WQI for the Month June 2016

Total Page:16

File Type:pdf, Size:1020Kb

WQI for the Month June 2016 WATER QUALITY INDEX OF RIVER WATER AT DIFFERENT LOCATIONS IN THE STATE OF ASSAM UNDER NWMP FOR JUN-2016 Fecal Total STN Sampling Mon DO BOD Stn Name Coliform Coliform Remarks Final_Remark Code Date Agency (mg/l) (mg/l) (MPN/100ml) (MPN/100ml) 1030 6/8/2016 BRAHAMPUTRA AT DIBRUGARH, PCBA 6.8 0.6 360 910 BOD(Satisfied) Satisfactory ASSAM DO(Satisfied) FC(Satisfied) TC(Satisfied) 1031 6/3/2016 BRAHAMPUTRA AT PANDU, PCBA 7.1 1.7 2100 29000 BOD(Satisfied) Not_Satisfactory ASSAM DO(Satisfied) FC(Satisfied) TC(Not_Satisfied) 1258 6/8/2016 JHANJI AT N.H. CROSSING PCBA 5.6 1.2 730 15000 BOD(Satisfied) Not_Satisfactory JORHAT, ASSAM DO(Satisfied) FC(Satisfied) TC(Not_Satisfied) 1259 6/13/2016 DHANSIRI AT GOLAGHAT, ASSAM PCBA 6.8 2.0 730 1500 BOD(Satisfied) Satisfactory DO(Satisfied) FC(Satisfied) TC(Satisfied) 1260 6/27/2016 BRAHAMPUTRA AT KHERGHAT PCBA 7.6 0.6 300 2000 BOD(Satisfied) Satisfactory (AFTER CONFL. WITH DIBANG DO(Satisfied) FC(Satisfied) TC(Satisfied) 1261 6/16/2016 SUBANSIRI AT PCBA 8.3 0.4 Nil 2300 BOD(Satisfied) Satisfactory GEREKAMUKH,ASSAM, (BEFORE DO(Satisfied) CONFL. WITH FC(Satisfied) TC(Satisfied) 1262 6/8/2016 BRAHAMPUTRA AT NIMATIGHAT, PCBA 6.1 1.4 360 2100 BOD(Satisfied) Satisfactory ASSAM DO(Satisfied) FC(Satisfied) TC(Satisfied) 1298 6/20/2016 DISANG AT GUNDAMGHAT, PCBA 5.8 2.1 Nil 700 BOD(Satisfied) Satisfactory ASSAM DO(Satisfied) FC(Satisfied) TC(Satisfied) Fecal Total STN Sampling Mon DO BOD Stn Name Coliform Coliform Remarks Final_Remark Code Date Agency (mg/l) (mg/l) (MPN/100ml) (MPN/100ml) 1299 6/6/2016 BRAHAMPUTRA AT JOGIJHOGA PCBA 5.6 1.5 360 1400 BOD(Satisfied) Satisfactory NEAR BRIDGE, ASSAM DO(Satisfied) FC(Satisfied) TC(Satisfied) 1422 6/8/2016 BURHIDIHING AT MARGHERITA, PCBA 4.2 2.2 720 7500 BOD(Satisfied) Not_Satisfactory ASSAM DO(Satisfied) FC(Satisfied) TC(Not_Satisfied) 1423 6/27/2016 BORAK AT PANCHAGRAM , ASSAM PCBA 5.6 1.2 300 4300 BOD(Satisfied) Satisfactory DO(Satisfied) FC(Satisfied) TC(Satisfied) 1526 6/20/2016 BRAHMPUTRA RIVER AT PCBA 7.5 1.2 300 2000 BOD(Satisfied) Satisfactory DHENUKHAPAHAR, ASSAM DO(Satisfied) FC(Satisfied) TC(Satisfied) 1527 6/8/2016 BHOGDOI RIVER AT JORHAT PCBA 5.2 1.0 1100 24000 BOD(Satisfied) Not_Satisfactory ,ASSAM DO(Satisfied) FC(Satisfied) TC(Not_Satisfied) 1528 6/3/2016 BHARALU RIVER AT GUWAHATI PCBA Nil 12.7 2000 15000 BOD(Not_Satisfied) Not_Satisfactory DO(Not_Satisfied) FC(Satisfied) TC(Not_Satisfied) 1530 6/8/2016 DIGBOI RIVER AT LAKHIPATHE, PCBA 3.0 6.0 360 7500 BOD(Not_Satisfied) Not_Satisfactory RESERVE FOREST, DIGBOI DO(Not_Satisfied) FC(Satisfied) TC(Not_Satisfied) 1531 6/20/2016 *MORA BHARALI AT TEZPUR, PCBA 7.2 2.1 Nil 1500 BOD(Satisfied) Satisfactory ASSAM DO(Satisfied) FC(Satisfied) TC(Satisfied) 2058 6/16/2016 DISANG RIVER AT DILLIGHAT, PCBA 7.6 0.8 300 2000 BOD(Satisfied) Satisfactory DIBRUGARH DIST., ASSAM DO(Satisfied) FC(Satisfied) TC(Satisfied) Fecal Total STN Sampling Mon DO BOD Stn Name Coliform Coliform Remarks Final_Remark Code Date Agency (mg/l) (mg/l) (MPN/100ml) (MPN/100ml) 2059 6/7/2016 KOLONG RIVER AT MARIGAON PCBA 5.6 0.6 300 1500 BOD(Satisfied) Satisfactory DO(Satisfied) FC(Satisfied) TC(Satisfied) 2060 6/27/2016 MANAS RIVER AT NH-31 PCBA 6.0 1.0 Nil 730 BOD(Satisfied) Satisfactory CROSSING, BARPETA, DISTRICT DO(Satisfied) FC(Satisfied) TC(Satisfied) 2061 6/8/2016 RIVER KHARSANG BEFORE PCBA 5.9 1.6 300 1200 BOD(Satisfied) Satisfactory CONFLUENCE WITH BURIDIHING DO(Satisfied) N FC(Satisfied) TC(Satisfied) 2062 6/8/2016 BURIDIHING NEAR DULIAJAN AT PCBA 6.1 2.5 300 2000 BOD(Satisfied) Satisfactory D/S, TINSUKIA DO(Satisfied) FC(Satisfied) TC(Satisfied) 2063 6/16/2016 JAI BHARALI RIVER NEAR PCBA 8.0 1.4 Nil 300 BOD(Satisfied) Satisfactory BISWANATH CHARALI, SONITPUR DO(Satisfied) FC(Satisfied) TC(Satisfied) 2064 6/14/2016 BRAHMAPUTRA RIVER AT PCBA 5.9 1.5 300 2100 BOD(Satisfied) Satisfactory CHANDRAPUR, GUWAHATI DO(Satisfied) FC(Satisfied) TC(Satisfied) 2065 6/3/2016 PAGLDIA RIVER NEAR NALBARI PCBA 7.5 1.1 730 4300 BOD(Satisfied) Satisfactory TOWN, DIST. NALBARI, AS DO(Satisfied) FC(Satisfied) TC(Satisfied) 2066 6/13/2016 BRAHMAPUTRA RIVER AT DHUBRI PCBA 5.8 1.3 360 1500 BOD(Satisfied) Satisfactory DO(Satisfied) FC(Satisfied) TC(Satisfied) 2067 6/3/2016 BRAHMPUTRA RIVER AT PCBA 7.2 1.3 300 1400 BOD(Satisfied) Satisfactory SUALKUCHI, DIST. KAMRUP, DO(Satisfied) ASSAM FC(Satisfied) TC(Satisfied) Fecal Total STN Sampling Mon DO BOD Stn Name Coliform Coliform Remarks Final_Remark Code Date Agency (mg/l) (mg/l) (MPN/100ml) (MPN/100ml) 2068 6/27/2016 U/S OF KATHAKAL AT MATIJURI, PCBA 5.7 1.0 Nil 730 BOD(Satisfied) Satisfactory DIST. HAILAKANDI, ASS DO(Satisfied) FC(Satisfied) TC(Satisfied) 2069 6/14/2016 BRAHMPUTRA RIVER NEAR PCBA 6.3 2.1 730 9300 BOD(Satisfied) Not_Satisfactory WATER INTAKE POINT AT DO(Satisfied) KACHARI FC(Satisfied) TC(Not_Satisfied) 2229 6/27/2016 KUNDLI RIVER AT KUNDLI/ PCBA 8.5 0.7 Nil 1000 BOD(Satisfied) Satisfactory SAPAKHOWA, SADIA. DO(Satisfied) FC(Satisfied) TC(Satisfied) 2230 6/16/2016 BURHIDIHING RIVER AT DULIAJAN PCBA 7.3 1.7 300 1000 BOD(Satisfied) Satisfactory (INTAKE POINT OF OIL DO(Satisfied) FC(Satisfied) TC(Satisfied) 2231 6/20/2016 DIKHOW RIVER AT DIKHOW PCBA 5.6 1.4 300 1500 BOD(Satisfied) Satisfactory BRIDGE SIVASAGAR DO(Satisfied) FC(Satisfied) TC(Satisfied) 2232 6/13/2016 KOHORA RIVER AT N.H. PCBA 7.4 1.6 730 15000 BOD(Satisfied) Not_Satisfactory CROSSING, KOHORA DO(Satisfied) FC(Satisfied) TC(Not_Satisfied) 2233 6/16/2016 BOGINADI NEAR BRIDGE NH-52, PCBA 8.2 1.4 300 700 BOD(Satisfied) Satisfactory LAKHIMPUR DO(Satisfied) FC(Satisfied) TC(Satisfied) 2234 6/16/2016 RANGA NADI D/S OF HYDEL PCBA 7.8 2.4 300 1000 BOD(Satisfied) Satisfactory PROJECT DO(Satisfied) FC(Satisfied) TC(Satisfied) 2235 6/21/2016 PANCHNAI RIVER AT NH-52 PCBA 7.8 1.6 Nil 910 BOD(Satisfied) Satisfactory CROSSING, ORANG DO(Satisfied) FC(Satisfied) TC(Satisfied) Fecal Total STN Sampling Mon DO BOD Stn Name Coliform Coliform Remarks Final_Remark Code Date Agency (mg/l) (mg/l) (MPN/100ml) (MPN/100ml) 2236 6/13/2016 KAPILI RIVER AT DHARMTUL PCBA 5.4 1.5 360 2300 BOD(Satisfied) Satisfactory BRIDGE, NH-31, NAGAON DO(Satisfied) FC(Satisfied) TC(Satisfied) 2237 6/13/2016 KALONG RIVER AT U/S OF PCBA 3.6 1.5 730 9300 BOD(Satisfied) Not_Satisfactory ANANDARAM DEKIAL PHUKAN BRI DO(Not_Satisfied) FC(Satisfied) TC(Not_Satisfied) 2238 6/27/2016 BEKI RIVER AT NH-37 CROSSING PCBA 5.6 1.0 Nil Nil BOD(Satisfied) Satisfactory AT BARPETA ROAD DO(Satisfied) FC(Satisfied) TC(Satisfied) 2239 6/13/2016 SANKOSH RIVER, DHUBRI PCBA 5.5 1.4 300 4300 BOD(Satisfied) Satisfactory DO(Satisfied) FC(Satisfied) TC(Satisfied) 2240 6/6/2016 BARAK RIVER AT D/S OF SILCHAR PCBA 5.7 1.1 300 2100 BOD(Satisfied) Satisfactory DO(Satisfied) FC(Satisfied) TC(Satisfied) 2241 6/6/2016 SONAI RIVER AT SONAI PCBA 5.6 1.2 300 2000 BOD(Satisfied) Satisfactory DO(Satisfied) FC(Satisfied) TC(Satisfied) 2242 6/27/2016 KUSHIARA RIVER AT KARIMGANJ PCBA 5.7 1.3 Nil 730 BOD(Satisfied) Satisfactory DO(Satisfied) FC(Satisfied) TC(Satisfied).
Recommended publications
  • Kaziranga Travel Guide - Page 1
    Kaziranga Travel Guide - http://www.ixigo.com/travel-guide/kaziranga page 1 Pleasant weather. Carry Light woollen, umbrella. Kaziranga When To Max: 25.2°C Min: 17.9°C Rain: 165.0mm Sheltering a major portion of Sep VISIT Cold weather. Carry Heavy woollen, world's population of Rhinos, umbrella. Kaziranga is one among the five Max: 25.1°C Min: 16.5°C Rain: 192.0mm http://www.ixigo.com/weather-in-kaziranga-lp-1137760 natural UNESCO world heritage Oct sites in India. Home to the Great Famous For : Nature / WildlifePlaces To Jan Cold weather. Carry Heavy woollen, umbrella. Indian One Horned Rhinos and VisiCity Cold weather. Carry Heavy woollen. Max: 25.2°C Min: 16.3°C Rain: 78.0mm many other exotic species, Max: 18.8°C Min: 8.5°C Rain: 6.0mm Kaziranga National Park is one of Kaziranga is famed for the conservation of Nov Feb the most sought after destinations numerous exotic species including the pride Cold weather. Carry Heavy woollen. Cold weather. Carry Heavy woollen. of the state, the one horned rhino. There Max: 22.7°C Min: 12.6°C Rain: 18.0mm for the wildlife buffs. Max: 19.7°C Min: 9.4°C Rain: 15.0mm are also other rarely found animals and Dec endangered species that can be seen here Mar Very cold weather. Carry Heavy woollen. such as the Hoolock Gibbons, Swamp deer, Cold weather. Carry Heavy woollen. Max: 13.5°C Min: 4.7°C Rain: 15.0mm Leopard Cats, Civet Cats, Tigers etc. The Max: 22.8°C Min: 12.4°C Rain: 24.0mm broad terrain of the jungle is covered in Apr plush flora that includes tall elephant grass, Cold weather.
    [Show full text]
  • Priority List 2008-09
    Priority List 2008-09 Prio rity Name of the Project Estimat ed CPA*/C PN** General / Hill fixed Cost (Rs. in / BTC Areas crore) 1 Improvement of Drainage System in Titabar 2.08 CPA General Town 2 Modernisation and Augmentation of 7.9 CPA General Infrastructure of H.R.H. Prime of Wales Institute of Engineering & Technology, Jorhat 3 Improvement of Road Infrastructure, 48.72 CPA General Widening, Improvement of Riding Quality of Road Structure, Construction of RCC Drain cum Footpath & without Footpath, Providing Street Lighting and Road Furniture in Dibrugarh Municipality Limit of Dibrugarh City 4 Upgradaton of Approach Road to the 4.49 CPA General Mohanbari Airport, Diburgarh including Widenening, Roadside Drain and Street Light 5 Preservation of Cultural Heritage of Majuli 5.4 CPA General Natun Kamalabari Satra (Phase -I) 6 Mahapurush Shri Shri Madhav Deb 5.34 CPA General Kalashetra at Dhekia Khowain Jorhat District 7 Development of Assam Medical College & 20 CPA General Hospital, HOPE, Dibrugarh (Phase -II) 8 Modernisation and Augmentation of 9.26 CPA General Infrastructure of Jorhat Engineering Institure 9 Modernisation and Augmentation of 3.75 CPA General Infrastructure of Lahowal Polytechnic, Dibrugarh 10 Anti Erosion measures to protect the L/B 2.31 CPA General embankment of River Buridehing and its adjoining areas including Namphakial Village (at Ch 4510 m to 4850 m) 11 Construction of new 33/11 kV, 2x5 MVA S/S 13.34 CPA BTC at Thirubari with 45 Km 11 kV lines and 55 Km 33 kV lines from Dhiligaon to Thirubari 12 Zoo Japorigog Road 6.06 CPA General 13 End Point of Bhangagarh Flyover (via GMC) 5 CPA General to Khalilpara Film Studio Road 14 Construction of RCC Bridge No.
    [Show full text]
  • Download 3.82 MB
    Initial Environmental Examination (updated) Project Number: 38412-033 July 2018 India: Multitranche Financing Facility Assam Integrated Flood and Riverbank Erosion Risk Management Investment Program Project 2 Kaziranga Subproject (Golaghat District) Prepared by the Flood and River Erosion Management Agency of Assam, Government of Assam for the Asian Development Bank. This is an updated version of the initial environmental examination originally posted in September 2010 available on https://www.adb.org/sites/default/files/linked-documents/38412-01-ind-seia.pdf. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, §¨ ©¦£ and may be preliminary in nature. Your attention is directed to the ¡ ¢ £¤¥¦ section on £¦ ¢£ ¦ In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Initial Environmental Examination Project Number: 38412-033 July 2018 INDIA: ASSAM INTEGRATED FLOOD AND RIVERBANK EROSION RISK MANAGEMENT INVESTMENT PROGRAM PROJECT 2 KAZIRANGA SUBPROJECT GOLAGHAT DISTRICT Prepared by the Flood and River Erosion Management Agency of Assam (FREMAA) for the Asian Development Bank. The initial environmental examination report is a document of the borrower. The views expressed
    [Show full text]
  • List of Candidates Called for Preliminary Examination for Direct Recruitment of Grade-I Officers in Assam Judicial Service
    LIST OF CANDIDATES CALLED FOR PRELIMINARY EXAMINATION FOR DIRECT RECRUITMENT OF GRADE-I OFFICERS IN ASSAM JUDICIAL SERVICE. [ Candidature is subject to fulfilment of eligibility criteria prescribed by the Rules ] Sl No Name of the Category Roll No Issue No Present Address Candidate 1 2 3 4 5 6 1 AAMIR AKHTAR General 0001 3244 C-119, Reids Line, Delhi University, Delhi-7 2 ABDUL AWAL DEWAN General 0002 3245 Maherban Path, P.O.& P/S Hatigaon, Dist: Kamrup, Assam 3 ABDUL HAI LASKAR General 0003 3246 Madurband (Kandigram), PO & PS- Silchar, Dist- Cachar, Assam, Pin-788001 4 ABDUL MANNAN SARKAR General 0004 3247 Bilasipara, W/No.7, P.O. & P.S. Bilasipara, Dist. Dhubri, Assam 5 ABDUL RAKIB BARLASKAR General 0005 3248 Vill: Bahadurpur, P.O. Rongpur PT-II, Dist. Cachar, Assam, Pin 788009 6 ABDUS SABUR AKAND General 0006 3249 Bishnujyoti Path, Shanaghar, Hatigaon, Dist Kamrup (M) ,Pin-781038, Assam 7 ABHIJIT BHATTACHARYA General 0007 3250 Purbashree Apartment, Flat No. 2/3, Borthakur Mill Road, Ulubari, Guwahati-781007 8 ABHIJIT BHATTACHARYA General 0008 3251 53, LAMB Road, Opp. Ugratara Temple, Uzan Bazar, Guwahati781001 9 ABHIJIT GHOSH OBC 0009 3252 Jyoti Nagar, Bongal Pukhuri, PO & PS- Jorhat, Dist. Jorhat , Assam, 10 ABIDUR RAHMAN General 0010 3253 Sibsagar Bar Association, P.O. Sibsagar, Dist. Sibsagar, Assam, Pin - 785640. 11 ABU BAKKAR SIDDIQUE General 0011 3254 R/O House No.7, Bishnujyoti Path(West), Natbama,(Near Pipe Line), P.O. Hatigaon, Guwahati-781038 12 ABUBAKKAR SIDDIQUE General 0012 3255 P.D.Chaliha Road, H. No.-11, Ground Floor, Hedayetpur, P/S Latasil, P.O.
    [Show full text]
  • List of Candidate for the Post of Office Peon, CJM
    LIST OF CANDIDATES FOR THE POST OF OFFICE PEON SL NAME OF DATE OF EDUCATIONAL GENDER FATHER'S NAME ADDRESS PIN DISTRICT CASTE REMARKS NO CANDIDATE BIRTH QUALIFICATION DERGAON TOWN, WARD NO. 2, CHOKOLAGHAT 1 SRI RAJNISH GOGOI MALE SRI PANKAJ GOGOI 785614 GOLAGHAT 10-06-1991 H.S.L.C. OBC PATH, NEAR DAILY BAZAR SRI KRISHNA PADA DERGAON TOWN, NEAR GAS AGENCY, WARD NO. 2 SRI KUNDAN PAUL MALE 785614 GOLAGHAT 18-06-1994 H.S.L.C. OBC PAUL 4, P.O & P.S DERGAON KARBI 3 RAJIB ENGTI MALE SRI SEM ENGTI VILL. DIRING LEKTHE, P.O.KAZIRANGA 785609 11-12-1991 H.S.L.C. S.T(H) ANGLONG 4 RAJIB GOSWAMI MALE RAJEN GOSWAMI CHALIHA GAON, P.O. CHALIHA, P.S. JORHAT 785004 JORHAT 12-03-1981 H.S.L.C. GENERAL RUMI BORKOTOKY 5 FEMALE NABIN BORKOTOKY CHALIHA GAON, P.O. CHALIHA, P.S. JORHAT 785004 JORHAT 12-03-1985 H.S.L.C. GENERAL GOSWAMI VILL. : ROWMARI, P.O. BEDETI, BATIAMARI, P.S. 6 KAUSHIK NATH MALE YUGAL NATH 784179 BISWANATH 06-10-1986 H.S.L.C. OBC BEHALI CHAKIMUKH HALOWA GAON, P.O. CHAKIMUKH, 7 SRI NIHAL GOGOI MALE DILIP GOGOI 785685 SIVASAGAR 25-09-1195 H.S.L.C. OBC P.S. NAZIRA DHEKIAKHOWA, JORHAT, P.O. DHEKIAKHOWA, 8 AMLAN JYOTI NEOG MALE DEBEN NEOG 785700 JORHAT 10-09-1995 H.S.L.C. GENERAL P.S. TEOK SRI KAMAL SRI DHONIRAM LETEKU GAON, 8 NO. WARD, TITABOR, P.O. 9 MALE 785630 JORHAT 01-01-1975 B.A.
    [Show full text]
  • Kaziranga National Park Technical Report 4
    Enhancing our heritage Kaziranga National Park UNESCO-IUCN-WII Enhancing our heritage Kaziranga National Park Improving Protection and Building Capacity of Staff At Kaziranga National Park By Manoj Kumar Misra Sponsored by UNESCO-IUCN-WII August 2005 ____________________________________________________________________ 178-F, Pocket - 4, Mayur Vihar - I, Delhi - 110 0091. UNESCO-IUCN-WII Enhancing our heritage Kaziranga National Park KAZIRANGA NATIONAL PARK (ASSAM) Project Title: Enhancing our heritage: Managing and Monitoring for Success in World Natural Heritage Sites. Project Objectives: 1) Review of Protection Strategies and suggestion to enhance their effectiveness 2) Development of a Comprehensive Capacity Building Plan for Frontline Staff. Methodology: Relevant background information was sought from the park management. The park was visited from 16.3.05 till 22.3.05. The existing management plan of the park was perused for relevant information. One to one discussions were held with the Director of the park and other park officials. Field visits were made to various locations in the park to get a first hand impression of the field situation and requirements and to elicit the views of the staff posted at various camps in the park. A one day workshop was held on 20.3.05 for different levels of field staff to elicit their views regarding the park, its protection requirements as well as their training needs through an adaptive SWOT process (List of participants and report enclosed). Pictures where appropriate were also taken. Other relevant
    [Show full text]
  • Detailed Project Report National Adaptation Fund
    DETAILED PROJECT REPORT ON MANAGEMENT OF ECOSYSTEM OF KAZIRANGA NATIONAL PARK BY CREATING CLIMATE RESILIENT LIVELIHOOD FOR VULNERABLE COMMUNITIES THROUGH ORGANIC FARMING AND POND BASED PISCICULTURE for NATIONAL ADAPTATION FUND ON CLIMATE CHANGE SUBMITTED TO MINISTRY OF ENVIRONMENT, FOREST & CLIMATE CHANGE, GOVERNMENT OF INDIA Indira Paryavaran Bhavan, Jorbagh Road, New Delhi - 110003 Page | 1 Title of Project/Programme: Management of ecosystem of Kaziranga National Park by creating climate resilient livelihood for vulnerable communities through organic farming and pond based pisciculture Project/Programme Objective/s: The proposed project entails the following broad objectives: ► Rejuvenating selected beels which are presently completely dry and doesn’t hold any water, which includes de-siltation of the beel to increase the depth and thus the augment the water holding capacity of the beel. ► Increase in livelihood option for vulnerable communities living in vicinity of Kaziranga National Park through organic farming and pond based fisheries ► Management of watersheds through check dams and ponds Organic farming is envisaged for the vulnerable communities within the southern periphery of the national park. A focused livelihood generation from fisheries is also envisaged for the fishing communities living in the in the north bank of Brahmaputra. Project/ Programme Sector: ► Forestry, agriculture, fisheries and ecosystem Name of Executing Entity/ies/Department: ► Kaziranga National Park (KNP) under Department of Environment & Forests (DoEF), Government of Assam. Beneficiaries: ► Vulnerable communities living in the periphery of Kaziranga National Park (KNP), Assam Project Duration: 3 years Start Date: October 2016 End Date: September 2019 Amount of Financing Requested (INR.): 2,473.08 Lakhs Project Location: The list of finalised project sites are as under.
    [Show full text]
  • CMS Newsletter Is We Are Now at the Threshold of 2010 and at This Publishing the 1St Issue of Vol
    eb Volume 7 Number 1, October – December 2009, Date of Release: December 31, 2009 http://www.cmsdu.org A Quarterly Newsletter of the Centre for Management Studies, Dibrugarh University INSIDE TOP STORIES Let Peace Prevail… Fifth Alumni Meet, 2009 Investor’s Summit, 2009 Let the Paradise Remain… Let the New Year Awaken us to Infinite Page Page Possibilities… Let us Strive to be Happy Always… Top Story sanMilan 2009…Bigger…Better Dr. Shyam Bharda Medhi, MA, LLB, MSc (England), PhD, IAS (Red.) and a former Commissioner & Secretary, Govt. of Assam while giving the Keynote address on Day 1 of the 2009 edition of sanMilan which had the theme Creativity and Innovation : The Fulcrum of Growth, spoke about the indivisibility of knowledge and how each and every discipline is interlinked with each other. He also talked about the ability of innovation in human beings, which according CMS Wishes Everybody a Very Happy New Year! to him are confidence, honesty and love for mankind. He spoke about a University in which he said that a University is the conscience of a nation. According to him, the scope for creativity and innovation is not limited, thus it can encompass any existing thing, and it all depends on the way we look at regular things. Dr. Medhi remarked that innovations are those which aims at improving the way people live and lead their life, not all innovations are for the well being of the mankind. He talked about the relationship of technology with innovation where he gave a brief introduction of hard technology and soft technology.
    [Show full text]
  • Silent Stranglers: Eradication of Mimosa in Kaziranga National Park, Assam
    OCCASIONAL REPORT NO. 12 SILENT STRANGLERS Kaziranga National Park is one of the last strongholds of the greater one-horned rhinoceros, the Asiatic wild buffalo, the Asian elephant and the swamp deer. All these are greatly dependent on the grasslands of Eradication of Mimosa in the park for food and cover. The threat of the exotic Mimosa invisa that is strangling these grasslands has to be tackled quickly and scientifi- Kaziranga National Park, Assam cally. This is the story of how WTI and IFAW are assisting the Assam Forest Department to eradicate mimosa in Kaziranga. Joseph Vattakkavan, N. K. Vasu, Surendra Varma, Nidhi Gureja, Ambika Aiyadurai A-220 New Friends Colony, New Delhi-110065 Tel.: 011 26326025, 26326026, Fax: 011 26326027 Assam Forest Department Website: http//www.wildlifetrustofindia.org The Wildlife Trust of India (WTI) is a non-profit conservation organization committed to help conserve nature, especially endangered species and threatened habitats, in partnership with communities and governments. Suggested Citation: Vattakkavan, J., Vasu, N. K., Varma, S., Gureja, N. and Project Team Aiyadurai, A. (2002). Silent Stranglers: Eradication of Mimosa in Kaziranga National Park, Assam. Wildlife Trust of India, New Delhi. Pp Ambika Aiyadurai Anirudha Dey Aniruddha Mookerjee D. D. Boro Keywords: Conservation; Wild Species, Assam, Kaziranga National Park, Joseph Vattakkavan Mimosa, Habitat Recovery Joydeep Bose L. N. Baruah Madan Tamuli The designations of geographical entities in this publication and the presen- N. K. Vasu tation of the material do not imply the expression of any opinion whatsoev- Nidhi Gureja er on the part of the authors or WTI concerning the legal status of any coun- P.
    [Show full text]
  • Table of Content
    UNESCO- IUCN Enhancing Our Heritage Project: Monitoring and Managing for Success in Natural World Heritage Sites Final Management Effectiveness Evaluation Report Kaziranga National Park, Assam, India November 2007 Table of Content Project Background 1 How the Evaluation was carried out 2 The Project Workbook and Tool Kits 3 Section 1: Introduction 4-7 Section 2: Context and Planning Assessment 8-36 Tool 1: Identifying Site Values and Management Objectives 11 Tool 2: Identifying Threats 14 Tool 3: Engagement of Stakeholder/Partners 28 Tool 4: Review of National Context 35 Section 3: Planning 37-48 Tool 5: Assessment of Management Planning 37 Tool 6: Design Assessment 44 Section 4: Inputs and Process Assessment 49-51 Tool 7: Assessment of Management Needs and Inputs 49 Section 5: Assessment of Management Process 52-64 Tool 8: Assessment of Management Processes 52 Section 6: Outputs 65-69 Tool 9: Assessment of Management Plan Implementation 66 Tool 10: Assessment of Work/Site Output Indicators 67 Section 7: Outcomes 70-78 Tool 11: Assessing the Outcomes of Management – Ecological Integrity 70 Tool 12: Assessing the Outcomes of Management – Achievement of Principal Objectives 75 List of Boxes Box 1: Kaziranga National Park ~ 100 Years of Success Story 5 Box 2: IUCN-WCPA framework for Management Effectiveness Evaluation 7 Box 3: Protection Strategy 17 Box 4: Conservation of Beels for Waterbirds in Kaziranga National Park, Assam 20 Box 5: Management of Invasive Species in Kaziranga National Park, Assam 24 Box 6: Declaration of Kaziranga Tiger Reserve in 2007 46 Box 7 Raptor community of Kaziranga National Park, Assam 72 Box 8: Kaziranga Centenary Celebrations (1905-2005) 77 References 79 List of Annexures Annexure-I: List of water birds recorded during 2005-2006 from Kaziranga National Park.
    [Show full text]
  • Abundance of Diseases in Food Fishes of North East Region of India with Reference to Economic Loss
    IOSR Journal of Agriculture and Veterinary Science (IOSR-JAVS) e-ISSN: 2319-2380, p-ISSN: 2319-2372.Volume 7, Issue 1 Ver. I (Jan. 2014), PP 23-33 www.iosrjournals.org Abundance of Diseases in Food Fishes of North East Region of India With Reference To Economic Loss Haren Ram Chiary1, Kapinder1, Umesh C. Goswami2, H.S. Singh3 1(Department of Zoology, Kirori Mal College, University of Delhi, Delhi-110007, India) 2(Department of Zoology, Gauhati University, Guwahati-781014, Assam) 3(Department of Zoology, Ch. Charan Singh University, Meerut - 250004, India) Abstract: Aquaculture is the fastest growing food producing sector in the world. The inland fishery resources of India have a rich production potential. North Eastern Region of the country is located between 21.570N – 29.300N latitude and 89.460E – 97.300E longitude. The fishery resources of the region fall within all three types of climate i.e. tropical, sub-tropical and temperate and represent a strong biodiversity. Two principal rivers Brahmaputra, Barak and their numerous tributaries harbor varieties of fish species. The threat of diseases has now become a risk to the growth of the aquaculture sector which significantly affects both economic and socio economic development. A list of 197 species and 25 families of fish is given in the paper with the diseases reported in them. Key words: Diseases, Inland fishery, North East region, Threat. I. Introduction The North East region has about 19,150 km of rivers; 23,972 ha. of reservoirs; 1,43,740 ha.of lakes; 40,809 ha. of ponds and 2,780 ha.
    [Show full text]
  • PI NASA South Asia Land Cover Landuse Change Science Team Member
    Name: Miss Shukla Acharjee Designation: Assistant Professor NASA-AERONET- PI NASA South Asia Land Cover Landuse Change Science Team Member Nodal Officer – Swachh Bharat Mission (Gramin), Dibrugarh University (2015-present) Nodal Officer – UNICEF Dibrugarh University (2015-present) Nodal Officer - Unnat Bharat Abhiyan Dibrugarh University (2018-present) Nodal Officer, Swachh Bharat Internship Scheme (SBSI) of Swachh Bharat Abhijan (Gramin) launched by MHRD, Government of India, (2018) Nodal Officer – DST Vigyan Jyoti Scheme, Dibrugarh University (2020-present) Department/Centre: Centre for Studies in Geography Phone no: 9435056716 Email: [email protected] [email protected] homepage :https://www.dibru.ac.in/index.php/list-of-users/userprofile/shuklaacharjee Google Scholar page : https://scholar.google.com/citations?user=3LPtDEcAAAAJ&hl=en ORCID ID: https://orcid.org/0000-0001-5426-1087 Linkedin: https://www.linkedin.com/in/shuklaacharjee/?originalSubdomain=in Research Disciplines: Earth surface processes, fluvial systems, landuse and landcover and Disaster Management Education Qualification: 06.12.10 Ph.D Thesis entitled: Studies of fluvio-geomorphology, soil, land use and floodprone area mapping of the Bhogdoi (Disai) River Basin, Assam (using Remote Sensing & GIS Supervisors: Prof. J.N. Sarma (Department of Applied Geology, Dibrugarh University, Dibrugarh) & Dr.M. Konwar (Department of Geography, DCB Girls College, Jorhat), 2006 -2010 1993-1995 Master of Science, Cotton College, Guwahati. Dissertation entitled: Textural parameters
    [Show full text]