08:5521/02/2013
Bedford Borough Council Highways Maintenance programme 2011/13
- 21/02/2013 08:54
- ast Amend
COUNCIL INFO
Town or Parish
- Bedford Borough Scheme Name
- Scheme Description & Location
Borough Council Wards
STRUCTURAL MAINTENANCE SCHEMES
789 787 174
CCC
2011 >12 2011 >12 2011 >12
Amey A6 North of Borough c/o Amey A6 Wilstead bypass phase 1 (joint treatment)
Resurface from Borough northern boundary to Knotting Fox Farm Resurfacing (Joint treatment)- exact extents to be determined Resurfacing Queen Alexandra Road to Chapel Close
Sharnbrook Wilstead
Souldrop Wilstead Bedford
Goldington / Newnham
ES ES
A428 Goldington Road Bedford c/o A6 London Road/ Rope Walk (Wilmer's corner) Roundabout - Repairs to kerbs and localised patching works on roundabout and kerbs only
Kingsbrook / Castle
/ Cauldwell
- 745
- C
- 2011 >12
approaches
1049
1050 1051 1052 1053 1054 1055 1056 1057
FFFFFFFFFFD
2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12
ES ES ES ES ES ES ES ES ES
- Greenhill St part
- part slabs to DBM
- Castle
Castle Castle Castle Castle Castle
Bedford Bedford Bedford Bedford Bedford Bedford Bedford Bedford Bedford Bedford Bedford
Thurlow Street part Greyfriars part part slabs to DBM small element paving eastern part near shops
- relay large areas blocks
- Allhallows part
St Pauls Sq South part Mill St part courts to TI Relay and protect Small Element Paving. Completion of works. Completion of SEP North side
Castle/ De
Parys
St Peter's Street part
- Horne Lane part
- St Pauls Square to Car Park, North side o/s Argos SEP
- Castle
Castle Castle Castle
Southside by footbridge DBM plus kerbing. SEP middle section. o/p Priory Street
Midland Road part
2011 >12 2011 >12
BBC ES
Vicars Walk and Town Centre regeneration St Marys Street Bedford c/o
Mark Hathaway £52,000 from schemes 732-737
- Drainage scheme (Check Estimate)
- 722
C:\Documents and Settings\jallen\My Documents\2011 12 programme web version3 21.09.11
02.09.2011 V11
08:5521/02/2013
Bedford Borough Council Highways Maintenance programme 2011/13
COUNCIL INFO
Town or Parish
- Bedford Borough Scheme Name
- Scheme Description & Location
Borough Council Wards
STRUCTURAL MAINTENANCE SCHEMES
Kempston West / Kempston South
- 982
- D
- 2011 >12
- ES
- Woburn Road, Kempston
- Drainage scheme. BWBp (check estimate)
- Bedford
1061 1062
703
DD
2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12
Amey Church Hill Ravensden Amey Wilden Rd Renhold
Great Barford Great Barford
Clapham
Ravensden
- Renhold
- Drainage scheme
- Drainage scheme
- D
- ES
ES ES
- High Street Clapham
- Clapham
Widen
Drainage scheme (Glenn Peet added 03.03.11 D101) Brook erosion
- 754
- D
- High Street , Wilden
- Wyboston
- 998
- D
- Oldways Road Ravensden Flood prevention
- Drainage scheme
Drainage scheme Drainage scheme Drainage scheme Drainage scheme
- Gt Barford
- Ravensden
Kempston Shortstown Shortstown
Harrold
Kempston
South
1063 1064 1065 1066
- D
- Amey A421 borrow pit
- D
- ES
ES ES
- A600 Tinkers Hill, Shortstown
- Eastcotts
Eastcotts Harrold
- D
- Shortstown Flooding
- D
- Harrold Causeway Railings
LS
Amey Lump Sum Total
Castle /
Queen's Park
- 309
- C
- 2011 >12
- ES
- Ford End Road c/o
- Prebend Street to Hurst Grove
- Bedford
583 381 976 603
CCCC
2011 >12 2011 >12 2011 >12 2011 >12
ES ES ES
Roise Street / Beckett Street. c/o Brecon Way c/o
Resurface the whole lengths Resurface the whole length Resurface
Castle Putnoe
Bedford Bedford Bedford Clapham
- Bamford Road c/o
- Kingsbrook
- Clapham
- Amey Highbury Grove, Clapham c/o
- Resurfacing carriageway
C:\Documents and Settings\jallen\My Documents\2011 12 programme web version3 21.09.11
02.09.2011 V11
08:5521/02/2013
Bedford Borough Council Highways Maintenance programme 2011/13
COUNCIL INFO
Town or Parish
- Bedford Borough Scheme Name
- Scheme Description & Location
Borough Council Wards
STRUCTURAL MAINTENANCE SCHEMES
595 297 394 366 396 401 991 601 364 362
1064
363
CCCCCCCCCCCC
2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12
ES ES ES ES ES ES ES
- Nursery Gardens c/o P2
- Resurface the whole length
- Brickhill
- Bedford
Bedford Bedford Bedford Bedford Bedford Bedford Clapham Bedford Bedford Bedford Bedford
- Luke Place c/o P2
- Resurface the whole length
- Cauldwell
Kempston
North
Foster Road c/o P2 - joint treatment Althorpe Street c/o P2
Resurfacing/joint treatment - exact extents to be determined
- Resurface the whole length
- Cauldwell
Queen's Park Kingsbrook De Parys
- Howard Avenue c/o P2
- Resurfacing - exact extents to be determined
- Resurfacing - exact extents to be determined
- Willow Road and Junction of St Helena Road c/o P2
- Brendon Ave
- Resurfacing
Resurfacing Resurfacing Resurfacing Resurfacing Resurfacing
Reply 29
- Amey Green Lane, Clapham
- Clapham
ES ES ES ES
Muswell Road Mabel Road
Cauldwell Cauldwell Cauldwell Cauldwell
Ridgmount Street Sandhurst Road
Surface treatment Bunyan Road to Farrer St Plus repair speed humps Reply 42
Kempston Central
& East
- 596
- C
- 2011 >12
- ES
- Elstow Road, Kempston
- Bedford
Kempston
North
313 345 383
CCC
2011 >12 2011 >12 2011 >12
ES ES ES
- Hillgrounds Road, Kempston (Vine Close to Loveridge Av)
- Resurfacing Phase 2 Reply 6
- Bedford
Bedford Bedford
Avon Drive (Part) Arrowleys
Resurfacing Dove Road area and near Pheasant. Reply 17 Resurfacing Reply 21
Brickhill Putnoe
C:\Documents and Settings\jallen\My Documents\2011 12 programme web version3 21.09.11
02.09.2011 V11
08:5521/02/2013
Bedford Borough Council Highways Maintenance programme 2011/13
COUNCIL INFO
Town or Parish
- Bedford Borough Scheme Name
- Scheme Description & Location
Borough Council Wards
STRUCTURAL MAINTENANCE SCHEMES
294 755 368 960 238
CCCCC
2011 >12 2011 >12 2011 >12 2011 >12 2011 >12
ES ES ES
- Ettrick Glenavon and Greskine Close
- Resurfacing
- Reply 22
- Goldington
Goldington Eastcotts
Bedford
- Bedford
- Windmill Close
- Resurfacing Reply 22 Gas works proposed poss 2012 2013
- Resurfacing Reply 24
- Meeting Close, Cotton End
- Cotton End
Turvey
Kempston
Rural
- Amey The Loop, Turvey
- Resurfacing.
- Reply 16
- Reply 3 and 31
- ES
ES
Stewartby Way, Stewartby. Resurface part, patch part Bunyan Road, Kempston (Roundabout to Elstow Rd)
- Resurfacing P1
- Elstow
- Stewartby
Kempston Central & East / Kempston
South
- 244
- C
- 2011 >12
- Resurfacing
- P1
- Bedford
1025 1026
824
CCCCCCCCCC
2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12
Amey Brook Lane and Dove Lane, Harrold Amey Tandy's Close, Turvey
Thin surfacing Thin surfacing
PI PI
Reply 27 Reply 27
- Harrold
- Harrold
Turvey
Kempston
Rural
Amey C5 Little Staughton Road, Colmworth
Amey C44 Church End, Renhold
- Patch and Surface dressing
- Wyboston
Great Barford
Harpur
Colmworth Renhold Bedford Bedford Chawston Bolnhurst Elstow
- 248
- Finish kerbing and Resurfacing
- Resurfacing
- 1028
1042
826
- ES
- Stanley Street
- BBC
- Phillpotts Avenue, Bedford
- Resurfacing
- Newnham
Wyboston Wyboston
Elstow
Amey C40 Chawston Lane/Colesden Road X Roads Amey B660 junction with St Neots Road, Bolnhurst Amey Abbeyfields/Elstow Brook bridge
Resurfacing/ Surface dressing - Postponed Resurface - added to programme Resurfacing bridge deck Replace speed humps
739 756
Kempston
West
- 1065
- ES
- Williamson Road, Kempston
- Bedford
C:\Documents and Settings\jallen\My Documents\2011 12 programme web version3 21.09.11
02.09.2011 V11
08:5521/02/2013
Bedford Borough Council Highways Maintenance programme 2011/13
COUNCIL INFO
Town or Parish
- Bedford Borough Scheme Name
- Scheme Description & Location
Borough Council Wards
STRUCTURAL MAINTENANCE SCHEMES
1066
954 933 929
CCCCCCCCCCCCCCCCC
2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12
ES ES
- Foster Hill Road, Bedford
- Replace speed humps
- Harpur
Elstow
Bedford Kempston Hardwick
- B530 Chimney Corner, Kempston Hardwick
- Resurfacing
- Reply 32
Amey C28 High Road, Felmersham Amey Yelnow Lane, Sharnbrook
Patch and surface dress Patch and surface dress Patching works
P1 P1
Sharnbrook Sharnbrook
Felmersham Sharnbrook
Bedford Borough
- ES
- Pre-patching for surface dressing
Keysoe & Bolnhurst
795 818
- Amey B660 Kimbolton Road, Bolnhurst (New Road to St Neots Rd) Surface dressing (patched)
- Wyboston
Great Barford
Harrold
Amey C56 Barford Road, Willington Amey Odell Road, Harrold
Surface dressing (patched) Surface dressing (patched) Surface dressing (patched) Surface dressing (patched) Surface dressing (patched) Surface dressing (patched) Fibredeck Surface dressing (patched) Fibredeck Surface dressing (patched) Resurface - added to programme Microasphalt whole length
Willington
- Harrold
- 802
- 804
- Amey Colesden Road, Colmworth
- Wyboston
- Colmworth
Thurleigh Renhold
Riseley / Wyboston
- 810
- Amey Thurleigh Road, Thurleigh
- 803
- Amey Ravensden Road, Renhold
- Great Barford
Wyboston Riseley
Keysoe & Bolnhurst
794 796 794 796
Amey B660 Kimbolton Road, Bolnhurst/Pertenhall
- Amey High Street, Riseley
- Riseley
Pavenham
Oakley
Amey High Street, Pavenham (Area previously left) Amey High Street / Pavenham Road, Crossroads. Oakley
Oakley
605 732 733
Oakley
BBC BBC
Meadway c/o Barnhill c/o
Goldington Goldington
Bedford
- Bedford
- Microasphalt whole length
C:\Documents and Settings\jallen\My Documents\2011 12 programme web version3 21.09.11
02.09.2011 V11
08:5521/02/2013
Bedford Borough Council Highways Maintenance programme 2011/13
COUNCIL INFO
Town or Parish
- Bedford Borough Scheme Name
- Scheme Description & Location
Borough Council Wards
STRUCTURAL MAINTENANCE SCHEMES
734 735
CCCCCCCCCCCF
2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12
BBC BBC BBC ES
- Monkshill c/o
- Microasphalt part
- Goldington
Goldington Goldington Goldington
Putnoe
Bedford Bedford Bedford Bedford Bedford Bedford Bedford Bedford
Sharnbrook
Bedford Bedford Bedford Stewartby Bedford Bedford Bedford Roxton
- Linkway c/o
- Microasphalt whole length
- Microasphalt part
- 736
- The Risings c/o. Cost total including 4 schemes above
- Vicars Walk c/o
- 737
- Microasphalt whole length
Microasphalt whole length Microasphalt whole length Microasphalt whole length Resurfacing Aylesbury Road to Barkers lane
1074 1025
376
- ES
- Elm Close. Addition to programme
- Amey Brook Lane, Harrold
- Harrold
BBC BBC ES
- Aylesbury Road
- Newnham
Newnham Sharnbrook De Parys Newnham
Queen's Park
Elstow
1043
573
Wendover Drive (thin surfacing on remaining length) C26 High Street Sharnbrook (northern end) Park Avenue Phase2?
Resurfacing - exact extents to be determined (inc rom Swan PH to bends)
- 222
- ES
- Phased resurfacing?
- Remedial works
- ES
- Barkers Lane, Roundabout
Footway on Chestnut Avenue Phase2? Stewartby Way, Stewartby Kimbolton Road
977 260 254 498 774
- ES
- Footway Treatment
- F
- ES
- Footway Treatment Reply 3
- Footway Treatment Reply 9
- F
- ES
- DePary's
Putnoe
Footway Treatment Outside Raglan court (Elderly residents) Reply 21
- F
- ES
- Dover Crescent
- F
- ES
- Sargeant's Way, Bedford
- Footway Treatment
- Goldington
- Wyboston
- S
- Amey C40 Grange Culvert
- Bridge strengthenning. - Replacement structure
C:\Documents and Settings\jallen\My Documents\2011 12 programme web version3 21.09.11
02.09.2011 V11
08:5521/02/2013
Bedford Borough Council Highways Maintenance programme 2011/13
COUNCIL INFO
Town or Parish
- Bedford Borough Scheme Name
- Scheme Description & Location
Borough Council Wards
STRUCTURAL MAINTENANCE SCHEMES
SSSSSSSSSSSSL
2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12 2011 >12
- Amey Two Brewers (337) Design only
- Bridge strengthenning. - Consider replacement.
Bridge strengthenning. - Consider replacement or overslabbing Bridge strengthenning. - Replace with Box culvert Bridge strengthenning. - Replace structure part
Wyboston Riseley
Staploe Dean & Shelton
Melchbourne &
Amey Shelton Culvert (314) Design only Amey C5 Eastfield Farm Culvert (167) Amey C40 Salph End Bridge
Riseley
Yielden
Great Barford
Great Barford
Riseley
Renhold
- Renhold
- Amey C5 Great Barford Bridge (180)
Amey Crown Culvert (315) Design only Amey Bury Farm Culvert (464) Design only
Bridge strengthenning. - Protect week edge of structure Bridge strengthenning. - Consider deck replacement Bridge strengthenning. - Saddling recommended
Dean & Shelton
Kempston
Rural
Stagsden Wilden
Bridge strengthenning. - New required to stop bank erosion £85,000 budget in drainage
- ES
- High Street, Wilden Retaining Wall
- Wyboston
Eastcotts Various
Amey A600/A421 Parapet upgrade Amey Parapet Upgrades
Bridge strengthenning. - Construction of higher Parapet Bridge and Structures other - Various locations Bridge and Structures other - Various locations Bridge and Structures other - Various locations
Shortstown Bedford Borough Bedford Borough Bedford Borough
Amey Waterproofing and joint schemes - initial study Amey Subway Pumps and Telemetry Amey Lantern Replacement Programme Amey Column Replacement programme Amey Lighting Improvement Scheme Amey Road Closures for Amey schemes Amey Road Closures for Amey schemes
Various Various
Putnoe, Woodside, Brickhill, Cauldwell, Fenlake, Goldington, Wymington, Turvey, Thurleigh, and Harrold.