Hydrological Characterization of the Sturgeon River.Pdf

Total Page:16

File Type:pdf, Size:1020Kb

Hydrological Characterization of the Sturgeon River.Pdf HYDROLOGICAL CHARACTERIZATION OF THE STURGEON RIVER WATERSHED IN NORTHEASTERN ONTARIO: A HYDROMETR IC AND WATER ISOTOPE ANALYSIS (Thesis Format: Manuscript) BY NANCY ENGLAND GRADUATE PROGRAM IN ENVIRONMENTAL SCIENCE A THESIS SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF MASTER OF ENVIRONMENTAL SCIENCES SCHOOL OF GRADUATE STUDIES NIPISSING UNIVERSITY NORTH BAY, ONTARIO APRIL, 2017 © NANCY ENGLAND, 2017 Abstract The Sturgeon River is a large watershed (~7000 km 2) located in northeastern Ontario and is a major headwater system of Lake Nipissi ng. River flow and lake levels are managed to balance a variety of environmenta l, social, and economic factors, as well as for the production of hydroelectric power, as described by the St urgeon River Water Management Plan. The objectives of the study were to compare the infl uence of the controlled (e.g. Lake Temagami) and uncontrolled subcatchments on resultant flow downstream; review 1979 (flood), 2010 (drought), and 2013 (contemporary year with wa ter isotope sampling) in the context of hydrologic history; and, explor e relationships between hydrol ogic characteristics and water isotope analysis during 2013, and recommend how information gained from water isotope tracers may improve future operation of the watershed. The historical hydrologic anal ysis involved the comparison of reservoir drawdowns, annual hydrographs, monthly boxplots, flood frequencies, and flow durati on curves, for river flow and dam outflow data at six different sites across the watershed. A calcu lated inflow data set was also prepared and the same metrics were compare d, to determine the relative influence of 3 hydroelectric reservoirs. In addition, the flow and meteorological conditions of two hydrologically significant spring freshets, the 1979 flood and drought of 2010, were compared to the study year (2013). To broaden the analysis of 2013, stable isotope samples were collected from selected locations within the watershed. Results of both hydrometric and isotope analys es showed the varying influence of the reservoirs on the system through each season. Anal ysis of controlled catchments revealed that i during winter months, flows were augmented downstream through reservoir drawdowns, while peak flows were reduced during the spring. Analysis of hydrologically significant years 1979 (flood) and 2010 (drought) illustrate two extreme categories of hydrologic response and meteorological scenarios that management activities were unable to prevent. The separation of flow peaks from southern and northern melt events was found to be the difference between the 1979 and 2013. In 2013 freshet flow was found to be driven by a combination of rain and snowmelt. Spatial differences in rain and timing of melt were found to allow the southern portion of the watershed to melt and flush through the system, while the northern portion melted after the initial flow peak at Crystal Falls (415.6 m3/s on April 21). The analysis of isotope values through the freshet showed a clear separation between the southern melt period and the initiation of melt from the northern portion of the watershed. Through the summer, reservoirs in the east became increasingly enriched in δ18O and δ2H while flow from the western portion of the river remained fairly stable due to groundwater driven baseflow. The influence of reservoirs on isotope values within the river decreased with distance downstream from the confluence of the Sturgeon and Temagami Rivers near River Valley. Isotope tracers were found to be a useful tool for the evaluation of inputs to the Sturgeon River and the timing and changing influence of different branches of the system. They were also useful in identifying the impact of groundwater interactions, which are not captured by traditional hydrometric analysis. Long-term monitoring using isotope tracers would help characterize the hydrology of the system, to gain deeper insight into seasonal trends. ii Keywords Isotope hydrology, stable water isotopes, hydrologic metrics, hydroelectric, reservoir, inflow, mass balance, Sturgeon River, Canada iii Co‐Authorship Statement In this manuscript, Dr. A. James of Nipissing University will be listed as co-author because of her involvement in the conceptual development of the research, structure and editing of the thesis, and contribution to the field and laboratory measurements of δ18O and δ2H; Dr. Rich Pyrce for critique of the hydrologic and methodological approach, and editing; and Dr. K. Chutko of Nipissing University for his contribution to the field campaign design, the collection of samples, and analysis of laboratory measurements of δ2H and δ18O. iv Acknowledgements Thank you to Nipissing University, Canada Foundation of Innovation, and the Canada Research Chair program for providing the funding and resources to make this research possible. Thank you to Ontario Power Generation for your data, resources, and time. Thank you to Krys and Brittany for making the field component so thorough and enjoyable. Thank you to April and Rich, for the significant investment of time, patience, and encouragement. Most of all, thank you to my friends, family, and Jenna; you keep me going. v Table of Contents 1 Introduction .................................................................................................................. 1 2 Literature Review ......................................................................................................... 5 2.1 Reservoir Influence and Watershed Analysis Metrics............................................... 5 2.2 Isotope Fundamentals ................................................................................................ 9 2.3 Large Scale Watershed Studies Using Water Isotopes as Tracers .......................... 12 2.4 Isotope Studies on Large Hydroelectric Systems .................................................... 16 3 Study Site .................................................................................................................... 17 4 Methods ...................................................................................................................... 19 4.1 Flow & Meteorological Data ................................................................................... 19 4.2 Hydrometric Analysis .............................................................................................. 22 4.3 Sampling and Analysis of Stable Water Isotopes in 2013 ....................................... 25 4.3.1 Spatial and Temporal Campaign ..................................................................... 25 4.3.2 Sample Collection & Quality .......................................................................... 28 4.4 Isotope Calculations ................................................................................................ 29 4.4.1 Groundwater Mixing Analysis ........................................................................ 29 4.4.2 Discharge Anomaly ......................................................................................... 30 5 Results ........................................................................................................................ 31 5.1 Hydrologic Analysis ................................................................................................ 31 5.2 Comparison of 1979, 2010, and 2013 ...................................................................... 35 5.3 Water Isotope Storyline of 2013 .............................................................................. 40 5.3.1 2013 Water Isotope Study ............................................................................... 40 5.3.2 Temporal & Spatial Analysis of Isotope Samples ........................................... 42 5.4 Mixing Analysis ...................................................................................................... 49 5.5 Discharge Anomaly ................................................................................................. 51 6 Discussion ................................................................................................................... 51 6.1 The Significance of Storage .................................................................................... 51 6.2 Sturgeon River Water Management & the Classification of System Response ...... 55 6.3 Use for Large Scale Watershed Applications .......................................................... 57 7 Conclusions ................................................................................................................ 59 8 References .................................................................................................................. 62 9 List of Tables .............................................................................................................. 68 10 List of Figures ............................................................................................................. 87 vi Appendix A – North Bay & Sudbury Climate Normals.................................................... 111 Appendix B – Water Isotope Results ................................................................................ 125 Appendix C – Precipitation Sample Volumes ................................................................... 143 Appendix D – OPG, MNRF, and NU Snow Data ............................................................. 145 Appendix E – Isotopic Sample Result Precision & Accuracy .......................................... 175
Recommended publications
  • Paramedic Board Presentation
    MANDATE • The Board has been tasked under the Ambulance Act to insure provision of Land Ambulance to all citizens in the district of Nipissing and cost share 50/50 for the total cost of ambulance services. • The Board is the Designated Delivery Agent for the District of Nipissing. OPERATION OPTIONS (2001) 1. Same Provider 2. Direct Delivery - Remain with the same provider at - Paramedic 3. Third Party the download in employees of 2001 DNSSAB - Certified - 80 plus Ambulance paramedics Provider (RFP) - Present Model NIPISSING AMBULANCE (PARAMEDIC) SERVICES PROVIDERS North Bay Mattawa Regional General Town of Health Centre Hospital Temagami North Bay Mattawa Temagami West Calvin Nipissing Papineau- Chisholm Cameron South Mattawan Algonquin Bonfield East Ferris NIPISSING DISTRICT COMMUNITIES NIPISSING AMBULANCE ( PARAMEDIC) SERVICES PROVIDERS • All providers must be certified and inspected by MOH & Long Term Care at a minimum every 3 year • Providers are fully responsible to insure that all aspect of the act are followed • The paramedics are employees of the provider and not the DNSSAB all HR issues are dealt by the provider (Employment Standards, Collective agreements Health & Safety and any other act that may apply) NIPISSING AMBULANCE (PARAMEDIC) SERVICE PROVIDERS • The DNSSAB manages the funding distribution to meet the need of the districts citizens in pre-hospital primary emergency care • The DNSSAB purchases medical equipment to stock ambulances • The DNSSAB purchases paramedics uniforms • The DNSSAB processes monthly Electronic Fund
    [Show full text]
  • 2010/2011 Annual Report
    NORTH BAY REGIONAL HEALTH CENTRE 2010/2011 ANNUAL REPORT WELCOME WITH PRIDE, WE CARE www.nbrhc.on.ca TO TABLE OF CONTENTS 4 REPORT BOARD CHAIR PRESIDENT & CEO THE NEW 7 A SUCCESSFUL MOVE NORTH BAY 8 A DAY TO REMEMBER OPEN HOUSE REGIONAL 11 31 BEDS RELOCATE HEALTH 12 ARTS RESIDENCY PROGRAM 13 SAYING CENTRE GOODBYE 15 PHOTOVOICE RECOGNITION 19 REPORT VOLUNTEER ASSOCIATION 22 FINANCIALS 27 REPORT FROM THE HOSPITAL FOUNDATION 32 DONOR LISTINGS North Bay Regional Health Centre 50 College Drive North Bay ON, P1B 0A4 705.474.8600 or 705.474.1200 www.nbrhc.on.ca REPORT OF THE BOARD CHAIR AND PRESIDENT & CEO 2010/2011 was a historical year for both the North Bay General Hospital (NBGH) and the Northeast Mental Health Centre (NEMHC). It was the year: • We had a successful move into our long- enhance the patient experience by providing a awaited, 752,000 square foot, state-of-the-art full continuum of service. health centre and opened its doors for patient care on January 29 and 30. • We are Canada’s first fully integrated regional specialized mental health facility and district • We saw the last baby born in the old acute care referral hospital. Previous NEMHC hospital—a place where babies took their first President and CEO Robert Cunningham was breath for the past 100 years; and the first appointed as Executive Vice President of baby born in the new hospital where families NBRHC and Chief Amalgamation Officer and will now begin their life-long journey together lead the work with the Board and staff and for the next half century and beyond.
    [Show full text]
  • Temagami Times Winter 2014 Pgs 1-13
    VOLUME 44 . NUMBER 1 . CIRCULATION 1,700 A FREE PUBLICATION THE VOICE OF THE TEMAGAMI LAKES ASSOCIATION (TLA) WINTER 2014 Council Makes Decision on Fire Protection Options Are you thinking of purchasing a fire pump to protect your cottage? You may be eligible for a municipal subsidy under a new policy being put in place in the near future. Does your cottage have water-only access? You will likely see some form of limited fire service rate on your tax bill in 2015. What prompted these chang- es? In October of 2011, the Lake Temagami Permanent Residents As- sociation (LaTemPRA) approached the Municipality to ask for their as- Friday Creek, Temagami sistance in providing additional fire Photo by Doug Adams. protection services on Lake Tema- gami. This request turned out to be quite complex, and Council decided mid-June when sampling kits were dis- to form an Ad Hoc Committee to re- TLA Study Finds Low tributed to interested volunteers, who search and make recommendations donated small samples of fish muscle on the feasible options. The commit- Levels of Mercury in tissue and provided other information tee, which was struck in late April of 2012, was to include members of such as fish species, length and loca- the community, with representation Lake Temagami Sport Fish tion of catch. In total, over 50 indi- from both permanent and seasonal vidual samples from Lake Trout (10 residents of Lake Temagami, as well The TLA undertook an exciting potential risks, the data collected samples), Smallmouth Bass (31 sam- as the Temagami and Marten River new environmental monitoring proj- will allow the TLA to monitor future ples) and Walleye (11 samples) were Fire Chiefs, the Ontario Fire Mar- ect this past summer, in collaboration trends in fish mercury concentrations submitted by about five volunteers.
    [Show full text]
  • Mclaren Forest Conservation Reserve (C159)
    McLaren Forest Conservation Reserve (C159) Statement of Conservation Interest Ontario Ministry of Natural Resources North Bay District March 2005 Approval Statement We are pleased to approve this Statement of Conservation Interest for the McLaren Forest Conservation Reserve (C159). McLaren Forest Conservation Reserve is a 410 hectare site, 439 hectare site with forest reserves, located in Ecodistrict 5E-6 approximately 50 km south of Temagami along Highway 11 (figure 1). The boundary of the conservation reserve is located in the geographic townships of McLaren, Sisk and Gladman within the Corporation of the Municipality of Temagami in the District of Nipissing (figure 2). The eastern sections of the conservation reserve are within Nipissing Crown Game Preserve. The whole area is included within the Marten River Enhanced Management Area (E154r). McLaren Forest Conservation Reserve is bordered by Crown land, Marten Lake and the Nipissing Crown Game Preserve (figure 1). The conservation reserve is known to encompass significant life science values through the presence of such features as the old growth red and white pine forests that are found in the site. During the Lands for Life planning process the public was widely consulted and provided valuable input into what became Ontario’s Living Legacy. McLaren Forest Conservation Reserve was recognized for protection during the Keep It Wild Campaign and Ontario’s Living Legacy Land Use Strategy and is now part of the Crown Land Use Policy Atlas . Comments received during that time, and during consultation related to the formal Public Lands Act regulation of the boundaries of this conservation reserve were generally supportive of the protection of this area.
    [Show full text]
  • Position Plan – Executive Summary
    Executive Summary Founded in 1999, The Corporation of the Municipality of West Nipissing (West Nipissing) amalgamated the former Towns of Cache Bay and Sturgeon Falls, the organized Townships of Caldwell, Field and Springer, the unorganized Townships of Bertram, Latchford, Falconer, Loudon, MacPherson, Beaucage, Pedley, Kirkpatrick, Grant, Badgerow, Hugel, Fell, Bastedo, Gibbons, Crerar, McWilliams, Dana and a section of Janes. With a wide range of existing assets at its disposal, the new municipality offers a great deal of opportunity for the future. In particular, the municipal economy benefits from a wealth of natural resources, spectacular wilderness, proximity to two major northern cities, affordable real estate, a diverse and rich cultural heritage, and strong educational and health services. 805 McWilliamsMcWilliams DanaDana 6 Thistle Lake 64 539 GibbonsGibbons FELLFELL 11 River Valley CrerarCrerar Pike Lake BASTEDOBASTEDO 539 Tomiko Lake 539 Field 5 Stu FIELDFIELD HugelHugel BadgerowBadgeroMuskosongw rgeo Kipling Lake n Riv er GRANTGRANT 575 Chebogan Deer Lake Lake Bain Cache Lake Crystal Lake 64 Falls To Sudbury Tanner Lake SPRINGERSPRINGER 7 Little Sturgeon River River 17 PEDLEYPEDLEY Warren Verner BEAUCAGEBEAUCAGE chesnay KirkpatrickKirkpatrick 17 Springer u 64 Sturgeon Falls D CaldwellCaldwell 3 4 ? 17 2 Meadowside iver 64 Cache R Bay NipissingNipissing McPhersonMcPherson 1 1st1st NationNation Beaucage Pt. urgeon St Res.Res. #10#10 17 Lavigne Jocko Pt. North West hardwood I. Goulais Pt. Bay East Dokis Pt. 11A hardwood I. Rock slands Little Oak I. Lake Nipissing Manitou Iron I. Islands Goose West Arm 8 Islands Hay of Narrows Lake Sandy I. Nipissing LoudonLoudon West Bay LATCHFORDLATCHFORD 535 BERTRAMBERTRAM 64 Monetville FalconerFalconer French River Noëlville Wosely Bay 528 PLANNING,PLANNING, BUILDINGBUILDING & DEVELOPMENTDEVELOPMENT DDEPARTMENTEPARTMENT REVISEDREVISED DECEMBERDECEMBER 1,1, 20002000 1 As illustrated in the accompanying West map, West Nipissing is strategically Nipissing poised at a mid-point between Sault Sudbury Ottawa Ste.
    [Show full text]
  • A Place to Call Home Nipissing District 10 Year Housing And
    A Place to Call Home Nipissing District 10 Year Housing and Homelessness Plan 2014-2024 This page was left blank intentionally. Table of Contents INTRODUCTION 1 Letter from DNSSAB Chair 1 Municipal Endorsement 2 Board of Directors Approval of Plan 3 Acknowledgements 4 Purpose 7 Preamble 8 THE 10 YEAR HOUSING AND HOMELESSNESS PLAN FOR NIPISSING DISTRICT 12 Vision 12 Mission 12 Guiding Principles 13 Section 1: District Objectives and Considerations 15 Strategic Objective 1: Homelessness Prevention, Shelters and Diversion 16 Strategic Objective 2: Improving Housing Stability 22 Strategic Objective 3: Increasing Housing Affordability and Options Along the Housing Continuum 29 Strategic Objective 4: Sustaining and Expanding the Housing Portfolio 37 Strategic Objective 5: Leadership, Integration, Coordination and Advocacy 41 Strategic Objective 6: Awareness, Education, Information and Best Practices 49 Plan Implementation 57 Section 2: Municipal Objectives and Considerations 60 INFORMING THE PLAN 67 Informing the Plan A 68 Demographic Backdrop 68 Informing the Plan B 80 The Housing Continuum 80 Informing the Plan C 82 The Research 82 Housing and Homelessness in Nipissing District 87 Informing the Plan D 93 Year Housing10 and Homelessness Plan: Tables of Contents Making Progress 2008-2013 93 Fundamental Difference in Housing Objectives between 2008 and 2013 96 Informing the Plan E 97 Summary of Actions for Groups of Particular Interest 97 LETTER FROM DNSSAB CHAIR November 2013 We are often challenged to plan for the future – what job to take, to marry, or to have children. As the course of our lives changes, another question arises; where will I live? Housing is one of the most fundamental parts of our lives.
    [Show full text]
  • Temagami Times – Fall 2017
    VOLUME 47 . NUMBER 3 . CIRCULATION 1,300 A FREE PUBLICATION Temagami Times THE VOICE OF THE TEMAGAMI LAKES ASSOCIATION (TLA) FALL 2017 Fall Colouring (photo by Gerry Gooderham) Forest Tent Caterpillars Arrived in Temagami By Chip Kittredge, Island 1158 were affected or defoliated by forest tent caterpillars in Ontario this season. People might remember the summer of 2017 for Luckily, the forest tent caterpillar is a native species the incredible numbers of bugs. Some said they’ve and not new to Ontario! Although there are invasive never seen such clouds of black flies despite coming exotic species that have spread throughout the prov- to Temagami for decades. Cottagers were driven in- ince, the forest tent caterpillar is not one of them. doors, taking shelter in screened refuges. First Nation Typically, Ontario forests have evolved adaptations residents and local folks might have just shrugged to tolerate infestations from this caterpillar. and said, “What do you expect? It’s what happens at For examples of actual invasive species (not native that time of year.” to Ontario) that could have adverse effects on our Forest Tent Caterpillar But, there were also different types of creatures Lake and surrounding areas, refer to the Summer 2017 (photo by Ectotherms Wiki) evident in June 2017. Observant people might have issue of the Temagami Times. There are real concerns seen something happening to the foliage on their about the movement of invasive species between drives north from North Bay. Trees that should have IN THIS ISSUE: water bodies in Ontario. In fact, certain areas have been leafy and bright green, were showing only sparse inspection stations where boats can be examined to foliage.
    [Show full text]
  • Voyageur Cycling Route Feasibility Study and Implementation Plan
    1 TABLE OF CONTENTS 1.0 INTRODUCTION ......................................................................................... 1 1.1 Vision and Objectives .................................................................................. 1 1.2 Anticipated Users ......................................................................................... 2 1.3 Report Structure ........................................................................................... 3 2.0 STAKEHOLDER AND PUBLIC ENGAGEMENT ....................................... 5 2.1 Engagement Strategy .................................................................................. 5 2.2 Input from Stakeholders and the Public ....................................................... 6 3.0 ROUTE AND FACILITY SELECTION PROCESS ...................................... 7 3.1 MTO Route Selection Methodology ............................................................. 7 3.2 OTM Book 18 Facility Selection Process .................................................. 10 3.3 Proposed Facility Types for the Voyageur Cycling Route ......................... 11 3.4 Data Sources ............................................................................................. 17 4.0 THE VOYAGEUR CYCLING ROUTE ....................................................... 19 4.1 Ministry of Transportation Ontario (MTO) Route Planning Studies ........... 20 4.2 Section A: Coniston to Hagar (Map #1) ..................................................... 22 4.3 Section B: Hagar to Noelville (Map #1) ....................................................
    [Show full text]
  • North Bay Parry Sound District Health Unit Census Subdivisions
    North Bay Parry Sound District Health Unit Census Subdivisions Thorne Eldee Tilden Lake Nipissing, Unorganized, North Part, UNO Field West Nipissing, M Verner Redbridge Nipissing 10, R Mattawan, TP Sturgeon Falls Mattawa, T North Bay, C Lavigne Rutherglen Corbeil Papineau-Cameron, TP Bonfield Calvin,TP East Ferris, TP Bonfield, TP Callander, Astorville M Nipissing, Unorganized, South Part, UNO Nipissing Village Powassan Kiosk French River 13, R Chisholm, Dokis 9, R TP Nipissing, TP Restoule Powassan, M Trout Creek Parry Sound, Unorganized, Loring Henvey Inlet 2, R Arnstein North East Part, UNO Port Loring Machar, TP Parry Sound, Unorganized, Centre Part, UNO South River, VL Britt Sundridge, VL Joly, TP Strong Whitestone Magnetawan Kearney, T Magnetewan 1, R Dunchurch Armour, TP Whitestone, M The Magnetawan, Burk's Falls, VL Archipelago, M Naiscoutaing 17A, R TP Ryerson, Katrine TP Kearney Emsdale McKellar Shawanaga 17, R Sprucedale Perry, TP McDougall, Novar M McKellar, TP Carling, TP McMurrich/Monteith, TP Carling Badger's Corners Orrville Snug Harbour Parry Sound, R Seguin, TP Humphrey Parry Island First Nation, R Rosseau The Archipelago, TP Legend Main Roads 0 5 10 20 30 40 Kilometers NBPSDHU Census Subdivisions Surrounding Census Divisions Source: Adapted from Statistics Canada Census Subdivision Boundary File 92-162-XWE 2009001, Census year 2006, Released May 25, 2009; Road Network File 92-500-XWE 2008001, Census year 2006, Released June 3 , 2009; and Boundary Files 92-160-XWE 2006001, Census year 2006, Released October 18, 2006 DMTI Spatial 2001, Cities, Towns and Villages File, CTV 2001. Created by: North Bay Parry Sound District Health Unit (April 30, 2010), Using ArcGIS, Version 9.3.1 (Environmental Systems Research Institute, Inc.
    [Show full text]
  • Temagami's Tangled Wild
    Temagami’s Tangled Wild Race, Gender, and the Making of Canadian Nature jocelyn thorpe foreword by graeme wynn Sample Material © 2011 UBC Press Buy the book: www.ubcpress.ca Contents List of Illustrations / vii Foreword / ix Acknowledgments / xxi Introduction: Welcome to n’Daki Menan (Our Land) / 1 1 Tangled Wild / 11 2 Timber Nature / 33 3 Virgin Territory for the Sportsman / 53 4 A Rocky Reserve / 75 5 Legal Landscapes / 93 Conclusion: A Return to n’Daki Menan / 125 Notes / 131 Bibliography / 165 Index / 181 Sample Material © 2011 UBC Press Buy the book: www.ubcpress.ca Illustrations Welcome to N’Daki Menan / 2 Map of Temagami Integrated Planning Area / 3 Map of N’Daki Menan and Temagami Forest Reserve boundaries / 34 Forest and Stream cover / 58 Grand Trunk Railway advertisement / 60 Map of potential settlement lands of n’Daki Menan / 128 Sample Material © 2011 UBC Press Buy the book: www.ubcpress.ca foreword Nature and Nation in a “Little Known District amid the Wilds of Canada” by graeme wynn ome thirty years ago, after reflecting critically and historically on such Sconcepts as culture, society, individual, and class, the novelist, critic, and cultural studies scholar Raymond Williams famously suggested that “nature” might be the most complex word in the English language.1 Despite the nominal continuity of its use through many centuries, the term is richly freighted with intricate and quite diverse meanings. Does “nature” refer to the “essential constitution of the world” or to the inherent and immutable laws that govern (or describe)
    [Show full text]
  • North Bay Parry Sound District Health Unit Municipal Geographic Designations
    North Bay Parry Sound District Health Unit Municipal Geographic Designations Thorne Eldee Tilden Lake Field Nipissing, Unorganized, North Part, UNO West Nipissing, M Verner Nipissing 10, R North Bay, Redbridge Sturgeon Falls Mattawan, Mattawa, T C TP Lavigne Corbeil Bonfield, Rutherglen TP Calvin,TP Papineau-Cameron, East Ferris, Bonfield TP TP Astorville Callander, Nipissing, Unorganized, M South Part, UNO Chisholm, Powassan French River 13, R Nipissing Village TP Kiosk Dokis 9, R Nipissing, Powassan, Restoule TP M Henvey Inlet 2, R Trout Creek Loring Parry Sound, Unorganized, Port Loring Arnstein North East Part, UNO Machar, Parry Sound, Unorganized, TP Centre Part, UNO South River, VL Joly, TP Britt Sundridge, VL Magnetewan 1, R Whitestone, M Strong, TP Magnetawan Whitestone Kearney, T Naiscoutaing 17A, Armour, TP Dunchurch Magnetawan, R The Burk's Falls, VL Archipelago, M Ryerson, Katrine TP Kearney TP Emsdale McKellar Sprucedale Perry, TP McDougall, McKellar, Novar Shawanaga 17 and 17B, Carling, TP McMurrich/Monteith, Major Roads R M TP TP Carling Badger's Corners Unorganized Territory Snug Harbour Orrville First Nation Reserves Parry Sound, T Seguin, TP Humphrey Surrounding CD North Bay District Municipal Rosseau Parry Island Geographic Designations First Nation, R The Archipelago, West TP Central East Parry Sound District Municipal Geographic Designations 0 5 10 20 30 40 Kilometers West Source: Adapted from Statistics Canada Census Subdivision Boundary File 92-162-XWE 2009001, South East Census year 2006, Released May 25, 2009; Road Network File 92-500-XWE 2008001, Census year 2006, Released June 3 , 2009; Boundary Files 92-160-XWE 2006001, Census year 2006, Released October 18, 2006; North East and DMTI Spatial Inc.
    [Show full text]
  • Capital Plan (Draft) 2016
    Draft CAPITAL PLAN (DRAFT) 2016 Table of Contents Executive Summary ................................................................................................................................................................. 2 Near North District School Board Boundary ........................................................................................................................... 4 Demographic Analysis ............................................................................................................................................................. 5 Our Community Partners ........................................................................................................................................................ 8 Student Enrolment ................................................................................................................................................................ 10 Facilities................................................................................................................................................................................. 11 Grade Configuration and Programs ...................................................................................................................................... 14 Facility Condition .................................................................................................................................................................. 15 School Capacity Utilization ...................................................................................................................................................
    [Show full text]