 Environmental Safeguards Consultants (ESC) Limited Page | 1 If you have to print, we suggest you use, for economic and ecological reasons, double‐sided printas much as possible. Page | 2 TABLE OF CONTENTS ACRONYMS AND ABBREVIATIONS ..................................................................................7 EXECUTIVE SUMMARY ........................................................................................................9 Project Background............................................................................................................................ 9 Project Need and Justification............................................................................................................ 9 The ESIA Study and Objective .......................................................................................................... 9 Project Description and Components................................................................................................. 9 Project Cost...................................................................................................................................... 11 ESIA Approach and Methodology................................................................................................... 11 Public Consultation, Participation and Disclosure........................................................................... 12 Policy, Legal and Administrative
    [Show full text]
  • G4S OFFICES 1 ABC Place Total Petrol Station 2 Airport JKIA Outside
    G4S OFFICES NAIROBI OFFICES 1 ABC Place Total petrol Station 2 Airport JKIA Outside Cargo Center 3 Nairobi Safari Club Nairobi Safari Club parking 4 Athiriver Chaster acade-Opp Athiriver Mining 5 Buruburu Buruburu Shoping centre -Next to Tuskys 6 Kampus Mall University Way Opp UNO 7 Afya center Oillibya petro station Opp Afya Center 8 Moi Avenue Moi Avenue Private packing next to Equity Bank 9 Koinange street Koinange street Private packing Opp Chai house 10 Standard Street Opp CBA Bank 11 Hilton Acade Hilton Acade-Office1 12 Hilton Acade Hilton Acade-Office2 13 Community Community Area Opp Ministry of Public Works 14 Karen Shell Petrol Station Opp Karen Police Station 15 Dagoreti Total petrol Station 16 Hurlingh Hurligurm at Kenol Petrol Station 17 Industrial Area Enterprise Road at Likoni Junction Total Petrol Station 18 Kiambu Diana House,First Floor Next to Fred Pharmacy 19 Kirinyaga Road Kirinyanga Road Opp Shell Petrol 20 Kitengela KENOL KOBIL PETROL STATION -PIZZA INN 21 Limuru Road Limuru Road Total Petrol Station next to Aga khan primary school 22 Embakasi Hub North Airport Road Opp Taj Mall 23 City Branch Mawa Court Opp Mburungar 24 Ngong Ngong Centre Opp Naivas Supermarket 25 Riverside Riverside drive -German Embassy 26 Rongai Kobil Petrol Station 27 UN-Gigiri Kobil Petrol Station Next to Java 28 Westlands Near the Mall At Shell Petrol station 29 Willson Airport Opp Shell petrol Station 30 Witu Rd Next to Toyota Ltd,DHL offices 31 Survey-Shell Chomazone Shell Petrol station Survey Thika Road 32 Thome Shell Petrol Station -Thika
    [Show full text]
  • Aprp 2011/2012 Fy
    KENYA ROADS BOARD ANNUAL PUBLIC ROADS PROGRAMME FY 2011/ 2012 Kenya Roads Board (KRB) is a State Corporation established under the Kenya Roads Board Act, 1999. Its mandate is to oversee the road network in Kenya and coordinate its development, rehabilitation and maintenance funded by the KRB Fund and to advise the Minister for Roads on all matters related thereto. Our Vision An Effective road network through the best managed fund Our Mission Our mission is to fund and oversee road maintenance, rehabilitation and development through prudent sourcing and utilisation of resources KRB FUND KRB Fund comprises of the Road Maintenance Levy, Transit Toll and Agricultural cess. Fuel levy was established in 1993 by the Road Maintenance Levy Act. Fuel levy is charged at the rate of Kshs 9 per litre of petrol and diesel. The allocation as per the Kenya Roads Board Act is as follows: % Allocation Roads Funded Agency 40% Class A, B and C KENHA 22% Constituency Roads KERRA 10% Critical links – rural roads KERRA 15% Urban Roads KURA 1% National parks/reserves Kenya Wildlife Service 2% Administration Kenya Roads Board 10% Roads under Road Sector Investment Programme KRB/Minister for Roads KENYA ROADS BOARD FOREWORD This Annual Public Roads Programme (APRP) for the Financial Year (FY) 2011/2012 continues to reflect the modest economic growth in the country and consequently minimal growth in KRBF. The Government developed and adopted Vision 2030 which identifies infrastructure as a key enabler for achievement of its objective of making Kenya a middle income country by 2030. The APRP seeks to meet the objectives of Vision 2030 through prudent fund management and provision of an optimal improvement of the road network conditions using timely and technically sound intervention programmes.
    [Show full text]