X18 15 X4 X45 X127

Total Page:16

File Type:pdf, Size:1020Kb

X18 15 X4 X45 X127 189,330 SQ FT (17,589 SQ M) LOGISTICS / DISTRIBUTION BUILDING TO LET UNDER CONSTRUCTION AVAILABLE SUMMER 2021 NAL HEIG S DOORS S DOOR KING SP G SPACE OM 1.5 M ER H ES ES AR AC IN S FR VA T T C CC P E RK Y IN C A R S L A E PA P R L IL P K E A C A R U V S E O R A E L C T R D L C E 15 7 V 8 4 2 1 G W M 1 x127 5 x45 H O 1 P 5 1.5 x18 x4 4 PROLOGIS.CO.UK/DIRFT A NEW 189,330 SQ FT LOGISTICS / DISTRIBUTION BUILDING AT THE UK’S PREMIER RAIL SERVED LOGISTICS PARK THE ULTIMATE BUILDING glazed pier SPECIFICATION Car BEST IN AVAILABLE access FOR YOUR CLASS SUMMER 2021 BUSINESS NEEDS DC189 87.20m DC189 A 189,330 SQ FT DC189 at DIRFT is a new logistics / distribution Construction is underway and early access 5 (17,589 SQ M) Warehouse 178,922 sq ft 16,622 sq m facility situated at the heart of the UK’s road for fit out can be given from summer 2021. pier glazed and rail network. With 15m clear internal height, Office (2 storeys) 10,408 sq ft 967 sq m and a 55m yard, DC189 is a best in class facility Potential 192.85m sprinkler tanks sprinkler Total 189,330 sq ft 17,589 sq m at the UK’s premier logistics park. house pump and Approximate floor areas (GIA) D I R 2 storey F T office D R Gas Sub I V 15 Emergency access only E x18 A WORLD CLASS PARK, 55m HGV Gatehouse access 15M CLEAR 18 DOCK HOME TO WORLD CLASS BRANDS INTERNAL HEIGHT ACCESS DOORS (WITH SPACE FOR 9 MORE) point Potential future fuel future x45 x4 4 LEVEL 45 HGV TRAILER ACCESS DOORS PARKING SPACES x127 500 Ground floor First floor 127 CAR POWER SUPPLY office office PARKING SPACES FROM 500KVA Racking pallet spaces: Very narrow aisle: 25,872 pallets Wide aisle: 19,404 pallets Indicative CGI THE ULTIMATE ROAD AND RAIL COMING THE BENEFITS AND ACCESS SERVED LOCATION SOON SPEAK FOR THEMSELVES A STOMER RAIL We know our customers need the ability to move U B T D THE HUB AT DIRFT Prologis is a long term owner of the buildings that it develops – this model enables us CU S H I R REACH 47 MILLION RAIL GIVES YOU THE COMPETITIVE goods quickly across the UK. DIRFT is at the heart of E F to create unique single ownership parks that offer market leading services and property H T T The Hub at DIRFT is a dedicated space for CUSTOMERS IN UNDER EDGE WITH RAPID ACCESS TO the UK domestic intermodal sector, enabling occupiers management, delivering tangible benefits to our customer’s operations and their staff. 47M 90% logistics and skills training and education and 4.5 HRS (HGV DRIVE TIME) THE UK’S DEEP SEA PORTS AND to respond quickly to changing demand and reduce will be available to customers seeking additional Source: Mercator GeoSystems 90% OF UK CONTAINER TRAFFIC carbon emission throughout their operations and supply space for hosting training or meetings. chain. Thanks to its proximity to the M1 and the West BUS SERVICES SKILLED WORKFORCE Coast Main Line, DIRFT is already an important and DC189 is a short walk from the • Strongest 30 minute labour growing part of the logistics supply chain for customers RY PA LORRY PARK R R catchment when compared with O K main bus stops on Danes Way, ROAD AIR like Sainsbury’s, Tesco and Eddie Stobart. L As well as restrooms, washrooms, and with frequent and punctual services competing schemes The Hub at DIRFT M1 J18 1 mile East Midlands Airport 37 miles cooking facilities, secure HGV parking for 300 towards Rugby, Daventry • Highest availability of truck drivers How can DIRFT benefit your business? vehicles will be available for delivery drivers and Northampton. M1 / M6 / A14 Interchange 5 miles London Heathrow Airport 81 miles serving customers on Prologis DIRFT. • Wage levels are comparable with • Unrivalled connectivity for Port Traffic other logistics parks A14 J1 10 miles GREEN TRAVEL PLAN • Exceptional flexibility and resilience for customer • Growing local population M69 J2 16 miles supply chains IL T E R NEW RAIL TERMINAL DC189 shares the benefit of an A M R I • Same day delivery of fresh produce W N active car sharing community at RAIL E A At a time where the UK’s roads are becoming AMENITIES • Private estate enables movement of containers N L DIRFT, helping to make the commute busier than ever, rail freight offers businesses the • Three operating rail freight terminals Destinations include (north to south): via red-diesel powered tugs opportunity to create even more resilient, efficient to work easy. • Ability to move overweight containers from and sustainable supply chains. A £50m investment • Two truck stops; established SEA Grangemouth 7 hrs • Save money by sharing travel costs building to rail terminal in the new rail terminal at DIRFT allows greater Stobart Truck Stop and new DIRFT Lorry park Tilbury 107 miles Mossend and Coatbridge 6 hrs • Access to Channel Tunnel (Silk Road) flexibility and competitive pricing and available at • Cut congestion and pollution secure lorry park no extra cost to occupiers on Prologis RFI DIRFT; • Fast Freight – into urban areas London Gateway 109 miles Teesport 7 hrs you only pay for what you use! • Gasrec natural gas and biogas SECURE ESTATE refuelling station Immingham 118 miles Seaforth / Liverpool 5 hrs • Site wide security • Houlton, an adjacent housing development, Southampton 122 miles Felixstowe 5 hrs EST PA UKS LARGEST PARCEL HUB providing 6,200 new homes complete G R • Dedicated Police Community Felixstowe 135 miles R C Wentloog 4 hrs A E L with new schools and community centres L Support Officers In 2021 DIRFT will become home to the S H Dover 166 miles ’ Thurrock and Barking 3-4 hrs U K new Royal Mail National Distribution Centre • Two leading hotels; ibis and Holiday Inn B U • ANPR control and regulation meaning DIRFT III occupiers will have the London Gateway 4 hrs • Lilbourne Meadow provides 173 acres opportunity to create huge operational savings. of open space with walking trails and Channel Tunnel 5 hrs New rail terminal cycles routes to Rugby via a link road PROLOGIS ESSENTIALS MARKETPLACE PROLOGIS.CO.UK/ESSENTIALS Welcome to LOWERING YOUR FLEXIBLE TO BEST-IN-CLASS Prologis Essentials OPERATIONAL COSTS YOUR NEEDS SUSTAINABILITY Your Prologis Marketplace Essentials Marketplace • Annual energy cost savings of up to £91,172* • Flexible lease terms from 5 years • BREEAM ‘Very Good’ When it comes to getting your warehouse Already a customer? That’s great. Prologis An evolving supply line of essential products LED lighting easy to install, low maintenance up and running, we’ve got you covered. Essentials Marketplace is your source for to help with your warehouse operations. fixtures for brighter, safer workspaces. • Access to Prologis’ comprehensive and low • 15m clear internal height • Brise Soleil to reduce solar gain replacements, upgrades or temporary Prologis Essentials Marketplace conveniently Forklifts your partner to equip, expand or If you want to drive-down energy costs, improve safety and cost buildings insurance 2 solutions as well - making life easier and efficiency and create a more pleasant working environment for • Uniformly distributed floor loading of 50kN/m • EPC rating of ‘A’ brings you all the set-up and operational upgrade your fleet quickly. your employees, contact Wayne Porter on 0121 224 8785 or giving you back valuable time. • Private estate allows tugs to move overweight equipment needed for a cost effective, email [email protected]. • 55m deep service yard • LED office lighting with automatic movement Racking flexible solutions to help you quick and carefree start. containerised freight using red diesel and lower structure or restructure an efficient • A mixture of level and dock doors suitable for and daylight controls licensed drivers FOR QUICK WAREHOUSE SETUP facility layout. single and double height trailers - with the ability • Rainwater harvesting AND SMOOTH OPERATIONS • Ready to install rooftop photo-voltaic array to add additional dock doors if required • Energy monitoring system with ‘smart meters’ • LED lighting to external yard areas and doors • Open plan offices with a range of fit out options • 15% rooflights providing natural daylight • Sprinkler system can be added at your request • Proximity to UK’s largest parcel hub • Power supply of 500kVA • Access to multiple rail freight terminals • Chill store ready THESE INITIATIVES WILL REDUCE THESE FEATURES MEAN THE SPACE CAN CONTRIBUTING POSITIVELY TO YOUR YOUR OPERATIONAL COSTS BE USED TO FACILITATE YOUR SPECIFIC CSR ENVIRONMENTAL CREDENTIALS FORKLIFTS OPERATIONAL NEEDS AND EXCEEDING YOUR CUSTOMER An easy and cost-effective The right racking system to suit Efficient and reliable - upgrade EXPECTATIONS solution for preconfigured your needs – a fast and easy to ‘smart’ lighting with forklifts, reach and pallet trucks, service that makes arranging movement and daylight controls from our word-class partners. racking simple. at an incredibly low price. *Energy cost savings of up to £91,172 per annum when compared to an existing building (pre-1995) and £19,713 per annum compared to a typical new build. SAT NAV: NN6 7GZ To Nottingham LEICESTER A47 J21 A563 1 Existing railport A5 ABOUT PROLOGIS A444 A47 2 Tesco 7 M69 Prologis is the leading developer 3 Sainsbury’s A6 6 A5 and owner of logistics property in 4 The Hub J12 the UK and worldwide. We have the 5 NHS J1 M1 expertise, the sites and the in-house 6 Royal Mail A444 M1 funds to deliver the high quality 5 A427 7 Rail Freight Terminal A5 A6 buildings that help our customers DC189 J3 run their businesses as efficiently as 4 To Birmingham A4303 J20 possible.
Recommended publications
  • Members and Parish/Neighbourhood Councils RAIL UPDATE
    ITEM 1 TRANSPORT COMMITTEE NEWS 07 MARCH 2000 This report may be of interest to: All Members and Parish/Neighbourhood Councils RAIL UPDATE Accountable Officer: John Inman Author: Stephen Mortimer 1. Purpose 1.1 To advise the Committee of developments relating to Milton Keynes’ rail services. 2. Summary 2.1 West Coast Main Line Modernisation and Upgrade is now in the active planning stage. It will result in faster and more frequent train services between Milton Keynes Central and London, and between Milton Keynes Central and points north. Bletchley and Wolverton will also have improved services to London. 2.2 Funding for East-West Rail is now being sought from the Shadow Strategic Rail Authority (SSRA) for the western end of the line (Oxford-Bedford). Though the SSRA have permitted a bid only for a 60 m.p.h. single-track railway, excluding the Aylesbury branch and upgrade of the Marston Vale (Bedford-Bletchley) line, other Railtrack investment and possible developer contributions (yet to be investigated) may allow these elements to be included, as well as perhaps a 90 m.p.h. double- track railway. As this part of East-West Rail already exists, no form of planning permission is required; however, Transport and Works Act procedures are to be started to build the missing parts of the eastern end of the line. 2.3 New trains were introduced on the Marston Vale line, Autumn 1999. A study of the passenger accessibility of Marston Vale stations identified various desirable improvements, for which a contribution of £10,000 is required from this Council.
    [Show full text]
  • Agenda Item 8: West Coast Main Line Released Capacity
    East West Rail Consortium 13th March 2019 Agenda Item 8: West Coast Main Line Released Capacity Recommendation: It is recommended that the meeting: a) Note the update on the West Coast Main Line Released Capacity study b) Endorse the strategic issues identified in paragraph 2.6 that have been identified by England’s Economic Heartland as needing to be considered by the study c) Note that England’s Economic Heartland has established a working group of representative interests, working on a ‘task and finish’ basis to support the EEH Business Unit d) Note the update on the Old Oak Common: Future Chiltern Capacity 1. Context 1.1. The East West Rail Consortium has previously identified the strategic importance of developing rail services along the Northampton – Milton Keynes – Aylesbury – High Wycombe – Old Oak Common axis. 1.2. The opportunity to realise this occurs through a combination of the opening of East West Rail and the opening of the first stage of HS2. 1.3. The Chiltern and East West Rail Route Strategy was published by Network Rail in 2017 and identified the potential and need to develop this north- south axis, partly in response to limitations elsewhere on the network and partly in response to the potential for further passenger growth as a result of planned growth set out in locally. 1.4. Realising the potential to develop services on this north-south axis has been a long-standing strategic priority for England’s Economic Heartland and was included within the submission to the 2018 Budget. 1.5. Over and above the on-going work being taken forward by the East West Rail Company to deliver East West Rail, there are two pieces of work underway that are pertinent to realising the opportunity to deliver services on the north-south axis: London North West South CMSP – Released Capacity WCML South Old Oak Common Station: Future Chiltern Capacity 2.
    [Show full text]
  • Draft Alternative Site Assessment
    Draft Alternative Site Assessment The Rail Central Rail Freight Interchange and Highway Order 201[X] Stage 2 Consultation Draft (March 2018) Regulation 5(2)(q) Contents 1. Introduction 1 2. Need 3 3. Options Appraisal 5 4. Methodology 11 5. Stage 1: Sieving Results 20 6. Stage 2: Site Assessment 21 7. Stage 3: Sites identified by Local Representation and Other Studies 70 8. Stage 4: Rail Central 83 9. Stage 5: Comparative Assessment 85 10. Overview and Conclusions 110 Appendix 1: Phase 1 Alternative Site Assessment 112 Appendix 2: Plan 1 – Catchment Area 113 Appendix 3: Plan 2 – Motorway Junction Buffer 114 Appendix 4: Plan 3 – Railways within Motorway Junctions 115 Appendix 5: Plan 4 – W8 Gauge Railways and Above 116 Appendix 6: Plan 5 – Key Environmental Designations 117 Appendix 7: Plan 6 – Excluding Environmental Designations 118 Appendix 8: Plans 6a – 6f – Excluding Environmental Designations 119 Appendix 9: Plans 7-1 to 7-25 Agricultural Land Classification 120 Appendix 10: Labour Market Availability Data 121 Contact David Diggle [email protected] March 2018 1. Introduction 1.1 Ashfield Land Management Limited and Gazeley GLP Northampton s.àr.l. intend to apply for a Development Consent Order (DCO) for a Strategic Rail Freight Interchange (SRFI), referred to as Rail Central at land at Arm Farm, Milton Malsor in South Northamptonshire (the Rail Central site). 1.2 The draft Alternative Site Assessment (ASA) provides a preliminary assessment of alternative sites that have been considered in selecting the Rail Central site. This draft ASA establishes a preliminary area in which it is appropriate to search for an alternative site, sets out the search criteria to assess potential sites and assesses the suitability of alternative sites.
    [Show full text]
  • Appendix 2.4 to Environmental Statement (Document 5.2)
    UPDATED COMPARATIVE ANALYSIS OF NORTHAMPTON GATEWAY AND RAIL CENTRAL APPENDIX 2.4 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) The Northampton Gateway Rail Freight Interchange Order 201X UPDATED COMPARATIVE ANALYSIS OF NORTHAMPTON GATEWAY AND RAIL CENTRAL | 8 JANUARY 2019 www.northampton-gateway.co.uk Updated Comparative Analysis of Northampton Gateway SRFI and the proposed Rail Central SRFI Date: January 2019 Author: Oxalis Planning This page is intentionally left blank 2 Updated Comparative Analysis of Northampton Gateway SRFI and the proposed Rail Central SRFI CONTENTS Executive Summary 1.0 Introduction 2.0 Rail Central Overview 3.0 Comparative Assessment: Good Design 4.0 Comparative Assessment: Operational and Functional Aspects 5.0 Comparative Assessment: Environmental Impacts 5.1 Landscape and Visual Impact 5.2 Highways 5.3 Air Quality 5.4 Noise and Vibration 5.5 Lighting 5.6 Biodiversity 5.7 Agricultural Land 5.8 Archaeology 5.9 Heritage 5.10 Drainage 6.0 Conclusions Appendices: 1. Comparative Plan showing the location of the Northampton Gateway proposal and the location of the Rail Central proposal. 2. Rail Central scheme Parameter Plan 3. Rail Central scheme Illustrative Landscape Masterplan 3 Updated Comparative Analysis of Northampton Gateway SRFI and the proposed Rail Central SRFI This page is intentionally left blank 4 Updated Comparative Analysis of Northampton Gateway SRFI and the proposed Rail Central SRFI EXECUTIVE SUMMARY 1. Unsurprisingly, given the proximity of the Rail Central site and the Northampton Gateway site, the sites share many of the same characteristics in relation to high level considerations, such as proximity to markets and access to the strategic rail network.
    [Show full text]
  • Welcome to the Rail User Express. We Continue with The
    November 2019 Welcome to the Rail User Express. RUX is published around the middle of each month. It may be forwarded, or items reproduced in another newsletter (quoting sources). Anyone may request RUX as an email attachment, or opt to be notified when it is posted on the Railfuture (Rf) website. There is no charge for either service. Following GDPR, Railfuture Membership now maintains both lists. Please advise if you no longer wish to receive the newsletter or link, or if you know of anyone who would like to be added. For further details of any of the stories mentioned, please consult the relevant website, or ask the editor for the source material. The DfT’s Autumn Update of the Rail Network Enhancements Pipeline (RNEP) on the progress of schemes funded in CP6 (2019-2024) makes salutary reading, and the message is clear: don’t hold your breath! Even schemes buoyed by a visit from the S of S for Transport are still at an early stage, eg Skipton - Colne at Decision to Initiate, and Ashington - Blythe – Tyne at Decision to Develop. No scheme can proceed into delivery until it has a Decision to Deliver. So, taken at face value, even Phase 2 of the Western section of East West Rail (Bicester - Bedford) has yet to be confirmed. Roger Smith We continue with the usual roundup of news items from groups around the UK. Please keep your contributions coming: they are all gratefully received. Friends of the Far North Line As a member of the FNL Review Team, FoFNL is delighted that its Report confirms that infrastructure work essential to planned improvements to the FNL service pattern is to go through its final stages before financial approval.
    [Show full text]
  • Sustainability Appraisal for Northampton Local Plan Part 2 Appendices
    Northampton Borough Council Sustainability Appraisal for Northampton Local Plan Part 2 Appendices Final report Prepared by LUC June 2020 Northampton Borough Council Sustainability Appraisal for Northampton Local Plan Part 2 Appendices Version Status Prepared Checked Approved Date 1. DRAFT FOR CLIENT REVIEW – J. Pearson J. Pearson QA to be 18.05.2020 NOT FOR ISSUE (Updated as a completed in S. Temple result of new/revised site parallel with allocations and policies since N. Collins client review, Proposed Submission Round 1) prior to E. Hynes consultation L. Meldrum E. Lendak C. Green 2. PROPOSED SUBMISSION J. Pearson J. Pearson J. Owen 16.06.2020 ROUND 2 - Final S. Temple E. Lendak C. Green Bristol Land Use Consultants Ltd Landscape Design Edinburgh Registered in England Strategic Planning & Assessment Glasgow Registered number 2549296 Development Planning Lancaster Registered office: Urban Design & Masterplanning London 250 Waterloo Road Environmental Impact Assessment Manchester London SE1 8RD Landscape Planning & Assessment Landscape Management landuse.co.uk 100% recycled paper Ecology Historic Environment GIS & Visualisation Contents SA for Northampton Local Plan Part 2 (Proposed Submission Rnd 2) June 2020 Contents Table C.3: Responses to consultation comments on September 2017 SA of Local Plan Part 2 Site Options paper C-19 Appendix A Table C.4: Regulation 19 Round 1 Consultation Review of other relevant policies, plans, Responses Relating to the Sustainability Appraisal C-25 and programmes A-1 Table E.1: Assessment criteria for
    [Show full text]
  • Roxhill Public Consultation
    PUBLIC CONSULTATION DETAILS AND SUMMARY OF PROPOSALS UPDATE BY ROXHILL OCTOBER 2017 Roxhill is proposing a Strategic Rail Freight Interchange (SRFI) on land to the west of the M1 Junction 15. The proposed SRFI is known as ‘Northampton Gateway’. An SRFI is a large multi-purpose freight interchange and distribution centre linked into both the rail and trunk road systems. This document has been prepared to make the community Roxhill is holding a statutory consultation process from 9th aware of Roxhill’s public consultation activity being October until 24th November 2017. This will focus on a undertaken in October and November, and to provide a number of public consultation exhibitions being held as summary of the Northampton Gateway proposals. It follows follows: earlier consultation activity, including an Update Newsletter distributed in July 2017, to give an overview of the ongoing Hilton Hotel, Collingtree Monday 9th October, 1.30pm – 7.30pm work, and indicative programme for the next steps. The Royal Oak pub, Blisworth This forms part of Roxhill’s proposed strategy for Wednesday 11th October, 1.30pm – 7.30pm consultation as set out in the published Statement of Community Consultation (SoCC). Details of how local Milton Malsor Village Hall people can view and comment on updated information Friday 13th October, 2pm – 7.30pm about the proposed development are provided on the back Roade Primary School page. Saturday 14th October, 12 noon – 5pm An initial stage of public consultation was held in late 2016 The Forum, Moat Lane, Towcester (SNDC Council to make people aware of the proposals at an early stage, to Chamber) Friday 20th October, 2pm – 7pm gain feedback on the proposals and to inform people of the Contact details are included at the back of this leaflet, likely application process.
    [Show full text]
  • Northampton Gateway Strategic Rail Freight Interchange Local Impact Report November 2018
    Northamptonshire County Council Northampton Gateway Strategic Rail Freight Interchange Local Impact Report November 2018 Contents Section 1 Introduction Section 2 Highways Section 3 Rail services Section 4 Archaeological impact Section 5 Flood Water Management and Drainage 1. Introduction 1.1. This Local Impact Report has been prepared by Northamptonshire County Council at the request of the Examining Authority as part of the Secretary of State’s consideration of the application made by Roxhill (Junction 15) Limited for a Development Consent Order to permit the construction of the Northampton Gateway Strategic Rail Freight Interchange. 1.2. This Report has been prepared in line with Advice note one: Local Impact Reports published by The Planning Inspectorate in April 2012 to give details of the likely impact of the proposed development on the authority’s area. 1.3. The proposed site of the Rail Freight Interchange, including construction of a rail freight terminal, rail-served warehousing and rail and road access to the site is located south of Northampton to the south-west of Junction 15 of the M1. Associated highway mitigation works are also proposed, including construction of a bypass to the village of Roade. All the works covered by the Development Consent Order are contained within the administrative area of Northamptonshire County Council. 2. Highways Location 2.1. The proposed site of the Northampton Gateway Strategic Rail Freight Interchange is immediately south-west of M1 Junction 15. Access to and from the site is proposed from the A508, which links M1 Junction 15 with the A5 at Old Stratford to the north of Milton Keynes.
    [Show full text]
  • The Northampton Gateway Rail Freight Interchange
    The Northampton Gateway Rail Freight Interchange – Order 201X Local Highway Authority Response to Stage 2 Statutory Public Consultation Pursuant to Section 42 of the Planning Act 2008 and Regulation 11 of the Infrastructure Planning (EIA) Regulations 2009 Dear Sir/Madam, Thank you for consulting Northamptonshire Highways as the Local Highway Authority (LHA) for Northamptonshire. This response is made without prejudice to any views expressed by other functions within Northamptonshire County Council, or those of Highways England with regard to the strategic road network. This response represents the combined comments of all relevant sections of Northamptonshire Highways, having consulted those teams internally. Transport Assessment The LHA has met the Applicant of the Northampton Gateway proposals and their highways consultants/engineers, along with Highways England, for some time as part of a Transport Working Group (TWG). This TWG has resulted in agreement over the likely traffic predicted to be generated by the proposed development (both light and heavy vehicles) over the course of a typical day, and in particular the peak hours on the highway network. A methodology for distributing the development trips on the road network is also agreed, based on utilisation of the County Council’s Strategic Transport Model, known as the NSTM. The NSTM has been further validated in the area surrounding the proposed development to ensure that it is fit for purpose as the basis for forecasting future traffic levels. In line with the Core Strategy Plan Period the future year for assessment purposes is 2031. Both the baseline and forecast NSTM models have been signed off by the County Council as fit for purpose.
    [Show full text]
  • LNW Route Specification 2017
    Delivering a better railway for a better Britain Route Specifications 2017 London North Western London North Western July 2017 Network Rail – Route Specifications: London North Western 02 SRS H.44 Roses Line and Branches (including Preston 85 Route H: Cross-Pennine, Yorkshire & Humber and - Ormskirk and Blackburn - Hellifield North West (North West section) SRS H.45 Chester/Ellesmere Port - Warrington Bank Quay 89 SRS H.05 North Transpennine: Leeds - Guide Bridge 4 SRS H.46 Blackpool South Branch 92 SRS H.10 Manchester Victoria - Mirfield (via Rochdale)/ 8 SRS H.98/H.99 Freight Trunk/Other Freight Routes 95 SRS N.07 Weaver Junction to Liverpool South Parkway 196 Stalybridge Route M: West Midlands and Chilterns SRS N.08 Norton Bridge/Colwich Junction to Cheadle 199 SRS H.17 South Transpennine: Dore - Hazel Grove 12 Hulme Route Map 106 SRS H.22 Manchester Piccadilly - Crewe 16 SRS N.09 Crewe to Kidsgrove 204 M1 and M12 London Marylebone to Birmingham Snow Hill 107 SRS H.23 Manchester Piccadilly - Deansgate 19 SRS N.10 Watford Junction to St Albans Abbey 207 M2, M3 and M4 Aylesbury lines 111 SRS H.24 Deansgate - Liverpool South Parkway 22 SRS N.11 Euston to Watford Junction (DC Lines) 210 M5 Rugby to Birmingham New Street 115 SRS H.25 Liverpool Lime Street - Liverpool South Parkway 25 SRS N.12 Bletchley to Bedford 214 M6 and M7 Stafford and Wolverhampton 119 SRS H.26 North Transpennine: Manchester Piccadilly - 28 SRS N.13 Crewe to Chester 218 M8, M9, M19 and M21 Cross City Souh lines 123 Guide Bridge SRS N.99 Freight lines 221 M10 ad M22
    [Show full text]
  • England's Economic Heartland Rail Study Phase 1 15 MB
    Passenger Rail Study Phase One: Baseline Assessment of the current network A technical report produced by Network Rail for the EEH evidence base Table of Figures ....................................................................................................................................................... 3 Glossary ................................................................................................................................................................... 4 Executive Summary ................................................................................................................................................. 5 An Area of National Importance ......................................................................................................................... 5 Understand the Railway’s Role ........................................................................................................................... 5 Introduction ............................................................................................................................................................ 9 Aim of Phase 1 of the Passenger Rail Study ........................................................................................................ 9 What is the purpose of baselining the existing passenger network? ............................................................... 10 Methodology ....................................................................................................................................................
    [Show full text]
  • Black Country and Southern Staffordshire Regional Logistics Site Study
    Black Country and southern Staffordshire - Regional Logistics Site Study Black Country and southern Staffordshire Regional Logistics Site Study Final Report April 2013 UNITED KINGDOM & IRELAND Prepared for: Wolverhampton City Council, Dudley Metropolitan Borough Council, Sandwell Metropolitan Borough Council, Walsall Council, Staffordshire County Council, South Staffordshire District Council, CENTRO, Cannock Chase District Council, Stafford Borough Council, Lichfield District Council and Tamworth Borough Council Black Country and southern Staffordshire - Regional Logistics Site Study Rev Date Details Prepared by Checked by Approved by 1 September First Draft Mark Phillips Alan Houghton 2012 Principal Head of Planning Planning and and Regeneration Regeneration Consultant 2 October Second draft Anita Longworth 2012 Principal Planner 3 December Third draft Jerry Thorne 2012 Rail Specialist 4 April 2013 Fourth draft Eleanor Deeley CBRE Bob Perkins Associate Economics Paul Roberts Principal Traffic Engineer Byron Song /Simon Tomlinson The Logistics Business Ltd 4th Floor, Bridgewater House, Whitworth Street, Manchester. M1 6LT E Mail: [email protected] i Black Country and southern Staffordshire - Regional Logistics Site Study Limitations URS Infrastructure & Environment UK Limited (“URS”) has prepared this Report for the sole use of the Black Country and southern Staffordshire local authorities (“Client”) in accordance with the Agreement under which our services were performed. No other warranty, expressed or implied, is made as to the professional advice included in this Report or any other services provided by URS. This Report is confidential and may not be disclosed by the Client nor relied upon by any other party without the prior and express written agreement of URS. The conclusions and recommendations contained in this Report are based upon information provided by others and upon the assumption that all relevant information has been provided by those parties from whom it has been requested and that such information is accurate.
    [Show full text]