810 Mission Avenue Oceanside, CA 92054 Agenda

(760) 966-6500

(760) 967-2001 (fax) Thursday, April 18, 2019 GoNCTD.com

Regular Meeting: 2:00 P.M.

Location: NCTD Administrative Offices, 810 Mission Avenue, Oceanside, CA 92054

View Live Stream at: https://www.youtube.com/GoNCTD

MISSION North County Transit District’s mission is to deliver safe, convenient, reliable and user-friendly public transportation services.

VISION Our vision is to build an integrated transit system that enables our customers to travel easily and efficiently throughout our growing region.

For individuals with disabilities, NCTD will provide assistive services. To obtain such services or copies of documents in an alternate format, please call or write, a minimum of 72 hours prior to the event, to request these needed reasonable modifications. NCTD will make every attempt to accommodate requests that do not give 72-hour notice. Please contact the Clerk of the Board at (760) 966-6553.

For individuals with sensory disabilities, this document is available in alternate formats. For information, please contact the Clerk of the Board at 760/966-6553. Persons with hearing impairment, please use the Relay Service (CRS): 800/735-2929 TTY; 800/735-2922 voice; 800/855-3000 Spanish. CRS Customer Service: 877/632-9095 English or 877/419-8440 Spanish.

Agenda materials can be made available in alternative languages upon request. To make a request, please call (760) 966-6553 at least 72 hours in advance of the meeting.

Los materiales de la agenda de NCTD están disponibles en otros idiomas. Para hacer una solicitud, llame al (760) 966-6553 al menos 72 horas antes de la reunión.”

Any writings or documents provided to a majority of the members of the NCTD Board of Directors regarding any item on this agenda will be made available for public inspection at the office of the Clerk of the Board located at 810 Mission Avenue, Oceanside, CA 92054, during normal business hours.

1 REGULAR MEETING BEGINNING AT 2:00 PM • CALL TO ORDER • ROLL CALL OF BOARD MEMBERS • PLEDGE OF ALLEGIANCE TO THE AMERICAN FLAG • SAFETY BRIEF & EVACUATION PROCEDURES – Anthony Flores, Clerk of the Board • CHANGES TO THE AGENDA • PUBLIC COMMUNICATIONS There is a time limit of 15 minutes for this section of Public Communications and each speaker is limited to three minutes for their presentation. All persons wishing to address the Board during the meeting must complete a “Request to Speak” form. These forms are provided in a box at the table in the hallway and must be completed and given to the Clerk of the Board before that agenda item is called. A. MINUTES Approve Minutes for NCTD’s Special and Regular Board Meetings of March 21, 2019 (S) (Anthony Flores, Clerk of the Board) B. CONSENT ITEMS 1 – 10 Items reviewed and recommended for approval by the Executive Committee, Marketing, Service Planning and Business Development Committee (MSPBD), Performance, Administration and Finance Committee (PAF), Staff (S), or Board (B) All matters listed under CONSENT are considered by the Board to be routine and will be enacted by one motion. There will be no separate discussion on these items prior to the time the Board votes on the motion, unless members of the Board, the Executive Director, or the public, request specific items to be discussed and/or removed from the Consent Calendar for separate action. A request from the public to discuss an item must be filed with the Clerk of the Board on the “Request to Speak” form before that agenda item is called. ITEMS PULLED FROM CONSENT WILL BE MOVED TO THE END OF THE AGENDA 1. Receive the Monthly Intergovernmental Affairs Reports (Attachments 1A and 1B) (Matthew O. Tucker, Executive Director) 2. Receive the Monthly Transit Operations Performance Report (S) (Attachment 2A) (Damon Blythe, Chief Operations Officer – Transit Planning & Bus Operations) 3. Receive Quarterly Report of Contract Actions Issued Under the Executive Director's Authority (S) (Attachment 3A) (Jennifer M. Taylor, Chief Procurement and Contract Administration Officer) 4. Receive the Executive Committee Chair Report (S) (Attachment 4A) (Anthony Flores, Clerk of the Board) 5. Award Agreement No. 19046 to ADK Consulting and Executive Search for Executive Recruitment Services (S) (Karen L. Tucholski, Chief Administrative Officer) 6. Award Agreement No. 19044 to Crowe LLP for a Customer Relationship Management Software System and Maintenance Support (S) (Karen L. Tucholski, Chief Administrative Officer) 7. Award Agreements for Temporary Staffing Services (S) (Karen L. Tucholski, Chief Administrative Officer)

2 8. Set Public Hearing for June 20, 2019 for Consideration of Adoption of the FY2020 Operating Budget and FY2020-2024 Capital Improvement Plan and Authorize Certain Related Actions (S) (Eun Park-Lynch, Chief Financial Officer) 9. Award Agreement No. 19047 to Vavrinek, Trine, Day and Company, LLP for Financial Audit Services (S) (Eun Park-Lynch, Chief Financial Officer) 10. Award Purchase Order No. 33982 to Autolift Services, Inc. for the Purchase of Portable Lifts (S) (Tracey Foster, Chief Development Officer) C. OTHER BUSINESS ITEM(S) 11 – 16 11. Approve Amended and Restated Employment Agreement Between NCTD and General Counsel (Attachments 11A and 11B) (Karen L. Tucholski, Chief Administrative Officer) 12. Adopt Resolution No. 19-03 Approving Modifications to Board Policy No. 19, Delegation of Authority to the Executive Director (Attachment 12A) (Jennifer M. Taylor, Chief Procurement and Contract Administration Officer) 13. Authorize the Executive Director to Negotiate and Execute Change Order No. 2 to Ordering Agreement No. 18055 for a Limited Notice to Proceed for the Purchase of Two (2) Charger Locomotives Pursuant to Multi-State Locomotive Master Agreement No. 14-01-DPIT from Siemens Mobility, Inc. (Eric Roe, Chief Operations Officer – Rail) 14. Approve Task Order Agreement No. 05 to Agreement No. 16041 with IBI Group for FY2019 Bus Stop Improvement Design Services and Bid and Construction Support (Attachment 14A) (Tracey Foster, Chief Development Officer) 15. Receive the Calendar Year 2019 Discretionary Grants Strategy and Adopt Resolution No. 19- 04 in Support of NCTD’S Discretionary Grant Application Strategy (Attachments 15A and 15B) (Matthew O. Tucker, Executive Director) 16. Approve Request to SANDAG for Funding Equipment In Support of Service Expansion (Attachments 16A – 16D) (Matthew O. Tucker, Executive Director) D. INFORMATIONAL ITEM(S) 17 17. Receive Executive Director’s Report on Proposed FY2020 Budget Guidance and Strategic Areas of Focus (Matthew O. Tucker, Executive Director) • EXECUTIVE DIRECTOR’S REPORT • BOARD MEMBER REPORTS, COMMENTS, AND CORRESPONDENCE • REMAINING PUBLIC COMMUNICATIONS ➢ For any remaining speakers who have completed a “Request to Speak” form. • ADJOURNMENT • CERTIFICATIONS AND RULES (FOR BOARD AND PUBLIC INFORMATION) ➢ Posting of Board Agenda (Page 6) ➢ Rules for Public Speakers at meetings of the North County Transit District (Page 7) ➢ Quorum and Voting Information (Page 8)

3 Upcoming Meetings: • MSPBD Committee Meeting: May 16, 2019 at 12:00 p.m. • Regular Board Meeting: May 16, 2019 at 2:00 p.m. All Regular Board and Committee Meetings will be held at NCTD Administrative Offices, 810 Mission Ave., Oceanside CA, unless otherwise provided on public notice.

4

MAP OF NORTH COUNTY TRANSIT DISTRICT OFFICES

The NCTD Board Chambers is located at NCTD Administrative Offices, 810 Mission Avenue, Oceanside, CA 92054 and is accessible by the COASTER (NCTD Commuter Rail), (NCTD Hybrid Rail), and the BREEZE (NCTD Bus). Please log onto www.goNCTD.com to check our current routes and schedules, or call 1-800-COMMUTE.

5

April 11, 2019 To: North County Transit District Board Members From: Clerk of the Board Subject: POSTING OF BOARD AGENDA

In Compliance with the Ralph M. Brown Act, as Amended, the following information is provided.

The Agenda for this meeting of the Board was posted as follows:

Regular Meeting: April 18, 2019 at 2:00 p.m.

Posted At: 810 Mission Avenue, Oceanside, CA

Posted Online At: www.goNCTD.com

Date & Time of Posting: April 11, 2019 at 5:00 p.m.

Posted By: Imelda Kubota, Administrative Assistant

6

Rules for Public Speakers at Meetings of the North County Transit District

Per Board policy, all public communications at meetings of the North County Transit District shall be made and received in accordance with the following procedures:

1. COMMENTS NOT ON AGENDA

A. Total time limit all speakers: • Beginning of meeting: Fifteen (15) minutes • End of meeting: No time limit. B. Time limit per speaker per meeting: Three (3) minutes, with no donation of time allowed. C. Priority: First come, first served. All speaker slips will be numbered as the Clerk of the Board receives them. Those not allowed to speak at the beginning of the meeting due to limit stated above, will be called at the end of the meeting. D. Order on agenda: Items will be heard at the beginning of the meeting and if the time limit stated in Paragraph A is exhausted, those who filled out a speaker slip and have not yet spoken, will be given an opportunity to speak at the end of the meeting under “Remaining Public Communications.”

2. TIME LIMITS FOR ADDRESSING MATTERS ON THE AGENDA

A. Total time limit: None. B. Time limit per speaker: Three (3) minutes, with one donation of three minutes, for a maximum of six minutes. C. These rules apply to both public hearing and non-public hearing items listed on the agenda. D. Comments made not germane to the subject matter of the agenda item being considered are out of order.

3. CUTOFF FOR TURNING IN SPEAKER SLIPS

A. Speakers wishing to speak to an item on the Board Agenda must submit a speaker slip to the Clerk of the Board before that agenda item is called. Speaker slips will be available at the meeting. B. Speakers turning in slips after discussion begins on an item will be heard at the end of the meeting under “Remaining Public Communications.”

4. MODIFICATION OF RULES BY CHAIR

A. The Board Chair may, in his or her absolute discretion, relax the requirements of these rules. However, a decision of the Chair to do so in one instance shall not be deemed a waiver of the rules as to any other instance or matter.

7

Quorum and Voting

Pursuant to Public Utilities Code § 125102, a majority of the Board members eligible to vote shall constitute a quorum for the transaction of business and all official acts of the Board shall require the affirmative vote of a majority of the members of the Board eligible to vote; however, after a vote of the members is taken, a weighted vote may be called by any two members eligible to vote.

In the case of a weighted vote, the County of and each city (with exception of the City of San Diego), shall, in total, exercise 100 votes to be apportioned annually based on population. Approval under the weighted vote procedure requires the vote of the representatives of not less than three jurisdictions representing not less than 51 percent of the total weighted vote to supersede the original action of the Board. When a weighted vote is taken on any item that requires more than a majority vote of the Board members eligible to vote, it shall also require the supermajority percentage of the weighted vote. County population: The population of the County of San Diego shall be the population in the unincorporated area of the county within the area of jurisdiction of the Board pursuant to Public Utilities Code § 125052.

*ACS – American Community Survey

8 Board Agenda Errata Sheet

Thursday, April 18, 2019

Regular Meeting: 2:00 P.M.

Agenda Item No. 7, Award Agreement for Temporary Staffing Services (Consent):

Modifications were made to the Staff Report to provide additional information regarding the procurement process and to ensure a complete record; no proposed changes to the staff recommendation.

MINUTES OF THE SPECIAL AND REGULAR MEETINGS OF THE NORTH COUNTY TRANSIT DISTRICT’S BOARD OF DIRECTORS HELD MARCH 21, 2019

MINUTES OF THE SPECIAL MEETING

CALL TO ORDER

Tony Kranz, Board Chair, called the Special Meeting to order at 12:00 p.m.

ROLL CALL OF BOARD MEMBERS

1. Jack Feller (City of Oceanside) 2. Tony Kranz (City of Encinitas) 3. John Franklin (City of Vista) (Arrived at 1:15 p.m.) 4. Paul McNamara (City of Escondido) 5. Jim Desmond (County of San Diego) (Arrived at 12:09 p.m.) 6. Dave Druker (City of Del Mar) 7. Jewel Edson (City of Solana Beach) 8. Sharon Jenkins (City of San Marcos) 9. Priya Bhat-Patel (City of Carlsbad) 10. TBD (City of San Diego) (Absent – Appointment not made)

SAFETY BRIEF

Anthony Flores, Clerk of the Board, provided emergency evacuation procedures.

CHANGES TO THE AGENDA

None

PUBLIC COMMUNICATIONS

None

WORKSHOP ITEM(S)

W1 Receive Presentation from PFM Financial Advisors LLC on State of the Transit Industry: Funding Overview at the Federal, State, and Local Levels and Financing Considerations

Eun Park-Lynch, Chief Financial Officer, introduced Peter Shellenberger and Darren Hodge of PFM Financial Advisors LLC, who gave a presentation on the state of the transit industry with specific attention on funding, trends, and legislation at the federal, state, and local levels. The presentation also included an overview of the District’s financial ratios, financing options, and considerations.

Board Vice-Chair Feller asked Mr. Hodge if the forecasts are looked at daily. Mr. Hodge informed the Board that they are looked at on a weekly basis, except for the Treasury Curve as it relates to borrowings and interest rate movements. Board Member McNamara wanted further explanation regarding the correlation between the claims of increases in property value when transit infrastructure is built around it. Matthew O. Tucker, Executive Director, stated that national studies have been done that provide data showing this and that staff would send the information to the Board. Mr. Tucker added that this question will also be addressed as part of a public benefit study that is on today’s agenda for approval. Board Member Kranz added that he feels San Marcos has prime examples of this around Palomar College and Cal State University San Marcos. Board Member Desmond commented that he believes communities need to be willing to accept the density that transit needs, and that is not always the case especially in the affluent coastal areas. Board Member Edson asked what percentage of Highway Trust Funds were going to transit. Mr. Shellenberger answered that it was a 20% split in 2018. Board Member Desmond asked if general fund money has been transferred to backfill the Highway Trust Fund depletion. Mr. Schellenberger confirmed this, and Mr. Tucker added that he believes effective planning needs to be done over the next two to three years in regard to program funding. Board Member McNamara mentioned that he is not seeing growth around the Escondido Transit Center. Mr. Tucker commented that multiple factors impact growth, including public policy needed to support development. Board Member Jenkins asked if the decrease in sales tax is factored in any of the forecasts. Mr. Hodge informed her that PFM does not provide economic forecasts and that the information they are providing is taken from a Transnet forecast; however, he stated that the government is addressing this to ensure that sales taxes are going to be going to the appropriate jurisdictions. Board Member Desmond asked if outside factors such as transportation network companies (TNC’s), are considered when decisions and projections are being made. Mr. Tucker answered that those items are part of the Land Use Study and the Strategic Multimodal Transit Study that NCTD is conducting. He further stated that such items are part of larger national economic discussions regarding population growth, spending, etc. Board Member Jenkins asked how the District compares to other agencies in regard to Debt Service Coverage. Mr. Shellenberger said that the District is in a good position from a coverage standpoint. Board Member Desmond requested clarification on whether the District’s historical performance relative to debt service coverage indicated any trend, either positive or negative. Mr. Hodge stated that no particular trend was indicated and that much depends on planning. Mr. Tucker stated that this would be more of a question for Ms. Park-Lynch as this is part of the strategies that will be heard as part of the budget, including 5 and 10 year forecasts and that this presentation was setting the stage for the budget process. ADJOURNMENT The Special Meeting adjourned at 1:27 p.m.

Page 2 of 9

MINUTES OF THE REGULAR MEETING OF MARCH 21, 2019

CALL TO ORDER

Tony Kranz, Board Chair, called the Regular Meeting to order at 2:00 p.m.

ROLL CALL OF BOARD MEMBERS

1. Jack Feller (City of Oceanside) 2. Tony Kranz (City of Encinitas) 3. John Franklin (City of Vista) 4. Paul McNamara (City of Escondido) 5. Jim Desmond (County of San Diego) 6. Dave Druker (City of Del Mar) 7. Jewel Edson (City of Solana Beach) 8. Sharon Jenkins (City of San Marcos) 9. Priya Bhat-Patel (City of Carlsbad) 10. TBD (City of San Diego) (Absent – Appointment not made)

PLEDGE OF ALLEGIANCE TO THE AMERICAN FLAG

Board Chair Kranz led the Pledge of Allegiance to the American Flag.

SAFETY BRIEF

Anthony Flores, Clerk of the Board, provided emergency evacuation procedures.

CHANGES TO THE AGENDA

Anthony Flores, Clerk of the Board, informed the Board that there were no changes to the Agenda.

PUBLIC COMMUNICATIONS

Edwin Peters, Public Speaker: Mr. Peters stated that he was threatened on the SPRINTER last Sunday and that there was no Train Attendant on board. He asked that the video be checked. Board Member Kranz thanked him for bringing this to the Board’s attention and for speaking today. He asked that Eric Roe, Chief Operations Officer – Rail, follow-up with Mr. Peters.

Joan Brown, Public Speaker: Ms. Brown spoke to the Board regarding the upcoming bus stop closures and stated she felt they should not be a priority. Ms. Brown stated she takes many different buses and feels that the priority should be making improvements to stops.

Page 3 of 9

APPROVAL OF MINUTES OF THE FEBRUARY 21, 2019 REGULAR BOARD MEETING

ON THE MOTION OF BOARD MEMBER EDSON TO APPROVE THE MINUTES OF FEBRUARY 21, 2019, SECONDED BY BOARD MEMBER BHAT-PATEL.

AYES: FELLER, KRANZ, FRANKLIN, MCNAMARA, DESMOND, DRUKER, EDSON, JENKINS, BHAT-PATEL NOES: NONE ABSENT: NONE ABSTAIN: NONE MOTION CARRIES.

CONSENT ITEMS 1 – 3, 5, 7-9:

Board Member Edson requested that Consent Items 4 and 6 be pulled for discussion.

Board Member Desmond thanked the staff for the Monthly Transit Operations Performance Report and requested that a chart containing a 10-year ridership history be included. Mr. Tucker stated that it will be in the quarterly report presentation moving forward.

Board Chair Kranz asked for a motion for the remaining items that were not pulled from Consent.

1. Receive the Monthly Transit Operations Performance Report 2. Receive the Quarterly Investment Report for the Second Quarter of FY2019 3. Receive Committee Chair Reports 5. Award Agreement No. 19036 to TRC Consultants, Inc. for Stormwater Consulting Services 7. Award Agreement No. 19038 to IBI Group to Conduct the Strategic Multimodal Transit Implementation Plan 8. Award Agreement No. 19040 to Cambridge Systematics, Inc. to Conduct a District-Wide Public Benefits Study (S) 9. Approve Task Order Agreement No. 16 to Agreement No. 16044 with Bombardier Transportation (Holdings) USA, Inc. for the Overhaul of COASTER Bi-level Coach and Cab Cars

ON THE MOTION OF BOARD MEMBER DRUKER TO APPROVE CONSENT ITEMS 1-9, WITH THE EXCEPTION OF ITEMS 4 AND 6, SECONDED BY BOARD MEMBER EDSON.

AYES: FELLER, KRANZ, FRANKLIN, MCNAMARA, DESMOND, DRUKER, EDSON, JENKINS, BHAT-PATEL NOES: NONE ABSENT: NONE ABSTAIN: NONE MOTION CARRIES.

Page 4 of 9

OTHER BUSINESS ITEM(S) 10

10. Receive Monthly Intergovernmental Affairs Report and Adopt Calendar Year 2019 Legislative Agenda

Richard Harmon of Townsend Public Affairs gave a presentation containing Legislative activity, as well as the 2019 Proposed Legislative Agenda, and provided updates on Bills of interest to the District.

Board Chair Kranz asked why specific transit oriented development (TOD) projects are listed where discretionary grant funding is going to be pursued. Mr. Tucker answered that the list is not all-inclusive, but reflects priority projects.

Board Member Bhat-Patel asked Mr. Tucker to provide direction on how the Board can be more effective in lobbying and supporting the bills that are moving forward, as well as working with their jurisdictions should they be lobbying for similar bills. She commented that she believes the legislative agenda should be looked at by the Board periodically to ensure it remains current. Lastly, Ms. Bhat-Patel requested updates on AB 847, AB 176 and AB 1025. Mr. Harmon stated that AB 1025 is becoming a STEM Education Bill and he will provide the Board with updates on the mentioned Bills.

Board Member Bhat-Patel commented that certain cities were left off in the list of TOD projects and asked if they will be included. Mr. Tucker re-iterated that the list was not all-inclusive and explained why those specific projects were listed.

Board Member Bhat-Patel asked outside of implementing zero emission bus technology, is there anything else that the District can do to support climate action plans. Mr. Tucker stated that is part of the capital programs and service levels that the District operates.

Board Member Bhat-Patel suggested that the District utilize the Board Members to write to Sacramento for support, especially for funding of infrastructure and ridership improvements. Mr. Tucker mentioned that the District will work the Board Chair in sending a letter for each City to identify a liaison to work as part of a Legislative Committee supporting cross-purpose items. Mr. Tucker added that the District will be drafting letters of support for Mayoral signatures as it moves forward in seeking discretionary grants for projects that will be advancing.

Board Member Desmond asked for more information on SB 50. Mr. Harmon provided information on the purpose and main components of the Bill.

Board Member Edson stated she understood SB 50 to remove local jurisdictional authority on some matters regarding buildings near transit centers, which she is not comfortable with. She further commented that she feels many of the provisions are in conflict with the Coastal Act. Mr. Harmon stated that moving ahead will make sure to focus on some of the Coastal Act concerns. He encouraged the Board Members to speak with the Senator Wiener regarding their feedback should they ever be in Sacramento.

Page 5 of 9

Board Member Feller commented on SB 50 that some jurisdictions have more transit and/or train stations than others and that the impact of that legislation would accordingly vary significantly among the cities.

Board Member Edson asked if AB 226 and AB 1543 were positive bills as it would require that a fare paid pursuant to a reduced fare transit program be counted as full adult fare for calculating required ratios. Mr. Harmon confirmed this.

Board Member Kranz stated that this is a two-part agenda item and asked for a motion to adopt the Calendar Year 2019 Legislative Agenda.

ON THE MOTION OF BOARD MEMBER EDSON TO APPROVE AGENDA ITEM 10, SECONDED BY BOARD MEMBER DESMOND.

AYES: FELLER, KRANZ, FRANKLIN, MCNAMARA, DESMOND, DRUKER, EDSON, JENKINS, BHAT-PATEL NOES: NONE ABSENT: NONE ABSTAIN: NONE MOTION CARRIES.

INFORMATIONAL ITEM(S) 11

11. Receive Update on Implementation of Fare Changes Pursuant to SANDAG Comprehensive Fare Ordinance

Eun Park-Lynch, Chief Financial Officer, provided a brief background on the Regional Fare Policy and then proceeded to give an update on the fare change implementation status. Ms. Park-Lynch informed the Board that there has been a delay and the change is now expected to be implemented in the summer of 2019. Ms. Park-Lynch also said the delay in the fare increases will affect NCTD’s budgeted FY2019 fare revenues.

Board Member Druker asked for further information regarding San Diego Metropolitan Transit System (MTS) intending to change the fare system from Cubic to Init. Mr. Tucker informed the Board that MTS awarded the contract to Init in December and added that the District intends to use this new system so that there can be one regional fare system which will streamline the fare purchase process for not just our customers, but ’s and Amtrak’s as well. He stated that a detailed presentation will be forthcoming as information becomes available.

CONSENT ITEM(S) 4 AND 6

4. Award Agreement No. 19041 to STV, Inc. for Zero Emissions Bus Infrastructure Planning

Board Member Edson commented that she supports the move to Zero Emissions Buses (ZEB) and asked if there was a back-up plan should there be a cataclysmic event. Mr. Tucker stated that the District would need to have enough generators to recharge the buses and that facility needs such as solar and bus charging areas are currently being analyzed.

Page 6 of 9

ON THE MOTION OF BOARD MEMBER DRUKER TO APPROVE AGENDA ITEM 4, SECONDED BY BOARD MEMBER EDSON.

AYES: FELLER, KRANZ, FRANKLIN, MCNAMARA, DESMOND, DRUKER, EDSON, JENKINS, BHAT-PATEL NOES: NONE ABSENT: NONE ABSTAIN: NONE MOTION CARRIES.

6. Adopt Resolution No. 19-02 Authorizing the Execution of the Certifications and Assurances and Authorized Agent Forms for the Low Carbon Transit Operations Program for the Purchase of Zero Emission Buses

Board Member Edson asked if staff has determined the initial routes that would be served by the ZEB Pilot Program and if Escondido was part of the ZEB project because of the infrastructure. Mr. Tucker stated that the District will be conducting studies regarding the routes that would be served and that both Escondido and Oceanside are part of the program because that is where the bus facilities are located. He added that an upgrade to support electric vehicle technology would be needed.

ON THE MOTION OF BOARD MEMBER EDSON TO APPROVE AGENDA ITEM 6, SECONDED BY BOARD MEMBER BHAT-PATEL.

AYES: FELLER, KRANZ, FRANKLIN, MCNAMARA, DESMOND, DRUKER, EDSON, JENKINS, BHAT-PATEL NOES: NONE ABSENT: NONE ABSTAIN: NONE MOTION CARRIES.

BOARD MEMBER REPORTS, COMMENTS AND CORRESPONDENCE

Board Vice-Chair Feller commented that there is concern in Oceanside regarding the bus stop removals that are part of the Bus Stop Optimization Program. Mr. Tucker said that the date has been moved to April 21 to allow for public feedback on the proposed changes and that the District will still be moving forward with the removals. Mr. Tucker added that a press release has been done, as well as signs being placed on each of the bus stops to be eliminated.

Board Member Desmond mentioned an item that has been discussed at the SANDAG Board Meeting regarding SANDAG taking more TDA funds than before and wanted to know if there were any recommendations regarding the funds that the NCTD Board gets to vote on prior to the item being moved forward. Mr. Tucker answered that staff recommendations have been stated and that SANDAG is not making a request to the District related to Transnet or TDA funds.

Lori A. Winfree, General Counsel, commented that in general for items to be taken out of order there should be a formal motion and vote. She stated that she wanted to confirm the changes to the Agenda to ensure accuracy in the minutes. She noted the following: Agenda Items 4 and

Page 7 of 9

6 were pulled from consent and were moved, without opposition, to the end of the Informational Item; subsequently some Board Member reports were heard that were taken out of order prior to going into Closed Session, and when the Board returns from Closed Session it will reopen the Board Member reports.

CLOSED SESSION ITEM(S) 12

12. Closed Session Pursuant to Government Code Section 54957.6 – Public Employee Performance Evaluation, Title: Lori A. Winfree, General Counsel.

The Board went into Closed Session at 3:10 p.m. The Board returned to open session at 3:59 p.m. Lori A. Winfree, General Counsel, stated on the record that there was no reportable action and the item will be placed on the April agenda.

REMAINING PUBLIC COMMUNICATIONS

None

EXECUTIVE DIRECTOR’S REPORT

None

REMAINING BOARD MEMBER REPORTS, COMMENTS AND CORRESPONDENCE

Board Member Druker stated that he attended the SANDAG Transportation Committee Meeting last Friday where an engineer mentioned the concept of trenching along the Del Mar Bluffs which will be presented to the Transportation Committee in about a month. He also reported that in respect to the ITOP Report, the SANDAG Board is looking at how to change the way the maintenance effort is calculated. Mr. Tucker clarified that that item is related to the Transnet Ordinance and is not part of the 70/30 split.

Board Member Jenkins stated that she went on the facilities tour with Board Alternate Randy Walton. She added that it was fabulous and encourages new Board Members to go.

Board Chair Kranz mentioned that there was an Airport Sub-Committee Meeting as part of the SANDAG Board Retreat and one of the things that was discussed is that MTS and NCTD should explore operating a shuttle from the to the Airport.

Board Chair Kranz informed the Board of the Del Mar Bluffs facility tour on April 13th for which details were provided in an RSVP e-mail.

ADJOURNMENT

The meeting adjourned at 4:05 p.m. Submitted by Anthony Flores, Clerk of the Board for North County Transit District.

BOARD CHAIR North County Transit District

Page 8 of 9

CERTIFICATION

I, Anthony Flores, duly appointed and qualified, Clerk of the Board of the North County Transit District, do hereby certify that the above is a true and correct copy of the Minutes of the Special and Regular Meetings held on March 21, 2019 approved by the Board of Directors of the North County Transit District adopted at a legally convened meeting of the Board of Directors of the North County Transit District held on the 18th day of April 2019.

CLERK OF THE BOARD North County Transit District

For individuals with sensory disabilities, this document is available in alternate formats. For information, please contact the Clerk of the Board at 760/966-6553. Persons with hearing impairment, please use the California Relay Service (CRS): 800/855-7100 TTY; 800/855-7100 voice; 800/855-7200 Spanish. CRS Customer Service: 877/546-7414 or 800-867-4323 TTY.

Page 9 of 9

Agenda Item # 1 RECEIVE THE MONTHLY INTERGOVERNMENTAL AFFAIRS REPORTS Time Sensitive: ☐ Consent: ☒

STAFF Receive the Monthly Intergovernmental Affairs Reports for the reporting period of RECOMMENDATION: March 2019.

BACKGROUND Attached are the Intergovernmental Affairs Monthly Reports submitted by INFORMATION: Townsend Public Affairs for March 2019. As needed, staff will provide updates on local, state and federal intergovernmental affairs, legislative and political matters.

ATTACHMENT: 1A – Monthly Legislative Report (Townsend) – March 2019 1B – State Legislative Report (Townsend) – March 2019

GOAL/STRATEGIC Strategically Focus Intergovernmental and Legislative Relations DIRECTION:

FISCAL IMPACT: This staff report has no fiscal impact.

COMMITTEE REVIEW: None

STAFF CONTACT: Matthew O. Tucker, Executive Director E-mail: [email protected] Phone: 760-966-6500

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-001

MEMORANDUM

To: North County Transit District Board of Directors Matthew O. Tucker, Executive Director

From: Townsend Public Affairs, Inc. Christopher Townsend, President Richard Harmon, Senior Director

Date: April 1, 2019

Subject: Monthly Report—March 2019

SUMMARY

This memorandum is an overview of activities undertaken by Townsend Public Affairs (TPA) over the last month, working on behalf of the North County Transit District, including the following subjects:

• Legislative Activity and Updates o State Update ▪ Legislative Activity ▪ Legislative Housing Proposals ▪ Tax Increment Financing and Related Proposals ▪ High-Speed Rail Hearing

o Tracked Legislation

• Administrative Action and Updates o Governor’s Housing Proposal

• Potential Funding Opportunities

State Capitol Office ▪ 925 L Street • Suite 1404 • Sacramento, CA 95814 • Phone (916) 447-4086 • Fax (916) 444-0383 Federal Office ▪ 600 Pennsylvania SE • Suite 207 • Washington, DC 20003 • Phone (202) 546-8696 • Fax (202) 546-4555 Central California Office ▪ 744 P Street • Suite 308 • Fresno, CA 93721 • Phone (949) 399-9050 • Fax (949) 476-8215 Southern California Office ▪ 1401 Dove Street • Suite 330 • Newport Beach, CA 92660 • Phone (949) 399-9050 • Fax (949) 476-8215 Northern California Office ▪ 300 Frank Ogawa Plaza • Suite 204 • Oakland, CA 94612 • Phone (510) 835-9050 • Fax (510) 835-9030

LEGISLATIVE ACTIVITY AND UPDATES

State Update

Legislative Activity

By the end of March, most policy committees had held at least one hearing to consider proposed legislation. Bills must wait 30 days after introduction before being heard in a committee, so many bills won’t be considered until April. Combined with the Legislature’s spring recess, April will be busy with hearings prior to deadlines at the end of the month.

Looking ahead, April is a key month for tax revenues as the Governor and Department of Finance prepare updated revenue projections for inclusion in the revised budget proposal due in early May. So far this year, tax revenues have cumulatively come in approximately $2 billion below estimates.

Legislative Housing Proposals

We have been discussing the package of proposed legislation from a regional effort in the Bay Area known as the CASA Compact since late last year. Over the last month, the Legislature has formalized this package of bills covering several policy areas, with a few of them likely specific to the Bay Area, but most with statewide impacts.

The following table is what we have been using to track the policy areas and legislation introduced to focus on those areas. Some of bills are discussed in more detail in other sections of this report, including legislation related to development around transit and tax increment and other financing tools.

CASA Element (10 Elements) Corresponding Legislation

Tenant Protections

#1: Just Cause Eviction Policy AB 1481 (Bonta): Tenancy

#2: Emergency Rental Assistance and Rent AB 36 (Bloom): Affordable Housing: Rental Cap Prices

#3: Emergency Rent Assistance and Access SB 18 (Skinner): Keep Californians Housed to Legal Counsel Act

Housing Inclusion and Capacity

#4: Remove Regulatory Barriers to AB 68 (Ting): Land Use: Accessory Dwelling Accessory Dwelling Units Units

SB 13 (Wieckowski): Accessory Dwelling Units

2

#5: Minimum Zoning near Transit SB 50 (Wiener): Planning and Zoning: Housing Development: Equitable Communities Incentive

SB 4 (McGuire): Housing

#6: Good Government Reforms to Housing AB 1483 (Grayson): Housing Development Approval Process Project Applications: Reporting

AB 1484 (Grayson): Mitigation Fee Act: Housing Developments

SB 330 (Skinner): Housing Crisis Act of 2019

Approval Process and Timeline

#7: Expedited Approvals and Financial AB 1485 (Wicks): Housing Development: Incentives for Select Housing Streamlining

SB 6 (Beall/McGuire): Residential Development: Available Land

#8: Unlock Public Land for Affordable AB 1486 (Ting): Local Agencies: Surplus Housing Land

Funding and Coordination

#9: Funding and Financing the CASA AB 1487 (Chiu): Land Use: Housing Element Compact SB 5 (Beall/McGuire): Local-State Sustainable Investment Incentive Program

AB 11 (Chiu): Community Redevelopment Law of 2019

ACA 1 (Aguiar-Curry): Local Government Financing: Affordable Housing and Public Infrastructure: Voter Approval

#10: Regional Housing Enterprise AB 1487 (Chiu): Land Use: Housing Element

3

There are two pieces of legislation that would address housing near transit—Senate Bill 50 (Wiener) and Senate Bill 4 (McGuire). Both of these bills will be heard the first week of April in the Senate Housing Committee chaired by Senator Wiener.

Last year, Senator Wiener introduced SB 827, which created an incentive for housing developers to build denser housing near transit by exempting developments from certain low-density requirements, including maximum controls on residential density, maximum controls on floor area ratio (FAR), minimum parking requirements, and maximum building height limits, as specified. A developer could choose to use the benefits provided in that bill if it met certain requirements. Senate Bill 827 failed in the Senate Transportation and Housing Committee.

Senate Bill 50 is different from SB 827 in several ways:

• First, unlike SB 827, this bill is not limited in application to proximity near transit; this bill provides reduced zoning requirements for specified projects in “jobs-rich areas” that are traditionally “high-opportunity” and will result in more housing across the State.

• With regards to the inclusion of units affordable to lower income households, SB 827 contained an inclusionary housing scheme that only applied to additional units granted by that bill, not the number of units in the base zoning. This bill provides that projects with 11- 19 units may pay an in-lieu fee for affordable housing, if feasible, and requires projects with 21 or more units to contain affordable households or pay an in-lieu fee.

• This bill also increases demolition protections for sites that have previously housed tenants and removes complex “Right to Return” provisions that could have proved difficult to enforce. Specifically, this bill prohibits an eligible site from containing housing occupied by tenants within the seven years preceding the date of the application and parcels on which an owner of has taken their rentals properties off the market for rent or lease within 15 years prior to the date the development proponent submits an application.

• This bill also creates a delayed implementation for sensitive communities, as defined, and permits them to come up with a community plan that may include zoning and other policies to encourage multifamily development at varying income levels and protect vulnerable residents from displacement.

Senate Bill 50 is similar in nature to SB 4. Both bills encourage denser housing near transit by relaxing density, height, parking, and FAR requirements, but also differ in several ways. Senate Bill 4 only applies in jurisdictions that have built fewer homes in the last 10 years than jobs and have unmet housing needs, whereas SB 50 bill does not have threshold requirements. Also, the zoning benefits in SB 50 also extend to projects in proximity to high quality bus corridors. While both bills only apply to parcels in residential zones, SB 4 only applies to infill sites and is not permitted in specified areas.

Both bills also relate to areas not tied to transit; SB 4 allows for duplexes on vacant parcels that allow a residential use in cities less than 50,000 and fourplexes in cities greater than 50,000. Senate Bill 50 does not limit density; however, it is limited to areas designated as “jobs-rich” by HCD and OPR. Lastly, SB 4 also provides a streamlined approval process.

4

The following table attempts to describe the current versions of each bill:

SB 4 SB 50 SB 4 SB TOD Transit Rich Duplex and 50 Jobs-Rich Fourplex Density Metro: min. 30 No limit Urban cities: 2 units No limit units/acre Non-urban cities: 4 Suburban: min. 20 units units/acre Parking Cities < 100,000 No parking .5 spaces per unit .5 spaces per unit and 1/4-1/2 mile from transit: DBL (spaces/BR or .5 spaces/unit if 100% affordable) Cities >100,000 and 0-1/4 mile from transit: no parking Concessions No 1 C/I: projects with No 1 C/I: projects with and 10% LI or 5% VLI 10% LI or 5% VLI Incentives 2 C/I: projects with 2 C/I: projects with (C/I) 20% LI or 10% VLI 20% LI or 10% VLI 3 C/I: projects with 3 C/I: projects with 30% LI or 15% VLI 30% LI or 15% VLI Waivers or Existing design Must comply with Existing design Must comply with Reductions review applies relevant standards, review applies relevant standards, of Dev. including including Standards architectural design architectural design Height One story over No less than 45’ or Meet existing None allowable height 55’ (proximity) zoning requirement Floor Area .6 times the No less than 2.5 or Meet existing None Ratio number of stories 3.25 (proximity) zoning requirement Streamlining Ministerial review No new Ministerial review No new streamlined streamlined approvals, but may approvals, but may qualify under SB 35 qualify under SB 35 Reduced No No Not a new No Fees residential use, except connection for service fees; no more than $3,000 in school fees * Density Bonus Law (DBL); Bedroom (BR); Low-income (LI); Very Low-Income (VLI)

We are expecting both authors to work together and potentially combine their proposals into one bill and will keep you updated on this progress.

5

Tax Increment Financing and Related Proposals

The Legislature has been working for a number of years on various tools to replace former redevelopment, including EIFDs and Community Revitalization and Investment Authorities. The following bills are additional options being considered this year related to redevelopment and tax increment financing, as well as tools for existing programs:

• Senate Bill 5 (Beall/McGuire)—Creates the Affordable Housing and Community Development Investment Program (Program). The bill establishes an application process, eligible uses for the funds made available by the bill, a process for distributing funds, project requirements, and accountability measures. Specifically, this bill:

o Allows various local agencies to apply for the Program, either individually or jointly o Requires an applicant to submit a plan to the Affordable Housing and Community Development Committee made up of several State officials. o Requires the plan submitted by the applicant to the Committee to include various types of information about the projects and community outreach. o Allows the Committee to approve $200 million in plans in the first year, increasing in $200 million increments each year for five years until reaching $1 billion after five years—over nine years, the total can reach $2 billion. o Requires at least 50 percent of funding to be used on the construction of affordable housing. o Directs the county auditor to reduce the amount of property tax revenue the applicant would otherwise have contributed to the county’s Education Revenue Augmentation Fund (ERAF). o Gives the Department of Finance the ability to recalculate the Proposition 98 guarantee so that schools receive the same amount of funding they would have absent this Program.

• Assembly Bill 11 (Chiu)—Allows a city or county to form an Affordable Housing and Infrastructure Agency to fund projects. Specifically, this bill requires agencies to:

o Create a resolution of intention, which includes a preliminary project plan along with an extensive amount of other required actions and analysis before the Strategic Growth Council (SGC) may approve agency formation. o An agency may not be formed if it will result in a negative state fiscal impact, to be determined by the State Controller, and must promote statewide greenhouse gas reduction goals. o The SCG shall ensure that the projects proposed in the resolution of intention equitably represent rural, suburban, and urban communities, and that establishing the agency would not result in an inequitable geographic distribution of agencies throughout the state. o Submit an annual report and a final report of any audit undertaken by any other local, state, or federal government entity, to its governing body and to the State Controller and the Department of Housing and Community Development. o Report the total number of housing units the agency assisted in creating or maintained.

6

• Senate Bill 128 (Beall)—Repeals the 55 percent voter approval requirement for an EIFD to issue bonds after the EIFD board approves the bond issuance. In its place, SB 128 requires the EIFD board to approve a bond before it can issue the bond.

• Assembly Constitutional Amendment 1 (Aguiar-Curry)—Proposes amendments to the California Constitution to allow a city, county, or special district, with 55 percent voter approval, to incur bonded indebtedness or impose specified special taxes to fund projects for affordable housing, permanent supportive housing, or public infrastructure.

High-Speed Rail Hearing

On March 26, the Senate Transportation Committee and Senate Budget Subcommittee 2 held an oversight hearing on the status of the High-Speed Rail project. The hearing lasted over three hours with the panels and questions from committee members. As expected, there was very little new information shared by any of the panelists—the real discussion will come after the High- Speed Rail Authority releases its project update report on May 1.

A lot of questions focused on the federal government’s threat to pull back the $929 million in grant funding. No new information was provided, but Republicans argued they could play a role with the White House, questioning the current practice of filing lawsuits on so many actions by the Trump Administration and how that did not foster a cooperative relationship.

The first panel—made up of representatives of the Peer Review Group, California State Auditor, and Legislative Analyst’s Office—continued to express skepticism about the progress of the project and its ability to meet deadlines for expenditure of federal funding. The representatives largely argued the Legislature should take the opportunity to take a step back and review all options for moving forward.

Lenny Mendonca, the new Chair of the Authority, and California State Transportation Agency Secretary Brian Annis provided an overview of the status of the project, including a presentation about credibility and transparency. Specific project updates from the most recent Authority Board meeting were provided by Chief Operating Officer Joe Hedges.

Representatives of agencies receiving regional investments made up the third panel—Caltrain, Metrolink and LA Metro—discussing various projects in their service areas with funding from the high-speed rail project.

The Authority will provide its project update report in May and be back in front of these committees shortly after that for what will likely be a much livelier discussion about the direction of the project.

7

Tracked Legislation

Attached is a list of legislation we are currently monitoring, and below are bills of interest to the District, given the benefits or impacts to the District’s goals.

• Assembly Bill 176 (Cervantes)—the California Alternative Energy and Advanced Transportation Financing Authority Act establishes the California Alternative Energy and Advanced Transportation Financing Authority. The act authorizes, until January 1, 2021, the authority to provide financial assistance in the form of a sales and use tax exclusion for projects, including those that promote California-based manufacturing, California- based jobs, advanced manufacturing, reduction of greenhouse gases, or reduction in air and water pollution or energy consumption. The Sales and Use Tax Law, for the purposes of the taxes imposed pursuant to that law, until January 1, 2021, excludes the lease or transfer of title of tangible personal property constituting a project to any contractor for use in the performance of a construction contract for a participating party that will use that property as an integral part of the approved project. This bill would extend the authorization to provide financial assistance in the form of a sales and use tax exclusion for qualifying projects until January 1, 2031 and would extend the sales and use tax exclusion until January 1, 2031.

Status—This bill is pending in the Assembly Natural Resources Committee.

• Assembly Bill 625 (Kalra)—would add the State to existing law imposing requirements on certain local government agencies that award or otherwise enter into contracts for public transit services or for the collection and transportation of solid waste, relating to the retention of employees of the prior contractor or subcontractor.

Status—This bill is pending in the Assembly Appropriations Committee.

• Assembly Bill 752 (Gabriel)—this bill would require a multimodal transit stations with a public restroom that commences operations or a renovation on or after January 1, 2021, to include a lactation room. No State funding is provided.

Status—This bill is pending in the Assembly Transportation Committee.

• Assembly Bill 784 (Mullin)—would provide a sales tax exemption until January 1, 2024, with respect to the sale of specified zero-emission technology medium- and heavy-duty transit bus vehicles.

Status—This bill previously related to another topic; it is pending in the Assembly Revenue and Taxation Committee.

• Assembly Bill 847 (Mullin)—would require the Department of Housing and Community Development, upon appropriation by the Legislature, to establish a competitive grant program to award grants to cities and counties to offset up to 100% of any transportation- related impact fees exacted upon a qualifying housing development project, as defined, by the local jurisdiction.

Status—This bill is pending in the Assembly Housing and Community Development Committee.

8

• Assembly Bill 1017 (Boerner Horvath)—this bill will be amended to strike the current content and to require that the CPUC conduct a preliminary review of a crossing by the Rail Crossing Engineering Branch (RCEB) for a municipality that that has developed a plan which has been adopted by the municipality through a resolution.

Status—This bill is pending in the Assembly Appropriations Committee.

• Assembly Bill 1350 (Gonzalez)—this bill would create the Youth Transit Pass Program upon the appropriation of cap and trade funding and would require Caltrans to administer the program.

Status—This bill is pending a hearing in the Assembly Transportation Committee.

• Assembly Bill 1351 (Lackey)—this bills has been amended to require the State Transportation Agency, in consultation with public transit operators, to conduct an assessment of the procedures public transit operators use to provide dial-a-ride and paratransit services to individuals with disabilities who are visiting their service territories and are certified to use another in-state public transit operator’s similar dial-a-ride and paratransit services, to the extent available. The assessment shall include, but not be limited to, timelines and methods for qualifying individuals to submit certification documents, including by electronic submission, to transit operators. On or before October 1, 2020, the Transportation Agency shall publish the assessment on its internet website. After conducting and publishing the assessment, the Transportation Agency may adopt guidelines for the development of a statewide reciprocity program to enable individuals with disabilities who a public transit operator has certified to use its dial-a-ride and paratransit services to use another in-state public transit operator’s similar dial-a-ride and paratransit services, to the extent available.

Status—This bill is pending in the Assembly Transportation Committee.

• Assembly Bill 1413 (Gloria)—would make provisions of AB 805 (2017) regarding project labor agreements consistent statewide, as well as provide technical clarifications to other provisions of the AB 805 statutes.

Status—This bill is pending in the Assembly Local Government Committee.

• Assembly Bill 1543 (Holden)—would require a fare paid pursuant to a reduced fare transit program to be counted as a full adult fare for purposes of calculating any required ratios of fare revenues to operating costs.

Status—This bill is pending a hearing in the Assembly Transportation Committee; however, the Assembly Transportation Committee has indicated they will not be hearing legislation related to transit fares pending the release of a study from UCLA on the issue.

• Assembly Bill 1785 (Boerner Horvath)—this bill would require a railroad owner or operator, or a government entity through which the railroad passes, to file a special motion to strike a cause of action seeking damages for an incident occurring in the railroad right- of-way. The court would be required to grant the special motion to strike unless the plaintiff

9

establishes that there is a probability that the plaintiff will overcome all defenses asserted by the defendant and prevail on the claim.

Status—This bill is pending in the Assembly Judiciary Committee. It is intending to address the issue of trespassing on railroad right-of-way when there is no fault on the part of the railroad owner or operator.

• Senate Bill 50 (Wiener)—would provide for special incentives and considerations for certain types of housing around transit locations.

Status—This bill is pending in the Senate Governance and Finance Committee.

• Senate Bill 336 (Dodd)—would require a transit operator to ensure each of its fully- automated transit vehicles is staffed by at least one of its employees, who has had specified training, while the vehicle is in service.

Status—This bill is pending in the Senate Transportation Committee.

• Senate Bill 397 (Glazer)—would require public transit operators to develop best practices for allowing pets on public transit vehicles during mandatory evacuations.

Status—This bill is pending in the Senate Transportation Committee.

• Senate Bill 498 (Hurtado)—this bill would require the California Transportation Commission (CTC), with respect to specified funds resulting from TCIF program savings, to establish a competitive grant program to provide grants from those funds in the 2020– 21 and 2021–22 fiscal years to short-line railroad operators, for railroad reconstruction, maintenance, upgrade, or replacement expenditures. The bill would require the CTC to adopt guidelines, in consultation with representatives from specified government and industry entities, by July 1, 2020, to be used by the CTC to select grant recipients.

Status—This bill is pending in the Senate Transportation Committee.

10

ADMINISTRATIVE ACTION AND UPDATES

Governor’s Housing Proposal

On March 11, Governor Newsom’s Department of Finance posted its proposed budget trailer bill language related to housing. The language contains the following:

• Establishes the Local Government Planning Support Grants Program to provide grants for planning activities to enable jurisdictions to meet new short-term housing goals and rewards for milestones. o Creates a 3-year annualized housing allocation to be achieved in calendar years 2020 and 2021, with no annual targets lower than current RHNA goals. o $250 million will be split equally between distribution to regions/counties and cities. In the case of cities, funding will be based on population, with $750,000 available to cities over 200,000, $275,000 for cities between 60,000 and 200,000, and $150,000 for cities under 60,000). o A NOFA will be issued by August 15, 2019, with cities eligible to apply for funding by December 31, 2019, and regions eligible to apply by December 31, 2020.

• Establishes the Production and Process Improvement Reward Program for regions and counties (and cities through these agencies) that have demonstrated progress toward increased housing production. o $500 million is available based on a region or county’s share of annual housing targets. o Jurisdictions must have compliant housing elements and have submitted all annual and other progress reports.

• Directs the Department of Housing and Community Development (HCD), in cooperation with the Office of Planning and Research and State Transportation Agency, by December 31, 2022 and after a stakeholder participation process, to propose linking transportation and other non-housing funding to a new RHNA process. o Beginning July 1, 2023, the Controller may withhold a jurisdiction’s Road Maintenance and Rehabilitation Account (SB 1) funds if they do not have a compliant housing element or have not zoned or entitled for its annual housing goals. o By May 1, 2023, and then annually, HCD will report to the Controller a list of cities and counties with funds to be withheld.

Many Members of the Legislature have been outspoken against the Governor’s proposal to withhold transportation funding from local agencies who don’t meet their housing targets. The efforts to first approve Senate Bill 1 and then to defeat Proposition 6 were largely successful due to the support of local agencies identifying needs and then moving quickly to put those funds into projects. Budget committees will be considering the Governor’s proposal over the coming weeks.

11

POTENTIAL FUNDING OPPORTUNITIES

Included below is a list of several upcoming grant programs, descriptions and due dates:

• Environmental Enhancement and Mitigation Program (June 2019)—The EEM Program funds projects that contribute to mitigation of the environmental effects of transportation facilities. The EEM Program encourages projects that produce multiple benefits which reduce greenhouse gas emissions, increase water use efficiency, reduce risks from climate change impacts, and demonstrate collaboration with local, state and community entities. Eligible projects must be directly or indirectly related to the environmental impact of the modification of an existing transportation facility or construction of a new transportation facility.

• Sustainable Transportation Planning Grants (Fall 2019)—Successful planning projects are expected to directly benefit the multi-modal transportation system. Sustainable Communities Grants will also improve public health, social equity, environmental justice, and provide other important community benefits. The grant program will fund local and regional multimodal transportation and land use planning projects that further the region’s RTP SCS, contribute to the State’s GHG reduction targets, and assist in achieving the Caltrans Mission and Program Objectives.

• Adaptation Planning Grants (Fall 2019)—This funding will advance adaptation planning on California’s transportation infrastructure, including but not limited to roads, railways, bikeways, trails, bridges, ports, and airports. Funded projects are expected to not only adapt the transportation system to climate change impacts but also to benefit the multimodal transportation system. Applicants who have adaptation planning efforts underway as well as those who have not yet started work are encouraged to apply.

• Local Partnership Program (Winter 2019)—Jurisdictions with voter approved taxes, tolls, and fees, or with imposed fees, will be eligible for this competitive grant program if the taxes, tolls, or fees are dedicated solely to transportation. The initial programming cycle will cover 2017-18 through 2019-20. The program will match up to $5 million for the construction of transportation projects.

• Trade Corridor Enhancement Program (Winter 2019)—The objective of the Trade Corridor Enhancement Program is to fund infrastructure improvements on federally designated Trade Corridors of National and Regional Significance, on the Primary Freight Network, as identified in the California Freight Mobility Plan, and along other corridors that have a high volume of freight movement as determined by the Commission. The program will fund projects that benefit the movement of goods along identified major trade corridors.

12

North County Transit District 2019-20 Legislative Report (4/6/2019)

AB 145 (Frazier D) High-Speed Rail Authority: Senate confirmation. Current Text: Introduced: 12/13/2018 html pdf Status: 1/24/2019-Referred to Com. on TRANS. Location: 1/24/2019-A. TRANS. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Current law creates the High-Speed Rail Authority with specified powers and duties relative to development and implementation of a high-speed train system. The authority is composed of 11 members, including 5 voting members appointed by the Governor, 4 voting members appointed by the Legislature, and 2 nonvoting legislative members.This bill would provide that the members of the authority appointed by the Governor are subject to appointment with the advice and consent of the Senate. Organization Position North County Watch Transit District

AB 185 (Grayson D) California Transportation Commission: transportation policies: joint meetings. Current Text: Introduced: 1/10/2019 html pdf Status: 2/4/2019-Referred to Com. on TRANS. Location: 2/4/2019-A. TRANS. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Current law creates the California Transportation Commission, with various powers and duties relative to the programming of transportation capital projects and allocation of funds to those projects pursuant to the state transportation improvement program and various other transportation funding programs. Existing law requires the commission and the State Air Resources Board to hold at least 2 joint meetings per calendar year to coordinate their implementation of transportation policies. This bill would require the Department of Housing and Community Development to participate in those joint meetings. Organization Position North County Watch Transit District

AB 252 (Daly D) Department of Transportation: environmental review process: federal program. Current Text: Introduced: 1/23/2019 html pdf Status: 3/20/2019-In committee: Set, first hearing. Referred to suspense file. Location: 3/12/2019-A. APPR. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Current federal law requires the United States Secretary of Transportation to carry out a surface transportation project delivery program, under which the participating states may assume certain responsibilities for environmental review and clearance of transportation projects that would otherwise be the responsibility of the federal government. Current law, until January 1, 2020, provides that the State of California consents to the jurisdiction of the federal courts with regard to the compliance, discharge, or enforcement of the responsibilities it assumed as a participant in the program. This bill would extend the operation of these provisions indefinitely. Organization Position North County Watch Transit District

AB 285 (Friedman D) California Transportation Plan. Current Text: Amended: 3/6/2019 html pdf Last Amend: 3/6/2019 Status: 3/26/2019-From committee: Do pass and re-refer to Com. on NAT. RES. (Ayes 11. Noes 2.) (March 25). Re-referred to Com. on NAT. RES. Location: 3/25/2019-A. NAT. RES. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would require the Department of Transportation to address in the California Transportation Plan how the state will achieve maximum feasible emissions reductions in order to attain a statewide Page 1/11 reduction of greenhouse gas emissions of 40% below 1990 levels by the end of 2030 and attain the air quality goals described in California’s state implementation plans required by the federal Clean Air Act. Organization Position North County Watch Transit District

AB 352 (Garcia, Eduardo D) California Global Warming Solutions Act of 2006: Greenhouse Gas Reduction Fund: investment plan: Transformative Climate Communities Program. Current Text: Amended: 3/14/2019 html pdf Last Amend: 3/14/2019 Status: 3/26/2019-From committee: Do pass and re-refer to Com. on APPR. (Ayes 8. Noes 0.) (March 25). Re-referred to Com. on APPR. Location: 3/26/2019-A. APPR. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would, beginning July 1, 2020, would require state agencies administering competitive grant programs that allocate moneys from the Greenhouse Gas Reduction Fund to give specified communities preferential points during grant application scoring for programs intended to improve air quality, to include a specified application timeline, to allow applicants from the Counties of Imperial and San Diego to include daytime population numbers in grant applications, and to prohibit grant eligibility and scoring criteria from precluding low-income communities, as defined, from applying for or being awarded a grant. Organization Position North County Watch Transit District

AB 380 (Frazier D) Office of the Transportation Inspector General. Current Text: Amended: 3/21/2019 html pdf Last Amend: 3/21/2019 Status: 3/25/2019-Re-referred to Com. on A. & A.R. Location: 3/11/2019-A. A. & A.R. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would eliminate the Independent Office of Audits and Investigations and would instead create the Independent Office of the Transportation Inspector General in state government, as an independent office that would not be a subdivision of any other government entity, to ensure that specified state agencies and all external entities that receive state and federal transportation funds are operating efficiently, effectively, and in compliance with federal and state laws. Organization Position North County Watch Transit District

AB 423 (Gloria D) San Diego County Air Pollution Control District: members. Current Text: Amended: 4/1/2019 html pdf Last Amend: 4/1/2019 Status: 4/2/2019-Re-referred to Com. on NAT. RES. Location: 2/15/2019-A. NAT. RES. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would require, as of March 1, 2021, the San Diego County Air Pollution Control District to have a specified membership. The bill would require the San Diego air district to create an internet website separate from the County of San Diego internet website and post specified information, including, among others, the agendas and minutes of the governing board of the San Diego air district and all permit information and enforcement actions. Organization Position North County Watch Transit District

AB 510 (Cooley D) Local government records: destruction of records. Current Text: Introduced: 2/13/2019 html pdf Status: 2/21/2019-Referred to Com. on L. GOV. Location: 2/21/2019-A. L. GOV.

Page 2/11 Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Current law authorizes the head of a department of a county or city, or the head of a special district to destroy recordings of telephone and radio communications maintained by that county, city, or special district after 100 days if that person receives approval from the legislative body and the written consent of the agency attorney. This bill would exempt the head of a department of a county or city, or the head of a special district from these recording retention requirements if the county, city, or special district adopts a records retention policy governing recordings of routine video monitoring and recordings of telephone and radio communications. Organization Position North County Watch Transit District

AB 625 (Kalra D) Service contracts: public transit: collection and transportation of solid waste: retention of employees. Current Text: Introduced: 2/15/2019 html pdf Status: 4/4/2019-From committee: Do pass and re-refer to Com. on APPR. (Ayes 7. Noes 0.) (April 3). Re-referred to Com. on APPR. Location: 4/4/2019-A. APPR. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Current law imposes requirements on certain local government agencies that award or otherwise enter into contracts for public transit services or for the collection and transportation of solid waste, relating to the retention of employees of the prior contractor or subcontractor. Current law requires such a local government agency letting a contract out to bid to give a 10% preference to a bidder who agrees to retain employees for a specified period, as prescribed. Specific provisions apply only to service contracts for the collection and transportation of solid waste. This bill would expand the application of these provisions to a state agency that enters into such a contract. Organization Position North County Watch Transit District

AB 631 (McCarty D) Sacramento Regional Transit District: voting threshold. Current Text: Introduced: 2/15/2019 html pdf Status: 4/4/2019-From committee: Do pass. (Ayes 8. Noes 0.) (April 3). Location: 2/25/2019-A. L. GOV. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Current law describes the authorized boundaries of the Sacramento Regional Transit District, as specified. Current law authorizes the detachment of territory from the district by a supermajority vote of at least 80% of the nonweighted vote of the district’s board of directors and by a majority vote of the governing body of the territory proposed to be detached. This bill would reduce the board’s supermajority vote requirement from 80% to 67% for purposes of detaching a territory from the district. Organization Position North County Watch Transit District

AB 676 (Frazier D) California Transportation Commission: annual report. Current Text: Introduced: 2/15/2019 html pdf Status: 3/26/2019-From committee: Do pass and re-refer to Com. on APPR. (Ayes 14. Noes 0.) (March 25). Re-referred to Com. on APPR. Location: 3/25/2019-A. APPR. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Current law requires the California Transportation Commission to adopt and submit to the Legislature, by December 15 of each year, an annual report summarizing the commission’s prior-year decisions in allocating transportation capital outlay appropriations and identifying timely and relevant transportation issues facing the state. This bill would instead require the commission to adopt and submit the annual report by December 31 of each year. Organization Position North County Watch Transit District

Page 3/11 AB 752 (Gabriel D) Public transit: transit stations: lactation rooms. Current Text: Amended: 3/21/2019 html pdf Last Amend: 3/21/2019 Status: 3/25/2019-Re-referred to Com. on TRANS. Location: 3/21/2019-A. TRANS. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would require a multimodal transit station that has a public restroom and that commences operations or a renovation on or after January 1, 2021, to include a lactation room. To the extent the bill imposes additional duties on a local agency, the bill would impose a state-mandated local program. Organization Position North County Watch Transit District

AB 784 (Mullin D) Sales and use taxes: exemption: California Hybrid and Zero-Emission Truck and Bus Voucher Incentive Project: transit bus vehicles. Current Text: Amended: 3/25/2019 html pdf Last Amend: 3/25/2019 Status: 3/26/2019-Re-referred to Com. on REV. & TAX. Location: 3/14/2019-A. REV. & TAX Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Current state sales and use tax laws impose a tax on retailers measured by the gross receipts from the sale of tangible personal property sold at retail in this state of, or on the storage, use, or other consumption in this state of, tangible personal property purchased from a retailer for storage, use, or other consumption in this state. The Sales and Use Tax Law provides various exemptions from those taxes. This bill would, until January 1, 2024, provide an exemption from those taxes with respect to the sale of specified zero-emission technology medium- and heavy-duty transit bus vehicles. Organization Position North County Watch Transit District

AB 931 (Boerner Horvath D) State and local boards and commissions: representation: appointments. Current Text: Introduced: 2/20/2019 html pdf Status: 4/4/2019-Coauthors revised. From committee: Do pass and re-refer to Com. on A. & A.R. (Ayes 7. Noes 0.) (April 3). Re-referred to Com. on A. & A.R. Location: 2/20/2019-A. A. & A.R. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Current law establishes the policy of the Legislature to ensure equal access to specific information about the many local regulating and advisory boards, commissions, and committees and to ensure equal opportunity to be informed of vacancies on those boards. Existing law requires each legislative body of a local agency to prepare an appointments list of all regular and ongoing boards, commissions, and committees that are appointed by the legislative body of the local agency. This bill, on and after January 1, 2025, would require the composition of each state and local board and commission with appointed members to have a specified minimum number of women board members or commissioners based on the total number of board members or commissioners on that board. Organization Position North County Watch Transit District

AB 983 (Boerner Horvath D) Transportation electrification. Current Text: Introduced: 2/21/2019 html pdf Status: 4/1/2019-In committee: Set, first hearing. Hearing canceled at the request of author. Location: 3/7/2019-A. U. & E. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would require an electrical corporation to work with local agencies or regional planning agencies in its service territory with responsibility for planning electric vehicle deployment to determine where to install new electrical charging stations along local transit corridors. The bill would authorize an electrical corporation to file an application with the PUC by December 31, 2020, with the support of the local or regional planning agency, for the infrastructure investments required to support electrical charging stations at transit corridor entry and exit points or other locations. Page 4/11 Organization Position North County Watch Transit District

AB 992 (Mullin D) Open meetings: local agencies: social media. Current Text: Introduced: 2/21/2019 html pdf Status: 3/7/2019-Referred to Com. on L. GOV. Location: 3/7/2019-A. L. GOV. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would provide that the Ralph M. Brown Act does not apply to the posting, commenting, liking, interaction with, or participation in, internet-based social media platforms that are ephemeral, live, or static, by a majority of the members of a legislative body, provided that a majority of the members do not discuss among themselves business of a specific nature that is within the subject matter jurisdiction of the legislative body of the local agency. Organization Position North County Watch Transit District

AB 1017 (Boerner Horvath D) Railroads: at-grade pedestrian crossings: supplemental safety measure improvements. Current Text: Introduced: 2/21/2019 html pdf Status: 3/26/2019-In committee: Hearing postponed by committee. Location: 3/7/2019-A. U. & E. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: The Public Utilities Commission has the exclusive power to determine and prescribe the manner and the terms of installation, operation, maintenance, use, and protection of specified rail crossings. Under current law, except as provided, a bell, siren, horn, whistle, or similar audible warning device shall be sounded at any public crossing in accordance with federal law. To the extent consistent with federal law, this bill would require the commission to identify standardized supplemental safety measure improvements for at-grade pedestrian crossings, as specified. Organization Position North County Watch Transit District

AB 1089 (Stone, Mark D) Santa Cruz Metropolitan Transit District. Current Text: Amended: 3/25/2019 html pdf Last Amend: 3/25/2019 Status: 3/26/2019-Re-referred to Com. on L. GOV. Location: 3/25/2019-A. L. GOV. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Current law authorizes the formation of the Santa Cruz Metropolitan Transit District, with specified powers and duties related to the operation of public transit services serving the County of Santa Cruz. Current law requires the district’s purchases of supplies, equipment, and materials exceeding $25,000 to be by contract let to the lowest responsible bidder. This bill would instead require the district’s purchase of supplies, equipment, and materials exceeding $150,000 to be by contract let to either the lowest responsible bidder or to the responsible bidder that submits a proposal that provides the best value to the district. Organization Position North County Watch Transit District

AB 1184 (Gloria D) Public records: writing transmitted by electronic mail: retention. Current Text: Amended: 3/25/2019 html pdf Last Amend: 3/25/2019 Status: 3/26/2019-Re-referred to Com. on JUD. Location: 3/25/2019-A. JUD. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would, notwithstanding any law, require public agencies to retain and preserve energy writing transmitted by electronic mail for a period of at least 2 years.This bill contains other existing laws. Page 5/11 Organization Position North County Watch Transit District

AB 1350 (Gonzalez D) Youth Transit Pass Pilot Program. Current Text: Amended: 3/26/2019 html pdf Last Amend: 3/26/2019 Status: 3/27/2019-Re-referred to Com. on TRANS. Location: 3/25/2019-A. TRANS. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would create the Youth Transit Pass Pilot Program upon the appropriation of moneys from the Greenhouse Gas Reduction Fund by the Legislature, and would require the Department of Transportation to administer the program. The bill would require the department to award available moneys to eligible participants, as defined, to provide free transit passes to persons under the age of 25 through new or existing transit pass programs, as specified. Organization Position North County Watch Transit District

AB 1351 (Lackey R) Transit operators: paratransit and dial-a-ride services. Current Text: Introduced: 2/22/2019 html pdf Status: 3/14/2019-Referred to Com. on TRANS. Location: 3/14/2019-A. TRANS. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would require a for-profit or nonprofit transit operator that receives funds through the Mills-Alquist-Deddeh Act and that provides dial-a-ride or paratransit service to (1) determine the eligibility of an applicant for those services within 7 days following the submission of a complete application, as specified, (2) provide service to an eligible person at any requested time on a particular day in response to a request for service made the previous day, and (3) allow a person who has been determined eligible by another transit operator to submit any proof of that eligibility electronically and, upon receipt of that information, to provide service to that person. Organization Position North County Watch Transit District

AB 1413 (Gloria D) Transportation: local transportation authorities: transactions and use taxes. Current Text: Introduced: 2/22/2019 html pdf Status: 3/14/2019-Referred to Com. on L. GOV. Location: 3/14/2019-A. L. GOV. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would authorize a local transportation authority to impose a tax applicable to only a portion of its county if 2/3 of the voters voting on the measure within the portion of the county to which the tax would apply vote to approve the tax, as specified, and other requirements are met, including that the revenues derived from the tax be spent within, or for the benefit of, the portion of the county to which the tax would apply. Organization Position North County Watch Transit District

AB 1442 (Rivas, Luz D) California Transportation Commission. Current Text: Introduced: 2/22/2019 html pdf Status: 3/14/2019-Referred to Com. on TRANS. Location: 3/14/2019-A. TRANS. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: In order to perform its duties and functions, existing law requires the California Transportation Commission to organize itself into at least 4 committees: (1) the Committee on Aeronautics, which shall consider issues related to aeronautics, (2) the Committee on Streets and Highways, which shall consider issues related to streets and highways, (3) the Committee on Mass Transportation, which shall consider issues related to the movement of groups of people within urban areas, and between rural communities and between cities, and (4) the Committee on Planning, which Page 6/11 shall be responsible for transportation planning issues, as specified. This bill would authorize rather than require the commission to organize itself into at least 4 committees. Organization Position North County Watch Transit District

AB 1457 (Reyes D) Omnitrans Transit District. Current Text: Introduced: 2/22/2019 html pdf Status: 3/14/2019-Referred to Coms. on L. GOV. and TRANS. Location: 3/14/2019-A. L. GOV. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would create the Omnitrans Transit District in the County of San Bernardino. The bill would provide that the jurisdiction of the district would initially include the Cities of Chino, Chino Hills, Colton, Fontana, Grand Terrace, Highland, Loma Linda, Montclair, Ontario, Rancho Cucamonga, Redlands, Rialto, San Bernardino, Upland, and Yucaipa, and specified portions of the unincorporated areas of the County of San Bernardino. The bill would authorize other cities in the County of San Bernardino to subsequently join the district. The bill would require the district to succeed to the rights and obligations of the existing Omnitrans Joint Powers Authority and would dissolve that authority. The bill would require the transfer of assets from the authority to the district. The bill would provide for a governing board composed of representatives of governing bodies within the county and would specify voting procedures for the taking of certain actions by the board. The bill would specify the powers and duties of the board and the district to operate transit services, and would authorize the district to seek voter approval of retail transactions and use tax measures and to issue revenue bonds. The bill would enact other related provisions. By imposing requirements on the district and affected local agencies, the bill would impose a state-mandated local program.This bill contains other existing laws. Organization Position North County Watch Transit District

AB 1536 (Gray D) Reinvestment in Infrastructure for a Sustainable and Equitable California (RISE) districts: standards. Current Text: Amended: 3/28/2019 html pdf Last Amend: 3/28/2019 Status: 4/1/2019-Re-referred to Com. on H. & C.D. Location: 3/28/2019-A. H. & C.D. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would, no later than November 30, 2020, require the Office of Planning and Research to develop standards for the formation of Reinvestment in Infrastructure for a Sustainable and Equitable California (RISE) districts. The bill would require that these standards encourage equitable development in location-efficient areas adjacent to public transit investments in passenger rail in order to refocus growth toward city centers while reducing greenhouse gas emissions and reinforcing community resilience. Organization Position North County Watch Transit District

AB 1543 (Holden D) Transportation funds: transit operators: fare revenues. Current Text: Introduced: 2/22/2019 html pdf Status: 3/14/2019-Referred to Com. on TRANS. Location: 3/14/2019-A. TRANS. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would require a fare paid pursuant to a reduced fare transit program to be counted as a full adult fare for purposes of calculating any required ratios of fare revenues to operating costs specified in the Transportation Development Act, except for purposes of providing information in a specified annual report to the Controller or providing information to the entity conducting a fiscal or performance audit pursuant to specified provisions. Organization Position North County Watch Transit District

AB 1560 (Friedman D) California Environmental Quality Act: transportation: major transit stop. Current Text: Introduced: 2/22/2019 html pdf Page 7/11 Status: 4/3/2019-In committee: Hearing postponed by committee. Location: 3/14/2019-A. NAT. RES. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: CEQA requires the Office of Planning and Research to prepare and propose guidelines for the implementation of CEQA by public agencies and the Secretary of the Natural Resources Agency to certify and adopt the guidelines. CEQA requires the office to propose revisions to the guidelines establishing criteria for determining the significance of transportation impacts of projects within transit priority areas to meet certain objectives. CEQA defines “transit priority area” as an area within 1/2 mile of a major transit stop. This bill would revise the definition of “major transit stop” to include a bus transit station, as defined, that is served by a local circulator or a local serving on-demand transit program. Organization Position North County Watch Transit District

AB 1717 (Friedman D) Transit-Oriented Affordable Housing Funding Program Act. Current Text: Amended: 3/28/2019 html pdf Last Amend: 3/28/2019 Status: 4/1/2019-Re-referred to Com. on H. & C.D. Location: 3/28/2019-A. H. & C.D. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would establish the Transit-Oriented Affordable Housing Funding Program, to be administered by the California Housing Finance Agency (CalHFA). The bill would authorize the city council of a city, or the board of supervisors of a city and county, to participate in the program by enactment of an ordinance establishing a transit-oriented affordable housing district, as provided. The bill would require that the city council or board of supervisors serve as the governing board of the district and, in that capacity, prepare and adopt a transit-oriented affordable housing financing plan. Organization Position North County Watch Transit District

AB 1778 (Boerner Horvath D) Greenhouse Gas Reduction Fund: investment plan. Current Text: Introduced: 2/22/2019 html pdf Status: 2/25/2019-Read first time. Location: 2/22/2019-A. PRINT Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: The California Global Warming Solutions Act of 2006 authorizes the State Air Resources Board to include use of market-based compliance mechanisms. Current law requires all moneys, except for fines and penalties, collected by the state board as part of a market-based compliance mechanism to be deposited in the Greenhouse Gas Reduction Fund and to be available upon appropriation. Current law requires the moneys from the fund to be used to facilitate the achievement of reductions of greenhouse gas emissions consistent with the act, as specified. This bill would make technical, nonsubstantive changes to those provisions. Organization Position North County Watch Transit District

AB 1785 (Boerner Horvath D) Pleadings: motion to strike. Current Text: Amended: 3/28/2019 html pdf Last Amend: 3/28/2019 Status: 4/1/2019-Re-referred to Com. on JUD. Location: 3/28/2019-A. JUD. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would permit a railroad owner or operator, or a government entity through which a railroad passes, to file a special motion to strike a cause of action seeking damages for an incident occurring in a portion of a railroad right-of-way open to the public. The court would be required to grant the special motion to strike unless the plaintiff establishes that there is a probability that the plaintiff will overcome all defenses asserted by the defendant and prevail on the claim. The bill would permit an appeal to be taken from an order granting or denying the special motion to strike. Organization Position Page 8/11 North County Watch Transit District

SB 4 (McGuire D) Housing. Current Text: Amended: 2/28/2019 html pdf Last Amend: 2/28/2019 Status: 4/4/2019-Set for hearing April 24. Location: 4/2/2019-S. GOV. & F. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would authorize a development proponent of a neighborhood multifamily project or eligible TOD project located on an eligible parcel to submit an application for a streamlined, ministerial approval process that is not subject to a conditional use permit. The bill would define a “neighborhood multifamily project” to mean a project to construct a multifamily unit of up to 2 residential dwelling units in a nonurban community, as defined, or up to 4 residential dwelling units in an urban community, as defined, that meets local height, setback, and lot coverage zoning requirements as they existed on July 1, 2019. The bill would define an “eligible TOD project” as a project located in an urban community, as defined, that meets specified height requirements, is located within 1/2 mile of an existing or planned transit station parcel or entrance, and meets other floor area ratio, density, parking, and zoning requirements. Organization Position North County Watch Transit District

SB 50 (Wiener D) Planning and zoning: housing development: incentives. Current Text: Amended: 3/11/2019 html pdf Last Amend: 3/11/2019 Status: 4/4/2019-Set for hearing April 24. Location: 4/2/2019-S. GOV. & F. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would require a city, county, or city and county to grant upon request an equitable communities incentive when a development proponent seeks and agrees to construct a residential development, as defined, that satisfies specified criteria, including, among other things, that the residential development is either a job-rich housing project or a transit-rich housing project, as those terms are defined; the site does not contain, or has not contained, housing occupied by tenants or accommodations withdrawn from rent or lease in accordance with specified law within specified time periods; and the residential development complies with specified additional requirements under existing law. Organization Position North County Watch Transit District

SB 127 (Wiener D) Transportation funding: active transportation: complete streets. Current Text: Introduced: 1/10/2019 html pdf Status: 1/24/2019-Referred to Com. on TRANS. Location: 1/24/2019-S. TRANS. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would establish a Division of Active Transportation within the Department of Transportation and require that an undersecretary of the Transportation Agency be assigned to give attention to active transportation program matters to guide progress toward meeting the department’s active transportation program goals and objectives. The bill would require the California Transportation Commission to give high priority to increasing safety for pedestrians and bicyclists and to the implementation of bicycle and pedestrian facilities. Organization Position North County Watch Transit District

SB 146 (Beall D) Peninsula Rail Transit District. Current Text: Introduced: 1/18/2019 html pdf Status: 4/4/2019-Read third time. Passed. (Ayes 36. Noes 0.) Ordered to the Assembly. In Assembly. Read first time. Held at Desk. Location: 4/4/2019-A. DESK

Page 9/11 Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Current law, operative under certain conditions, redesignates the Peninsula Corridor Study Joint Powers Board as the Peninsula Rail Transit District, comprised of 9 members appointed from various governing bodies situated in the City and County of San Francisco and the Counties of San Mateo and Santa Clara, with specified powers.This bill would repeal the provisions relating to the Peninsula Rail Transit District. Organization Position North County Watch Transit District

SB 336 (Dodd D) Transportation: fully-automated transit vehicles. Current Text: Introduced: 2/19/2019 html pdf Status: 4/2/2019-Set for hearing April 9. April 9 hearing postponed by committee. Location: 2/28/2019-S. TRANS. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Current law establishes regulations for the operation of an autonomous vehicle on public roads for testing purposes by a driver who possesses the proper class of license for the type of vehicle being operated if the manufacturer meets prescribed requirements. Current law imposes various requirements on transit operators.This bill would require a transit operator, as defined, to ensure each of its fully-automated transit vehicles, as defined, is staffed by at least one of its employees, who has had specified training, while the vehicle is in service. Organization Position North County Watch Transit District

SB 356 (McGuire D) North Coast Railroad Authority: rail right-of-way: Sonoma-Marin Area Rail Transit District. Current Text: Introduced: 2/19/2019 html pdf Status: 2/28/2019-Referred to Com. on TRANS. Location: 2/28/2019-S. TRANS. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would require the North Coast Railroad Authority, within 90 days of removing all of its debts, liabilities, and contractual obligations, to convey and transfer its rights, interests, privileges, and title, lien free, relating to a specified rail right-of-way, its licenses and certificates of public convenience and necessity, any common carrier obligations held by the authority or an associated freight operator, and the railroad assets the authority owns to the district. Organization Position North County Watch Transit District

SB 397 (Glazer D) Public transit operators: passengers with pets: evacuation orders. Current Text: Introduced: 2/20/2019 html pdf Status: 2/28/2019-Referred to Com. on TRANS. Location: 2/28/2019-S. TRANS. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would require each public transit operator to develop best practices for allowing pets on public transit vehicles serving areas subject to an evacuation order. If an evacuation order is issued that covers all or a portion of a public transit operator’s service area, the bill would require the operator to authorize passengers to board public transit vehicles with their pets in the area covered by the evacuation order, consistent with those best practices. Organization Position North County Watch Transit District

SB 498 (Hurtado D) Trade Corridors Improvement Fund: grant program: short-line railroads. Current Text: Amended: 4/1/2019 html pdf Last Amend: 4/1/2019 Status: 4/1/2019-From committee with author's amendments. Read second time and amended. Re- referred to Com. on RLS. Location: 2/21/2019-S. RLS. Page 10/11 Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would require the California Transportation Commission, with respect to specified funds resulting from TCIF program savings, to establish a competitive grant program to provide grants from those funds in the 2020–21 and 2021–22 fiscal years to short-line railroad operators, as defined, for railroad reconstruction, maintenance, upgrade, or replacement expenditures. The bill would require the commission to adopt guidelines, in consultation with representatives from specified government and industry entities, by July 1, 2020, to be used by the commission to select grant recipients. Organization Position North County Watch Transit District

SJR 5 (Beall D) California transportation infrastructure. Current Text: Amended: 3/13/2019 html pdf Last Amend: 3/13/2019 Status: 3/22/2019-Set for hearing April 9. Location: 3/20/2019-S. TRANS. Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf. Enrolled Vetoed Chaptered 1st House 2nd House Conc. Summary: Would urge the Congress and the President of the United States to (1) provide all federal resources promised to California and other states expeditiously and without delay, (2) work together to enact the robust bipartisan federal infrastructure legislation necessary to restore California’s and other states’ crumbling road and freight infrastructure, respond to growing traffic congestion, and increase investment in public transportation, most particularly, by expanding paratransit services for the elderly and those with special needs, and (3) address the shortfall in the federal Highway Trust Fund by restoring the lost purchasing power of the federal fuel tax, in order to provide the long-term funding stability necessary for California and other states. Organization Position North County Watch Transit District Total Measures: 39 Total Tracking Forms: 39

Page 11/11 Agenda Item # 2 RECEIVE THE MONTHLY TRANSIT OPERATIONS PERFORMANCE REPORT FOR FEBRUARY 2019

Time Sensitive: ☐ Consent: ☒

STAFF Receive the Monthly Transit Operations Report for February 2019. RECOMMENDATION:

BACKGROUND The Monthly Transit Operations Performance Report provides an overview of INFORMATION: NCTD’s performance trends by mode as they relate to budgeted goals for each month of the fiscal year. NCTD’s performance goals are developed as part of the annual operations budget development process.

The Monthly Transit Operations Performance Report is intended to provide performance reporting around key performance indicators without the detailed analysis of trends that are included within the Quarterly and Year-End Transit Operations Reports. The data contained in this report is unaudited and subject to change. Final and audited financial and performance results will be provided as part of NCTD’s Comprehensive Annual Financial Report. Attached to this report is a table that provides information on NCTD’s modal performance compared to the established goals, as well as a comparison to the previous fiscal year.

System-wide Ridership:

NCTD’s system-wide ridership totaled 776,379 in the month of February 2019, 3.18% below the monthly budgeted goal. System-wide average weekday ridership totaled 33,460, 2.44% below the budgeted goal. Average Saturday ridership totaled 15,082 and average Sunday ridership totaled 12,187. Average Saturday ridership was 7.62% below the budgeted goal and average Sunday ridership was 3.65% below the budgeted goal.

BREEZE / LIFT / FLEX:

BREEZE ridership totaled 472,070 for the month of February 2019, 3.69% below the budgeted goal. Average weekday ridership totaled 20,001; average Saturday ridership totaled 9,985; and average Sunday ridership totaled 8,031. Average Weekday, Saturday, and Sunday ridership was below the budgeted goals, 3.30%, 6.19%, and 5.26% respectively.

BREEZE boardings per revenue hour in February 2019 was 14.41, 0.47% above the budgeted goal of 14.34. On time performance for February 2019 was 89.27%, which is 0.81% below the budgeted goal. There was a total of fifty-one (51) mechanical failures in February, which exceeds the goal of no more than thirty- two (32) mechanical failures/month. NCTD’s contractor is currently increasing the number of engine and transmission rebuilds due to the age of the fleet; once this is complete, instances of mechanical failures are expected to decrease.

LIFT ridership totaled 12,855, 12.38% below the budgeted assumption. On-time performance for the month of February 2018 was 89.08%, 3.17% below the goal. Call response time (the average amount of time a customer waits from the time

April 18, 2019 Board Meeting Staff Report No.: 19-04-002 they select an option (reservations, cancellations, etc.) to the time they first speak to a representative) was 1:21, 32.50% above the goal of 2:00.

FLEX ridership totaled 2,580 in February 2019, 11.79% above the budgeted goal. On-time performance for FLEX was 99.37%, 4.60% above the goal.

COASTER / SPRINTER:

COASTER ridership totaled 92,132 for the month of February 2019, 4.37% below the budgeted goal. SPRINTER ridership totaled 196,742 in February 2019, 0.82% below the budgeted goal. On-time performance was 87.90% on COASTER and 97.90% on SPRINTER in the month of February 2019. COASTER on-time performance was 7.47% below the goal, while SPRINTER on-time performance was 0.10% below the goal. There were sixty-three (63) COASTER complaints received, of which more than fifty (50) were due to an incident on February 4, 2019, when COASTER Train 653 was terminated due to a mechanical issue. SPRINTER had seventeen (17) major mechanical failures in February 2019. NCTD’s contractor is currently overseeing SPRINTER mechanical component rebuilds; once complete, instances of mechanical failures are expected to decrease.

ATTACHMENT: 2A – Monthly Transit Operations Performance Report, February 2019

GOAL/STRATEGIC Accountability and Performance Management DIRECTION:

FISCAL IMPACT: This staff report has no fiscal impact.

COMMITTEE REVIEW: None

STAFF CONTACT: Damon Blythe, Chief Operations Officer-Transit Planning & Bus Operations E-mail: [email protected] Phone: 760-966-6708

April 18, 2019 Board Meeting Staff Report No.: 19-04-002 ATTACHMENT 2A

Transit Operations Performance Report - February 2019 External Factors Goal February 2019 Variance from Goal February 2018 Weekdays -- 20 -- 20 Saturdays -- 4 -- 4 Sundays -- 4 -- 4 Days of Inclement Weather -- 15 -- 5 Average Cost of Gallon of Gasoline** -- $3.28 -- $3.39

SYSTEM (All Modes) Goal February 2019 Variance from Goal February 2018

Total Boarding Riders 801,853 776,379 (3.18%) 843,162 Average Weekday Riders 34,298 33,460 (2.44%) 36,064 Average Saturday Riders 16,326 15,082 (7.62%) 17,626 Average Sunday Riders 12,649 12,187 (3.65%) 13,569

BREEZE Performance Goal February 2019 Variance from Goal February 2018

Total Boarding Riders 490,152 472,070 (3.69%) 515,949 Average Weekday Riders 20,684 20,001 (3.30%) 21,772 Average Saturday Riders 10,643 9,985 (6.19%) 11,204 Average Sunday Riders 8,476 8,031 (5.26%) 8,922 Boardings per Revenue Hour 14.34 14.41 0.47% 15.22 Percent of Scheduled Service Operated 99.98% 99.72% (0.26%) 99.90% Major Mechanical Failures 32 51 60.44% 38 Other Mechanical Failures 0 1 100.00% 3 Chargeable Accidents 4 6 34.83% 7 On-time Performance 90.00% 89.27% (0.81%) 88.84% Passenger Concerns 83 66 (20.48%) 86

LIFT Performance Goal February 2019 Variance from Goal February 2018

Total Riders 14,672 12,855 (12.38%) 14,672 Average Weekday Riders 651 572 (12.17%) 651 Average Saturday Riders 256 206 (19.28%) 256 Average Sunday Riders 157 148 (5.57%) 157 Passengers per Revenue Hour 1.59 1.94 21.89% 1.63 Passengers per Revenue Mile 0.10 0.11 0.78% 0.10 Accidents and Incidents 1 0 (100.00%) 2 On-Time Performance 92.00% 89.08% (3.17%) 91.50% Passenger Concerns 22 36 63.64% 35 Call Response Time (minutes) 2:00 1:21 (32.50%) 2:15 Average Length of Call (minutes) 2:00 2:52 43.33% 2:41 1-30 Minutes Past the 30-Minute Pick-Up Window 932 961 3.11% 971 31-60 Minutes Past the 30-Minute Pick-Up Window 64 42 (34.38%) 62 >60 Minutes Past the 30-Minute Pick-Up Window 32 5 (84.38%) 6

FLEX Performance Goal February 2019 Variance from Goal February 2018

Total Riders 2,308 2,580 11.79% 2,308 Average Weekday Riders 93 111 19.25% 93 Average Saturday Riders 45 44 (1.12%) 45 Average Sunday Riders 66 45 (32.08%) 66 Passengers per Revenue Hour 1.60 2.01 25.63% 1.49 Passengers per Revenue Mile 0.10 0.11 3.39% 0.10 On-time Performance 95.00% 99.37% 4.60% 98.78% Passenger Concerns 2 3 50.00% 1 Accidents and Incidents 0 0 - % 0 COASTER Performance Goal February 2019 Variance from Goal February 2018 Total Boarding Riders 96,343 92,132 (4.37%) 101,414 Average Weekday Riders 4,405 4,322 (1.88%) 4,637 Average Saturday Riders 1,301 1,022 (21.42%) 1,825 Average Sunday Riders 760 875 15.13% 1,067 Boardings per Revenue Hour 178.14 132.28 (25.74%) 202.02 Percent of Scheduled Service Operated 100.00% 98.57% (1.43%) 99.59% Major Mechanical Failures 1 1 - % 3 Other Mechanical Failures 0 0 - % 0 Chargeable Accidents 0 0 - % 0 On-time Performance 95.00% 87.90% (7.47%) 89.80% Passenger Concerns 7 63 800.00% 13 SPRINTER Performance Goal February 2019 Variance from Goal February 2018 Total Boarding Riders 198,378 196,742 (0.82%) 208,819 Average Weekday Riders 8,465 8,454 (0.12%) 8,910 Average Saturday Riders 4,082 3,825 (6.30%) 4,297 Average Sunday Riders 3,189 3,089 (3.16%) 3,357 Boardings per Revenue Hour 108.65 108.81 0.14% 115.58 Percent of Scheduled Service Operated 100.00% 99.78% (0.22%) 99.84% Major Mechanical Failures 1 17 1,600.00% 13 Other Mechanical Failures 0 5 500.00% 4 Chargeable Accidents 0 0 - % 0 On-time Performance 98.00% 97.90% (0.10%) 97.80% Passenger Concerns 10 8 (20.00%) 14 Agenda Item # 3 RECEIVE QUARTERLY REPORT OF CONTRACT ACTIONS ISSUED UNDER THE EXECUTIVE DIRECTOR'S AUTHORITY

Time Sensitive: ☐ Consent: ☒

STAFF Receive the quarterly report of contracts and/or contract modifications for the RECOMMENDATION: reporting period of January 1, 2019 to March 31, 2019, issued pursuant to the delegation of authority provided by the Board of Directors to the Executive Director in Board Policy No. 19.

BACKGROUND Pursuant to the North County Transit District’s (NCTD) Board of Directors (Board) INFORMATION: Policy No. 19, Delegation of Authority to the Executive Director, the Executive Director or his designee may:

• Amend a contract of any value consistent with the Board-adopted budget if the amendment does-not-exceed $50,000, singular or cumulative value, and if the amendment does not involve a major change in scope, unless the amendment costs are reimbursable by a third party and an agreement for reimbursement is in place, in which event, the amendment may be of any value. • Award a contract if the initial contract value does-not-exceed $100,000 and is consistent with the Board-adopted budget.

The Executive Director must:

• Report contract actions and amendments made in accordance with this authority to the Board of Directors on a quarterly basis.

The Executive Director has delegated authority for execution of contracts, following review and approval by General Counsel, to the Chief of Procurement and Contract Administration.

As provided in the FY19 Business Plan Initiatives, the Procurement and Contract Administration Division reports the following results for Key Performance Indicators for Quarter 1 as follows:

• The average number of days to post a solicitation from date of requisition approval was fifteen (15) days, well below the FY19 goal of thirty (30) calendar days. • Staff negotiated a total of $570,377.82 in cost savings and avoidance during the reporting period.

Staff recommends that the Board of Directors receive the quarterly report of contracts and/or contract modifications for the reporting period of January 1, 2019 to March 31, 2019, issued pursuant to the delegation of authority provided by the Board of Directors to the Executive Director in Board Policy No. 19.

ATTACHMENT: 3A – Original Commitments $100,000 in Value or Less and Change Order Commitments $50,000 in Value or Less (January 1, 2019 to March 31, 2019)

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-003

STRATEGIC Accountability and Performance Management DIRECTION:

FISCAL IMPACT: This staff report has no fiscal impact.

COMMITTEE REVIEW: None

STAFF CONTACT: Jennifer M. Taylor, Chief Procurement and Contract Administration Officer E-mail: [email protected] Phone: 760-967-2862

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-003 Original Commitments 100K in Value or Less and Change Order Commitments 50K in Value or Less January 1, 2019 to March 31, 2019

Order Number Original Order Change Order Vendor Name Description Amount Federal Funds Sole Source 18005 X Balfour Beatty Infrastructure, CP Song Equilateral Install $ 34,220.40 Y N 19017 X Downstream Services, Inc FWD1 - Sewage Lift Station Repair $ 598.20 Y N 19039 X Trovillion Inveiss & Demakis A WC Legal Fees $ 19,112.50 N N 19041 X STV Incorporated Task 1 - ZEB Infrastructure PSR $ 6.12 Y N 19042 X ESRI, Inc. ArcGIS Viewer License $ 3,100.00 N N 19043 X Floyd Skeren Manukian Langevin WC Legal Fees $ 19,112.50 N N 19045 X GCAP Services, Inc. DBE Goal Update/Shortfall $ 1,561.30 N N 31105 X McDougal Love Eckis Boehmer & FY19 Legal Services $ 4,424.75 N N 32673 X NEOGOV Online Recruitment Mgmt $ 3,425.00 N N 33737 X PlanetBids, Inc. Software Services $ 16,100.00 N N 33842 X US Bank/IMPAC Govt. Services TASCAM SanDisk $ 49.99 N N 33861 X Jefferson South Solutions, LLC Safety Culture Assessment $ 681.23 N N 33864 X US Bank/IMPAC Govt. Services Office Supplies $ 613.25 N N 33866 X US Bank/IMPAC Govt. Services Buffered Cable $ 2,000.00 N N 33867 X US Bank/IMPAC Govt. Services Supplies for GAO/Tremont move $ 79.80 N N 33868 X US Bank/IMPAC Govt. Services GearMage Software $ 299.99 N N 33869 X Datel Systems, Inc. Wireless Bridge at ETC $ 5,000.00 N N 33870 X US Bank/IMPAC Govt. Services iStockphoto Renewal $ 1,250.00 N N 33871 X NEB-CAL Printing COASTER Emerg. Evac. Brochure $ 1,658.00 N N 33872 X US Bank/IMPAC Govt. Services Office Supplies $ 725.63 N N 33873 X US Bank/IMPAC Govt. Services W2 Envelopes $ 51.70 N N 33874 X Access Professional, Inc. East Division Gate System $ 2,500.00 N N 33875 X US Bank/IMPAC Govt. Services Circuit Board $ 60.73 N N 33876 X US Bank/IMPAC Govt. Services Panel, Connector, Towelette, Patch $ 760.34 N N 33877 X US Bank/IMPAC Govt. Services Mouse, Adapter, Flash, Tape, Stand $ 2,015.82 N N 33878 X US Bank/IMPAC Govt. Services Digital Cameras (4) $ 221.97 N N 33879 X US Bank/IMPAC Govt. Services 2019 Legal Reference Books $ 1,233.72 N N 33880 X Datel Systems, Inc. Barracuda Web Application Firewall $ 8,945.02 N N 33881 X US Bank/IMPAC Govt. Services Office Supplies $ 434.10 N N 33883 X Zuza LIFT Brochure Updates $ 925.00 N N 33884 X US Bank/IMPAC Govt. Services Web hosting/PTC rail partners $ 250.00 N N 33885 X e-Builder, Inc. Option yr 3 of 5 License Fee $ 26,250.62 Y Y 33886 X US Bank/IMPAC Govt. Services Portable Radios $ 4,094.00 N N 33889 X US Bank/IMPAC Govt. Services MOW Tools $ 2,519.02 N N 33891 X EIS, Inc. DBA Genuine Cable Gr Exane Cable $ 2,882.40 N N 33892 X Dimensional Silk Screen, Inc. Decals $ 1,212.19 N N 33893 X Johnson Controls, Inc. HVAC Repair reversing valve $ 2,847.31 N N 33894 X US Bank/IMPAC Govt. Services Weather Guard Saddle Box $ 815.64 N N 33895 X Bay Alarm Company Burglar Alarm Monitoring GAO $ 1,396.68 N N 33896 X US Bank/IMPAC Govt. Services GoDaddy SSL Cert $ 349.99 N N 33897 X US Bank/IMPAC Govt. Services SIOS DataKeeper Support Renewa $ 4,776.42 N N 33898 X US Bank/IMPAC Govt. Services Office Supplies $ 1,195.28 N N 33899 X Minute Man Press San Marcos Customer Newsletter Winter $ 833.99 N N 33900 X US Bank/IMPAC Govt. Services Super Shuttle Reimbursement $ 139.94 N N 33901 X US Bank/IMPAC Govt. Services Misc PPE order $ 1,490.40 N N Original Commitments 100K in Value or Less and Change Order Commitments 50K in Value or Less January 1, 2019 to March 31, 2019

33902 X US Bank/IMPAC Govt. Services FY19 OmniStar PTC Utilities $ 1,375.00 N N 33903 X US Bank/IMPAC Govt. Services Office Supplies $ 751.30 N N 33905 X Johnson Controls, Inc. HVAC Troubleshoot -Thermostat $ 435.00 N N 33906 X US Bank/IMPAC Govt. Services Badge Reels $ 75.40 N N 33907 X US Bank/IMPAC Govt. Services SCUG Membership 2019 $ 250.00 N N 33908 X US Bank/IMPAC Govt. Services January Misc IT $ 2,142.15 N N 33912 X R&J Material Handling Inc. Forklift Purchase $ 42,198.45 Y N 33913 X Superior Wireless Consulting, Mobile Phones $ 29,161.43 Y N 33914 X US Bank/IMPAC Govt. Services CAPPO Membership Dues $ 1,040.00 N N 33915 X US Bank/IMPAC Govt. Services ID Ribbon and blank cards $ 509.40 N N 33916 X US Bank/IMPAC Govt. Services Standing Desk $ 995.00 N N 33917 X Johnson Controls, Inc. HVAC Service Call $ 378.10 N N 33918 X S & A Systems, Inc. FleetWatch License & Support $ 13,128.75 Y Y 33919 X US Bank/IMPAC Govt. Services Office Supplies $ 808.73 N N 33922 X InContact, Inc VPI Support and Maintenance $ 9,519.77 Y N 33923 X US Bank/IMPAC Govt. Services PPE-Safety Glasses and Shields $ 73.79 N N 33924 X Dimensional Silk Screen, Inc. Promotional Kiosk Poster $ 698.22 N N 33925 X Datel Systems, Inc. Lost & Found Cameras Install $ 1,500.00 N N 33926 X US Bank/IMPAC Govt. Services Flashlights and Charging Kit $ 269.80 N N 33927 X US Bank/IMPAC Govt. Services Toolbox $ 756.20 N N 33928 X Dimensional Silk Screen, Inc. COASTER Schedule Station Sign $ 448.00 N N 33929 X Carousel Industries of North A OpenDNS - Cisco Unbrella $ 4,745.51 N N 33930 X EIDIM Group, Inc. AV Equipment for Closed Session $ 4,703.11 Y N 33931 X Knot Technology Solutions LLC RFID System $ 61,031.76 Y N 33932 X US Bank/IMPAC Govt. Services Steel Wheel Gauge $ 340.43 N N 33933 X US Bank/IMPAC Govt. Services Cerberus Support Renewal $ 2,950.02 N N 33934 X US Bank/IMPAC Govt. Services Office Supplies $ 153.01 N N 33935 X US Bank/IMPAC Govt. Services Office Supplies $ 287.11 N N 33936 X Lewis Brisbois Bisgaard & Smit Handbook Review $ 3,000.00 N N 33938 X US Bank/IMPAC Govt. Services CA Municipal Law handbook $ 129.00 N N 33939 X US Bank/IMPAC Govt. Services Custom SQL Script Speedtrax $ 1,050.00 N N 33940 X US Bank/IMPAC Govt. Services VMWare Workstation ONE $ 2,989.35 N N 33941 X Singh Group, Inc. Tree Removal at CBV $ 950.00 N N 33942 X US Bank/IMPAC Govt. Services GoDaddy Cert for Webmail $ 169.99 N N 33943 X Global Power Group, Inc. Generator Maintenance $ 3,156.00 N N 33944 X US Bank/IMPAC Govt. Services XPR Portable Radios $ 4,725.41 N N 33945 X Lewis Brisbois Bisgaard & Smit General Legal Fees $ 50.00 N N 33946 X US Bank/IMPAC Govt. Services Motorola 800MHz Whip antennas $ 360.50 N N 33947 X KFY United Mechanical Contract AC Units for Signal Houses $ 41,467.91 Y N 33948 X US Bank/IMPAC Govt. Services Signs-Bus stop discontinued $ 592.63 N N 33949 X US Bank/IMPAC Govt. Services Office Supplies $ 894.33 N N 33950 X US Bank/IMPAC Govt. Services Mobotix Domes $ 147.00 N N 33951 X US Bank/IMPAC Govt. Services Windshield Tag $ 128.76 N N 33952 X US Bank/IMPAC Govt. Services Battery for HHU $ 242.93 N N 33953 X US Bank/IMPAC Govt. Services Thin Client $ 372.65 N N 33954 X Floyd Skeren Manukian Langevin WC Legal Fees $ 4,230.09 N N Original Commitments 100K in Value or Less and Change Order Commitments 50K in Value or Less January 1, 2019 to March 31, 2019

33955 X US Bank/IMPAC Govt. Services RTC Battery $ 22.46 N N 33956 X US Bank/IMPAC Govt. Services Toolkit keyboard mouse ties $ 124.59 N N 33957 X US Bank/IMPAC Govt. Services Office Supplies $ 1,039.76 N N 33958 X US Bank/IMPAC Govt. Services Flashlights & Charging Kits $ 674.50 N N 33959 X US Bank/IMPAC Govt. Services Code of Federal Regs - Books $ 144.00 N N 33960 X United Site Services of Califo Portable Restroom Rental $ 611.87 N N 33961 X US Bank/IMPAC Govt. Services KeeKit Key Lock Boxes $ 109.95 N N 33962 X US Bank/IMPAC Govt. Services Traffic Cones $ 261.43 N N 33963 X PTC-220, LLC Spectrum Maint/Access Fee $ 33,636.00 Y N 33964 X Multicard Systems Badge Pass Support Agreement $ 4,000.00 N N 33965 X InContact, Inc VPI Upgrade $ 21,040.00 Y N 33966 X Datel Systems, Inc. Ubiquiti link for replacement $ 300.70 N N 33967 X Minute Man Press San Marcos LIFT Customer Newsletter Spring $ 424.54 N N 33968 X SSS Hot Off the Press Blank Compass Cards $ 2,929.25 N N 33969 X US Bank/IMPAC Govt. Services Office Supplies $ 557.48 N N 32971 X KAAR Direct Mail & Fulfilment FY19 Rider Alerts $ 5,963.70 N N 33614 X SANDAG COASTER Train Wash Refurbish $ 21,957.70 Y N 33972 X Datel Systems, Inc. Wireless Link for East $ 4,804.68 Y N 33973 X Dimensional Silk Screen, Inc. COASTER Cutout $ 390.00 N N Agenda Item # 4 RECEIVE THE EXECUTIVE COMMITTEE CHAIR REPORT

Time Sensitive: ☒ Consent: ☒

STAFF Receive the Executive Committee Chair Report. RECOMMENDATION:

BACKGROUND On April 4, 2019 at 9:00 a.m. the Executive Committee met as scheduled with all INFORMATION: appointed members in attendance.

Attachments 4A – 4C provide summary information concerning the meetings and include presentations that were provided at the meetings.

ATTACHMENT(S): 4A –Executive Committee Chair Report

GOAL/STRATEGIC N/A DIRECTION:

FISCAL IMPACT: This staff report has no fiscal impact.

COMMITTEE REVIEW: None

STAFF CONTACT: Anthony Flores, Clerk of the Board E-mail: [email protected] Phone: 760-966-6553

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-004 ATTACHMENT 4A

Date: April 18, 2019 To: NCTD Board of Directors From: Karen L. Tucholski, Chief Administrative Officer Re: Executive Committee Meeting Summary of April 4, 2019

On April 4, 2019, Board Chair Kranz called the Executive Committee Meeting to order at 9:00 a.m. The following members were in attendance at the meeting: • Tony Kranz, Board Chair (City of Encinitas) • Jack Feller, Board Vice-Chair (City of Oceanside) • Sharon Jenkins, PAF Committee Vice-Chair (City of San Marcos) • Dave Druker, MSPBD Committee Chair (City of Del Mar)

1. Review Proposed FY2020 Budget Guidance from Executive Director: The Executive Director provided an overview of the budget process and presented key assumptions to support the development of the FY2020 Budget (Attachment No. 1). 2. Review Proposed FY2020 Strategic Areas of Focus and Divisional Goals: The Executive Director presented NCTD’s proposed FY2020 Business Plan Initiatives and Division Goals for discussion and further development (Attachment No. 2). 3. Discuss Board Policy No. 19, Delegation of Authority to the Executive Director and Executive Director Procurement Authority Staff reviewed existing delegation of contracting authority to the Executive Director authorized in Board Policy No. 19 and provided the business justification for proposed modifications in authority levels (Attachment No. 3). Board Chair Kranz adjourned the meeting at 10:43 a.m.

Attachment No. 1: FY2020 Budget Guidance PowerPoint Attachment No. 2: FY2020 Strategic Areas of Focus and Divisional Goals PowerPoint Attachment No. 3: Board Policy No. 19 Executive Director Procurement Authority PowerPoint ATTACHMENT NO. 1 TO AGENDA ITEM 4A

Proposed FY2020 Operating Budget Guidance from the Executive Director

Executive Committee April 4, 2019 Board Policy No. 17

• Accrual Basis: – Revenues are recognized when earned and realized, regardless of when actual payment is received. – Expenses are recognized when incurred, regardless of when they are actually paid. • Financial Principles: ➢ Adopt a balanced budget: Total revenue > = Total expenses ➢ Estimate revenues conservatively ➢ Plan expenses to support effective transportation; identify priority services; ensure fiscal stability ➢ Adopt a Capital Improvement Program (CIP) that is based on need and in accordance with the long-term capital program ➢ Use short-term and long-term debt appropriately, for valid business reasons, including temporary cash flow, emergency shortfall and urgent unfunded capital improvements.

2 Board Policy No. 17

• Responsibilities: – Chief Financial Officer (CFO): Planning, coordinating, analyzing, preparing, and issuing the budget. – Division Chiefs: Preparing and submitting each Division’s budget. – Executive Director: Responsible for making the final determination of the proposed budget to be submitted for approval to the Board of Directors. – Board of Directors: Adopting the annual budget • Budget Monitoring and Controls: – The Controller, Fiscal, Projects and Grants reviews and approves requisitions based on available funds. – Department Managers and Division Chiefs are responsible for reviewing Actual to Budget reports on a monthly basis. – Division Chiefs have the discretion to reapportion funds with its departments, but cannot exceed the total approved amount for the Division. – The Executive Director may transfer funds between Divisions but not exceed the total appropriated funds. 3 Board Policy No. 17

• Budget Document includes: – Ridership forecast – Service Implementation Plan – Operating Revenues and Expenses – Department budgets – Budgeted FTEs (Full-time equivalents) – 5-Year Operating Budget outlook – Allocation of federal, state and local funds – Preventive Maintenance Funding Plan – Capital Improvement Program – Business Plan initiatives – Low, Mid, and High-range Forecasts – Divisional goals – Classification and Compensation Schedule – Cost Recovery Fee Schedule – Service Implementation Plan – Disadvantaged Business Enterprise Goal

4 Budget Timeline – Phase II Context of FY2020 Budget Development

• National and NCTD Ridership Trends • State Funding • Federal Transportation and Passenger Rail Funding Levels: – Highway Trust Fund Short Fall • Economic Uncertainty • Operating Budget Pressure Points • Expectation of Improved and Increased Transit Services • State of Good Repair Needs

6 National Modal Ridership Trends

Rail & Demand Response Bus Ridership (000s) Ridership (000s) 6,000,000 600,000

5,500,000 500,000

5,000,000

400,000 4,500,000

4,000,000 300,000

3,500,000 200,000

3,000,000

100,000 2,500,000

2,000,000 0 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

Bus (000s) Commuter Rail Light Rail (000s) Demand Response (000s) (000s) NCTD Modal Ridership Trends

Rail & Demand Response Bus Ridership Ridership 10,000,000 5,000,000

9,000,000 4,500,000

8,000,000 4,000,000

7,000,000 3,500,000

6,000,000 3,000,000

5,000,000 2,500,000

4,000,000 2,000,000

3,000,000 1,500,000

2,000,000 1,000,000

1,000,000 500,000

0 0 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

BREEZE SPRINTER COASTER LIFT Local Funding State Funding

• State Transit Assistance: – Increased funding for existing formula funds – Created a new State of Good Repair program • Other program changes of SB1: – Created State Rail Assistance (transit), Solutions for Congested Corridors Program (transit eligible but mainly used for streets to date), and Local Partnership Program (transit eligible but primarily for streets) – Enhanced funding for Transit and Intercity Rail Capital Program

Program Funding Source Estimated Annual Revenue Eligible Uses Competitive or Formula

3.5 percentage points of Capital and operations for State Transit Assistance Program $250,000,000 Formula diesel sales tax increase transit only

State of good repair capital State Transit Assistance Program - State of Good Repair TIF $105,000,000 Formula projects for transit only

Capital and operating for: Even split for specific 0.5 percentage points of State Rail Assistance $44,000,000 ●50% intercity rail operators through FY 2020; diesel sales tax increase ●50% commuter rail TBD thereafter

Capital projects for transit Transit and Intercity Rail Capital Program TIF $300,000,000 Competitive only

Capital projects in congested Solutions for Congested Corridors Program TIF $250,000,000 Competitive corridors; transit is eligible

High need transportation Local Partnership Program Various $200,000,000 Both projects

= Existing program with expanded funding = New program created by SB1

10 SB1’s Impact on NCTD

Formula Programs

• SB1 significantly boosted STA funding to NCTD – Up 97.1% between FY 2017 and FY 2018, $14.0 with SB1 incremental amount planned to Estimated $12.0

purchase COASTER locomotives Millions $10.0 • SGR funding is a new source created by SB1 $8.0 – $1.6 million estimated to be allocated to $6.0 NCTD in FY 2020 $4.0 SB1 funding became available • Received $1.0 million through the Local Partnership $2.0 Program for FY 2019 $0.0 2012 2013 2014 2015 2016 2017 2018 2019 2020

State Transit Assistance State of Good Repair

Competitive Program Awards  Awarded $10.5 million over several years through the State Rail Assistance Program to contribute to replacement of five (5) locomotives for the COASTER

 TIRCP: Awarded $17.5 million for fencing and signal optimization projects and expecting to receive approximately $40.4 million over the next 10 years through an On-Time Performance (OTP) Incentive Agreement with LOSSAN

11 Public Transportation and Passenger Rail Funding Levels

$16.31 $16.03 16

$15.05 15 $14.81

$14.21 $14.03 $14.01 14 $13.45 $13.15 13

Billions of Dollars of Billions 12

11

10 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020

FAST Act Authorized Transportation Appropriations Acts

12 Highway Trust Fund Shortfall

FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 $50 $40 $28

$14

-$1 $0

-$17

-$35 -$50 -$53

-$73 Billions Billions Dollars of -$100 -$94

-$116

-$150 -$139

-$164

-$200

13 Economic Uncertainty 2009 Budget Outlook Sparked Changes to Business Model

2009 Budget Outlook $120 $105.9 $102.7 $99.3 Expenses $100 $89.9 $93.8 Revenue $80 $87.1 $82.1 83.5 $78.3 $80.3 $60 What happened? Local sales tax revenue* $40 down 20%, state raiding transit funds, and added costs for new light rail service $20 $4.6 $4.6 $4.6 $4.6 $4.6 Reserves

Millions of Dollars of Millions $0 -$2.8 -$20 -$15.6 Deficit -$19.0 -$20.6 -$22.4 -$40 FY 10 FY 11 FY 12 FY 13 FY 14

* From FY 2009 to FY 2011

15 Operating Budget Pressure Points

• Expenses: – CalPERS Unfunded Liability $2.5 million – SPRINTER Debt Payments $1.25 million – SPRINTER Debt Interest $876,000 – Consumer Price Index Increases • Implementation of Regulatory Requirements: – Positive Train Control Operations and Maintenance $3 million+ – Asset Management – Compliance Programs • Use of Net Asset: – Cash Flow for Capital Needs – Historic Use for Payment of SPRINTER Debt Principal Payments and CalPERS Unfunded Liability

16 Expectations of Improved and Increased Transit Services NCTD Capital Priorities

• Del Mar Bluffs Stabilization • Locomotive Replacements • Commuter Rail Car and Cab Replacement and Expansion • CNG Bus Replacements • Fare Collection System • Rose Canyon Bridge Replacement • SPRINTER Frequency Improvements

18 NCTD Capital Priorities

Need Investment $721. millionDel MarSupport Bluffs right-of- wayStabilization improvements, including construction of stabilization measures on the Del Mar Bluffs $56.32. Locomotivemillion State of good Replacements repair facilities projects and expansion to support zero emission buses $53 million Replacement and overhaul of COASTER Coach Cars and Cab Cars, including the replacement of 8 Coach Cars and 8 Cab Cars that have reached the end of their useful life and the overhaul of the remaining 10 Coach cars and 2 Cab Cars $48.6 million Replacement of BREEZE, FLEX, and LIFT buses that have reached the end of their useful life. This includes replacement CNG vehicles as well as Zero Emission Buses to comply with the California Air Resources Board ruling. $43.6 million Expansion of COASTER service to support regional plans requires 12 COASTER cars and 3 cabs $28.8 million Four additional locomotives for state of good repair and service expansion $14.8 million Design and construct new Maintenance of Way (MOW) and General Administrative Office (GAO) buildings $12.5 million Implementation of a new fare revenue system $2.6 million Non-revenue vehicle replacement to support operations and maintenance FY2020 Executive Director Budget Guidance • Increase Customer Ridership and Revenue • Maintain current service levels: – Implement pilot service improvements – Advance ADA Paratransit Productivity Improvements: • Implement 100% brokered nights, weekends, and off-peak service • Implement same day tax program • Optimize expenses: – Focus on areas where expenses can be reduced – Leverage current and future technology investments – Positive Train Control Project Transition to Operations and Maintenance • Fund State of Good Repair and Priority Capital Needs

20 FY2020 Executive Director Budget Guidance • Focus and Allocate Resources for Discretionary Grant Applications • Strategic Risk Taking to Improve Services By Using Net Assets: – Procure 2 Additional Locomotives – Seek funding for two new trainsets to improve frequencies in 2021/2022 • Prepare for potential economic downturn: – Staff will need to develop an expense and service reduction package given the lead time for approvals to implement

21 Committee Discussion and Direction

• The Board will need to provide policy direction to the Executive Director that considers: – Public Policy Goals and Expectation – Financial and Economic Considerations – Regulatory Environment • The Board of Directors is required to adopt the operating and capital budget on an annual basis that is balanced • All courses of action carry risks, rewards, and negative impact • FY2020 through 2024 timeframe is significantly important in shaping the future sustainability and prosperity of NCTD

22 Questions?

23 ATTACHMENT NO. 2 TO AGENDA ITEM 4A

Review Proposed FY 2020 Strategic Areas of Focus and Divisional Goals

Executive Committee April 4, 2019 NCTD Projects to Increase Transit Ridership

• Locomotive procurement for increased frequencies • Battery-electric bus pilot to meet state goals • On-demand rideshare pilot at Poinsettia COASTER station – Partnership with City of Carlsbad, SANDAG • Micromobility pilot at California State University San Marcos (CSUSM) SPRINTER station – Partnership with CSUSM, City of San Marcos, and SANDAG Key Studies to Increase Transit Ridership and Grant Funding

• Land Use and Transit Integration Study (LUTIS) – Coordination with local jurisdictions to develop a matrix of service options and recommendations for better integrating land use and transit • Strategic Multimodal Transit Implementation Plan – Builds upon the LUTIS to develop implementable service strategies for existing and future mobility services • Public Benefits Study – Demonstrates specific economic and environmental benefits to increased NCTD services Enhance the Customer Experience: NCTD Wayfinding Study & Master Plan

• Develop cohesive and comprehensive signage and wayfinding plan for all transit stations and stops • Helps solve first/last mile issue through: – Real Time Information – Clarity & ease of use – Connectivity – Community placemaking – Brand & image Improve Service Quality: Mobility Hub Pilot Programs

• Carlsbad Poinsettia Mobility Hub – Collaborative effort between the City of Carlsbad, NCTD, and SANDAG – Implement an on-demand rideshare program for COASTER commuters to Carlsbad businesses • CSUSM Mobility Hub – Collaborative effort between CSUSM, the City of San Marcos, NCTD, and SANDAG – Implement shared micromobility for CSUSM college students, staff, and faculty Revenue Vehicle Modernization and Upgrades • NCTD has procured five (5) new energy-efficient locomotives to replace existing locomotives – Plans to seek Board approval to advance procurement of two (2) additional replacement locomotives. Need two (2) additional locomotives for 30 minute headways in 2021/2022 • NCTD is included in a multi-agency procurement for rail cabs and cars – need eight (8) cabs in 2021/2022 for 30 minute headways. • NCTD is in the process of procuring six (6) battery- electric buses to use in a pilot Technology Upgrades

• Updated GoNCTD Website – Greater ease of use on both desktop and mobile – Improved trip planning functions • Customer Relationship Management software – Expanded communication solutions – Enhanced website service alerts and text alerts • Real-time Trip Information – Currently analyzing vendor options Technology Upgrades

• Next Generation Regional Fare Collection System – Streamlined regional fares will pave the way for new Regional Fare Collection System – Regional, account-based fare system will streamline regional fare architecture – Coordinating with MTS, California State Transportation Association (CalSTA), LOSSAN, and Metrolink Improved Service Frequencies in 2020/2021 • Regional Transportation Plan – Double tracking the coastal rail corridor to provide increased frequency on the COASTER by 2020 – Double tracking the SPRINTER rail line to support increased frequencies – Includes operating funds for 30 minute frequencies

• NCTD’s locomotive replacement will enable increased mid-day COASTER frequencies

• NCTD cannot implement 30 minute frequencies if SANDAG does not provide funding for two new trainsets 8 NCTD Capital Priorities

• Del Mar Bluffs Stabilization • Locomotive Replacements and Expansion • Commuter Rail Car and Cab Replacement and Expansion • CNG Bus Replacements • Fare Collection System • Rose Canyon Bridge Replacement • SPRINTER Frequency Improvements • Zero Emission Bus Procurement and Facilities Improvements Discretionary Grant Applications

• Anticipated Federal Programs: – Bus and Bus Infrastructure Program (FTA) – Low or No Emission Vehicle Program (FTA) – Transit Security Grant Program (FEMA) – Mobility on Demand Sandbox Program (FTA) – Consolidated Rail Infrastructure and Safety Improvements (FTA) – Better Utilizing Infrastructure to Leverage Development (USDOT) • Anticipated State Programs – Transit and Intercity Rail Capital Program (CalSTA) – Caltrans Transportation Planning Grants (Caltrans) Transit Oriented Development and Facility Projects • Solana Beach Transit Center Transit Oriented Development – Execute agreement with City of Solana Beach to advance project • Oceanside Transit Center Transit Oriented Development • Escondido Transit Center Transit Oriented Development • Signal and Maintenance of Way Building Construction – Currently leasing a facility • Re-construction of 810 Mission General Administration Building – Carlsbad Village Transit Center is most cost effective location due to parking availability Financial Health and Management

• Implement Indirect Cost Allocation Plan and Expanded Fee Schedule

• Advance Parking Management and Code of Conduct Citation Program

• Implement service improvement and cost efficiency program for LIFT ADA Paratransit – Same Day Taxi – Implement brokerage model for weekend and non-peak services Questions? ATTACHMENT NO. 3 TO AGENDA ITEM 4A

Discussion: Board Policy No. 19 Delegation of Authority to the Executive Director

Executive Committee April 4, 2019 Current Board Policy No. 19

The NCTD Board of Directors (Board) has adopted Board Policy No. 19, Delegation of Authority to the Executive Director, authorizing the Executive Director (ED) to award contracts and amend agreements as follows: • Award initial contracts up to $100,000 • Approve contract amendments up to $50,000 (singular or cumulative) unless amendment would increase the contract value over $100,000 • Award individual Task Order Agreements (TOA) up to $100,000 • The ED is required to report contract actions and modifications made in accordance with Board Policy No. 19 to the Board on a quarterly basis 1 Current Board Policy No. 19

• On February 21, 2019, the Board adopted Resolution 19-01 electing to participate in the State of California’s Uniform Public Construction Cost Accounting Act (Act). • The Act authorizes NCTD to contract for public projects of $200,000 or less by informal bid procedures. • Informal bid procedures include reduced bid times with no requirement to advertise in newspapers of general circulation.

2 Analysis of Board Policy No. 19

• With the authority currently provided in Board Policy No. 19, staff prepares many items for Board approval on an annual basis. For example, over the past two (2) years staff has prepared staff reports and related materials for Board consideration for approximately: – 70 Contract Awards – 35 TOAs – 38 Contract Modifications (Change Orders and Supplemental Agreements) • Many of these items are routine, required activities for continued operations such as: software licenses, facilities maintenance, and other routine business requirements.

3 Analysis of Board Policy No. 19

• The Board preparation cycle for each contract action takes approximately eight (8) weeks, and several hours of staff time on a monthly basis. • In many cases the contract did not exceed ED authority at the time of award, but subsequently the addition of a routine change order increased the total contract value above the ED’s authority requiring a stop in the work while staff sought the Board’s approval on the contract modification or a ratification by the Board. • Most procurement activity that NCTD conducts on a day-to-day basis far exceeds the current $100,000 threshold.

4 Analysis of Board Policy No. 19

• Staff conducted a survey of public agencies in San Diego County to determine contracting thresholds delegated to staff from the governing board. • The range for governing board approval is from $15,000 to $5,000,000 (Cities, County, School Districts, and Transit Agencies).

5 Proposed Revisions to Board Policy No. 19

To realize efficiencies in the procurement and Board approval processes, staff recommends amending Board Policy No. 19 as follows: • Authorize ED to award initial contracts up to $200,000 (this corresponds with the informal bid threshold authorized by the Act) • Amend contracts (change orders/supplemental agreements) up to $100,000 (singular or cumulative) • Award individual TOAs up to $200,000 • The ED would still be required to report all contract actions and modifications made in accordance with Board Policy No. 19 to the Board on a quarterly basis 6 Proposed Revisions to Board Policy No. 19

Current Proposed

New Contract $100,000 $200,000

Contract Amendment $50,000 $100,000

Task Order Agreement $100,000 $200,000

7 Next Steps

• If the Executive Committee supports the staff recommendation, staff will advance a recommendation to the full Board for consideration of the proposed changes to Board Policy No. 19 and request adoption of a Resolution in support at the April 18, 2019 Regular Board Meeting.

8 Questions?

9 Agenda Item # 5 AWARD AGREEMENT NO. 19046 TO ADK CONSULTING AND EXECUTIVE SEARCH FOR EXECUTIVE RECRUITMENT SERVICES

Time Sensitive: ☐ Consent: ☒

STAFF Award Agreement No. 19046 to ADK Consulting and Executive Search to provide RECOMMENDATION: Executive Recruitment Services, for a base period of three (3) years in an amount not-to-exceed $215,214, and further authorize the Executive Director to exercise two (2) optional one (1) year extension(s), if determined in the best interest of NCTD, in an amount not-to-exceed $186,278, for a total contract value not-to- exceed $401,492.

BACKGROUND As a multi-modal transit agency, the North County Transit District (NCTD) is INFORMATION: responsible for a wide range of operation, maintenance, administrative, and compliance functions which require specialized skill sets. In order to obtain the specific knowledge, skills, and abilities necessary to fulfill these obligations, the District must conduct extensive employment recruiting processes to find and hire qualified staff. Such recruitments are typically conducted by the Human Resources Department, but occasional assistance of a recruiting firm can aide in finding the necessary resources for hard-to-fill positions. Historically, NCTD has utilized such services for senior executive and/or “niche” industry positions.

On February 5, 2019, NCTD issued Request for Proposals (RFP) No. 27820R for Executive Recruitment Services. Notices were published in two (2) newspapers of general circulation and posted on Planetbids. The solicitation closed on March 8, 2019, with fourteen (14) proposals being received by the deadline. Eleven (11) proposals were deemed responsive and responsible, and were evaluated by the Source Selection Committee (SSC) in accordance with the following selection criteria:

• Technical Approach • Personnel and Qualifications • Proposed Staffing, Implementation, and Review Approach • Cost Proposal

A Best and Final Offer was requested on March 29, 2019, which resulted in firm fixed fees instead of fees based on a percentage of negotiated salaries. This strategy is intended to provide an overall savings to the agency over the term of the agreement. The SSC determined that ADK Consulting and Executive Search is the proposer offering the best overall value to the District. Under the terms of the proposed agreement, ADK Consulting and Executive Search will provide executive recruitment services to include the following:

• Conduct local, regional, and/or nationwide searches for individual positions • Review candidate qualifications and provide recommendations for personal interview by NCTD • Perform reference/background checks, and coordinate with NCTD to present offers and confirm acceptance

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-005 Staff recommends that the Board award Agreement No. 19046 to ADK Consulting and Executive Search to provide Executive Recruitment Services, for a base period of three (3) years in an amount not-to-exceed $215,214, and further authorize the Executive Director to exercise two (2) optional one (1) year extension(s), if determined in the best interest of NCTD, in an amount not-to- exceed $186,278, for a total not-to-exceed contract value of $401,492.

ATTACHMENT: None

GOAL/STRATEGIC Foster Human Resources and Organizational Development DIRECTION:

FISCAL IMPACT: The fiscal impact of this action is not-to-exceed $401,492. There is no fiscal impact for FY 2019 since there are no anticipated recruitments using these services during the current fiscal year. Future year costs will be budgeted in accounts 350.503xxx through the annual budgeting process.

COMMITTEE REVIEW: None

STAFF CONTACT: Karen L. Tucholski, Chief Administrative Officer E-mail: [email protected] Phone: 760-966-6574

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-005 Agenda Item # 6 AWARD AGREEMENT NO. 19044 TO CROWE LLP FOR A CUSTOMER RELATIONSHIP MANAGEMENT SOFTWARE SYSTEM AND MAINTENANCE SUPPORT

Time Sensitive: ☐ Consent: ☒

STAFF Award Agreement No. 19044 to Crowe LLP for the purchase, implementation and RECOMMENDATION: maintenance of a Customer Relationship Management software system and maintenance support for a base period of five (5) years in an amount not-to- exceed $724,125, and further authorize the Executive Director to exercise three (3) optional one (1) year extensions, if determined to be in the best interest of NCTD, in an amount not-to-exceed $276,600 for all three (3) years, and increase the agreement as-needed for pass through costs for Microsoft licenses in an amount not to exceed $147,782 for a total not-to-exceed amount of $1,148,507. BACKGROUND The North County Transit District (NCTD) offers public transit services that are a INFORMATION: vital part of San Diego’s regional transportation network, moving over 10 million passengers annually. Additionally, NCTD owns extensive property in San Diego County, including two railway lines. Proper communication with customers, stakeholders, and the general public is vital to NCTD’s overall mission.

Currently, NCTD utilizes an internally created MS Access database to log and track customer feedback (complaints, comments, and compliments). System functionality is extremely limited, lacks most of the features that are standard in modern software systems, and is not on par with industry standards for customer communications tools. Other forms of customer interaction are done on separate software systems which adds to the complexity of NCTD’s communications efforts with its customers and the public. To address these challenges and enhance the overall customer experience with NCTD, there is a need to purchase an integrated, scalable Customer Relationship Management (CRM) software system to merge the District’s current systems and manual processes into a consolidated platform supporting customer relationship management functions.

On June 11, 2018, NCTD issued Request for Proposals (RFP) No. 27580 for Customer Relationship Management System Software and Support. Notices were published in two (2) newspapers of general circulation and posted on Planetbids. The solicitation closed on August 13, 2018, with eight (8) proposals being received by the deadline. Seven (7) proposals were deemed responsive and responsible, and evaluated by the Source Selection Committee (SSC) in accordance with the following selection criteria:

• System Functionality • Maintenance Services • Company Background, Experience, and References • Implementation Methodology • Cost Proposal

In addition to evaluation by the SSC, NCTD engaged Intueor Consulting Inc., to perform a review of the SSC’s top-ranked software system via its on-call Technology Consulting Agreement for the purpose of validating system capabilities. The information provided by Intueor confirmed the proposed April 18, 2019 Board Meeting Staff Report No.: SR-19-04-006 functionality of the Microsoft Dynamics 365 product as presented by Crowe LLP (Crowe).

A Best and Final Offer was requested on February 5, 2019, which resulted in an overall reduction in the cost proposal and resultant cost savings of $6,400 from the original proposal. The SSC determined that Crowe is the proposer offering the best overall value to the District. Under the terms of the proposed agreement, Crowe will provide Customer Relationship Management Software and Support to include the following:

• A CRM software system and user licenses to track and monitor customer feedback, including implementation services • Functionality for customers and key stakeholders to receive service alerts via text messaging • Functionality to support tracking and monitoring Lost and Found items on- board NCTD vehicles and on NCTD property; tracking customer activity and approvals related to refund requests; and tracking customer activity related to Public Records Requests • Training for NCTD staff to include Basic Administrator and End User training, as well as customized training manuals • CRM System Maintenance (Routine and Emergency)

Staff recommends that the Board award Agreement No. 19044 to Crowe LLP for the purchase, implementation and maintenance of a Customer Relationship Management software system and maintenance support for a base period of five (5) years in an amount not-to-exceed $724,125, and further authorize the Executive Director to exercise three (3) optional one (1) year extensions, if determined to be in the best interest of NCTD, in an amount not-to-exceed $276,600 for all three (3) years and increase the agreement as-needed for pass through costs for Microsoft licenses in an amount not-to-exceed $147,782, for a total not-to-exceed amount of $1,148,507.

ATTACHMENT: None

GOAL/STRATEGIC Enhance Customer Service, Improve Service Quality, and Increase Ridership DIRECTION:

FISCAL IMPACT: The total fiscal impact of this proposed contract action is an amount not-to-exceed $1,148,507 if all option years are exercised. The capital cost of this proposed contract action is $355,147 and is funded with Federal Transit Administration (FTA) and local matching Transportation Development Act (TDA) funds in project account 118001, which has a total budget of $492,369. If the Board approves the recommendation action, the available balance in project account 118001 will be reduced to $34,638. The operating fiscal impact of this action is $793,360, which will be budgeted in future fiscal years operating budgets development cycles as required.

COMMITTEE REVIEW: None

STAFF CONTACT: Karen L. Tucholski, Chief Administrative Officer E-mail: [email protected] Phone: 760-966-6574

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-006 Agenda Item # REVISED 7 AWARD AGREEMENTS FOR TEMPORARY STAFFING SERVICES

Time Sensitive: ☐ Consent: ☒

STAFF Award agreements for temporary staffing services for a base period of three (3) RECOMMENDATION: years in an aggregate amount not-to-exceed $1,800,000, and further authorize the Executive Director to exercise one (1) optional two (2) year extension, if determined in the best interest of NCTD, in an aggregate amount not-to-exceed $600,000 annually, for a total aggregate agreement value not-to-exceed $3,000,000.

BACKGROUND As a multi-modal transit agency, the North County Transit District (NCTD) is INFORMATION: responsible for a wide range of operation, maintenance, administrative, and compliance functions that support effective and efficient operation of our vital public transit services. From time-to-time NCTD has the need to utilize temporary staffing services in an administrative capacity to ensure operational continuity. NCTD uses temporary employees to cover staffing shortfalls that include such situations as leaves of absence, extended position vacancies, periods of unusually high workload, and additional staffing for special projects. The costs for these temporary staffing services are typically offset by funds in the operating budget for staff salaries and benefits which are available due to vacancy or other unpaid leave, resulting in no negative fiscal impact.

On January 18, 2019, NCTD issued Request for Proposals (RFP) No. 28140 for Temporary Staffing Services. Proposals were accepted for jobs in three (3) independent categories: Administrative, Finance, and Information Technology. Proposers had the option of responding to a single category, or multiple categories. Notices were published in two (2) newspapers of general circulation and posted on Planetbids. The solicitation closed on February 20, 2019, with nineteen (19) proposals being received by the deadline; four (4) of the proposals were deemed non-responsive. Sixteen (16)The fifteen (15) of the proposals were deemed responsive and responsible, and were evaluated by the Source Selection Committee (SSC) in accordance with the following selection criteria:

• Technical Approach • Personnel and Qualifications • Proposed Staffing, Implementation, and Review Approach • Cost Proposal

The SSC evaluated and qualified four (4) proposers. A Best and Final Offer was requested from each of the four (4) proposers on March 15, 2019, which resulted in fixed rates inclusive of planned increases to California’s minimum wage. The four companies recommended for contract award are:

1. Manpower – Administrative Staffing 2. HB Staffing – Administrative Staffing 3. Infojini, Inc. – Finance Staffing 4. SoftHQ – Information Technology Staffing

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-007 The proposed agreements for the above firms have a combined aggregate amount not-to-exceed $600,000 annually. In the prior two fiscal years (FY 2017 and FY2018), NCTD utilized approximately $300,000 annually in temporary staffing services. While NCTD does not anticipate needing the full $600,000 aggregate annual amount, the District must also account for the reality that neither the specific volume of temporary staffing services nor the job classifications to be filled is predictable from year-to-year. For example, during FY 2018 the range of temporary staffing needs included the following positions: Customer Service Assistant, Administrative Assistant, Right-of-Way Coordinator, Senior Systems Engineer, and Accountant. Therefore, the annual aggregate amounts have been divided up among the four firms with appropriate individual agreement amounts to ensure that adequate resources are available to support any needed services during the proposed agreement term.

On February 25, 2019, LA Business Personnel, Inc. requested a reconsideration of the non-responsiveness determination. Following a thorough review of the evidence presented, NCTD determined that the protest was without merit and provided a written response with instructions on how LA Business Personnel, Inc. could submit an appeal by March 29, 2019. No appeal was received by the deadline and the matter was deemed resolved.

On April 10, 2019, after the Notice of Intent to Award was issued, Beatty’s Services Inc. inquired of staff as to why they were not selected for award. A copy of the non-responsive letter was re-sent to them with an invitation for a debrief. It is staff’s understanding that Beatty’s Services, Inc. contends that they were not selected for award due to an act of discrimination as it is a minority-owned business. Beatty’s Services, In. has provided no evidence to substantiate this claim and no formal protest letter was received. Staff evaluated Beatty’s Services, Inc.’s protest of award and determined that it lacks merit and should not impact the Board’s ability to consider this matter today.

Staff For the foregoing reasons, staff recommends that the Board award agreements for temporary staffing services, for a base period of three (3) years in an aggregate amount not-to-exceed $1,800,000, and further authorize the Executive Director to exercise one (1) optional two (2) year extension, if determined in the best interest of NCTD, in an aggregate amount not-to-exceed $600,000 annually, for a total aggregate contract value not-to-exceed $3,000,000.

ATTACHMENT: None

GOAL/STRATEGIC Foster Human Resources and Organizational Development DIRECTION:

FISCAL IMPACT: The fiscal impact of this action is not-to-exceed $3,000,000. Salaries and benefits are budgeted in the annual operating budget in accounts xxx.501xxx and xxx.502xxx and are funded with local operating funds, unless associated with capital projects or preventive maintenance activities, which may be funded with Federal Transit Administration (FTA) and other federal, state, and local funds. The fiscal impact for FY 2019 will be determined as temporary staffing is needed and the costs will be offset by the budgeted amounts in accounts xxx.501xxx and xxx.502xxx. Future year costs will be budgeted in the annual budgeting process as required.

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-007 COMMITTEE REVIEW: None

STAFF CONTACT: Karen L. Tucholski, Chief Administrative Officer E-mail: [email protected] Phone: 760-966-6574

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-007 Agenda Item # 8 SET PUBLIC HEARING FOR JUNE 20, 2019 FOR CONSIDERATION OF ADOPTION OF THE FY2020 OPERATING BUDGET AND FY2020- 2024 CAPITAL IMPROVEMENT PLAN AND AUTHORIZE CERTAIN RELATED ACTIONS

Time Sensitive: ☒ Consent: ☒

STAFF Staff recommends that the North County Transit District’s Board of Directors: RECOMMENDATION: 1) Set a public hearing for June 20, 2019 for consideration of adoption of the FY2020 Operating Budget; and 2) Authorize staff to execute the following actions related to the FY2020 Operating Budget and FY2020-FY2024 Capital Improvement Plan in accordance with the State of California Public Utilities Code §125106: a. Publish notice no later than May 16, 2019 that the North County Transit District will hold a public hearing on June 20, 2019 related to the consideration for adoption of the FY2020 Operating Budget and FY2020-FY2024 Capital Improvement Plan; and b. Receive and consider public comment; and c. Release the FY2020 Operating Budget and FY2020-FY2024 Capital Improvement Plan documents for public review and comment no later than June 5, 2019. BACKGROUND The North County Transit District is developing the proposed FY2020 Operating INFORMATION: Budget and FY2020-FY2024 Capital Improvement Plan in accordance with Board of Directors (Board) Policy No. 17, Budget Development. In addition to the proposed budget document, the following items will accompany the release of the FY2020 budget for public review and comment:

A. Classification and Compensation Schedule. The proposed operating budget includes the District Classification and Compensation Schedule, a condensed structure that aligns job categories with marketplace compensation, and offers flexibility for future staffing requirements. B. Right-of-Way (ROW) Cost Recovery Fee Schedule. Staff has updated the ROW Cost Recovery Fee Schedule to reflect current costs of providing certain services. The District owns and/or maintains a considerable amount of real estate, including eighty-two (82) miles of rail right-of-way on the coastal and inland corridors. Other entities often have needs to conduct business on District property. The ROW Cost Recovery Fee Schedule identifies the costs an outside entity is charged for conducting business on District property. C. Disadvantaged Business Enterprise (DBE) Goal. The District’s overall DBE Goal for the three (3) -year Federal Fiscal Year goal period of 2017- 2019 (October 1, 2016 through September 30, 2019), pursuant to Title 49 Code of Federal Regulations Part 26 — Participation by Disadvantaged Business Enterprises in U.S. Department of Transportation Programs is a race-neutral 4.6%, which was concurred with the Federal Transit Administration on October 20, 2016.

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-008 D. FY2020-FY2029 Comprehensive Strategic, Operating and Capital Plan. The Comprehensive Strategic, Operating and Capital Plan (Comprehensive Plan) is the District’s short-range transit and strategic business plan which ties short-range planning with operating and capital budgeting. The Comprehensive Plan incorporates key District business initiatives, the Service Implementation Plan and service standards, an economic-based contingency plan, and the five-year operating and capital budgets for low-, mid-, and high-revenue forecasts. • Service Implementation Plan. The Service Implementation Plan provides the level of service provided by the District's transit system, which is used to support the budgeted cost associated with planned service levels. The Service Implementation Plan is included as a section within the FY2020-FY2029 Comprehensive Strategic, Operating and Capital Plan document.

Staff recommends that the North County Transit District’s Board of Directors: 1) Set a public hearing for June 20, 2019 for consideration of adoption of the FY2020 Operating Budget and FY2020-FY2024 Capital Improvement Plan; and 2) Authorize staff to execute the following actions related to the FY2020 Operating Budget and FY2020-FY2024 Capital Improvement Plan in accordance with the State of California Public Utilities Code §125106: a. Publish notice no later than May 16, 2019 that the North County Transit District will hold a public hearing on June 20, 2019 related to the consideration for adoption of the FY2020 Operating Budget and FY2020-FY2024 Capital Improvement Plan; and b. Receive and consider public comment; and c. Release the FY2020 Operating Budget and FY2020-FY2024 Capital Improvement Plan documents for public review and comment no later than June 5, 2019.

ATTACHMENT: None

GOAL/STRATEGIC Improve Financial Health DIRECTION:

FISCAL IMPACT: This staff report has no fiscal impact.

COMMITTEE REVIEW: None

STAFF CONTACT: Eun Park-Lynch, Chief Financial Officer E-mail: [email protected] Phone: 760-967-2858

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-008 Agenda Item # 9 AWARD AGREEMENT NO. 19047 TO VAVRINEK, TRINE, DAY AND COMPANY, LLP FOR FINANCIAL AUDIT SERVICES

Time Sensitive: ☐ Consent: ☒

STAFF Award Agreement No. 19047 to Vavrinek, Trine, Day and Company, LLP for RECOMMENDATION: Financial Audit Services for a period of five (5) years in an amount not-to-exceed $317,500.

The North County Transit District (NCTD) is required to undergo financial audits BACKGROUND to comply with federal and state regulations. On May 16, 2013, NCTD’s Board of INFORMATION: Directors awarded a five (5)-year contract for financial audit services to Macias, Gini & O’Connell LLP (MGO) for FY2013-FY2017. The contract was extended for an additional year for the audit of FY2018 due to special operational circumstances. With the conclusion of the agreement with MGO, NCTD is seeking a firm to provide financial audit services for FY2019-FY2023 as follows:

a) Perform an annual financial audit of the financial statements with appropriate note disclosures to ensure that the financial statements prepared by staff are in accordance with Generally Accepted Accounting Principles (GAAP) and should include the Statements of Net Position, the Statements of Revenues, Expenses and Changes in Net Position, the Statements of Cash Flows, the Notes to the Basic Financial Statements, and Required Supplementary Information for each fiscal year ending June 30th. b) Prepare a separate audit report under the Single Audit Act to meet Federal Department of Transportation (DOT) Inspector General Audit requirements on grants by recipient organizations under (Office of Management and Budget) OMB Circular A-133. c) Perform Transportation Development Act (TDA) audits and prepare a separate audit report to indicate the District’s compliance, as outlined in Title 21, Division 3, Chapter 2, Article 5.5, Section 6664 and 6667 of the California Administrative Code, in relation to the expenditure of funds allocated under Article 4.0 and Article 4.5 of the Transportation Development Act laws, rules, regulations and the allocation instructions of the San Diego Association of Governments (SANDAG). In order to meet the requirements of SANDAG, the audit report must meet or exceed the requirements of Section 99245 of the California Public Utilities Code. c.) Prepare a separate Independent Accountant’s Report on Applying Agreed-Upon Procedures to indicate the District’s compliance with the requirements of the Federal Transit Administrator National Transit Database Uniform System of Accounts and Records and Reporting System (NTD Report); as specified in 49 CFR Part 630, Federal Register, January 15, 1993, and as presented in the respective year Reporting Manual.

d.) Prepare a separate audit report, to include in the audited CAFR (Item 2.a) in accordance with the Transportation Development Act (TDA)

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-009 PUC Section 99245 that meets District compliance requirements under Public Transportation Modernization Improvement and Service Enhancement Account (PTMISEA) bond funding requirements. e.) Make presentations of the audited financial statements to the NCTD Performance, Administration and Finance Committee and the Board of Directors, as necessary. f.) Review the Comprehensive Annual Financial Report (CAFR), which includes Management’s Discussion and Analysis, the Audited Financial Statements, and Statistical Information

On February 8, 2019, NCTD issued Request for Proposal (RFP) No. 28190 to provide financial audit services for FY2019-FY2023. Notices were published in two (2) newspapers of general circulation and posted on PlanetBids. The solicitation closed on March 11, 2019, with four (4) proposals being received by the deadline. All four (4) proposals were deemed responsive and responsible, and evaluated by the Source Selection Committee (SSC) in accordance with the following selection criteria:

• Technical Approach • Personnel and Qualifications • Proposed Staffing, Implementation, and Review Approach • Cost Proposal

A best and final offer (BAFO) was requested on April 8, 2019, which resulted in an overall reduction of Vavrinek, Trine, Day and Company, LLP’s (VTD)’s cost proposal and resultant cost savings of $11,426 from the original proposal. The SSC concluded that VTD was the highest-ranking firm and determined its BAFO provides NCTD with the best overall value. VTD’s BAFO was under NCTD’s independent cost estimate (ICE) that was completed by staff prior to the solicitation and therefore staff has determined the proposal to be fair and reasonable.

Staff recommends that the Board award Agreement No. 19047 to VTD for financial audit services for a period of five (5) years in an amount not-to-exceed $317,500.

ATTACHMENT: None

GOAL/STRATEGIC Legal, Regulatory and Policy Compliance DIRECTION:

FISCAL IMPACT: The total fiscal impact of this proposed contract action is $317,500 over the course of five (5) years. The fiscal impact for FY2019 is estimated to be $17,941 for interim audit work, which is funded with local operating funds in accounts 340.50311x, which collectively have an FY2019 total budget of $209,750. If the Board of Directors approves this proposed contract action, the balance available in accounts 340.50311x will be reduced to $70,738. Future years expenses will be budgeted accordingly through the annual operating budget process.

COMMITTEE REVIEW: None

STAFF CONTACT: Eun Park-Lynch, Chief Financial Officer E-mail: [email protected] Phone: 760-967-2858

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-009 Agenda Item # 10 AWARD PURCHASE ORDER NO. 33982 TO AUTOLIFT SERVICES, INC. FOR THE PURCHASE OF PORTABLE LIFTS

Time Sensitive: ☐ Consent: ☒

STAFF Award Purchase Order No. 33982 to Autolift Services, Inc. for the purchase of RECOMMENDATION: portable lifts to support bus and SPRINTER operations in an amount not-to- exceed $336,392.

BACKGROUND The North County Transit District (NCTD) has three (3) sets of four (4) mobile INFORMATION: column bus lifts that are beyond their useful service life and require replacement. These lifts are required to perform preventative and reactive maintenance activities at the BREEZE Maintenance Facilities.

SPRINTER also has an existing set of jacks that are utilized for maintenance of the SPRINTER fleet at the SPRINTER Operations Facility (SOF). To reduce the downtime for projects and allow parallel execution of the planned maintenance, a second set of eight (8) lifting jacks is required.

On February 14, 2019, NCTD issued Invitation for Bid (IFB) No. 28241 for the purchase of bus and SPRINTER Portable Lifts. Notices were published in two (2) newspapers of general circulation and posted on PlanetBids. Eight (8) bids were received by the March 20, 2019 deadline and two (2) were deemed responsive and responsible. A summary of the responsive and responsible bids are as follows:

Bidder Name Base Bid Optional Grant Total Bid SPRINTER lifts

Autolift Services, Inc. $71,791.75 $264,600 $336,391.75

Western Pump, Inc. $116,875.90 No Bid $116,875.90

Following the bid analysis, it was determined that Autolift Services, Inc. provided the lowest, responsive and responsible bid. Autolift Services, Inc.’s bid was over NCTD’s independent cost estimate (ICE) that was completed by staff prior to the solicitation. The variance between the ICE and the Bid was primarily due to the Buy America provision not factored into the estimate for the SPRINTER lifts. Following review, staff has deemed the bid to be fair and reasonable.

Staff recommends that the NCTD’s Board of Directors award Purchase Order No. 33982 to Autolift Services, Inc. for the purchase of portable lifts to support bus and SPRINTER operations in an amount not-to-exceed $336,392.

ATTACHMENT: None

GOAL/STRATEGIC Asset Management and State of Good Repair DIRECTION:

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-010 FISCAL IMPACT: The fiscal impact of this proposed contract action is $336,392. The bus lifts will be funded with Federal Transit Administration (FTA) and local matching Transportation Development Act (TDA) funds in project 119020, which has a total budget of $250,000. The SPRINTER lifts will be funded with Federal Transit Administration (FTA) and local matching State Transit Assistance (STA) funds in project 619010, which has a total budget of $264,601. If the Board of Directors approves this proposed contract action, the balance available in project 119020 will be reduced to $171,222 and the balance available in project 619010 will be reduced to $1.

COMMITTEE REVIEW: None

STAFF CONTACT: Tracey Foster, Chief Development Officer E-mail: [email protected] Phone: 760-966-6674

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-010 Agenda Item # 11 APPROVE AMENDED AND RESTATED EMPLOYMENT AGREEMENT BETWEEN NCTD AND GENERAL COUNSEL

Time Sensitive: ☒ Consent: ☐

STAFF Approve the Amended and Restated Employment Agreement Between the North RECOMMENDATION: County Transit District (NCTD) and General Counsel based on results of the annual performance evaluation conducted by the Board of Directors to address compensation and update other terms and conditions of the agreement.

BACKGROUND General Counsel is engaged via an Employment Agreement with NCTD that is INFORMATION: approved by the Board of Directors (Board). Per the requirements therein, the Board conducts an annual performance evaluation based upon established goals. The following goals were established for the FY2019 review period:

Goal No. 1 – Comprehensive System Review Goal No. 2 – Continue Fostering a Culture of Compliance Goal No. 3 – General Counsel/Board Partnership Goal No. 4 – Advancement of Key Projects

Pursuant to General Counsel’s employment agreement, the Executive Director reviewed General Counsel’s performance in achieving the aforementioned goals and provided feedback to the Board. The Executive Committee of the Board met in Closed Session, pursuant to Government Code § 54957.6, on March 5, 2019, to evaluate General Counsel’s performance for this rating period and determined that General Counsel’s performance exceeded expectations relative to the requirements for the above-referenced goals and requested that the Board Chair and Vice-Chair meet with General Counsel to negotiate a new extended agreement.

Subsequently, the full Board met in Closed Session, pursuant to Government Code § 54957.6, on March 21, 2019, to review the Executive Committee recommendations. Following deliberation and discussion, the Board of Directors collectively recommend the following:

1. Overall Evaluation Rating: Exceeded Expectations 2. Based on the assessment and pursuant to the current employment agreement, increase General Counsel’s annual salary from $214,120.08 to $220,755.86, effective April 8, 2019. 3. Thereafter, based on satisfactory performance, increase General Counsel’s annual salary per the schedule below: a. April 8, 2020: $250,000 b. April 8, 2021: Cost of Living Adjustment (COLA) c. April 8, 2022: COLA d. April 8, 2023: COLA e. April 8, 2024: COLA

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-011 4. Award a merit-based performance enhancement payment effective as of April 8, 2019 in the amount of $10,000, which will be made as a contribution to General Counsel’s 401(a) Retirement Plan account. 5. Amend Section II.D. Benefits as follows: a. Effective April 8, 2020, the annual Board contribution to General Counsel’s 401(a) Retirement Plan account will increase from $10,000 to $20,000.

The draft Amended and Restated Employment Agreement Between NCTD and General Counsel captures the proposed recommendation and updates formatting of the benefits overview to maintain consistency with the standard management benefits package as per Section II.D. of the Employment Agreement.

Based on the foregoing, it is recommended that the Board of Directors approve the Amended and Restated Employment Agreement Between NCTD and General Counsel based on results of the annual performance evaluation conducted by the Board of Directors to address compensation and update other terms and conditions of the agreement.

ATTACHMENT: 11A – Draft Redline Amended and Restated Employment Agreement Between NCTD and General Counsel 11B – Draft Clean Amended and Restated Employment Agreement Between NCTD and General Counsel

GOAL/STRATEGIC N/A DIRECTION:

FISCAL IMPACT: The FY2019 impact of this proposed Board action is approximately $12,000, which is funded by non-federal monies in the salary and wages, and employee benefits accounts of the District's General Counsel Division. These accounts have a combined FY2019 budget of $963,460, which is sufficient to support this Board action. Future years' salary and wages and employee benefits will be allotted as needed through the annual operating budget development process.

COMMITTEE REVIEW: Executive Committee Date: March 5, 2019

STAFF CONTACT: Karen L. Tucholski, Chief Administrative Officer E-mail: [email protected] Phone: 760-966-6574

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-011

AMENDED AND RESTATED EMPLOYMENT AGREEMENT BETWEEN THE NORTH COUNTY TRANSIT DISTRICT AND LORI A. WINFREE

This AMENDED AND RETSTATED EMPLOYMENT AGREEMENT (hereinafter “Amended and Restated Employment Agreement”) is made as of the 18th day of April 2019 (“Effective Date”), by and between the NORTH COUNTY TRANSIT DISTRICT (hereinafter “NCTD”) a governmental entity as employer, and Lori A. Winfree (hereinafter “WINFREE”) an individual as employee, who hereby agree as follows:

I. RECITALS

A. NCTD is a governmental entity existing pursuant to California Public Utilities Code Section 125000 et. seq., having the powers and duties therein specified and generally responsible for public transit services within North San Diego County.

B. WINFREE was selected by the NCTD Board of Directors (hereinafter “the Board”) to serve as NCTD’s General Counsel, after a nationwide search on February 26, 2013.

C. The parties entered into an initial Employment Agreement effective April 8, 2013 (“Agreement”). The parties subsequently amended the Agreement by approval of the Board as follows: First Amended Agreement (effective September 30, 2014); Second Amended Agreement (effective December 17, 2015); Third Amended Agreement (effective May 18, 2017); and a Fourth Amended Agreement (effective May 17, 2018).

D. Additionally, on December 20, 2018, the parties entered into a Supplemental Agreement to amend Exhibit A – NCTD Benefits Overview (“Supplemental Agreement”).

E. The parties now desire to incorporate all amendments and the Supplemental Agreement by way of this Amended and Restated Employment Agreement as of the Effective Date set forth herein.

F. The parties agree that this Amended and Restated Employment Agreement has no fixed term, subject to the rights of termination set forth herein.

G. This Amended and Restated Employment Agreement sets forth all of the terms and conditions agreed to between the parties.

II. COMPENSATION

A. Salary: Commencing on and retroactive to April 8, 2019, upon a finding of satisfactory performance, WINFREE’S annual gross salary shall be $220,755.86. WINFREE shall be further entitled to the following gross salary increase on the noted effective date as provided below upon a finding of satisfactory performance by the Board in April 2020:

April 8, 2020: $250,000

Beginning effective April 8, 2021 through April 8, 2024, as provided below, WINFREE shall receive an automatic annual cost-of-living adjustment (COLA) to her gross salary in accordance with Government Code section 3511.12 and the California Consumer Price Index for Urban Wage Earners and Clerical

AMENDED AND RESTATED EMPLOYMENT AGREEMENT BETWEEN THE NORTH COUNTY TRANSIT DISTRICT AND LORI A. WINFREE Page 1 of 7 AMENDED AND RESTATED EMPLOYMENT AGREEMENT BETWEEN THE NORTH COUNTY TRANSIT DISTRICT AND LORI A. WINFREE

Workers as calculated by the Department of Industrial Relations, as published annually in December. Said adjustments shall not be less than 0% and not more that 3%:

April 8, 2021: COLA April 8, 2022: COLA April 8, 2023: COLA April 8, 2024: COLA

Future increases beyond those identified herein shall be at the discretion of the Board. In making any salary determinations, the Board will consider the performance evaluation conducted by the Executive Director in making its findings.

B. Expense Reimbursement: NCTD shall reimburse WINFREE for reasonable and documented attendance at meetings, for official business-related travel, and for other work-related activities where expenses are incurred incident to the performance of WINFREE’s job and in conformance with NCTD policies on expense reimbursement. Expenses shall include travel to meetings of relevant industry groups and Boards of which WINFREE and/or NCTD is a member, as well as relevant informational and educational seminars as approved by the Executive Director. At WINFREE’s option NCTD shall provide WINFREE with a NCTD cell phone pursuant to NCTD’s standard practices for management employees.

C. Licensure/Professional Memberships: Throughout the term of this Agreement, WINFREE shall retain her California license to practice law in active, good standing. Failure to do so shall be considered a breach of this Agreement, and cause for termination by NCTD as described in Section IV. A.a.ii below. NCTD shall pay WINFREE’s required fee to renew her California Bar License and membership in the following legal organizations: San Diego County Bar Association. Notwithstanding the foregoing, the cost of educational seminars and other obligations necessary to retain California Bar licensure shall be addressed pursuant to II.B, above.

D. Benefits: WINFREE shall be eligible for the benefits package as set forth in Exhibit “A” attached hereto and incorporated herein by this reference. In addition, NCTD shall contribute to WINFREE’S 401(a) Retirement Plan account the amount of $10,000.00 through April 7, 2020. Effective April 8, 2020, NCTD’s contribution to WINFREE’S 401(a) Retirement Plan account will increase to $20,000.00 annually.

III. DUTIES AND RESTRICTIONS

A. Duties: As General Counsel, WINFREE is NCTD’s highest legal services position. In accordance with the duties and responsibilities described in Job Description, included as Exhibit “B”, attached hereto and incorporated herein by this reference, and which may from time to time be amended by the Board and/or supplemented by the Executive Director in their respective discretion, the WINFREE shall have oversight and responsibility for District-wide legal services and compliance, subject to the day-to-day direction provided by the Executive Director. The Board has designated the Executive Director as the highest ranking official of NCTD, subject to the final policy direction provided by the Board in

AMENDED AND RESTATED EMPLOYMENT AGREEMENT BETWEEN THE NORTH COUNTY TRANSIT DISTRICT AND LORI A. WINFREE Page 2 of 7 AMENDED AND RESTATED EMPLOYMENT AGREEMENT BETWEEN THE NORTH COUNTY TRANSIT DISTRICT AND LORI A. WINFREE

accordance with the Executive Directors employment agreement, applicable Board policies, and actions of the full Board of Directors.

B. Restrictions: Outside Employment: WINFREE shall not accept any other employment during the term of this Agreement and shall devote her full-time effort to her NCTD position. WINFREE shall not engage in any outside activities during the term of this Agreement that generate financial or other conflict of interest with her position as NCTD General Counsel, or the appearance thereof. If WINFREE is not certain whether a particular proposed activity is permitted under this Agreement, she shall request a determination thereon from (i) the Executive Director, who shall consult with the Board Chair, or (ii) from the Board before engaging in the activity, and the Executive Director or the Board, as applicable, shall within thirty (30) days make a determination thereon. Failure to act on the part of the Executive Director or the Board, as applicable, within said thirty (30) day period shall be deemed approval.

IV. TERMINATION OF AGREEMENT

A. By NCTD: NCTD may terminate this Agreement at any time, either with or without cause, by majority vote of the total authorized membership of the Board. Termination shall be under one or more of the following paragraphs:

a. For Cause: i. Misconduct: In the event that NCTD has determined, based on evaluation of the facts and circumstances, that there is good cause to terminate this Agreement due to: (1) malfeasance, (2) gross negligence, (3) fraud, (4) serious misconduct, or (5) conviction of a felony on the part of WINFREE, NCTD shall give WINFREE notice of termination, which at the option of the Board shall either be effective immediately, or the notice shall specify the intent to terminate and the date the termination will become final. In either case, the notice shall be accompanied by a statement of the basis for the termination. In the case of a termination that is effective immediately, WINFREE shall have the right to present any rebuttal information to the Board, in writing, no later than ten (10) calendar days after the termination. In the event that the Board gives notice of intent to terminate at a future date, WINFREE shall have the right to present any rebuttal information to the Board, in writing, prior to the effective date of the termination. In either case, WINFREE shall have the right to a hearing before the Board, in open or closed session as authorized by the Brown Act, within fourteen (14) days following termination. The Board shall review any rebuttal information provided by WINFREE and any other relevant material and shall then determine whether to uphold the termination or rescind it. The Board’s decision shall be final.

ii. Breach of Duty/Material Uncorrected Failure to Perform: In the event that NCTD has determined, based on an evaluation of the facts and circumstances, that there is good cause to terminate this Agreement that does not rise to the level of seriousness addressed above in subparagraph IV.A.a.i. “Misconduct”, above, such as (1) failure to maintain an active license to practice law in CA as required by Section II. D “Licensure/Professional

AMENDED AND RESTATED EMPLOYMENT AGREEMENT BETWEEN THE NORTH COUNTY TRANSIT DISTRICT AND LORI A. WINFREE Page 3 of 7 AMENDED AND RESTATED EMPLOYMENT AGREEMENT BETWEEN THE NORTH COUNTY TRANSIT DISTRICT AND LORI A. WINFREE

Memberships” above, (2) a repeated material failure to meet stated, reasonable performance objectives within WINFREE’s control to correct but as to which is not corrected in spite of notice of necessary corrective action, (3) uncorrected, repeated, material failure to present a positive public and media image on behalf of NCTD, in spite of notice and opportunity to correct the deficiency, (4) or other uncorrected material failure in performance. NCTD may terminate the Agreement for cause by the date specified in a written notification to WINFREE provided NCTD: (1) first gives notice to WINFREE in writing of the alleged breach of duty/failure in performance and reasonable opportunity to cure the problem; (2) gives WINFREE a reasonable opportunity to present evidence to the Board within fourteen (14) calendar days of WINFREE’s written request for a hearing after having received the written notice specified in (1), above, in open or closed session as authorized by the Brown Act, in rebuttal to any alleged breach of duty/failure in performance or of any extenuating circumstances showing that the failure was beyond the control of WINFREE, and (3) NCTD will not terminate for cause under this subparagraph IV.A.a.ii unless the Board determines that WINFREE is either incapable or unwilling to correct the perceived problem in spite of having had warnings and a reasonable opportunity to cure the problem, and that the evidence in support of the grounds for termination is substantial taking into account all of the information available to the Board including any evidence presented by WINFREE.

b. Without Cause: NCTD shall have the right to terminate WINFREE’s employment under this Agreement at any time during the term thereof without cause. Should NCTD exercise its right under this subparagraph IV.A.b, it shall provide WINFREE with written notice thereof, a minimum of thirty (30) days prior to effective date of the termination.

B. By WINFREE: WINFREE may terminate this Agreement at any time with or without cause, by (1) giving NCTD thirty (30) days advance written notice of her intent to terminate, or sooner by mutual agreement. In the event that WINFREE exercises her right to terminate under this subparagraph IV.B, she shall not be entitled to any severance benefits, or to any other similar termination benefits under law or NCTD rules and regulations, provided however, that WINFREE shall be entitled to payment for any unused vacation at the time her notice of termination is effective.

C. Severance: In the event this Agreement is terminated by NCTD “For Cause” pursuant to Paragraph IV.A.a above, WINFREE shall not be entitled to any severance benefits under this Agreement or under any other provision of law or NCTD policy or procedure, unless it is subsequently determined that such termination was not for just cause, consistent with the requirement specific in Paragraph VI of this Agreement. In the event that WINFREE’s employment is terminated by NCTD without cause pursuant to Section IV.A.b, WINFREE shall be entitled to severance benefits as follows:

a. Computation/Items Included: Severance benefits under this subparagraph shall be computed based upon (1) WINFREE’s monthly salary in effect at the time of termination (2) continued payment by NCTD or the cash equivalent value, at NCTD’s option, of health and dental benefits in favor of WINFREE and her family at the rate paid by NCTD at the time of termination.

AMENDED AND RESTATED EMPLOYMENT AGREEMENT BETWEEN THE NORTH COUNTY TRANSIT DISTRICT AND LORI A. WINFREE Page 4 of 7 AMENDED AND RESTATED EMPLOYMENT AGREEMENT BETWEEN THE NORTH COUNTY TRANSIT DISTRICT AND LORI A. WINFREE

b. Amount: The amount of severance benefits shall be a lump sum equal to the value of WINFREE’s then-monthly salary and benefits as they exist at the time of termination for a period of six (6) months following the date of termination. c. Separately Negotiated/Waiver: The parties expressly acknowledge that these severance pay provisions have been independently negotiated. Acceptance at the time of termination by WINFREE of the severance pay benefits provided by this Section shall operate as a full and complete waiver and release of any and all rights, claims, and/or causes of action which WINFREE may have, or have had, at any time, in the past or future, arising out of WINFREE’s employment by NCTD, including but not limited to claims for wrongful termination. If WINFREE wishes to retain any such rights, WINFREE must decline to accept the severance benefits provided by this paragraph.

Acceptance of the severance benefits under this paragraph will operate as a general release on the part of WINFREE as to all claims, known or unknown, and WINFREE specifically waives the provisions of California Civil Code Section 1542 which provides:

“A GENERAL RELEASE DOES NOT EXTEND TO CLAIMS WHICH THE CREDITOR DOES NOT KNOW OR SUSPECT TO EXIST IN HIS OR HER FAVOR AT THE TIME OF EXECUTING THE RELEASE, WHICH IF KNOWN BY HIM OR HER MUST HAVE MATERIALLY AFFECTED HIS OR HER SETTLEMENT WITH THE DEBTOR. ”

V. DISPUTE RESOLUTION

A. Informal Meet and Confer: The parties agree to meet and confer informally as the first step toward resolution of any dispute. The Board may be represented by the Board Chair and/or the Executive Director and WINFREE may bring a representative of her choice, at her option and expense.

B. Board Resolution: If the parties are unable to resolve the matter informally through meet and confer, the matter shall be submitted to the Board for final resolution at a meeting to be held by the Board within thirty (30) days of submittal, and shall make a final decision within forty-five (45) days of the initial meet and confer session, unless WINFREE and the Board mutually agree to a longer period. In the event the provisions of IV.A.a are invoked, the time periods set forth therein for Board consideration and action will control.

C. Litigation: As to matters not covered by Section IV.A.a above, neither party shall commence any litigation, arbitration, or other formal dispute resolution process until the process described in Section V.A and B. above have been completed.

VI. INDEMNIFICATION

A. In Favor of WINFREE: NCTD shall, to the fullest extent permitted by law, indemnify and hold harmless WINFREE from and against any and all claims, actions, causes of action, or judgments of any kind for which WINFREE may be held liable and which arise out of or relate to WINFREE’s

AMENDED AND RESTATED EMPLOYMENT AGREEMENT BETWEEN THE NORTH COUNTY TRANSIT DISTRICT AND LORI A. WINFREE Page 5 of 7 AMENDED AND RESTATED EMPLOYMENT AGREEMENT BETWEEN THE NORTH COUNTY TRANSIT DISTRICT AND LORI A. WINFREE

performance of her job duties at NCTD provided (1) WINFREE acted in good faith at all times and (2) WINFREE’s actions or failures to act which gave rise to liability occurred during and within the course and scope of her employment at NCTD. Notwithstanding the foregoing, NCTD’s indemnification obligation shall not extend to GC’s gross negligence or willful misconduct.

In addition, NCTD shall defend, at NCTD expense and with counsel of NCTD’s choosing, any action, claim, or proceeding in which WINFREE is named and which alleges actions on the part of WINFREE, or failures to act, within the scope of the above-referenced indemnity obligation even if such action, claim, or proceeding is ultimately proved groundless.

The indemnification provisions contained herein under Section VI.A shall survive termination (with or without cause) of the Agreement until the expiration of applicable causes of action.

VII. MISCELLANEOUS PROVISIONS

A. Governing Law: This Agreement shall be interpreted and enforced in conformance with California law.

B. Entire Agreement: This Agreement, together with the Exhibits attached hereto, represents the entire agreement between the parties and supersedes any prior agreements, written or oral, and any representations, written or oral, not expressly included herein.

C. Venue: The venue for any litigation to interpret or enforce this Agreement shall be the San Diego Superior Court, North County Division.

D. Integration Clause: If any part, provision, paragraph, or subparagraph of this Agreement shall be held to be void or unenforceable by a final judgment of a court of competent jurisdiction, then unless that provision is found in such proceeding to be material to this Agreement, said void or unenforceable provision shall be severed from this Agreement and the balance of this Agreement shall remain in full force and effect. In the event that the void or unenforceable provision is found to be material to this Agreement, then the entire Agreement shall be void.

E. Independent Review/Interpretation: WINFREE and NCTD affirm in signing this Agreement that they have each had an opportunity to review and consider this Agreement, and to have it reviewed and to receive advice from independent advisors of their own choosing, including attorneys, and that each knowingly and voluntarily enters into this Agreement. WINFREE and NCTD further affirm that this Agreement was the mutual product of their negotiations, including give and take, and that neither party shall be considered the drafter of this Agreement such that the Agreement is interpreted against that party.

F. Public Record: WINFREE acknowledges that this Agreement is a public record under California law available for public inspection and copying.

AMENDED AND RESTATED EMPLOYMENT AGREEMENT BETWEEN THE NORTH COUNTY TRANSIT DISTRICT AND LORI A. WINFREE Page 6 of 7 AMENDED AND RESTATED EMPLOYMENT AGREEMENT BETWEEN THE NORTH COUNTY TRANSIT DISTRICT AND LORI A. WINFREE

G. Counterparts: This Agreement may be signed in counterparts, each of which shall be deemed an original, but all of which together shall constitute one and the same Agreement.

DATED: ______NORTH COUNTY TRANSIT DISTRICT

By: ______Board Chair

DATED: ______Lori A. Winfree, General Counsel

APPROVED BY BOARD ACTION DATED: April 18, 2019

[CLERK OF THE BOARD STAMP]

AMENDED AND RESTATED EMPLOYMENT AGREEMENT BETWEEN THE NORTH COUNTY TRANSIT DISTRICT AND LORI A. WINFREE Page 7 of 7 EXHIBIT A NCTD BENEFITS OVERVIEW Revised: April 18, 2019

Retirement: NCTD participates in the CalPERS retirement program with a benefit formula of 2% @ 62 for PEPRA new members or 2% @ 60 for PERS Classic members. Benefits are calculated based on your age at retirement, the number of years of service credit with CalPERS and the average of your monthly compensation over the past 36 months (36 months average highest hourly pay rate). The employee contribution rate each payroll is set by CalPERS for both PEPRA and Classic members. Taxes are deferred to retirement.

457 Deferred Compensation Retirement Plan: NCTD offers a Voluntary Deferred Compensation Savings Plan through Voya Financial Services. Employees are eligible to enroll any time after the date of hire. The plan allows employees to contribute “pre-tax” dollars into selected funds of their choice. Highlights are:

- Contribute up to amount specified annually by the IRS - Catch-up contributions for those 50+ of up to amount specified annually by the IRS - Is portable, can be rolled over into another qualified retirement plan - Employer match into a 401(a) account (50% up to 8% of employee compensation; Max NCTD contribution of 4%)

Medical Insurance: NCTD participates medical insurance through CalPERS. A variety of HMO and PPO plans are available based upon their annual coverage offerings. Human Resources can provide information on any current calendar year plans.

NCTD contributes towards the cost of monthly medical premiums based upon the level of coverage selected by the employee (Single, Employee Plus 1 Dependent, Family). NCTD contribution rates for each level are maintained by the Human Resources Department.

Dental Insurance: NCTD offers two different dental plans for employees and their eligible dependents (HMO and PPO) from a reliable dental insurance provider. Human Resources can provide information regarding annual insurance provider and available plans. Both plans are part of NCTD’s cafeteria plan (pre-tax payroll deductions for monthly premiums).

Vision Insurance: NCTD offers vision services for employees and their eligible dependents through a reliable vision insurance provider. Human Resources can provide information regarding annual insurance provider and available plan. The plan is part of NCTD’s cafeteria plan (pre-tax payroll deductions for monthly premiums).

Life Insurance: NCTD cares for its employees, and thus provides at no cost to the employee group life insurance in the amount of $200,000 (coverage includes Accidental Death and Dismemberment and Accelerated Death benefits). Additional life insurance is available for employees and their eligible dependents at your expense. * Tax reporting is required for any amounts over $50,000, per IRS guidelines. Supplemental life insurance coverage premiums are deducted on a post-tax basis.

Long Term Disability Insurance Option: NCTD offers voluntary Long Term Disability (LTD) insurance. Units may be elected in increments of $100 up to 80% of the individual hourly wage to a maximum of $5,000/month. Deductions are post- tax, coverage 24/7, limitations or exclusions, and benefits are payable to age 65 or for two years (whichever is longer).

Employee Assistance Plan: Life isn’t without its unexpected bumps in the road, another reason NTD offers the Employee Assistance Plan (EAP). The EAP offers assistance in areas such as: - Emotional Support - Work/Life Balance - Family Care - And much more, easy to use, and available 24/7 Exhibit A Page 2

Flexible Spending Account Plan: NCTD offers two core FSA plans and two Commuter plans. All plans are “Use It OR Lose It” calendar year plans (Jan. 1st – Dec. 31st). The commuter transit and parking plans do not have a “use it or lose it” policy. Plans are as follows: - Health Care Spending Account: o May contribute up to amount specified annually by the IRS - Dependent Care Spending Account: o May contribute up to amount specified annually by the IRS (including limitations if married) - Commuter Transit Account: o May contribute up to amount specified annually by the IRS - Commuter Parking Account: o May contribute up to amount specified annually by the IRS

Disability Insurance: Employees contribute to California State Disability Insurance (SDI). The current contribution rate is 1.0 % of earnings and is totally paid by the employee. After 7-day waiting period, SDI pays a percentage of employee’s salary to a maximum of $1,011.00 per week, for up to 52 weeks. SDI may be coordinated with Paid Time Off (PTO).

Legal Holidays: Designated paid holidays per year as per Employee Handbook.

Bereavement: NCTD offers up to (3) three calendar days of paid leave. Five (5) days if travel is greater than 300 miles.

PTO (Paid Time Off): PTO shall be earned equally in each pay period during the year in accordance with the maximum annual accrual rate as noted in the NCTD Employee Handbook, and maximum annual accrual cap.

Management Leave: An annual accrual of 80 hours per year shall be provided. Said annual accrual shall not exceed 400 hours per year in combination with PTO (above).

Transportation Passes: All NCTD employees receive an identification “” which can be used to ride MTS/NCTD transit service (excludes paratransit services) at no charge. Eligible family members also receive a pass for NCTD public transportation (excludes paratransit services) at no charge.

Family Status Change: This allows employees to add/drop dependents from current benefit plan elections per IRS “Qualifying Events.” For examples of qualifying events, please see the NCTD Employee Handbook. If a “Qualifying Event” occurs, the employee MUST contact HR within 31 days of event, (Qualifying Event must relate to the benefit change requested). Exhibit B GENERAL COUNSEL

Job Description

05/18/2017

FSLA STATUS: Exempt GRADE: Board APPROVE: HR Manager

DEFINITION Under policy direction of the North County Transit District Board of Directors, serves as the Chief Legal Officer of NCTD; performs highly responsible professional and legal work as the legal advisor to NCTD; and organizes, coordinates, and directs the activities of the Office of the General Counsel.

Distinguishing Characteristics This position is distinguished by its overall responsibility for management of the legal function. The incumbent is expected to exercise considerable judgment and work independently and is responsible for complex, highly visible legal matters, as well as providing key advice to the NCTD Board of Directors, the Executive Director, and Executive staff. Incumbent represents the District in related court matters.

Supervision Received and Exercised This position reports to the NCTD Board of Directors, but may receive direction in the performance of duties from the Executive Director relative to work assignments and related matters. This position directly supervises legal support staff in the General Counsel Department and in the Procurement and Contract Administration Division. Further, this position is expected to participate in the sharing of expert knowledge, and as a vital member of various project teams that may be instituted.

Working Conditions The position works primarily in an office setting and most of the working period is spent in a seated position. Periodic site visits to project locations may be required as well as interaction with the public and other agencies.

EXAMPLES OF DUTIES

Essential Functions Functions include, but are not limited to, the following:

• Establishes and maintains goals, objectives and plans for carrying out the functions of the office consistent with the policy determinations of the Board of Directors. • Organizes, coordinates, supervises, and directs the activities of the Office of General Counsel, including hiring, training, evaluating, and counseling department staff. • Organizes, coordinates, supervises, and directs the activities of the Procurement and Contract Administration Division through the direct supervision of the Chief of Procurement and Contract Administration, which may include hiring, training, evaluating, and counseling Division staff. • Establishes and maintains appropriate administrative policies, services, controls and reporting systems in the effective and efficient performance of office functions including fiscal and personnel records.

1 GENERAL COUNSEL

Job Description

05/18/2017

• Maintains close liaison with and makes presentations to the NCTD Board of Directors as to legal matters relating to or affecting NCTD. • Maintains close contact and coordinates with city attorneys, County Counsel, and member agencies. • Coordinates with other agencies and appropriate community organizations. • Recommends the annual budget for the Office of General Counsel. • Collaborates with the Chief of Procurement and Contract Administration on development of that Division’s annual budget. • Evaluates legal claims filed against NCTD. • Studies, interprets and applies constitutions, statutes, ordinances, court decisions, and legal opinions in connection with legal advice, suits, trials, hearings, appeals, and similar legal proceeding. • Provides guidance and recommendations to CEO and Board members, subject to NCTD policies, whether to prosecute, compromise, or dismiss civil litigation. • Defends or prosecutes (or directs the defense or prosecution), as legally required, all civil actions and proceedings in which NCTD or any of its officers are involved. • Advises the Board and NCTD management and directs legal work in regard to NCTD’s capital development program. • Reviews NCTD policies and procedures and other legal documents for legality and compliance with laws and regulations. • Prepares and/or reviews resolutions and ordinances as well as Board agenda items. • Drafts and approves to form all leases, contracts, and other agreements. • Establishes required standards for form and content for all leases, contracts and other agreements, and ensures compliance with required forms, documents, and agreements throughout all District divisions and departments. • Advises NCTD Board, Committees, and Divisions through oral or written opinions, and drafts legal documents, resolutions, ordinances and other items. • Serves as Counsel to the Board of Directors during meetings and deliberations of the Board and Committees. • Collaborates with NCTD management on matters where legal considerations are present or likely. • Conducts investigations, provides legal oversight and guidance, makes recommendations as appropriate to avoid or minimize negative outcomes, and reduce or eliminate liability by NCTD and its staff. • Develops preventive law strategies and legal compliance programs on a wide range of topics to help minimize litigation, third party disputes and other potential legal issues. • Monitors legal developments including proposed legislation and court decisions that may impact NCTD and recommends action. • Arranges for outside counsel on matters as required. • Maintains familiarity with the General Plans of San Diego County and its cities as well as the Regional Transportation Plan and other local transportation plans so as to be able to provide advice to NCTD Board of Directors, Executive Director, and staff. • Prepares a variety of reports relating to legal activities and cases. • Performs other professional legal services as mandated by law. • Performs other related duties as assigned.

2 GENERAL COUNSEL

Job Description

05/18/2017

QUALIFICATIONS

Education/Experience • Juris Doctor or equivalent from an accredited school of law. • Ten (10)-plus years of broad and extensive experience as a practicing attorney, including progressively responsible management or supervision, and experience working with a public agency. • Transit and/or rail experience required.

Substitution of experience for the required education is not accepted.

Licenses/Certifications • Active member in good standing with the California State Bar required. • Possession of and the ability to maintain a California driver’s license, Class C, and a satisfactory driving record for the last five years.

General Requirements

Knowledge of: • Principles of criminal, civil, constitutional, and administrative law as it relates to NCTD. This includes government/public administration, municipal laws and ordinances, court methods and procedures, and legal authorities relative to public and private transportation entities. • Responsibilities, powers, and functions of the Office of the General Counsel. • State and Federal laws and constitutional provisions affecting NCTD operations. • Principals of land use, municipal law and government finance, California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA). • Federal laws and regulations relating to transit grants and the principles of drafting and negotiating grant agreements, letter of no prejudice, and other federal grant documents. • Statutory and other legal authorities prescribing the development, adoption, administrative, and enforcement of congestion management plans. • Judicial proceedings at the administrative, trial and appellate levels and Rules of Evidence. • Principles, methods, materials, and practices of legal research. • Management techniques and skills applicable to a professional law office. • Demonstrated proficiency in computer software programs including the Microsoft Office Suite.

Ability to: • Analyze, appraise and organize facts, evidence and precedents and present such materials orally or in clear, written, and legal form. • Analyze and appraise a variety of legal documents and instruments. • Draft legal instruments such as resolutions, ordinances, contracts, and other pertinent documents. • Make effective court and hearing presentations. • Establish and maintain effective professional relationships with Board members, NCTD personnel, and city attorneys, as well as local officials and the general public.

3 GENERAL COUNSEL

Job Description

05/18/2017

• Communicate legal issues to non-attorneys. • Supervise and coordinate the work of professional, administrative, and clerical subordinates. • Work successfully with diverse persons and interests both in government and with the public in general; • Draft and review legal opinions, contracts, ordinances, resolutions, leases, utility franchises, policies, legislation, and/or other legal documents; conduct related negotiations when applicable.

Physical Requirements The physical demands described here are representative of those that must be met by an employee to successfully perform the essential functions of this job. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions.

Ability to use the phone and computer for extended periods, manual dexterity to complete clerical functions, work with office equipment, and daily lifting of equipment up to 25 pounds is required. Ability to hear, see and to communicate verbally to exchange information. Ability to physically travel between District locations and other destinations, work in evenings when required, work in hazardous conditions, and negotiate a variety of different and irregular terrain as is typical along a railway right of way. May be subject to fumes, odors, dusts, gases, chemicals. Ability to walk, climb, balance, bend, carry, push, reach, sit, and stand.

Machines / Tools / Equipment • Ability to operate a personal computer and Microsoft Office Suite programs. • Ability to operate standard office equipment, including a fax and scanner machine, copy machine, and telephone. • Ability to carry and operate a Blackberry/iPhone on-call device. .

______Employee Signature Date

______PRINT Employee Name

4 RELATED TO AGENDA ITEM 11

Approve Amended and Restated Employment Agreement Between NCTD and General Counsel

Board Meeting April 18, 2019 Recommendation

• Approve the Amended and Restated Employment Agreement Between the North County Transit District (NCTD) and General Counsel based on results of the annual performance evaluation conducted by the Board of Directors to address compensation and update other terms and conditions of the agreement.

1 Questions?

2 Agenda Item # 12 ADOPT RESOLUTION NO. 19-03 APPROVING MODIFICATIONS TO BOARD POLICY NO. 19, DELEGATION OF AUTHORITY TO THE EXECUTIVE DIRECTOR

Time Sensitive: ☐ Consent: ☐

STAFF Adopt Resolution No. 19-03 approving modifications to Board Policy No. 19, RECOMMENDATION: Delegation of Authority to the Executive Director.

BACKGROUND Pursuant to Board Policy No. 1, General Provisions: “At least annually, staff will INFORMATION: review and suggest revisions to existing North County Transit District’s (NCTD) Board of Directors’ (Board) Policies, as appropriate, and bring new Board Policies, if appropriate, to the Board for consideration and approval.”

On September 19, 2018, Assembly Bill 3177 (AB 3177) was approved by the Governor and filed with the Secretary of State with an effective date of January 1, 2019. AB 3177 realigned NCTD’s procurement authorities with other local agencies. As a result, AB 3177 increased NCTD’s informal bid threshold for materials, goods, equipment and services to $100,000 and expressly authorized NCTD to opt into the Uniform Public Construction Cost Accounting Act (Act). Subsequently, on February 21, 2019 the Board adopted Resolution No. 19-01 electing to participate in the Act. Pursuant to the Act, the informal bid threshold for public works projects for NCTD has increased from $10,000 to $200,000.

Due to the provisions established in Board Policy 19, the NCTD Executive Director has the authority to award initial contracts up to $100,000; approve contract amendments up to $50,000 (singular or cumulative) unless the amendment would increase the contract value over $100,000; and award Task Order Agreements (TOA) up to $100,000. The Executive Director is required to report contract actions and modifications made in accordance with Board Policy No. 19 to the Board on a quarterly basis. Contract actions above the provisions of Board Policy No. 19 are presented to the Board for approval.

Over the past two years, staff has prepared 143 staff reports and related material for Board consideration. Many of these items were routine, required activities for continued operations such as software licenses, facilities maintenance, and other routine business requirements. Staff conducted a survey of public agencies in the San Diego County region to determine if the delegation of authority to NCTD’s Executive Director in Board Policy No. 19 is comparable to dollar thresholds delegated to Executive Directors, City Managers, and purchasing agents throughout the County. The delegation of authority from the governing body to the appointed official in San Diego County ranges from $15,000 to $5,000,000 (Cities, County, School Districts, and Transit Agencies). Following this analysis, and in order to realize efficiencies in the procurement and Board processes in the purchase of materials, goods and equipment to support continued operations, staff recommends that the Board of Directors authorize the Executive Director to award initial contracts up to $200,000, amend contracts up to $100,000 (singular or cumulative), and award individual TOAs up to $200,000, which is reflected in Resolution No. 19-03. The Executive Director will still be required to report contract actions and modifications made in accordance with Board Policy No. 19 to the Board on a quarterly basis. April 18, 2019 Board Meeting Staff Report No.: SR-19-04-012 General Counsel has reviewed and approved the proposed modifications to Board Policy No. 19 and staff has provided strikeout/underline and clean versions of the proposed modifications for the Board’s consideration. Additionally, the proposed modifications were presented to the Board’s Executive Committee on April 4, 2019 and were approved to advance to the full Board for consideration. If the Board adopts Resolution No. 19-03, the adopted policy shall supersede all similar policies, resolutions, and other documents previously adopted by the Board or approved by the Executive Director regarding the subject matter contained therein.

Staff recommends that the Board adopt Resolution No. 19-03 approving modifications to Board Policy No. 19, Delegation of Authority to the Executive Director.

ATTACHMENT: 12A – Draft Resolution No. 19-03 Approving Modifications to Board Policy No. 19, Delegation of Authority to the Executive Director

GOAL/STRATEGIC Legal, Regulatory and Policy Compliance DIRECTION:

FISCAL IMPACT: This staff report has no fiscal impact.

COMMITTEE REVIEW: Executive Committee DATE: April 4,2019

STAFF CONTACT: Jennifer M. Taylor, Chief Procurement and Contract Administration Officer E-mail: [email protected] Phone: 760-967-2862

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-012

RESOLUTION NO. 19-03

RESOLUTION OF THE BOARD OF DIRECTORS OF THE NORTH COUNTY TRANSIT DISTRICT TO ADOPT THE CALIFORNIA UNIFORM CONSTRUCTION COST ACCOUNTING ACT

WHEREAS, the North County Transit District (“NCTD”) Board of Directors (“Board”) has adopted Board Policies 1 through 33 to guide the daily operations of NCTD; and WHEREAS Board Policy No. 1 states that at least annually, the Board will review such Board Policies as previously adopted; and WHEREAS, the Board has identified the need to revise Board Policy No. 19, Delegation of Authority to Executive Director, as set forth in full in Exhibit A to this Resolution. NOW, THEREFORE, BE IT RESOLVED that the Board of Directors of the North County Transit District hereby approves revised Board Policy No. 19, Delegation of Authority to Executive Director, as set forth in Exhibit A to this Resolution. BE IT FURTHER RESOLVED that insofar as the provisions of any Ordinance, Resolution, document or previous action of the Board and/or the Executive Director, prior to the date of this Resolution, are inconsistent with the provisions of this Resolution or any policy adopted by this Resolution, this Resolution and the Board Policies adopted herein shall control. PASSED, APPROVED AND ADOPTED at the regular meeting of the Board of Directors of the North County Transit District this 18th day of April 2019.

BOARD CHAIR North County Transit District

CERTIFICATION

I, Anthony Flores, duly appointed and qualified, Clerk of the Board of the North County Transit District, do hereby certify that the above is a true and correct copy of a resolution passed and approved by the Board of Directors of the North County Transit District adopted at a legally convened meeting of the Board of Directors of the North County Transit District held on the 18th day of April 2019.

CLERK OF THE BOARD North County Transit District

RESOLUTION NO. 19-03

RESOLUTION OF THE BOARD OF DIRECTORS OF THE NORTH COUNTY TRANSIT DISTRICT APPROVING REVISED BOARD POLICY NO. 19 – DELEGATION OF AUTHORITY TO EXECUTIVE DIRECTOR

Exhibit A

Legal Blacklines of Board Policy No. 19, Delegation of Authority to Executive Director

Page 2 of 2

Board Policy No. 19 Delegation of Authority to the Executive Director

Summary

This policy establishes delegation of authority from the North County Transit District (NCTD, District) Board of Directors (Board) to the Executive Director, pursuant to Resolution No. 18-0919- 03 dated October 18, 2018April 18, 2019.

Policy

As a recipient of public funds, NCTD is responsible for ensuring proper expenditure of funds for public purposes for which they are intended, adherence to all applicable standards and regulations as established by federal and state law, and full and open competition and equitable treatment in all transactions. The NCTD Board establishes the following delegation of authority to the Executive Director:

General Responsibilities

The Executive Director may:

1. Delegate functions delegated by the Board to NCTD staff when necessary and/or appropriate.

2. Execute a contract or contract change order within the parameters of the law and Board direction and/or as established in this Board Policy No. 19.

3. Ensure that written contracts and procurement procedures are developed in accordance with Federal Transit Administration (FTA) requirements delineated in the most current version of FTA Circular 4220.1, the FTA Best Practices and Lessons Learned Manual and Master Agreement, California Public Utilities Code §§125221, 125222, 125223, and 125224, and the California Public Contract Code §§20350, 20351, et seq.

4. Approve revisions to contracts and procurement policies and procedures, with the exception of procurement polices established in this Board Policy No. 19.

5. In the event of emergency or an exigent circumstance, take all necessary actions to prevent significant unnecessary loss to NCTD or a shut-down of public services, or to address a situation threatening the health and/or safety of persons or property, including, but not limited to, authorization to contract with a contractor or consultant on a sole source basis, consistent with applicable state or federal law without prior approval from the Board. In the event such an emergency or urgent need occurs, the Executive Director will consult with the Chair of the Board as necessary, and, regardless of contract value, the Executive Director will submit a report to the Board at its next regular meeting to obtain ratification for those actions, in accordance with all applicable provisions of law, including but not limited to the requirements of California Public Contract Code §22050.

6. Approve all design plans, specifications, and estimates for authorized capital projects.

Page 1 of 6 Board Policy No. 19 – Delegation of Authority to the Executive Director

7. Execute and accept associated payments for all right-of-way property transfer documents, including, but not limited to, rights of entry, licenses, leases, deeds, easements, escrow instructions, and certificates of acceptance.

8. Reject all bids or proposals and suspend the competitive procurement process.

9. Provide the final determination to persons or firms filing a protest regarding NCTD procurement or contracting processes or procedures.

10. Execute a contract for services performed by District personnel of any value if the services are reimbursable and accept reimbursement from any entity for services performed by District personnel.

11. Award a contract if the initial contract value does not exceed $100,000$200,000 and is consistent with the Board-adopted budget.

12. Award a revenue-generating contract if the initial contract value does not exceed $100,000.

13. Authorize a contract modification/amendment (which includes contract change orders and supplemental agreements) of any value consistent with the Board-adopted budget if the modification/amendment does not exceed $50,000$100,000, singular or cumulative in value, and if the modification/amendment does not involve a major change in scope, unless the modification/amendment costs are reimbursable by a third party and an agreement for reimbursement is in place, in which event, the modification/amendment may be of any value.

14. Award individual task orders to any task order-based contract under the basic scope of the contract, valued at not more than $100,000$200,000.

15. Award contracts or purchase orders of any value when District funds are reimbursed by a third party, the procurement was conducted in accordance with approved procedures, and an agreement for District reimbursement is in place.

16. Not amend a contract which was originally awarded at a value of $100,000$200,000 or less if the amendment increases the contract value over $100,000$200,000 in value.

17. Report contract actions and modifications made in accordance with this policy to the Board of Directors on a quarterly basis.

18. Execute a memorandum of understanding, memorandum of agreement, or interagency agreement along with general counsel if the document involves ministerial business transactions and if the annual committed value does not exceed $100,000 or, regardless of the value, if the expenditure of District funds is reimbursable.

19. In accordance with the California Government Code §935.4, approve settlements for liability and workers compensation claims that do not exceed $50,000 and forward a claim of any amount to the Board of Directors for consideration and action as may be appropriate.

Page 2 of 6 Board Policy No. 19 – Delegation of Authority to the Executive Director

20. Execute all documents required by any local, state, or federal agency that provide operating or capital funds for District use, including, but not limited to, Transportation Development Act (TDA) claims, State Transit Assistance (STA) claims, Regional Transportation Improvement Program (RTIP) submittals, U.S. Department of Transportation (DOT), Federal Railroad Administration (FRA), and Federal Transit Administration (FTA) grant applications.

21. Award licensing, maintenance or support contract renewals for hardware or software to extend the coverage period from the original equipment manufacturer for an amount not- to-exceed the Board-adopted budget per item per year being renewed. This applies to hardware or software licensing, maintenance or support agreements procured according to standard and approved procedures. Authorization for award of new procurements for hardware or software and the related licensing, maintenance and support, as well as for hardware or software licensing, maintenance and support that exceeds the Board- adopted budget, must comply in all respects with this Board Policy No. 19

22. Pay bills for insurance premiums in an amount not-to-exceed the Board-adopted budget per year being renewed. This applies to insurance procured according to standard and approved procedures.

23. Pay bills for utilities, such as water, gas and electric services, and pass-through expenses in which only one provider of such services is available to the District, such as taxes, employee reimbursements and benefits, and intergovernmental transfers.

24. Authorize the distribution of complimentary transit passes to improve customer satisfaction, as a marketing tool to increase ridership, or on a case-by-case basis and approved by the Chief Financial Officer, in accordance with Board Policy No. 20 – Complimentary Transit Passes.

25. Pay bills for diesel and unleaded fuel procured on a weekly bid basis with an award to the lowest cost bidder, where NCTD does not have an existing Board-approved fixed- price contract to purchase fuel. Staff will provide the Board with a fuel procurement overview and recommendation on an annual basis in January of each year to determine whether a contract to purchase fuel is in the best interests of the District.

26. Implement and execute any agreements, reports or other documents required for the continued implementation of, and compliance with applicable storm water regulations, including but not limited to, the NCTD Phase II Non-Traditional MS4/NPDES permit (currently Order No. 2013-0001-DWQ), NCTD Construction General Permit (currently Order No. 2012-0006-DWQ) and/or Industrial General Permit (currently Order 2014- 0057- DWQ, NPDES NO. CAS000001) as issued, amended or superseded by the State Water Resources Control Board (SWRQB) or any other necessary related order, law or regulation.

Page 3 of 6 Board Policy No. 19 – Delegation of Authority to the Executive Director

Other Duties and Responsibilities

The Executive Director shall be responsible for management of all aspects of NCTD operations on a day-to-day basis, subject only to the policy direction of the Board. The Executive Director’s duties and responsibilities shall include:

1. Supervision of all department heads, departments, and employees (except for General Counsel, who reports directly to the Board) including authority, to hire and terminate NCTD employees in accordance with applicable law and NCTD Ordinance No. 4 – Establishing A Personnel Merit System policies, rules, and regulations;

2. Responsibility for overall management of employee relations matters;

3. Establishment of a proposed set of short-range goals and a proposed action plan for developing and implementing medium and longer-term goals for the District, to be presented to the Board for review and consideration annually.

4. Assist the Board in community and public relations matters;

5. Monitoring, managing, and overseeing the District budget, revenues and expenses;

6. Oversee timely development and presentation to the Board of annual proposed budgets;

7. Assuming overall responsibility for management of staff and in guiding NCTD towards its Board-approved goals;

8. Assuring that NCTD's financial affairs are properly managed, accounted for, and audited, and that appropriate reports thereon are made to the Board and to others as required by law;

9. Confer with legislative liaisons regarding legislative matters; monitoring, reporting on, and making recommendations on legislative activities;

10. Attending all regular and special meetings of the Board and of Board committees and subcommittees as requested, assuming overall responsibility for preparation and presentation of all agendas and staff reports;

11. Meeting with the city councils and managers of each of the member agencies of NCTD, and with the County Board of Supervisors and its Chief Administrative Officer;

12. Represent the Board and staff in contacts and communications with the public, member agencies, and other outside agencies and organizations with respect to transit matters and NCTD issues, within the scope of Board policies and programs;

13. Such other and further activities as the Board may from time to time direct;

14. Such other and further activities as the Executive Director determines necessary to competently and professionally carry out his/her responsibilities in the best interest of NCTD.

Page 4 of 6 Board Policy No. 19 – Delegation of Authority to the Executive Director

For additional information on the Executive Director’s responsibilities, please refer to NCTD Ordinance No. 4.

Approvals

______Board Chair Date

______Executive Director Date

______General Counsel Date

Page 5 of 6 Board Policy No. 19 – Delegation of Authority to the Executive Director

DATE REVISION NO. RESOLUTION NO. COMMENTS

10/18/2012 ADOPTED

10/17/2013 1 2013 REVISION

10/16/2014 2 2014 REVISION

01/15/2015 3 2015 REVISION

10/15/2015 4 2015 REVISION

10/20/2016 5 16-10 2016 REVISION

10/19/2017 6 17-10 2017 REVISION

10/18/2018 7 18-09 2018 REVISION

4/18/2019 8 19-03 2019 REVISION

Page 6 of 6 RELATED TO AGENDA ITEM 12

Discussion: Board Policy No. 19 Delegation of Authority to the Executive Director

Board Meeting April 18, 2019 Current Board Policy No. 19

The NCTD Board of Directors (Board) has adopted Board Policy No. 19, Delegation of Authority to the Executive Director, authorizing the Executive Director (ED) to award contracts and amend agreements as follows: • Award initial contracts up to $100,000 • Approve contract amendments up to $50,000 (singular or cumulative) unless amendment would increase the contract value over $100,000 • Award individual Task Order Agreements (TOA) up to $100,000 • The ED is required to report contract actions and modifications made in accordance with Board Policy No. 19 to the Board on a quarterly basis 1 Current Board Policy No. 19

• On February 21, 2019, the Board adopted Resolution 19-01 electing to participate in the State of California’s Uniform Public Construction Cost Accounting Act (Act). • The Act authorizes NCTD to contract for public projects of $200,000 or less by informal bid procedures. • Informal bid procedures include reduced bid times with no requirement to advertise in newspapers of general circulation. • Informal bid procurements above $5,000 require staff to seek a minimum of three (3) competitive quotes.

2 Analysis of Board Policy No. 19

• With the authority currently provided in Board Policy No. 19, staff prepares many items for Board approval on an annual basis. • Over the past two (2) years staff has prepared 143 staff reports and related materials for Board consideration. • Many of these items are routine required activities for continued operations such as software licenses, facilities maintenance, and other routine business requirements.

3 Analysis of Board Policy No. 19

• The Board preparation cycle for each contract action takes approximately eight (8) weeks, and several hours of staff time on a monthly basis. • In many cases the contract did not exceed ED authority at the time of award, but subsequently the addition of a routine change order increased the total contract value above the ED’s authority requiring a stop in the work while staff sought the Board’s approval on the contract modification or a ratification by the Board. • Most procurement activity that NCTD conducts on a day-to-day basis far exceeds the current $100,000 threshold.

4 Analysis of Board Policy No. 19

• Staff conducted a survey of public agencies in San Diego County to determine contracting thresholds delegated to staff from the governing board. • The range for governing board approval is from $15,000 to $5,000,000 (Cities, County, School Districts, and Transit Agencies).

5 Proposed Revisions to Board Policy No. 19

To realize efficiencies in the procurement and Board approval processes, staff recommends amending Board Policy No. 19 as follows: • Authorize ED to award initial contracts up to $200,000 (this corresponds with the informal bid threshold authorized by the Act) • Amend contracts (change orders/supplemental agreements) up to $100,000 (singular or cumulative) • Award individual TOAs up to $200,000 • The ED would still be required to report all contract actions and modifications made in accordance with Board Policy No. 19 to the Board on a quarterly basis 6 Executive Committee Review

• The proposed revisions to the contracting authority delegated to the Executive Director from the Board of Directors in Board Policy No. 19 was reviewed by the Executive Committee at its meeting on April 4, 2019. • The Executive Committee approved the advancement of the proposed revisions to the full Board of Directors for consideration.

7 Recap of Proposed Revisions to Board Policy No. 19

Current Proposed

New Contract $100,000 $200,000

Contract Amendment $50,000 $100,000

Task Order Agreement $100,000 $200,000

8 Recommendation

Staff recommends that the Board adopt Resolution No. 19-03 revising Board Policy No. 19 - Delegation of Authority to Executive Director

9 Questions?

10 Agenda Item # 13 AUTHORIZE THE EXECUTIVE DIRECTOR TO NEGOTIATE AND EXECUTE CHANGE ORDER NO. 2 TO ORDERING AGREEMENT NO. 18055 FOR A LIMITED NOTICE TO PROCEED FOR THE PURCHASE OF TWO (2) CHARGER LOCOMOTIVES PURSUANT TO MULTI- STATE LOCOMOTIVE MASTER AGREEMENT NO. 14-01-DPIT FROM SIEMENS MOBILITY, INC.

Time Sensitive: ☒ Consent: ☐

STAFF Staff recommends that the Board of Directors authorize the Executive Director to RECOMMENDATION: negotiate and execute Change Order No. 2 to Ordering Agreement No. 18055 to the Multi-State Locomotive Master Agreement No. 14-01-DPIT for a limited notice-to-proceed for the purchase of two (2) additional locomotives in an amount not-to-exceed $2,000,000.

BACKGROUND The North County Transit District (NCTD) currently operates a fleet of seven (7) INFORMATION: locomotives on the San Diego Subdivision to support COASTER operations. The fleet is composed of two (2) F-59 locomotives that were purchased as new by NCTD in 2001 and five (5) F-40 that were purchased as used locomotives that were originally built between 1975 -1992 by GM Electro-Motive Power Division. The F-40 locomotives where refurbished by MK/MPI between 1988 through 1998. On June 21, 2018, the Board of Directors awarded a contract to Siemens Mobility, Inc. for the purchase of five (5) SC-44 Charger Locomotives to replace the existing five (5) F40 locomotives. The contract provides for NCTD to exercise options to acquire additional locomotives up to a total of nine (9) if funding is available.

The Siemens Charger locomotive is a diesel-electric passenger locomotive designed and manufactured by Siemens Mobility, Inc. for the North American market. The Charger has been purchased and is operational in several states, including California, Illinois, Maryland, Pennsylvania, Oregon, and Washington. The Siemens Chargers are among the nation’s cleanest passenger locomotives and are the first high-speed passenger locomotive to receive Tier 4 emissions certification from the US Environmental Protection Agency (EPA). With the environmentally-friendly Cummins-built diesel engine, the locomotives reduce emissions by nearly 90% compared to the Tier 0 F-40 locomotives currently being used by NCTD. The Charger offers a 4,000-horse power Cummins Diesel engine that has a top speed of 125 mph and provides an innovative design that allows for comfort and efficiency with state-of-the-art hardware. All Charger systems meet or exceed regulatory requirements and the locomotive is Buy America compliant.

This proposed action is to authorize the Executive Director to negotiate and execute a Limited Notice to Proceed (LNTP) for two (2) of those options which would be used to replace the two (2) F59 locomotives. The LNTP, if executed, would allow Siemens to procure the long lead time items and allow the delivery of the two (2) additional locomotives directly following the delivery of the existing order of five (5) Chargers on order. The proposed funding for the LNTP is $2 million which would cover long lead time items.

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-013 The long lead time items that would be purchased with the LNTP are as follows:

• Complete bogies including gearboxes and traction motors • Traction converter • HEP transformer • Brake equipment • Carshell steel and laser hybrid welded parts • Positive Train Control (PTC) system and event recorders • Central Control Unit • Master controller

Staff is negotiating with Siemens regarding the structure of the proposed LNTP but will return to the Board for authorization to fully exercise the options should the additional funding necessary to complete the transaction be identified and if determined to be in the best interests of NCTD. The proposed strategy for funding the full cost for the two additional locomotives is to pursue Carl Moyer grant funding from the Air Pollution Control District combined with funding from future State Transit Assistance SB1 incremental funds for both locomotives.

Based on the foregoing, staff recommends that the Board of Directors authorize the Executive Director to negotiate and execute Change Order No. 2 to Ordering Agreement No. 18055 to the Multi-State Locomotive Master Agreement No. 14- 01-DPIT for a limited notice to proceed for the purchase of (two) 2 additional locomotives in an amount not-to-exceed $2,000,000.

ATTACHMENT: None

GOAL/STRATEGIC Enhance Customer Service, Improve Service Quality, and Increase Ridership DIRECTION:

FISCAL IMPACT: The fiscal impact of this proposed contract action is $2,000,000, which will be funded with State Transit Assistance Incremental SB1 funds in project 418010, which has a total budget of $16,718,822. If the Board approves the proposed contract action, the budget in project 418010 will be reduced to $7,200,626.

COMMITTEE REVIEW: None

STAFF CONTACT: Eric Roe, Chief Operations Officer – Rail E-mail: [email protected] Phone: 760-966-6596

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-013 RELATED TO AGENDA ITEM 13

Limited Notice to Proceed (LNTP) For Purchase of Two (2) Additional Locomotives Board Meeting April 18, 2019 COASTER Locomotive Fleet

• The North County Transit District (NCTD) currently operates a fleet of seven (7) locomotives on the San Diego Subdivision to support COASTER operations. • The fleet is composed of two (2) F-59 locomotives that were purchased as new by NCTD in 2001 and five (5) F-40 locomotives refurbished by MK/MPI and purchased by NCTD in 1993. • On June 21, 2018, the Board approved the purchase of five (5) Siemens Charger SC-44 locomotives at a cost of $37,138,897 to replace the five (5) F-40 locomotives and the option to purchase up to four (4) additional locomotives.

1 COASTER F-59 Replacement

• The two (2) F-59 locomotives are 18 years old and are nearing the end of their 25-year useful life. – Over the last 24 months, the two (2) F-59 locomotives have had 44 failures in revenue service • NCTD has determined that it is not cost advantageous to overhaul the COASTER F-59 locomotives – Estimated cost for overhaul is $3,397,434 versus $7,427,780 for a new locomotive – Current COASTER F-59 locomotives are Tier 2 emissions technology, while the new Siemens locomotives are Tier 4 emissions technology. • Siemens anticipates delivery of replacement locomotives in December 2020 if the LNTP is executed by April 30, 2019 – Typical locomotive delivery from time of procurement to delivery spans three (3) years – Siemens has recently received an order from Amtrak for 75 Charger locomotives and VIA Rail for 34 locomotives. – If NCTD does not act by April 30, 2019, NCTD will not be able to receive locomotives until mid-2024.

2 Limited Notice to Proceed

• The Limited Notice to Proceed is to procure long lead time items: – Complete bogies including gearboxes and traction motors – Traction converter – HEP transformer – Brake equipment – Carshell steel and laser hybrid welded parts – Positive Train Control (PTC) system and event recorders – Central Control Unit – Master controller

3 Funding the Replacement of COASTER F-59 Locomotives • Currently, NCTD does not have the approximately $15 million required to replace the two (2) COASTER F-59 locomotives • NCTD and Siemens have agreed to advance the potential procurement of the two (2) additional locomotives via an LNTP, if Board approval is granted, that would require a $2 million payment within 30 days. • Staff is negotiating with Siemens regarding the structure of the proposed LNTP but will return to the Board for authorization to fully exercise the options should the additional funding necessary to complete the transaction be identified and if determined to be in the best interests of NCTD.

4 Funding Strategy • San Diego County Air Pollution Control District (APCD) Carl Moyer Grant – NCTD received a $10 million grant from this source of funding for the five (5) replacement locomotives currently being constructed. – The San Diego APCD’s model provides $30,000 for each weighted ton for year of greenhouse gas emission reduction up to a maximum of 85% of the total project cost – NCTD staff has estimated a maximum grant eligibility of $12,627,226 for the two (2) locomotives – The San Diego APCD will need to receive a supplemental award for the State Air Resources Board to be able to provide the maximum benefit to NCTD – Applications are typically accepted in the summer and awards made in the fall/winter. • State Rail Assistance Funds 5 Replacement Locomotive

6 Staff Recommendation

• Authorize the Executive Director to Negotiate and Execute Change Order No. 2 to Ordering Agreement No. 18055 for a Limited Notice to Proceed for the Purchase of two (2) Charger Locomotives Pursuant to Multi-State Locomotive Master Agreement No. 14-01-DPIT from Siemens Mobility, Inc. in an amount not-to-exceed $2,000,000.

7 Questions?

8 Agenda Item # 14 APPROVE TASK ORDER AGREEMENT NO. 05 TO AGREEMENT NO. 16041 WITH IBI GROUP FOR FY2019 BUS STOP IMPROVEMENT DESIGN SERVICES AND BID AND CONSTRUCTION SUPPORT

Time Sensitive: ☐ Consent: ☐

STAFF Approve Task Order Agreement No. 05 to Agreement No. 16041 with IBI Group, RECOMMENDATION: for FY2019 Bus Stop Improvements Design Services, and Bid and Construction Support in an amount not-to-exceed $159,128.

BACKGROUND The North County Transit District (NCTD), as part of the Bus Stop Optimization INFORMATION: Program, is implementing phased improvements for bus stops throughout the service area that include adding amenities and upgrades for compliance with Americans with Disability Act (ADA) requirements. NCTD staff identified eighteen (18) bus stops in Oceanside, Vista, and Escondido in need of various improvements (Attachment 15A - List of Bus Stops Proposed for Improvement). The improvements include increasing bus stop concrete pads to meet size, grade, quality, and other design considerations to accommodate the installation of bus stop furniture. A scope of work was developed for the design, bid support, and construction support for the various bus stop improvements.

On January 10, 2019, NCTD issued a Request for Statements of Qualifications (RFSQ) No. 28189 to NCTD’s on-call architectural and engineering services firms for Design Services, Bid Support, and Construction Support for FY2019 Bus Stop Improvements. Two (2) responses to the RFSQ were received by the January 23, 2019 deadline. Both Statements of Qualifications were deemed responsive and responsible and were evaluated by the Source Selection Committee (SSC) in accordance with the Federal Brooks and California Mini Brooks Acts, which is a qualifications-based selection process. The SSC determined that IBI Group was the highest qualified firm due to their knowledge and experience performing site investigations and work on projects of similar scope. Following review of the IBI Group’s cost proposal, staff entered into negotiations to ensure the scope aligned with NCTD’s expectations for the bus stops in question which resulted in a reduction of the initial proposal of $464,250.

Staff recommends that the Board approve Task Order Agreement No. 05 to Agreement No. 16041 with IBI Group for bus stop improvement design services and bid and construction support in an amount not-to-exceed $159,128. It is estimated that the design of the project will be completed by September 2019. NCTD estimates that this project will be ready for bid in December 2019 with a contract award in January 2020. The construction schedule will be established as part of the contract award.

ATTACHMENT: Attachment 14A - List of Bus Stops Proposed for Improvement

GOAL/STRATEGIC Asset Management and State of Good Repair DIRECTION:

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-014 FISCAL IMPACT: The fiscal impact of this proposed contract action is $159,128, which is funded with Federal Transit Administration (FTA) and matching local State Transit Assistance (STA) and Transportation Development Act (TDA) funds in project 119036, which has a total budget of $276,466. If the Board of Directors approves this proposed contract action, the balance available in project 119036 will be reduced to $104,078.

COMMITTEE REVIEW: None

STAFF CONTACT: Tracey Foster, Chief Development Officer E-mail: [email protected] Phone: 760-966-6674

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-014

Agenda Item #4 – Bus Stop Improvement Listing

Stop ID Stop Name / Stop Intersection City

20587 Mission Avenue / El Camino Real Oceanside

20562 Mission Avenue / Airport Road Oceanside

22638 Seagaze Drive / Ditmar Street Oceanside

20166 Mission Avenue / Carey Road East Oceanside

21356 Douglas Drive / North River Road Oceanside

20631 Thunder Drive / Waring Road Oceanside

20199 Vista Way / El Camino Real Oceanside

22082 Douglas Drive / Country Villas Apartments Oceanside

20180 Mission Avenue / Foussat Road Oceanside

20550 Mission Avenue / Carey Road Oceanside

21779 460 North Midway Drive Escondido

22714 Escondido Boulevard / El Norte Parkway Escondido

22151 W 9th Avenue / Windsor PIace Escondido

21174 North Santa Fe Avenue & Bobier Drive Vista

21672 North Santa Fe Avenue & Bobier Drive Vista

21670 North Santa Fe Avenue & Townsite Drive Vista

21173 North Santa Fe Avenue & Los Angeles Drive Vista

20672 West Vista Way / Highway 78 Westbound On Ramp Vista

RELATED TO AGENDA ITEM 14

FY2019 BUS STOP IMPROVEMENTS DESIGN SERVICES, AND BID AND CONSTRUCTION SUPPORT

Board Meeting April 18, 2019 BACKGROUND

• The North County Transit District’s (NCTD) Bus Stop Optimization Program includes implementing phased improvements for bus stops throughout the service area • Bus Stop Optimization Program goals: – Improve transit system speed – Consolidate underutilized stops and improve bus stop infrastructure to enhance the customer riding experience – Potentially improve fuel economy • Eighteen (18) stops identified for improvements based on: – ADA compliance, ridership, infrastructure, customer requests, and demographics.

1 BACKGROUND • Stops by Jurisdiction: – Oceanside: 10 – Vista: 5 – Escondido: 3

• Future phases will include improvements to stops in other cities

2 Current Bus Stop Conditions

• N. Santa Fe Avenue • W. 9th Avenue and and Townsite Drive, Windsor Place, Vista Escondido

3 IMPROVEMENTS • The bus stop improvements will vary by stop and may include: – Increasing pads to an adequate size, grade, quality, or other design considerations to accommodate the installation of bus stop furniture (shelter, benches, trash cans) – Furniture to be installed will be in accordance with NCTD bus stop design standards and all local, state, and federal regulations • Benches – Greater than 10 daily boardings – Anti-vagrant • Shelters – Greater than 20 daily boardings – Advertising panels where larger shelter footprints are feasible and solar powered lighting will be bid options

4 REQUEST FOR STATEMENT OF QUALIFICATIONS • A request for Statements of Qualifications (RFSQ) No. 28189 was issued on January 10, 2019 to NCTD’s on-call Architectural and Engineering Services firms for Design Services, Bid Support, and Construction Support for FY2019 Bus Stop Improvements. • Two (2) responses to the RFSQ were received by the January 23, 2019 deadline – Both Statements of Qualifications were deemed responsive and responsible and were evaluated by a Source Selection Committee (SSC) in accordance with the Federal Brooks and California Mini Brooks Acts, which is a qualifications-based selection process.

5 REQUEST FOR STATEMENT OF QUALIFICATIONS

• The SSC determined that IBI Group was the highest qualified firm due to their knowledge and experience performing site investigations, and work on projects of similar scope. • Design is anticipated to be completed in September of 2019, and bid for construction in December 2019, with award in January 2020

6 RECOMMENDATION

• Staff recommends that the Board award Task Order Agreement No. 05 to Agreement No. 16041 with IBI Group for bus stop improvement design services in an amount not-to-exceed $159,127.77

7 QUESTIONS?

8 Agenda Item # 15 RECEIVE THE CALENDAR YEAR 2019 DISCRETIONARY GRANTS STRATEGY AND ADOPT RESOLUTION NO. 19-04 IN SUPPORT OF NCTD’S DISCRETIONARY GRANT APPLICATION STRATEGY

Time Sensitive: ☒ Consent: ☐

STAFF Staff recommends that the Board of Directors: RECOMMENDATION: 1) Receive the Calendar Year 2019 Discretionary Grants Strategy and adopt Resolution No. 19-04 in support of NCTD’s discretionary grant application strategy; and 2) Authorize the Executive Director to provide a draft support letter and resolution to NCTD member agencies in support of NCTD’s Calendar Year 2019 Discretionary Grants Strategy.

BACKGROUND Staff has developed the Discretionary Grants Strategy as a strategic planning INFORMATION: document to support project needs as specified in the North County Transit District’s (NCTD) Capital Improvement Program (CIP). This document includes information on key NCTD project priorities, specific grant applications that will be submitted, and a summary of state and federal funding programs. NCTD’s identified needs include:

• Capital projects that promote safety and maintain District assets in a state of good repair, including the stabilization of the Del Mar Bluffs. • Capacity-enhancing bridge replacement and double-tracking projects that support increased transit services along the LOSSAN corridor. • Replacement of locomotives to support state of good repair and service expansion. Overhaul, replacement, and expansion of rail cars and cabs to support regional plans for increased COASTER frequencies. • Buses and vans for BREEZE, LIFT, and FLEX services to replace vehicles that are past their useful life and support a state of good repair, as well as comply with California zero-emission transit bus regulations. • Facilities repair and expansion projects to support zero-emission bus deployment, as well as facilities projects to build new NCTD administrative offices and maintenance of way building. • Passenger information and amenities to improve customer service.

This document is dynamic and reflects the best information available at the time of development. Staff will update the document on an annual basis and provide regular updates on its discretionary grant strategy efforts as needed.

Discretionary grant awards are based on a number of factors, including but not limited to: merit, project eligibility per specific grant program goals and requirements, and project cost and proposed cost sharing. Grantors, in the course of reviewing grant applications, also expect that the proposed project is broadly supported within the community. As a result, many of the discretionary grant applications request specific letters of support from member agencies and key stakeholders and organizations within the region.

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-015 Staff is requesting that the Board adopt Resolution No. 19-04 in support of NCTD’s discretionary grant application strategy. Additionally, in an effort to be proactive, NCTD staff will develop and is requesting that the Board support and authorize the Executive Director to provide a draft support letter and resolution to NCTD member agencies in support of NCTD’s Calendar Year 2019 Discretionary Grants Strategy for projects specified in the Discretionary Grants Strategy and for other unspecified projects and grant opportunities that may become available in the course of calendar year 2019.

Based on the foregoing, staff recommends that the Board of Directors:

1) Receive the Calendar Year 2019 Discretionary Grants Strategy and adopt Resolution No. 19-04 in support of NCTD’s discretionary grant application strategy; and 2) Authorize the Executive Director to provide a draft support letter and resolution to NCTD member agencies in support of NCTD’s Calendar Year 2019 Discretionary Grants Strategy.

ATTACHMENTS: 15A – NCTD Calendar Year 2019 Discretionary Grant Strategy 15B – Draft NCTD Resolution No. 19-04

GOAL/STRATEGIC Strategically Focus Intergovernmental & Legislative Relations DIRECTION:

FISCAL IMPACT: This staff report has no fiscal impact.

COMMITTEE REVIEW: None

STAFF CONTACT: Matthew O. Tucker, Executive Director E-mail: [email protected] Phone: 760-966-6500

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-015

NORTH COUNTY TRANSIT DISTRICT DISCRETIONARY GRANTS STRATEGY CY2019

March 2019

Contents Executive Summary ...... 1 NCTD Project Priorities ...... 1 Anticipated Grant Program Participation ...... 1 NCTD FY2020-2024 Capital Improvement Program ...... 2 NCTD Top Project Priorities ...... 5 Del Mar Bluffs Stabilization ...... 5 Rail Fleet Replacement and Expansion ...... 5 Bus Fleet Replacement and Expansion ...... 5 Next Generation Fare System ...... 6 Rose Canyon Bridge Replacements ...... 6 SPRINTER Frequency Improvements ...... 6 Additional NCTD Project Priorities...... 10 Advanced Technology ...... 10 Wayfinding ...... 10 Real-Time Arrival Information ...... 10 Next Generation Fare System ...... 10 NCTD Facilities Improvements ...... 10 Zero Emission Facilities Conversion ...... 10 Maintenance of Way and General Administration Buildings ...... 11 Transit-Oriented Development ...... 11 Mobility Hubs ...... 11 Top Ten LOSSAN Project Priorities ...... 11 State of Good Repair ...... 12 Double Tracking ...... 12 Capacity Enhancement ...... 12 Federal Discretionary Grant Funding Opportunities ...... 15 Federal Funding Sources ...... 15 Key Calendar Year 2019 Applications ...... 16 FRA State of Good Repair ...... 17 Better Utilizing Investments to Leverage Development ...... 17 FTA’s Low or No Emission Vehicle Program ...... 17 State and Regional Discretionary Grant Opportunities ...... 20 State and Regional Funding Sources ...... 20

Key Calendar Year 2019 Applications ...... 20 Low Carbon Transit Operations Program (LCTOP) ...... 21 Transit and Intercity Rail Capital Program (TIRCP) ...... 21 Carl Moyer Memorial Air Quality Standards Attainment Program ...... 21 Calendar Year 2018 Discretionary Grant Applications ...... 25 Submitted Transit and Intercity Rail Capital Program (TIRCP) Discretionary Grant Applications with LOSSAN, SANDAG and NCTD ...... 26 Transit and Intercity Rail Capital Program (TIRCP) Application Submitted by NCTD ...... 28 Transit and Intercity Rail Capital Program (TIRCP) Application Submitted by Capitol Corridor Joint Powers Authority ...... 28 Other Grant Applications Submitted in Calendar Year 2018 ...... 29 Eligibility Requirements and Considerations ...... 30

Executive Summary Staff has developed the Discretionary Grants Strategy document as a strategic planning document to support high-priority project needs. This document outlines North County Transit District’s (NCTD) capital project priorities and applicable federal and state funding programs. Information within this document includes the following: NCTD Project Priorities The Discretionary Grants Strategy document includes information regarding NCTD’s Capital Improvement Program, as well as high-priority capital needs for both NCTD and the LOSSAN corridor. Identified capital needs include priorities such as:

• Capital projects that promote safety and maintain District assets in a state of good repair, including the stabilization of the Del Mar Bluffs; • Capacity-enhancing bridge replacement and double-tracking projects that support increased transit services and reliability for NCTD, LOSSAN, Metrolink, and BNSF along the LOSSAN corridor; • Replacement of locomotives to support state of good repair needs and service expansion. • Overhaul, replacement, and expansion of rail cars and cabs to support regional plans for increased COASTER frequencies; • Buses and vans for BREEZE, LIFT, and FLEX services to maintain a state of good repair and replace vehicles that are past their useful life; • Zero-emission bus procurement to comply with the California Air Resources Board’s ruling to transition public transit bus fleets to 100 percent zero-emission by 2040; • Facilities repair and expansion projects to support zero-emission bus deployment; and • Facilities projects to build new NCTD administrative offices and a Maintenance of Way building.

Anticipated Grant Program Participation This document provides an overview of specific grant programs that NCTD plans to participate in, and a summary of key state and federal funding programs. Major state and federal grant programs include California State Transportation Agency’s (CalSTA) Transit and Intercity Rail Capital Program (TIRCP), the Air Pollution Control District’s (APCD) Carl Moyer Memorial Air Quality Standards Attainment Program, the Federal Railroad Administration’s (FRA) State of Good Repair (SOGR) Program, the and US Department of Transportation’s Better Utilizing Investments to Leverage Development (BUILD). This document outlines these programs and many others that NCTD plans to participate in to fulfil its capital needs. This document is dynamic and reflects the best information available at the time of development. Staff will update the document on an annual basis and provide regular updates on its discretionary grant strategy efforts at NCTD Board meetings, as needed.

Page 1 of 30

NCTD FY2020-2024 Capital Improvement Program Each year, the North County Transit District (District) prepares an update of its baseline five-year Capital Improvement Program (CIP) to review and adjust existing capital needs and plan for future capital needs. The District uses a ranking system to evaluate proposed new capital investments from District Divisions according to established criteria which prioritizes maintaining a state of good repair, regulatory requirements, safety and security, and projects that have ongoing contractual obligations. At its December 20, 2018 meeting, the District’s Board of Directors (Board) approved a constrained five-year (FY20–24) Capital Improvement Program (CIP) in the amount of $130,716,702, which included an FY20 CIP of $48,842,042 (Exhibit A). The proposed CIP investment over the FY20–24 period is $187 million below the unconstrained needs of $319 million (Exhibit B). The FY20 proposed CIP investment is approximately $46.7 million below the unconstrained needs of $95.5 million and $27 million above the $21.8 million funded in FY19. The proposed FY20–24 CIP is based on the following assumptions:

• Federal Transit Administration (FTA) grant funding (Sections 5307, 5311, 5337 and 5339) of at least $36.6 million annually will be made available to the District; • State of California Carl Moyer Program funding of $10 million will be made available to the District for the procurement of five (5) replacement locomotives; • TIRCP funding of $17.7 million will be made available for fencing and signal optimization projects. Additional TIRCP funding will be generated from an On-time Performance Incentive Agreement with LOSSAN, which the District may use at its discretion; • State of California Low Carbon Transit Operations Program (LCTOP) will provide at least $1.6 million annually towards the future purchase of zero-emission buses; • State Transit Assistance (STA) and State Rail Assistance (SRA) funding of at least $14.2 million annually (which includes new funds generated pursuant to SB 1) will be made available to the District; and • Local revenues (TransNet and Transportation Development Act [TDA]) will increase from approximately $55 million in FY20 to $62 million in FY24. Given the District’s ongoing capital investments, and emphasis on the list of LOSSAN priority projects, District staff have identified discretionary grant funding that could aid in narrowing the gap between constrained and unconstrained capital needs. In the pages following, the District has outlined its current five-year proposed funding plan, capital needs and priority projects, federal, state, and local discretionary grant opportunities, and the District’s strategy in securing additional funding to fulfill these capital needs.

Page 2 of 30

Exhibit A: FY2020-FY2024 Constrained CIP

NORTH COUNTY TRANSIT DISTRICT CAPITAL IMPROVEMENT PROGRAM FY2020 – FY2024 CONSTRAINED BASELINE

Asset Class Asset Class Description FY2020 FY2021 FY2022 FY2023 FY2024 Total 104 Revenue Vehicles-ADA - $ 2,164,052 $ 1,501,387 $ 1,142,407 $ 1,414,405 $ 6,222,251 104 Revenue Vehicles-Bus $ 7,816,561 $ 11,898,986 $ 11,636,523 $ 12,348,593 $ 12,111,595 $ 55,812,258 104 Revenue Vehicles-Rail $ 16,672,053 $ 21,265,261 $ 290,090 $ 242,000 $ 242,000 $ 38,711,404 338 Building and Structure Improvements $ 2,268,229 $ 490,000 $ 1,515,000 $ 1,175,000 $ 1,175,000 $ 6,623,229 433 Right-of-Way Improvements $ 2,687,744 $ - $ - $ - $ - $ 2,687,744 436 Signal Equipment $ 16,150,000 $ - $ - $ - $ - $ 16,150,000 438 Radio Equipment $ 1,500,000 $ - $ - $ - $ - $ 1,500,000 439 Revenue Collection and Fare Equipment $ 1,229,953 $ 955,605 $ 28,756 $ - $ - $ 2,214,314 440 Data Processing Equipment $ 517,502 $ 72,000 $ 57,000 $ 92,000 $ 57,000 $ 795,502 Total Constrained CIP $ 48,842,042 $ 36,845,904 $ 15,028,756 $ 15,000,000 $ 15,000,000 $ 130,716,702

Revenue Vehicles-Rail

Building and Structure Improvements

Right-of-Way Improvements

Signal Equipment

Revenue Vehicles-Bus Radio Equipment Revenue Collection and Fare Equipment Data Processing Equipment

Revenue Vehicles-ADA

Page 3 of 30

Exhibit B: FY2020-FY2024 Unconstrained CIP

NORTH COUNTY TRANSIT DISTRICT CAPITAL IMPROVEMENT PROGRAM FY2020 – FY2024 UNCONSTRAINED BASELINE

Asset Class Asset Class Description FY2020 FY2021 FY2022 FY2023 FY2024 Total 440 Data Processing Equipment $ 9,386,977 $ 627,000 $ 64,500 $ 325,000 $ 122,000 $ 10,525,477 338 Building and Structure Improvements $ 5,788,145 $ 3,773,000 $ 5,210,000 $ 21,265,000 $ 20,285,451 $ 56,321,596 438 Radio Equipment $ 1,921,000 $ - $ 1,500,000 $ - $ - $ 3,421,000 439 Revenue Collection and Fare Equipment $ 4,000,000 $ 4,500,001 $ 4,000,000 $ - $ - $ 12,500,001 104 Revenue Vehicles - ADA $ 3,171,283 $ 2,164,052 $ 1,501,387 $ 1,142,407 $ 1,414,405 $ 9,393,534 104 Revenue Vehicles - Bus $ 10,995,115 $ 11,898,986 $ 11,636,523 $ 12,823,127 $ 12,111,595 $ 59,465,346 104 Revenue Vehicles - Rail $ 24,906,404 $ 27,433,128 $ 14,879,057 $ 19,952,545 $ 9,482,994 $ 96,654,128 434 Operating Yards Equipment $ - $ 64,500 $ 400,000 $ - $ - $ 464,500 435 Shop/Garage Equipment $ 1,047,452 $ 41,508 $ 285,000 $ - $ - $ 1,373,960 500 Office Furniture and Equipment $ 19,153 $ 215,000 $ 215,000 $ 215,000 $ 215,000 $ 879,153 337 Building and Structures $ 1,837,750 $ 13,005,250 $ - $ - $ - $ 14,843,000 431 Transit Way Equipment $ 443,777 $ - $ - $ - $ - $ 443,777 223 Service Vehicles - Rail $ 360,000 $ - $ - $ - $ - $ 360,000 436 Signal Equipment $ 17,169,463 $ - $ - $ - $ - $ 17,169,463 223 Service Vehicles - Bus $ 874,494 $ 181,114 $ 366,677 $ 445,834 $ 489,093 $ 2,357,212 433 Right-of-Way Improvements $ 13,589,410 $ 5,981,425 $ 4,260,875 $ 4,460,875 $ 4,060,875 $ 32,353,460 Total Unconstrained CIP $ 95,510,423 $ 69,884,964 $ 44,319,019 $ 60,629,788 $ 48,181,413 $ 318,525,607

Right-of-Way Data Processing Equipment Improvements

Service Vehicles - Bus Building and Structure Improvements Signal Equipment Service Vehicles - Rail Transit Way Equipment Building and Structures

Office Furniture and Equipment Radio Equipment

Shop/Garage Equipment Revenue Collection and Fare Equipment Operating Yards Equipment Revenue Vehicles - ADA

Revenue Vehicles - Rail Revenue Vehicles - Bus

Page 4 of 30

NCTD Top Project Priorities Each year, NCTD staff, its Board of Directors, customers, and other key stakeholders identify strategic areas of focus and key business initiatives as part of its annual budget process. The following sections represent several categories that are aligned with these strategic areas of focus. These goals and initiatives help define the direction of NCTD’s discretionary grant strategy, identifying key areas of need for discretionary funding. The following is a list of NCTD’s Top Project Priorities: 1. Del Mar Bluff Stabilization Projects 5 (Through Construction) 2. Del Mar Bluff Stabilization Project 6 (Design and Environmental Clearance) 3. Locomotive Replacements 4. Commuter Rail Car and Cab Replacement and Expansion 5. CNG Bus Replacements 6. Fare Collection System Replacement 7. Rose Canyon Bridge Replacement 8. SPRINTER Frequency Improvements Exhibit C provides an overview of these key project priorities, which includes high-priority capital projects, as well as other fleet replacement and facilities projects. Del Mar Bluffs Stabilization NCTD, in collaboration with SANDAG, has developed and performed bluff stabilization since 1998 that has resulted in the completion of three bluff stabilization projects at a cost of approximately $5 million. In late 2018, NCTD and SANDAG initiated a Draft Prioritization for Future Improvements – Del Mar Bluffs Stabilization to Year 2050, which outlines an approach to complete short- and mid-term improvements with preliminary cost estimates. NCTD and SANDAG are currently advancing this new phase of bluff stabilization projects that will be completed between 2019 and 2050. Del Mar Bluffs Stabilization Phase 4 is fully funded at $3 million; Phase 5 is estimated to cost $24 million; Phase 6 is estimated to cost an additional $40 to $60 million. NCTD recently requested $12 million in funding via a federal State of Good Repair grant application that would be matched with $12 million in state and local funds to advance Del Mar Bluffs Stabilization 5 – Preserving Track-Bed Support. Seeking full funding for Phases 5 and 6 of the Del Mar Bluffs Stabilization will continue to be a high priority for NCTD. Rail Fleet Replacement and Expansion NCTD will seek discretionary funding to replace and expand its fleet to support increased frequencies. Specific rail fleet projects include funding for the replacement and expansion of the locomotive fleet and the overhaul, replacement, and expansion of rail car and cab fleet. These fleet investments will help to support regional plans for increased frequencies and maintain a state of good repair. The total estimated cost for rail fleet replacement and overhaul is $81.8 million. The estimated cost for rail expansion is $43.6 million. Bus Fleet Replacement and Expansion Specific bus fleet projects include the procurement of Compressed Natural Gas (CNG) buses and vans for BREEZE, LIFT, and FLEX services to replace 119 vehicles that are past their useful life. The total estimated cost for replacement BREEZE, LIFT, and FLEX vehicles is $47.6 million. These investments will help to maintain a state of good repair and improve service quality and reliability. Additionally, NCTD will need to invest in zero-emission bus and equipment procurement

Page 5 of 30

to comply with the California Air Resources Board’s ruling to transition public transit bus fleets to 100 percent zero-emission by 2040. NCTD is currently advancing the procurement of six (6) battery electric buses as part of a demonstration pilot for this effort, which has an associated cost of approximately $6 million. NCTD will continue to seek discretionary funding in order to transition its compressed natural gas (CNG) and diesel bus fleet to zero-emission vehicles. Next Generation Fare System NCTD and MTS share regional technologies that support transit operations and fare collection. In late 2018, San Diego MTS selected INIT (Innovations in Transportation, Inc) via a competitive procurement to provide an account-based, open architecture electronic fare system. This system will include real-time fare purchasing and loading, a website and mobile app for account management, and a vastly expanded retail network. INIT’s back-office processing and revenue management system utilizes an open architecture design to integrate with third-party vendors. The Southern California Regional Rail Authority (Metrolink) awarded a contract to INIT in mid CY2018, and NCTD will collaborate with Metrolink and LOSSAN to support fare integration. NCTD will pursue TIRCP funding as part of a comprehensive program of projects to support regional fare integration as part of its plans to upgrade ticket vending machines and fare validators as part of the San Diego regional fare system. Rose Canyon Bridge Replacements The Rose Canyon Bridges include four aging timber trestle bridges with construction dates ranging between 1917 and 1943. These bridges are located at mileposts 254.7, 255.1, 255.3, and 257.2 within Rose Canyon, between Miramar Air Station and the intersection of I-5 and SR-42. State of Good Repair bridge replacement costs for design, environmental approvals, and construction for all four bridges is estimated at $27 million. The priority for replacement in FY 19 and 20 will be bridge 257.2 as a significant amount of project development activities have been completed to make this a shovel ready project. SPRINTER Frequency Improvements In late 2012 and early 2013, NCTD conducted a concept-level analysis of passenger rail operations along the SPRINTER corridor to identify the infrastructure required for greater service frequencies. In CY2019, NCTD will reexamine these studies to identify the necessary capital investments for improving SPRINTER frequencies to 20-minute or 15-minute headways. NCTD will incorporate this analysis into a program of projects to be submitted for TIRCP funding.

Page 6 of 30

Exhibit C: NCTD Key Project Priorities

Page 7 of 30

Page 8 of 30

Page 9 of 30

Additional NCTD Project Priorities The following additional priorities are aimed at further enhancing customer service, improving service quality, increasing ridership, and developing and improving community partnerships. Advanced Technology High-quality passenger amenities help to attract and maintain riders on the NCTD system. Key transit amenities include wayfinding, real-time arrival information, an improved fare collection system, and passenger comfort features such as shelters and benches. Through investments in these amenities, NCTD can improve both the passenger experience and the relationship of NCTD facilities to the communities within the service area. Wayfinding NCTD is currently developing its Wayfinding Master Plan with the help of a design consultant. This plan will result in a master design plan and package of biddable documents for a cohesive, streamlined wayfinding system for the NCTD service area. NCTD will seek discretionary grant funding for the design and installation of the wayfinding specifications, which include both digital and static signage. Programs that have previously funded wayfinding implementation include SANDAG’s Smart Growth Incentive Program. Real-Time Arrival Information In November 2018, the Capitol Corridor Joint Powers Authority issued a request for statement of qualifications (RFSQ) to provide the California Passenger Information Display System (CalPIDS). The Capital Corridor is seeking a vendor to design, test, implement, and maintain the elements of a PIDS for three passenger rail services in Northern California, and has opened the potential for other passenger rail agency partners in California to utilize its RFSQ as a procurement mechanism for electronic signage. NCTD will pursue TIRCP funding for an electronic signage system and may elect to utilize the CalPIDS procurement as an option. NCTD staff will review the CalPIDS package and selected vendor in preparation of the TIRCP call for projects. Next Generation Fare System NCTD will pursue funding to replace its existing ticket vending machines and fare validators as part of the regional fare system with MTS. NCTD will coordinate with MTS on the implementation of this regional fare system, which will provide a seamless, inter-operable experience for the customer throughout San Diego County. This fare system will also enable future integration with Metrolink, who has selected the same vendor for their fare system. NCTD Facilities Improvements Key facilities improvements include the following:

• Zero Emission Facility Conversion • Maintenance of Way Building • General Administration Building • Transit Oriented Development

Zero Emission Facilities Conversion In order to support the bus fleet transition to zero-emission technology, NCTD will need to invest in the expansion of its East and West divisions to accommodate the appropriate battery-electric

Page 10 of 30

charging infrastructure. NCTD estimates that this will cost approximately $41 million and is advancing a series of Project Study Reports to gather additional information on the capital needs associated with this transition. Maintenance of Way and General Administration Buildings Additionally, NCTD has identified the construction of a new General Administrative Office (GAO) building at Carlsbad Village Transit Center and a new Maintenance of Way (MOW) Building at the Del Mar Wye as key facilities priorities. NCTD’s GAO building is currently at capacity for approved NCTD personnel levels and requires significant maintenance and renovation. Remodel of the current GAO building is not fiscally responsible, leading NCTD to pursue a new GAO building opportunity at Carlsbad Village Transit Center. This building has a high-level cost estimate of $8.6 million. NCTD’s current MOW Building is a leased facility in Oceanside. NCTD seeks to build a new facility on property currently owned by NCTD with a more effective location for response times along the San Diego Subdivision. This building has a high-level cost estimate of $5.7 million. NCTD’s Development Services Division aims to initiate engineering plans, specifications, and estimates for both the GAO and MOW buildings by July 2019 if funding is secured. Transit-Oriented Development To increase transit-supportive planning in North County, NCTD will pursue discretionary grant funding for a variety of transit-oriented and smart growth projects. Transit-oriented communities help to form a strong ridership base by providing improved access to transit services. NCTD will pursue large-scale joint development projects located near or at transit stations. These projects could feature residential, commercial, or mixed-use real estate opportunities that maximize access to public transportation. Specific joint development opportunities include Oceanside, Carlsbad Village, Solana Beach, and Escondido stations. Mobility Hubs NCTD regularly submits grant applications for a variety of planning studies. These studies include long-range planning such as NCTD’s Land Use and Transit Integration Study and the Strategic Multimodal Transit Implementation Plan. As the transportation industry evolves, NCTD will continue seeking grant funding in order to research, test, and implement new forms of mobility services in North County. As part of the regional plan, SANDAG has developed a Regional Mobility Hub Strategy to demonstrate how transportation services, amenities, and supporting technologies can work together to improve access to transit and other shared mobility choices for communities throughout San Diego County. In support of this strategy, NCTD will pursue discretionary grant opportunities that help develop Mobility Hubs within North County. This includes projects such as shared micromobility (scooters and bikeshare) and shared ride services such as Uber, Lyft, and other micro-transit providers. The previously identified passenger information and amenities help to support development of regional mobility hubs. Top Ten LOSSAN Project Priorities NCTD, in coordination with the Los Angeles – San Diego – San Luis Obispo Rail Corridor Agency (LOSSAN), and the San Diego Association of Governments (SANDAG) have developed a priority listing of projects (Exhibit D). This program is focused on state of good repair and capacity enhancement to advance regional and state goals of improved and integrated passenger and

Page 11 of 30

freight rail service on the LOSSAN Corridor. Safety, continuity of operations, and state of good repair are core fundamental principles of these capital priorities. The program of projects comprises of three state of good repair projects, five double-tracking projects that support both capacity enhancement and state of good repair, and two capacity-enhancing projects. NCTD, LOSSAN, and SANDAG are pursuing funding support from both State and Federal sources for the implementation of this program of key projects. These projects are linked to current railroad operating plans, railroad state of good repair and capacity needs, and major transportation corridor projects. State of Good Repair The stabilization of the Del Mar Bluffs is NCTD’s highest ranked priority. The erosion of the Del Mar Bluffs poses a serious safety concern for the entire corridor, and is a high priority for NCTD, SANDAG, and its partners at Amtrak and BNSF. NCTD and SANDAG are coordinating to submit an application to the Federal Rail Administration’s State of Good Repair Program. The remaining two state of good repair projects support the replacement of San Onofre and Rose Creek bridges that have an average age of 80 years, well beyond their expected useful life. These bridges are identified for repair, modification, or replacement under NCTD’s federally-mandated Bridge Management Plan. Double Tracking Five projects support the replacement of single-track bridges that have reached the end of their useful life with double track bridges to support planned increases in passenger and freight rail operations. The Batiquitos Lagoon Double Track, San Dieguito Double Track and Platform, Sorrento to Miramar-Phase 2, and Eastbrook to Shell Double Track are in final design and will be shovel ready by 2020. The La Costa to Encinitas Station Double Track project is ready to be advanced into preliminary engineering. The Batiquitos Lagoon Double Track, Eastbrook to Shell Double Track, San Dieguito Double Track and Platform (Del Mar), and the La Costa to Encinitas Station Double Track project are all part of the North Coast Corridor Public Works Plan. Per state law (Kehoe SB 468), these projects are required to be completed concurrently with improvements on Interstate 5 to minimize environmental impacts associated with construction activities and provide multimodal transportation improvements. These single-track bridges have reached and/or are approaching the end of their useful life. These investments represent significant benefits to the public by ensuring continued safe operations through sensitive habitat while removing single-track train traffic choke-points. The Sorrento to Miramar-Phase 2 project adds double tracking and raises operating speeds from 25 mph to 40 mph for passenger trains on the Miramar Grade which is the steepest and slowest stretch on the San Diego portion of the LOSSAN corridor. This project will support improved movement of both freight and passenger operations and remove a critical choke-point that poses daily risk of delays in the event of an incident or equipment failure. Capacity Enhancement The remaining two high priority projects include the construction of the Convention Center Platform and the procurement of three new five car COASTER passenger trainsets to provide increased frequencies. The Convention Center Platform (CCP) supports one seat rides to downtown San Diego, representing a ridership generator for commuters and special events

Page 12 of 30

attendees. The Convention Center Platform will also increase capacity at the Santa Fe Depot for both passenger and freight operations. To achieve the benefits of the state of good repair and capacity enhancement projects, NCTD will need three additional trainsets by 2020 to complement increased frequency and limited stop service that will be operated by Amtrak. The need for the additional trainsets comes directly from SANDAG modeling in the 2018 Infrastructure Development Plan for the LOSSAN Corridor in San Diego County. NCTD is currently procuring replacement train equipment and has included options to support expedited delivery of the additional trainsets. The San Diego region has demonstrated its commitment to improved rail service on the San Diego portion of the LOSSAN corridor by investing more than $215 million in local funds derived from TransNet into the LOSSAN Corridor. The ten projects that have been identified, if implemented, will significantly advance passenger and freight rail service and support current efforts from LOSSAN, NCTD, BNSF, Metrolink, and CALSTA to provide improved and integrated rail service in Southern California.

Page 13 of 30

Exhibit D: LOSSAN Rail Priority Projects Short Term Projected Funding (in $ Millions) – 2019-2025 Funding – 2026-2035 GRAND Project TOTAL FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26-30 FY31-35 TOTAL (FY19-25) (FY19-35) State of Good Repair (SOGR) Del Mar Bluffs Stabilization $3.0 $9.0 $9.0 $1.0 $22.0 $22.0 $28.0 $72.0 San Onofre Bridge $3.0 $3.0 $21.0 $21.0 $1.5 $49.5 $49.5 Replacements Rose Creek Bridge $2.0 $2.0 $11.0 $11.0 $1.3 $27.3 $27.3 Replacements Additional Train Sets Procurement Add 3 five car trainsets in 2020 $6.0 $32.0 $32.0 $70.0 $70.0 Double Track Projects* Br 234.8 Batiquitos Lagoon DT $33.0 $35.0 $12.0 $80.0 $80.0 Br 243.0 San Dieguito DT $80.0 $80.0 $36.0 $196.0 $196.0 Sorrento Miramar Phase 2 DT $11.0 $4.0 $60.0 $50.0 $9.0 $134.0 $134.0 Br 225.4 San Luis Rey River - $30.0 $40.0 $12.0 $82.0 $82.0 EBSDT La Costa to Encinitas Station DT $119.9 $119.9 New Station Projects Convention Center Platform $5.0 $5.0 $10.0 $37.0 $47.0 Total $0 $25.0 $83.0 $248.0 $205.0 $92.8 $17.0 $670.8 $178.9 $28.0 $877.7

Page 14 of 30

Federal Discretionary Grant Funding Opportunities The following section provides an overview of federal discretionary grant programs relevant to NCTD, including funding levels and potential NCTD projects that are eligible under each program. Tables 1 and 2 provide an overview of federal funding levels for Fiscal Year 2019, while Table 3 provides a brief overview of each program’s focus area and eligible projects. Federal Funding Sources The Fixing America’s Surface Transportation (FAST) Act was signed into law in December 2015. This legislation authorizes $305 billion over fiscal years 2016 to 2020 for a variety of transportation programs, including public transportation and rail. The Consolidated Appropriations Act of 2019 (H.J. Res. 31) was signed into law in February 2019, providing FY2019 funding for several government departments including USDOT through September 30, 2019. This legislation is slightly less than FY2018 funding levels, but represents $1.2 billion more than the FY2019 FAST Act authorization levels and $2 billion more than FY2017 enacted funding levels. The legislation includes $13.4 billion for public transportation and $2.6 billion for intercity passenger rail grants. The following table provides a program-level overview of funding levels through this legislation. Figure 1 provides a comparison of FAST Act funding authorization and enacted Transportation Appropriations acts since Federal FY 2016.

Table 1: Federal Appropriations – Public Transportation Formula and Competitive Programs Federal Public Transportation Programs FY2019 Funding Formula Programs Urbanized Area Formula Grants $4.8 billion State of Good Repair Formula Grants $2.9 billion Rural Area Formula Grants $699 million Growing Station/High-Density States Formula Grants $601 million Growing State Apportionments $293 million High-Density State Apportionments $308 million Bus and Bus Facilities Formula Grants $622 million Seniors and Individuals with Disabilities Formula Grants $280 million Planning Formula Grants $139 million Competitive Programs Capital Investment Grants $2.5 billion Bus and Bus Facilities Competitive Grants $482 million No and Low Emission Competitive Grant Program $85 million Transit-Oriented Development Pilot Program $10 million Technical Assistance and Workforce Development $14 million Washington Metropolitan Area Transit Authority $150 million Administrative Expenses and Other Programs $135 million Public Transportation Total $13.4 billion

Page 15 of 30

Table 1: Federal Appropriations – Intercity Passenger Rail Programs Federal Intercity Passenger Rail Programs FY2019 Funding Amtrak Grants $1.9 billion Northeast Corridor Amtrak Grants $650 million National Network Amtrak Grants $1.3 billion CRISI Grants $255 million Federal-State Partnership for State of Good Repair $400 million Restoration and Enhancement Grants $5 million Maglev Technology Deployment Program $10 million Intercity Passenger Rail Total $2.6 billion

Figure 1: Public Transportation and Passenger Rail Funding Levels

$16.31 $16.03 16

$15.05 15 $14.81 $14.21 $14.03 $14.01 14 $13.45 $13.15 13

12 Billions Dollars of Billions

11

10 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020

FAST Act Authorized Transportation Appropriations Acts

Source: American Public Transportation Association

Key Calendar Year 2019 Applications NCTD is advancing a program of projects that build capacity and bring assets into a state of good repair. NCTD anticipates participating in call for projects for key funding programs including, but not limited to, the FRA’s State of Good Repair program and Consolidated Rail Infrastructure and Safety Improvement Grants Program (CRISI), US DOT’s Better Utilizing Investments to Leverage Development (BUILD) program, and the Federal Transit Administration’s (FTA) Low or No Emission Vehicle Program.

Page 16 of 30

FRA State of Good Repair NCTD and SANDAG have coordinated to submit a joint grant application to the FRA’s State of Good Repair grant program for the stabilization of the Del Mar Bluffs. The application includes a request for approximately $24 million for a variety of stabilization measures. The Del Mar Bluffs remains as the top funding priority for NCTD in order to ensure the continued safety of the corridor. Better Utilizing Investments to Leverage Development NCTD has participated in several rounds of BUILD grant application cycles, which is formerly known as the TIGER program. Previously, NCTD submitted the Del Mar Bluffs as a key project for this program. If NCTD and SANDAG do not secure funding for the Del Mar Bluffs under the FRA’s State of Good Repair program, NCTD will advance the Del Mar Bluffs Stabilization for the BUILD program. Other eligible projects include those listed on NCTD’s top 10 LOSSAN capital priorities. FTA’s Low or No Emission Vehicle Program NCTD regularly participates in the FTA’s Low or No Emission Vehicle Program and its Bus and Bus Facilities Competitive Grants Program. NCTD will seek funding for zero-emission buses and infrastructure under these key programs. These programs will support District efforts to replace its aging bus fleet. The following table provides an overview of additional federal programs that NCTD anticipates participating in. This list of discretionary grant programs is subject to change, and NCTD will adjust its strategy accordingly.

Page 17 of 30

Table 2: Federal Discretionary Grant Programs Relevant to NCTD Agency Program Name Program Focus and Eligible Projects Potential NCTD Projects FTA Access and Mobility Funds capital projects and programs for the Travel training and non- Partnership Grants transportation of disadvantaged populations that will emergency medical improve the coordination of transportation services and transportation. non-emergency medical transportation. US Better Utilizing Investments to Funds major investments in transportation infrastructure, NCTD Maintenance of Way DOT Leverage Development including road, rail, transit, and port projects. BUILD facility, bridge rehabilitation (BUILD) Transportation Grants emphasizes safety, state of good repair, and economic or replacement, Del Mar Program competitiveness as components of its merit criteria. Bluffs stabilization. FTA Bus and Bus Infrastructure Funds capital projects to replace, rehabilitate and Replacement zero-emission Investment Program (5339) purchase buses, vans, and related equipment, and to buses construct bus-related facilities, including technological changes or innovations to modify low or no emission vehicles or facilities. FTA Capital Investment Grants Funds major transit capital investments, including heavy To be determined. (5309) rail, commuter rail, light rail, streetcars, and . Projects seeking CIG funding must complete a series of steps over several years in order to be eligible for funding. Depending on project type, Project Development and/or Engineering phases must be completed prior to a grant agreement. Projects must then be rated by the FTA at various points along the project’s process. FRA Consolidated Rail Infrastructure Funds capital projects that will improve passenger and Double tracking, bridge and Safety Improvements freight rail transportation systems in terms of safety, rehabilitation or Program (CRISI) efficiency, or reliability. replacement, Del Mar Bluffs stabilization. FRA Federal-State Partnership for Funds capital projects to repair, replace, or rehabilitate Double tracking, bridge State of Good Repair Grant qualified railroad assets to reduce the state of good rehabilitation or Program (SGR) repair backlog and improve intercity passenger rail replacement, Del Mar Bluffs performance. stabilization. FRA Infrastructure for Rebuilding Funds projects that address critical issues facing Capacity-enhancing America Grants (INFRA) highways and bridges. This program emphasizes private projects such as double sector involvement and innovative approaches to tracking or bridge improve processes for building significant projects.

Page 18 of 30

rehabilitation or replacements. FTA Low or No Emission Vehicle Funds the purchase or lease of low or no emission Replacement zero-emission Program [5339(c)] transit buses and related equipment, or to lease, buses. construct, or rehabilitate facilities to support low or no emission buses. FTA Mobility on Demand (MOD) Funds projects that promote innovative business models Mobility Hub Pilot Programs Sandbox Demonstration to deliver high quality, seamless and equitable mobility such as Micromobility at Program options for all travelers. SPRINTER stations and TNCs connecting to COASTER service FTA Pilot Program for Expedited Up to eight (8) projects will be selected for expedited To be determined. Project Delivery [3005(b)] grant awards. Projects must be supported through a public-private partnership and be operated and maintained by an existing public transportation provider. FTA Pilot Program for Transit- Provides funding to local communities to integrate land To be determined. Oriented Development use and transportation planning with a new fixed Planning (5309) guideway or core capacity transit capital investment (i.e. agencies seeking or recently received funding through the Capital Investment Grant (CIG) Program). FTA Public Transportation Provides funding to develop innovative products and To be determined. Innovation (5312) services assisting transit agencies in better meeting the needs of their customers. Eligible projects include the research, development, demonstration, and deployment of public transportation technologies. FTA Safety Research and Provides technical and financial support for transit Intrusion detection system; Demonstration Program agencies to pursue innovative approaches to eliminate CCTV upgrades. or mitigate safety hazards, with a project emphasis on demonstration of technologies and safer designs. FEMA Transit Security Grant Program Funds transportation infrastructure security activities to Intrusion detection system; strengthen critical infrastructure and protect against CCTV upgrades. risks associated with potential terrorist attacks. Eligible projects include preparedness activities, operations deterrence and operations packages, and capital projects.

Page 19 of 30

State and Regional Discretionary Grant Opportunities The following section provides an overview of state and regional discretionary grant programs relevant to NCTD, including funding levels and potential NCTD projects that are eligible under each program. Table 5 provides an overview of funding levels, while Table 6 provides an overview of each program’s focus area and eligible projects. State and Regional Funding Sources The Road Repair and Accountability Act (Chapter 5, Statutes of 2017, SB 1) was enacted in 2017 and provides stable, long-term funding for state and local transportation infrastructure through fuel taxes and vehicle value-based transportation improvement fees. SB 1 provides an average of $5.4 billion per year over the next ten years for a variety of state and local projects. The table below provides a breakdown of the proposed SB 1 Funding in the 2019-2020 Budget. The Governor’s office will release a five-year infrastructure plan that will identify priorities for investments in the state’s infrastructure later this year.

Table 2: State SB 1 Funding Allocation Road Repair and Accountability Act Funding (SB 1) FY2019-2020 Local Road Repairs $1.2 billion Repair and Maintenance of the State Highway System $1.2 billion Repair and Maintain Bridges and Culverts $400 million Improve Trade Corridors $307 million Increase Throughput on Congested Commute Corridors $250 million Local Transit Operations $458 million Capital Improvements for Transit, Commuter, and Intercity $386 million Rail (TIRCP Program) Local Partnership Projects $200 million Active Transportation Program (ATP) $100 million Expansion of Freeway Service Patrols $25 million Local Planning Grants $25 million Total $5.4 billion Source: Governor’s Budget Summary 2019-20; January 9, 2019 Additionally, proceeds from the Cap-and-Trade Program support a wide range of programs and projects that are relevant to NCTD. The Legislature and Governor appropriate money from the Greenhouse Gas Reduction Fund (GGRF) to State agencies through the Budget process. The California Air Resources Board’s FY2018-2019 Funding Plan for Clean Transportation Incentives represents a total of $483 million in clean transportation investments. This includes $455 million for Low Carbon Transportation investments and $28 million for the Air Quality Improvement Program funded with Cap-and-Trade Auction Proceeds, which are deposited in the Greenhouse Gas Reduction Fund (GGRF). This Plan includes $180 million for Clean Truck & Bus Vouchers and the Zero- and Near-Zero Emission Freight Facilities Projects. The development of the FY2019-2020 Funding Plan is currently underway. Key Calendar Year 2019 Applications NCTD is advancing a program of projects that build capacity and bring assets into a state of good repair. NCTD anticipates participating in call for projects for key funding programs including, but not limited to, the Carl Moyer Program, Low Carbon Transit Operations Program, and Transit and Intercity Rail Capital Program.

Page 20 of 30

Low Carbon Transit Operations Program (LCTOP) NCTD intends to utilize LCTOP funding for the purchase of zero emission replacement buses. Staff intends to roll over previously allocated LCTOP funds totaling $2,152,177 for the purchase of six (6) zero emission buses. These buses are estimated to cost $5,400,000. NCTD will submit the FY2019-2019 LCTOP funding request in March 2019. Transit and Intercity Rail Capital Program (TIRCP) NCTD is developing a program of competitive projects to submit in the next cycle of California Transit Agency’s Transit and Intercity Rail Capital Program, which is anticipated in September 2019. The purpose of the TIRCP program is to “fund transformative capital improvements that will modernize California’s intercity, commuter, and urban rail systems, and bus and ferry transit systems, to significantly reduce emissions of greenhouse gases, vehicle miles traveled, and congestion.” Other key objectives of the program include the expansion and improvement of transit service to increase ridership, the integration of intercity and commuter rail services, and transit safety improvements. NCTD has identified an initial list of potential projects that are eligible for TIRCP grant funding, including, but not limited to: 1. SPRINTER double-tracking to support increased frequency 2. Batiquitos Lagoon Double Tracking (Br 234.8) 3. San Dieguito Double Tracking (Br 234.0) 4. Sorrento to Miramar Phase II Double Tracking 5. San Luis Rey River Double Tracking (Br 225.4) 6. Convention Center Platform 7. California Passenger Identification Display System (CalPIDS) capital investment 8. San Diego Next Generation Fare System capital investment 9. NCTD Wayfinding capital program 10. Additional locomotives and five car trainsets In CY2019, NCTD will work with its project partners LOSSAN and SANDAG to finalize the program of projects. This project list is largely built on NCTD’s capacity-enhancing projects included in the Top 10 LOSSAN Capital Priorities. NCTD will procure the assistance of a consultant team to help develop and submit the final grant application package to the TIRCP program. Carl Moyer Memorial Air Quality Standards Attainment Program Similar to the TIRCP program, the NCTD will develop a program of competitive projects to submit in the next cycle of the Carl Moyer program, which is expected in September 2019. NCTD will utilize a consultant team in order to model and capture the emission-reduction benefits of cleaner- than-required engines, equipment, and emission reduction technologies. The following table provides an overview of additional state and regional programs that NCTD anticipates participating in. This list of discretionary grant programs is subject to change, and NCTD will adjust its strategy accordingly.

Page 21 of 30

Table 3: State and Regional Discretionary Grant Programs Relevant to NCTD Agency Program Name Program Focus and Eligible Projects Potential NCTD Projects CTC/Caltrans Active Transportation Funds infrastructure and planning projects that encourage First/last mile infrastructure and Program (Statewide and increased use of active modes of transportation such as investments (i.e sidewalk SANDAG Regional) biking and walking. Eligible projects include improvements connectivity and bicycle to or development of bikeways and walkways that improve infrastructure); planning mobility, access, and safety for non-motorized users; studies installation of traffic control devices; bicycle facilities; active transportation plans; and other safe routes to transit projects. Caltrans Adaptation Planning Grant Funds a variety of projects that aim to anticipate and To be determined. Program prepare for climate change impacts. Eligible projects include climate vulnerability assessments, extreme weather event evacuation planning, resilience planning, transportation infrastructure adaptations plans, natural and green infrastructure planning, integration of transportation adaptation planning into existing plans, and evaluation of adaptation strategies. CARB Carl Moyer Memorial Air Provides grant funding to purchase cleaner-than-required Locomotives and zero- Quality Standards engines, equipment, and emission reduction technologies. emission buses Attainment (Carl Moyer) Eligible projects include cleaner on-road trucks, transit Program buses, off-road equipment, locomotives, and light duty vehicle scrap. CARB Hybrid and Zero-Emission Provides funding on a first-come, first-served basis. The Zero-emission buses Truck and Bus Voucher program provides vouchers of up to $95,000 for California Incentive Program purchasers and lessees of zero-emission trucks and buses, and up to $30,000 for eligible hybrid trucks and buses. HVIP provides increased incentives for fleets located in disadvantaged communities, with vouchers up to $110,000 for zero-emission trucks and buses. Trucks and buses that are outfitted with engines meeting the optional low NOx standard are eligible for up to a $25,000 voucher through Low NOx Engine Incentives. Caltrans Local Partnership Program Provides funding for counties, cities, districts, and regional Signal optimization transportation agencies in which voters have approved fees or taxes solely dedicated to transportation improvements. Caltrans Low Carbon Transit A formulaic program that funds operating and capital Zero-emission buses Operations Program assistance to transit agencies with the goal of reducing greenhouse gas (GHG) emissions and improving mobility.

Page 22 of 30

Metropolitan On-Site Retrofit Program Provides financial incentives directly to public or private Connection to reclaimed Water District property owners to convert potable water irrigation or water system for select NCTD of Southern industrial water systems to recycled water service. facilities California Incentives of up to $195 per acre-foot for five years of estimated water use are available, with a cap at the actual retrofit costs. Items eligible for incentives include project design; permitting; construction costs associated with the retrofit of potable to recycled water systems; connection fees and required recycled water signage. SANDAG Smart Growth Incentive Funds transportation-related infrastructure improvements Wayfinding signage Program and planning efforts that support smart growth development. The program’s goal is to fund comprehensive public infrastructure projects and planning activities that facilitate compact, mixed-use, transit-oriented development and increase housing and transportation choices. CTC Solutions for Congested Funds projects designed to achieve a balanced set of First/last mile infrastructure Corridors Grant Program transportation, environmental, and community access investments (i.e sidewalk improvements within highly congested travel corridors connectivity and bicycle throughout the State as part of a comprehensive corridor infrastructure) plan. These improvements may be on the State highway system, local streets and roads, public transit facilities, bicycle and pedestrian facilities or required mitigation or restoration. SANDAG Specialized Transportation Funds projects and programs that expand mobility options Replacement LIFT vehicles Grant Program for seniors and individuals with disabilities. Eligible projects include, but are not limited to, purchase of accessible vans and buses, coordinated volunteer driver programs, shopping shuttle services, non-emergency medical trips, and transit travel training classes. Caltrans State of Good Repair Funds capital projects that maintain the public transit system NCTD’s top 10 LOSSAN in a state of good repair. Eligible projects include transit capital priorities capital projects or services to maintain, repair, or modernize existing vehicle fleet or facilities; the design, acquisition and construction of new vehicles or facilities that improve existing transit services; and transit services that complement local efforts for repair and improvement of local transportation infrastructure. CalSTA State Rail Assistance Formulaic program that provides funding for California’s To be determined. Program commuter and inter-city rail agencies. Funding for commuter rail is split between the state’s five commuter rail agencies, allowing each eligible agency to submit a request for funds.

Page 23 of 30

This program emphasizes projects that promote connectivity, integration of intercity rail service, and projects that have the greatest potential to grow rail ridership. California Storm Water Grant Funds multi-benefit storm water management planning and To be determined. Water Program implementation projects such as green infrastructure, Boards rainwater and storm capture projects, storm water treatment facilities, and storm water resource plans. Caltrans Sustainable Transportation Funds planning projects that directly benefit multimodal Planning studies including Planning Grant Program transportation systems through the integration of land use, active transportation, housing, and transportation planning. Eligible projects technology, smart growth, include studies and assessments that help advance and other key community community efforts to reduce single occupancy vehicle trips mobility goals. and transportation-related GHG emissions. CalSTA Transit and Intercity Rail Funds capital improvements to modernize California’s SPRINTER doubletracking, Capital Program (TIRCP) intercity, commuter, and urban rail systems, and bus and California Passenger ferry transit systems. The program aims to significantly Identification System reduce emissions of greenhouse gases, vehicle miles (CALPIDS), fare system traveled, and congestion. Projects include rail capital integration projects to expand, enhance or improve existing rail systems and connectivity; projects that increase service levels, reliability, and decrease travel times; integrating ticketing and scheduling systems; and bus rapid transit investments. CARB Volkswagen Environmental The Trust and associated mitigation plan invests primarily in Zero-emission buses Mitigation Trust Funds zero emission replacements for heavy-duty trucks, buses, and equipment. Funding for zero-emission buses is awarded on a first-come, first-served basis.

Page 24 of 30

Calendar Year 2018 Discretionary Grant Applications NCTD and its project partners submitted grant applications in Calendar Year 2018 totaling over $60 million in competitive discretionary funding requests. Additionally, LOSSAN submitted a program of projects to the California Transit and Intercity Rail Capital Program (TIRCP) totaling $501 million in funding requests for the region. Through this TIRCP application, the region received over $65 million for projects that benefit NCTD, including signal optimization and capitalized maintenance activities, on-time performance improvements, right-of-way fencing, and a study of maintenance/layover facilities. Metrolink also submitted an application to the TIRCP program and received an award of $875 million for its Southern California Optimized Rail Expansion (SCORE) program of projects. This program includes double track and bridge improvements north of Control Point Songs within NCTD’s right-of-way. The first three tables consist of a program of projects submitted to TIRCP. The fourth table consists of other federal, state, and local programs NCTD has participated in. These tables provide an overview of the applications submitted as well as the project costs and funding requests associated with each application. Many of these grant programs have annual cycles; for applications that were not successful, NCTD will work to improve and adjust its discretionary grant strategy to continually participate in these funding opportunities.

Page 25 of 30

Submitted Transit and Intercity Rail Capital Program (TIRCP) Discretionary Grant Applications with LOSSAN, SANDAG and NCTD

App Project Title Description Project Cost Funding Phase ($M) Request ($M)

Batiquitos Lagoon Double Add 0.7 miles of double track and bridge replacement 1 $75.3 $44.4 Track

Sorrento to Miramar Phase Add 1.8 miles of double track and curve straightening 1 $129.0 $99.6 2 Double Track

San Dieguito Lagoon Add 2.1 miles of double track and improvements, 1 Double Track and Platform including San Dieguito bridge replacement and special $200.0 $183.5 Construction events platform at Del Mar Racetrack

Construct new fencing in Oceanside, Encinitas and Del 1 Fencing $1.3 $1.3 Mar

San Diego Study alternatives for new maintenance/layover facility for 1 Maintenance/Layover trains in downtown San Diego $0.3 $0.3 Facility

Signal respacing (SD Respace signals to allow increased frequency/closer 1 County - Metrolink applying headways on existing infrastructure - study and $17.9 $15.9 for north of SD) implementation funding

Page 26 of 30

App Project Title Description Project Cost Funding Phase ($M) Request ($M)

1 OTP Incentive Program Payments for OTP milestones. $23.0 $23.0

Replace three aging timber bridges at milepost 207.6, San Onofre Bridge 2 207.8, and 209.9, and turnout replacement at milepost $47.0 $47.0 Replacements and Turnout 208.6)

Eastbrook to Shell Double Add .6 miles of double track and replacement of San Luis 2 $82.8 $71.9 Track Rey bridge in Oceanside

Final design for railroad trench, pending PE and 2 Carlsbad Village Trenching $10.0 $10.0 environmental

2 Station Wayfinding Signage Station signage updates/refresh $0.7 $0.7

Page 27 of 30

Transit and Intercity Rail Capital Program (TIRCP) Application Submitted by NCTD Project Title Description FY2019 FY2020 FY2021 Total Total Project TIRCP

TIRCP Seven (7) COASTER Replacement $ 7.00 $11.84 $ 0.53 $19.38 $58.71 Locomotives

Transit and Intercity Rail Capital Program (TIRCP) Application Submitted by Capitol Corridor Joint Powers Authority Project Title Description Phase 2 Phase 3 – Phase 4 – Total Total Project Design- Development 3-Year Pilot TIRCP Completed of Program Operations by July 2018

TIRCP State-wide Integrated Travel Program- $ .70 $17.47 $ 9.87 $.70 for $TBD Development and Implementation of Phase 2 Smart Phone Application with a Pilot Group of Transit Systems (including NCTD) and the agencies that manage intercity rail. Design/requirements are being requested for Phase 2 which is already underway. Future phases are subject to agency agreements and funding.

Page 28 of 30

Other Grant Applications Submitted in Calendar Year 2018

Grant Source Project Description Grant Amount Requested Federal Programs Department of Homeland Security Transit Operational deterrence through directed $2,050,800 Security Grant Program (TSGP) patrols on COASTER and SPRINTER FTA Section 5339(b) Bus and Bus Purchase of twenty (20) replacement LIFT Facilities Infrastructure Investment $1,000,000 paratransit vehicles Program FTA Section 5339(c) Low or No Emission Purchase of six (6) battery-electric buses $2,850,000 Bus Program FTA Human Services Coordinated Outreach, facilitation, and implementation $125,000 Research (HSCR) of a travel training program Implementation of a non-emergency FTA Innovative Coordinated Access and medical trip (NEMT) mobility management $250,000 Mobility (ICAM) program USDOT Better Utilization of Investments to Del Mar Bluffs stabilization $8,950,000 Leverage Development (BUILD) State Programs One planning grant application for an assessment of pedestrian and cyclist connectivity to existing NCTD stops and Active Transportation Grant $2,518,000 stations. One infrastructure grant application for sidewalk and bicycle facilities investments. Caltrans Transportation Planning Grants SPRINTER Parking Lot Smart Growth $100,000 Program Study Regional Programs SANDAG Specialized Transportation Replacement of 14 LIFT vehicles $926,863 Grant Program

Page 29 of 30

Eligibility Requirements and Considerations Disadvantaged communities in California are specifically targeted for investment of proceeds from the State’s cap-and-trade program. These investments are aimed at improving public health, quality of life and economic opportunity in California’s most burdened communities at the same time reducing pollution that causes climate change. Authorized by the California Global Warming Solutions Act of 2006 (AB 32), the Cap and Trade Program is one of several strategies that California uses to reduce greenhouse gas emissions that cause climate change. The funds must be used for programs that further reduce emissions of greenhouse gases. In 2012, the Legislature passed Senate Bill 535 (de Leon), directing that 25 percent of the proceeds from the Greenhouse Gas Reduction Fund (GGRF) go to projects that provide a benefit to disadvantaged communities. The legislation gave CalEPA responsibility for identifying those communities. In 2016, the Legislature passed AB 1550 (Gomez), which now requires that 25 percent of proceeds from the fund be spent on projects located in disadvantaged communities. Following a series of public workshops in February 2017, CalEPA has released its list of disadvantaged communities for the purpose of SB 535. No census tracks within NCTD’s service area were designated as an eligible disadvantaged community by CalEPA. Disadvantaged communities are defined as the top 25 percent scoring areas from CalEnviroScreen along with other areas with high amounts of pollution and low populations. CalEnviroScreen is a screening tool that evaluates the burden of pollution from multiple sources in communities while accounting for potential vulnerability to the adverse effects of pollution. CalEnviroScreen ranks census tracts in California based on potential exposures to pollutants, adverse environmental conditions, socioeconomic factors and prevalence of certain health conditions. Data used in the CalEnviroScreen model come from national and state sources. CalEnviroScreen is used by CalEPA and its boards and departments to aid in administering environmental justice grants, promote compliance with environmental laws, prioritize site-cleanup activities and identify opportunities for sustainable economic development. It is also being used to identify disadvantaged communities in California It is important to keep in mind the State’s emphasis on disadvantaged communities, particularly when directing funds from the Cap and Trade Program and other funding sources. Additional requirements in some of the funding programs below include eligibility for particular types of agencies. To pursue some funding sources, it may be necessary to partner with local cities or other government entities on joint applications.

Page 30 of 30

RESOLUTION NO. 19-04

RESOLUTION OF THE BOARD OF DIRECTORS OF THE NORTH COUNTY TRANSIT DISTRICT IN SUPPORT OF NCTD’S DISCRETIONARY GRANT APPLICATION STRATEGY

WHEREAS, the North County Transit District’s (NCTD) core fundamental principles are safety, continuity of operations and state of good repair; and

WHEREAS, NCTD has developed a list of priority projects focused on state of good repair and capacity enhancement to advance regional and state goals of improved and integrated passenger and freight rail service on the Los Angeles – San Diego – San Luis Obispo Rail (LOSSAN) Corridor; and

WHEREAS, the San Diego Association of Governments (SANDAG) has committed to improve rail service on the San Diego portion of the LOSSAN corridor by investing local funds derived from TransNet into the LOSSAN Corridor; and

WHEREAS, among other projects, NCTD’s highest priority projects include: stabilization of the Del Mar Bluffs, construction of the Convention Center Platform and the procurement of three (3) new COASTER passenger trainsets to provide increased service frequencies.

WHEREAS, discretionary grant awards are based on a number of factors, including but not limited to: merit, project eligibility per specific grant program goals and requirements, and project cost and proposed cost sharing.

WHEREAS, many of the discretionary grant applications request specific letters of support from member agencies and key stakeholders and organizations within the region.

NOW, THEREFORE, BE IT RESOLVED that NCTD’s Board of Directors hereby adopts this Resolution in support of NCTD’s Calendar Year 2019 Discretionary Grants Strategy for projects specified in the Discretionary Grants Strategy and for other unspecified projects and grant opportunities that may become available in the course of calendar year 2019 in order to achieve the benefits of state of good repair and capacity enhancement projects.

BE IT FURTHER RESOLVED that insofar as the provisions of any Ordinance, Resolution, document or previous action of the Board and/or the Executive Director, prior to the date of this Resolution, are inconsistent with the provisions of this Resolution or the policy adopted by this Resolution, this Resolution and the Board Policies adopted herein shall control.

PASSED, APPROVED AND ADOPTED at the regular meeting of the Board of Directors of the North County Transit District this 18th day of April 2019.

BOARD CHAIR North County Transit District

CERTIFICATION

I, Anthony Flores, duly appointed and qualified, Clerk of the Board of the North County Transit District, do hereby certify that the above is a true and correct copy of a resolution passed and approved by the Board of Directors of the North County Transit District adopted at a legally convened meeting of the Board of Directors of the North County Transit District held on the 18th day of April 2019.

CLERK OF THE BOARD North County Transit District

Page 2 of 2

RELATED TO AGENDA ITEM 15

Discretionary Grants Strategy

Board Meeting April 18, 2019 Purpose

• Identify and secure funding for capital projects that:

– Promote safety

– Maintain District assets in a state of good repair

– Enhance capacity

– Increase train frequencies

– Comply with California Air Resources Board (CARB) standards

– Facilitate regional growth • NCTD staff updates this document on an annual basis for Board approval

1 NCTD FY2020-FY2024 Constrained CIP

$130,716,702

Building and Revenue Structure Vehicles-Rail, Improvements, $38,711,404 $6,623,229

Right-of-Way Improvements, $2,687,744

Signal Equipment, $16,150,000 Revenue Vehicles-Bus, $55,812,258 Radio Equipment, $1,500,000

Revenue Collection and Fare Equipment, $2,214,314

Data Processing Revenue Equipment, Vehicles-ADA, $795,502 $6,222,251

2 5-Year Unconstrained CIP (NCTD & LOSSAN)

Right-of-Way Improv.

Svc. Vehicles-Bus Rose Creek La Costa to Bridge Bridge 243.0 San Sorrento Miramar Del Mar Bluffs Bridge 225.4 Encinitas DT, Signal Equip. Replacement, Dieguito DT, Phase 2 DT, Stabilization, $134.0 San Luis Rey $120.0 $72.0 $27.0 $196.0 River DT, Svc. Vehicles-Rail $82.0 San Onofre Bridge Bridge 234.8 Batiquitos Transit Way Equip. Replacement, $50.0 Lagoon DT, $80.0 Building & Structures

Office Furniture & Equip. Convention Three Shop/Garage Equip. Center Five-Car Platform, Train $47.0 Sets, $1.07B Operating Yards Equip. $70.0

Rev. Vehicles-Rail Unfunded

Rev. Vehicles-Bus

Rev. Vehicles-ADA

Rev. Collection & Fare Equip.

Radio Equipment Other NCTD Projects Building & Structure Improv.

Data Processing Equip.

$0.0 $100.0 $200.0 $300.0 $400.0 $500.0 $600.0 $700.0 $800.0 $ Millions 3 NCTD Capital Priorities

• Del Mar Bluffs Stabilization • Locomotive Replacements • Commuter Rail Car and Cab Replacement and Expansion • Zero Emission and Compressed Natural Gas Bus Procurement • Fare Collection System • Rose Canyon Bridge Replacement • SPRINTER Frequency Improvements • LOSSAN Infrastructure Projects

4 Key Anticipated Application Submittals

• Federal Programs – Bus and Bus Infrastructure Program (FTA) – Low or No Emission Vehicle Program (FTA) – Transit Security Grant Program (FEMA) – Mobility on Demand Sandbox Program (FTA) – Consolidated Rail Infrastructure and Safety Improvements (FTA) – Better Utilizing Infrastructure to Leverage Development (USDOT)

5 Key Anticipated Application Submittals

• State Programs – Transit and Intercity Rail Capital Program (CalSTA) – Carl Moyer Program (CARB) – Caltrans Transportation Planning Grants (Caltrans)

6 Transit and Intercity Rail Capital Program

• NCTD to procure grant assistance for development of the TIRCP application package for a combination of LOSSAN Corridor and NCTD-specific project priorities

• Projects will aim to enhance service capacity and improve passenger access through a variety of double-tracking projects, locomotive procurement, and digital and stationary wayfinding

7 Upcoming Grant Submittal: Low or No Emission Vehicle Program

• FY2019 Funding Availability: $85 million • Eligible projects include purchase of low or no emission vehicles and related equipment/facilities • NCTD will leverage: – Zero Emission Bus Infrastructure Planning efforts – Zero Emission Bus procurement – Partnership with SDG&E

8 How You Can Help

• Advocate for NCTD’s capital needs • Provide letters of support for grant applications • Participate in stakeholder and public outreach events for the Land Use and Transit Integration Study & Strategic Multimodal Transit Implementation Plan

9 Open for Discussion

10 STAFF RECOMMENDATION

• Receive the Calendar Year 2019 Discretionary Grants Strategy and adopt Resolution No. 19-04 in support of NCTD’s discretionary grant application strategy; and • Authorize the Executive Director to provide a draft support letter and resolution to NCTD member agencies in support of NCTD’s Calendar Year 2019 Discretionary Grants Strategy.

11 Agenda Item # 16 APPROVE REQUEST TO SANDAG FOR FUNDING COASTER EQUIPMENT IN SUPPORT OF SERVICE EXPANSION

Time Sensitive: ☒ Consent: ☐

STAFF Approve and execute a letter to the San Diego Association of Governments RECOMMENDATION: (SANDAG) requesting the scheduling of an item on a future agenda to provide funding for two additional trainsets to support the implementation of increased COASTER frequencies as specified in the 2050 Regional Transportation Plan.

BACKGROUND The North County Transit District (NCTD) and the San Diego Association of INFORMATION: Governments (SANDAG) are focused on increasing transit ridership and improving the riding experience of our customers. The San Diego region has demonstrated its commitment to improved service on the San Diego portion of the Los Angeles-San Diego-San Luis Obispo Rail Corridor (LOSSAN) by investing more than $767 million ($210 million in local funds derived from TransNet and $557 million from federal and other sources) into the LOSSAN corridor for rail infrastructure improvements and dedicating TransNet funds to support future operations.

The COASTER commuter rail service currently provides 22 weekday round trips with 4 additional trips for Friday nights (Attachment 16A). The COASTER schedule is deficient in the number of trips provided during the peak and non- peak periods to support the needs of commuters. NCTD has received consistent feedback from customers and key stakeholders requesting increased service frequencies. The 2050 Revenue Constrained Regional Plan (Attachment 16B) contemplates operating COASTER trains on 20-minute frequencies during the peak period within the 2018 decade, a significant improvement over the current headways that range between 45 to 60 minutes during the peak period. SANDAG and NCTD staff, within the context of the 2050 Regional Plan, have developed a phased implementation of increased frequencies. NCTD staff has completed an analysis that indicates that COASTER service frequencies can be increased to 30-minute headways during the peak and 60-minute headways during the non- peak period with the procurement of two new trainsets.

NCTD is currently procuring replacement locomotives and passenger cars, implementing new and upgraded technologies, and exploring new first and last mile solutions to support its plans to grow transit ridership. In order to implement its plans to grow transit ridership, SANDAG – as was contemplated in the TransNet Ordinance – needs to provide $43.6 million so that NCTD can procure capacity-enhancing locomotives, rail cars, and cabs. It typically takes approximately three (3) years to procure and receive delivery of rail cars and locomotives. However, NCTD has included options in its current procurement of locomotives so that two additional capacity enhancing locomotives can be delivered in 2021. Also, NCTD is part of a multi-agency procurement for rail cars and cabs that can be delivered by 2021/2022. To take advantage of this unique opportunity, NCTD needs SANDAG to provide a commitment by July 31, 2019 to fund the costs in accordance with the attached milestone payment schedule (Attachment 16C – Rail Equipment Milestone Payment Schedule).

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-016 NCTD staff has been working with SANDAG staff to support agreement to provide this funding. Given the NCTD’s Board of Directors’ desire to improve services as soon as possible, staff has developed the attached draft letter (Attachment 16D) from the Board to be transmitted to the SANDAG Chair and Executive Director to highlight the importance of providing this critical funding to take advantage of the infrastructure and other investments that have been made to support improved frequencies.

Accordingly, staff is requesting that the Board approve and execute a letter to SANDAG requesting the scheduling of an item on a future agenda to provide funding for two additional trainsets to support the implementation of increased COASTER frequencies as specified in the 2050 Regional Transportation Plan.

ATTACHMENTS: 16A – COASTER Schedule, Effective April 8, 2019 16B – 2050 RTP Appendix 16C – Rail Equipment Milestone Payment Schedule 16D – Draft Letter to SANDAG

GOAL/STRATEGIC Enhance Customer Service, Improve Service Quality, and Increase Ridership DIRECTION: FISCAL IMPACT: This staff report has no fiscal impact.

COMMITTEE REVIEW: None

STAFF CONTACT: Matthew O. Tucker, Executive Director E-mail: [email protected] Phone: 760-967-2867

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-016 SCHEDULE EFFECTIVEEFFECTIVE April OctoberApril 8, 7,2019 3,2019 2016 / VÁLIDA / -VÁLIDO April 8 de 2,abril, 7 2017de 2019 abril / VÁLIDO del 2019 del 3 de octubre, 2016 a 2 de abril, 2017

SOUTHBOUND MONDAY-FRIDAY FRI NIGHT ONLY OCEANSIDE TO SAN DIEGO READ COASTER COASTER COASTER COASTER COASTER COASTER COASTER COASTER COASTER COASTER COASTER COASTER COASTER DOWN TRAIN SERVICE NO. 630 634 636 638 640 644 648 654 656 660 662 664 672 Oceanside ↓ 5:03a 6:02a 6:33a 7:15a 7:40a 9:37a 11:08a 2:42p 3:32p 5:11p 5:41p 6:42p 9:51p Carlsbad Village ↓ 5:07a 6:06a 6:37a 7:20a 7:44a 9:42a 11:13a 2:47p 3:36p 5:16p 5:46p 6:48p 9:56p Carlsbad Poinsettia ↓ 5:13a 6:12a 6:42a 7:26a 7:49a 9:47a 11:18a 2:52p 3:43p 5:21p 5:51p 6:53p 10:01p Encinitas ↓ 5:19a 6:18a 6:50a 7:32a 7:56a 9:54a 11:25a 3:00p 3:49p 5:27p 5:56p 6:59p 10:07p Solana Beach ↓ 5:25a 6:23a 6:57a 7:39a 8:01a 10:00a 11:33a 3:05p 3:54p 5:34p 6:01p 7:05p 10:13p Sorrento Valley ↓ 5:35a* 6:40a 7:08a 7:49a 8:12a 10:11a* 11:42a* 3:14p* 4:03p 5:43p 6:11p 7:15p* 10:22p* San Diego-Old Town ↓ 5:57a 7:04a 7:30a 8:12a 8:35a 10:33a 12:07p 3:36p 4:28p 6:07p 6:37p 7:42p 10:43p San Diego-SF Depot ↓ 6:05a 7:11a 7:38a 8:20a 8:43a 10:40a 12:14p 3:44p 4:35p 6:15p 6:45p 7:50p 10:51p

NORTHBOUND MONDAY-FRIDAY FRI NIGHT ONLY PADRES SAN DIEGO TO OCEANSIDE READ COASTER COASTER COASTER COASTER COASTER COASTER COASTER COASTER COASTER COASTER COASTER COASTER COASTER COASTER DOWN TRAIN SERVICE NO. 631 635 639 645 651 653 655 657 661 663 665 671 675 699 San Diego-SF Depot ↓ 6:15a 7:39a 9:18a 12:49p 1:56p 3:36p 4:21p 4:53p 5:38p 6:26p 7:13p 8:12p 11:15p Train departs San Diego-Old Town ↓ 6:23a 7:47a 9:26a 12:57p 2:04p 3:44p 4:29p 5:01p 5:46p 6:34p 7:21p 8:18p 11:21p 60 minutes Sorrento Valley ↓ 6:45a 8:10a 9:48a* 1:19p* 2:26p* 4:06p 4:51p 5:24p 6:08p 6:56p 7:43p* 8:40p* 11:43p* (1 hour) after end Solana Beach ↓ 6:57a 8:23a 9:59a 1:30p 2:36p 4:17p 5:00p 5:34p 6:20p 7:06p 7:53p 8:50p 11:53p of game or Encinitas ↓ 7:03a 8:30a 10:05a 1:36p 2:42p 4:23p 5:08p 5:40p 6:26p 7:12p 7:59p 8:56p 11:59p fireworks show with Carlsbad Poinsettia ↓ 7:09a 8:36a 10:10a 1:42p 2:48p 4:29p 5:14p 5:46p 6:32p 7:18p 8:05p 9:02p 12:05a an absolute departure of Carlsbad Village ↓ 7:15a 8:42a 10:16a 1:47p 2:54p 4:35p 5:21p 5:52p 6:38p 7:24p 8:11p 9:08p 12:11a midnight. Oceanside ↓ 7:20a 8:47a 10:23a 1:54p 3:00p 4:41p 5:28p 5:58p 6:45p 7:30p 8:18p 9:15p 12:20a n SOUTHBOUND SATURDAY SUNDAY & HOLIDAYS Ride Any Amtrak Pacific OCEANSIDE TO Surfliner® Train SAN DIEGO READ COASTER COASTER COASTER COASTER COASTER COASTER COASTER COASTER COASTER COASTER DOWN COASTER passengers can ride any Amtrak Pacific TRAIN SERVICE NO. 680 684 688 690 692 696 680 684 688 692 Surfliner® train, 7 days a week with any valid RegionPlus Day Pass* or COASTER Regional Monthly/30-Day Pass, ↓ 8:20a 11:08a 2:00p 3:33p 5:21p 6:25p 8:20a 11:08a 2:00p 5:21p Oceanside within the trip limits printed on their COASTER pass. Valid Carlsbad Village ↓ 8:25a 11:13a 2:05p 3:38p 5:26p 6:30p 8:25a 11:13a 2:05p 5:26p between Oceanside and San Diego ONLY. Trips north of Oceanside will require a separate Amtrak ticket and Carlsbad Poinsettia ↓ 8:30a 11:18a 2:10p 3:44p 5:31p 6:35p 8:30a 11:18a 2:10p 5:31p reservation. Encinitas ↓ 8:36a 11:25a 2:16p 3:50p 5:37p 6:41p 8:36a 11:25a 2:16p 5:37p * Pass will be renamed “COASTER Regional Day Pass” Solana Beach ↓ 8:42a 11:33a 2:24p 3:56p 5:44p 6:47p 8:42a 11:33a 2:24p 5:44p on date to be determined in 2019. For a complete Amtrak Pacific Surfliner schedule, please Sorrento Valley ↓ 8:51a* 11:42a* 2:33p* 4:05p* 5:53p* 6:56p* 8:51a* 11:42a* 2:33p* 5:53p* visit PacificSurfliner.com San Diego-Old Town ↓ 9:13a 12:07p 2:54p 4:29p 6:14p 7:24p 9:13a 12:07p 2:54p 6:14p NOT VALID – FRI-TUES OF MEMORIAL DAY San Diego-SF Depot ↓ 9:21a 12:14p 3:02p 4:36p 6:23p 7:30p 9:21a 12:14p 3:02p 6:23p WEEKEND, FRI-TUES OF LABOR DAY WEEKEND, MONDAY THROUGH THE FOLLOWING TUESDAY OF THANKSGIVING WEEK, OPENING DAY NORTHBOUND SATURDAY SUNDAY & HOLIDAYS THROUGH SUNDAY OF THE SUMMER DEL MAR SAN DIEGO TO RACES, AND WED-SUN OF COMIC-CON WEEK OCEANSIDE READ COASTER COASTER COASTER COASTER COASTER COASTER COASTER COASTER COASTER COASTER DOWN (these dates subject to change). TRAIN SERVICE NO. 681 685 689 691 693 697 681 685 689 693 ONLY SERVES: DOES NOT SERVE: San Diego-SF Depot ↓ 9:35a 12:25p 3:36p 4:56p 7:10p 11:14p 9:35a 12:25p 3:36p 7:10p • San Diego-SF Depot • Sorrento Valley • San Diego-Old Town • Encinitas ↓ 9:42a 12:33p 3:44p 5:03p 7:18p 11:21p 9:42a 12:33p 3:44p 7:18p San Diego-Old Town • Solana Beach • Carlsbad Poinsettia Sorrento Valley ↓ 10:04a* 12:57p* 4:06p* 5:25p* 7:43p* 11:42p* 10:04a* 12:57p* 4:06p* 7:43p* • Oceanside • Carlsbad Village Solana Beach ↓ 10:13a 1:06p 4:17p 5:35p 7:53p 11:52p 10:13a 1:06p 4:17p 7:53p All Amtrak policies and terms of travel apply and may differ from NCTD policies including photo ID Encinitas ↓ 10:19a 1:11p 4:23p 5:42p 7:58p 11:58p 10:19a 1:11p 4:23p 7:58p requirements, food and beverage consumption (including Carlsbad Poinsettia ↓ 10:26a 1:16p 4:29p 5:48p 8:04p 12:04a 10:26a 1:16p 4:29p 8:04p alcohol), unaccompanied minors, accessibility, baggage restrictions, and pets. For more information, please visit: Carlsbad Village ↓ 10:33a 1:21p 4:35p 5:54p 8:10p 12:11a 10:33a 1:21p 4:35p 8:10p Amtrak.com/train-travel-plan Oceanside ↓ 10:39a 1:27p 4:41p 6:00p 8:16p 12:19a 10:39a 1:27p 4:41p 8:16p BIKES: RESERVATIONS and Amtrak ticket REQUIRED for BIKES on ALL Amtrak trains. n COASTER 699 will depart 60 minutes (1 hour) after end of game or fireworks COASTER operates on a Holiday (Sunday) Amtrak.com/bring-your-bicycle-onboard show, with an absolute departure time of midnight. This train will operate for all schedule on New Year’s Day, Memorial Day, Amtrak fares, schedules, routes, equipment and services Padres home games EXCEPT the games on the following dates: April 3 & 24, Labor Day, Thanksgiving Day, Christmas Eve, subject to change without notice. Other policies and May 8 & 22, June 2, 5 & 19, July 30, August 14, and September 26. and Christmas Day. COASTER operates on a restrictions apply. Amtrak and Pacific Surfliner are service * Sorrento Valley COASTER Connection shuttle service not available for this train. Saturday schedule on Martin Luther King, Jr. Day, marks of the National Railroad Passenger Corporation. Padres game times are subject to change. Visit GoNCTD.com for service updates. Presidents’ Day, Independence Day, and the Day Website: PacificSurfliner.com April 13-14: No rail service between Oceanside and San Diego. After Thanksgiving. Schedule subject to change. Phone: (800) 872-7245

Tickets sold at vending machines VALID ONLY for the SAME DAY of purchase. NO REFUNDS. One-way tickets valid for 2 hours from time of purchase. Tickets may be purchased via the Compass Cloud app on mobile devices. GoNCTD.com (760) 966-6500 Boletos adquiridos en las máquinas son VÁLIDOS SOLAMENTE EL MISMO DÍA DE SU COMPRA. NO REEMBOLSOS. Boletos de viaje sencillo son válidos por 2 horas desde el momento de compra. Boletos pueden ser comprados a través de la aplicación “Compass Cloud” en dispositivos móviles. @GoNCTD /GoNCTD /GoNCTD Appendix A 2050 RTP Projects, Costs, and Phasing

Appendix Contents 2050 RTP Projects, Costs, and Phasing ...... A-2

2050 Regional Transportation Plan

2050 RTP Projects, Costs, and Table A.12 lists the projects assumed in the Phasing 2050 No Build Scenario. This appendix includes information for both Figures A.10 and A.11 depict the LOS and the Revenue Constrained Plan and ADT volumes for 2008 and for 2050, Unconstrained Needs scenario. Detailed respectively. highway and transit listings, cost estimates, and phasing are included for the Revenue

Constrained Plan. For the Unconstrained Revenue scenario, detailed highway and transit listings and cost estimates are provided. In addition to the projects, costs,

and phasing, level of service (LOS) and average daily traffic (ADT) data is included.

Figures A.1 and A.2 depict the 2050 Revenue Constrained transit and highway improvements, respectively. Tables A.1 and

A.2 list the capital improvements in the 2050 Revenue Constrained Plan in 2010 and year of expenditure (YOE) dollars, respectively. Tables A.3 and A.4 include highway project phasing

with costs shown in 2010 and YOE dollars, respectively. Table A.5 includes transit services phasing and headways for the Revenue

Constrained Plan. Tables A.6 and A.7 list major transit expenditures in 2010 and YOE dollars, respectively. Table A.8 lists the phased arterial improvements. In addition to the 2050

Revenue Constrained highway and transit improvements, Figures A.3 through A.6 depict the 2020 and 2035 transit and highway improvements, respectively.

Figure A.7 illustrate the high frequency transit

routes in 2035. Figures A.8 and A.9, depict the transit and highway improvements in the 2050 Unconstrained Network, respectively. The 2050 Unconstrained Network is

summarized in Tables A.9 through A.11. Table A.9 lists the major capital improvements included in the Unconstrained Network. Tables A.10 and A.11 summarize the

differences between the Revenue Constrained and the Unconstrained Networks (transit and highway projects).

A-2 Appendix A: 2050 RTP Projects, Costs, and Phasing

FIGURE A.1 HERE

SANDAG 2050 Regional Transportation Plan A-3

A-4 Appendix A: 2050 RTP Projects, Costs, and Phasing

FIGURE A.2 HERE

SANDAG 2050 Regional Transportation Plan A-5

A-6 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.1 – Capital Improvements – Revenue Constrained Plan ($ millions – 2010 dollars)

Transit Facilities

Service Route Description Cost COASTER 398 Double tracking (includes grade separations at Leucadia Blvd and $2,617 stations/platforms at Convention Center/Petco Park and Del Mar Fairgrounds, Del Mar Tunnel, and quiet zone improvements) SPRINTER 399 Double tracking (includes grade separations at El Camino Real, $970 Vista Village Dr, Melrose Dr, Mission/San Marcos stations and two additional locations) SPRINTER 588 SPRINTER Express $284 Trolley 510 Mid-Coast LRT Extension $1,642 Trolley 510 and 520 Trolley System Rehabilitation (Blue and Orange Lines) $510 Trolley 510 Blue Line Rail Grade Separations (Taylor St, Washington/ $550 Sassafras St, 28th St, 32nd St, E St, H St, Palomar St) Trolley 520 Orange Line Rail Grade Separations (Euclid Ave, Broadway/ Lemon $312 Grove Ave, Allison Ave/University Ave/La Mesa Blvd, Severin St) Trolley 522 Orange Line Express - El Cajon to downtown San Diego $230 Trolley 540 Blue Line Express - UTC to San Ysidro via downtown $455 Trolley 560 SDSU to downtown via Mid-City, El Cajon/Park Blvds $1,921 Trolley 561 UTC to Mira Mesa via Sorrento Mesa/Carroll Canyon $1,140 Trolley 562 UTC to San Ysidro via Kearny Mesa, Mission Valley, Mid-City, $2,548 Southeastern San Diego, National City/Chula Vista via Highland Ave/4th Ave Trolley 563 Pacific Beach to El Cajon via Clairemont, Kearny Mesa, $1,262 Mission Valley, SDSU Trolley 510, 520, 540, Downtown Trolley Tunnel (12th & Imperial Transit Center to $2,592 522, and 560 County Center/Little Italy Trolley Station) BRT 90 Santee/El Cajon Transit Centers to downtown via SR 94 $0 (Peak Only) BRT 470 Escondido – UTC/UCSD via Mira Mesa Blvd $ 20 BRT 610 Temecula (peak only)/Escondido to downtown $ 89 BRT 628 South Bay BRT (Otay Mesa-Downtown) via Otay Ranch/Millenia $200 BRT 640 I-5 - San Ysidro to downtown & Kearny Mesa via I-5 shoulder $90 lanes/HOV lanes, downtown, Hillcrest, Mission Valley BRT 653 Mid-City to Palomar Airport Road via Kearny Mesa/I-805/I-5 $10 BRT 870 El Cajon to UTC via Santee, SR 52, I-805 $7 BRT 890 El Cajon to Sorrento Mesa via SR 52, Kearny Mesa $12 BRT 680 and 688/689 Otay Mesa/San Ysidro to Sorrento Mesa via I-805 Corridor, Otay $425 Ranch/Millenia, National City, Southeastern San Diego, Mid-City, Kearny Mesa BRT 120, 610, and Hillcrest to Mission Valley Transit Priority Measures and I-15 $400 640 Green Line/BRT transfer station BRT - South Bay Maintenance Facility $51 BRT - Downtown BRT stations/layovers $110

SANDAG 2050 Regional Transportation Plan A-7

Table A.1 – Capital Improvements – Revenue Constrained Plan ($ millions – 2010 dollars) (Continued)

Transit Facilities (Continued)

Service Route Description Cost Rapid 2 North Park to downtown San Diego via 30th St, Golden Hill $38 Rapid 10 La Mesa to Ocean Beach via Mid-City, Hillcrest, Old Town $85 Rapid 11 Spring Valley to SDSU via Southeastern San Diego, downtown, $110 Hillcrest, Mid-City Rapid 15 Mid-City Rapid (downtown to SDSU via Mid-City, El Cajon, and $68 Park Blvds) Rapid 28 Point Loma to Kearny Mesa via Old Town, Linda Vista $48 Rapid 30 Old Town to Sorrento Mesa via Pacific Beach, La Jolla, UTC $102 Rapid 120 Kearny Mesa to downtown via Mission Valley $100 Rapid 471 Downtown Escondido to East Escondido $31 Rapid 473 Oceanside to UTC via Hwy 101 Coastal Communities, Carmel $127 Valley Rapid 474 Oceanside to Vista via Mission Ave/Santa Fe Road Corridor $49 Rapid 635 Eastlake/EUC to Palomar Trolley via Main Street Corridor $54 Rapid 636 SDSU to Spring Valley via East San Diego, Lemon Grove, Skyline $39 Rapid 637 North Park to 32nd Street Trolley via Golden Hill $32 Rapid 638 San Ysidro to Otay Mesa via Otay, SR 905 Corridor $53 Rapid 709 H Street Trolley to Otay Ranch/Millenia via H Street Corridor, $36 Southwestern College Rapid 910 Coronado to downtown via Coronado Bridge $25 Streetcar 553 Downtown San Diego: Little Italy to East Village $277 Streetcar 554 Hillcrest/Balboa Park/downtown San Diego Loop $249 Streetcar 555 30th St to downtown San Diego via North Park, Golden Hill $135 Shuttle 448/449 San Marcos Shuttle1 $0 Airport Express Airport Express Routes2 $51 Intermodal - Airport Intermodal Transit Center $165 Intermodal - San Ysidro Intermodal Transit Center $50 Other - Other Improvements (Vehicles/vehicle replacement, maintenance $6,824 facilities, transit system rehab, regulatory compliance, park and ride, ITS) Subtotal $27,195 1 Capital cost to be funded by the City of San Marcos 2 Capital cost to be funded by aviation funds

A-8 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.1 – Capital Improvements – Revenue Constrained Plan ($ millions – 2010 dollars) (Continued)

Managed Lanes/Highway Projects

Freeway From To Existing Improvements Cost I-5 SR 905 SR 54 8F 8F+2ML $295 I-5 SR 54 SR 15 8F 10F+2ML $165 I-5 SR 15 I-8 8F 8F+Operational $1,130 I-5 I-8 La Jolla Village Dr 8F/10F 8F/10F+2ML $530 I-5 La Jolla Village Dr I-5/I-805 Merge 8F/14F 8F/14F+2ML $250 I-5 I-5/I-805 Merge SR 56 8F/14F+2HOV 8F/14F+4ML $50 I-5 SR 56 Vandegrift Blvd 8F/8F+2HOV 8F+4ML $3,100 I-5 Vandegrift Blvd Orange County 8F 8F+4T $754 I-8 I-5 SR 125 8F/10F 8F/10F+Operational $565 I-8 SR 125 2nd Street 6F/8F 6F/8F+Operational $125 I-8 2nd Street Los Coches 4F/6F 6F $54 SR 11/Otay SR 905 Mexico -- 4T & POE $755 Mesa East Port of Entry (POE) SR 15 I-5 SR 94 6F 8F+2ML $90 SR 15 SR 94 I-805 8F 8F+2ML $20 SR 15 I-805 I-8 8F 8F+2TL $45 I-15 I-8 SR 163 8F 8F+2ML $850 I-15 SR 163 SR 56 8F+2ML(R) 10F+4ML/MB $419 I-15 Centre City SR 78 8F 8F+4ML $210 Parkway I-15 SR 78 Riverside County 8F 8F+4T $1,005 SR 52 I-5 I-805 4F 6F $110 SR 52 I-805 I-15 6F 6F+2ML $223 SR 52 I-15 SR 125 4F 6F+2ML(R) $325 SR 54 I-5 SR 125 6F 6F+2ML $100 SR 56 I-5 I-15 4F 6F $135 SR 67 Mapleview St Dye Rd 2C/4C 4C $570 SR 76 Melrose Drive I-15 2C 4C $404 SR 76 I-15 Couser Canyon 2C 4C/6C+Operational $130 SR 78 I-5 I-15 6F 6F+2ML/Operational $570 SR 94 I-5 SR 125 8F 8F+2ML $930 SR 94 SR 125 Avocado Blvd 4F 6F $90 SR 94 Avocado Blvd Jamacha Rd 4C 6C $30 SR 94 Jamacha Rd Steele Canyon Rd 2C/4C 4C $20

SANDAG 2050 Regional Transportation Plan A-9

Table A.1 – Capital Improvements – Revenue Constrained Plan ($ millions – 2010 dollars) (Continued)

Managed Lanes/Highway Projects (Continued)

Freeway From To Existing Improvements Cost SR 125 SR 905 San Miguel Rd 4T 8F $110 SR 125 San Miguel Rd SR 54 4F 8F $60 SR 125 SR 54 SR 94 6F 6F+2ML $100 SR 125 SR 94 I-8 8F 10F+2ML $285 SR 241 Orange County I-5 -- 4T/6T $501 I-805 SR 905 Carroll Canyon Rd 8F/10F 8F/10F+4ML $3,781 I-805 Carroll Canyon Rd I-5 (north) 8F/10F 8F/10F+2ML $87 SR 905 I-805 Mexico -- 6F $595 Subtotal $19,568 HOV Connectors Freeway Intersecting Movement Cost Freeway I-5 SR 78 South to East and West to North, $240 North to East and West to South I-5 I-805 North to North & South to South $110 I-15 SR 52 West to North and South to East $140 I-15 SR 78 East to South & North to West $105 SR 15 SR 94 South to West & East to North $80 SR 15 I-805 North to North & South to South $90 I-805 SR 52 West to North & South to East $90 I-805 SR 94 North to West & East to South $160 Subtotal $1,015 Freeway Connectors

Freeway Intersecting Movement Cost Freeway I-5 SR 56 West to North and South to East $185 I-5 SR 78 South to East and West to South $106 I-15 SR 56 North to West $100 SR 94 SR 125 South to East and West to North $319 Subtotal $710

A-10 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.1 – Capital Improvements – Revenue Constrained Plan ($ millions – 2010 dollars) (Continued)

Non-Highway Goods Movement Projects

Cost Vesta Street Bridge Mobility Connector over Harbor Drive at Naval Base San Diego $60 32nd Street Freeway Access Enhancement $119 10th Avenue Marine Terminal Rail Line Grade Separation/Barrio Logan Enhancement $67 Entrance National City Marine Terminal Bay Marina Drive, Civic Center Freeway Access Improvements $7 National City Rail Yard $7 Subtotal $260

Total $48,748 Key C = Conventional Highway Lanes MB = Movable barrier T = Toll Lanes F = Freeway Lanes ML = Managed lanes (HOV & TL = Transit Lanes Value Pricing) HOV = High Occupancy Vehicle Lanes ML(R) = Managed lanes (Reversible)

Note: All HOV lanes would convert to Managed Lanes by 2035 with an HOV occupancy of 3+ people.

SANDAG 2050 Regional Transportation Plan A-11

Table A.2 – Capital Improvements – Revenue Constrained Plan ($ millions – YOE dollars)

Transit Facilities

Service Route Description Cost COASTER 398 Double tracking (includes grade separations at Leucadia Blvd, $4,979 stations/platforms at Convention Center/Petco Park and Del Mar Fairgrounds, Del Mar Tunnel, and quiet zone improvements) SPRINTER 399 Double tracking (includes grade separations at El Camino Real, $1,149 Vista Village Dr, Melrose Dr, Mission/San Marcos stations and two additional locations) SPRINTER 588 SPRINTER Express $334 Trolley 510 Mid-Coast LRT Extension $1,642 Trolley 510 and 520 Trolley System Rehabilitation (Blue and Orange Lines) $456 Trolley 510 Blue Line Rail Grade Separations (Taylor St, Washington/Sassafras St, $861 28th St, 32nd St, E St, H St, Palomar St) Trolley 520 Orange Line Rail Grade Separations (Euclid Ave, Broadway/Lemon $491 Grove Ave, Allison Ave/University Ave/La Mesa Blvd, Severin St) Trolley 522 Orange Line Express - El Cajon to downtown San Diego $415 Trolley 540 Blue Line Express - UTC to San Ysidro via downtown $822 Trolley 560 SDSU to downtown via Mid-City, El Cajon/Park Blvds $4,009 Trolley 561 UTC to Mira Mesa via Sorrento Mesa/Carroll Canyon $1,556 Trolley 562 UTC to San Ysidro via Kearny Mesa, Mission Valley, Mid-City, $6,043 Southeastern San Diego, National City/Chula Vista via Highland Ave/4th Ave Trolley 563 Pacific Beach to El Cajon via Clairemont, Kearny Mesa, Mission Valley, $1,978 SDSU Trolley 510, 520, 540, Downtown Trolley Tunnel (12th & Imperial Transit Center to County $4,293 522, and 560 Center/Little Italy Trolley Station) BRT 90 Santee/El Cajon Transit Centers to downtown via SR 94 (Peak Only) $0 BRT 470 Escondido – UTC/UCSD via Mira Mesa Blvd $18 BRT 610 Temecula (peak only)/Escondido to downtown $80 BRT 628 South Bay BRT (Otay Mesa – downtown) via Otay Ranch/Millenia $181 BRT 640 I-5 - San Ysidro to downtown & Kearny Mesa via I-5 shoulder $86 lanes/HOV lanes, downtown, Hillcrest, Mission Valley BRT 653 Mid-City to Palomar Airport Road via Kearny Mesa/I-805/I-5 $16 BRT 870 El Cajon to UTC via Santee, SR 52, I-805 $7 BRT 890 El Cajon to Sorrento Mesa via SR 52, Kearny Mesa $17 BRT 680 and 688/689 Otay Mesa/San Ysidro to Sorrento Mesa via I-805 Corridor, Otay $441 Ranch/Millenia, National City, Southeastern San Diego, Mid-City, Kearny Mesa BRT 120, 610, and 640 Hillcrest to Mission Valley Transit Priority Measures and I-15 $518 Green Line/BRT transfer station BRT - South Bay Maintenance Facility $45 BRT - Downtown BRT stations/layovers $97

A-12 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.2 – Capital Improvements – Revenue Constrained Plan ($ millions – YOE dollars) (Continued)

Transit Facilities (Continued)

Service Route Description Cost Rapid 2 North Park to downtown San Diego via 30th St, Golden Hill $43 Rapid 10 La Mesa to Ocean Beach via Mid-City, Hillcrest, Old Town $90 Rapid 11 Spring Valley to SDSU via Southeastern San Diego, downtown, $157 Hillcrest, Mid-City Rapid 15 Mid-City Rapid (downtown to SDSU via Mid-City, El Cajon, and $63 Park Blvds) Rapid 28 Point Loma to Kearny Mesa via Old Town, Linda Vista $61 Rapid 30 Old Town to Sorrento Mesa via Pacific Beach, La Jolla, UTC $142 Rapid 120 Kearny Mesa to downtown via Mission Valley $131 Rapid 471 Downtown Escondido to East Escondido $48 Rapid 473 Oceanside to UTC via Hwy 101 Coastal Communities, Carmel Valley $176 Rapid 474 Oceanside to Vista via Mission Ave/Santa Fe Road Corridor $76 Rapid 635 Eastlake/EUC to Palomar Trolley via Main Street Corridor $81 Rapid 636 SDSU to Spring Valley via East San Diego, Lemon Grove, Skyline $57 Rapid 637 North Park to 32nd Street Trolley via Golden Hill $48 Rapid 638 San Ysidro to Otay Mesa via Otay, SR 905 Corridor $84 Rapid 709 H Street Trolley to Otay Ranch/Millenia via H Street Corridor, $39 Southwestern College Rapid 910 Coronado to downtown via Coronado Bridge $29 Streetcar 553 Downtown San Diego: Little Italy to East Village $187 Streetcar 554 Hillcrest/Balboa Park/downtown San Diego Loop $284 Streetcar 555 30th St to downtown San Diego via North Park, Golden Hill $397 Shuttle 448/449 San Marcos Shuttle1 $0 Airport Express Airport Express Routes2 $55 Intermodal - Airport Intermodal Transit Center $171 Intermodal - San Ysidro Intermodal Transit Center $52 Other - Other Improvements (Vehicles/vehicle replacement, maintenance $10,022 facilities, transit system rehab, regulatory compliance, park and ride, ITS) Subtotal $43,027 1 Capital cost to be funded by the City of San Marcos 2 Capital cost to be funded by aviation funds.

SANDAG 2050 Regional Transportation Plan A-13

Table A.2 – Capital Improvements – Revenue Constrained Plan ($ millions – YOE dollars) (Continued)

Managed Lanes/Highway Projects

Freeway From To Existing Improvements Cost I-5 SR 905 SR 54 8F 8F+2ML $500 I-5 SR 54 SR 15 8F 10F+2ML $393 I-5 SR 15 I-8 8F 8F+Operational $2,689 I-5 I-8 La Jolla Village Dr 8F/10F 8F/10F+2ML $1,261 I-5 La Jolla Village Dr I-5/I-805 Merge 8F/14F 8F/14F+2ML $260 I-5 I-5/I-805 Merge SR 56 8F/14F+2HOV 8F/14F+4ML $68 I-5 SR 56 Vandegrift Blvd 8F/8F+2HOV 8F+4ML $4,286 I-5 Vandegrift Blvd Orange County 8F 8F+4T $1,795 I-8 I-5 SR 125 8F/10F 8F/10F+Operational $1,273 I-8 SR 125 2nd Street 6F/8F 6F/8F+Operational $226 I-8 2nd Street Los Coches 4F/6F 6F $129 SR 11/Otay SR 905 Mexico -- 4T & POE $755 Mesa East Port of Entry (POE) SR 15 I-5 SR 94 6F 8F+2ML $214 SR 15 SR 94 I-805 8F 8F+2ML $31 SR 15 I-805 I-8 8F 8F+2TL $47 I-15 I-8 SR 163 8F 8F+2ML $1,849 I-15 SR 163 SR 56 8F+2ML(R) 10F+4ML/MB $419 I-15 Centre City SR 78 8F 8F+4ML $210 Parkway I-15 SR 78 Riverside County 8F 8F+4T $2,392 SR 52 I-5 I-805 4F 6F $262 SR 52 I-805 I-15 6F 6F+2ML $314 SR 52 I-15 SR 125 4F 6F+2ML(R) $587 SR 54 I-5 SR 125 6F 6F+2ML $238 SR 56 I-5 I-15 4F 6F $244 SR 67 Mapleview St Dye Rd 2C/4C 4C $781

A-14 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.2 – Capital Improvements – Revenue Constrained Plan ($ millions – YOE dollars) (Continued)

Managed Lanes/Highway Projects (Continued)

Freeway From To Existing Improvements Cost SR 76 Melrose Drive I-15 2C 4C $404 SR 76 I-15 Couser Canyon 2C 4C/6C+Operational $235 SR 78 I-5 I-15 6F 6F+2ML/Operational $592 SR 94 I-5 SR 125 8F 8F+2ML $1,310 SR 94 SR 125 Avocado Blvd 4F 6F $214 SR 94 Avocado Blvd Jamacha Rd 4C 6C $71 SR 94 Jamacha Rd Steele Canyon Rd 2C/4C 4C $48 SR 125 SR 905 San Miguel Rd 4T 8F $262 SR 125 San Miguel Rd SR 54 4F 8F $143 SR 125 SR 54 SR 94 6F 6F+2ML $238 SR 125 SR 94 I-8 8F 10F+2ML $421 SR 241 Orange County I-5 -- 4T/6T $522 I-805 SR 905 Carroll Canyon Rd 8F/10F 8F/10F+4ML $4,764 I-805 Carroll Canyon Rd I-5 (north) 8F/10F 8F/10F+2ML $81 SR 905 I-805 Mexico -- 6F $595 Subtotal $31,123 HOV Connectors

Intersecting Freeway Freeway Movement Cost I-5 SR 78 South to East and West to North, $377 North to East and West to South I-5 I-805 North to North & South to South $114 I-15 SR 52 West to North and South to East $260 I-15 SR 78 East to South & North to West $109 SR 15 SR 94 South to West & East to North $126 SR 15 I-805 North to North & South to South $94 I-805 SR 52 West to North & South to East $146 I-805 SR 94 North to West & East to South $166 Subtotal $1,392

SANDAG 2050 Regional Transportation Plan A-15

Table A.2 – Capital Improvements – Revenue Constrained Plan ($ millions – YOE dollars) (Continued)

Freeway Connectors

Intersecting Freeway Freeway Movement Cost I-5 SR 56 West to North and South to East $253 I-5 SR 78 South to East and West to South $166 I-15 SR 56 North to West $186 SR 94 SR 125 South to East and West to North $391 Subtotal $996 Non-Highway Goods Movement Projects Cost Vesta Street Bridge Mobility Connector over Harbor Drive at Naval Base San Diego $59 32nd Street Freeway Access Enhancement $117 10th Avenue Marine Terminal Rail Line Grade Separation/Barrio Logan Enhancement $66 Entrance National City Marine Terminal Bay Marina Drive, Civic Center Freeway Access Improvements $7 National City Rail Yard $7 Subtotal $256

Total $76,794 KEY C = Conventional Highway Lanes MB = Movable barrier T= Toll Lanes F = Freeway Lanes ML = Managed lanes (HOV & Value Pricing) TL = Transit Lanes HOV= High Occupancy Vehicle Lanes ML(R) = Managed lanes (Reversible)

Note: All HOV lanes would convert to Managed Lanes by 2035 with an HOV occupancy of 3+ people.

A-16 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.3 – Phased Highway Projects – Revenue Constrained Plan ($ millions – 2010 dollars)

($ Millions - 2010 Dollars) Year Built Cumulative By Freeway From To Existing Improvements Cost Cost 2018 I-5 Manchester SR 78 8F 8F+2HOV $480 $480 Ave 2018 SR 11/ SR 905 Mexico -- 4T $755 $1,235 Otay Mesa East POE 2018 I-15 SR 163 SR 56 8F+2ML(R) 10F+4ML/MB $419 $1,654 2018 I-15 Centre City SR 78 8F 8F+4ML $210 $1,864 Parkway 2018 SR 76 Melrose Drive I-15 2C 4C $404 $2,268 2018 SR 241 Orange County I-5 -- 4T $443 $2,711 2018 I-805 Palomar St SR 94 8F 8F+2HOV $200 $2,911 2018 I-805 SR 52 Carroll Canyon Rd 8F/10F 8F/10F+2HOV $163 $3,074 2018 I-805 Carroll Canyon I-5 (north) 8F/10F 8F/10F+2ML $87 $3,161 Rd 2018 SR 905 I-805 Mexico -- 6F $595 $3,756 2018 Vesta Street Bridge Mobility Connector over Harbor Drive at Naval Base $60 $3,816 San Diego 2018 32nd Street Freeway Access Enhancement $119 $3,935 2018 10th Avenue Marine Rail Line Grade Separation/Barrio Logan Enhancement $67 $4,002 Terminal Entrance 2018 National City Marine Bay Marina Drive, Civic Center Freeway Access $7 $4,009 Terminal Improvements 2020 I-5 La Jolla Village I-5/I-805 Merge 8F/14F 8F/14F+2ML $250 $4,259 Drive 2020 I-5/I-805 North to North & South to South (HOV Connectors) $110 $4,369 2020 SR 15 I-805 I-8 8F 8F+2TL $45 $4,414 2020 I-15 I-8 SR 163 8F 8F+2ML $130 $4,544 2020 SR 15/ North to North & South to South (HOV Connectors) $90 $4,634 I-805 2020 I-15/SR 78 East to South & North to West (HOV Connectors) $105 $4,739 2020 SR 78 I-5 I-15 6F 6F+2ML/Operational $570 $5,309 2020 SR 94 I-5 I-805 8F 8F+2ML $480 $5,789 2020 SR 94/ South to East (Freeway Connector) $139 $5,928 SR 125 2020 I-805 Palomar St SR 15 8F/8F+ 8F+4ML $1,200 $7,128 2HOV1

SANDAG 2050 Regional Transportation Plan A-17

Table A.3 – Phased Highway Projects – Revenue Constrained Plan ($ millions – 2010 dollars) (Continued)

($ Millions - 2010 Dollars) Year Built Cumulative By Freeway From To Existing Improvements Cost Cost 2020 I-805/ North to West & East to South (HOV Connectors) $160 $7,288 SR 94 2020 I-805 SR 52 Carroll Canyon Rd 8F/10F+ 8F/10F+4ML $391 $7,679 2HOV 2020 National City Rail Yard $7 $7,686 2030 I-5 Palomar St SR 15 8F 8F+2ML $200 $7,886 2030 I-5 I-5/I-805 Merge SR 56 8F/14F+2H 8F/14F+4ML $50 $7,936 OV 2030 I-5 SR 56 Manchester Ave 8F+2HOV 8F+4ML $500 $8,436 2030 I-5/SR 56 West to North (Freeway Connector) $65 $8,501 2030 I-5/SR 56 South to East (Freeway Connector) $120 $8,621 2030 I-5 Manchester Ave Palomar Airport 8F+2HOV2 8F+4ML $950 $9,571 Rd 2030 SR 67 Mapleview St Dye Rd 2C/4C 4C $570 $10,141 2030 SR 94/ West to North (Freeway Connector) $180 $10,321 SR 125 2030 SR 125 SR 94 I-8 8F 10F $215 $10,536 2030 SR 241 Orange County I-5 4T 6T $58 $10,594 2030 I-805 SR 905 Palomar St 8F 8F+4ML $350 $10,944 2030 I-805 SR 15 Mission Valley 8F 8F+4ML $230 $11,174 Viaduct 2030 I-805 Mission Valley SR 52 8F/10F 8F/10F+4ML $637 $11,811 Viaduct 2035 I-5 Palomar Airport SR 78 8F+2HOV2 8F+4ML $750 $12,561 Rd 2035 I-5 SR 78 Vandegrift Blvd 8F 8F+4ML $420 $12,981 2035 I-5/SR 78 South to East and West to North (HOV Connectors) $120 $13,101 2035 I-5/SR 78 North to East and West to South (HOV Connectors) $120 $13,221 2035 I-5/SR 78 South to East (Freeway Connector) $60 $13,281 2035 I-5/SR 78 West to South (Freeway Connector) $46 $13,327 2035 SR 15 SR 94 I-805 8F 8F+2ML $20 $13,347 2035 SR 15/ South to West & East to North (HOV Connectors) $80 $13,427 SR 94 2035 SR 52 I-805 I-15 6F 6F+2ML $223 $13,650

A-18 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.3 – Phased Highway Projects – Revenue Constrained Plan ($ millions – 2010 dollars) (Continued)

($ Millions - 2010 Dollars) Year Built Cumulative By Freeway From To Existing Improvements Cost Cost 2040 I-8 I-15 SR 125 8F/10F 8F/10F+Operational $125 $13,775 2040 I-8 SR 125 2nd Street 6F/8F 6F/8F+Operational $125 $13,900 2040 SR 52 I-15 SR 125 4F 6F+2ML(R) $325 $14,225 2040 SR 56 I-5 I-15 4F 6F $135 $14,360 2040 SR 76 I-15 Couser Canyon 2C 4C/6C+Operational $130 $14,490 2040 SR 94 I-805 College Ave 8F 8F+2ML $220 $14,710 2040 SR 94 College Ave SR 125 8F 8F+2ML $230 $14,940 2040 SR 125 SR 94 I-8 10F 10F+2ML $70 $15,010 2040 I-805 Mission Valley 8F 8F+4ML $610 $15,620 Viaduct 2040 I-805/ West to North & South to East (HOV Connectors) $90 $15,710 SR 52 2050 I-5 SR 905 Palomar St 8F 8F+2ML $95 $15,805 2050 I-5 SR 54 I-15 8F 10F+2ML $165 $15,970 2050 I-5 I-15 I-8 8F 8F+Operational $1,130 $17,100 2050 I-5 I-8 La Jolla Village Dr 8F/10F 8F/10F+2ML $530 $17,630 2050 I-5 Vandegrift Blvd Orange County 8F 8F+4T $754 $18,384 2050 I-8 I-5 I-15 8F 8F+Operational $440 $18,824 2050 I-8 2nd Street Los Coches 4F/6F 6F $54 $18,878 2050 SR 15 I-5 SR 94 6F 8F+2ML $90 $18,968 2050 I-15 Viaduct 8F 8F+2ML $720 $19,688 2050 I-15 SR 78 Riverside County 8F 8F+4T $1,005 $20,693 2050 I-15/SR 52 West to North and South to East (HOV Connectors) $140 $20,833 2050 I-15/SR 56 North to West (Freeway Connector) $100 $20,933 2050 SR 52 I-5 I-805 4F 6F $110 $21,043 2050 SR 54 I-5 SR 125 6F 6F+2ML $100 $21,143

SANDAG 2050 Regional Transportation Plan A-19

Table A.3 – Phased Highway Projects – Revenue Constrained Plan ($ millions – 2010 dollars) (Continued)

($ Millions - 2010 Dollars) Year Built Cumulative By Freeway From To Existing Improvements Cost Cost 2050 SR 94 SR 125 Avocado Blvd 4F 6F $90 $21,233 2050 SR 94 Avocado Blvd Jamacha Rd 4C 6C $30 $21,263 2050 SR 94 Jamacha Rd Steele Canyon Rd 2C/4C 4C $20 $21,283 2050 SR 125 SR 905 San Miguel Rd 4T 8F $110 $21,393 2050 SR 125 San Miguel Rd SR 54 4F 8F $60 $21,453 2050 SR 125 SR 54 SR 94 6F 6F+2ML $100 $21,553

KEY C = Conventional Highway Lanes MB = Movable barrier T = Toll Lanes F = Freeway Lanes ML = Managed lanes (HOV & TL = Transit Lanes Value Pricing) HOV = High Occupancy Vehicle Lanes ML(R) = Managed lanes (Reversible)

1 Project completed in two phases. See improvement from 8F to 8F+2HOV by 2018. 2 Project completed in two phases. See improvement from 8F to 8F+2HOV by 2018. Note: All HOV lanes would convert to Managed Lanes by 2035 with an HOV occupancy of 3+ people.

A-20 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.4 – Phased Highway Projects – Revenue Constrained Plan ($ millions – YOE dollars)

($ Millions - YOE Dollars) Year Built Cumulative By Freeway From To Existing Improvements Cost Cost 2018 I-5 Manchester SR 78 8F 8F+2HOV $460 $460 Ave 2018 SR 11/ SR 905 Mexico -- 4T $755 $1,215 Otay Mesa East POE 2018 I-15 SR 163 SR 56 8F+2ML(R) 10F+4ML/MB $419 $1,634 2018 I-15 Centre City SR 78 8F 8F+4ML $210 $1,844 Parkway 2018 SR 76 Melrose Drive I-15 2C 4C $404 $2,248 2018 SR 241 Orange I-5 -- 4T $443 $2,691 County 2018 I-805 Palomar St SR 94 8F 8F+2HOV $197 $2,888 2018 I-805 SR 52 Carroll Canyon 8F/10F 8F/10F+2HOV $160 $3,048 Rd 2018 I-805 Carroll I-5 (north) 8F/10F 8F/10F+2ML $81 $3,129 Canyon Rd 2018 SR 905 I-805 Mexico -- 6F $595 $3,724 2018 Vesta Street Bridge Mobility Connector over Harbor Drive at Naval Base $59 $3,783 San Diego 2018 32nd Street Freeway Access Enhancement $117 $3,900 2018 10th Avenue Marine Rail Line Grade Separation/Barrio Logan Enhancement $66 $3,966 Terminal Entrance 2018 National City Marine Bay Marina Drive, Civic Center Freeway Access $7 $3,973 Terminal Improvements 2020 I-5 La Jolla Village I-5/I-805 8F/14F 8F/14F+2ML $260 $4,233 Drive Merge 2020 I-5/I-805 North to North & South to South (HOV Connectors) $114 $4,347 2020 SR 15 I-805 I-8 8F 8F+2TL $47 $4,394 2020 I-15 I-8 SR 163 8F 8F+2ML $135 $4,529 2020 SR 15/ North to North & South to South (HOV Connectors) $94 $4,623 I-805 2020 I-15/SR 78 East to South & North to West (HOV Connectors) $109 $4,732 2020 SR 78 I-5 I-15 6F 6F+2ML/Operational $592 $5,324 2020 SR 94 I-5 I-805 8F 8F+2ML $499 $5,823 2020 SR 94/ South to East (Freeway Connector) $144 $5,967 SR 125 2020 I-805 Palomar St SR 15 8F/8F+2HOV1 8F+4ML $1,247 $7,214

SANDAG 2050 Regional Transportation Plan A-21

Table A.4 – Phased Highway Projects – Revenue Constrained Plan ($ millions – YOE dollars) (Continued) ($ Millions - YOE Dollars) Year Built Cumulative By Freeway From To Existing Improvements Cost Cost 2020 I-805/ North to West & East to South (HOV Connectors) $166 $7,380 SR 94 2020 I-805 SR 52 Carroll Canyon Rd 8F/10F+ 8F/10F+4ML $406 $7,786 2HOV 2020 National City Rail Yard $7 $7,793 2030 I-5 Palomar St SR 15 8F 8F+2ML $274 $8,067 2030 I-5 I-5/I-805 Merge SR 56 8F/14F+2H 8F/14F+4ML $68 $8,135 OV 2030 I-5 SR 56 Manchester Ave 8F+2HOV 8F+4ML $685 $8,820 2030 I-5/SR 56 West to North (Freeway Connector) $89 $8,909 2030 I-5/SR 56 South to East (Freeway Connector) $164 $9,073 2030 I-5 Manchester Ave Palomar Airport Rd 8F+2HOV2 8F+4ML $1,301 $10,374 2030 SR 67 Mapleview St Dye Rd 2C/4C 4C $781 $11,155 2030 SR 94/ West to North (Freeway Connector) $247 $11,402 SR 125 2030 SR 125 SR 94 I-8 8F 10F $295 $11,697 2030 SR 241 Orange County I-5 4T 6T $79 $11,776 2030 I-805 SR 905 Palomar St 8F 8F+4ML $463 $12,239 2030 I-805 SR 15 Mission Valley 8F 8F+4ML $315 $12,554 Viaduct 2030 I-805 Mission Valley SR 52 8F/10F 8F/10F+4ML $873 $13,427 Viaduct 2035 I-5 Palomar Airport SR 78 8F+ 8F+4ML $1,181 $14,608 Rd 2HOV2 2035 I-5 SR 78 Vandegrift Blvd 8F 8F+4ML $661 $15,269 2035 I-5/SR 78 South to East and West to North (HOV Connectors) $189 $15,458 2035 I-5/SR 78 North to East and West to South (HOV Connectors) $188 $15,646 2035 I-5/SR 78 South to East (Freeway Connector) $94 $15,740 2035 I-5/SR 78 West to South (Freeway Connector) $72 $15,812 2035 SR 15 SR 94 I-805 8F 8F+2ML $31 $15,843 2035 SR 15/ South to West & East to North (HOV Connectors) $126 $15,969 SR 94 2035 SR 52 I-805 I-15 6F 6F+2ML $314 $16,283

A-22 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.4 – Phased Highway Projects – Revenue Constrained Plan ($ millions – YOE dollars) (Continued)

($ Millions - YOE Dollars) Year Built Cumulative By Freeway From To Existing Improvements Cost Cost 2040 I-8 I-15 SR 125 8F/10F 8F/10F+Operational $226 $16,509 2040 I-8 SR 125 2nd Street 6F/8F 6F/8F+Operational $226 $16,735 2040 SR 52 I-15 SR 125 4F 6F+2ML(R) $587 $17,322 2040 SR 56 I-5 I-15 4F 6F $244 $17,566 2040 SR 76 I-15 Couser Canyon 2C 4C/6C+Operational $235 $17,801 2040 SR 94 I-805 College Ave 8F 8F+2ML $396 $18,197 2040 SR 94 College Ave SR 125 8F 8F+2ML $415 $18,612 2040 SR 125 SR 94 I-8 10F 10F+2ML $126 $18,738 2040 I-805 Mission Valley Viaduct 8F 8F+4ML $1,101 $19,839 2040 I-805/ West to North & South to East (HOV Connectors) $146 $19,985 SR 52 2050 I-5 SR 905 Palomar St 8F 8F+2ML $226 $20,211 2050 I-5 SR 54 I-15 8F 10F+2ML $393 $20,604 2050 I-5 I-15 I-8 8F 8F+Operational $2,689 $23,293 2050 I-5 I-8 La Jolla Village Dr 8F/10F 8F/10F+2ML $1,261 $24,554 2050 I-5 Vandegrift Blvd Orange County 8F 8F+4T $1,795 $26,349 2050 I-8 I-5 I-15 8F 8F+Operational $1,047 $27,396 2050 I-8 2nd Street Los Coches 4F/6F 6F $129 $27,525 2050 SR 15 I-5 SR 94 6F 8F+2ML $214 $27,739 2050 I-15 Viaduct 8F 8F+2ML $1,714 $29,453 2050 I-15 SR 78 Riverside County 8F 8F+4T $2,392 $31,845 2050 I-15/SR 52 West to North and South to East (HOV Connectors) $260 $32,105 2050 I-15/SR 56 North to West (Freeway Connector) $186 $32,291 2050 SR 52 I-5 I-805 4F 6F $262 $32,553 2050 SR 54 I-5 SR 125 6F 6F+2ML $238 $32,791

SANDAG 2050 Regional Transportation Plan A-23

Table A.4 – Phased Highway Projects – Revenue Constrained Plan ($ millions – YOE dollars) (Continued)

($ Millions - YOE Dollars) Year Built Cumulative By Freeway From To Existing Improvements Cost Cost 2050 SR 94 SR 125 Avocado Blvd 4F 6F $214 $33,005 2050 SR 94 Avocado Blvd Jamacha Rd 4C 6C $71 $33,076 2050 SR 94 Jamacha Rd Steele Canyon Rd 2C/4C 4C $48 $33,124 2050 SR 125 SR 905 San Miguel Rd 4T 8F $262 $33,386 2050 SR 125 San Miguel Rd SR 54 4F 8F $143 $33,529 2050 SR 125 SR 54 SR 94 6F 6F+2ML $238 $33,767

KEY C = Conventional Highway Lanes MB = Movable barrier T = Toll Lanes F = Freeway Lanes ML = Managed lanes (HOV & TL = Transit Lanes Value Pricing) HOV = High Occupancy Vehicle Lanes ML(R) = Managed lanes (Reversible)

1 Project completed in two phases. See improvement from 8F to 8F+2HOV by 2018. 2 Project completed in two phases. See improvement from 8F to 8F+2HOV by 2018.

Note: All HOV lanes would convert to Managed Lanes by 2035 with an HOV occupancy of 3+ people.

A-24 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.5 – Phased Transit Services – Revenue Constrained Plan

Peak Off-Peak Headway Headway Decade Service Route Description (Minutes) (Minutes) 2018 COASTER 398 Double tracking/Increased Frequency between Oceanside 20 Current and downtown San Diego with extension to Convention Center/Petco Park 2018 Trolley 510 Mid-Coast LRT Extension (peak frequencies 7.5 to 7.5/15 15 downtown/15 to UTC) 2018 Trolley 530 Green Line Extend to downtown – Bayside 15 15 2018 BRT 470 Escondido – UTC/UCSD via Mira Mesa Blvd 10 - 2018 BRT 607 Rancho Bernardo – downtown Express 10 - 2018 BRT 608 Escondido – downtown Express 10 - 2018 BRT 610 Temecula (Peak Only)/Escondido – downtown 10 10 2018 BRT 628 South Bay BRT (Otay Mesa – downtown) via 15 - Otay Ranch/Millenia 2018 BRT 680 Otay Mesa to Sorrento Mesa via I-805 Corridor, Otay 15 15 Ranch/Millenia, National City, Southeastern San Diego, Kearny Mesa 2018 BRT 688 San Ysidro to Sorrento Mesa Express 15 - 2018 BRT 689 Millenia/Otay Ranch to UTC/Torrey Pines Express 15 - 2018 Rapid 15 Mid-City Rapid (SDSU – downtown) via Mid-City, El Cajon 10 10 and Park Blvds 2018 Rapid 201/202 UTC Area Super Loop 10 15 2018 Rapid 350 Escondido to Del Lago via Escondido Blvd & Bear Valley 10 10 2020 Streetcar 554 Hillcrest/Balboa Park/downtown San Diego Loop 10 10 2020 BRT 90 Santee/El Cajon Transit Centers to downtown via SR 94 15 - 2020 BRT 640 I-5 - San Ysidro to downtown & Kearny Mesa via I-5 15 15 shoulder lanes/HOV lanes, downtown, Hillcrest, Mission Valley 2020 BRT 870 El Cajon to UTC via Santee, SR 52, I-805 (Peak only) 10 - 2020 Rapid 10 La Mesa to Ocean Beach via Mid-City, Hillcrest, Old Town 10 10 2020 Shuttle 448/449 San Marcos Shuttle 15 15 2020 Airport I-5 from McClellan-Palomar Airport to San Diego 30 30 Express International Airport 2020 Airport I-15 from Escondido Transit Center to San Diego 30 30 Express International Airport 2020 Airport I-15 from Escondido Transit Center to Cross Border Facility 30 30 Express 2020 Local Bus Routes - 15 minutes in key corridors 15 15

SANDAG 2050 Regional Transportation Plan A-25

Table A.5 – Phased Transit Services – Revenue Constrained Plan (Continued)

Peak Off-Peak Headway Headway Decade Service Route Description (Minutes) (Minutes) 2030 COASTER 398 Additional Double tracking/Increased Frequency 20 60 2030 SPRINTER 399 Double tracking (Oceanside-Escondido) Increased 10 10 Frequencies 2030 Trolley 561 UTC to Mira Mesa via Sorrento Mesa/Carroll Canyon 7.5 7.5 (extension of route 510) 2030 Trolley 520 Orange Line - Increased Frequency (existing 15/15) 7.5 15 2030 Streetcar 553 Downtown San Diego: Little Italy to East Village 10 10 2030 SPRINTER 588 SPRINTER Express 10 15 2030 BRT 890 El Cajon to Sorrento Mesa via SR 52, Kearny Mesa 10 - 2030 Rapid 2 North Park to downtown San Diego via North Park, Golden 10 10 Hill 2030 Rapid 28 Point Loma to Kearny Mesa via Old Town, Linda Vista 10 10 2030 Rapid 30 Old Town to Sorrento Mesa via Pacific Beach, La Jolla, UTC 10 10 2030 Rapid 120 Kearny Mesa to downtown via Mission Valley 10 10 2030 Rapid 473 Oceanside to UTC via Hwy 101 Coastal Communities, 10 10 Carmel Valley 2030 Rapid 709 H Street Trolley to Otay Ranch/Millenia via H Street Corridor, 10 10 Southwestern College 2030 Rapid 910 Coronado to downtown via Coronado Bridge 10 10 2035 Trolley 520 Orange Line - Extend to Airport Intermodal Transit Center 7.5 15 2035 Streetcar 555 30th St to downtown San Diego via North Park/Golden Hill 10 10 2035 Trolley 560 Mid-City to downtown (Phase 1) via El Cajon and Park Blvds 7.5 7.5 2035 Trolley 563 Pacific Beach to El Cajon via Clairemont, Kearny Mesa, 7.5 10 Mission Valley, SDSU 2035 BRT 653 Mid-City to Palomar Airport Road via Kearny Mesa/I-805/I-5 15 - 2035 Rapid 11 Spring Valley to SDSU via Southeastern San Diego, 10 10 Downtown, Hillcrest, Mid-City 2035 Rapid 201/202 UTC Area Super Loop - Increase Frequencies 10 10 2035 Rapid 471 Downtown Escondido to East Escondido 10 10 2035 Rapid 474 Oceanside to Vista via Mission Ave/Santa Fe Road Corridor 10 10 2035 Rapid 635 Eastlake/EUC to Palomar Trolley via Main Street Corridor 10 10 2035 Rapid 636 SDSU to Spring Valley via East San Diego, Lemon Grove, 10 10 Skyline 2035 Rapid 637 North Park to 32nd Street Trolley via Golden Hill 10 10

A-26 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.5 – Phased Transit Services – Revenue Constrained Plan (Continued)

Peak Off-Peak Headway Headway Decade Service Route Description (Minutes) (Minutes) 2035 Rapid 638 San Ysidro to Otay Mesa via Otay, SR 905 Corridor 10 10 2035 Shuttle 448/449 San Marcos - Increase Frequencies 10 10 2035 Local Bus Routes - 10 minutes in key corridors 10 10 2040 Trolley 520 Orange Line - Increased Frequencies 7.5 7.5 2040 Trolley 522 Orange Line Express - El Cajon to downtown San Diego 10 10 2040 Trolley 530 Green Line Extend to downtown - Bayside 7.5 7.5 2040 Trolley 540 Blue Line Express - UTC to San Ysidro via downtown 10 10 2050 Trolley 560 SDSU to downtown (Phase 2) via Mid-City, El Cajon and 7.5 7.5 Park Blvds 2050 Trolley 562 UTC to San Ysidro via Kearny Mesa, Mission Valley, 7.5 10 Mid-City, Southeastern San Diego, National City/Chula Vista via Highland Ave/4th Ave

SANDAG 2050 Regional Transportation Plan A-27

Table A.6 – Major Transit Expenditures – Revenue Constrained Plan ($ millions – 2010 dollars)

2010 - 2021 - 2031 - 2041 - Project Categories 2020 2030 2040 2050 Total Major New Facilities $4,519 $4,001 $6,345 $5,506 $20,371 Miscellaneous Capital/Rehabilitation/Replacement $1,368 $1,807 $1,142 $2,507 $6,824 Transit Operations $3,449 $4,220 $5,840 $6,191 $19,700 ADA, Senior, and Specialized Transportation Services $345 $422 $584 $619 $1,970 High-Speed Rail $0 $0 $0 $7,000 $7,000 TOTAL $9,681 $10,450 $13,911 $21,823 $55,865

Table A.7 – Major Transit Expenditures - Revenue Constrained Plan ($ millions – YOE dollars)

2010 - 2021 - 2031 - 2041 - Project Categories 2020 2030 2040 2050 Total Major New Facilities $4,512 $5,917 $9,583 $12,993 $33,005 Miscellaneous Capital/Rehabilitation/Replacement $1,392 $2,511 $1,196 $4,923 $10,022 Transit Operations $3,993 $6,775 $12,942 $18,977 $42,687 ADA, Senior, and Specialized Transportation Services $399 $677 $1,294 $1,898 $4,268 High-Speed Rail $0 $0 $0 $16,644 $16,644 TOTAL $10,296 $15,880 $25,015 $55,435 $106,626

A-28 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.8 – Phased Arterial Projects1 – Revenue Constrained Plan

Conformity SANDAG Lead Analysis Year ID Agency Project Title Project Description 2018 CB04A Carlsbad El Camino Real In Carlsbad, widen El Camino Real to prime arterial Widening - Tamarack standards with three travel lanes, bike lanes and Avenue to Chestnut sidewalks in each direction including intersection Avenue improvements at Tamarack Avenue and Chestnut Avenue 2018 CB04B Carlsbad El Camino Real and In Carlsbad, along the eastside of El Camino Real Cannon Road just south of Cannon Road widen to prime arterial standards with three through lanes, a right turn lane and a sidewalk approaching the intersection 2018 CB04C Carlsbad El Camino Real - Lisa In Carlsbad, along the west side of El Camino Real, Street to Crestview roadway widening to provide three southbound Drive through lanes, curb, gutter and sidewalk per Prime Arterial standards 2018 CB12 Carlsbad College Boulevard In Carlsbad, from Badger Lane to Cannon Road, Reach A - Badger construct a new segment of College Blvd. to Lane to Cannon Road provide 4-lane roadway with raised median, bike lanes and sidewalks/trails in accordance with Major Arterial standards 2018 CB13 Carlsbad Poinsettia Lane Reach In Carlsbad, from Cassia Drive to Skimmer Court, E - Cassia Drive to construct a new 4-lane roadway with median, bike Skimmer Court lanes, and sidewalks/trails to major arterial standards 2018 CB22 Carlsbad Avenida Encinas - In Carlsbad, Avenida Encinas from Palomar Airport Widen from Palomar Road southerly to existing improvements adjacent Airport Road to to the EWPCF, roadway widening to Secondary EWPCF Arterial standards 2018 CB24 Carlsbad College Boulevard In Carlsbad, at the intersection of College Blvd. and and Palomar Airport Palomar Airport Road, roadway widening along Road - Intersection southbound College Blvd. to provide dual left turns, Improvements one thru lane, one shared thru/right turn lane and one right turn lane and to lengthen right turn lanes on the other approaches to the intersection 2018 CB26 Carlsbad Melrose and Palomar In Carlsbad, at the intersection of Palomar Airport Airport Road Road and Melrose Drive, roadway widening along southbound Melrose to provide an additional right turn lane to westbound Palomar Airport Road 2018 CB32 Carlsbad El Camino Real In Carlsbad, widen El Camino Real from 900 feet Widening - Cassia to north of Cassia Road to Camino Vida Roble, along Camino Vida Roble the northbound side of the roadway to provide three travel lanes and a bike lane in accordance with Prime Arterial standards 2018 CB30 Carlsbad El Camino Real – In Carlsbad, at the intersection of El Camino Real El Camino Real to and Tamarack Avenue construct a second left turn Tamarack Avenue lane from El Camino Real to westbound Tamarack

1 The arterials listed in this table reflect locally initiated projects that were submitted by local jurisdictions in the 2010 Regional Transportation Improvement Program.

SANDAG 2050 Regional Transportation Plan A-29

Table A.8 – Phased Arterial Projects – Revenue Constrained Plan (Continued)

Conformity SANDAG Lead Analysis Year ID Agency Project Title Project Description 2018 CB31 Carlsbad El Camino Real – In Carlsbad along El Camino Real from 700 feet La Costa Avenue to north of La Costa Avenue to Arenal Road, widening Arenal Road along the southbound side of the roadway to provide three travel lanes and a bike lane in accordance with Prime Arterial Standards 2018 CB33 Carlsbad Palomar Airport Road In Carlsbad, widening along eastbound Palomar and El Camino Real Airport Road to provide a dedicated right turn lane Right Turn Lane to southbound El Camino Real 2018 CB34 Carlsbad Palomar Airport Road In Carlsbad widening along eastbound Palomar - Palomar Airport Airport Road to provide a dedicated right turn lane Road to Paseo Del to southbound Paseo Del Norte Norte 2018 CB35 Carlsbad Palomar Airport Road In Carlsbad lengthen the left turn pocket along - Palomar Airport eastbound Palomar Airport Road to northbound Road to Paseo Del Paseo Del Norte Norte 2018 CHV08 Chula Vista Willow Street Bridge Replace and widen bridge including shoulders Project - Bonita Road to Sweetwater Road 2018 CHV20 Chula Vista North Fourth Avenue Add additional lane on east side of Fourth Avenue and Brisbane Street 2018 CNTY14 San Diego South Santa Fe Vista City limits to 700 feet south of Woodland - County Avenue North - reconstruct and widen from 2 to 4 lanes including Montgomery Drive to bicycle lane South of Woodland Drive 2018 CNTY21 San Diego Bradley Avenue Widen Bradley Avenue including the SR 67 overpass County Overpass at SR 67 - from 2 to 4 lanes plus sidewalks Magnolia Avenue to Mollison Avenue 2018 CNTY24 San Diego Cole Grade Road - Widen to accommodate 14-ft traffic lane in both County North of Horse Creek direction, 12-ft center 2-way left turn, 6-ft bike lane Trail to South of & 10-ft pathway Pauma Heights Road 2018 CNTY34 San Diego Dye Road Extension - In Ramona, study, design and construct a 2-lane County Dye Road to San community collector road with intermittent turn Vicente Road lanes, bike lanes, curb, gutter, and pathway/walkway 2018 CNTY35 San Diego Ramona Street In the community of Ramona, construct new road County Extension - Boundary extension, 2 lanes with intermittent turn lanes, bike Avenue to Warnock lanes and walkway/pathway Drive 2018 CNTY36 San Diego San Vicente Road In Ramona, design and reconstruct road County Improvements - improvements, including 2-lane community Warnock Drive to collector road with intermittent turn lanes, bike Wildcat Canyon Road lanes, asphalt concrete dike, and pathway/walkway

A-30 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.8 – Phased Arterial Projects – Revenue Constrained Plan (Continued)

Conformity SANDAG Lead Analysis Year ID Agency Project Title Project Description 2018 CNTY39 San Diego Bear Valley Parkway Widen from 2 to 4 lanes, with a center median, a County North - San Pasqual bike lane and shoulder in each direction of travel Valley Road to Boyle Avenue 2018 CNTY76 San Diego Jamacha Blvd (Phase In unincorporated Spring Valley, the current funds County 1 and 2) - Omega programmed are for Phase 1 - between Omega Street to Sweetwater Street and Spring Valley Glen, widen from 2-lane to Spring Boulevard 4-lane roadway with bicycle and pedestrian improvements 2018 ENC31 Encinitas I-5/Encinitas Modify interchange to improve safety and alleviate Boulevard congestion (design only) Interchange Modification 2018 ESC02 Escondido Bear Valley/East Realignment and widening from 2 to 4 lanes Valley/Valley Center - Citrus Avenue to Beven Drive 2018 ESC02A Escondido East Valley/Valley Widen roadway from 4 to 6 lanes with raised Center medians and left turn pockets; modify signal at Lake Wohlford and Valley Center Road; widen bridge over Escondido Creek 2018 ESC03 Escondido Citracado Parkway - Widen from 2 to 4 lanes with left turn pockets and Don Lee Place to new traffic signal at Aero Way and Citracado Vineyard Parkway 2018 ESC04 Escondido Citracado Parkway II - Widen from 2 to 4 lanes with raised medians, West Valley to construct bridge over Escondido Creek Harmony Grove 2018 ESC05 Escondido El Norte Parkway Widen from 2 to 4 lanes and construct missing Phase IV section of El Norte Pkwy. with left turn pockets, raised medians and new traffic signals 2018 ESC06 Escondido El Norte Parkway Construct missing 2-lane bridge at Escondido Creek Bridge at Escondido Creek - Kaile Lane to Key Lime Way 2018 ESC08 Escondido Felicita Avenue/ Widen from 2 to 4 lanes with left turn pockets, Juniper Street - from raised medians on Felicita; new traffic signals at Escondido Boulevard Juniper and Chestnut, Juniper and 13th Avenue, to Juniper Street and Juniper and 15th Avenue; modify traffic signal at from Juniper Street to Juniper and Felicita Chestnut Street 2018 ESC09 Escondido Ninth Avenue – Widen from 2 to 4 lanes with raised median and La Terraza Boulevard modify traffic signals at Ninth Avenue and Tulip to Spruce Street Street - design phase 2018 ESC24 Escondido Centre City Parkway - Widen 4 lanes to 6 lanes with intersection Mission Road to improvements SR 78

SANDAG 2050 Regional Transportation Plan A-31

Table A.8 – Phased Arterial Projects – Revenue Constrained Plan (Continued)

Conformity SANDAG Lead Analysis Year ID Agency Project Title Project Description 2018 ESC25 Escondido Citracado/Nordahl - Widen from 4 lanes to 6 lanes with double left turn Country Club Lane to lanes and exclusive right turn lanes SR 78 2018 LG13 Lemon Street Improvements Lemon Grove Avenue Realignment Project: A key Grove (Congestion Relief) project in the redevelopment of the city's downtown Village Specific Plan, this project improves access to and from SR 94, reducing motorist delays and emissions, while greatly enhancing the visual appeal of the block adjacent to the trolley station. 2018 NC01 National Plaza Boulevard Widen from 2 to 3 lanes including a new traffic lane City Widening in each direction, new sidewalks, sidewalk widening, traffic signal upgrades and interconnection 2018 O06 Oceanside Melrose Drive Extension in Oceanside, future construction of 4- lane arterial highway with medians, sidewalks and bike lanes 2018 O26 Oceanside SR 76 & Rancho Del Widen SR 76 for one additional lane width Oro Boulevard 1,500 feet west and east of Rancho del Oro Boulevard 2018 O27 Oceanside Coast Highway and Roundabout in Oceanside, construction of a traffic SR 76 circle at the intersection of North Coast Highway and SR 76; the traffic circle will be unsignalized; free traffic flow at all approaches 2018 POW02 Poway Espola Road Widen Espola Road from 2 to 3 lanes with 8-foot bike lanes/shoulders 2018 SD34 San Diego El Camino Real In San Diego on El Camino Real from San Dieguito Road to Via de la Valle - reconstruct and widen from 2 to 4 lanes and extend transition lane and additional grading to avoid biological impacts (CIP 52-479.0) 2018 SD70 San Diego West Mission Bay In San Diego, replace bridge and increase from 4- to Drive Bridge 6-lane bridge including Class II bike lane (52-643) 2018 SD83 San Diego SR 163/Friars Road Friars Road from Avenida de las Tiendas to Mission Interchange Center Road widen and improve Friars Road and Modification overcrossing; reconstruct interchange including improvements to ramp intersections (Phase 1). Construct new connector roadways and structures (Phase 2). Construct auxiliary lanes along northbound and southbound SR 163 (Phase 3) 2018 SD90 San Diego SR 163/Clairemont In San Diego, widen from 4- to 6-lane prime Mesa Boulevard arterial; Phase II of the project - west ramps Interchange (CIP 52-745.0)

A-32 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.8 – Phased Arterial Projects – Revenue Constrained Plan (Continued)

Conformity SANDAG Lead Analysis Year ID Agency Project Title Project Description 2018 SD102A San Diego Otay Truck Route On Otay Truck Route in San Diego from Drucker Widening Lane to La Media, add one lane (total 3 lanes) for trucks; from Britannia to La Media, add one lane for trucks and one lane for emergency vehicles (Border Patrol/fire department access); along Britannia from Britannia Court to the Otay Truck Route - add one lane for trucks 2018 SD103 San Diego I-5/Genesee Avenue In San Diego, replace Genesee Avenue over crossing Interchange from 4-lane bridge with 6-lane bridge; construct auxiliary lanes and replace Voigt Drive bridge; add additional lane at on/off ramp to Sorrento Valley Rd.; add one carpool lane and one general purpose lane to on ramp from Sorrento Valley Road to southbound I-5; install ramp meters at on ramp and construct a southbound auxiliary lane between Sorrento Valley Road and Genesee Avenue 2018 SD133 San Diego Mira Sorrento Place Mira Sorrento Place from Scranton Road to Vista Sorrento Parkway in San Diego widen the existing 2-lane 560-foot portion of Mira Sorrento Place (40-foot road width, 55-foot right of way) to a 4-lane collector (72-foot road width, 92-foot right of way), and extend the road to intersect with Vista Sorrento Parkway at the existing on/off ramps to I-805 2018 SM19 San Marcos Grand Avenue Bridge In San Marcos, construct 4-lane arterial; between Bent Avenue to Discovery Street construct 6-lane arterial 2018 SM22 San Marcos South Santa Fe - Widen and realign existing road to 4-lane secondary Bosstick to Smilax arterial standards 2018 SM24 San Marcos Woodland Parkway Modify existing ramps at Woodland Parkway and Interchange Barham Drive; widen and realign Barham Drive to Improvements – accommodate a new eastbound SR 78 on-ramp; La Moree Road to widen and realign SR 78 undercrossing and Rancheros Drive associated work 2018 SM25 San Marcos Borden Road Street Construction of approximately 700 lineal feet of a Improvements and new 4-lane secondary arterial including a bridge Bridge Construction - Twin Oaks to Woodward Street 2018 SM30 San Marcos San Marcos Widen road to a 6-lane prime arterial Boulevard Street Improvements - Rancho Santa Fe to Bent Avenue 2018 SM31 San Marcos Discovery Street Widen roadway to 4-lane secondary arterial Improvements - McMahr Rd to Bent Avenue/Craven Road

SANDAG 2050 Regional Transportation Plan A-33

Table A.8 – Phased Arterial Projects – Revenue Constrained Plan (Continued)

Conformity SANDAG Lead Analysis Year ID Agency Project Title Project Description 2018 SM32 San Marcos Via Vera Cruz Bridge Widen to 4-lane secondary arterial and construct a and Street bridge at San Marcos Creek Improvements - San Marcos Boulevard to Discovery Street 2018 SM42 San Marcos Street Improvements: In the City of San Marcos, on Discovery Street from Discovery Street - Craven Road to west of Twin Oaks Valley Road, Craven Road to West construct approximately 5,100 lineal feet of a new of Twin Oaks Valley 6-lane roadway Road 2018 SM43 San Marcos Barham Drive - In the City of San Marcos, on Barham Drive Twin Oaks Valley between Twin Oaks Valley Road and La Moree Road to La Moree Road, widen and reconstruct the north side of Road Barham Drive to a 6-lane prime arterial and associated work 2018 SM44 San Marcos Eastbound SR 78 Construct auxiliary lanes along eastbound SR 78 Auxiliary lane - between Woodland Parkway Interchange and Woodland Parkway Nordahl Road Interchange; includes widening of to Nordahl Road Mission Road undercrossing 2018 SM48 San Marcos Creekside Drive Construct approximately 3,000 feet of a 2-lane collector road from Via Vera Cruz to Grand Avenue in the City of San Marcos. The road will include two 12-foot lanes, diagonal parking on the north side, and parallel parking on the south side. In addition, the project also will include a 10-foot bike trail meandering along the south side. 2018 VISTA08A Vista W. Vista Way - The scope of this project is to provide right of way Emerald Drive to acquisition and construction for the widening of Grapevine Road W. Vista Way a distance of 1,500 feet from the intersection with Emerald Drive to the intersection with Grapevine Road 2020 CNTY14A San Diego South Santa Fe Widening of South Santa Fe Avenue to a 5-lane County Avenue South - South major road with a center left turn lane, curb, gutter, of Woodland Drive to sidewalk, bike lanes, and drainage improvements Smilax Road from 700 ft. south of Woodland Dr to Smilax Road 2020 O22 Oceanside College Boulevard - In Oceanside, widen from the existing 4 lanes to Vista Way to Old 6 lanes with bike lanes and raised median Grove Road 2020 O23 Oceanside College Boulevard In Oceanside, widen from 4 to 6 lanes plus bike Bridge - San Luis Rey lanes and a striped-only median; widening includes River the approach roadway and the bridge deck over the San Luis Rey River - Design Phase 2020 SD189 San Diego Sea World Drive In San Diego, replace existing 4-lane bridge with an Widening and I- 5 8-lane bridge with new on/off ramps; widen Interchange approachways to add right turn lanes to improve Improvements access to I-5 (CIP 52-706.0)

A-34 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.8 – Phased Arterial Projects – Revenue Constrained Plan (Continued)

Conformity SANDAG Lead Analysis Year ID Agency Project Title Project Description 2020 SD190 San Diego Palm Avenue/ In San Diego, future widening of Palm Avenue I-805 Interchange Bridge including providing for repairs to the bridge approaches and abutments, installing sidewalks, signals, and striping . Phase I was work pertaining to re-striping to reconfigure travel lanes; no actual modifications to the physical geometry of the bridge took place

. Phase II of the project will widen the bridge on the north side; in addition to this the scope of work will also contain restriping of the lanes and modifications to the on/off ramps

. Phase III of the project will widen the bridge on the south side; in addition to this the scope of work will also contain restriping of the lanes and modifications to the on/off ramps

. Both Phase II and III will have environmental documentation prepared and all technical studies performed before entering into full design signage modifications: also modify freeway on and off ramps (CIP 52-640.0) 2030 SD81 San Diego Genesee Avenue - In San Diego, future widening to 6-lane major street Nobel Drive to SR 52 north of Decoro Street and to a 6-lane primary arterial south of Decoro Street and included Class II bicycle lanes (CIP 52-458.0) 2030 SM10 San Marcos SR 78/Smilax Construct new interchange at Smilax Road interchange and SR 78 improvements

SANDAG 2050 Regional Transportation Plan A-35

A-36 Appendix A: 2050 RTP Projects, Costs, and Phasing

FIGURE A.3 HERE

SANDAG 2050 Regional Transportation Plan A-37

A-38 Appendix A: 2050 RTP Projects, Costs, and Phasing

FIGURE A.4 HERE

SANDAG 2050 Regional Transportation Plan A-39

A-40 Appendix A: 2050 RTP Projects, Costs, and Phasing

FIGURE A.5 HERE

SANDAG 2050 Regional Transportation Plan A-41

A-42 Appendix A: 2050 RTP Projects, Costs, and Phasing

FIGURE A.6 HERE

SANDAG 2050 Regional Transportation Plan A-43

A-44 Appendix A: 2050 RTP Projects, Costs, and Phasing

FIGURE A.7 HERE (New Figure)

SANDAG 2050 Regional Transportation Plan A-45

A-46 Appendix A: 2050 RTP Projects, Costs, and Phasing

FIGURE A.8 HERE

SANDAG 2050 Regional Transportation Plan A-47

A-48 Appendix A: 2050 RTP Projects, Costs, and Phasing

FIGURE A.9 HERE

SANDAG 2050 Regional Transportation Plan A-49

Table A.9 – Major Capital Improvements – Unconstrained Network

Transit Facilities

($ Millions – 2010 Dollars)

Service Route Description Cost High 598 Commuter Rail Overlay (Temecula to Airport ITC) $330 Speed Rail High - Extension from Airport ITC to International border $3,557 Speed Rail COASTER 398 Double Tracking (includes all COASTER improvements, positive train control, and $5,606 UTC tunnel) SPRINTER 399 Double Tracking (includes all SPRINTER improvements and extension to South $1,029 Escondido) SPRINTER 588 SPRINTER Express $284 Trolley 510 Mid-Coast LRT Extension $1,642 Trolley 510 and 520 Trolley System Rehabilitation (Blue and Orange Lines) $510 Trolley 510 Blue Line Rail Grade Separations $550 Trolley 520 Orange Line Rail Grade Separations $312 Trolley 522 Orange Line Express - El Cajon to downtown San Diego $230 Trolley 540 Blue Line Express - UTC to San Ysidro via downtown $455 Trolley 550 SDSU to San Ysidro via East San Diego, SE San Diego, National City $1,665 Trolley 560 SDSU to downtown via El Cajon Blvd/Mid-City (transition of Mid-City Rapid to $1,921 LRT) Trolley 561 UTC to Mira Mesa via Sorrento Mesa/Carroll Cyn (extension of route 510) $1,140 Trolley 562 UTC to San Ysidro via Kearny Mesa, Mission Valley, Mid-City, National City/Chula $2,548 Vista via Highland Ave/4th Ave Trolley 563 Pacific Beach to El Cajon via Kearny Mesa, Mission Valley, SDSU $1,262 Trolley 564 Otay Mesa East Border Crossing to Western Chula Vista via Otay Ranch/Millenia $854 Trolley 566 Palomar Street Trolley Station to UTC via Mid-City, Kearny Mesa $327 Trolley 510, 520, 540, Downtown Trolley Tunnel $2,592 522 and 560 Trolley Various Downtown Bus Tunnel and Hubs $2,917 BRT 90 Santee/El Cajon Transit Centers to downtown via SR 94 (peak only) (interim $0 service for Route 522 Orange Line Express) BRT 430 Oceanside to Escondido (peak only) $234 BRT 470 Escondido to UTC via Mira Mesa Blvd $20 BRT 610 Temecula (peak only)/Escondido to downtown (Sabre Springs/Mira Mesa PNRs, $89 Mid-City Stations) BRT 628 South Bay BRT (Otay Mesa-downtown) $200

A-50 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.9 – Major Capital Improvements – Unconstrained Network (Continued)

Transit Facilities (Continued)

($ Millions – 2010 Dollars)

Service Route Description Cost BRT 640 I-5 - San Ysidro to downtown & Kearny Mesa via I-5 shoulder lanes/HOV lanes, $90 downtown, Hillcrest/Mission Valley Guideway (interim service for Route 540 Blue Line Express BRT 650 Chula Vista to Palomar Airport Road Business Park via I-805/I-5 (peak only) $80 BRT 652 Downtown to UTC via Kearny Mesa Guideway/I-805 $2 BRT 653 Mid-City to Palomar Airport Road via Kearny Mesa/I-805/I-5 $10 BRT 870 El Cajon to UTC via Santee, SR 52, I-805 $7 BRT 890 El Cajon to Sorrento Mesa via SR 52, Kearny Mesa $12 BRT 680 and Otay Mesa/San Ysidro to Sorrento Mesa via I-805 Corridor, Otay Ranch/Millenia, $425 688/689 National City, Southeastern San Diego, Mid-City, Kearny Mesa BRT 120, 610, and Hillcrest to Mission Valley Transit Priority Measures, Full Guideway downtown to $3,302 640 Kearny Mesa, and I-15 Green Line transfer station BRT 692 El Cajon to Otay Mesa via Spring Valley, SR 125, Millenia $6 BRT 940 Oceanside to UTC via I-5, Carlsbad, Encinitas (peak only) $38 BRT - South Bay Maintenance Facility $51 BRT - Downtown BRT stations/layovers $110 Rapid 2 North Park to downtown San Diego via 30th St $38 Rapid 10 La Mesa to Ocean Beach via Mid-City, Hillcrest, Old Town $85 Rapid 11 Spring Valley to SDSU via SE San Diego, downtown, Hillcrest, Mid-City $110 Rapid 15 Mid-City Rapid SDSU to downtown (interim service for Route 560 Trolley) $68 Rapid 28 Point Loma to Kearny Mesa via Old Town, Linda Vista $48 Rapid 30 Old Town to Sorrento Mesa via Pacific Beach, La Jolla, UTC $102 Rapid 41 Fashion Valley to UTC/UCSD via Linda Vista and Clairemont $54 Rapid 103 Solana Beach to Sabre Springs BRT station via Carmel Valley $70 Rapid 120 Kearny Mesa to downtown $100 Rapid 440 Carlsbad to San Marcos via Palomar Airport Road $50 Rapid 471 Downtown Escondido to East Escondido $31 Rapid 473 Oceanside to UTC via Hwy 101 Coastal Communities, Carmel Valley $127 Rapid 474 Oceanside to Vista via Mission Ave/Santa Fe Road Corridor $49 Rapid 477 Camp Pendleton to Carlsbad Village via College Blvd, Plaza Camino Real $78

SANDAG 2050 Regional Transportation Plan A-51

Table A.9 – Major Capital Improvements – Unconstrained Network (Continued)

Transit Facilities (Continued)

($ Millions – 2010 Dollars)

Service Route Description Cost Rapid 635 Eastlake/EUC to Palomar Trolley via Main Street Corridor $54 Rapid 636 SDSU to Spring Valley via East San Diego, Lemon Grove, Skyline $39 Rapid 637 North Park to 32nd Street Trolley via Golden Hill $32 Rapid 638 San Ysidro to Otay Mesa via Otay, SR 905 Corridor $53 Rapid 639 Otay to North Island via Imperial Beach and Silver Strand, Coronado $53 Rapid 709 H Street Trolley to Millenia via H Street Corridor, Southwestern College $36 Rapid 910 Coronado to downtown via Coronado Bridge $25 Streetcar 551 Chula Vista downtown $1,340 Streetcar 552 National City downtown $400 Streetcar 553 Downtown San Diego: Little Italy to East Village $277 Streetcar 554 Hillcrest/Balboa Park/downtown San Diego Loop $249 Streetcar 555 30th St to downtown San Diego via North Park/Golden Hill $139 Streetcar 557 El Cajon downtown $1,600 Streetcar 558 Escondido downtown $500 Streetcar 559 Oceanside downtown $450 Streetcar 565 Mission Beach to la Jolla via Pacific Beach $2,390 Shuttle - San Marcos Shuttle1 $0 Airport Airport Express Routes2 $51 Express Intermodal - Airport Intermodal Transit Center $165 Intermodal - San Ysidro Intermodal Transit Center $50 Intermodal - Otay Mesa East Intermodal Transit Center $0 Other - Other Improvements (Vehicles/vehicle replacement, maintenance facilities, $8,084 transit system rehab, regulatory compliance, park and ride, ITS) Subtotal $51,404 1 Capital cost to be funded by the City of San Marcos 2 Capital cost to be funded by aviation funds

A-52 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.9 – Major Capital Improvements – Unconstrained Network (Continued)

Managed Lanes/Highway Projects

($ Millions – 2010 Dollars)

Freeway From To Existing Improvements Cost I-5 SR 905 SR 54 8F 8F+2ML $295 I-5 SR 54 I-15 8F+2ML 10F+2ML $165 I-5 I-15 I-8 8F 8F+Operational $1,130 I-5 I-8 La Jolla Village Dr 8F/10F 8F/10F+2ML $530 I-5 La Jolla Village I-5/I-805 Merge 8F/14F 8F/14F+2ML $300 Drive I-5 I-5/I-805 Merge SR 56 8F/14F+2HOV 8F/14F+4ML $40 I-5 SR 56 Manchester Ave 8F+2HOV 10F+4ML $655 I-5 Manchester Ave Palomar Airport 8F 10F+4ML $1,710 Road I-5 Palomar Airport Vandegrift 8F 10F+4ML $1,585 Road I-5 Vandegrift Blvd Orange County 8F 8F+4T $754 I-8 I-5 I-15 8F 8F+Operational $440 I-8 I-15 SR 125 8F/10F 8F/10F+Operational $125 I-8 SR 125 2nd Street 6F/8F 6F/8F+Operational $125 I-8 2nd Street Los Coches 4F/6F 6F $54 I-8 Los Coches Dunbar Rd 4F/6F 6F $335 SR 11/Otay SR 905 Mexico -- 4T + POE $755 Mesa East Port of Entry (POE) SR 15 I-5 SR 94 6F 8F+2ML $90 SR 15 SR 94 I-805 8F 8F+2ML $20 SR 15 I-805 I-8 8F 8F+2TL $45 I-15 Viaduct 8F 8F+2ML $720 I-15 I-8 SR 163 8F 8F+2ML $130 I-15 SR 163 SR 56 8F+2ML(R) 10F+4ML/MB $419 I-15 Centre City SR 78 8F+4ML 10F+4ML $210 Parkway I-15 SR 78 Riverside County 8F 8F+4T $1,005

SANDAG 2050 Regional Transportation Plan A-53

Table A.9 – Major Capital Improvements – Unconstrained Network (Continued)

Managed Lanes/Highway Projects (Continued)

($ Millions – 2010 Dollars)

Freeway From To Existing Improvements Cost SR 52 I-5 I-805 4F 6F $110 SR 52 I-805 I-15 6F 6F+2ML $223 SR 52 I-15 SR 125 4F 6F+3ML(R) $440 SR 52 SR 125 SR 67 4F 6F $120 SR 54 I-5 SR 125 6F 6F/8F+2ML $140 SR 56 I-5 I-15 4F 6F+2ML $220 SR 67 I-8 Mapleview St 4F/6F 6F/8F $360 SR 67 Mapleview St Dye Rd 2C/4C 4C $570 SR 76 I-5 Melrose Drive 4E 6E $225 SR 76 Melrose Drive I-15 2C 4C $404 SR 76 I-15 Couser Canyon 2C 4C/6C+Operational $130 SR 78 I-5 I-15 6F 6F+2ML/Operational $570 SR 94 I-5 I-805 8F 8F+2ML $480 SR 94 I-805 College Ave 8F 10F+2ML $290 SR 94 College Ave SR 125 8F 8F+2ML $230 SR 94 SR 125 Avocado Blvd 4F 6F $90 SR 94 Avocado Blvd Jamacha Rd 4C 6C $30 SR 94 Jamacha Rd Steele Canyon Rd 4C 6C $20 SR 125 SR 905 San Miguel Rd 4T 8F $110 SR 125 San Miguel Rd SR 54 4F 8F $60 SR 125 SR 54 SR 94 6F 8F+2ML $140 SR 125 SR 94 I-8 8F 10F+2ML $285 SR 163 I-805 I-15 8F 8F+2ML $320 SR 241 Orange County I-5 -- 4T/6T $501 I-805 SR 905 Carroll Canyon Rd 8F/10F 8F/10F+4ML $3,781 I-805 Carroll Canyon Rd I-5 (north) 8F/10F 8F/10F+2ML $87 SR 905 I-5 I-805 4F 8F $150 SR 905 I-805 Mexico -- 8F $1,021 Subtotal $22,744

A-54 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.9 – Major Capital Improvements – Unconstrained Network (Continued)

HOV Connectors

($ Millions – 2010 Dollars) Intersecting Freeway Freeway Movement Cost I-5 SR 15 North to North and South to South $183 I-5 SR 54 West to South and North to East $120 I-5 SR 54 South to East and West to North $120 I-5 SR 56 South to East and West to North $170 I-5 SR 56 North to East and West to South $80 I-5 SR 78 South to East and West to North, $240 North to East and West to South I-5 I-805 North to North & South to South $116 I-15 SR 52 West to North and South to East $140 I-15 SR 52 West to South and North to East $140 I-15 SR 56 East to North and South to West $180 I-15 SR 78 East to South & North to West $105 I-15 SR 94 South to West & East to North $80 I-15 SR 163 North to North and South to South $160 I-15 I-805 North to North & South to South $90 SR 52 SR 125 North to West and East to South $100 SR 94 SR 125 East to North and South to West $140 I-805 SR 52 West to North & South to East $90 I-805 SR 54 North to West and East to South $140 I-805 SR 94 West to South and North to East $160 I-805 SR 94 East to North and South to East $160 I-805 SR 163 North to North and South to South $150 Subtotal $2,864

SANDAG 2050 Regional Transportation Plan A-55

Table A.9 – Major Capital Improvements – Unconstrained Network (Continued) Freeway Connectors ($ Millions – 2010 Dollars) Intersecting Freeway Freeway Movement Cost I-5 I-8 East to North and South to West $320 I-5 SR 56 West to North and South to East $185 I-5 SR 78 South to East and West to South $106 I-5 SR 94 North to East $120 I-15 SR 56 North to West $100 SR 94 SR 125 South to East and West to North $319 Subtotal $830

Non-Highway Goods Movement ($ Millions – 2010 Dollars) Vesta Street Bridge Mobility connector over Harbor Drive at Naval Base San Diego $60 32nd Street Freeway access enhancement $119 10th Avenue Marine Terminal Rail line grade separation/Barrio Logan enhancement $67 Entrance 10th Avenue Marine Terminal Enhance military project capacity, expand open storage $19 Entrance National City Marine Terminal Bay Marina Drive, Civic Center freeway access improvements $7 National City Marine Terminal Wharf extension, vehicle processing facility, berths 24-10 and 24-11 $151 National City Rail Yard $7 Desert Line Basic Service, rehabilitation $182 Logistics Center - South County $180 Logistics Center - North County $2,130 Logistics Center - Mid County $166 San Diego International Airport Access to I-5 $32 San Diego International Airport Aircraft/ground access, AC facilities, transload $111 Future Expansion Freeway/ground access N. field $173 Subtotal $3,404

Total $79,986 KEY C = Conventional Highway Lanes MB = Movable barrier T = Toll Lanes F = Freeway Lanes ML = Managed lanes (HOV & Value Pricing) TL = Transit Lanes HOV = High Occupancy Vehicle Lanes ML(R) = Managed lanes (Reversible)

Note: All HOV lanes would convert to Managed Lanes by 2035 with an HOV occupancy of 3+ people.

A-56 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.10 – Summary of 2050 Revenue Constrained Plan and Unconstrained Scenario – Transit Services and Headways Revenue Constrained Unconstrained Service Route Description Peak/Off-Peak Peak/Off-Peak HSR 598 Temecula to Lindbergh Intermodal Transit Center N/A 15/15 COASTER 398 Increase in COASTER service (includes all improvements) 20/60 15/15 SPRINTER 399 Increase in SPRINTER Rail (includes all improvements) 10/10 7.5/7.5 SPRINTER 588 SPRINTER Express 10/15 10/10 Trolley 510 Increase in Existing Blue Line Trolley Service 7.5/7.5 7.5/7.5 (includes all improvements) Trolley 520 Increase in Existing Orange Line Trolley Service 7.5/7.5 7.5/7.5 (includes all improvements) Trolley 522 Orange Line Express - El Cajon to downtown San Diego 10/10 10/10 Trolley 530 Increase in Green Line Trolley Service 10/10 7.5/7.5 Trolley 540 Blue Line Express - UTC to San Ysidro via downtown 10/10 10/10 Trolley 550 SDSU to San Ysidro via East San Diego, SE San Diego, N/A 7.5/7.5 National City Trolley 560 SDSU to downtown via El Cajon Blvd/Mid-City (transition of 7.5/7.5 7.5/7.5 Mid-City Rapid to LRT) Trolley 561 UTC to Mira Mesa via Sorrento Mesa/Carroll Canyon Note A 7.5/7.5 Trolley 562 UTC to San Ysidro via Kearny Mesa, Mission Valley, 7.5/10 7.5/7.5 Mid-City, National City/Chula Vista via Highland Ave/ 4th Ave Trolley 563 Pacific Beach to El Cajon via Kearny Mesa, Mission Valley, 7.5/10 7.5/7.5 SDSU Trolley 564 Otay Mesa East Border Crossing to Western Chula Vista via 7.5/7.5 7.5/7.5 Otay Ranch/Millenia Trolley 566 Express Palomar Street Trolley Station to UTC via Mid-City, N/A 10/10 Kearny Mesa BRT 90 Santee/El Cajon Transit Centers to downtown via SR 94 Note B Note B (Peak Only) BRT 430 Oceanside to Escondido via SR 78 Managed Lanes N/A 10/10 BRT 470 Escondido-UTC via Mira Mesa Blvd 10/NA 10/NA BRT 610 Temecula (peak only)/Escondido to downtown 10/NA 10/10 BRT 628 South Bay BRT (Otay Mesa-downtown) 15/15 15/15 BRT 640 San Ysidro to Kearny Mesa via I-5 shoulder lanes/HOV lanes, Note C Note C downtown, Hillcrest/Mission Valley Guideway (interim service for Blue Line Express Route 540)

SANDAG 2050 Regional Transportation Plan A-57

Table A.10 – Summary of 2050 Revenue Constrained Plan and Unconstrained Scenario – Transit Services and Headways (Continued) Revenue Constrained Unconstrained Service Route Description Peak/Off-Peak Peak/Off-Peak BRT 650 Chula Vista to Palomar Airport Road Business Park via N/A 15/15 I-805/I-5 (Peak Only) BRT 652 Downtown to UTC via Kearny Mesa Guideway/I-805 N/A 10/10 BRT 653 Mid-City to Palomar Airport Road via Kearny Mesa/I-805/ I-5 15/NA 15/NA BRT 870 El Cajon to UTC via Santee, SR 52, I-805 10/NA 10/NA BRT 890 El Cajon to Sorrento Mesa via SR 52, Kearny Mesa 10/NA 10/NA BRT 680 Otay Mesa to Sorrento Mesa via I-805 15/15 - BRT 688 Millenia/San Ysidro to Sorrento Mesa Express 15/NA 15/NA BRT 689 Millenia/Otay Ranch to UTC/Torrey Pines Express 15/NA 15/NA BRT 692 El Cajon to Otay Mesa via Spring Valley, SR 125, Millenia N/A 10/10 BRT 940 Oceanside to UTC via I-5, Carlsbad, Encinitas (Peak Only) N/A 10/10 Rapid 2 North Park to downtown San Diego via 30th St 10/10 10/10 Rapid 10 La Mesa to Ocean Beach via Mid-City, Hillcrest, Old Town 10/10 10/10 Rapid 11 Spring Valley to SDSU via SE San Diego, downtown, Hillcrest, 10/10 10/10 Mid-City Rapid 15 Mid-City Rapid SDSU - downtown Note D Note D Rapid 28 Point Loma to Kearny Mesa via Old Town, Linda Vista 10/10 10/10 Rapid 30 Old Town to Sorrento Mesa via Pacific Beach, La Jolla, UTC 10/10 10/10 Rapid 41 Fashion Valley to UTC/UCSD via Linda Vista and Clairemont N/A 10/10 Rapid 103 Solana Beach to Sabre Springs BRT station via Carmel Valley N/A 15/15 Rapid 120 Kearny Mesa to downtown 10/10 10/10 Rapid 201/202 UTC Area Super Loop - Increase Frequencies 10/10 10/10 Rapid 350 Escondido to Del Lago via Escondido Blvd & Bear Valley 10/10 10/10 Rapid 440 Carlsbad to San Marcos via Palomar Airport Road Corridor N/A 10/10 Rapid 471 Downtown Escondido to East Escondido 10/10 10/10 Rapid 473 Oceanside to UTC via Hwy 101 Coastal Communities, 10/10 10/10 Carmel Valley Rapid 474 Oceanside to Vista via Mission Ave/Santa Fe Road Corridor 10/10 10/10 Rapid 477 Camp Pendleton to Carlsbad Village via College Boulevard, N/A 10/10 Plaza Camino Real

A-58 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.10 – Summary of 2050 Revenue Constrained Plan and Unconstrained Scenario – Transit Services and Headways (Continued) Revenue Constrained Unconstrained Service Route Description Peak/Off-Peak Peak/Off-Peak Rapid 635 Eastlake/EUC to Palomar Trolley via Main Street Corridor 10/10 10/10 Rapid 636 SDSU to Spring Valley via East San Diego, Lemon Grove, 10/10 10/10 Skyline Rapid 637 North Park to 32nd Street Trolley via Golden Hill 10/10 10/10 Rapid 638 San Ysidro to Otay Mesa via Otay, SR 905 Corridor 10/10 10/10 Rapid 639 Otay to North Island via Imperial Beach and Silver Strand, N/A 10/10 Coronado Rapid 709 H Street Trolley to Millenia via H Street Corridor, 10/10 10/10 Southwestern College Rapid 910 Coronado to downtown via Coronado Bridge 10/10 10/10 Streetcar 551 Chula Vista downtown N/A 10/10 Streetcar 552 National City downtown N/A 10/10 Streetcar 553 Downtown San Diego: Little Italy to East Village 10/10 10/10 Streetcar 554 Hillcrest/Balboa Park/downtown San Diego Loop 10/10 10/10 Streetcar 555 30th St to downtown San Diego via North Park/ Golden Hill 10/10 10/10 Streetcar 557 El Cajon downtown N/A 10/10 Streetcar 558 Escondido downtown N/A 10/10 Streetcar 559 Oceanside downtown N/A 10/10 Streetcar 565 Mission Beach to La Jolla via Pacific Beach N/A 10/10 Shuttle 448/449 San Marcos Shuttle 10/10 10/10 Airport Express Airport Express Routes 30/30 30/30

Notes: A Included as extensions to Route 510 Blue Line B Interim service until implementation of Route 522 Orange Line Express C Interim service until implementation of Route 540 Blue Line Express D Interim service until implementation of Route 560 Trolley Line

SANDAG 2050 Regional Transportation Plan A-59

Table A.11 – Summary of 2050 Revenue Constrained Plan and Unconstrained Scenario – Highway Projects

Managed Lanes/Highway Projects Revenue Freeway From To Existing Constrained Unconstrained I-5 SR 905 SR 54 8F 8F+2ML 8F+2ML I-5 SR 54 SR 15 8F 10F+2ML 10F+2ML I-5 I-15 I-8 8F 8F+Operational 8F+Operational I-5 I-8 La Jolla Village Dr 8F/10F 8F/10F+2ML 8F/10F+2ML I-5 La Jolla Village Dr I-5/I-805 Merge 8F/14F 8F/14F+2ML 8F/14F+2ML I-5 I-5/I-805 Merge SR 56 8F/14F+2HOV 8F/14F+4ML 8F/14F+4ML I-5 SR 56 Manchester Ave 8F/10F+2HOV 8F+4ML 10F+4ML I-5 Manchester Ave Palomar Airport 8F 8F+4ML 10F+4ML Rd I-5 Palomar Airport Rd Vandegrift 8F 8F+4ML 10F+4ML I-5 Vandegrift Blvd Orange County 8F 8F+4T 8F+4T I-8 I-5 I-15 8F 8F+Operational 8F+Operational I-8 I-15 SR 125 8F/10F 8F/10F+Operational 8F/10F+Operational I-8 SR 125 2nd Street 6F/8F 6F/8F+Operational 6F/8F+Operational I-8 2nd Street Los Coches 4F/6F 6F 6F I-8 Los Coches Dunbar Rd 4F/6F 4F/6F 6F SR 11/ SR 905 Mexico -- 4T+POE 4T+POE Otay Mesa East POE SR 15 I-5 SR 94 6F 8F+2ML 8F+2ML SR 15 SR 94 I-805 8F 8F+2ML 8F+2ML SR 15 I-805 I-8 8F 8F+2TL 8F+2TL I-15 Viaduct 8F 8F+2ML 8F+2ML I-15 I-8 SR 163 8F 8F+2ML 8F+2ML I-15 SR 163 SR 56 8F+2ML(R) 10F+4ML/MB 10F+4ML/MB I-15 SR 56 Centre City 10F+4ML/MB 10F+4ML/MB 10F+4ML/MB Parkway I-15 Centre City Parkway SR 78 8F 8F+4ML 10F+4ML I-15 SR 78 Riverside County 8F 8F+4T 8F+4T SR 52 I-5 I-805 4F 6F 6F SR 52 I-805 I-15 6F 6F+2ML 6F+2ML SR 52 I-15 SR 125 4F 6F+2ML(R) 6F+3ML(R) SR 52 SR 125 SR 67 4F 4F 6F

A-60 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.11 – Summary of 2050 Revenue Constrained Plan and Unconstrained Scenario – Highway Projects (Continued)

Managed Lanes/Highway Projects (Continued) Revenue Freeway From To Existing Constrained Unconstrained SR 54 I-5 SR 125 6F 6F+2ML 6F/8F+2ML SR 56 I-5 I-15 4F 6F 6F+2ML SR 67 I-8 Mapleview St 4F/6F 4F/6F 6F/8F SR 67 Mapleview St Dye Rd 2C/4C 4C 4C SR 76 I-5 Melrose Drive 4E 4E 6E SR 76 Melrose Drive I-15 2C 4C 4C SR 76 I-15 Couser Canyon 2C 4C/6C+Operational 4C/6C+Operational SR 78 I-5 I-15 6F 6F+2ML/Operational 6F+2ML/Operational SR 94 I-5 I-805 8F 8F+2ML 8F+2ML SR 94 I-805 College Ave 8F 8F+2ML 10F+2ML SR 94 College Ave SR 125 8F 8F+2ML 8F+2ML SR 94 SR 125 Avocado Blvd 4F 6F 6F SR 94 Avocado Blvd Jamacha Rd 4C 6C 6C SR 94 Jamacha Rd Steele Canyon Rd 4C 6C 6C SR 94 Steele Canyon Rd Melody Rd 2C 2C 4C SR 125 SR 905 San Miguel Rd 4T 8F 8F SR 125 San Miguel Rd SR 54 4F 8F 8F SR 125 SR 54 SR 94 6F 6F+2ML 8F+2ML SR 125 SR 94 I-8 8F 10F+2ML 10F+2ML SR 163 I-805 I-15 8F 8F 8F+2ML SR 241 Orange County I-5 -- 4T/6T 4T/6T I-805 SR 905 Carroll Canyon Rd 8F/10F 8F/10F+4ML 8F/10F+4ML I-805 Carroll Canyon Rd I-5 (north) 8F/10F 8F/10F+2ML 8F/10F+2ML SR 905 I-5 I-805 4F 4F 8F SR 905 I-805 Mexico -- 6F 8F

SANDAG 2050 Regional Transportation Plan A-61

Table A.11 – Summary of 2050 Revenue Constrained Plan and Unconstrained Scenario – Highway Projects (Continued) HOV Connectors Revenue Freeway Intersecting Freeway Movement Constrained Unconstrained I-5 SR 15 North to North and South to South   I-5 SR 54 West to South and North to East   I-5 SR 54 South to East and West to North   I-5 SR 56 South to East and West to North   I-5 SR 56 North to East and West to South   I-5 SR 78 South to East and West to North,   North to East and West to South I-5 I-805 North to North & South to South   I-15 SR 52 West to North and South to East   I-15 SR 52 West to South and North to East   I-15 SR 56 East to North and South to West   I-15 SR 78 East to South & North to West   I-15 SR 94 South to West & East to North   I-15 SR 163 North to North and South to South   I-15 I-805 North to North & South to South   SR 52 SR 125 North to West and East to South   SR 94 SR 125 East to North and South to West   I-805 SR 52 West to North & South to East   I-805 SR 54 North to West and East to South   I-805 SR 94 West to South and North to East   I-805 SR 94 East to North and South to East   I-805 SR 94 North to West & East to South   I-805 SR 163 North to North and South to South   Freeway Connectors   Revenue Freeway Intersecting Freeway Movement Constrained Unconstrained I-5 I-8 East to North and South to West   I-5 SR 56 West to North and South to East   I-5 SR 78 South to East and West to South   I-5 SR 94 North to East   I-15 SR 56 North to West   SR 94 SR 125 South to East and West to North  

A-62 Appendix A: 2050 RTP Projects, Costs, and Phasing

Table A.11 – Summary of 2050 Revenue Constrained Plan and Unconstrained Scenario – Highway Projects (Continued) Non-Highway Goods Movement Projects Vesta Street Bridge Mobility Connector over Harbor   Drive at Naval Base San Diego 32nd Street Freeway Access Enhancement   10th Avenue Marine Terminal Rail Line Grade Separation/Barrio   Entrance Logan Enhancement 10th Avenue Marine Terminal Enhance military project capacity,  Entrance expand open storage  National City Marine Terminal Bay Marina Drive, Civic Center   Freeway Access Improvements National City Marine Terminal Wharf extension, vehicle processing  facility, berths 24-10 and 24-11  National City Rail Yard   Desert Line Basic Service, rehabilitation   Logistics Center - South County   Logistics Center - North County   Logistics Center - Mid County   San Diego International Airport Access to I-5   San Diego International Airport Aircraft/ground access, AC facilities,   transload Future Expansion Freeway/ground access N. field     KEY C = Conventional Highway Lanes MB = Movable barrier T = Toll Lanes F = Freeway Lanes ML = Managed lanes (HOV & Value Pricing) TL = Transit Lanes HOV = High Occupancy Vehicle Lanes ML(R) = Managed lanes (Reversible)

Note: All HOV lanes would convert to Managed Lanes by 2035 with an HOV occupancy of 3+ people.

SANDAG 2050 Regional Transportation Plan A-63

Table A.12 – 2050 No Build Projects

The following transportation projects were assumed to be built in the 2050 No Build Scenario.

Highway From To Note I-15 SR 163 SR 78 Under construction SR 52 SR 125 SR 67 Opened to traffic March 2011 SR 76 Mission Road I-15 Under construction/development I-805 Carroll Cyn Road I-5/I-805 Merge Under construction SR 905 I-805 Mexico Under construction Transit I-15 Bus Rapid Transit (BRT) (downtown and UTC) Under construction SuperLoop In service Mid-City Rapid Bus Final design South Bay BRT (downtown) Environmental

A-64 Appendix A: 2050 RTP Projects, Costs, and Phasing

FIGURE A.10 HERE

SANDAG 2050 Regional Transportation Plan A-65

A-66 Appendix A: 2050 RTP Projects, Costs, and Phasing

FIGURE A.11 HERE

SANDAG 2050 Regional Transportation Plan A-67

A-68 Appendix A: 2050 RTP Projects, Costs, and Phasing Rail Equipment Milestone Payment Schedule Coach and Cab Car Payment Milestones

Contractor may invoice for requested goods and services in accordance with the table below:

Invoice Table

Description When invoicing may occur

Rail Car In accordance with the progress payment table that follows

Documents, Manuals & Catalogs Upon acceptance

Section 16.5.1 Spare Parts Upon acceptance

Diagnostic Test Equipment, including special Upon acceptance tools

Warranty, 2 years Upon final acceptance of the vehicle to which it applies

Training Upon completion

Delivery Upon conditional acceptance of the vehicle to which it applies

Progress Payment Table

Progress Payment Percent of Total Milestone Description Vehicle Price Submittal of supplier acknowledgement of receipt of 1 10% purchase orders for long lead time subcontracts

Successful completion of the vehicle shell and 2 20% watertightness test

Successful completion of vehicle assembly and 3 30% ready to start factory tests

4 15% Release of vehicle for shipment Conditional acceptance 5 15%

Final acceptance 6 10%

1

Rail Equipment Milestone Payment Schedule Charger Locomotive – Original Payment Schedule

Cumulative Percentage of Anticipated Percentage of Total # Description of Work Milestone Total Contract Completion Date Contract Price Price A Receipt of Notice to Proceed July 6th, 2018 20% 20% B Completion of carshell production (at a % rate per locomotive; i.e., per locomotive = 50% / # of locomotives). Earliest date for this milestone July 1st, 2020 50% 70% payment is July 1st, 2020, even if a locomotive carshell is completed prior to that date. C Delivery and Conditional Acceptance of all production locomotives (at a % December 31st, 10% 80% rate per locomotive; i.e. per 2020 locomotives = 10% / # of locomotives) D Final Acceptance of the production locomotives (at a % rate per February 28th, 10% 90% locomotive; i.e. per locomotives = 2021 10% / # of locomotives) E Delivery and acceptance of training February 28th, 5% 95% and manuals. 2021 F Delivery and acceptance of all the February 28th, 5% 100% special tools. 2021

Charger Locomotive – Accelerated Delivery Payment Schedule

Cumulative Percentage of Anticipated Percentage of Total # Description of Work Milestone Total Contract Completion Date Contract Price Price A Receipt of Notice to Proceed July 6, 2018 20% 20% B Completion of carshell production (at a % rate per locomotive; i.e., per July 1, 2020 50% 70% locomotive = 50% / # of locomotives). C Delivery and Conditional Acceptance of all production locomotives (at a % December 31, 10% 80% rate per locomotive; i.e. per 2020 locomotives = 10% / # of locomotives) D Final Acceptance of the production locomotives (at a % rate per February 28, 2021 10% 90% locomotive; i.e. per locomotives = 10% / # of locomotives) E Delivery and acceptance of training February 28, 2021 5% 95% and manuals. F Delivery and acceptance of all the February 28, 2021 5% 100% special tools.

2

April 18, 2019

The Honorable Steve Vaus Board Chair San Diego Association of Governments 401 B Street, Suite 800 San Diego, CA 92101

Mr. Hasan Ikhrata Executive Director San Diego Association of Governments 401 B Street, Suite 800 San Diego, CA 92101

Re: Funding Request for COASTER Increased Service Frequencies

Dear Messrs. Vaus and Ikhrata:

The undersigned members of the North County Transit District (NCTD) Board of Directors would like to formally request that the San Diego Association of Governments (SANDAG) place on the agenda of a future meeting of their Board of Directors, a request to fund the capital acquisition costs for two new trainsets (consisting of two locomotives and eight rail cars and two rail cabcars), which will increase capacity as specified in the 2050 Regional Transportation Plan.

Every member of both our Board of Directors is focused on increasing transit ridership and improving the riding experience of our customers. Our region has demonstrated its commitment to improved service on the San Diego portion of the Los Angeles-San Diego-San Luis Obispo Rail Corridor (LOSSAN) by investing more than $767 million ($210 million in local funds derived from TransNet and $557 million from federal and other sources) into the LOSSAN corridor for rail infrastructure improvements and dedicating TransNet funds to support future operations.

NCTD has received consistent feedback from customers and key stakeholders wanting to know when NCTD will implement increased service frequencies; specifically, when NCTD will implement the region’s plans that would result in 30- minute COASTER frequencies to realize the significant investments in local, state, and federal funds to implement capacity-enhancement projects. NCTD is currently procuring replacement locomotives and passenger cars, implementing new and Re: Funding Request for COASTER Increased Service Frequencies April 18, 2019 Page 2 of 3

upgraded technologies, and exploring new first and last mile solutions to support our plans to grow transit ridership.

In order to implement our plans to grow transit ridership, we need SANDAG – as was contemplated in the TransNet Ordinance – to provide $43.6 million so that NCTD can procure the two capacity-enhancing trainsets. As you are aware, it typically takes approximately 3 years to procure and take delivery of rail cars and locomotives. However, NCTD has included options on its current procurement of locomotives so that two additional capacity enhancing locomotives can be delivered in 2021 as well. Also, NCTD is part of a multi-agency procurement for rail cars and cabs that can also support delivery by 2021/2022. To take advantage of this unique opportunity, we need SANDAG to provide a commitment by July 31, 2019 to fund the costs in accordance with the attached milestone payment schedule.

We have requested that NCTD’s Executive Director, Matthew Tucker, work with you to find an approach to make this happen. We are hoping that the SANDAG Board of Directors, with your leadership, will work collaboratively with NCTD to achieve this short-term goal that will provide significant benefits and congestion relief on the North Coast Corridor.

Sincerely,

Tony Kranz Jack Feller NCTD Board Chair NCTD Vice Chair City of Encinitas City of Oceanside

Priya Bhat-Patel Dave Druker City of Carlsbad City of Del Mar

Paul McNamara Jim Desmond City of Escondido County of San Diego

Re: Funding Request for COASTER Increased Service Frequencies April 18, 2019 Page 3 of 3

Sharon Jenkins Jewel Edson City of San Marcos City of Solana Beach

John Franklin City of Vista

cc: North County City Mayors SANDAG Board of Directors Matthew O. Tucker, Executive Director, NCTD

RELATED TO AGENDA ITEM 16

Request to SANDAG for Funding in Support of Acquisition of COASTER Equipment for Service Expansion

Board Meeting April 18, 2019 Current COASTER Schedule

Wait Times Between 11 South Bound Trains

42 Min 214 Min 31 Min 25 Min 91 Min 50 Min 30 Min 59 Min 117 Min 99 Min

1 Current COASTER Schedule

Wait Times 11 Between North Bound Trains

211 Min 32 Min 99 Min 67 Min 45 Min 45 Min 47 Min 84 Min 100 Min 48 Min

2 Peer Comparison

Weekday Average Headway Average Headway Agency Population Trips Peak (Range) Off-Peak (Range)

NCTD 849,420 22 25 – 59 Minutes 67 – 214 Minutes

Dallas Area Rapid Transit (Trinity 2,407,830 73 30 Minutes 60 Minutes Railway Express)

Sound Transit (Sounder) 3,054,000 34 20 - 30 Minutes 180 – 405 Minutes (Northbound and Southbound)

Regional Transit District (RTD A 2,920,000 142 15 Minutes 15 – 30 Minutes Line

Utah Transit Authority 1,883,504 63 30 Minutes 60 Minutes

Northern Indiana Commuter 958,644 43 15 – 45 Minutes 43 – 120 Minutes Transportation District

3 COASTER On-Board Survey

• On-Board Survey performed between January 22, 2018 and February 23, 2018 • Data collected during all time periods, including weekends • Survey also given to employers and available on-line • Designed to drive scheduling decisions • Customers desire a wide range of arrival and departure times at Santa Fe, Old Town, and Sorrento Valley • Not able to meet desired demand with current schedule or equipment

4 Completed Double Track Projects to Support Service Expansion

Year Cost Name Location Completed Carlsbad Double Track 229.6 – 231.6 2012 $16.0 M Tecolote / Washington St. 262.2 and 265.2 2013 $11.0 M Crossovers Santa Margarita River Bridge 222.8 – 223.6 2014 $40.6 M Sorrento to Miramar Phase I 249.9 – 251.0 2014 $43.0 M San Onofre to Pulgas Double 212.3 – 216.4 2015 $37.7 M Track Phase I Sorrento Valley Double Track 247.8 – 248.9 2015 $31.8 M

5 2050 Regional Transportation Plan

• The San Diego region has invested more than $767 million ($210 million in local funds derived from TransNet and $557 million from federal and other sources) into the LOSSAN corridor for rail infrastructure improvements and dedicating TransNet funds to support future operations. • The San Diego region, as part of TransNet, is currently collecting dedicated funding to support implementation of the 2050 Regional Transportation Plan which contemplates operating COASTER trains on 20 minute frequencies during the peak period within the 2018 decade. • NCTD staff has collaborated to develop an alternative plan that is reflective of service needs and railroad capacity. – Trains every 30 minutes in each direction during peak (5:00am to 9:00am, 3:00pm to 7:00pm) – Trains every 60 minutes in each direction mid-day – Increase from 22 to 42 trains daily 6 COASTER Trainset

7 COASTER Fleet Needs

• Existing Fleet – 7 Locomotives • 5 F-40 • 2 F-59 – 28 Cars • 10 Cab Cars • 18 Coach Cars • Capacity Enhancement – 2 Locomotives – 10 Cars • 2 Cab Cars • 8 Coach Cars

8 Capacity Enhancement Needs • The total cost of the two (2) new trainsets is ~$43.6 million • SANDAG was required to purchase the capacity enhancing equipment similar to what has been done for the MTS Mid-Coast. • NCTD and SANDAG staff have discussed the need for the new equipment along with the long lead time for delivery. • To achieve the region’s plans and public demand for increased COASTER frequencies, the NCTD Board and SANDAG Board need to provide leadership to identify the funding necessary to purchase the capacity enhancing equipment.

9 Staff Recommendation

• Approve and execute a letter to the San Diego Association of Governments (SANDAG) requesting the scheduling of an item on a future SANDAG Board agenda to provide funding for two additional trainsets to support the implementation of increased COASTER frequencies as specified in the 2050 Regional Transportation Plan.

10 QUESTIONS?

11 Agenda Item # 17 RECEIVE EXECUTIVE DIRECTOR’S REPORT ON PROPOSED FY2020 BUDGET GUIDANCE AND STRATEGIC AREAS OF FOCUS

Time Sensitive: ☐ Consent: ☐

STAFF Receive Executive Director’s report on proposed FY2020 Budget Guidance and RECOMMENDATION: Strategic Areas of Focus.

BACKGROUND The Executive Director will present key assumptions to support the development INFORMATION: of the FY2020-2024 Budget and review Proposed FY2020 Strategic Areas of Focus and Divisional Goals. The Executive Director provided two (2) separate presentations at the NCTD Executive Committee meeting of April 4, 2019. In summary, the Executive Director provided a high-level presentation of the following issues, trends, needs, and assumptions that will shape the development of the FY2020 budget:

• National and NCTD Ridership Trends • State Funding • Federal Transportation and Passenger Rail Funding Levels – Highway Trust Fund Short Fall • Economic Uncertainty • Operating Budget Pressure Points • Expectation of Improved and Increased Transit Services • State of Good Repair Needs

Based on the aforementioned issues, trends, needs and assumptions, the Executive Director has provided the following guidance to the Chief Financial Officer to support the development of the FY2020 budget:

• Increase Customer Ridership and Revenue • Maintain current service levels – Implement pilot service improvements – Advance ADA Paratransit Productivity Improvements • Implement 100% brokered nights, weekends, and off-peak service • Implement same day taxi program • Optimize expenses – Focus on areas where expenses can be reduced – Leverage current and future technology investments – Positive Train Control Project Transition to Operations and Maintenance • Fund State of Good Repair and Priority Capital Needs • Focus and Allocate Resources for Discretionary Grant Application • Strategic Risk Taking to Improve Services by using Net Assets – Procure two (2) additional replacement locomotives – Seek funding from Carl Moyer Program to support part of the cost of the procurement • Prepare for potential economic downturn – Staff will need to develop an expense and service reduction package given the lead time for approvals to implement

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-017 The Executive Director is requesting feedback from the Board of Directors regarding the budget guidance. The Executive Director and Chief Financial Officer are using the 5-year budget model to support strategic investments that will foster increased ridership and address state of good repair needs. The strategy assumes that NCTD will be aggressive and successful in seeking discretionary funding to meeting the significant capital needs that exist and that NCTD will cash flow certain projects for its existing cash assets rather than assuming debt. Simultaneously, NCTD will seek cost efficiency and prepare for potential downturn in the economy that could impact public funding should it occur. The Board will adopt the FY2020 Operating and Capital Budget at its June meeting. The Executive Director’s presentation is intended to support the Board providing feedback and direction in the early stages of the budget development process.

ATTACHMENT: None

GOAL/STRATEGIC Improve Financial Health DIRECTION:

FISCAL IMPACT: This staff report has no fiscal impact.

COMMITTEE REVIEW: Executive Committee Date: April 4, 2019

STAFF CONTACT: Matthew O. Tucker, Executive Director E-mail: [email protected] Phone: 760-966-6500

April 18, 2019 Board Meeting Staff Report No.: SR-19-04-017 RELATED TO AGENDA ITEM 17

Proposed FY20-24 Budget Guidance and Strategic Initiatives

Board Meeting April 18, 2019 Presentation Agenda

• Context of FY2020-FY2024 Budget Development – National and NCTD Ridership Trends – State Funding – Federal Transportation and Passenger Rail Funding Levels – Highway Trust Fund Short Fall – Economic Uncertainty – Operating and Capital Budget Pressure Points – Expectations of increase service frequencies • Strategic Initiatives • Board Discussion and Feedback

2 National Modal Ridership Trends

Rail & Demand Response Bus Ridership (000s) Ridership (000s)

6,000,000 600,000

5,500,000 500,000 5,000,000 400,000 4,500,000

4,000,000 300,000

3,500,000 200,000 3,000,000 100,000 2,500,000

2,000,000 0 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

Bus (000s) Commuter Rail Light Rail (000s) Demand Response (000s) (000s)

3 NCTD Modal Ridership Trends

4 Local Funding

5 State Funding

• State Transit Assistance: – Increased funding for existing formula funds – Created a new State of Good Repair program • Other program changes of SB1: – Created State Rail Assistance (transit), Solutions for Congested Corridors Program (transit eligible but mainly used for streets to date), and Local Partnership Program (transit eligible but primarily for streets) – Enhanced funding for Transit and Intercity Rail Capital Program Program Funding Source Estimated Annual Revenue Eligible Uses Competitive or Formula

3.5 percentage points of Capital and operations for State Transit Assistance Program $250,000,000 Formula diesel sales tax increase transit only

State of good repair capital State Transit Assistance Program - State of Good Repair TIF $105,000,000 Formula projects for transit only

Capital and operating for: Even split for specific 0.5 percentage points of State Rail Assistance $44,000,000 ●50% intercity rail operators through FY 2020; diesel sales tax increase ●50% commuter rail TBD thereafter

Capital projects for transit Transit and Intercity Rail Capital Program TIF $300,000,000 Competitive only

Capital projects in congested Solutions for Congested Corridors Program TIF $250,000,000 Competitive corridors; transit is eligible

High need transportation Local Partnership Program Various $200,000,000 Both projects

= Existing program with expanded funding = New program created by SB1

6 SB1’s Impact on NCTD

Formula Programs

• SB1 significantly boosted STA funding to NCTD – Up 97.1% between FY2017 and FY2018, $14.0 with SB1 incremental amount planned to Estimated $12.0

purchase COASTER locomotives Millions $10.0 • SGR funding is a new source created by SB1 $8.0 – $1.6 million estimated to be allocated to $6.0 NCTD in FY2020 $4.0 SB1 funding became available • Received $1.0 million through the Local Partnership $2.0 Program for FY2019 $0.0 2012 2013 2014 2015 2016 2017 2018 2019 2020

State Transit Assistance State of Good Repair

Competitive Program Awards  Awarded $10.5 million over several years through the State Rail Assistance Program to contribute to replacement of five (5) locomotives for the COASTER

 TIRCP: Awarded $17.5 million for fencing and signal optimization projects and expecting to receive approximately $40.4 million over the next 10 years through an On-Time Performance (OTP) Incentive Agreement with LOSSAN

7 Public Transportation and Passenger Rail Funding Levels

$16.31 $16.03 16

$15.05 15 $14.81

$14.21 $14.03 $14.01 14 $13.45 $13.15 13

Billions of Dollars of Billions 12

11

10 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020

FAST Act Authorized Transportation Appropriations Acts

8 Highway Trust Fund Shortfall

FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 $50 $40 $28

$14

-$1 $0

-$17

-$35 -$50 -$53

-$73 Billions Billions Dollars of -$100 -$94

-$116

-$150 -$139

-$164

-$200

9 Economic Uncertainty

10 2009 Budget Outlook Sparked Changes to Business Model

2009 Budget Outlook $120 $105.9 $102.7 $99.3 Expenses $100 $89.9 $93.8 Revenue $80 $87.1 $82.1 83.5 $78.3 $80.3 $60 What happened? Local sales tax revenue* $40 down 20%, state raiding transit funds, and added costs for new light rail service $20 $4.6 $4.6 $4.6 $4.6 $4.6 Reserves

Millions of Dollars of Millions $0 -$2.8 -$20 -$15.6 Deficit -$19.0 -$20.6 -$22.4 -$40 FY 10 FY 11 FY 12 FY 13 FY 14

* From FY 2009 to FY 2011

11 Operating and Capital Budget Pressure Points • Expenses: – CalPERS Unfunded Liability $2.5 million – SPRINTER Debt Payments $1.25 million – SPRINTER Debt Interest $876,000 – Consumer Price Index Increases • Implementation of Regulatory Requirements: – Positive Train Control Operations and Maintenance $3 million+ – Asset Management – Compliance Programs • Use of Net Asset: – Cash Flow for Capital Needs – Historic Use for Payment of SPRINTER Debt Principal Payments and CalPERS Unfunded Liability • Unfunded Capital Needs in excess of $1 billion

12 Expectations of Improved and Increased Transit Services

13 Improved Service Frequencies in FY2020-FY2024 • Significantly improve service frequencies between FY2020 – FY2024 – Improve service frequencies on BREEZE and implement comprehensive program for first and last mile services – Implement 30 minute peak service frequencies for COASTER – Implement 15 minute frequencies for SPRINTER

14 Enhance the Customer Experience: NCTD Wayfinding Study & Master Plan • Phased implementation of comprehensive signage and wayfinding plan for all transit stations and stops • Help solve first/last mile issue through: – Real Time Information – Clarity & ease of use – Connectivity – Community placemaking – Brand & image

15 Improve Service Quality: Mobility Hub Pilot Programs

• Carlsbad Poinsettia Mobility Hub – Collaborative effort between the City of Carlsbad, NCTD, and SANDAG – Implement an on-demand rideshare program for COASTER commuters to Carlsbad businesses • CSUSM Mobility Hub – Collaborative effort between CSUSM, the City of San Marcos, NCTD, and SANDAG – Implement shared micromobility for CSUSM college students, staff, and faculty

16 Revenue Vehicle Modernization and Upgrades

• Procure two (2) additional replacement locomotives • NCTD is included in a multi-agency procurement for rail cabs and cars – need to fund eight (8) cabs • Procure six (6) battery-electric buses and 80 replacement compressed natural gas vehicles between FY2020-FY2024

17 Technology Upgrades

• Next Generation Regional Fare Collection System – Streamlined regional fares will pave the way for the new Regional Fare Collection System – Regional, account-based fare system will streamline regional fare architecture – Coordinating with MTS, California State Transportation Association (CalSTA), LOSSAN, and Metrolink

18 Transit Oriented Development and Facility Projects

• Solana Beach Transit Center Transit Oriented Development – Negotiating an agreement with City of Solana Beach to advance project • Oceanside Transit Center Transit Oriented Development • Escondido Transit Center Transit Oriented Development • Signal and Maintenance of Way Building Construction – Currently leasing a facility • Re-construction of 810 Mission General Administration Building – Carlsbad Village Transit Center is most cost effective location due to parking availability

19 FY2020 – FY2024 Executive Director Budget Guidance • Enhance Performance Management – Expense Management and Cost Recovery – Cash Flow Management – Project Management and Delivery (On-time and Under-Budget Execution) – Zero Delay Transit Operations • Improve Services to increase ridership and customer revenue – FY2020 service levels remain flat – Phased service improvements between FY2021 – FY2024 based on funding availability and completion of capital projects • Optimize expenses: – Focus on areas where expenses can be reduced – Leverage current and future technology investments – Positive Train Control Project Transition to Operations and Maintenance

20 FY2020 - 2024 Executive Director Budget Guidance • Prepare for Potential Economic Downturn Between FY2020 - FY2024 – Staff will need to develop an expense and service reduction package given the lead time for approvals to implement • Strategic Risk Taking to Improve Services By Using Net Assets to Cash Flow Key Capital Investments – Goal is to avoid short and long term debt financing • Fund State of Good Repair and Priority Capital Needs – Focus and Allocate Resources for Discretionary Grant Applications – Assume robust political leadership and advocacy by Board to support local, state, and federal funding that results in increased funding for NCTD

21 Board Discussion and Direction

• The Board will need to provide policy direction to the Executive Director that considers: – Public Policy Goals and Expectation – Financial and Economic Considerations – Regulatory Environment • The Board of Directors is required to adopt the operating and capital budget on an annual basis that is balanced • All courses of action carry risks and rewards • FY2020 - FY2024 timeframe is significantly important in shaping the future sustainability and prosperity of NCTD

22 Board Discussion and Feedback

23