Management in the Maldives

Total Page:16

File Type:pdf, Size:1020Kb

Management in the Maldives Completion Report Project Number: 33218-013 Loan Number: 2170 August 2014 Maldives: Regional Development Project, Phase II— Environmental Infrastructure and Management This document is being disclosed to the public in accordance with ADB’s Public Communications Policy 2011. CURRENCY EQUIVALENTS Currency Unit – rufiyaa (Rf) At Appraisal At Project Completion 28 April 2005 11 September 2013 Rf1.00 = $0.077 $0.065 $1.00 = Rf12.96 Rf15.41 ABBREVIATIONS ADB – Asian Development Bank ADP – atoll development plan EIR – economic rate of return IDC – island development committee IDP – island development plan LLEE – Live and Learn Environmental Education MEE – Ministry of Energy and Environment MEEW – Ministry of Environment, Energy, and Water MHTE – Ministry of Housing, Transport, and Environment MHUD – Ministry of Housing and Environment MOAD – Ministry of Atolls Development MOFT – Ministry of Finance and Treasury MWSA Maldives Water and Sanitation Authority NGO – nongovernment organization NPSC – national project steering committee O&M – operation and maintenance PHAST – Participatory Hygiene and Sanitation Transformation PIU – project implementation unit PMC – project management consultant PMU – project management unit RDP I – Regional Development Project RDP II – Regional Development Project, Phase II – Environmental Infrastructure and Management RPAC – regional project advisory committee SPS – sewage pumping station STP – sewage treatment plant SWM – solid waste management UNICEF – United Nations Children’s Fund WDC – women’s development committee NOTES In this report, "$" refers to US dollars. Vice-President W. Zhang, Operations 1 Director General H. Kim, South Asia Department (SARD) Director Y. Fei, Urban Development and Water Division, SARD Team leader P. Cawrse, Urban Development Specialist, SARD In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CONTENTS Page BASIC DATA i MAPS vi I. PROJECT DESCRIPTION 1 II. EVALUATION OF DESIGN AND IMPLEMENTATION 2 A. Relevance of Design and Formulation 2 B. Project Outputs 2 C. Project Costs 6 D. Disbursements 7 E. Project Schedule 7 F. Implementation Arrangements 8 G. Conditions and Covenants 9 H. Consultant Recruitment and Procurement 9 I. Performance of Consultants, Contractors, and Suppliers 10 J. Performance of the Borrower and the Executing Agency 11 K. Performance of the Asian Development Bank 11 III. EVALUATION OF PERFORMANCE 11 A. Relevance 11 B. Effectiveness in Achieving Outcome 12 C. Efficiency in Achieving Outcome and Outputs 12 D. Preliminary Assessment of Sustainability 13 E. Impact 13 IV. OVERALL ASSESSMENT AND RECOMMENDATIONS 14 A. Overall Assessment 14 B. Lessons 14 C. Recommendations 14 APPENDIXES 1. Chronology of Main Events 16 2. Design and Monitoring Framework 18 3. Comparison of Estimated and Actual Project Costs 24 4. Annual Average Exchange Rates 25 5. Summary of Contracts 26 6. Project Financing Plan 27 7. Breakdown of Actual Disbursements of Loan Proceeds 28 8. Implementation Schedule 31 9. Status of Compliance with Major Loan Covenants 32 10. Financial and Economic Reevaluation 38 11. Gender Action Plan Implementation Achievements 40 12. Sustainability Analysis and Lessons Learned 43 BASIC DATA A. Loan Identification 1. Country Maldives 2. Loan Number 2170-MLD (SF) 3. Project Title Regional Development Project, Phase II – Environmental Infrastructure and Management 4. Borrower Republic of Maldives 5. Executing Agency Ministry of Finance and Treasury 6. Amount of Loan (At appraisal) SDR3,903,000 (approximately $6.000 million) (At closing) SDR3,457,081 (approximately $5.366 million) 7. Project Completion Report Number PCR: MLD 1463 B. Loan Data 1. Appraisal - Date Started 23 Aug 2004 - Date Completed 30 Aug 2004 2. Loan Negotiations - Date Started 19 Mar 2005 - Date Completed 19 Mar 2005 3. Date of Board Approval 28 Apr 2005 4. Date of Loan Agreement 20 Sep 2005 5. Date of Loan Effectiveness - In Loan Agreement 19 Dec 2005 - Actual 20 Apr 2006 - Number of Extensions 3 6. Closing Date - In Loan Agreement 31 Mar 2011 - Actual 09 Sep 2013 - Number of Extensions 3 7. Terms of Loan - Interest Rate 1% during the grace period; 1.5% thereafter - Maturity 32 years - Grace Period (number of years) 8 years ii 8. Disbursements a. Dates Initial Disbursement Final Disbursement Time Interval 03 July 2006 26 August 2013 80.77 months Effective Date Original Closing Date Time Interval 20 Apr 2006 31 Mar 2011 59.37 months b. Amount (in SDR) Last Net Original revised Amount amount Amount Undisbursed Category allocationa allocationb cancelledc available disbursed balance 1 Civil works 212,000 2,078,278 150,738 1,927,540 1,927,540 0 2 Equipment, machineries, furniture, and construction materials 1,682,000 338,211 113,632 224,579 224,579 0 3 Overseas and local training, learning resources, workshop and research development 209,000 116,307 15,033 101,274 101,274 0 4 Consulting services 1,112,000 1,112,000 55,258 1,056,742 1,056,742 0 5 Project administration 206,000 125,204 49,954 75,250 75,250 0 6 Interest 133,000 133,000 61,304 71,696 71,696 0 7 Unallocated 349,000 0 0 0 0 Total SDR 3,903,000 3,903,000 445,919 3,457,081 3,457,081 0 Total in $ 6,000,000 6,042,914 674,461 5,365,564 5,365,564 a Per loan agreement. b Last reallocation made on 29 January 2013 (figures from Loan Financial Information System as of 18 September 2013). c Amount cancelled as of 9 September 2013. 9. Local Cost (Financed) - Amount ($): 1.035 - Percent of Local Costs: 28.700% - Percent of Total Costs: 13.040% iii C. Project Data 1. Project Cost ($ million) Cost Appraisal Estimate Actual Foreign Exchange Cost 5.38 4.33 Local Currency Cost 2.12 3.61 Total 7.50 7.94 2. Financing Plan ($ million) Cost Appraisal Estimate Actual Implementation Costs Borrower Financed 1.50 2.58 ADB Financed 5.80 5.25 Total 7.30 7.83 Interest/Service Charges Borrower Financed 0.00 0.00 ADB Financed 0.20 0.11 Subtotal 0.20 0.11 Total Project Cost 7.50 7.94 ADB = Asian Development Bank. 3. Cost Breakdown by Project Outputs ($ million) Outputs Appraisal Estimate Actual A. Base cost 1. Environmental infrastructure 3.07 4.70 2. Planning and environmental 0.48 0.35 management 3. Building management and 2.35 1.89 implementation capacity Subtotal (A) 5.90 6.94 B. Contingencies 0.61 0.00 C. Taxes and duties 0.79 0.89 D. IDC 0.20 0.11 Total 7.50 7.94 IDC = interest during construction. 4. Project Schedule Appraisal Actual Award Item Estimate of Contract Completion Date of Contract with Consultants 1. Project management consultant October 2005 May 2007 May 2013 2. Environmental awareness & community mobilization October 2006 January 2008 Sept 2011 Civil Works Contract 1. Construction of septic tank systema October 2007 iv Appraisal Actual Award Item Estimate of Contract Completion 2. Construction of reed bed treatment and outfalla April 2008 3. Design, supply, and install turnkey contract for sewerage and SPS at Alif Dhaal Atoll. Mahibadoo, September September Maldivesb April 2006 2010 2012 4. Design, supply, and install turnkey contract for sewerage and SPS at Laamu Atoll. Fonadhoo, September September Maldivesb October 2006 2010 2012 Equipment and Supplies November November First procurement October 2005 2010 2010 Last procurement June 2010 August 2012 March 2012 Training and Awareness Program First training October 2005 January 2008 March 2008 December Last training June 2010 October 2012 2012 Start of Operations December 1. Solid waste management pilot (Fonadhoo)a October 2006 2008 2. Solid waste management for Naifaru and Mahibadhooa April 2008 June 2010 Completion of Tests and Commissioning 1. Solid waste management pilot (Fonadhoo)a 2. Solid waste management for Naifaru and Mahidabooa aThis component was cancelled in a major change in project scope. bThe water supply component was cancelled. 5. Project Performance Report Ratings Ratings Implementation Period Development Objectives Implementation Progress Apr 2006–Apr 2007 S S May 2007–Dec 2007 S S Jan 2007–Mar 2008 S S May 2008–July 2009 S PS Aug 2009–Dec 2010 (midterm) S S Jan 2011–Nov 2011 S S Dec 2011–Dec 2012 (final) S S PS = partly satisfactory, S = satisfactory. v D. Data on Asian Development Bank Missions No. of No. of Specialization Name of Mission Date Persons Person- of Members Days Project inception 19–22 Jun 2006 2 8 a, d Project review 1 17–24 Apr 2007 1 8 c Project review 2 2–6 Dec 2007 3 15 b, c Project review 3 6–10 Apr 2008 1 5 c Project review 4 1–10 Aug 2009 1 10 a Project review 5 7–13 Dec 2010 2 14 a, e Project review 6 15–22 Nov 2011 1 8 c Project review 7 11–13 Dec 2012 1 3 c Project completion 5–12 Apr 2014 2 16 a, f a = project officer, b = safeguards specialist, c = urban development specialist, d = assistant project analyst, e= senior operations assistant, f = consultant. o o 72 00'E 80 00'E 72 o 00'E 74 o 00'E INDIA Bay of THILADHUNMATHEE UTHURUBURI Arabian Sea Bengal (Haa Alifu Atoll) Dhidhdhoo o o 10 00'N 10 00'N UPPER NORTH REGION Gailandhoo Channel Nolhivaranfaru SRI THILADHUNMATHEE DHEKUNUBURI LANKA (Haa Dhaalu Atoll) Laccadive Sea MILADHUNMADULU UTHURUBURI (Shaviyani Atoll) Funadhoo Male Moresby Channel o 6 00'N 6 o 00'N MALDIVES Alifushi MILADHUNMADULU DHEKUNUBURI MAALHOSMADULU UTHURUBURI (Noonu Atoll) o 1 o 00'N 1 00'N (Raa Atoll) Manadhoo Un'goofaaru I N D I A N O C E A N o o 72 00'E 80 00'E Naifaru FAADHIPPOLHU
Recommended publications
  • Electricity Needs Assessment
    Electricity needs Assessment Atoll (after) Island boxes details Remarks Remarks Gen sets Gen Gen set 2 Gen electricity electricity June 2004) June Oil Storage Power House Availability of cable (before) cable Availability of damage details No. of damaged Distribution box distribution boxes No. of Distribution Gen set 1 capacity Gen Gen set 1 capacity Gen set 2 capacity Gen set 3 capacity Gen set 4 capacity Gen set 5 capacity Gen Gen set 2 capacity set 2 capacity Gen set 3 capacity Gen set 4 capacity Gen set 5 capacity Gen Total no. of houses Number of Gen sets Gen of Number electric cable (after) cable electric No. of Panel Boards Number of DamagedNumber Status of the electric the of Status Panel Board damage Degree of Damage to Degree of Damage to Degree of Damaged to Population (Register'd electricity to the island the to electricity island the to electricity Period of availability of Period of availability of HA Fillladhoo 921 141 R Kandholhudhoo 3,664 538 M Naalaafushi 465 77 M Kolhufushi 1,232 168 M Madifushi 204 39 M Muli 764 134 2 56 80 0001Temporary using 32 15 Temporary Full Full N/A Cables of street 24hrs 24hrs Around 20 feet of No High duty equipment cannot be used because 2 the board after using the lights were the wall have generators are working out of 4. reparing. damaged damaged (2000 been collapsed boxes after feet of 44 reparing. cables,1000 feet of 29 cables) Dh Gemendhoo 500 82 Dh Rinbudhoo 710 116 Th Vilufushi 1,882 227 Th Madifushi 1,017 177 L Mundoo 769 98 L Dhabidhoo 856 130 L Kalhaidhoo 680 94 Sh Maroshi 834 166 Sh Komandoo 1,611 306 N Maafaru 991 150 Lh NAIFARU 4,430 730 0 000007N/A 60 - N/A Full Full No No 24hrs 24hrs No No K Guraidhoo 1,450 262 K Huraa 708 156 AA Mathiveri 73 2 48KW 48KW 0002 48KW 48KW 00013 breaker, 2 ploes 27 2 some of the Full Full W/C 1797 Feet 24hrs 18hrs Colappes of the No Power house, building intact, only 80KW generator set of 63A was Distribution south east wall of working.
    [Show full text]
  • Annual Report 2017
    ANNUAL REPORT 2017 STATE ELECTRIC COMPANY LIMITED TABLE OF CONTENTS Executive Summary About us 1 Chairman’s Message 3 CEO’s Message 4 Board of Directors 5 Executive Management 7 How we grew 14 Who we serve 15 Statistical Highlights 16 Financial Highlights 17 Our Footprint 18 Market Review 19 Strategic Review 20 - Power Generation 20 - Distribution System 24 - Human Resources 25 - Corporate Social Responsibility 29 - Customer Services 30 - Financial Overview 32 - Creating efficiency and reducing cost 40 - Business Diversification 41 - Renewable Energy 44 Moving Forward 45 - Grid of the Future 46 - An Efficient Future 47 - Investing for the Future 47 Audited Financial Statements 2017 48 Company Contacts EXECUTIVE SUMMARY The year 2017 is marked as a challenging yet Business was diversified into new areas such successful year in the recent history of State as water bottling and supply. Further STELCO Electric Company Limited (STELCO). The main showroom services were expanded to provide highlight of the year is that STELCO has more varieties of products. observed a net positive growth, after a few consecutive loss making years. Though STELCO has posted a positive growth, the increasing gearing ratio is an area of Some of the success stories in 2017 include the concern which needs to be addressed at the commencement of STELCO Fifth Power policy level with government authorities. Development Project as well as addition of generation capacity to the STELCO network. Based on current forecasts, the electricity Further upgrades on distribution network as demand doubles every five to ten years, hence well as adoption of new technologies to STELCO needs to generate a profit of over MVR improve service quality were implemented.
    [Show full text]
  • Population and Housing Census 2014
    MALDIVES POPULATION AND HOUSING CENSUS 2014 National Bureau of Statistics Ministry of Finance and Treasury Male’, Maldives 4 Population & Households: CENSUS 2014 © National Bureau of Statistics, 2015 Maldives - Population and Housing Census 2014 All rights of this work are reserved. No part may be printed or published without prior written permission from the publisher. Short excerpts from the publication may be reproduced for the purpose of research or review provided due acknowledgment is made. Published by: National Bureau of Statistics Ministry of Finance and Treasury Male’ 20379 Republic of Maldives Tel: 334 9 200 / 33 9 473 / 334 9 474 Fax: 332 7 351 e-mail: [email protected] www.statisticsmaldives.gov.mv Cover and Layout design by: Aminath Mushfiqa Ibrahim Cover Photo Credits: UNFPA MALDIVES Printed by: National Bureau of Statistics Male’, Republic of Maldives National Bureau of Statistics 5 FOREWORD The Population and Housing Census of Maldives is the largest national statistical exercise and provide the most comprehensive source of information on population and households. Maldives has been conducting censuses since 1911 with the first modern census conducted in 1977. Censuses were conducted every five years since between 1985 and 2000. The 2005 census was delayed to 2006 due to tsunami of 2004, leaving a gap of 8 years between the last two censuses. The 2014 marks the 29th census conducted in the Maldives. Census provides a benchmark data for all demographic, economic and social statistics in the country to the smallest geographic level. Such information is vital for planning and evidence based decision-making. Census also provides a rich source of data for monitoring national and international development goals and initiatives.
    [Show full text]
  • Villas and Residences | Club Intercontinental Benefits | Opening Special | Getting Here
    VILLAS AND RESIDENCES | CLUB INTERCONTINENTAL BENEFITS | OPENING SPECIAL | GETTING HERE RESTAURANTS AND BARS | OCEAN CONSERVATION PROGRAM & COLLABORATION WITH MANTA TRUST | AVI SPA & WELLNESS AND KIDS CLUB A new experience lies ahead of you this September with the opening of the new InterContinental Maldives Maamunagau Resort. Spread over a private island with lush tropical greenery, InterContinental Maldives Maamunagau Resort seamlessly blends with the awe-inspiring natural beauty of the island. Resort facilities include: • 81 Villas & Residences • 6 restaurants and bars • Club InterContinental benefits • “The Retreat” - an adults only lounge • An overwater spa • 5 Star PADI certified diver center oering courses and daily expeditions with an on-site Marine Biologist • Planet Trekkers children’s facility VILLAS AND RESIDENCES Experience Maldives’ breathtaking vistas from each of the spacious 81 Beach, Lagoon and Overwater Villas and Residences at the InterContinental Maldives Maamunagau Resort. Choose soothing lagoon or dramatic ocean views with a perfect vantage point from your private terrace for a spectacular Bedroom - Overwater Pool Villa Outdoor Pool Deck - Overwater Pool Villa sunrise or sunset. Each Villa or Residence is tastefully designed encapsulating the needs of the modern nomad infused with distinct Maldivian design; featuring one, two or three separate bedrooms, lounge with an ensuite complemented by a spacious terrace overlooking the ocean or lagoon with a private pool. GO TO TOP Livingroom - Lagoon Pool Villa Bedroom - One
    [Show full text]
  • Base Information Malé, Hulhumalé, Maldives
    Base information Malé, Hulhumalé, Maldives We make your most important time of the year to your most beautiful experience. 1 yachts yachts supermarket supermarket Useful information airport Transfer After arrival by plane we pick you up and bring you to the yacht. Please let us know your arrival time. The costs for the transfer are already covered with the comfort package. Address BLUE HORIZON Pte Ltd M.Bolissafaru, 2nd Floor, Orchid Magu, Malé, Maldives GPS: 4.177213, 73.506887 Supermarket Our office can be found in the north of Malé (see map). The yachts are about Near the yachts is a large supermarket 20 minutes away, at Hulhumalé. (Redwave City Square). The two islands are connected by a GPS: 4.211042, 73.542010 bridge and can be reached by taxi or shuttle. Opening hours: daily 09:00 – 18:00 h Contact persons: 20:00 – 22:00 h Base manager: The supermarket can be reached by Mr. Ahmed Zubair Adam taxi, which we gladly organize for 00960 77 88 425 you. The taxi costs about € 5. Office: Mr. Ameer Abbas (00960 794 11 69) Mrs. Lorna (00960 795 11 62) Errors and mistakes reserved. 2 What to do in case of damage? Please contact the base immediately! Exchange insurance policy data (for liability damage) Take pictures of the damage Create a sketch with description of how the accident happened and let Damages can happen even to very experi- it sign from all involved persons enced skippers. Please let us know straight away when damage occurs, so we can Create a record with the port organise everything and so you don’t lose captain valuable holiday time.
    [Show full text]
  • Table 2.3 : POPULATION by SEX and LOCALITY, 1985, 1990, 1995
    Table 2.3 : POPULATION BY SEX AND LOCALITY, 1985, 1990, 1995, 2000 , 2006 AND 2014 1985 1990 1995 2000 2006 20144_/ Locality Both Sexes Males Females Both Sexes Males Females Both Sexes Males Females Both Sexes Males Females Both Sexes Males Females Both Sexes Males Females Republic 180,088 93,482 86,606 213,215 109,336 103,879 244,814 124,622 120,192 270,101 137,200 132,901 298,968 151,459 147,509 324,920 158,842 166,078 Male' 45,874 25,897 19,977 55,130 30,150 24,980 62,519 33,506 29,013 74,069 38,559 35,510 103,693 51,992 51,701 129,381 64,443 64,938 Atolls 134,214 67,585 66,629 158,085 79,186 78,899 182,295 91,116 91,179 196,032 98,641 97,391 195,275 99,467 95,808 195,539 94,399 101,140 North Thiladhunmathi (HA) 9,899 4,759 5,140 12,031 5,773 6,258 13,676 6,525 7,151 14,161 6,637 7,524 13,495 6,311 7,184 12,939 5,876 7,063 Thuraakunu 360 185 175 425 230 195 449 220 229 412 190 222 347 150 197 393 181 212 Uligamu 236 127 109 281 143 138 379 214 165 326 156 170 267 119 148 367 170 197 Berinmadhoo 103 52 51 108 45 63 146 84 62 124 55 69 0 0 0 - - - Hathifushi 141 73 68 176 89 87 199 100 99 150 74 76 101 53 48 - - - Mulhadhoo 205 107 98 250 134 116 303 151 152 264 112 152 172 84 88 220 102 118 Hoarafushi 1,650 814 836 1,995 984 1,011 2,098 1,005 1,093 2,221 1,044 1,177 2,204 1,051 1,153 1,726 814 912 Ihavandhoo 1,181 582 599 1,540 762 778 1,860 913 947 2,062 965 1,097 2,447 1,209 1,238 2,461 1,181 1,280 Kelaa 920 440 480 1,094 548 546 1,225 590 635 1,196 583 613 1,200 527 673 1,037 454 583 Vashafaru 365 186 179 410 181 229 477 205 272
    [Show full text]
  • Coastal Adpatation Survey 2011
    Survey of Climate Change Adaptation Measures in Maldives Integration of Climate Change Risks into Resilient Island Planning in the Maldives Project January 2011 Prepared by Dr. Ahmed Shaig Ministry of Housing and Environment and United Nations Development Programme Survey of Climate Change Adaptation Measures in Maldives Integration of Climate Change Risks into Resilient Island Planning in the Maldives Project Draft Final Report Prepared by Dr Ahmed Shaig Prepared for Ministry of Housing and Environment January 2011 Table of Contents 1 INTRODUCTION 1 2 COASTAL ADAPTATION CONCEPTS 2 3 METHODOLOGY 3 3.1 Assessment Framework 3 3.1.1 Identifying potential survey islands 3 3.1.2 Designing Survey Instruments 8 3.1.3 Pre-testing the survey instruments 8 3.1.4 Implementing the survey 9 3.1.5 Analyzing survey results 9 3.1.6 Preparing a draft report and compendium with illustrations of examples of ‘soft’ measures 9 4 ADAPTATION MEASURES – HARD ENGINEERING SOLUTIONS 10 4.1 Introduction 10 4.2 Historical Perspective 10 4.3 Types of Hard Engineering Adaptation Measures 11 4.3.1 Erosion Mitigation Measures 14 4.3.2 Island Access Infrastructure 35 4.3.3 Rainfall Flooding Mitigation Measures 37 4.3.4 Measures to reduce land shortage and coastal flooding 39 4.4 Perception towards hard engineering Solutions 39 4.4.1 Resort Islands 39 4.4.2 Inhabited Islands 40 5 ADAPTATION MEASURES – SOFT ENGINEERING SOLUTIONS 41 5.1 Introduction 41 5.2 Historical Perspective 41 5.3 Types of Soft Engineering Adaptation Measures 42 5.3.1 Beach Replenishment 42 5.3.2 Temporary
    [Show full text]
  • Behind the Scenes
    ©Lonely Planet Publications Pty Ltd 179 Behind the Scenes SEND US YOUR FEEDBACK We love to hear from travellers – your comments keep us on our toes and help make our books better. Our well-travelled team reads every word on what you loved or loathed about this book. Although we cannot reply individually to your submissions, we always guarantee that your feedback goes straight to the appropriate authors, in time for the next edition. Each person who sends us information is thanked in the next edition – the most useful submissions are rewarded with a selection of digital PDF chapters. Visit lonelyplanet.com/contact to submit your updates and suggestions or to ask for help. Our award-winning website also features inspirational travel stories, news and discussions. Note: We may edit, reproduce and incorporate your comments in Lonely Planet products such as guidebooks, websites and digital products, so let us know if you don’t want your comments reproduced or your name acknowledged. For a copy of our privacy policy visit lonelyplanet.com/ privacy. OUR READERS ACKNOWLEDGMENTS Many thanks to the travellers who used the Climate map data adapted from Peel MC, Finlayson last edition and wrote to us with helpful BL & McMahon TA (2007) ‘Updated World Map of the hints, useful advice and interesting anec- Köppen-Geiger Climate Classification’, Hydrology and dotes: Earth System Sciences, 11, 163344. Barney Smith, Johann Schelesnak, Juan Miguel Mariatti, Kevin Callaghan Cover photograph: Hammock on tropical beach, Maldives; Sakis Papadopoulos, Corbis AUTHOR THANKS Tom Masters A huge thanks first of all to Moritz Estermann, who was my companion for much of my trip, and who provided excellent guidance on fine food and wine, was an expert with pillow menus and remained positive through some of the worst weather I’ve ever seen in Maldives.
    [Show full text]
  • Hunan Roads Development III Project
    PD ASIAN DEVELOPMENT BANK RRP: MLD 33218 REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE BOARD OF DIRECTORS ON A PROPOSED LOAN TO THE REPUBLIC OF THE MALDIVES FOR THE REGIONAL DEVELOPMENT PROJECT, PHASE II – ENVIRONMENTAL INFRASTRUCTURE AND MANAGEMENT April 2005 CURRENCY EQUIVALENTS (as of 14 April 2005) Currency Unit – rufiyaa (Rf) Rf1.00 = $0.077 $1.00 = Rf12.96 ABBREVIATIONS ADB – Asian Development Bank ADP – atoll development plan EIRR – economic internal rate of return GDP – gross domestic product IsDB – Islamic Development Bank IDC – island development committee IDP – island development plan IEE – initial environmental examination IS – international shopping MEC Ministry of Environment and Construction MHUDB – Maldives Housing and Urban Development Board MOAD – Ministry of Atolls Development MOFAMR – Ministry of Fisheries, Agriculture and Marine Resources MOFT – Ministry of Finance and Treasury MOH – Ministry of Health NPSC – national project steering committee MWSA – Maldives Water and Sanitation Authority O&M – operation and maintenance PHAST – Participatory Hygiene and Sanitation Transformation PIU – project implementation unit PMU – project management unit PPMS – project performance management system RPAC – regional project advisory committee TEAP – Tsunami Emergency Assistance Project UNDP – United Nations Development Programme UNICEF – United Nations Children’s Fund WDC – women’s development committee GLOSSARY Central Regions — Group of 13 atolls, part of the Maldives, between 1o and 6 oN, 72-74 oE. It comprises the South Central, Central, and North Central regions. Community — The community-based approach to management of utility management services and facilities, including sanitation and sewage treatment and solid waste management. Cooperative — Commercial enterprise owned and managed by and for the benefit of customers or workers.
    [Show full text]
  • Cowry Shell Money and Monsoon Trade: the Maldives in Past Globalizations
    Cowry Shell Money and Monsoon Trade: The Maldives in Past Globalizations Mirani Litster Thesis submitted for the degree of Doctor of Philosophy The Australian National University 2016 To the best of my knowledge the research presented in this thesis is my own except where the work of others has been acknowledged. This thesis has not previously been submitted in any form for any other degree at this or any other university. Mirani Litster -CONTENTS- Contents Abstract xv Acknowledgements xvi Chapter One — Introduction and Scope 1 1.1 Introduction 1 1.2 An Early Global Commodity: Cowry Shell Money 4 1.2.1 Extraction in the Maldives 6 1.2.2 China 8 1.2.3 India 9 1.2.4 Mainland Southeast Asia 9 1.2.5 West and East Africa 10 1.3 Previous Perspectives and Frameworks: The Indian Ocean 11 and Early Globalization 1.4 Research Aims 13 1.5 Research Background and Methodology 15 1.6 Thesis Structure 16 Chapter Two — Past Globalizations: Defining Concepts and 18 Theories 2.1 Introduction 18 2.2 Defining Globalization 19 2.3 Theories of Globalization 21 2.3.1 World Systems Theory 21 2.3.2 Theories of Global Capitalism 24 2.3.3 The Network Society 25 2.3.4 Transnationality and Transnationalism 26 2.3.5 Cultural Theories of Globalization 26 2.4 Past Globalizations and Archaeology 27 2.4.1 Globalization in the Past: Varied Approaches 28 i -CONTENTS- 2.4.2 Identifying Past Globalizations in the Archaeological 30 Record 2.5 Summary 32 Chapter Three — Periods of Indian Ocean Interaction 33 3.1 Introduction 33 3.2 Defining the Physical Parameters 34 3.2.1
    [Show full text]
  • 37327 Public Disclosure Authorized
    37327 Public Disclosure Authorized REPUBLIC OF THE MALDIVES Public Disclosure Authorized TSUNAMI IMPACT AND RECOVERY Public Disclosure Authorized Public Disclosure Authorized JOINT NEEDS ASSESSMENT WORLD BANK - ASIAN DEVELOPMENT BANK - UN SYSTEM ki QU0 --- i 1 I I i i i i I I I I I i Maldives Tsunami: Impact and Recovery. Joint Needs Assessment by World Bank-ADB-UN System Page 2 ABBREVIATIONS ADB Asian Development Bank DRMS Disaster Risk Management Strategy GDP Gross Domestic Product GoM The Government of Maldives IDP Internally displaced people IFC The International Finance Corporation IFRC International Federation of Red Cross IMF The International Monetary Fund JBIC Japan Bank for International Cooperation MEC Ministry of Environment and Construction MFAMR Ministry of Fisheries, Agriculture, and Marine Resources MOH Ministry of Health NDMC National Disaster Management Center NGO Non-Governmental Organization PCB Polychlorinated biphenyls Rf. Maldivian Rufiyaa SME Small and Medium Enterprises STELCO State Electricity Company Limited TRRF Tsunami Relief and Reconstruction Fund UN United Nations UNFPA The United Nations Population Fund UNICEF The United Nations Children's Fund WFP World Food Program ACKNOWLEDGEMENTS This report was prepared by a Joint Assessment Team from the Asian Development Bank (ADB), the United Nations, and the World Bank. The report would not have been possible without the extensive contributions made by the Government and people of the Maldives. Many of the Government counterparts have been working round the clock since the tsunami struck and yet they were able and willing to provide their time to the Assessment team while also carrying out their regular work. It is difficult to name each and every person who contributed.
    [Show full text]
  • Escape to Paradise
    ESCAPE TO PARADISE ANGSANA.COM WELCOMEWELCOME TO TO ANGSANA ANGSANA IHURU IHURU STYLISH LIVING An Anisland island retreat retreat set on set North on MaléNorth Atoll Malé with Atoll azure with waters azure waters Complementing the energising vibe of crisp ocean air, the cheery boasting jaw-dropping visibility, a spectacular sweep of boasting jaw-dropping visibility, a spectacular sweep of Beachfront Villa (57sqm) interior of the Beachfront Villa is tinged with stimulating lime-green powder-white beach, breathtaking sunset panoramas and and tangerine orange accents. Put up your feet and tan on the a relaxedpowder-white atmosphere, beach, the reasons breathtaking for staying sunset at Angsana panoramas and a lounger, nap on the verandah or catch some air on our Maldivian Joli Ihuru are crystal-clear. relaxed atmosphere, the reasons for staying at Angsana Ihuru swing. This villa sleeps up to four guests. Thisare laidback crystal-clear. paradise is a 20–minute speedboat ride away from Malé International Airport and a world apart from the daily grind. This laidback paradise is a 20–minute speedboat ride away from Malé International Airport and a world apart from the daily grind. Haa Alif Atoll Haa Dhall Atoll Shaviyani Atoll Bubble over with beachside bliss and enjoy a soak in your private Beachfront Jet-Pool Villa (68sqm) jet-pool. Sheltered by leafy trees, swaying palms and flowering shrubs, Noonu Atoll the Beachfront Jet-pool Villa, is the perfect coastal hideout for up to four guests. Go on a digital detox and read a paperback on your Raa Atoll spacious porch, rinse off in your outdoor shower and chill out with family and friends at this oceanfront playground.
    [Show full text]