THIS IS LOGISTICS Why DIRFT?

Total Page:16

File Type:pdf, Size:1020Kb

THIS IS LOGISTICS Why DIRFT? THE UK’S PREMIER LOGISTICS / DISTRIBUTION DEVELOPMENT RAIL CONNECTED / M1 J18 BUILD TO SUIT FROM 100,000 - 1.6 MILLION SQ FT THIS IS LOGISTICS Why DIRFT? DIRFT is the UK’s premier logistics park: FLEXIBILITY LOCATION READY FOR LABOUR RAIL FREIGHT DEVELOPMENT Building sizes from Park life & amenity Building plateaus prepared Strongest 30 minute Direct access to West 100,000 - 1.6 million sq ft labour catchment Coast Main Line, the UK’s Just 4 miles from M1 / 38 MVA already live on site primary rail freight route Lease length M6 / A14 Interchange Highest availability Roads and infrastructure in place of truck drivers 3 rail freight terminals Building height Reach 47 million within the estate provide customers in under Growing local population supply chain resilience 4.5 hours (HGV drive time) On time services (within 15 mins) 94% right time departures 87% right time arrivals It’s the hub location for leading brands The success of Prologis RFI DIRFT is primarily due to its optimum location for warehousing and logistics in the centre of Britain, with strategic road communications to the M1 (adjacent to J18) and M6/A14 interchange (within 4 miles). Discover more reasons why DIRFT is the UK’s premier logistics development Grangemouth GLASGOW Coatbridge EDINBURGH Mossend Hillington (Deanside) KEY Elderslie Sea Port & Intermodal Rail Freight Terminal Port of Tyne Intermodal Rail Freight Terminal NEWCASTLE West Coast Main Line (W10) Teesport Wilton Wilton Tees Riverside Intermodal Park Leeds West Coast Main Line Leeds LEEDS Selby Wakefield Stourton Europort UK’s Primary Rail Freight Route Seaforth Port of Liverpool MANCHESTER Doncaster Destinations include (north to south): Trafford Park 1 & 2 Doncaster / Barton Dock Railport Immingham Garston SHEFFIELD • Grangemouth - 7hrs Rossington LIVERPOOL (Inland Port (for Edinburgh and eastern central belt) Trafford Park Doncaster) Markham Vale Ditton Widnes (Mersy • Mossend and Coatbridge - 6hrs Multimodel (for Glasgow and western central belt) Gateway) • Teesport - 7hrs Castle Donington NOTTINGHAM (gateway to the North) Gateway • Seaforth / Liverpool - 5hrs East Midlands (for Liverpool and North West) Birch Coppice Corby (Cirft) • Felixstowe - 5hrs BIRMINGHAM (deep sea port) Lawley Street Ely Hams Hall • Wentloog - 4hrs (for South Wales and West) Daventry Felixstowe • Thurrock and Barking 3-4hrs (for London and South East) Harwich / • London Gateway - 4hrs Avonmouth / Bathside Bay Portbury (deep sea port) OXFORD Dagenham Thamesport Central Park SWINDON Barking Wentloog • Southampton - 4hrs Bristol Parson Street Willesden London Gateway (deep sea port) BRISTOL Erith CARDIFF (Howbury Park) LONDON • Channel Tunnel - 5hrs Chatham / Sheerness (for Europe and Silk Road) Bristol Dover Tilbury Port of Southampton Folkestone Channel Tunnel Portsmouth The ultimate road and rail served location! We know our customers need the ability to move How can DIRFT benefit your business? goods quickly across the UK. DIRFT is at the heart • Unrivalled connectivity for Port Traffic of the UK domestic intermodal sector, enabling • Exceptional flexibility and resilience for occupiers to respond quickly to changing demand customer supply chains and reduce carbon emission throughout their • Same day delivery of fresh produce operations and supply chain. Thanks to its proximity • Private estate enables movement of to the M1 and the West Coast Main Line, DIRFT is containers via red-diesel powered tugs already an important and growing part of the logistics • Ability to move overweight containers from supply chain for customers like Sainsbury’s, Tesco building to rail terminal and Eddie Stobart. • Access to Channel Tunnel (Silk Road) • Fast Freight – into urban areas With planning and infrastructure in place, we’re ready to go A new state of the art Intermodal Rail Freight Terminal Q. What planning is in place? Q. How will a new ‘Prologis’ building A. DIRFT has planning consent under a help our business? Development Consent Order (DCO). A. As the UK’s leading developer and owner One of the benefits is a quick passage of industrial and logistics property, Prologis EXPANSION OR BUILD TO SUIT FROM 100,000 - 1.6 MILLION SQ FT through planning, which means 8 weeks know what works best to meet the demands WITH UP TO 21M to get detailed consent for bespoke build of our customers today and into the future; CLEAR INTERNAL HEIGHT to suit buildings. to name a few, 42% lower energy cost, READY FOR DEVELOPMENT greater versatility and sustainability. Q. Can buildings be delivered to a fixed timeline? Q. Who manages the estate? A. Yes, with access roads and fully prepared 534,744 SQ FT (49,679 SQ M) A. Prologis take the long term view - we own, UNDER CONSTRUCTION building plateaus installed, DIRFT provides manage and maintain the estate, offering a the certainty of delivery required. range of park services designed to support the business operations of our customers and create a high quality working environment Q. Securing power can slow things - which is a benefit to our customers and down, is this the case here? their workforce. 189,124 SQ FT (17,568 SQ M) FULL PLANNING AND TENDERED A. No, DIRFT has already secured an additional 38 MVA for new customers, Q. Is using rail freight compulsory? so its plug and play without delay. A. No. Using rail is your choice (and you only pay per use). Other customers at DIRFT benefit from using rail to give their supply chain resilience, increasing access to the UK’s urban Estate Office and Centre for Learning areas, reduced reliance on HGV’s and speed. The labour pool stats speak for themselves Labour Force Growth Workforce in 30 mins Wage Growth There is a growing The 30 minute drive As an established location, workforce to supply catchment from DIRFT wage growth is limited DIRFT comparable to is greater than when compared to competing schemes competing schemes competing schemes Wages Workforce in 45 mins Wage levels at DIRFT The 45 minute drive are comparable with catchment from DIRFT competing schemes is comparable to competing schemes DIRFT is competitive on every level DIRFT has several competitive advantages Public Training for transport logistics skills Amenities Improved access to bus stops Prologis provides an on site training • Houlton, an adjacent housing with multiple stops and frequent facility and proactive assistance development, providing 6,200 services towards Rugby, Daventry with training for employers, helping new homes complete with new and Northampton. to up-skill and build the future schools and community centres logistics workforce. • Lilbourne Meadow provides 173 acres of open space with walking trails and cycles routes to Rugby via a link road • Two leading hotels; ibis and Green Retaining Holiday Inn travel plan quality labour • Gasrec natural gas and biogas refuelling station Employees at DIRFT have the DIRFT has been designed to • Two truck stops; established benefit of an active car sharing create an attractive and high Stobart Truck Stop and new community and assisted green quality working environment with DIRFT secure lorry park travel planning. significant welfare both in the buildings and across the wider • Save money by sharing estate - making it a place people travel costs want to work and want to stay. • Cut congestion and pollution NOTTINGHAM More than 60% of the workforce at DIRFT travel less than BURTON UPON TRENT 30 minutes to work LEICESTER NUNEATON CORBY BIRMINGHAM Highest availability of truck COVENTRY KETTERING RUGBY drivers in the region Prologis RFI DIRFT ROYAL DIRFT LEAMINGTON 33,028 SPA East Midlands 31,919 DAVENTRY NORTHAMPTON Magna Park 28,545 PP Northampton 14,966 BEDFORD 30 MINUTE Midlands LP 10,775 DRIVE TIME BANBURY MILTON KEYNES 45 MINUTE Source: Hickley & Associates DRIVE TIME 173 acre (70 hectare) area Lilbourne Meadows of open space A secure Lorry (HGV) Park will form part of the development, HGV Park providing space for some 300 HGVs to use. A new state of the art Intermodal Rail Freight Terminal Computer generated image EXPANSION OR BUILD TO SUIT FROM 100,000 - 1.6 MILLION SQ FT WITH UP TO 21M CLEAR INTERNAL HEIGHT READY FOR DEVELOPMENT Indicative image Direct access to the new adjacent Rail Freight Terminal 534,744 SQ FT (49,679 SQ M) UNDER CONSTRUCTION 189,124 SQ FT (17,568 SQ M) Estate Office and FULL PLANNING AND TENDERED Centre for Learning Houlton, Rugby 6,200 new homes www.houltonrugby.co.uk Sainsbury’s Rail Freight Terminal Tesco Rail Freight Northampton Loop Line Terminal West Coast Main Line Potential Service Station UK’s Primary Rail Freight Route Daventry International Rail Freight Terminal Operated by Malcolm Rail INDICATIVE MASTERPLAN N 0m 250m 500m Prologis is a long term owner of the buildings that • Customers have direct access to our dedicated • Private estate road management safeguards against it develops – this model enables us to create unique in-house property and facilities management obstructive parking to ensure free flow traffic single ownership parks that offer market leading team with a customer focused approach and services and property management, delivering unrivalled knowledge of the logistics sector – • The private estate roads also allow for transportation tangible benefits to our customer’s operations this means ongoing support throughout your between buildings and the rail freight terminal and their staff. occupation of the building with tugs and red diesel to dramatically reduce costs • Fully serviced with pro-active security and estate • Access to Prologis’ comprehensive and low cost management services
Recommended publications
  • Members and Parish/Neighbourhood Councils RAIL UPDATE
    ITEM 1 TRANSPORT COMMITTEE NEWS 07 MARCH 2000 This report may be of interest to: All Members and Parish/Neighbourhood Councils RAIL UPDATE Accountable Officer: John Inman Author: Stephen Mortimer 1. Purpose 1.1 To advise the Committee of developments relating to Milton Keynes’ rail services. 2. Summary 2.1 West Coast Main Line Modernisation and Upgrade is now in the active planning stage. It will result in faster and more frequent train services between Milton Keynes Central and London, and between Milton Keynes Central and points north. Bletchley and Wolverton will also have improved services to London. 2.2 Funding for East-West Rail is now being sought from the Shadow Strategic Rail Authority (SSRA) for the western end of the line (Oxford-Bedford). Though the SSRA have permitted a bid only for a 60 m.p.h. single-track railway, excluding the Aylesbury branch and upgrade of the Marston Vale (Bedford-Bletchley) line, other Railtrack investment and possible developer contributions (yet to be investigated) may allow these elements to be included, as well as perhaps a 90 m.p.h. double- track railway. As this part of East-West Rail already exists, no form of planning permission is required; however, Transport and Works Act procedures are to be started to build the missing parts of the eastern end of the line. 2.3 New trains were introduced on the Marston Vale line, Autumn 1999. A study of the passenger accessibility of Marston Vale stations identified various desirable improvements, for which a contribution of £10,000 is required from this Council.
    [Show full text]
  • Agenda Item 8: West Coast Main Line Released Capacity
    East West Rail Consortium 13th March 2019 Agenda Item 8: West Coast Main Line Released Capacity Recommendation: It is recommended that the meeting: a) Note the update on the West Coast Main Line Released Capacity study b) Endorse the strategic issues identified in paragraph 2.6 that have been identified by England’s Economic Heartland as needing to be considered by the study c) Note that England’s Economic Heartland has established a working group of representative interests, working on a ‘task and finish’ basis to support the EEH Business Unit d) Note the update on the Old Oak Common: Future Chiltern Capacity 1. Context 1.1. The East West Rail Consortium has previously identified the strategic importance of developing rail services along the Northampton – Milton Keynes – Aylesbury – High Wycombe – Old Oak Common axis. 1.2. The opportunity to realise this occurs through a combination of the opening of East West Rail and the opening of the first stage of HS2. 1.3. The Chiltern and East West Rail Route Strategy was published by Network Rail in 2017 and identified the potential and need to develop this north- south axis, partly in response to limitations elsewhere on the network and partly in response to the potential for further passenger growth as a result of planned growth set out in locally. 1.4. Realising the potential to develop services on this north-south axis has been a long-standing strategic priority for England’s Economic Heartland and was included within the submission to the 2018 Budget. 1.5. Over and above the on-going work being taken forward by the East West Rail Company to deliver East West Rail, there are two pieces of work underway that are pertinent to realising the opportunity to deliver services on the north-south axis: London North West South CMSP – Released Capacity WCML South Old Oak Common Station: Future Chiltern Capacity 2.
    [Show full text]
  • Draft Alternative Site Assessment
    Draft Alternative Site Assessment The Rail Central Rail Freight Interchange and Highway Order 201[X] Stage 2 Consultation Draft (March 2018) Regulation 5(2)(q) Contents 1. Introduction 1 2. Need 3 3. Options Appraisal 5 4. Methodology 11 5. Stage 1: Sieving Results 20 6. Stage 2: Site Assessment 21 7. Stage 3: Sites identified by Local Representation and Other Studies 70 8. Stage 4: Rail Central 83 9. Stage 5: Comparative Assessment 85 10. Overview and Conclusions 110 Appendix 1: Phase 1 Alternative Site Assessment 112 Appendix 2: Plan 1 – Catchment Area 113 Appendix 3: Plan 2 – Motorway Junction Buffer 114 Appendix 4: Plan 3 – Railways within Motorway Junctions 115 Appendix 5: Plan 4 – W8 Gauge Railways and Above 116 Appendix 6: Plan 5 – Key Environmental Designations 117 Appendix 7: Plan 6 – Excluding Environmental Designations 118 Appendix 8: Plans 6a – 6f – Excluding Environmental Designations 119 Appendix 9: Plans 7-1 to 7-25 Agricultural Land Classification 120 Appendix 10: Labour Market Availability Data 121 Contact David Diggle [email protected] March 2018 1. Introduction 1.1 Ashfield Land Management Limited and Gazeley GLP Northampton s.àr.l. intend to apply for a Development Consent Order (DCO) for a Strategic Rail Freight Interchange (SRFI), referred to as Rail Central at land at Arm Farm, Milton Malsor in South Northamptonshire (the Rail Central site). 1.2 The draft Alternative Site Assessment (ASA) provides a preliminary assessment of alternative sites that have been considered in selecting the Rail Central site. This draft ASA establishes a preliminary area in which it is appropriate to search for an alternative site, sets out the search criteria to assess potential sites and assesses the suitability of alternative sites.
    [Show full text]
  • Appendix 2.4 to Environmental Statement (Document 5.2)
    UPDATED COMPARATIVE ANALYSIS OF NORTHAMPTON GATEWAY AND RAIL CENTRAL APPENDIX 2.4 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) The Northampton Gateway Rail Freight Interchange Order 201X UPDATED COMPARATIVE ANALYSIS OF NORTHAMPTON GATEWAY AND RAIL CENTRAL | 8 JANUARY 2019 www.northampton-gateway.co.uk Updated Comparative Analysis of Northampton Gateway SRFI and the proposed Rail Central SRFI Date: January 2019 Author: Oxalis Planning This page is intentionally left blank 2 Updated Comparative Analysis of Northampton Gateway SRFI and the proposed Rail Central SRFI CONTENTS Executive Summary 1.0 Introduction 2.0 Rail Central Overview 3.0 Comparative Assessment: Good Design 4.0 Comparative Assessment: Operational and Functional Aspects 5.0 Comparative Assessment: Environmental Impacts 5.1 Landscape and Visual Impact 5.2 Highways 5.3 Air Quality 5.4 Noise and Vibration 5.5 Lighting 5.6 Biodiversity 5.7 Agricultural Land 5.8 Archaeology 5.9 Heritage 5.10 Drainage 6.0 Conclusions Appendices: 1. Comparative Plan showing the location of the Northampton Gateway proposal and the location of the Rail Central proposal. 2. Rail Central scheme Parameter Plan 3. Rail Central scheme Illustrative Landscape Masterplan 3 Updated Comparative Analysis of Northampton Gateway SRFI and the proposed Rail Central SRFI This page is intentionally left blank 4 Updated Comparative Analysis of Northampton Gateway SRFI and the proposed Rail Central SRFI EXECUTIVE SUMMARY 1. Unsurprisingly, given the proximity of the Rail Central site and the Northampton Gateway site, the sites share many of the same characteristics in relation to high level considerations, such as proximity to markets and access to the strategic rail network.
    [Show full text]
  • Welcome to the Rail User Express. We Continue with The
    November 2019 Welcome to the Rail User Express. RUX is published around the middle of each month. It may be forwarded, or items reproduced in another newsletter (quoting sources). Anyone may request RUX as an email attachment, or opt to be notified when it is posted on the Railfuture (Rf) website. There is no charge for either service. Following GDPR, Railfuture Membership now maintains both lists. Please advise if you no longer wish to receive the newsletter or link, or if you know of anyone who would like to be added. For further details of any of the stories mentioned, please consult the relevant website, or ask the editor for the source material. The DfT’s Autumn Update of the Rail Network Enhancements Pipeline (RNEP) on the progress of schemes funded in CP6 (2019-2024) makes salutary reading, and the message is clear: don’t hold your breath! Even schemes buoyed by a visit from the S of S for Transport are still at an early stage, eg Skipton - Colne at Decision to Initiate, and Ashington - Blythe – Tyne at Decision to Develop. No scheme can proceed into delivery until it has a Decision to Deliver. So, taken at face value, even Phase 2 of the Western section of East West Rail (Bicester - Bedford) has yet to be confirmed. Roger Smith We continue with the usual roundup of news items from groups around the UK. Please keep your contributions coming: they are all gratefully received. Friends of the Far North Line As a member of the FNL Review Team, FoFNL is delighted that its Report confirms that infrastructure work essential to planned improvements to the FNL service pattern is to go through its final stages before financial approval.
    [Show full text]
  • Sustainability Appraisal for Northampton Local Plan Part 2 Appendices
    Northampton Borough Council Sustainability Appraisal for Northampton Local Plan Part 2 Appendices Final report Prepared by LUC June 2020 Northampton Borough Council Sustainability Appraisal for Northampton Local Plan Part 2 Appendices Version Status Prepared Checked Approved Date 1. DRAFT FOR CLIENT REVIEW – J. Pearson J. Pearson QA to be 18.05.2020 NOT FOR ISSUE (Updated as a completed in S. Temple result of new/revised site parallel with allocations and policies since N. Collins client review, Proposed Submission Round 1) prior to E. Hynes consultation L. Meldrum E. Lendak C. Green 2. PROPOSED SUBMISSION J. Pearson J. Pearson J. Owen 16.06.2020 ROUND 2 - Final S. Temple E. Lendak C. Green Bristol Land Use Consultants Ltd Landscape Design Edinburgh Registered in England Strategic Planning & Assessment Glasgow Registered number 2549296 Development Planning Lancaster Registered office: Urban Design & Masterplanning London 250 Waterloo Road Environmental Impact Assessment Manchester London SE1 8RD Landscape Planning & Assessment Landscape Management landuse.co.uk 100% recycled paper Ecology Historic Environment GIS & Visualisation Contents SA for Northampton Local Plan Part 2 (Proposed Submission Rnd 2) June 2020 Contents Table C.3: Responses to consultation comments on September 2017 SA of Local Plan Part 2 Site Options paper C-19 Appendix A Table C.4: Regulation 19 Round 1 Consultation Review of other relevant policies, plans, Responses Relating to the Sustainability Appraisal C-25 and programmes A-1 Table E.1: Assessment criteria for
    [Show full text]
  • Roxhill Public Consultation
    PUBLIC CONSULTATION DETAILS AND SUMMARY OF PROPOSALS UPDATE BY ROXHILL OCTOBER 2017 Roxhill is proposing a Strategic Rail Freight Interchange (SRFI) on land to the west of the M1 Junction 15. The proposed SRFI is known as ‘Northampton Gateway’. An SRFI is a large multi-purpose freight interchange and distribution centre linked into both the rail and trunk road systems. This document has been prepared to make the community Roxhill is holding a statutory consultation process from 9th aware of Roxhill’s public consultation activity being October until 24th November 2017. This will focus on a undertaken in October and November, and to provide a number of public consultation exhibitions being held as summary of the Northampton Gateway proposals. It follows follows: earlier consultation activity, including an Update Newsletter distributed in July 2017, to give an overview of the ongoing Hilton Hotel, Collingtree Monday 9th October, 1.30pm – 7.30pm work, and indicative programme for the next steps. The Royal Oak pub, Blisworth This forms part of Roxhill’s proposed strategy for Wednesday 11th October, 1.30pm – 7.30pm consultation as set out in the published Statement of Community Consultation (SoCC). Details of how local Milton Malsor Village Hall people can view and comment on updated information Friday 13th October, 2pm – 7.30pm about the proposed development are provided on the back Roade Primary School page. Saturday 14th October, 12 noon – 5pm An initial stage of public consultation was held in late 2016 The Forum, Moat Lane, Towcester (SNDC Council to make people aware of the proposals at an early stage, to Chamber) Friday 20th October, 2pm – 7pm gain feedback on the proposals and to inform people of the Contact details are included at the back of this leaflet, likely application process.
    [Show full text]
  • Northampton Gateway Strategic Rail Freight Interchange Local Impact Report November 2018
    Northamptonshire County Council Northampton Gateway Strategic Rail Freight Interchange Local Impact Report November 2018 Contents Section 1 Introduction Section 2 Highways Section 3 Rail services Section 4 Archaeological impact Section 5 Flood Water Management and Drainage 1. Introduction 1.1. This Local Impact Report has been prepared by Northamptonshire County Council at the request of the Examining Authority as part of the Secretary of State’s consideration of the application made by Roxhill (Junction 15) Limited for a Development Consent Order to permit the construction of the Northampton Gateway Strategic Rail Freight Interchange. 1.2. This Report has been prepared in line with Advice note one: Local Impact Reports published by The Planning Inspectorate in April 2012 to give details of the likely impact of the proposed development on the authority’s area. 1.3. The proposed site of the Rail Freight Interchange, including construction of a rail freight terminal, rail-served warehousing and rail and road access to the site is located south of Northampton to the south-west of Junction 15 of the M1. Associated highway mitigation works are also proposed, including construction of a bypass to the village of Roade. All the works covered by the Development Consent Order are contained within the administrative area of Northamptonshire County Council. 2. Highways Location 2.1. The proposed site of the Northampton Gateway Strategic Rail Freight Interchange is immediately south-west of M1 Junction 15. Access to and from the site is proposed from the A508, which links M1 Junction 15 with the A5 at Old Stratford to the north of Milton Keynes.
    [Show full text]
  • The Northampton Gateway Rail Freight Interchange
    The Northampton Gateway Rail Freight Interchange – Order 201X Local Highway Authority Response to Stage 2 Statutory Public Consultation Pursuant to Section 42 of the Planning Act 2008 and Regulation 11 of the Infrastructure Planning (EIA) Regulations 2009 Dear Sir/Madam, Thank you for consulting Northamptonshire Highways as the Local Highway Authority (LHA) for Northamptonshire. This response is made without prejudice to any views expressed by other functions within Northamptonshire County Council, or those of Highways England with regard to the strategic road network. This response represents the combined comments of all relevant sections of Northamptonshire Highways, having consulted those teams internally. Transport Assessment The LHA has met the Applicant of the Northampton Gateway proposals and their highways consultants/engineers, along with Highways England, for some time as part of a Transport Working Group (TWG). This TWG has resulted in agreement over the likely traffic predicted to be generated by the proposed development (both light and heavy vehicles) over the course of a typical day, and in particular the peak hours on the highway network. A methodology for distributing the development trips on the road network is also agreed, based on utilisation of the County Council’s Strategic Transport Model, known as the NSTM. The NSTM has been further validated in the area surrounding the proposed development to ensure that it is fit for purpose as the basis for forecasting future traffic levels. In line with the Core Strategy Plan Period the future year for assessment purposes is 2031. Both the baseline and forecast NSTM models have been signed off by the County Council as fit for purpose.
    [Show full text]
  • LNW Route Specification 2017
    Delivering a better railway for a better Britain Route Specifications 2017 London North Western London North Western July 2017 Network Rail – Route Specifications: London North Western 02 SRS H.44 Roses Line and Branches (including Preston 85 Route H: Cross-Pennine, Yorkshire & Humber and - Ormskirk and Blackburn - Hellifield North West (North West section) SRS H.45 Chester/Ellesmere Port - Warrington Bank Quay 89 SRS H.05 North Transpennine: Leeds - Guide Bridge 4 SRS H.46 Blackpool South Branch 92 SRS H.10 Manchester Victoria - Mirfield (via Rochdale)/ 8 SRS H.98/H.99 Freight Trunk/Other Freight Routes 95 SRS N.07 Weaver Junction to Liverpool South Parkway 196 Stalybridge Route M: West Midlands and Chilterns SRS N.08 Norton Bridge/Colwich Junction to Cheadle 199 SRS H.17 South Transpennine: Dore - Hazel Grove 12 Hulme Route Map 106 SRS H.22 Manchester Piccadilly - Crewe 16 SRS N.09 Crewe to Kidsgrove 204 M1 and M12 London Marylebone to Birmingham Snow Hill 107 SRS H.23 Manchester Piccadilly - Deansgate 19 SRS N.10 Watford Junction to St Albans Abbey 207 M2, M3 and M4 Aylesbury lines 111 SRS H.24 Deansgate - Liverpool South Parkway 22 SRS N.11 Euston to Watford Junction (DC Lines) 210 M5 Rugby to Birmingham New Street 115 SRS H.25 Liverpool Lime Street - Liverpool South Parkway 25 SRS N.12 Bletchley to Bedford 214 M6 and M7 Stafford and Wolverhampton 119 SRS H.26 North Transpennine: Manchester Piccadilly - 28 SRS N.13 Crewe to Chester 218 M8, M9, M19 and M21 Cross City Souh lines 123 Guide Bridge SRS N.99 Freight lines 221 M10 ad M22
    [Show full text]
  • England's Economic Heartland Rail Study Phase 1 15 MB
    Passenger Rail Study Phase One: Baseline Assessment of the current network A technical report produced by Network Rail for the EEH evidence base Table of Figures ....................................................................................................................................................... 3 Glossary ................................................................................................................................................................... 4 Executive Summary ................................................................................................................................................. 5 An Area of National Importance ......................................................................................................................... 5 Understand the Railway’s Role ........................................................................................................................... 5 Introduction ............................................................................................................................................................ 9 Aim of Phase 1 of the Passenger Rail Study ........................................................................................................ 9 What is the purpose of baselining the existing passenger network? ............................................................... 10 Methodology ....................................................................................................................................................
    [Show full text]
  • Black Country and Southern Staffordshire Regional Logistics Site Study
    Black Country and southern Staffordshire - Regional Logistics Site Study Black Country and southern Staffordshire Regional Logistics Site Study Final Report April 2013 UNITED KINGDOM & IRELAND Prepared for: Wolverhampton City Council, Dudley Metropolitan Borough Council, Sandwell Metropolitan Borough Council, Walsall Council, Staffordshire County Council, South Staffordshire District Council, CENTRO, Cannock Chase District Council, Stafford Borough Council, Lichfield District Council and Tamworth Borough Council Black Country and southern Staffordshire - Regional Logistics Site Study Rev Date Details Prepared by Checked by Approved by 1 September First Draft Mark Phillips Alan Houghton 2012 Principal Head of Planning Planning and and Regeneration Regeneration Consultant 2 October Second draft Anita Longworth 2012 Principal Planner 3 December Third draft Jerry Thorne 2012 Rail Specialist 4 April 2013 Fourth draft Eleanor Deeley CBRE Bob Perkins Associate Economics Paul Roberts Principal Traffic Engineer Byron Song /Simon Tomlinson The Logistics Business Ltd 4th Floor, Bridgewater House, Whitworth Street, Manchester. M1 6LT E Mail: [email protected] i Black Country and southern Staffordshire - Regional Logistics Site Study Limitations URS Infrastructure & Environment UK Limited (“URS”) has prepared this Report for the sole use of the Black Country and southern Staffordshire local authorities (“Client”) in accordance with the Agreement under which our services were performed. No other warranty, expressed or implied, is made as to the professional advice included in this Report or any other services provided by URS. This Report is confidential and may not be disclosed by the Client nor relied upon by any other party without the prior and express written agreement of URS. The conclusions and recommendations contained in this Report are based upon information provided by others and upon the assumption that all relevant information has been provided by those parties from whom it has been requested and that such information is accurate.
    [Show full text]