8.0 Appendix A
Total Page:16
File Type:pdf, Size:1020Kb
Appendix A Duty to Investigate Area E Ongoing Section 19 Investigations Lincolnshire County Council Section 19 Investigations - Network North Area E - Contact Officer - Jeanne Gibson- Area Highways Manager Identified Actions/Works Risk Management Consideration for Authorities with Estimated Timescales Number of Flooded inclusion in future S19 Report File Date of Incident Town & Location Description of Flooding Responsibilities and Actions and Recommendations Proposed Action/Works Promoter Status Recommendation / Properties Common Works Reference whether they are Scheme Completion Programme exercising functions There are currently no on-going Section 19 investigations, or works resulting from Section 19 investigations, in this area. Page 15 Lincolnshire County Council 12/09/2016 14 Appendix A Duty to Investigate Area E Ongoing Section 19 Investigations Lincolnshire County Council Section 19 Investigations - Network North Area F - Contact Officer - Steve Wiles - Area Highways Manager Identified Actions/Works Risk Management Consideration for Authorities with Estimated Timescales Number of Flooded inclusion in future S19 Report File Date of Incident Town & Location Description of Flooding Responsibilities and Actions and Recommendations Proposed Action/Works Promoter Status Recommendation / Properties Common Works Reference whether they are Scheme Completion Programme exercising functions LCC - Yes Further detailed study required into the ownership, condition and capacity of the surface water sewer system with a view to Surface water drainage scheme under Flooding was caused by surcharging surface WLDC - Yes Keelby providing a new pipe system to intercept flows from the A18 Yes (may also require consideration. Further LCC investigation and Investigation & water sewers combined with overland flows. LCC 28/06/2012 4 Barton Street; to reduce flows entering the village, and to Anglian Water design required. On-going Feasibility 2015/16 S19-032 Severn Trent Water - AW Maple Avenue, Riby Road and Pelham Crescent upgrade the pipe between Riby Road and Caddle Beck. Further investment) Feasibility 2015/16 Possible works 2016/17 4 Properties Yes LCC investigation and design required. Scheme bid submitted Work 2016/17 for feasibility and works. Brookenby Internal FloodingFlooding caused on 12/06/2016 Sunday 12/6/16 by surcharging manhole in 2 Awaiting Report Awaiting Report On-going s19-179 Dale View Road verge 1. That all RMA's inspect their respective infrastructure and Over a period of 60 minutes during the take any necessary steps to ensure it is working as well as afternoon 43.4mm of rain fell in possible. Gainsborough, of which 35.6mm fell in 30 LCC - Yes minutes (a return period of 227 years). The 2. Advice be made available to victims of flooding with regard Further investigations required by all RMA's. surface water drains and combined sewer Gainsborough WLDC - Yes to resistance measures which might be appropriate, for example Liaison with Severn Trent Water in hand. LCC Investigation & systems were unable to cope with the Marshalls Yard, Elsham Walk, Tower Street, Hill Crescent, Limber air brick covers and flood gates. Further investigations with regard to flood Severn Trent feasibility 2017/18. 09/06/2014 intense rainfall, the various systems 50 Yes On-going S19-115 Close, Trinity Street, Silver Street, Caldicott Drive, Darwin Street, Severn Trent Water - risk management measures subject to WLDC Possible works consequently surcharging and the resulting Rectory Avenue, Spring Gardens, Priory Close, Long Wood Road Yes 3. LCC consider improvements to the highway surface water meeting the requirements of Defra Flood 2018/19. surface water runoff entering properties. In drainage where this will offer resistance to flooding from surface Defence Grant in Aid. all around 50 properties were flooded runoff. internally. 4. That the LLFA investigate the feasibility of overland flood 50 Properties routes to manage the risk of flooding from surface water Page 16 Lincolnshire County Council 12/09/2016 14 Appendix A Duty to Investigate Area E Ongoing Section 19 Investigations Lincolnshire County Council Section 19 Investigations - Network North Area G - Contact Officer - Kyra Nettle - Acting Area Highways Manager Identified Actions/Works Risk Management Consideration for Authorities with Estimated Timescales Number of Flooded inclusion in future S19 Report File Date of Incident Town & Location Description of Flooding Responsibilities and Actions and Recommendations Proposed Action/Works Promoter Status of Scheme Properties Common Works Reference whether they are Completion Programme exercising functions Increase frequency of routine cleansing Carriageway flooding - 02:23 Hrs - Polcie Ad-hoc cleansing of outfall with high power incident 39 14/08/15 - Deep flood undier rail jet-vac bridge on station road Potterhanworth.. Car Increase frequency of routine cleansing Cut grips into the verge at regular intervals stuck and freed by FB. 02:26 Hrs - Kier Ad-hoc cleansing of outfall with high power jet-vac east and west of the bridge to reduce the Potterhanworth North ER to attend and close road at bridge. Cut grips into the verge at regular intervals east and west of the 14/08/2015 0 LCC - Yes NO quantity of highway surface water reaching LCC On-going 2016 S19-131 Under Railway Bridge, Station Road 03:33 Hrs ER team on site very bad and bridge to reduce the quantity of highway surface water reaching the drainage system. needs closing. 03:54 Hrs - Road closed and the drainage system traffic diverted via Heighnton. Works programmed End Feb 2016 A Jet to attend site cway flooding The length of dropped kerbs are no longer Standing water collects in the carriageway required and should be replaced with full channel at a low point between kerb offlets, The length of dropped kerbs are no longer required and should face kerbs to provide a barrier to water North Hykeham flows over a dropped kerb and footway and be replaced with full face kerbs to provide a barrier to water ingress. Further work should follow on to 13/08/2015 1 LCC- Yes NO LCC On-going 2016 S19-130 Newark Road down the access to the property. ingress. Further work should follow on to address the standing address the standing water on the water on the carriageway. carriageway. 1 property Site work programmed to start w/c 8/02/2016 Cherry Willingham Flooding into the property due to drainage, 15/06/2016 water in customers house. 1 Awaiting Report Awaiting Report On-going s19-164 Ancaster Close 1 Property water runs down blacksmith lane and then goes into the customers driveway. This happened on Friday about 4,30pm and this has not happened before. Water flooded the house as the heavy water caused the moat around the customers property to overflow Boothby Graffoe and burst into the house. This got to about 3 14/06/2016 1 Awaiting Report Awaiting Report On-going s19-165 inchs high. This may be just a coincendance Main Street but the road was surface dressed a couple of weeks ago and this may have contributed to the flooding as customer states heavy rain Page 17 before has not caused any flooding to the property. 1 Property Water is not flowing now but this morning just before caller got up he says there was a it is recommended to lift all the centre kerbs heavy downpour. The surface water has it is recommended to lift all the centre kerbs to re-establish a to re-establish a 25mm upstand. In Welbourne entered callers kitchen and living room on 25mm upstand. In agreement with resident, it is recommended agreement with resident, it is recommended 15/06/2016 the ground floor. The road was surface 1 to raise the existing kerbs directly outside footpath to a full to raise the existing kerbs directly outside On-going s19-167 Cliff Road/Leadenham Road dressed recently and caller thinks this is 110mm upstand. Dyke also to be unblocked to allow gully to footpath to a full 110mm upstand. Dyke also possibly the reason why it has entered the catch surface water and outfall into dyke. to be unblocked to allow gully to catch property surface water and outfall into dyke. 1 Property Cherry Willingham Cherry Willingham – pumping water from 15/06/2016 Close and flooded conservatory 1 Awaiting Report Awaiting Report On-going s19-175 St Hughs Close 1 Property Potterhanworth Police are requesting a road closure at this 16/06/2016 location. - CW flooded 0 Awaiting Report Awaiting Report On-going s19-180 Under Railway Bridge, Station Road Cway flooded The water is currently all the way across the road and causing vehicles to stop. Also all this water is flowing down pingle lane and Wellingore into the front garden of a property on that 10/06/2016 road. This is an ongoing issue and roger 1 Awaiting Report Awaiting Report On-going S19-187 Sleaford Road would like to know what is going to be happening in the long term regarding this. The drains have been recently jetted with no result Lincolnshire County Council 12/09/2016 14 Appendix A Duty to Investigate Area E Ongoing Section 19 Investigations Lincolnshire County Council Section 19 Investigations - Network North Area H - Contact Officer - Dean Myhill - Area Highways Manager Identified Actions/Works Risk Management Consideration for Authorities with Estimated Timescales Number of Flooded inclusion in future S19 Report File Date of Incident Town & Location Description of Flooding Responsibilities and Actions and Recommendations Proposed Action/Works Promoter Status Recommendation / Properties Common Works Reference whether they are Scheme Completion Programme exercising functions Surcharging from the highway drainage LCC has investigated the highway drainage system and system due to blockages within the system, undertaken a CCTV survey which indicates blockages and root Chapel St Leonards root ingress and possible concerns over the infestation. Gullies and connections have been jetted. Further Design 29/06/2012 2 LCC - Yes No Work being designed and costed LCC On-going S19-012 number of gullies.