Facility Management Staffing Report
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Selection of Logistics Company in Facility Management Sector with Topsis and Electre from Multi-Size Decision Making Methods
IJBTS International Journal of Business Tourism and Applied Sciences Vol.7 No.1 January-June 2019 SELECTION OF LOGISTICS COMPANY IN FACILITY MANAGEMENT SECTOR WITH TOPSIS AND ELECTRE FROM MULTI-SIZE DECISION MAKING METHODS Ali Fuat Guneri, Omer Yildiz Yildiz Technical University, Department of Industrial Engineering, Istanbul, TURKEY [email protected], [email protected] ABSTRACT In this study, it is discussed selection of a logistics company for a firm operating in the facility management sector and aimed to make contribution to Facility Management Sector with scientific methods which has gained importance in recent years in Turkey. Since many qualitative and quantitative criteria must be taken into account to make a correct and reliab le selection of logistics company, multi-criteria decision making techniques TOPSIS and ELECTRE have been implemented in an integrated way. 9 different criteria have been taken into account to be able to choose among 5 companies to present the solution method of the decision problem. Criteria regarding to the problem are weighted by competent people from different sectors working with logistics companies. Optimal company selection with TOPSIS method is provided, order of preference is determined and with the ELECTRE method, both the results were confirmed and the companies were ranked according to their superiority. Keywords—Electre, Facility Management, TOPSIS I. INTRODUCTION Companies that move with the motive of survival in competitive markets are obliged to have zero errors in order to ensure that every step they take is correct and effective. Customer satisfaction is strayed from the departments which are in contact with the customers and appeared in every aspect of production and service. -
Investigation of Facilities Management Practices for Providing Feedback During the Design Development and Review Stages Fadi A
International Journal of Building Pathology and Adaptation Investigation of facilities management practices for providing feedback during the design development and review stages Fadi A. Fatayer, Mohammad A. Hassanain, Abdullatif Abdallah, Abdul-Mohsen Al-Hammad, Article information: To cite this document: Fadi A. Fatayer, Mohammad A. Hassanain, Abdullatif Abdallah, Abdul-Mohsen Al-Hammad, (2019) "Investigation of facilities management practices for providing feedback during the design development and review stages", International Journal of Building Pathology and Adaptation, https:// doi.org/10.1108/IJBPA-05-2018-0040 Permanent link to this document: https://doi.org/10.1108/IJBPA-05-2018-0040 Downloaded on: 02 March 2019, At: 01:22 (PT) References: this document contains references to 48 other documents. To copy this document: [email protected] Access to this document was granted through an Emerald subscription provided by emerald- srm:467320 [] For Authors If you would like to write for this, or any other Emerald publication, then please use our Emerald for Authors service information about how to choose which publication to write for and submission guidelines are available for all. Please visit www.emeraldinsight.com/authors for more information. About Emerald www.emeraldinsight.com Emerald is a global publisher linking research and practice to the benefit of society. The company manages a portfolio of more than 290 journals and over 2,350 books and book series volumes, as well as providing an extensive range of online products and additional customer resources and services. Emerald is both COUNTER 4 and TRANSFER compliant. The organization is a partner of the Committee on Publication Ethics (COPE) and also works with Portico and the LOCKSS initiative for Downloaded by AN-NAJAH UNIVERSITY At 01:22 02 March 2019 (PT) digital archive preservation. -
A Review on Current Status of Facility Management Practices in Building
Proceedings of the 5th NA International Conference on Industrial Engineering and Operations Management Detroit, Michigan, USA, August 10 - 14, 2020 A Review on Current Status of Facility Management Practices in Building Industry and Prospective BIM Intervention to Manage the Facilities Effectively during its Service Life Abdulaziz Aldowayan, Fikri T. Dweiri Department of Industrial Engineering and Engineering Management University of Sharjah Sharjah, UAE [email protected],[email protected] Senthilkumar Venkatachalam Construction Engineering and Management Indian Institute of Technology Palakkad Kerala, Palakkad , India [email protected] Abstract BMS are deployed to manage buildings such as Shopping malls, office, and residential complexes. However, the information needed for their efficient functioning are either incomplete, generated separately, or hard to determine. BIM generates and stores useful integrated information during design and construction phases of the building projects. These Information are well utilized during design and construction stages but their usage in FM stage is limited. The guidelines and standards to facilitate BIM model during design and construction stages, are not considered critically usable. Hence, this paper aims to identify the need for crucial asset information during FM practices while executing the BMS process, to develop a standard framework for information specifications during the early development of BIM model, and utilize the same as a source for BMS in FM processes. Nevertheless, this paper addresses the common FM practices and its building data requirements towards efficient BMS implementation pivotal to the mechanical and electrical systems for a conceptual framework of a BIM model. The research adopts deductive approach through semi- structured qualitative interviews with FM stakeholders of the malls in Saudi Arabia to obtain the standard FM data requirement from client perspective, while managing the FM process through a BMS system. -
Read the Report
Relating Facility Performance Indicators with Organizational Sustainability Performance in Public Higher Education Facilities A Thesis Presented to The Academic Faculty by Gregory K. Adams In Partial Fulfillment of the Requirements for the Degree Master of Science in Building Construction and Integrated Facility Management in the College of Architecture Georgia Institute of Technology May 2010 Copyright 2010 by Gregory K. Adams Relating Accepted Facility Performance Indicators with Organizational Sustainability Performance in Georgia Public Higher Education Facilities Approved by: Professor Kathy Roper, Advisor College of Architecture Georgia Institute of Technology Dr. Daniel Castro-Lacouture College of Architecture Georgia Institute of Technology Dr. Linda Thomas-Mobley College of Architecture Georgia Institute of Technology Date Approved: March 19, 2010 This work is dedicated to the memory of my father, Edward S. “Jack” Adams, the smartest man I ever knew not to have received a college education who, more than any other, inspired and taught me to think critically, and to my mother, Arah E. Adams, whose love and support for me is as fresh today as the day she brought me to this world all these fifty-four years ago. ACKNOWLEDGEMENTS I wish to thank my wife, Maria Guadalupe Alonzo Adams, who made innumerable sacrifices so that I could complete this work, and my sons, Jack and Gary, who have supported their father in the pursuit of his education at the expense of time that would have otherwise been spent with them. My employer, the University System of Georgia, is to be commended for providing employees such as me the opportunity to perform this kind of research, and for supporting them through it. -
High Performance Buildings Need High Performance FM - How Does Your Organization Rate?
High Performance Buildings Need High Performance FM - How does your organization rate? By; Christopher P. Hodges, P.E., CFM, LEED-AP, IFMA Fellow, FRICS Introduction We’ve done a good job of defining what constitutes a high-performance building, but how do we keep our buildings in top performing shape? A building will remain high-performance only if the facility manager has the knowledge, skills and ability to keep it there. The facility manager is the key to operational efficiency, and is the one individual that has a working knowledge of the bricks and mortar, and of the political, economic, and environmental climate that exists within their organization. By arming facility managers with a toolkit of sustainable practices, we enable them to adopt and adapt sustainable practices to his or her unique environment. Facility managers can create alignment between organizational strategy and the delivery of economical, safe and productive work environments. High-performance buildings are kept in good working order through a commitment to high-performance facility management. For the characteristics of a high-performance organization, we can turn to recent management literature that defines those characteristics. Once we have committed to improving both the organization and the assets that are managed, we can truly define the most important metrics that define and maintain a building as “high-performance”. This presentation addresses the convergence of the characteristics that define high-performance in both the building and in the facility management organization that is managing them. By exploring and managing these key characteristics effectively, we can keep a facility running in top condition, creating safe, healthy, and productive work environments, while saving energy and resources, and operating in a cost effective manner. -
Designing of Facilities Management Sustainable Parameters for Improving Operational Efficiency
ISSN 1816-6075 (Print), 1818-0523 (Online) Journal of System and Management Sciences Vol. 7 (2017) No. 4, pp. 53-78 Designing of Facilities Management Sustainable Parameters for Improving Operational Efficiency Rashidul Islam1, Sarajul Fikri Mohamed1, Abdul Bari Amin2* and Tasnia 3 Hassan Nazifa 1Faculty of Built Environment, UTM, Skudai 81310, Johor Bahru, Malaysia 2University of Bridgeport, Bridgeport, CT 06604, USA 3Faculty of Civil Engineering, UTM, Skudai 81310, Johor Bahru, Malaysia Email: [email protected] Abstract. Sustainability practice in facilities management (FM) is becoming a crucial principle throughout the life-cycle of project development mainly at post-occupancy phase. FM collaboration would be productive to support sustainability through improvement of sufficient training and skills coupled with practice culture between designers and facility managers. Systematic review of literature and questionnaire survey was conducted to establish the most important design parameters, and these were separated into four categories of people, process, economy and social. Statistical package for the social sciences (SPSS) and relative significance index (RSI) with rank analysis techniques were then used to further explore the significance and influence of each design parameters in sustainable practice of FM. The top five most design parameters were recognised and highlighted in the design process included: “cost-effectiveness”, “value of asset” “environmental” and “practiced culture”. Finally, “design adaptability” and “health and safety”. The study concludes with development of a conceptual model for integration of design parameters to guide facility managers for appropriate actions. Keywords: Facilities Management; Sustainable Design; SPSS; RSI; Malaysia 1. Introduction Traditionally, the principal focus of FM has long time been on controlling and reducing cost for physical asset and now changed towards the creating added value (Jensen and van der Voordt 2016). -
Top Trends in Facilities Management How Society, Demographics and Technology Are Changing the World of FM
Top trends in facilities management How society, demographics and technology are changing the world of FM TOP TRENDS IN FACILITIES MANAGEMENT Contents Foreword: a world of opportunity 02 Top trends in FM: a summary 04 The changing face of outsourcing Outsourcing evolution 06 Integrated services 09 The new workplace The multi-generational workplace 10 Wellness 12 Collaboration 13 Digital disruption and the portfolio Managed workspace and co-working 14 Personalisation 16 Smart technology and artificial intelligence The smart workplace 18 Data-driven decision making 21 The rise of the robots 22 Conclusion 24 1 FOREWORD: A WORLD OF OPPORTUNITY Foreword: a world of opportunity Talking to clients I’m often struck by how fast the world of facilities management is changing. Global influences such as demographic and social changes are contributing to a shift in how the workplace is viewed and what people expect from it. Increasingly people want to choose Wellness in the workplace is one where and when they work and they look to response and is seen as a key way the workplace – wherever that may be – to of attracting and keeping key talent. deliver much more in the way of services and amenities. Every day it seems technology is In these days of disruption and pushing the boundaries of what real estate disintermediation there’s a constant can deliver for organisations. pressure on organisations to innovate and here too, the workplace has an All of which means that facilities important role to play, supporting management is transforming: from an asset, collaboration and boosting creativity. building and plant-centred activity to one which focuses on end-users and outcomes. -
Funds Availability Policy
Market USA Federal Credit Union Funds Availability Policy General Policy Our policy is to delay the availability of funds from your check deposits. During the delay, you may not withdraw the funds in cash, and we will not use the funds to pay share drafts that you have written. We apply check holds to deposits made into all types of accounts (checking; savings; IRA; club accounts; certificates; etc.). Savings accounts are not subject to expedited funds under Regulation CC. Deposits placed in a savings account can be held for an unlimited number of days. Determining the Availability of a Deposit The length of the delay is counted in business days from the day of your deposit. Every day is a business day, except Saturdays, Sundays, and Federal holidays. If you make a deposit during business hours on a business day we are open, we will consider that day to be the day of your deposit. However, if you make a deposit after we are closed for the day or on a day that we are not open, we will consider that the deposit was made on the next business day that we are open. Same Day Availability Funds from the following deposits are available on the day that we receive the deposit: Electronic Direct Deposit Cash Next Day Availability Funds from the following deposits are available on or before the first business day after the receipt of your deposit: • U.S. Treasury Checks* • U.S. Postal Money Orders* • Federal Reserve Bank and Federal Home Loan Bank Checks* • State/Local Government Checks* • Cashiers/Certified/Teller Checks* • Checks written on accounts at MUSA FCU (“on us”) • The first $225 of a days total deposits *The first $5,525 must be made available the next business day provided that the payee is the account holder and the deposits are made in person. -
Residential Demand for Broadband Telecommunications and Consumer Access to Unaffiliated Internet Content Providers
Residential Demand for Broadband Telecommunications and Consumer Access to Unaffiliated Internet Content Providers Jerry A. Hausman†, J. Gregory Sidak††, and Hal J. Singer††† In this article, we examine the open access debate in the context of cable services and broadband Internet services from an antitrust framework. Our analysis is prompted by the recent AT&T-MediaOne and AOL-Time Warner mergers, which raise issues concerning the impact of integrated cable content and Internet access to residential telecommunications. Economic analysis, demographic surveys and federal antitrust guidelines each indicate that the broadband Internet access market is distinct from the narrowband Internet access market. Emerging or competing technologies, such as satellite Internet services or digital subscriber lines, cannot discipline the broadband Internet access market over the relevant time horizons. Vertical integration increases the incentives and power of cable providers to discriminate against unaffiliated broadband content, thereby substantially decreasing consumer welfare. We conclude that the recent mergers of cable content and Internet access is the most current manifestation of the classic strategy of cable providers to control alternate channels of content distribution. Introduction ......................................................................................... 131 I. Improperly Combining the Narrowband and Broadband Internet Access Markets ........................................................................... 135 A. Qualitative -
Inet Revolutio2.4 Part 4
COOK Network Consultants, 431 Greenway Ave, Ewing, NJ 08618 USA ITU and IETF in Agreement on ENUM Administration Letter from ITU To ICANN Blocks .tel gTLD Applications As Competition to ENUM -- Administration Modeled on Neutral Tier 1 Database Holder of Pointers to Records of Provisioned Services lobbying. Editor’s Note: The ENUM process has should turn to: taken some significant further steps towards On Novemeber 1, 2000 in a letter <http:// implementation since the publication (in mid Title : Liaison to IETF/ISOC on www.icann.org/tlds/correspondence/itu-re- October) of our December issue that con- ENUM sponse-01nov00.htm> to Mike Roberts, tained the ENUM interview with Richard Author(s) : R. Blane Yoshio Utsumi, the ITU Secretary General Shockey of Neustar. In this brief article we Filename : draft-itu-sg2-liason- told Roberts to back off and not to inaugu- highlight the most recent developments. The enum-01.txt rate any names that would compete in any material that follows is based on conversa- Pages : 7 way with e164.arpa. After various para- tions with Shockey. Date : 08-Nov-00 graphs of diplomatic circumlocution the let- ter concluded: “As I am sure you are aware, According to Shockey, “communications Abstract: Working Party 1/2, of the Interna- the E.164 international public telecommu- between the IETF as a professional engineer- tional Telecommunication Union P Telecom- nication numbering plan is a politically sig- ing organization with the ITU Study groups munication Standardization Sector (ITU-T) nificant numbering resource with direct im- which are trying to solve engineering prob- held a meeting of its collaborators in Berlin plications of national sovereignty. -
3Com Officeconnect® Wireless 54 Mbps/108 Mbps 11G Cable/DSL
OfficeConnect® Wireless 54Mbps/108Mbps 11g Cable/DSL Router User Guide 3CRWER100-75(Model:WL-537) 3CRWER200-75(Model:WL-537S) http://www.3com.com/ 3Com Corporation Copyright © 2006, 3Com Corporation. All rights reserved. No part of this documentation may be reproduced 350 Campus Drive in any form or by any means or used to make any derivative work (such as translation, transformation, or Marlborough, MA adaptation) without written permission from 3Com Corporation. USA 01752-3064 3Com Corporation reserves the right to revise this documentation and to make changes in content from time to time without obligation on the part of 3Com Corporation to provide notification of such revision or change. 3Com Corporation provides this documentation without warranty, term, or condition of any kind, either implied or expressed, including, but not limited to, the implied warranties, terms or conditions of merchantability, satis34factory quality, and fitness for a particular purpose. 3Com may make improvements or changes in the product(s) and/or the program(s) described in this documentation at any time. If there is any software on removable media described in this documentation, it is furnished under a license agreement included with the product as a separate document, in the hard copy documentation, or on the removable media in a directory file named LICENSE.TXT or !LICENSE.TXT. If you are unable to locate a copy, please contact 3Com and a copy will be provided to you. UNITED STATES GOVERNMENT LEGEND If you are a United States government agency, then this documentation and the software described herein are provided to you subject to the following: All technical data and computer software are commercial in nature and developed solely at private expense. -
Cable Modem Service and the First Amendment: Adventures in a “Doctrinal Wasteland”
Harvard Journal of Law & Technology Volume 16, Number 1 Fall 2002 CABLE MODEM SERVICE AND THE FIRST AMENDMENT: ADVENTURES IN A “DOCTRINAL WASTELAND” * William E. Lee TABLE OF CONTENTS I. INTRODUCTION..............................................................................125 II. THE EMERGING BROADBAND MARKET .......................................129 III. FCC POLICY ...............................................................................134 A. The AT&T Mergers ..................................................................134 B. The AOL-Time Warner Merger................................................136 C. The Declaratory Ruling ...........................................................139 IV. THE FIRST AMENDMENT.............................................................140 A. AT&T Corp. v. City of Portland...............................................140 B. Comcast v. Broward County ....................................................147 1. Strict Scrutiny........................................................................149 2. Intermediate Scrutiny ............................................................154 V. CONCLUSION................................................................................157 I. INTRODUCTION Broadband communication facilities — whether provided by ca- ble companies, telephone companies, wireless providers, or satellite operators — are commonly seen as a veritable panacea for all that ails America. A group of technology company CEOs recently advocated a massive government program,